Loading...
HomeMy WebLinkAbout20200999.tiffRESOLUTION RE: APPROVE GRANT APPLICATION FOR ENERGY AND MINERAL IMPACT ASSISTANCE FUND (EIAF) PROGRAM FOR COUNTY ROADS 80 AND 37 DESIGN BUILD PROJECT (APRIL CYCLE -TIER II) AND AUTHORIZE ELECTRONIC SUBMITTAL WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Grant Application for the Energy and Mineral Impact Assistance Fund (EIAF) Program for the County Roads 80 and 37 Design Build Project (April Cycle -Tier II) from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to the Colorado Department of Local Affairs, with further terms and conditions being as stated in said application, and WHEREAS, after review, the Board deems it advisable to approve said application, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Grant Application for the Energy and Mineral Impact Assistance Fund (EIAF) Program for the County Roads 80 and 37 Design Build Project (April Cycle -Tier II) from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, to the Colorado Department of Local Affairs, be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Department of Public Works, be, and hereby is, authorized to submit electronically. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 30th day of March, A.D., 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: dithiv p,ok, Mike Freeman, Chair Weld County Clerk to the Board BY: l L Deputy Clerk to the Board APPROVED AS ounty At y Date of signature: 03/30/20 cc: Pc.)(sS/ER/cN), A cT(sc/cD) 03/3 0/20 Ste Kevin D. Ross 2020-0999 EG0078 Cam► -�� W#3'1 MEMORANDUM TO: Board of County Commissioners DATE: March 30, 2020 FROM: Stacey Swanson, Public Works Budget & Finance Manager SUBJECT: DOLA Applications— 2020 April Cycle In accordance with the work session with the Board of County Commissioners held on March 16, 2020, Public Works is requesting the Commissioners submit two energy and mineral impact grants to the Department of Local Affairs (DOLA) on April 1, 2020. The first grant request is for a Tier 1-$200,000 application for funding to assist with full depth reconstruction (FDR) of approximately 3.5 miles of WCR 6 from WCR 19 to the US 85 Highway. Public Works will mill off the asphalt to a depth suitable for mixing into the subgrade, then use cement -treated base (CTB). This will complete improvements on this haul route to assist with increased truck traffic. AE- The second grant request is for a Tier 2 -$1,000,000 application to hire a design/build contractor to create the design and construct the improvement of the WCR 80 and WCR 37 intersection. This project will including paving a portion of WCR 80 east of the intersection to meet the current pavement, aligning the intersection, improving site distance, and building a new wider bridge on WCR 80 over the Larimer/Weld canal. Staff recommends authorization of signature on the DOLA applications. I am available at your convenience to further discuss this matter. 2020-0999 ,o5/5o E oc 7S FY 2019 April 1 EIAF Tier I or Tier II Grant Application Local Government/Organization: Weld County Application Overview You are Required to Work with your Regional Field Manager prior to Completing your Application The Department of Local Affairs' (DOLA) Energy and Mineral Impact Assistance Fund (EIAF) program was created to assist political subdivisions that are socially and/or economically impacted by the development, processing, or energy conversion of minerals and mineral fuels. Funds come from the state severance tax on energy and mineral production and from a portion of the state's share of royalties paid to the federal government for mining and drilling of minerals and mineral fuels on federally -owned land. The creation of the fund is outlined in C.R.S. 34-63-102 (Federal Mineral Lease) and C.R.S. 39-29-110 (Severance). Grant dollars are to be awarded for the planning, design, construction, and maintenance of public facilities and for the provision of services by political subdivisions. NEW: Your application in this cycle requires that you answer TWO new questions. One question asks you to describe how your project addresses the Governor's key issues and the other question asks you to describe the outcomes your project will achieve. There are no other programmatic changes, just the addition of these two questions. A. APPLICANT/CONTACT INFORMATION 1. Local Government/Organization: Weld County In the case of a multi -jurisdictional application, select the other participating eligible organizations: 2. Principal Representative: (In the case of a multi -jurisdictional application, principal representative of the lead organization.) Honorific: Commissioner First Name: Mike Middle Name: Last Name: Freeman Suffix: Role: Chief Elected Mailing Address: PO Box 758 Address 2: City: Greeley State: CO Zip Code: 80632-0758 Phone #: 970-400-4200 Email Address: mfreeman@weldgov.com 3. Responsible Administrator (will receive all mailings) for the Application: Honorific: First Name: Barbara Middle Name: Last Name: Connolly Suffix: Role: Fiscal Agent Mailing Address: PO Box 758 Address 2: City: Greeley State: CO Zip Code: 80632-0758 Phone #: 970-400-4445 Email Address: bconnolly@weldgov.com B. CHIEF ELECTED OFFICIAL INFORMATION Please provide contact information for the chief elected official. a. Name In the case of a multi -jurisdictional application, chief elected official of the "lead" political subdivision. Mike Freeman b. Title Chair c. Street Address PO Box 758 d. City Greeley e. State Please use the two -letter abbreviation CO f. Zip 80632 g. Phone 970-400-4445 h. Email Address BOCC-Contracts@weldgov.com C. PROJECT DESCRIPTION AND DEMOGRAPHIC INFORMATION a. Project Title WCR 80 & 37 Design Build Project b. Amount of grant funds requested * The amount requested should equal "Grant Request Total" line from the project budget below. $ 1,000,000 c. Matching Funds $ 4,106,802 d. Description of the project scope of work Description of the various tasks involved in the project including specific data such as quantities, mileage, square feet, linear ft. etc. as well as specific project location within city and/or county etc. Weld County requests funding to hire a contractor to assist with intersection safety improvements at WCR 80 and WCR 37 in two phases. 1) Design improvements; obtain ROW; and 2) Reconstruction of a bridge over the Larimer/Weld canal, raising the intersection to correct sight distance, and realigning the intersection to meet WCR 37, including utility relocation, and improving the longevity of the heavily truck traffic road. WCR 80 will also be paved approximately one - quarter mile to the west to meet the current pavement. This intersection, located in the Northwest area of Weld County, is a major North/South agriculture and oil and gas route. With traffic continuing to increase due to the oil and gas industry, and the upcoming closure of both intersections at WCR 78 and US 85/Union Pacific Railroad, and Union Pacific Railroad/US 85 and WCR 37, this intersection needs improvements to handle the increased traffic directed to WCR80 and this intersection. Traffic who usually travel WCR 78 east of US 85 and WCR 37 north of US 85, will be using WCR 80 as an alternative route to access their farms, homes and oversized tank batteries containing oil and gas on WCR 37 and WCR 78. Currently, the bridge over WCR 80 is narrow, the intersection has poor site distance due to the canal and the hills to the north and east and the curvature of the WCR 80 at the intersection. In its current state, this intersection is unable to handle future traffic increases. e. Describe the problem, opportunity or challenge that resulted in the request. f. Local Priority If more than one application from the same government (1 of 2, 2 of 2, etc.) 1 g. State historic registry designation Is the project on a State registered historic site or in a State registered Historic District? No e.1 State historic registry number If the project is on the state registry, please provide the registry number. The department may need to seek a determination of effect from the State Historic Society. h. 2010 population of the applicant jurisdiction 252,625 i. Current population Current/most recent conservation trust fund/lottery distribution estimate is acceptable. 333,006 i.1 Current population estimate source DOLA j. 5 -year population projection 383,961 j.1 Population projection source DOLA k. Have you contacted your DOLA regional manager to discuss this project? You are required to contact your DOLA regional manager prior to submitting your application. Please indicate the date and method of your contact with your regional manager. Y k.1 Date You are required to complete this field. 03/10/2020 k. 2 Method of contact You are required to complete this section. In person I. Supporting documents Upload any supporting documents (PDF document). DOLA Tier I EIAF Application Map (will upload) D. DEMONSTRATION OF NEED The statutory purpose of the Energy and Mineral Impact Assistance program is to provide financial assistance to "political subdivisions socially or economically impacted by the development, processing or energy conversion of minerals and mineral fuels." a. Demonstration of need Why is the project needed at this time? WCR 37 is an important North/South collector roadway in Weld County. The road is busy due to numerous oil & gas wells in the vicinity, a large produce farm one -quarter mile from the intersection, all which require truck traffic to haul their goods. WCR 80 connects to US 85 and will be one of a few crossings of Union Pacific Railroad in the area. Traffic that normally utilizes WCR 78 or WCR 37 from US 85 east and north, will now be required to travel alternate routes. Additionally, three Econodes are located within a mile of the intersection. b. Project implementation How does the implementation of this project address the need? The completion of this project will serve the oil & gas industry with increased safety and an extended life of the road. It will also serve the increased road traffic due to the Union Pacific Railroad closures. By aligning the intersection and replacing the bridge over the canal, the roads and intersection will be better equipped. c. Does this project address the stated need Does this project, as identified in this application, completely address the stated need? If not, please describe additional work or phases and the estimated time frame. Do you anticipate requesting Energy and Mineral Impact Assistance funds for future phases? Yes, improvement to the WCR 80 and WCR 37 intersection addresses the safety and traffic volume needs for this portion of the roadway. Weld County will not be requesting additional funding for future projects at this intersection. d. What other implementation options have been considered? Weld County is trying to be proactive on improving this oil & gas haul route and planning for future increased traffic when WCR 78 at US 85 and WCR 37 at US 85 intersections are closed. ee What are the consequences if the project is not awarded funds? If funding is not awarded, the traveling public and truck traffic will be in danger of crashes and road deterioration over time. Since this will be a major entry route from US 85, the need for improvement is high. E. Current year financial information Please upload the completed current year financial information attachment (PDF format) a. Assessed Valuation (AV) most recent year $15,488,048,362 b. Total Mill Levy 15.038 c. Property Tax Revenue Generated (mill levy x AV/1000) $232,909,271,267 d. Sales Tax rate 0% d.1 Sales Tax Estimated Annual Revenue $0.00 e. General Fund Budgeted Revenue $161,061,234 f. General Fund Budgeted Expenditures $158,619,734 g. General Fund Balance as of December 31St of the previous year $XXXXXXXXX h. Portion of General Fund which is unassigned $18,041,500 i. Total Budgeted Revenue (all funds) $396,065,269 j. Total Budgeted Expenditures (all funds) $356,574,757 K. Total Fund Balance (all funds) $153,750,512 I. total Outstanding Debt (all funds) $0.00 Co -applicant Financials (where applicable) upload Special Fund(s) For projects to be managed through a Special Fund other than the General Fund (e.g. County Road and Bridge Fund) or managed through an Enterprise Fund a. Identify the relevant Special Fund or Enterprise Fund (only if needed) Public Works a.1 Special or Enterprise Fund Budgeted Revenue $65,540,797 a.2 Special or Enterprise Fund Budgeted Expenditures $65,348,108 a.3 Special or Enterprise Fund Outstanding Debt $0.00 a.4 Special Fund Mill Levy 1.550 a.5 Special or Enterprise Fund Balance as of December 31st of previous year If more than one Specialized or Enterprise Fund add more For Water and Sewer Projects Only Water Tap Fee Number of total water taps served by applicant Average Water Monthly User Charge Sewer Tap Fee Number of total sewer taps served by applicant Average Sewer Monthly Water Charge F. Project budget Please upload the project budget worksheet (PDF) Expenditures List Budget Line Items and Costs Budget Line Item Design Services Budget Line Item ROW/Easements Services Budget Line Item Materials Testing Services Budget Line Item Misc. Budget Line Item Construction Estimate Budget Line Item Utility Relocations Line Item Cost $ 544,000 Line Item Cost $ 800,000 Line Item Cost $ 75,000 Line Item Cost $ 20,000 Line Item Cost $2,667,802 Line Item Cost $1,000,000 $xxxxxxx Sources of Revenue Dollar for Dollar Cash Match is Required Energy/Mineral Impact Fund Grant Request $1,000,000 Energy/Mineral Impact Fund Loan Request (if applicable) $0.00 Source of Revenue/Match Cash $4,106,802 In -kind $0.00 Funding Committed? Yes or No Project contingency Please identify the contingency associated with the project budget. 1. If a contingency has not been identified as part of the budget, please explain why not? 2. Contingency % of Budget. 3. Contingency Dollar value 1. Weld County will absorb any costs 2. 0% of Budget 3. $0.00 How recently were the budget and contingency determined Month/Year 3/15/2020 G. MEASURABLE OUTCOMES What does this date €man? Stacey a. Describe the expected measurable outcomes How will the project enhance the livability* of your region, county, city, town or community (e.g. constructing a new water plant will eliminate an unsafe drinking water system and provide safe and reliable drinking water; the construction of a new community center will provide expanded community services, or projects achieving goals regarding energy conservation, community heritage, economic development/diversification, traffic congestion, etc.)? *(Livability means increasing the value and/or benefit in the areas that are commonly linked in community development such as jobs, housing, transportation, education, emergency mitigation, health and environment) The intersection improvements will enhance the increased traffic traveling from US 85, Ault, Eaton, and oil and gas truck traffic to and from the nearby Econodes. It will provide safe travel for oil/gas hauling, school buses, emergency vehicles and the traveling public, and add years of life to the existing roadway by using innovative technology at the sub -grade level, which will help with truck traffic deterioration. b. Historic structure preservation Does this project preserve and protect a registered state historic building, facility or structure? If yes, please describe, including year of construction. N/A, no historic building, facility, or structure is involved in the project. c. Energy efficiency Will this project implement an energy efficiency/strategy that could result in less carbon footprint or conserve energy use or capitalize on renewable energy technology? If yes, please describe. (word limit: 2,500 characters) Yes, Public Works will mill and recycle the asphalt materials and will reduce emissions as traffic at this intersection will flow and move through more quickly. The project will be constructed in concrete, which will significantly increase the maintenance life cycle in comparison to asphalt. d. Resiliency framework Will the project increase the community's long-term resilience and ability to anticipate, withstand, and/or rebound from a natural or manmade hazard event? For example, will the project factor in natural design concepts and will construction utilize sustainable materials? If yes, please describe Yes, utilizing the knowledge of the 2013 floods will help us design a more resilient intersection to protect the infrastructure investment from any future flood events. H. LOCAL EFFORT a. Relationship to Community Goals Is the project identified in the applicant's budget or a jurisdictionally approved plan (e.g. capital improvement plan, equipment replacement plan, comprehensive plan, utility plan, road maintenance and improvement plan or other local or regional strategic management or planning document)? What is its ranking? Yes, this project has been identified in the Public Capital Improvement Projects plan and general fund budget. b. Why can't this project be funded locally? Weld County needs all the funding assistance it can have since we are the most impacted oil and gas county in Colorado. With 3,000 miles of road to maintain, Weld County cannot fund improvements to all impacted roads and appreciates strategic funding assistance. c. Has this project been deferred because of lack of local funding? If so, how long? No, this is a project related to the closure of nearby county roads along US 85. d. Explain the origin and status of your local cash match. (Note: Whenever possible, local government cash match on a dollar for dollar match basis is encouraged.) Are the local funds committed or pending? If there are pending funds, when will the status of those funds be determined? The project will be funded out of Public Works 2020 General Fund. e. Community partners What other community entities, organizations, or stakeholders recognize the value of this project and are collaborating with you to achieve increased livability of the community? Please describe how your partners are contributing to achieve the improvement to the livability of the community through this project. If in -kind contributions are included in the project budget; detailed tracking will be required on project monitoring report. Motorists utilizing these roads appreciate the value of this safety project, especially residents from Ault, Eaton and rural areas. These roads are important collector connectors between Ault, Eaton and US 85. Weld County's population is increasing in this area and motorists including school buses, agriculture equipment, residents, oil and gas trucks and the Ault and Eaton Fire authorities, will recognize the value of this project. f. Tax rate, usage charges, or fees Have the applicant's tax rates, user charges or fees been reviewed recently to address funding for the proposed project? Yes f.1 Tax rate or usage charge modifications If the tax rate, user charges or fees were modified, what was the modification and when did this change occur? Weld County has been directing the revenues from the Specific Ownership Tax to Public Works since 1985. g. Has the applicant contacted representatives from local energy or mineral companies to discuss the project? If yes, when was the contact and what was discussed? Yes, impacted roadways are discussed at Weld County's Oil and Gas Working Group regular meetings. The Oil & Gas Working Group consists of industry partners discussing impacts affecting everyone and problem solves how we can all work together to minimize or mitigate these problems. I. READINESS TO GO a. When will the project begin b. What is the time frame for completion? Select an Option With 3 months 3-6 months 6-9 months 9-12 months This will take longer than 12 months to complete. Will not be complete until the end of 2022. ROW acquisition, utility relocations and irrigation work will be the focus in 2021 and construction of the project in 2022. c. Is planning or design work a component of this project? Select ,` -` or No tW.5t c.1 What additional design work remains? What percentage of design work is complete? 100%. Since this is a Design -Build project the county will hire a qualified contractor to perform the design. c.2 How were project cost estimates determined? How did the applicant develop project cost estimates? Estimates were developed by professional engineers involved with the project design. c.3 Is the project supported by bids, professional estimates or other credible information? c.3.i Bids Please attach a copy of any supporting documents (PDF Document). c.4 Are any Local, State or Federal permits required before the project can proceed? No If yes, please describe and note the status of permit acquisition. No additional permits are required for this project because it will occur within the existing right-of- way J. ENERGY & MINERAL RELATIONSHIP a. Community energy or mineral impact Describe how the applicant is, has been, or will be impacted by the development, production, or conversion of energy and mineral resources Weld County is the #1 producing oil and gas county in the entire state and therefore is extremely impacted. Much of the road's traffic is due to oil and gas trucks. As of December 2017, Weld County has 23,708 active wells, which emphasizes why energy and mineral impacts to Weld County are primarily related to oil and gas truck traffic activities. b. Use data Cite actual use data that documents direct impact as it relates to the need for the project. For example, "heavy truck traffic directly related to energy development activities is impacting County Road X. a traffic count done in May 2015 showed energy related truck traffic increased from 100 trips per day to 300." WCR 80 is currently a local road but will be updated to collector determination once the transportation plan is updated. Current traffic volumes on WCR 80 are 42 vehicles per day (vpd) with 37% truck traffic. This count was taken on 3/18/2020. WCR 37 is a collector road and will only be accessible from WCR 80 after the closure at WCR 78/US85. A traffic count done on March 18, 2020 showed energy related truck traffic at 6% and 468 vehicles per day. WCR 78 currently has 69 vpd and 25% truck traffic, which will be rerouted to WCR 80 and WCR 37 after the closure at WCR 78/US 85. K. MANAGEMENT CAPACITY a. Fund management How will you separate and track expenditures, maintain funds and reserves for the capital expenditures and improvements as Weld County's Accounting Department is recognized as a Tier 3 local government by the State and can manage all invoicing information through Banner Accounting System. In addition, Public Works will use the project management software PubWorks to assist in administering the grant. described in this project? b. Project sustainability Describe the funding plan in place to address the new operating and maintenance expenses generated from the project? Weld County will utilize our HUTF funding in order to maintain this corridor. c. Expertise Describe the technical and professional experience/expertise of the person(s) and/or professional firms responsible to manage this project. Weld County Public Works has several engineers on staff and proven expertise in roadway improvement projects. Barbara Connolly is the point of contact for this grant and Elizabeth Relford will be responsible for managing the construction project. d. Duplication of services Does the project duplicate service capacity already establish? Is the service inadequate? Has consolidation of services with another provider been considered? Weld County Public Works has several engineers on staff and proven expertise in roadway improvement projects. Barbara Connolly is the point of contact for this grant and Elizabeth Relford will be responsible for managing the construction project. L. HIGH PERFORMANCE CERTIFICATION (HPCP) PROGRAM COMPLIANCE Colorado Revised Statutes (C.R.S. 24-30-1305.5) require all new facilities, additions, and renovation projects that meet the following criteria to conform with the High -Performance Certification Program (HPCP) policy adopted by the Office of the State Architect (OSA) if: &D The project receives 25% or more of state funds; and • The new facility, addition, or renovation project contains 5,000 or more building gross square feet; and The building includes an HVAC system; and • In the case of a renovation project, the cost of the renovation exceeds 25% of the current value of the property. The HPCP requires projects that meet the criteria above to achieve third party verification with the target goal of LEED Gold or Green Globes -Three Globes. Projects are strongly encouraged to meet the Office of the State Architect's (OSA) Sustainable Priorities in addition to the LEED prerequisites. Projects funded through DOLA that meet the above applicability criteria are required to complete the DOLA registration and tracking process. See DOLA's HPCP web page for more information or contact your DOLA regional manager. In instances where achievement of LEED Gold or Green Globe -Three Globes certification is not achievable, an applicant may request a modification of the HPCP policy or a waiver if certain conditions exist. DOLA staff will work with applicants to identify workable solutions to meet the program's intent to maximize building energy efficiencies Note: If this application is for design services for a planned building project that meets the HPCP applicability criteria and the applicant intends to seek state funding for 25% or more of the total project cost, then the design should maximize high performance building certification standards (by completing the HPCP checklist) and build in anticipated project costs, as appropriate. a. HPCP project details Is the applicant seeking state funding for 25% or more of the total project cost (including all phases, if applicable)? (If no, the project does not meet the HPCP requirement and the rest of this section does not need to be completed) Select Yes or b. HVAC details Does the building include an HVAC system? Select Yes or No b.1 Type of HVAC system Please select whether the HVAC is an upgrade or a new system from the following drop down: HVAC Upgrade New HVAC system c. Project type Please select the type of construction project: New construction Renovation New Construction and renovation c.1 Square footage in excess of 5,000 square feet Is the building square footage (new construction and/or renovation) 5,000 SF or more? Select Yes or No c.l Building square footage What is the building square footage, indicate whether the square footage is new, renovation, or both. d. Does the cost of renovation exceed 25% of the current value of the property? Select from the drop down list. Select Yes or No d.1. What is the current property value? Determine based on assessed or appraised value. What is the total project cost for the renovations? Please provide both amounts in your response. e. Does this project meet the HPCP criteria? Select Yes or No if you answered "yes" to questions a, b, c, and d, then your project meets the HPCP applicability criteria. Complete the HPCP registration form and preliminary checklist and upload below. (See DOLA's I-IPCP web page for registration and checklist form.) e.1 HPCP registration form and checklist If you answered yes above, please upload the HPCP registration and checklist form below. f. Third party verification Have you included any additional costs in this grant application for third party verification to comply with the High Performance Certification Program? Select Yes or No f.1 Third party verification cost If you answered yes above, please specify the estimated cost for third participation verification/certification f.2 Third party verification resources Select Yes or No Will you need assistance locating resources, third party consultants, or technical assistance for HPCP third party verification requirements, preparing cost estimates, or otherwise complying with the HPCP? f.2.i Third party verification resources required If you answered yes above, please describe the type of resource identification assistance you need. M. TABOR COMPLIANCE AND ENVIRONMENTAL REVIEW a. Voter authorization Does the applicant jurisdiction have voter authorization to receive and expend state grants without regard to TABOR spending limitations? No a.1 If yes, please explain Weld County has a high enough TABOR revenue limit to accept the funds and still be under the TABOR revenue limit. b. State severance funds If the applicant jurisdiction receives a grant with State Severance funds, will the local government exceed the TABOR limit and force a citizen property tax rebate? No b.1 If yes, please explain c. TABOR refunds No c.1 if yes, please explain d. Has the applicant sought voter approval to keep revenues above fiscal spending limits? No d.1 If yes, please explain N/A e. Spending limits Are there any limitations to the voter approved revenues? (e.g., Can revenues only be spent on law enforcement or roads?) Y e. 1 If yes, please explain All Weld County ad valorem tax levies for county purposes, when applied to the total valuation for assessment of the County, shall be reduced so as to prohibit the levying of a greater amount of tax revenue than was levied from ad valorem taxation in the preceding year plus five percent (5%) except to provide for the payment of bonds and interest thereon. f. Enterprise status If the applicant jurisdiction is classified as an enterprise under TABOR, will acceptance of a state grant affect this status? No N. ENVIRONMENTAL REVIEW Indicate below whether any of the proposed project activities: a. Will be undertaken in flood hazard areas? a.1 List flood plain maps/studies reviewed. Describe alternatives considered. FEMA FIRM PANELS: 1250: 100 Year A. This is only at the portion of the paved road where our paving of WCR 80 will meet the current paving, approximately 1/4 mile west of intersection of WCR 80/WCR 37. b. Will affect historical, archaeological, or cultural resources or be in a geological hazard area? Select from the drop -down menu. b.1 If yes, describe alternatives considered and mitigation proposed. c. Address any other public health or safety related concerns not previously identified Select from the drop -down menu c.1 If yes, please explain. O. OFFICIAL BOARD ACTION a. Date of official board action Enter the date this project was approved for submission by the board March 30, 2020 C PROJECT BUDGET List expenditures and sources of revenue for the uroject. The totals on each side of the ledger must equal, Expenditures Sources of Revenue (Dollar for Dollar Cash Match is Required, unless financial circumstance warrants a reduction) Funding Committed List Budget Line Items (Examples architect, engineenng, construction, equipment items, etc ) ' Line Item Expenditures_.'_ Line_Item Costs _ - List the sources of matching funds and indicate either cash or documentable in -kind contribution Total revenue must equal total expenditures - , ' Cash In -Kind ' List Yes or No next to each hne item Energy/Mineral Impact Fund Grant Request $1,000,000 Yes Contracted Construction $2,667,802 *Energy/Mineral Impact Fund Loan Request (If applicable) No Utility Relocations $1,000,000 Design Services $ 544,000 Weld County Cash $4,106,802 Yes ROW/Easements Services $ 800,000 Materials Testing Services $ 75,000 Misc $ 20,000 TOTAL $5,106,802 TOTAL $5,106,802 $ Camera: 2,208 m 40'34'13'N 104'43'13'W 1,496 m • 1T .At il�. L a krr Vt hi° Ilk 6TNFST 46 x Er.5 T, L 17 'r '1" tfle t • , , ^, 1. t w New Contract Request Entity Information Entity Name* Entity ID* COLORADO DEPARTMENT OF LOCAL @00003104 AFFAIRS Contract Names DOLA EIAF TIER II GRANT APPLICATION-WCR 80/VVCR37 DESIGN BUILD INTERSECTION IMPROVEMENTS Contract Status CTB REVIEW Contract ID 3492 Contract Lead* SSWANSON ❑ New Entity? Contract Lead Email sswanson@weldgov corn Department Project # Parent Contract ID Requires Board Approval YES Contract Description: DOIA EIAF TIER II GRANT APPLICATION -APRIL 2020 HIRE CONTRACTOR TO DESIGN/BUILD THE INTERSECTION OF WCR 80 & WCR 37 Contract Description 2 Contract Type* APPLICATION Amount* $1,000,000 00 Renewable* NO Automatic Renewal I Grant YES IGA Department PUBLIC WORKS Department Email CM- PublicWorks@weldgov corn Department Head Email CM-PubiicWorks- DeptHead@weldgov corn County Attorney BOB CHOATE County Attorney Email BCHOATE@CO WELD CO US Requested BOCC Agenda Date* 03/30/2020 Due Date 03/26/2020 Will a work session with BOCC be required?* HAD Does Contract require Purchasing Dept. to be included? Grant Deadline Date If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID Note the Previous Contract Number and Master Services Agreement Number should be left bEank if those contracts are riot in On Base Contract Dates Effective Date 08/01/2020 Termination Notice Period Review Date* 12/31/2022 Committed Delivery Date Renewal Date Expiration Date* 03/31/2023 Contact, Information Contact Info Contact Name Purchasing Purchasing Approver Approval Process, Department Head JAY MCDONALD DH Approved Date 03125/2020 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 03/30/2020 Originator SSWANSON Contact Type Contact Email Purchasing Approved Date Finance Approver BARB CONNOLLY Finance Approved Date 03/26/2020 Tyler Ref # AG 033020 Contact Phone 1 Legal Counsel BOB CHOATE Contact Phone 2 Legal Counsel Approved Date 03/26/2020 Hello