Loading...
HomeMy WebLinkAbout20201034.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 39 BETWEEN COUNTY ROADS 76 AND 78 FOR APPROXIMATELY FOUR (4) DAYS, FOR A CULVERT REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 39, between County Roads 76 and 78, be temporarily closed, with said closure being effective April 14, 2020, for approximately four (4) days for a culvert replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Cc : SoO&t),D i5Po-+ck,CSP o4,oq/2o 2020-1034 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 39 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 6th day of April, A.D., 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: di / jC/ 4;4A. Weld County Clerk to the Board Mike Freeman, Chair P Steve BY: reno, Pro -Tern Scat . James APP ounty At :rney Kevin D. Ross Date of signature: o4-/oOI /20 2020-1034 EG0024 MEMORANDUM TO: Clerk to the Board DATE: April 2, 2020 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 39 between WCR 76 and WCR 78 is closed from 4/14/2020 thru 4/17/2020 for a culvert replacement. WCR 394 between WCR 35 and WCR 37 is closed from 4/14/2020 thru 4/17/2020 for a culvert replacement. WCR 13 between WCR 36 and WCR 38 is closed from 4/21/2020 thru 4/24/2020 for a culvert replacement. See attached closure diagrams. 2020-1034 �I a. -0—,4—t 1 .UU41 (WOW 011013 Ovon WCR 78 re -or 44:1 9 t -r r r► a -��rt r • « -rte e • 't ,r tis--� grit s n e LL if 4 b.r1i EAGLE DR J ct cro WCR 76 WCR 76 WCR 76 • U) M Arc o U MCI I 'f 1 rt r) 2 ROAD CLOSED LOCAL TRAFFIC ONLY I 1 111-0.. 0- f • 41 -111.-41•411•1111•- •* • • --l- F • ! • 41 #-e. t ■ s 7ell" IR Ii i A L } r P u I b Irlir OM ME Ella MI a Mon. ellilfr Spe it is • 1 1 1 1 1 N j S Project # AN -59 Road closure description WCR 39 between WCR 76 and WCR 78 closed 4/14/2020 thru 4/17/2020 for culvert replacement Notice to Public Road signs and barricaded during closure Message boards to be used Detour Route WCR 76 between WCR 39 and WCR 41 1 mile gravel WCR 41 between WCR 76 and WCR 78 1 mile gravel WCR 78 between WCR 39 and WCR 41 1 mile gravel I t -- Notes ADT of WCR 39 is: 2118/2017 Culvert replaced is drainage with new 18" CSPA Mag chloride to be used for dust control Culvert is 30' north of WCR 76 on WCR 39 Placement of signs not to scale Date 4/2/2020 Prepared by LEE STEPHEN Hello