HomeMy WebLinkAbout20201034.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 39 BETWEEN COUNTY ROADS 76 AND 78 FOR
APPROXIMATELY FOUR (4) DAYS, FOR A CULVERT REPLACEMENT
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 39, between County Roads 76 and 78,
be temporarily closed, with said closure being effective April 14, 2020, for approximately four (4)
days for a culvert replacement, and further, that standard official traffic control devices shall be
erected at said closure giving notice of the restrictions.
Cc : SoO&t),D i5Po-+ck,CSP
o4,oq/2o
2020-1034
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 39
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 6th day of April, A.D., 2020.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: di / jC/ 4;4A.
Weld County Clerk to the Board
Mike Freeman, Chair
P
Steve
BY:
reno, Pro -Tern
Scat . James
APP
ounty At :rney
Kevin D. Ross
Date of signature: o4-/oOI /20
2020-1034
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: April 2, 2020
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 39 between WCR 76 and WCR 78 is closed from 4/14/2020 thru 4/17/2020 for a culvert replacement.
WCR 394 between WCR 35 and WCR 37 is closed from 4/14/2020 thru 4/17/2020 for a culvert replacement.
WCR 13 between WCR 36 and WCR 38 is closed from 4/21/2020 thru 4/24/2020 for a culvert replacement.
See attached closure diagrams.
2020-1034
�I a. -0—,4—t
1
.UU41
(WOW
011013
Ovon
WCR 78
re -or 44:1 9 t -r r r► a -��rt r • « -rte e • 't ,r tis--� grit s n e LL
if
4
b.r1i
EAGLE DR
J
ct
cro
WCR 76 WCR 76 WCR 76
•
U)
M
Arc
o
U
MCI
I
'f
1
rt
r)
2
ROAD CLOSED
LOCAL
TRAFFIC ONLY
I
1
111-0.. 0- f • 41 -111.-41•411•1111•- •* • • --l- F • ! • 41 #-e. t ■ s 7ell" IR
Ii
i
A
L
}
r
P
u
I
b
Irlir OM ME Ella MI a Mon. ellilfr Spe it is
•
1
1
1
1
1
N
j
S
Project # AN -59
Road closure description
WCR 39 between WCR 76 and WCR 78
closed 4/14/2020 thru 4/17/2020
for culvert replacement
Notice to Public
Road signs and barricaded during closure
Message boards to be used
Detour Route
WCR 76 between WCR 39 and WCR 41 1 mile gravel
WCR 41 between WCR 76 and WCR 78 1 mile gravel
WCR 78 between WCR 39 and WCR 41 1 mile gravel
I t --
Notes
ADT of WCR 39 is: 2118/2017
Culvert replaced is drainage with new 18" CSPA
Mag chloride to be used for dust control
Culvert is 30' north of WCR 76 on WCR 39
Placement of signs not to scale
Date
4/2/2020
Prepared by
LEE STEPHEN