Loading...
HomeMy WebLinkAbout20213461.tiffCDPHE COLORADO Department of Public Health S Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 December 6, 2021 To Whom it May Concern: RECEIVED DEC 1 0 2021 WELD COUNTY COMMISSIONERS On December 1, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for Pawnee Waste LLC - Pawnee Waste Landfill. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive 5., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director Publ, c Rev:e49 1a/ao 2 Cc'.FL.(TP), Hir(DSITR),po(.3-►+IER!cwbc) o6(t) 12/15121 2021-3461 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Pawnee Waste LLC - Pawnee Waste Landfill - Weld County Notice Period Begins: December 1, 2021 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Pawnee Waste LLC Facility: Pawnee Waste Landfill industrial waste disposal site 47368 County Road 118, Grover Weld County The proposed project or activity is as follows: The applicant proposes to operate three (3) new solidification basins for the solidification of oil and natural gas exploration and production (EEtP) waste and other petroleum contaminated, non -hazardous, non-EEtP liquid waste. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 16WE0530 are available on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation • Send an email to cdphe.commentsapcd@state.co.us • Send comments to our mailing address: Renee Lee Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.01 COLORADO Department of Public Health b Environment Hello