Loading...
HomeMy WebLinkAbout20213003.tiffRESOLUTION RE: APPROVE POSSESSION AND USE AGREEMENT FOR COUNTY ROADS 41 AND 66 INTERSECTION IMPROVEMENTS PROJECT AND AUTHORIZE CHAIR TO SIGN - DARYL AND DALENE SCHUMP WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with a Possession and Use Agreement for the County Roads 41 and 66 Intersection Improvements Project between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Daryl and Dalene Schump, with further terms and conditions being as stated in said agreement, and WHEREAS, after review, the Board deems it advisable to approve said agreement, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Possession and Use Agreement for the County Roads 41 and 66 Intersection Improvements Project between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and Daryl and Dalene Schump, be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 25th day of October, A.D., 2021. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ditifeA) ..k',[io%vk, Weld County Clerk to the Board BY: Deputy Clerk to the Boar APPR y Attorney Date of signature: I I/02.../O-1 Moreno, Chair Ste Scott K. James, Pro-Tem EXCUSED Perry L. Buck Lori Sai cc:PW(SM/FR/cw) tall /2( 2021-3003 EG0079 Q +vae l q k53z3 MEMORANDUM TO: Esther Gesick, CTB DATE: October 19, 2021 FROM: Clay Kimmi, P.E., Public Works SUBJECT: Possession and Use Agreement or Schump Property for ROW and Easements on the CR 66 & CR 41 Intersection Project Please place the attached possession and use agreement on the BOCC agenda. The agreement provides the County with access and use of the Schump property while the County Attorney continues to negotiate for the purchase of the property. The property is located near the west end of the property. The agreement was reviewed by the BOCC in a pass around that was returned on October 19, 2021. All five commissioners approved the recommendation to pay Mr. and Mrs. Schump $171,000 in exchange for the possession and use agreement. The agreement also provides access so the septic system can be replaced. Public Works has included the acquisition of this property in its 2021 budget. I will attend the BOCC meeting to answer any questions the BOCC may have. Page 1of1 M:\Active Projects\WCR 66 and WCR 41 Intersection \Design\ROW \Schump \Possession and Use\Schump P&U Agrrement Memo to CT] 2021-3003 Eci 0019 BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: CR 66 and CR 41 ROW Possession and Use Offer for the Schump Property DEPARTMENT: Public Works DATE: October 14, 2021 PERSON REQUESTING: Clay Kimmi Brief description of the problem/issue: Public Works is in the process of ROW acquisition for the CR 66 and CR 41 project which is slated to begin construction in November of 2022. During the design phase of the project, it was determined that the County would need to acquire ROW, permanent easements, and temporary construction easements from the Schump property, which is located on CR 66 at the west end of the project. The estimated acquisition cost is estimated to be more than $5,000, so the County's contracted ROW agent acquired an appraisal on the County's behalf and the landowner was given the option to obtain a separate appraisal. There have been two work sessions regarding this property. At the last work session, the Board directed staff to work with Mr. Schump to obtain the entire parcel. Since Mr. Schump had retained an attorney to represent him, Bob Choate from the County Attorney's Office started negotiations. Since Mr. Schump keeps changing his mind regarding the sale of the property, Bob negotiated a Possession and Use agreement that give the County possession and use of the property for $171,000. The agreement will allow the County to keep proceeding with the project utility relocations that need to occur on the property as well as allowing us to relocate the septic system and leach field. Our attorney's will keep negotiating with Mr. Schump and his attorney to obtain the property prior to the start of construction which will be in November of 2022. What options exist for the Board? (include consequences, impacts, costs, etc. of options): 1. The BOCC can opt to accept the possession and use agreement and continue to negotiate with the landowner for the purchase of the property. 2. The BOCC can ask for another work session to discuss the agreement and status of the negotiations. Recommendation: Public Works recommends Option 1 which is to accept the possession and use agreement and to continue to negotiate for the purchase of the property. Perry L. Buck Mike Freeman Scott K. James, Pro -Tern Steve Moreno, Chair Lori Sane Approve Schedule Recommendation Work Session Via ima t Other/Comments: Karla Ford From: Sent: S bj yes Lori Saine Weld County Commissioner, District 3 1150 O Street PO Box 758 Greeley CO 80632 Phone: 970-400-4205 Fax: 970-336-7233 Email: isaine ; efdgovaco Website: www.co.weld.co.us In God We Trust Lori Saine Tuesday, October 19, 2021 8:53 AM Karla Ford RE: Please Reply - Pass Around PW CR66 and CR41 ROW - Schump Property Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. Frm: Karla Ford <kford@weldgov.com> Sent: Tuesday, October 19, 2021 7:28 AM To: Lori Saine <lsaine@weldgov.com> Subject: Please Reply - Pass Around PW CR66 and CR41 ROW - Schump Property I;.. ; portance: High Please advise if you approve recommendation. Karla Ford g Office Manager, Board of Weld County Commissioners 1150 0 Street, P.O, Box 758, Greeley, Colorado 80632 :: 970.336-7204 :: kford@weldgov.com :: www, etdaov.com "Please note my working hours are Monday -Thursday 7:00a.m.-5;OQp. 0** 1 POSSESSION AND USE AGREEMENT THIS AGREEMENT is made this ZVI day of October 2021, by and between DARYL D. SCHUMP AND DALENE N. SCHUMP, whose address is 19755 County Road 66, Greeley, Colorado 80631, hereinafter collectively referred to as "Owner," and the WELD COUNTY, a body corporate and politic of the State of Colorado, by and through its Board of County Commissioners, whose address is 1150 'O' Street, Greeley, Colorado 80631 hereinafter referred to as "County." WHEREAS, Owner owns a parcel of real property described as Corrected Lot B of Recorded Exemption RE275, as depicted on that certain plat recorded in the records of the Weld County Clerk and Recorder at reception #3043674 (hereinafter referred to as "Property") also known as 19755 CR 66, and WHEREAS, County finds it necessary to rebuild and improve the intersection of Weld County Road 41 (hereinafter "WCR 41"), and Weld County Road 66 (hereinafter "WCR 66"), which will involve the realignment and construction of said roads, (hereinafter referred to as "Intersection Improvement Project"), and WHEREAS, Owner and County are currently negotiating the purchase and sale of the Property, or portions thereof, and WHEREAS, Owner wishes to cooperate with County in completing the Project. NOW, THEREFORE, the parties herein agree as follows: EXHIBITS INCORPORATED. The following exhibits are attached and incorporated into this Agreement. • Exhibit A — Legal description and depiction of right-of-way (ROW) — (the "Road ROW") • Exhibit B — Form, legal description, and depiction of temporary construction easement (TCE) for road construction — (the "Road Construction TCE") • Exhibit C — Terms of TCE for on -site wastewater treatment system (OWTS) relocation (the "OWTS TCE") • Exhibit D — Weld County Appraisal Requirements: Eminent Domain Appraisal Process and Report Outline • APPRAISAL: CONVEYANCE OF POSSESSION County agrees to pay Owner one hundred seventy-one thousand one hundred dollars ($171,100.00). Such payment is made to Owner in consideration of Owner's conveyance of possession of the property interests described in Exhibits A, B, and C, and shall be subject to the requirements of section 11I.4 below. Such payment shall be made to Owners within 15 days of the date of this Agreement. 4777042 Pages: 1 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO AI02o.21 + �a63063 LS* CAI &Li, II II are begun, this Possession and Use Agreement shall operate as a stipulation to immediate and continued possession of the property interests described in Exhibits A and B, pursuant to C.R.S. 38-1-105(6). • Except for the cost of Owner's Appraisal as described in Section 11.2 above, all compensation paid under this Agreement shall be deducted from any greater settlement amount, award, or verdict. In the event the ultimate settlement amount, award, or verdict is less than the compensation paid under this Agreement, the Owner shall not be required to refund the difference to the County. • The Parties agree that, in the event proceedings in eminent domain are begun, the valuation day for determining the amount of just compensation shall be the date of mutual execution of this Agreement. • MISCELLANEOUS: 1. This Agreement and the conveyance of the property made pursuant to the terms herein, shall be binding upon, all and inure to the benefit of and be enforceable by the parties and their heirs, executors, administrators, successors, and assigns. 2. This Agreement shall not be valid until it has been approved by the Board of County Commissioners of Weld County, Colorado or its designee. 3. No term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of the Colorado Governmental Immunity Act §24-10-101 et seq., as applicable now or hereafter amended. 4. It is expressly understood and agreed that the enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the undersigned parties and nothing in this Agreement shall give or allow any claim or right of action whatsoever by any other person not included in this Agreement. It is the express intention of the undersigned parties that any entity other than the undersigned parties receiving services or benefits under this Agreement shall be an incidental beneficiary only. 5. This Agreement including the Exhibits attached hereto and incorporated herein, contains the entire agreement between the parties with respect to the subject matter contained in this Agreement. This instrument supersedes all prior negotiations, representations, and understandings or agreements with respect to the subject matter contained in this Agreement. No oral representation, promise, or consideration different from the terms herein contained shall be binding on either party, or its agents or employees. This Agreement may be changed or supplemented only by a written instrument signed by both parties. 6. Colorado law, and rules and regulations established pursuant thereto, shall be 4777042 Pages: 2 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO VIII I�r�ll�'�ihi'�I�V�h4�'hy L�l�h�� PAWN! ! lit I lut 11111 • County agrees to reimburse Owner, or pay an invoice directly, for the costs of an appraisal ("Owner's Appraisal"), not to exceed ten thousand dollars ($10,000.00). Such appraisal shall meet the Weld County Appraisal Requirements as enumerated in Exhibit D. Such appraisal shall provide two alternative estimated values: one value for a full acquisition of Owner's Property, and one value for the partial acquisition of Owner's Property as described in Exhibits A and B. Such payment shall be in addition to the compensation to be paid to Owner for purchase and sale of the property interests described in section III below. • Owner hereby agrees to grant possession to County of the Road ROW and Road Construction TCE as described and depicted in Exhibits A and B, respectively. County shall be entitled to take possession of these property interests immediately upon execution of this Agreement. • Owner hereby agrees to grant possession to County of the OWTS TCE as described in Exhibit C. County shall be entitled utilize the OWTS TCE pursuant to the terms of Exhibit C, and for the sole purpose of constructing a new On -Site Wastewater Treatment System on the north side of the house. The parties recognize that, regardless of whether the County eventually purchases the entire Property or only the portions thereof described in Exhibits A and B, the Project will require the relocation of the OWTS to the north side of the property. County will coordinate with Owner to construct the OWTS in a new location to avoid interruption to the services provided by the existing OWTS. • EMINENT DOMAIN PROCEEDINGS • At the time of execution of this Agreement, the parties recognize that they have not yet agreed whether to a purchase and sale of the entirety of the Property, or a partial acquisition of ROW and TCE as described in Exhibits A and B. This agreement is made with the understanding the Parties will continue to negotiate in good faith to agree upon the final purchase price of the Property, or the portions thereof as described in Exhibits A and B. • In the event a settlement is not reached within one -hundred twenty (120) days of the signing of this agreement, or thirty (30) days of County's receipt of Owner's Appraisal as described in section II.1 above (whichever is earlier), such failure will be a confession that the negotiations have failed. Thereafter the County may begin proceedings in eminent domain to acquire title to the property described in Exhibits A and B. The County shall not unreasonably delay the commencement of proceedings under the eminent domain law once the time provided for in this paragraph has expired. The Parties agree that in the event that eminent domain proceedings are filed, valuation shall be the only triable issue. • If the County begins proceedings in eminent domain, this Agreement shall continue in effect until either a settlement is reached or a Rule and Order is entered by the court, as provided for in C.R.S. 38-1-105(3). If such proceedings 4777042 Pages: 3 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO VIII NIPIIu is JhalRhio'F4ultho trr4911 ki;4 W�h 1I II applied in the interpretation, execution, and enforcement of this Agreement. Any provision included or incorporated herein by reference which conflicts with said laws, rules and/or regulations shall be null and void. In the event of a legal dispute between the parties, Contractor agrees that the Weld County District Court shall have exclusive jurisdiction to resolve said dispute. • If any term or condition of this Agreement shall be held to be invalid, illegal, or unenforceable by a court of competent jurisdiction, this Agreement shall be construed and enforced without such provision, to the extent that this Agreement is then capable of execution within the original intent of the parties. County and Owner acknowledge that each has read this Agreement, understands it and agrees to be bound by its terms. Each has had an opportunity to seek legal counsel in relation to the obligations required by this Agreement. IN WITNESS WHEREOF, the parties have set their hands on the day and year first above written. OWNER: DARYL D. SCHUMP By: OWNER: DALENE N. SCHUMP By: ATTEST: „occifei) COMMISSIONERS Weld of ty Clerk to the BY. Deputy C 4777042 Pages: 4 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO VIII I illeflOII r: EIVF)ter' 1�1+Lf!AINiI II Date of Signature: Date of Signa BOARD OF COUNTY WELD COUNTY, COLORADO eve Moreno, Chair 0CT 2 5 2021 o2,OV -30453 EXHIBIT A Legal Description and Depiction of Public Road Right -of -Way (ROW) 4777042 Pages: 5 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO 111 I FJ1.71VIPM 40411laillight IC M'i" 111 III EXHIBIT CALL UTILITY NOTIF.CATION CENTER OF COLORADO t ..i..rs.>11iala CMS spa CAL_ 2-&.SINESS JAYS .V ADVANCE BE:ORE YOU DIG, GRADE OR EXCAVATE FOR. T --E MARKING OF JNDERGROUND MEMRFR OTh. •TIES WEST LINE OF LOT B SW1 /4, SE1 /4 S.20, T06N, R65W, 6th P.M. O Roy C ROW 05+00 STA: 106+93 35' 35.72'L. NO -1'33'13"W 21.44' STA: 106+94 70' r\ OFF 14.32'L 1299.55' Row-, ROW_ 106+00 EXISTING 40' RIGHT-OF-WAY RD-BK 2, PG 77 JULY 7, 1876 N W1 /4, NE1/4 1 /4 S.29, T06N, R65W, 6th P.M. 100 Section Line ROW-- -� R O W 200 FEET SCHUMP PARC. #080320000038 RECP.# 3043674 WD 3-21-2003 LOT -B RE -275 RECP.# 1874867 N N72°11'27"E 35.46' STA: 108+38 70' .\ OFF: 41 72'L N89°20'18"E 145.02' ROw ft 9 RO N85°36'35"W 180.01' RW-3 - 5,436 S.F.± S. LINE SE1 /4, SE1 /4 S.20, T06N, R65W WELD COUNTY ROAD 66 & WELD COUNTY ROAD 41 INTX. PLAN CENTERLINE NE1/4, NE1/4 S.29, T06N, R65W, 6th P.M. SE 1 /4, SE 1 /4 S.20, T06N, R65W, 6th P.M. EAST LINE OF LOT B S01°33'18"E 47.75' 00 110+00 N85°36'35"W 1299.55' ROw W'a 66 N` STA: 108;74671 OFF 5.63'L. ROW P.O.C. NE. COR. SEC.29 FOUND 2-1/2" ALUMINUM CAP (ILLIGIBLE) S82" 1052..E 1.128.590 (to P,O.C.) RIGHT OF WAY ACQUISITION DARYL & DARLENE SCHUMP 4777042 Pages: 6 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO III )jPI1r'JN'P#iCII1I PftRl.'$fr' idling couNTY WELD COUNTY DEPARTMENT OF PUBLIC WORKS WCR66&41 INTERSECTION PROJECT Project No: GR 45 Date: 08/17/2021 Drawn by: CGG Scale: 1"=100' Sheet 1 of 2 iui EXHIBIT CALL UTILITY NOTIFICATION CENTER OF COLORADO POW 0 se, se, S Cal us as CALL 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES WEST LINE OF LOT B SWl /4, SE1 /4 S.20, TO6N, R65W, 6th P.M. Rover__ 105+00 ROW LTA: 106+93 35'k OFF' 35 72'L N01 °33'13"W 21.44' STA: 106+94.70' OFF: 14.32'L ROW------ ROti.�_ RO'. 106+00 1299.55' Section Line ROW---- ROW-�_ ROW---__- EXISTING 40' RIGHT-OF-WAY RD-BK 2, PG 77 JULY 7, 1876 N W1 /4, N E1 /4 S.29, TO6N, R65W, 6th P.M. 100 ROW 200 FEET SCHUMP PARC.#080320000038 RECP.# 3043674 WD 3-21-2003 LOT -B RE -275 RECP,# 1874867 T N72°11'27"E 35.46' ISTA. 108+38 70' OFF 41.72'L N89°20'18"E 145.02' ROW Ray ROW SE 1 /4, SE 1 /4 S.20, TO6N, R65W, 6th P.M. EAST LINE OF LOT B STA: 108+72 33' OFF 53.33'L P O.B R1N-3 S01°33'18"E 47.75' 1 Q 0O 110+00 Rnv-ftt3Yj N85°36'35"w , 1299.55' RoW--4\----. ROW----� N85°36'35"W 180.01' RW-3 = 5,436 S.F.± S. LINE SE1/4, SE1 /4 S.20, TO6N, R65W -- WELD COUNTY ROAD 66 & WELD COUNTY ROAD 41 INTX. PLAN CENTERLINE RIGHT OF WAY ACQUISITION RW-3 NE1 /4, NE1 /4 S.29, TO6N, R65W, 6th P.M. DARYL & DARLENE SCHUMP 4777042 Pages: 7 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO I IPS:14:)MUKI:Rilli 1111 y HOti'+� W.C.R. 66 Rc7V'�ROWS_ R STA: 108+74 64' OFF: 5.63'L P.O.C. NE. COR. SEC.29 FOUND 2-1/2" ALUMINUM CAP (ILLIGIBLE) S82070'52 "E 1,128.59. (toP.o.c) WELD COUNTY DEPARTMENT OF PUBLIC WORKS WCR66&41 INTERSECTION PROJECT Project No: GR 45 Date: 08/1712021 Drawn by: CGG Scale: 1"=100' Sheet 1 of 2 EXHIBIT DESCRIPTION A parcel of land, No. RW-3, Weld County Project No. GR 45 containing 5,436 sq. ft. (0.125 acres), more or less, being a portion of land described in a deed, recorded on March 21ST, 2003, at Reception Number 3043674 in the office of the Weld County Recorder, specifically in a portion of Lot B of described in Correction Plat of Recorded Exemption 0803-20-4-RE275, recorded November 18, 1981 at Reception Number 1874867, in said office of the Weld County Recorder, being in the Southeast quarter of Section 20, Township 6 North, Range 65 West, of the 6th Principal Meridian, in Weld County, Colorado, said parcel being more particularly described as follows: COMMENCING at the corner common to Sections 20, 21,28 and 29, Township 06 North, Range 65 West, of the 6th Principal Meridian, thence N 85° 36' 35" W, along the South line of said Southeast quarter of Section 20, a distance of 1,126.57 feet, thence N 04° 23' 25" E, perpendicular to said South line, a distance of 67.50 feet to a point on the East line of said Lot B, said point being opposite and 53.33 feet Left of Engineer's Station 108+72.33 and the POINT OF BEGINNING; Thence S 01° 33' 18" E, along said East line, a distance of 47.75 feet to a point at its intersection with the North right of way line for Weld County Road 66 as described in Right of Way Road Book 2, Page 77, recorded July 7, 1876 being 40 feet in width, 20 feet on both sides of said South Line, said point being opposite and 5.63 feet Left of Engineer's Station 108+74.64; Thence N 85° 36' 35" W, along said North right of way line, a distance of 180.01 feet to a point at its intersection with said N orth right of way line and the West line of said Lot B, said point being opposite and 14.32 feet Left of Engineer's Station 106+94.70; Thence N 01° 33' 13" W, along said West line, a distance of 21.44 feet and to a point opposite 35.72 feet Left of Engineer's Station 106+93.35; Thence N 89° 20' 18" E, a distance of 145.02 feet to a point opposite and 41.72 feet Left of Engineer's Station 108+38.70; Thence N 72° 11 27" E, a distance of 35.46 feet to the POINT OF BEGINNING; whence the point of commencement bears S 82'10'52" E, a distance of 1,128.59 feet. The above described parcel contains 5,436 sq. ft. (0.125 acres), more or less. BASIS OF BEARINGS: Bearings used in the calculation of coordinates are based on a grid bearing of N10°45'13"W from CHARN point "CDOT MILE POST 270.44" (a survey disc on aluminum rod) Section 32, Township 6 North, Range 65 West, Sixth P.M., and CHARN point "HORA" (a survey disc set in concrete) Section 31, Township 7 North, Range 65 West, Sixth P .M. as obtained from Global Positioning System(GPS) survey based on the Colorado High Accuracy Network (CHARN) The Basis of Bearings was provided by Weld County for use on this project. DEA field verified the provided control and aliquot monumentation, and set local control based on said provided data. The Basis of bearings shown here came directly from provided Weld County data. Corey G. Guerrero P.L.S. 33654 For and on behalf of Horrocks Engineers 5670 Greenwood Plaza, Suite 125W Greenwood Village, CO 80111 RIGHT OF WAY ACQUISITION RW-3 DARYL & DARLENE SCHUMP • i a V are .♦ ;86 r N WELD COUNTY DEPARTMENT OF PUBLIC WORKS WC R 66 & 41 INTERSECTION PROJECT Project No: GR 45 Scale: i"=100' 4777042 Pages: 8 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO �IIIl�.rl�. ate: 08/17/2021 Drawn by: CGG Sheet 2 of 2 EXHIBIT B Form, Legal Description, and Depiction of Temporary Construction Easement (TCE) for Road Construction 4777042 Pages: 9 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO 1111 ���:Yb�r�h�� h��'Il�i�� iLIV UN, 111111 GRANT OF TEMPORARY CONSTRUCTION EASEMENT FOR ROAD CONSTRUCTION This Temporary Construction Easement (TCE), is made between Daryl D. Schump and Dalene N. Schump, whose address is 19755 County Road 66, Greeley, Colorado 80631 (collectively, "Owner"), and the County of Weld, a body corporate and politic of the State of Colorado, through its Board of County Commissioners (County): WITNESSETH: That Owner, for and in consideration made by County, the receipt and sufficiency of which is hereby acknowledged, does hereby dedicate and convey unto Owner a Temporary Construction Easement, covering that real property lying and being in the County of Weld, State of Colorado, to wit: the real property described and depicted on the attached Exhibit. Subject to the following conditions: 1. The TCE is conveyed from Owner to County immediately and shall expire and be of no further force or effect on December 31, 2023, or upon the County's determination that the Project is complete, whichever is earlier. 2. The right to use the TCE shall belong to the County and its agents, employees, designees, contractors, guests, invitees, successors and assigns, and all those acting by or on behalf of the County for the purpose of surveying, appraising, establishing, laying, constructing, reconstructing, installing, realigning, modifying, replacing, improving, adding, altering, substituting, operating, maintaining, accessing, inspecting, patrolling, protecting, or repairing the roadway improvements. 3. County shall have the right of ingress, egress, entry and access in, to, through, on, over, under, and across the TCE from any adjacent property to which County has legal access, for any and all purposes necessary and/or incident to the exercise by the County of the rights granted to it hereunder. At the expiration of the term of this TCE, County shall promptly repair any damage to Owner's property caused by County, its agents, employees, contractors, guests, invitees, and all those acting by or on behalf of County so as to maintain the Owner's property in substantially as good or better condition as existed prior to use by County. 4. County agrees that any current access to the property from the Right -of -Way shall remain open throughout the term of the TCE. 5. County and Owner recognize that the Owner's existing On -Site Wastewater Treatment System (OWTS), also known as a septic system, is located within the TCE area. Therefore, County agrees that its use of the TCE shall not interfere with Owner's use of the OWTS until such OWTS has been relocated to the north side of the house, as contemplated by Exhibit C to the Possession and Use Agreement. 4777042 Pages: 10 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO 11111 ! ' !':1 iI 1I 111 EXHIBIT IPM CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG GRADE OR EXCAVATE FOR THE MARKING OF UNDERGRO..IND MEMBER UTILITIES WEST LINE OF LOT B SW1/4, SE1 /4 S.20, T06N, R65W ROW--� ROW 4+00 -f `-- ROW 0 ROW Row 05+00 ROW STA: 106+91 56' OFF 4 11'L N01 °33'13"W 28.44' ROW 1299.55' ROW 106+00 ROVE -- EXISTING 40' RIGHT-OF-WAY RD-BK 2, PG 77 JULY 7, 1876 N W1 /4, NE1/4 S.29, T06N, R65W .• 1' ROW -- Section Line 100 200 FEET Row SCHUMP PARC. #080320000038 RECP.# 3043674 WD 3-21-2003 LOT -B RE -275 RECP.# 1874867 TOE- 3 = 4,681 S.F.± N60'16'56"E 76.17' STA. 108+04 42' OFF 60 47'L S46° 14'12"E 12.06' STA 107+00 60' 1 OFF 56 08'l 107+00 RiD,A DARYL & DARLENE SCHUMP 4777042 Pages: 11 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County CO N89°20' 18"E 103.43' ROW- _ S89°20'18"W 145.02' STA 108+38 70' OFF 41.72'L SE1 /4, SE1 /4 S.20, T06N, R65W EAST LINE OF LOT B STA: 108+70 05' OFF: 99 81'L S01 `33'18"E 46.54' STA: 108+72 33'' OFF 53.33'L S72°11'27"W 35.46' 109+00 N85°36'35"W Rove OW 1299.55' ROW ---- -WELD COUNTY ROAD 66 & WELD COUNTY ROAD 41 IN TX. PLAN CENTERLINE couNTY W.C.R. 66 S. LINE SE1 /4, SE1 /4 S.20, T06N, R65W NE1/4, NE1/4 S.29, T06N, R65W Maas P.O.C. NE. COR. SEC.29 FOUND 2-1 /2" ALUMINUM CAP (ILLIGIBLE) S83 '47140"E 1,304.51' (to P.O.C.) WELD COUNTY DEPARTMENT OF PUBLIC WORKS WCR66&41 INTERSECTION PROJECT 'roject No: GR 45 Scale: 1"=-100' ate 08/17/2021 Drawn by: CGG Sheet 1 of III hU�1Rlp h1�i'F{i�lYi��ICC4 FY�4Y�'� ��+I�RU�kNLY4� 11111 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2 -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER utu.ir,Es WEST LINE OF LOT B S W1 /4, SE 1 /4 S.20, T06N, R65W ROW---- ROW Rn+N N W1 /4, NE1/4 S.29, T06N, R65W 200 FEET TEMPORARY CONSTRUCTION EASEMENT DARYL & DARLENE SCHUMP 4777042 Pages: 12 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO EXHIBIT PARC. #080320000038 RECP.# 3043674 WD 3-21-2003 LOT -B RE -275 RECP.# 1874867 N89320'18"E 103.43' S89°20'18"W 145.02' WELD COUNTY ROAD 66 & WELD COUNTY ROAD 41 IN TX. PLAN CENTERLINE - J III rjiAr III SE1 /4, SE1 /4 S.20, T06N, R65W EAST LINE OF LOT B S01 °33'18"E 46.54' STA: 108+72.33' OFF 53.33'L S72°11`27"W 35.46' NE1/4, NE1/4 S.29, TO6N, R65W P.O.C. NE. COR. SEC.29 FOUND 2-1/2" ALUMINUM CAP (ILLIGIBLE) S83'4 7'40"E 1.304.51' (to P.O.C,) WELD COUNTY DEPARTMENT OF PUBLIC WORKS WCR 66 & 41 INTERSECTION PROJECT Project No: GR 45 Date: 08/17/2021 Drawn by: CGG Sheet 1 of 2 EXHIBIT Description A temporary construction easement, No. TCE-3, Weld County Project No. GR 45 containing 4;681 sq. ft. (0.107 acres), more or less, being a portion of land described in a deed, recorded on March 21ST, 2003, at Reception Number 3043674 in the office of the Weld County Recorder, specifically in a portion of Lot B of described in Correction Plat of Recorded Exemption 0803-20-4-RE275, recorded November 18, 1981 at Reception Number 1874867, in said office of the Weld County Recorder, being in the Southeast quarter of Section 20, Township 6 North, Range 65 West, of the 6th Principal Meridian, in Weld County, Colorado, said temporary construction easement being more particularly described as follows: COMMENCING at the corner common to Sections 20, 21,28 and 29, Township 06 North, Range 65 West, of the 6th Principal Meridian, thence N 85° 36' 35" W, along the South line of said Southeast quarter, a distance of 1,303.85 feet, thence N 04° 23' 25" E, perpendicular to said South line a distance of 41.33 feet to a point on the West line of said Lot B, said point being opposite and 35.72 feet Left of Engineer's Station 106+93.35 said point being the POINT OF BEGINNING; Thence N 01° 33' 13" W, along said West line of Lot B, a distance of 28.44 feet to a point opposite and 64.11 feet Left of Engineer's Station 106+91.56; Thence S 46° 14 12" E, a distance of 12.06 feet to a point opposite and 56.08 feet Left of Engineer's Station 107+00.60; Thence N 89° 20' 18" E, a distance of 103.43 feet to a point opposite and 60.47 feet Left of Engineer's Station 108+04.42; Thence N 60° 16' 56" E, a distance of 76.17 feet to a point opposite and 99.81 feet Left of Engineer's Station 108+70.05 on said East line of Lot B; Thence S 01° 33' 18" E, along said East line of Lot B, a distance of 46.54 feet to a point opposite and 53.33 feet Left of Engineer's Station 108+72.33; Thence S 72° 11' 27" W, departing said East line, a distance of 35.46 feet to a point opposite and 41.72 feet Left of Engineer's Station 108+38.70; Thence S 89° 20' 18" W, a distance of 145.02 feet to the POINT OF BEGINNING; whence the point of commencement bears S 83° 47' 40" E, 1,304.51 feet. The above described temporary construction easement contains 4,681 sq. ft. (0.107 acres), more or less_ BASIS OF BEARINGS: Bearings used in the calculation of coordinates are based on a grid bearing of N 10°45'13"W from CHARN point "CDOT MILE POST 270.44" (a survey disc on aluminum rod) Section 32, Township 6 North, Range 65 West, Sixth P.M., and CHARN point "HORA" (a survey disc set in concrete) Section 31, Township 7 North, Range 65 West, Sixth P.M., as obtained from Global Positioning System(GPS) survey based on the Colorado High Accuracy Network (CHARN) The Basis of Bearings was provided by Weld County for use on this project. DEA field verified the provided control and aliquot monumentation, and set local control based on said provided data. The Basis of bearings shown here came directly from provided Weld County data. Corey G. Guerrero P.L.S. 33654 For and on behalf of Horrocks Engineers 5670 Greenwooc Plaza, Suite 125W Greenwood Village, CO 80111 TEMPORARY CONSTRUCTION EASEMENT TCE-3 DARYL & DARLENE SCHUMP 4777042 Pages: 13 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO III )jP1$ \'?IW Pi?t vI1 111111 t NT Y WELD COUNTY DEPARTMENT OF PUBLIC WORKS WCR66&41 INTERSECTION PROJECT Project No: GR 45 Date: 08/17/2021 Drawn by: CGG Scale: 1"=100' Sheet 2 of 2 EXHIBIT C Terms of Temporary Construction Easement (TCE) for On -Site Wastewater Treatment System (OWTS) Relocation 4777042 Pages: 14 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO VIII r1inlia�ih+ill iFigi1l44riliMilS MAW h IIIII GRANT OF TEMPORARY CONSTRUCTION EASEMENT FOR RELOCATION OF ON -SITE WASTEWATER TREATMENT SYSTEM (OWTS) This Temporary Construction Easement (TCE), is made between Daryl D. Schump and Dalene N. Schump, whose address is 19755 County Road 66, Greeley, Colorado 80631 (collectively, "Owner"), and the County of Weld, a body corporate and politic of the State of Colorado, through its Board of County Commissioners (County): WITNESSETH: That Owner, for and in consideration made by County, the receipt and sufficiency of which is hereby acknowledged, does hereby dedicate and convey unto Owner a Temporary Construction Easement, covering all of that property described as Corrected Lot B of Recorded Exemption RE275, as depicted on that certain plat recorded in the records of the Weld County Clerk and Recorder at reception #3043674. Subject to the following conditions: 1. The purpose of this TCE is to allow County to construct an On -Site Wastewater Treatment System (OWTS), also known as a septic system, on the north side of Owner's house. County and Owner recognize that the County's Intersection Improvement Project will require the existing OWTS to be removed and relocated. 2. Prior to removal of the existing OWTS on the south side of the house, County agrees to construct a new OWTS on the north side of the house, generally in the area of the lawn adjacent to the house. County shall cause the OWTS construction to be substantially completed and operational within one -hundred eighty (180) days, by a contractor selected in accordance with County's competitive bidding requirements. In no event shall the existing OWTS be rendered non -operational prior to the completion and connection of the new OWTS. 3. County shall have the right to use the TCE area for all purposes that are reasonably necessary and incidental to accomplishing the purpose of this TCE, including but not limited to: surveying, appraising, establishing, laying, constructing, reconstructing, installing, realigning, modifying, replacing, improving, adding, altering, substituting, operating, maintaining, accessing, inspecting, patrolling, protecting, or repairing the OWTS improvements, including the storage of materials related to said OWTS improvements. 4. The right to use the TCE shall belong to the County and its agents, employees, designees, contractors, guests, invitees, successors and assigns, and all those acting by or on behalf of the County for any purpose authorized herein. 5. County shall have the right of ingress, egress, entry and access in, to, through, on, over, under, and across the TCE from any adjacent property to which County has legal access, for any and all purposes necessary and/or incidental to the exercise by the County of the rights granted to it hereunder. At the completion of the construction of the OWTS, County shall promptly repair any damage to Owner's property caused by 4777042 Pages: 15 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO VIII KC: "Ill County, its agents, employees, contractors, guests, invitees, and all those acting by or on behalf of County so as to maintain the Owner's property in substantially as good or better condition as existed prior to use by County. 6. County agrees that any current access to the property from the Right -of -Way shall remain open throughout the term of the TCE. 7. County shall be responsible for all costs relating to the construction of the new OWTS and such costs incurred by the County shall not be deducted from compensation ultimately paid by County to Owners for the acquisition of the property necessary for County's Intersection Improvement Project. County shall also be responsible for obtaining all necessary permits and approvals for the new OWTS. 4777042 Pages: 16 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO II EXHIBIT D Weld County Appraisal Requirements 4777042 Pages: 17 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , CO IIII KUM hilelliMIN Ill''ANAhRhYl kalYi ii Bill WELD COUNTY Appraisal Requirements: Eminent Domain Appraisal Process and Report Outline 1. Appraisal report must be prepared consistent with: the Uniform Standards of Professional Appraisal Practice (USPAP) and state law. 2. List the WELD COUNTY project number, and the numbered parcels that are the subject of the appraisal. 3. Compensation Summary: state the total compensation estimate and the effective date of value, and include a signed and dated certification of value and a statement of assumptions and limiting conditions. For partial acquisitions, show the separate allocation of total compensation for: parts acquired (fee simple and easement), (*) compensable damages, (-) specific benefits (see #19 below), (+) temporary easement value. 4. Describe the purpose of the appraisal and the property rights or interests appraised. Describe scope of work to develop the appraisal. 5. Appraisal shall use the jurisdictional definition of "reasonable market value" described in Colorado Jury Instructions Civil 4m, 36:3. "...'Reasonable market value' means the fair, actual, cash market value of the property. It is the price the property could have been sold for on the open market under the usual end ordinary circumstances, that is, under those circumstances where the owner was willing to sell and the purchaser was willing to buy, but neither was under an obligation to do so." Also, in the Before Valuation only: "In determining the market value of the property actually taken, you are not to take into account any increase or decrease in value caused by the proposed public improvement." (Project Influence rule) 6. Identify the subject property (define larger parcel or affected area parcel; relates to highest and best use). T. Define and describe the surrounding neighborhood and discuss external market influences. A regional overview might also be appropriate. 8. Describe and photograph the subject whole property (land and any affected building/site improvements) and address pertinent characteristics (land/building size, shape, topography, utilities, access, entitlements, zoning, condition, functional utility and similar). Include minimum 5 -year subject sales history and analyze as appropriate. 9. Environmental: address any potential or evident contamination or other negative environmental conditions in, on or near the subject property as appropriate. Weld County might have additional information. 10. Discuss highest and best use (as vacant, and as improved where appropriate). Appraisal conclusions must be consistent with highest and best use. 11. Describe, photograph and discuss comparable land/building sales and rentals. All sale deeds must be reviewed by and the sales must be confirmed by the principal appraiser with the buyer and/or seller (statutory CRS 38-1-118). Confirm rental data also. Include sale and rental location maps and addresses or other location information, property sale legal descriptions and assessor parcel identification numbers. Apply appropriate market supported dollar or percentage adjustments and/or appropriate supported qualitative adjustments. All relevant physical, legal and economic factors, including cash equivalency, must be considered. 12. Describe and support final value correlation from sales and other data analyzed. 13. Project Influence - Subject Value Before Acquisition: Ignore any positive or negative impact on value caused by the project (other than physical deterioration within the owner's reasonable control) See also #5 above. 14. Describe and photograph fee simple and easement acquisition areas, including land, buildings and any affected improvements, including signs and sign sites. Revised February 2014 4777 42 Pages: 8 of 19 11/17/2021 12:58 iPM RFee:$0,00 Carly Koppes, Clerk and Recorder, Weld County , Co 11 Page 1 of 2 5. Value the parts taken (fee simple, easement) as part of the larger parcel or affected area parcel. Compensation for improvements is at their contributory value (vs. replacement). Separately show contributory value estimate for on -premise signs, billboards and sign sites (typically billboard sites). Include cost estimate to remove/relocate these signs on site, if legal under Weld County or other local regulations. Contact Weld County for more information. 16. Tenant -owned realty: separately show the estimated contributory value of tenant -owned realty as part of the property appraised. If required, Weld County will provide a completed Certified Inventory of Real and Personal Property form to be included in the appraisal. 17. Show the remainder value (math) before the taking (= Larger Parcel value [-minus) value of parts taken) 18. Describe the remainder property (land/improvements) and conclude its highest and best use. Distinct photographs of the remainder property (as compared to the Larger Parcel) might be appropriate if the Before/After differences are significant. 19. Estimate remainder value after the acquisition as if project built. The After Valuation may require essentially a complete second appraisal, depending on the nature of the acquisition. However, often less analysis is required to conclude the remainder property value. Here the appraiser will consider any influence on value to the subject remainder caused by the project (project influenced considered), except any damages found must be due only to the taking (severance) or to those project improvements made only on the subject land taken. Damages and/or specific benefits must be supported and only compensable damages may be included (not all damages are compensable under law). Specific benefits are to offset up to 100 percent of compensable damages to the remainder, and up to 50 percent of the reasonable market value of the parts taken. See also Colorado Jury Instructions Civil 4"', 36:4 and 36:5 and CRS 38-1-114. 20. Temporary easement valuation: this is a land rental concept for temporary land use. This should follow at the end of the value/compensation estimate process because a temporary easement is not a taking nor does it permanently affect any part of the property. 21. Include in the report appropriate maps, charts, plans, photographs and exhibits (Weld County ROW plans, flood and zoning maps, property plat or development plans, regulations, appraiser qualifications and similar). Revised February 2014 Page 2 of 2 4777042 Pages: 19 of 19 11/17/2021 12:58 PM R Fee:$0.00 Carly Koppes, Clerk and Recorder, Weld County , Co IIII FA! NbrfiluliA9 i 11111 Contract Form New Contract Request Entity Information Entity Name* SCHUMP, DALENE Entity ID* x.-00044658 ❑ New Entity? Contract Name* Contract ID POSSESSION AND USE AGREEMENT FOR SCHUMP PROPERTY 5323 Contract Status CTB REVIEW Contract Lead* CKIMMI Contract Lead Email CKimmi,:?co,weld.co.us Parent Contract ID Requires Board Approval YES Department Project # GR-45 Contract Description* POSSESSION AND USE AGREEMENT FOR THE SCHUMP PROPERTY ON THE CR 66 AND CR 41 PROJECT Contract Description 2 Contract Type* AGREEMENT Amount* Si 71,000.00 Renewable* NO Automatic Renewal NO Grant NO IGA NO Department PUBLIC WORKS Department Email CM- PublicWorkscaweidgov.com Department Head Email CM-PublicWorks- DeptHead,veldgov.com County Attorney BOB CHOATE County Attorney Email BCHOATE?'CO.WELD.CO.US Requested BOCC Agenda Date* 10 25,`2021 Due Date 10121 ;'2021 Will a work session with BOCC be required?* HAD Does Contract require Purchasing Dept. to be included? NO If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in OnBase Contract Dates Effective Date Review Date* Renewal Date 10/14,2021 Termination Notice Period Committed Delivery Date Expiration Date* 12 31 2023 Contact Information Contact Info Contact Name Purchasing Purchasing Approver Approval Process Department Head JAY MCDONALD DH Approved Date 10;20/2021 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 10,2512021 Originator CKIMMI Contact Type Contact Email Finance Approver CHRIS D'OVIDIO Contact Phone i Contact Phone 2 Purchasing Approved Date Finance Approved Date 10,`20/ 2021 Tyler Ref If AG 102521 Legal Counsel BOB CHOATE Legal Counsel Approved Date 10=20x2021 Hello