HomeMy WebLinkAbout740648.tiff HENSEL PHELPS CONSTRUCTION COMPANY
July 9, 1974
Board of Weld County Commissioners
P. 0. Box 758
Weld County Courthouse
Greeley, Colorado 80631
Attention Mr. Barton Buss
Subject: Weld County Services Complex
Greeley, Colorado
Serial Letter No. 5
Gentlemen:
At 10:00 A.M. on Tuesday, July 9, 1974, proposals for Bid Package No. 1 for the
Weld County Services Complex were received and opened. Item B of Bid Package
No. 1 included drilled pier excavation work, furnishing and placing of concrete,
and placing of reinforcing drilled piers only. We have completed our analysis
of the proposals received for drilled pier excavation, furnishing and placing
of concrete, and placing of reinforcing drilled piers. The results of these pro-
posals are as follows:
1. Al Amidon Drilling, Inc. - $69,921.00
2. Drilled Foundations Inc. - $71,880.00
3. Caissons Inc. - $89,989.00
4. Meredith Drilling Co. - $98,922.00
5. P & C Drilling - $146,972.00
You will note that the low proposal was submitted by Al Amidon Drilling, Inc.
We have examined all proposals and find them in order. Therefore, we are recom—
mending the low proposal as submitted by Al Amidon Drilling, Inc. be accepted.
Upon approval by the Board of Weld County Commissioners, we will issue a letter of
intent to Al Amidon Drilling, Inc. We have sixty (60) days from the receipt of
the proposal to issue a notice to proceed and a formal contract for the work. Our
recommendation is to proceed immediately to issue a letter of intent to Al Amidon
Drilling, Inc.
G R E E L E Y , COLORADO 6 0 6 3 1
T2�
( e vCFT 0rr ']E 9".`. % U !]=cl1E n!YO WAREHOUSE 4E n2p 91XTH l]VENrJE - AREA
C`
740648
HENSEL PHELPS CONSTRUCTION COMPANY
Board of Weld County Commissioners
Page 2
July 9, 1974
We are enclosing for your records and information a copy of our proposal summary
sheet and a copy of all proposals received for this bid item. If you have any
questions concerning these proposals or the action to be taken, we will be most
happy to answer them for you.
Very truly yours,
HENSEL PHELPS CONSTRUCTION CO.
Harold G. Evans, P. E.
mlg
17485.1
Enclosures
GREELEY , COLORADO 6 ❑ 6 3 1
'\1 - __ „_ r _ _< -, _ _E nn was Ebiou --.c ar a2a S:x rri wENUE nRFn COO= ] 03 ,D2 5555
.CC000O,r�
, %+. ' . ; t t`.! ..�i. *--); .%1; i._�1 . ! t-•i... 1 _ I _ _I . ' . ;.... {_
er 1-ii • I
j ! t , �1i r:IL_.J_b-� ---•— ' .--1 -_..1__ I. _I_ ......... ..
•I- '�`I . i I t 1 ! 1 !
. 1 • _ i
{ - 1 _
i_ I I • -1-1---1 -1-"----- 1—7—1..---T. —I---ri --E-:-.--f-+
1 i-1' Q 4: ,1 < - ---- -. _ -- _. . ._.4.--.4-._ -I._.. ' ._.. 1__ i _.j_ T
1 .I ilk �I C -- _- — — — - - } I I 1 1-._._1.. _ I .. r- - ;• - -
s, ..1 te! v i NJ; I t
%.....,,I.I t.1 ' T a►__^_I-v ti w1 V ' " ---_. - I.. �... - - y -_
E. I � r:_ Z`� i 1 ._i.---. I-
-
.� ` r ■■ ■ iii -r -- ; -�
€i ! tI �` ■ �■ ■ I r i
' i 1 r, i :. ••:.. -.' l I 0-. y„ %-1. [- -I-- - -1 T I -I
to } ''I �`,.. �!; ( oz.: ' a.._ •tii tv! ca:—'U:_ , -+ • `.... ( ) --._. • ' I...._:.J j .. ! I ' ._ L.
i ._ till i i ! °`1 �! '...; i��--. *t�s `tom _ _ ` _ 1_ 1
} ` v _ _ �-_- _ -
•$; I 4!` • ' .!t 00 . —�■� cs?_ --- ■ _4_____L___ T`
■ ■■■■■ it■■■■■ ■
42' 6'i
I c ■ , ■ ■■a■ ■�■ 1 ■ i
�1 %, V "• M n Yl _ i______.��■■■— ■■ _ - I
a►• iv 6` ■ — —, ■■�■
�' r ■ ■■ I ■■■ ■■ . ■
a ■■■ •
I ■ ■■ ■■■� - ■
I. C!4C�qq �' ' tJ I4 i■ C .I %, col Ol • ■■■ �a �` ■ ■■ I•
_
1 a iti I■ 1 ≥I ■ ■■■ ■ - ■ -
I a L� �- �- ■ ■■■ ■ - ■
1 a ~ H �- - --- � �� . -
jF 1 I��■ - - -__-._-:--_-.___,7-_-....___.._ - -_— - _ _..:
r 2 ' �I WI' i 1I I
,... ii ,, ....„, .... , i,
II 1I. 4 :; U .4-,• L V
j '1 a t,1 �! ill! cc,
i iiIli; U it ` ;! �r I I
hI I 1 i` o
I tt .. II 2 I La• t. it I11 �' �.� 1 t. t' _t' i I j I I I 1 i I
► I !__ ! ; I ; I ! i 11-I I I I-__I _I _! I i -
�.; 1/4,...„,:_,....LL; 11 I I I r L_j 1 .
��Y� �r, 11 ._LL�1_. �1.. ,4y...%:- TJT—i 1 L -C1 T I. _! I _i_ �`i I I rj I LA_- ~�f 1.. d
—1 `1 . I,—y j —� ii I--- —'' + ,„._;‘,.,.__:....L.;_....1-
—`,:� 1�'i ' I 1 F i ! I 1\11-1--1 tI !_\„'��_i�T 1.1 ' .j.1--1--ii 4 , y I i
• I I :__—L—_I 1 1 Z_ , �� i I �I -1-7,l Ii j 7111
'l ! 111i 111 � 1 � TiIitt z
III, III II II IIIIIIlIlll I I I f
" _� I I i I I I i I I I I I I I I 1 f
a t I i i , I 1 I�i—1 J 1 , 1 I I 1 1
-1 —{ I I I I ` I I I I { I i
( I I I I I l ! li ' i '
_
Z .
a •
• t , a1 1 A A4_r I 1 I I c vl 1 1 �1 •1 i �. c�� . .-
pIn x �^t 1:� �i I I I I ` 1 j U P! ! f A.I ;r l I I �� �j 1 ( \;.\ t
1 - r, _1 �5 I I 1 : 1 Y T c' t I 1 • tiV �1 I I • ' QI I i I 1..N I 7)z-6-
.'�` ..
i I I •I 1
•-- o I ' : I 1 1 ! 1 -_-.-•j_ i r 1 ! u; 1 I _..,`,1...N
1,i�1
w VIII lIII I I I _jI 1 ` III .
er
LA I.. 10 e4 1 :Id‘a..) • - .. .
2 t I 6,1 lill !•1 . tk% 1%k I:si laik or.]
I I I I I i I
≤ t i I i +ll
W I I Iii ii I I I 1 I :_ I j
I I I i I I I I 1 i
F I I I I- 1 I j ,.
I I � 11 1 II `r`
I t •
I
i ; I ::
1 ; a
' 1 ! I •
k ; • u , � } A
vl ? v
� I
.i 0 ! I
I Z. '. y i I L' Q: :13 1 �. ' �&I N I \a! \I.; by ,.. .
• ; i I - I 1 T 1 I I - _ . I I I • 1 II
`1, , i'' 0 , ; I I I I
L I I I I I ..
I �
', ` v U u \51 yl k , V •T 1
Iw. zt, U 3 �i1 �; I i
y,
kA ?1 2 y N1 :) 43 • 14 I j` I43, • J I y� I �I i i
�; • ! ft !
a t I
�1 R •
• 1
; r. ---. el , , p. - • -: li
.-LI . i. t• 4. z.? N ie: i. A A Al 0 ; . li zj III
Q d1 �I
I14:i q . 9 'z , ;i
I AIIIll' J
i; � I � I Q nj : 1a l: tit
�, ��I ; \;' �I. sv' ,E \Qt I z`• �I al u N, S I
o
`i U
•
II . I ! Ill
PUEBLO ') ICE i c— tuilowit,j Project s Lorresporecnce Lr.ly V L.1\ yrrati.c,
2040 Cr.: .?.i ❑ {- ≤-_--- to be handled throug'n. 1653 Lewis
Yium '.:74 Phone: 237-9117
Pueblo, i'.•.c,;•.ar'.0 81003 Denver, Colorado 80215
. 1 iDo1 d^I'_LING CO., INC.
DRILLED FOOTINGS n CAISSONS
BONDED 0 LICENSED
►*> ^_'........................... Cher tt•;.^�•??jtj Z!' Of':i!_Ger Date—_ _.
July 8, 1g?
Address e'= -.-`: _ "' a..`t & r;_r.�s ee, PO Dox 7_ 33, ';i eld .County Courthouse
State: 8'3_631.
•
- � a
Architect:.-__,'i h t.c cts_ r,��.n�ez i:_?Y urine -
and 2 hyd. Elev. sh-fts
Y. PRO.OSAL for ___.2 Caissons according to plans and specifications. drilled, cased &'Capped
Q Cased Lump Sum $
A. Drilling: ❑ Uncased Ready for Concrete_._-_•....._-____________ _-- Lump Sum $
)a Cased if necessary ------------ --------•------------- • -— - Lump Sum $_6�� 21.00--_
R. Furnishing and Placing Concrete ----.--•___-----------------_--•--•-------•------ Lump Sum $.__II1Chried
C. Placing (only) Concrete ------------------..-.....-----._---- __-_-- _ --._____—• Per Cubic Yard $---__.__—
D. Placing Reinforcing; Steel ----- ---------��d��--&-.P1.c)_— ----------•-- ------_.�_ Per each $ Irclu3ed
IL UNIT PRICES:
When actual depths are at variance with plan elevations unit prices apply.
niL l. •'i: �l per tin. fc t CQ C I i Bed-roci" 7,-1 vaticn
o N R;3Tiel per 1 n. foot �.Us
. t
R rg� ce,Atc.).•
•
INC
4770 ELATI STREET • DENVER, COLORADO 80216 • 825-7623
July 8, 1974
Mr. Barton Buss
Office of Budget and Finance
Weld County Courthouse , Greeley, Colorado.
Dear Sir:
The following, a proposal for 72 Caissons ready for concrete, for The Weld County
Services Complex : Greeley, Colorado
1. Drilling, Belling, Ribbing, Lump Sum $ 68, 600 .00
2. Furnish and Place Concrete $ yes
3. Vibrate Concrete $ Yes
4. Furnish and Place Re-steel. . CAGES. OUR .EQPT.•. .QYLY $ Yes
5. Casing Included $ yes
6. Dawatering Included - $ ves
7. Unit Prices per L.F.per cu.yd.each Caisson $ See below
Size Drilling Drilling Concrete Concrete
(Caisson) (Over) (Under) (Over) (Under)
30" 12. 50 3.90 Concrete Included
36" 16.00 5 .65
48" 24 . 30 9.60
8.. Rock excavation @ $130.00 per C .Y.
9. Furnishing and tying of reinforcing steel not included.
10. Elevator shafts (2) included in drilling price.
BID QUALIFICATIONS: The following qualifications apply to thisproposal. Should these qualifications be of variance with
the pans and spaciEcutians,the genera! contractor should consider this in preparing his proposal and contract.
1. Bid does not include:
a. Drilling in trenches.
b. Engineering work such cs layout and establishing devotions.
c. Providing access to drilling locations or responsibility for dry, level working area.
d. Clearing of overhead or underground obstructions or utilities.
e. P.ernoval of caisson spoils from the driliing area.
f. Drilling through or removing materials not shown by soil tests.
g. Forming, above or below grade.
2. Bid includes ( 1 ) Otle move in(s) and no delays to drilling or stand-by time.
3. Nin,;ty percent of all pay estimates is duo within 30 days after invoke date. Payment in full, including retention and
ethos,is due within 60 days after cornpfotion of our contract.
4. This proposal is valid for 30 days past hid date.
5. This proposal based on lest hole logs mt.doavailable for this project, for bid purpose. Major variation from conditions
shown,will be subject to price adjustment.
6. Cost of bond not included in proposal.
7. Thu acceptance of this proposal, including all items and qualifications heroin, shall become a part of any contract
issued.
D;dU.ED FOUNDATIONS, INC.
•
•
•
CA..:) .iuJlvS, HNC.
July 8, 1974
Hensel Phelps Construction Company
P.O. Box 0
Greeley, CO 80631
•
Reference: CAISSON DRILLING PROPOSAL
Project: WELD COUNTY SERVICES
Location: Greeley, Colorado
Architect: CNC/NHPQ, Inc.
A. DRILLING: Furnish and placing concrete, tie and place steel for
caissons (Bid Package #1=B) LUMP SUM - . $89;989.00
B. UNIT PRICES: When actual depths are at variance with plan elevations
unit prices apply.
SIZE DRILLING per. lin. ft. CONCRETE per lin. ft. ROCK EXCAVATION per lin.ft.
(Over) (Under) (Over) (Under) (Add)
30" 0 19.92 7.97 6.22 4.27 72.80
36" 0 24.89 9.96 8.96. 6.15 104.80
48" 0 37.20 14.88 15.90 10.92 186.00
•
C. QUALIFICATIONS: The following qualifications apply to this proposal.
•
1. Bid does not include:
a. Drilling in trenches.
b. Providing access to drilling locations or responsibility, level
working area.
c. Clearing of overhead or underground obstructions or utilities.
d. Removal of caisson spoils from the drilling area.
• 2. This proposal is valid until August 9, 1974.
CAISSONS, INC. ay/CY
//Incorporated in the STATE OF COLORADO • C14�� i S //IC,
Lee Tautz, President .�
PO BOX 1008. ENGLEWOOD. COLORADO 80110 303-761-tit;;
•
crAl ® DIVLI,N 6 OFFICE
722-8926 _,p v� ��
b+ /�
722-3253 j��' t6 F�v SAS So. Huron SI.
72252330 Denver, Colorado 80223
i.SONS dF` 4 a- DRILLED FOOTINGS
Date 7-3-74
Mr. Barton Buss, Chief Accounting Officer
Office of Budget R Finance
P n Rny 'RR tlald County Courthouse 9th Ave, & 9th St.
freelry,. Colorado 80631
Gentlemen: •
Submitted herewith is our proposal for 72 'caissons for W 1d County Carvirp
Complex 10th St & 10th Ave. Greeley. Colorado Bid Package Na 1 Rid Ttpfn R only
Item
A. Drilling and (Beflicig) , (riHb4ig) , scar.ifying $. 98,922.00
B. Concrete, furnishing and placing $ inrludad in above
C. Reinforcing Steel, £luxiishing.and-placing and tying $ included in above
D. Unit Prices .
Drilling Per L.F. Concrete per L.F. Rock Excavation
DIAMETER OVERRUN UNDERRUN OVERRUN UNDERRUN Per L,F, Add
30" $16.20 $ 5. 50 $ 7,20 $ 4t55
36" 23.30 7,80 10.40 6,55 75,00
48" 41 .40 13.95 18.50 11 65 125.00
* Meredith Drilling Co. , Inc. Management and Supervision reserves the right to
—determine the demarcation between practical rig refusal on rock and the beginning of
actual rock excavation.
Letter of July 3 acknowleaged
Note: •
Lump Sum includes 2 elevator Jack. Holes AC coerified; except,iwatep tight
c.m.p. cannot be provided therefore neoprene 'seal is excluded' as is water
that casing.
1. The following qualifications are to be considered as a part of this proposal:
(a) Exclude removal of caisson spoil from the area: (h) Exclude engineering or layout: (c) Exclude testing of concrete;
(d) Exclude drilling in trenches unless by prior mitten a agreement; (e) Exclude above or below ground forming.
2. Access to all drilling locations will be provided by others.
3. The responsibiiity for the removal of overhead, surface or underground utilities or obstructions rests with others.
4. This proposal includes_.4_move:in(s) with the drilling to be en a continuous basis with no delays
or stand-by time.
5. This proponrl is based upon soli conditions being as indicated by the test borings.
6. The terms of this proposal arc 0.3 follows: (a) Payment of sDq of all invoiced amounts within 30 days of date
of invoice. (h) Payment of 100%of all invoiced amounts within_(40 days after completion of our contract.
7. This proposal is valid for 3'0 days.
8. Bond, if reeuired, will be furnished, premium for same to be paid by you.
9. The acceptance of this propo>cl and all items noted and contained herein will become part of any contract issued,
Authorized signature denotes acceptance Yours Ve y tz. ,
of this proposal as a contract.
-�//� ' 772.,,A59
%Accepted By Date — 'f���-%;-77-r.1/
>`�.._
Thomas i". KeLLey
Vice President
-LICENSE #244603 •
g C COMPV ing co .
r
FOUIdDATIOF15 , PILINGS 8, CAISSONS
SNORING • UNDERPINNING �jj v
P.O. BOX 438 • WALNUT, CALIFORNIA 91789
(213) 435-8331 • (213) 443.4452 • (714) 595.0614 y "� °�-`�"--f``..__ss•�--""-"
July 5, 1974
Mr. Barton Buss SUBJECT: WELD CO. SERVICES BUILDING
Chief Accounting Office Greeley, Colorado
Office of Budget G Finance
P.O. Box 758 RE: 72 Caissons
Weld Co. Courthouse 2194 L. F.'
9th Ave. & 9th Street
• Greeley, Colorado 80631
Gentlemen:
The following is our proposal for the caissons on the above captioned project.
(Proposal for bid package No. 1==Drilled Piers.) This proposal includes drilling,
furnishing f, placing concrete, placing contractor's rebar cages, (P $ C DRILLING CO.
will assemble) furnishing & placing casing. Included in lumpsum price are the
two elevator shafts. This work will be done for the sum of $146,972.00
'Unit. Prices:
• Drilled pier excavation, per L.F•
ADD DEDUCT
30"p $ 8.25 per L/F $2.75 per L/F
36110 $11.88 per L/F $3.96 per L/F
48110 $21.18 per L/F $7.06 per LIP
Concrete fill, per L/F
30"P $12.32 per LIP $ 4.11 per L/F
36"0 $17.75 per L/F $ 5.92 per L/F
48"p $31.55 per L/F $10.52 per LIP
Rock excavation, per L/F
30"O $20.57 per L/F $ 6.85 per L/F
36"I7 $29.62 per L/F $ 9.87 per L/F
48"I $52.66 per L/F $17.55 per L/F
This proposal excludes all., engineering, layout, £ elevations,, disposal of spoils,
furnishing rebar cages and unloading of same, site clearing and mass excavation,
testing and inspections, premium on performance bond, removal or relocation of
utilities.