Loading...
HomeMy WebLinkAbout20212479.tiffCOLORADO Department of Public Health & Environment Weld County - Clerk to the Board 11500 St PO Box 758 Greeley, CO 80632 August 11, 2021 To Whom it May Concern: RECEIVED AUG 16 2021 WELD COUNTY COMMISSIONERS On August 12, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for Bayswater Exploration Et Production, LLC - Thornton 28-H Production Facility. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, Co 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director PvbI;G Reu;e�,.) O8723/.2. I cc : P L(-rp)H I-Cosfrit), PWCvA/ER/CHkK), O j(3M) og/i6/2I 2021-2479 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Bayswater Exploration a Production, LLC - Thornton 28-H Production Facility - Weld County Notice Period Begins: August 12, 2021 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Bayswater Exploration Et Production, LLC Facility: Thornton 28-H Production Facility Exploration Et Production Well Pad SWNW Section 28 Township 7N Range 66W Weld County The proposed project or activity is as follows: This exploration and production well pad is requesting permit coverage of the gas flaring from the vapor recovery tower (VRT) during vapor recovery unit (VRU) downtime. This source has three natural gas engines permitted under GP02, condensate and produced water storage vessels covered separately under GP08, condensate loadout permitted under GP07, and produced water loadout requesting permit coverage. The facility is synthetic minor for VOC in the ozone nonattainment region. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permit 19WE0212 are available on the Division's website at https://www.colorado.wv/cdphe/air-permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also includes guidance for public participation • Send an email to cdphe.commentsapcd@state.co.us • Send comments to our mailing address: Lauraleigh Lakocy Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.01 COLORADO Department of Public Health 6 Environment Hello