December 6, 2021
To Whom it May Concern:
RECEIVED
DEC 1 0 2021
WELD COUNTY
COMMISSIONERS
On December 1, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for
PDC Energy, Inc. - Harvey 32 Sec HZ. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
Pvbl�G RevTe3
i2 /2O/al
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
CC'. MCrl"), 14L(Ds1TR), PotsKIERIcHKK),
06 (3M)
l2/15 /2l
'/*J
2021-3462
Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: PDC Energy, Inc. - Harvey 32 Sec HZ - Weld County
Notice Period Begins: December 1, 2021
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: Harvey 32 Sec HZ
Well Production Facility
SWSE SEC 32 T4N R65W
Weld County
The proposed project or activity is as follows: Applicant proposes the construction and permitting of a
condensate storage tank battery (Pt 002), a produced water storage tank battery (Pt 003), and a
hydrocarbon liquid loadout source (Pt 004), all at a newly constructed well production facility located within
the non -attainment area of Weld County.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 21WE0361 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe.commentsapcd@state.co.us
• Send comments to our mailing address:
Ben Fischbach
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530