Loading...
HomeMy WebLinkAbout20210967.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 42 BETWEEN U.S. HIGHWAY 85 AND COUNTY ROAD 33 FOR APPROXIMATELY ONE (1) WEEK, FOR RAILROAD CROSSING REPLACEMENT WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 42, between U.S. Highway 85 and County Road 33, be temporarily closed, with said closure being effective April 10, 2021, for approximately one (1) week for a railroad crossing replacement, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CC: So(RO, D.S Pz t" , CS P 94 /I3/21 2021-0967 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 42 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 5th day of April, A.D., 2021. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ddat, � Steve M. eno, Chair Weld County Clerk to the Board BY:.(���// Deputy Clerk to the Board APP Coun " Attorney Lori Sain Date of signature: 04 /13/21 2021-0967 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 31, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 42 between US 85 and WCR 33 is closed from 4/10/2021 thru 4/16/2021 for a railroad crossing replacement. See attached closure diagrams. 2021-0967 °`"/O 5 E,&00D(1 www.invarion corn .4,� Right Turn lane northbound HY 85 to be closed +� W Left turn lane southbound HWY 85 to be closed I / Traffic signal change for NO eastbound turn arrows. disable traffic monitor for westbound traffic oil 42 so II does not detect equipment that will be working AP 2R 44 .,._ ... p..7400, Union Pacific railroad crossing replacement, along with Alf with repaving approaches to Xing 4 4 e U' ' tio itif !pipit 41 i : 4t PROJECT # "s M4-9 DETOUR ROAD CLOSURE DESCRIPTION /-tiiM4-9 J WCR 42 between HWY 85 and WCR 33 elegy i eir I closed 4/ 10/2021 thru 4/16/2021 + • 1 for R/R crossing replacement a I NOTICE TO PUBLIC yl OcNrir�y �,,� Road signs and barricaded .� AT-oznn � � . br��i I Art tr' siao , o ; Message boards to be used ' avo-1 + DETOUR ROUTE e. At WCR 33 between WCR 42 and HWY 85 1 mile gravel T , atm es. HWY 85 between WCR 42 and WCR 33 1 mile paved o l� ' QO � ww �y x . as I�iI A AT� ( L 1 \ � , a U 'Q a c) o 1st. h �R C WCR 42 42 L1u . rt � : ii k , NOTES: . 1:le! Y 1i � 1Sr i ii d ► ► &� 1 71) et2 h ,. it i ADT of WCR 42 is : 1652/2014 iw Ln # L , 1:,�� Rail crossing replacement; with paved approaches hi al ails 12TH sr 12TH 5.' if,i v 1 Mag Chloride to be used for dust control O a , wQRK Sp • crossing is 100' east of HWY 85 on WCR 42 y "k \ AHA0' LPC)o Prepared by : Lee Stephen 1,. W20- 1F 3/30/2021 Hello