HomeMy WebLinkAbout20210430.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF COUNTY ROAD 6 BETWEEN COUNTY ROADS 13 AND 19 FOR
APPROXIMATELY TWO (2) WEEKS, FOR TWO (2) CULVERT REPLACEMENTS
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 6, between County Roads 13 and 19, be
temporarily closed, with said closure being effective February 22, 2021, for approximately two (2)
weeks for the replacement of two (2) culverts, and further, that standard official traffic control
devices shall be erected at said closure giving notice of the restrictions.
CC:SO(Rs) Dispo hc11, CSP
01/23/21
2021-0430
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 6
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 10th day of February, A.D., 2021.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: d.deteA) G. ii-do•tok
Weld County Clerk to the Board
i
ounty A torney
Date of signature:
SteveAUloreno, Chair
2021-0430
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: February 8, 2021
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 6 between WCR 13 and WCR 19 is closed from 2/22/2021 thru 3/5/2021 for 2 culvert replacements.
See attached closure diagrams.
2021-0430
°alio
L -G 00DA
www.invarion.com
[7777,!]
;�al=
kOAU
LVOkK
AHEAD
1
Hi
,. 4.A ^
0-
2A
f
Al■-ool
anoim
DETOUR
IS a a-111.-._
-111.-.1-
%VCR e
g+
r
millgailbe
rr,
0V3HV
NMOM
OVOU
JA 4111 .411..411 « a SS .41 - - IS • a.-.
`a
4■--
anol3o
.o
m
O
PROJECT
# AN
-59
ROAD CLOSURE DESCRIPTION
WCR
closed
for
WCR
will
bridge
2
remain
culvert
6
6
replacement
between
2/22/2021
between
closed
replacements
WCR
thru
WCR
for
3/5/2021
continued
work
13
17
and
and
WCR
WCR
15
19
NOTICE
TO PUBLIC
Road
Message
signs
and
boards
barricaded
to
be
used
DETOUR
ROUTE
West
WCR
WCR
WCR
East
WCR
WCR
WCR
19
8
13
13
4
19
between
between
between
between
between
between
WCR
WCR
WCR
WCR
WCR
WCR
19
13
6 and
and
6 and
6 and
and
6 and
WCR
WCR
WCR
WCR
WCR
WCR
8
13
8
4
19
4
1
3
1
1
3
1
mile
mile
mile
mile
mile
mile
paved
gravel
paved
paved
gravel
paved
NOTES:
ADT
Culverts
Mag
Culvert
of
Chloride
WCR
is
replaced
.3
east
6
to
is:
be
of
3190/2018
are
used
irrigation:
WCR
for
13
dust
on
with
WCR
control
new
6
15"
& 18"
RCPA
Prepared
1/7/2021
by:
Lee Stephen
Hello