Loading...
HomeMy WebLinkAbout20210825.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 23 BETWEEN COUNTY ROAD 8 AND STATE HIGHWAY 52 FOR APPROXIMATELY FOUR (4) WEEKS, FOR BRIDGE BE- DECK WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 23, between County Road 8 and State Highway 52, be temporarily closed, with said closure being effective March 29, 2021, for approximately four (4) weeks for a bridge re -deck, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CC : SO(RS)g D. Spo.+c1,i CS P 3/a5aI 2021-0825 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 23 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 22nd day of March, A.D., 2021. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: diticdov je to;e1 Weld County Clerk to the Board BY: APP Lori Saine ttorney Date of signature: 3/7--s/ Steve •reno, hair Sc;mes, Pro -T Perry L. Buc,� ike reeman r 2021-0825 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 18, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item *WCR 23 between WCR 8 and SH 52 is closed from 3/29/2021 thru 4/23/2021 for a bridge re -deck. WCR 62 between WCR 41 and WCR 43 is closed from 3/24/2021 thru 4/2/2021 for a culvert replacement. See attached closure diagrams. 2021-0825 Yl OOD-Lk www.invarion.com OV3HV 03S013 f I 1'� ova [!. I 4Y4 ixa ` • I 0 ow o /etTnith r /.. t * A\.‘\ aI1RSBa l� M NOD/ I I I L to 1rtre ti... 11' ' DETOUR } ,.. „L �`I.I r - { PROJECT # an-64 - ROAD CLOSURE DESCRIPTION r �-%. - 0 WCR 23 between WCR 8 n HWY 2 , , � . and 5 • • closed 3/29/2021 thru 4/23/2021 � �r � ha - • ' for bridge re-deck ii NOTICE TO PUBLIC Road signs and barricaded Message boards to be used DETOUR ROUTE \N2. T 8 5 WCR 8 between WCR 23 and WCR 21 1 mile gravel >ts,a :ulna rw�. p^ 03 WCR 21 between WCR 8 and HWY 52 1 mile gravel HWY 52 between WCR 23 and VCR 21 1 mile paved r NOTES. [ flO13C ) L MOLD nO) r0)DUWtD [It (' 8 g"°`u` °` "` Y Q ADT of WCR 23 is: 843/2018 GE IOU -. a .. seam- es s a a-a-m-'- W I -dm e-s- A. E a -a -�- - in -.a -- - . * a al a s r Bridge BR 23/8A re-deck and guard rail replacement rm. Mag Chloride to be used for dust control oxo 41 ROAD I CLOSED Culvert is . 1 north ofWCR8onWCR23 AHEAD Ell ROAD Prepared by: Lee Stephen CLOSED 3 1000 FEET 11812021 Hello