Loading...
HomeMy WebLinkAbout20210981.tiffPlanner: Case Number: C. Gathman USR21-0002 LAND USE APPLICATION SUMMARY Hearing Date: March 16, 2021 Property Owners: Dane & & Nelda Kornasiewicz c/o Cassidy Orr— Housewolf, LLC Address: 620 State Highway 52, Erie, Colorado 80516 Request: A Site Specific Development Plan and Use by Special Review Permit fora Commercial Recreational Facility including Animal Training where the Maximum number of Animal Units Permitted in Section 23-3-70.D is exceeded or Traffic to and from the Facility exceeds Sixty (60) Daily Trips (Dock Diving Facility for Dogs) outside of subdivisions and historic townsites in the A (Agricultural) Zone District. Legal Subdivision Exemption SE -962 (West Parcel), being Part of the NE4 of Section 6, T1 N, Description: R68W of the 61h PM, Weld County, Colorado Location: South of and adjacent to State Highway 52 and approximately 2,000 -feet west of County Road 3. Size of Parcel: ± 3.87 acres Parcel No. 1467-06-1-00-049 The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received referral responses with comments from the following agencies: Weld County Department of Public Works, referral dated January 8, 2021 Colorado Department of Transportation, electronic mail dated February 11, 2021 Weld County Department of Public Health and Environment, referral dated January 22, 2021 Left Hand Water District, referral responses dated January 8, 2021 and electronic mail response dated February 12, 2021 Town of Erie, referral response dated February 3, 2021 The Department of Planning Services' staff has received referral responses without comments from the following agencies: Boulder County, referral dated January 13, 2021 Mountain View Fire Protection District, referral dated January 19, 2021 Weld County Zoning Compliance, referral dated January 8, 2021 PACFA- Colorado Department of Agriculture, referral dated January 11, 2021 Town of Frederick, referral dated January 11, 2021 Weld County Sheriff's Office, referral dated January 15, 2021 The Department of Planning Services' staff has not received responses from the following agencies: Weld County Department of Building Inspection Colorado Parks and Wildlife School District RE -1J Boulder Valley Conservation District USR21-0002, Orr— Housewolf, LLC, Page 1 of 10 Planner: Case Number: C. Gathman USR21-0002 USE BY SPECIAL REVIEW PERMIT ADMINISTRATIVE REVIEW Hearing Date: March 16, 2021 Property Owners: Dane & & Nelda Kornasiewicz C/o Cassidy Orr — Housewolf, LLC Address: 620 State Highway 52, Erie, Colorado 80516 Request: A Site Specific Development Plan and Use by Special Review Permit fora Commercial Recreational Facility including Animal Training where Maximum number of Animal Units Permitted in Section 23-3-70.D is exceeded or Traffic to and from the Facility exceeds Sixty (60) Daily Trips (Dock Diving Facility for Dogs) outside of subdivisions and historic townsites in the A (Agricultural) Zone District. Legal Subdivision Exemption SE -962 (West Parcel), being Part of the NE4 of Section 6, Ti N, Description: R68W of the 61h PM, Weld County, Colorado Location: South of and adjacent to State Highway 52 and approximately 2,000 -feet west of County Road 3. Size of Parcel: ± 3.87 acres Case Summary: Parcel No. 1467-06-1-00-049 The proposal is to build a dock and pool to be used for personal and competitions for dock diving or dog jumping. Dock diving is a dog sport where dogs compete in jumping for distance or height into a body of water. The operation will consist of private bookings where approximately four (4) individuals (1 employee and 3 customers along with their dogs) will use the diving facilities. There is anticipated to be 1-3 dogs during each private booking time slot. Private bookings would occur between the hours of 9:00am to 7:00pm from April to October. The application estimates a maximum of approximately 20 daily roundtrips would be associated with private bookings. Additionally, dock diving competitions would be held a maximum of one (1) Weekend per month from April to October from 9:00am to 5:00pm. Competitions will be conducted in waves with a maximum of twenty (20) dogs per wave. Each competitor will have up to two (2) handlers for a maximum anticipated operating capacity of forty-two (42) persons per each wave of competition. The traffic narrative estimates a maximum of 100 round trips per day (20 competitors x 5 competition waves x 1 vehicle per competitor). The traffic narrative estimates that most of the traffic (80%) will enter the site before 11:00am and leave after 5:00pm. The property utilizes a shared access with two adjacent properties to the east. The access is via non-exclusive 60 -foot access and utility easement delineated per the Subdivision Exemption SE -962 plat which was recorded 4/8/2003 under reception #3050600. A portable toilet will be provided for customers and spectators. The dock and pool are proposed to be surrounded by a 4 to 6 -foot tall fence for safety purposes. The depth of the pool will be four (4) feet. The pool will be saltwater not chlorine/chemical. The pool will be cleaned daily, and the pool filtration system will be cleaned weekly. There is a planned pet waste area consisting of a 20' x 20' fenced area lined with ground cloth and covered with wood chips or turf. Per the application, all pet waste will be bagged and disposed of daily into an onsite dumpster. The dumpster will be emptied weekly. The applicant provided a noise report, prepared by Alles Taylor and Duke, LLC, which indicated that the residential noise limit can be met and stated: "if a "PA system is used,... it should be pointed to the principal structure on the property." Noise is measured 25 -feet from the property line. USR21-0002, Orr— Housewolf, LLC, Page 2 of 10 DEPARTMENT OF PLANNING SERVICES STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED BASED ON THE FOLLOWING APPROVAL CRITERIA: The submitted materials are in compliance with the application requirements of Section 23 -2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services' staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-2-30 C. Harmonize development with surrounding land uses. 1. Transition between land use types and intensities with buffers. Uses that are incompatible with existing uses must be able to mitigate conflicts. The proposed dock diving facility is located near the southern property line (further away from the from the existing residences to the east). The applicant has provided a noise study indicating that the property can meet residential noise standards. Section 22-2-40 A. Support compatible economic development opportunities. 1. Identify target areas where the County is able to encourage shovel -ready commercial and industrial development. This property is located in a Weld County Opportunity Zone, where applicants are encouraged to explore commercial opportunities that are compatible with the surrounding area. A dock diving facility is a commercial opportunity that is compatible with the surrounding area when impacts like noise and traffic are adequately mitigated. B. Section 23-2-220.A.2 -- The proposed use is consistent with the intent of the A (Agricultural) Zone District. The proposed use is permittable under Sections 23-3-40.A. and 23-2-40.H. Agriculture in the County is considered a valuable resource which must be protected from adverse impacts resulting from uncontrolled and undirected business, industrial and residential land uses. The A (Agricultural) Zone District is established to maintain and promote agriculture as an essential feature of the county. The A (Agricultural) Zone District is intended to provide areas for the conduct of agricultural activities and activities related to agriculture and agricultural production, and for areas for natural resource extraction and energy development, without the interference of other, incompatible land uses. The proposal meets the intent because the proposed use will not impact surrounding agricultural uses. No farm ground will be taken out of production as a result of this use. C. Section 23-2-220.A.3 -- The uses which will be permitted will be compatible with the existing surrounding land uses. The site is located immediately to the west of two residences. The property to the south and west is located within the Town of Erie municipal limits and has been platted for a two -lot minor subdivision which has not been developed. One e-mail from a neighboring property owner to the southwest of the site stated concerns with noise (barking dogs) and increased traffic. The applicant has provided a noise report stating that the use will meet the residential noise standard. The facility will be operated during daylight hours (no lighting). Traffic to and from the site is limited during weekdays and the higher traffic animal competitions is limited to one (1) event a month. USR21-0002, Orr— Housewolf, LLC, Page 3 of 10 Conditions of Approval and Development Standards (noise limits) will assist in ensuring compatibility with existing surrounding land uses. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, ortheadopted Master Plans of affected municipalities. The site is located within the three (3) mile referral area of the Town of Erie and the Town of Frederick. This site is not located within the boundary of a Cooperative Planning Agreement (CPA). The Town of Frederick, in their referral response dated January 11, 2021, stated no conflict with their interests. The Town of Erie in their referral comments, dated February 3, 2021 indicated that the Town of Erie Comprehensive Plan (last updated in 2015) identifies the property as LDR-Low Density Residential and this zoning classification does not include business uses. The Town of Erie stated that they do not support the request as it conflicts with their comprehensive plan. The Town of Erie stated that the adjacent property is in the platting process for residential development and requests that the outdoor dog facilities be located a minimum of 300 -feet f ram this property. The size and shape of the property does not allow the outdoor dog facilities to be located a minimum of 300 -feet from the town limits of Erie. Additionally, relocating the facility would move it closer to existing residences to the east whereas the property in Erie has not yet been developed/built for residential use. There is presently an equipment building (constructed in 2006) on the property. The applicant provided a noise study that indicates that the facility can meet the residential noise standard measured 25 -feet from the property line. E. Section 23-2-220.A.5 -- The application complies with Chapter 23, Articles V and XI, of the Weld County Code. The property is not within the Geologic Hazard Overlay District, Agricultural Heritage Overlay District, Airport Overlay District, MS 4 Area or a Special Flood Hazard Area. Building Permits issued on the property will be required to adhere to the fee structure of the County -Wide Road Impact Fee Program, County Facility Fee and Drainage Impact Fee Programs. F. Section 23-2-220.A.6 -- The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision forthe proposed use. The proposal is located on approximately 3.87. acres delineated as Prime if Irrigated and Prime per the 2020 Natural Resource Conservation Service Soil Survey. The property has existing residential improvements, is not being farmed and is too small for larger scale agricultural production. G. Section 23-2-220.A.7 — There is adequate provisions for the protection of the health, safety, and welfare of the inhabitants of the neighborhood and County. The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards can ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. USR21-0002, Orr— Housewolf, LLC, Page 4 of 10 The Department of Planning Services' staff recommendation for approval is conditional upon the following: 1. Prior to recording the map: A. The applicant shall address the requirements of the Colorado Department of Transportation, as stated in the referral response dated February 11, 2021. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. (Department of Building Inspection) B. A Communication Plan shall be submitted to and approved by the Department of Planning Services. (Department of Planning Services) C. The proposed signage as delineated on the USR map is within the right-of-way for State Highway 52. The applicant shall do one of the following: 1) Written authorization from the Colorado Department of Transportation authorizing a sign in this location. 2) The sign location shall relocated within the boundaries of the lot and shall meet the setback requirements delineated in Section 23-4-120 of the Weld County Code. (Department of Planning Services) 3) The map shall be amended to delineate the following: 1. All sheets of the map shall be labeled USR21-0002 (Department of Planning Services) 2. The attached Development Standards. (Department of Planning Services) 3. The map shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 4. The applicant shall delineate on the map the trash collection areas. Section 23 -2- 240.A.1 3 of the Weld County Code addresses the issue of trash collection areas. (Department of Planning Services) 5. The map shall delineate the onsite lighting in accordance with the approved Lighting Plan. (Department of Planning Services) 6. All signs shall be shown on the map and shall adhere to Chapter 23, Article IV, Division 2 and Appendices 23-C, 23-D and 23-E of the Weld County Code. (Department of Planning Services) 7. The map shall delineate the parking area for the vendors, customers and/or employees. (Department of Planning Services) 8. The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to state highways. Show the approved CDOT accesses on the map and label with access permit number if applicable. USR21-0002, Orr— Housewolf, LLC, Page 5 of 10 Show and label the drainage flow arrows. (Department of Public Works) 10. Please contact CDOT to verify the right-of-way. Show and label the right-of-way. (Department of Public Works) 11. Show and label the parking and traffic circulation f low arrows showing how traffic moves around the property. (Department of Public Works) 2. Upon completion of Condition of Approval #1 above, the applicant shall submit one (1) electronic copy (.pdf) of the map for preliminary approval to the Weld County Department of Planning Services. Upon approval of the map the applicant shall submit a Mylar map along with all other documentation required as Conditions of Approval. The Mylar map shall be recorded in the office of the Weld County Clerk and Recorder by the Department of Planning Services. The map shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar map and additional requirements shall be submitted within one hundred twenty (120) days from the date of the Board of County Commissioners Resolution. The applicant shall be responsible for paying the recording fee.(Department of Planning Services) 3. In accordance with Weld County Code Ordinance #2012-3, approved April 30, 2012, should the plat not be recorded within the required one hundred twenty (120) days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall added for each additional three (3) month period. (Department of Planning Services) 4. The Use by Special Review Permit is not perfected until the Conditions of Approval are completed and the map is recorded. Activity shall not occur, nor shall any building or electrical permits be issued on the property, until the Use by Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder or the applicant has been approved for an early release agreement (Department of Planning Services) USR21-0002, Orr— Housewolf, LLC, Page 6 of 10 SITE SPECIFIC DEVELOPMENT PLAN USE BY SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Kornasiewicz — c/o Orr — Housewolf LLC U S R21-00 02 1. A Site -Specific Development Plan and Use by Special Review Permit, USR21-0002, for a Commercial Recreational Facility including Animal Training where Maximum number of Animal Units Permitted in Section 23-3-70.D is exceeded or Traffic to and from the Facility exceeds Sixty (60) Daily Trips (Dock Diving Facility for Dogs) outside of subdivisions and historic townsites in the A (Agricultural) Zone District, subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The hours of operation for private bookings are from 9:00 a.m. - 7:00 p.m. Monday — Friday on an annual basis from April 15th to October 15th. (Department of Planning Services) 4. Dock Diving Competitions will occur one weekend a month on an annual basis from April 15th to October 15th. Competitions hours be between the hours of 9:00am to 5:00pm. (Department of Planning Services) 5. The parking area on the site shall be maintained. (Department of Planning Services) 6. All signs shall adhere to Chapter 23, Article IV, Division 2 and Appendices 23-C, 23-D and 23-E of the Weld County Code. (Department of Planning Services) 7. The property owner shall maintain compliance with the Communication Plan. (Department of Planning Services) 8. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Department of PublicWorks) 9. The access to the site shall be maintained to mitigate any impacts to the public road, including damages and/or off -site tracking. (Department of Public Works) 10. There shall be no parking or staging of vehicles on public roads. On -site parking shall be utilized. (Department of PublicWorks) 11. The historical f low patterns and runoff amounts on the site will be maintained. (Department of Public Works) 12. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30 -20- 100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 13. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. (Department of Public Health and Environment) 14. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. The applicant shall operate in accordance with Chapter 14, Article 1 of the Weld County Code, and the accepted waste handling plan and nuisance abatement plan. (Department of Public Health and Environment) 15. Fugitive dust shall attempt to be confined on the property. Uses on the property should comply with the Colorado Air Quality Commission's air quality regulations and the accepted dust abatement plan. (Department of Public Health and Environment) USR21-0002, Orr— Housewolf, LLC, Page 7 of 10 16. Adequate drinking, hand washing, and toilet facilities shall be provided for employees and patrons of the facility, at all times. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. (Department of Public Health and Environment) 17. Temporary uses that are utilized for a time period of six months or less, portable toilets and bottled water are acceptable. Records of maintenance and properdisposal for portable toilets shall be retained on a quarterly basis and available for review by the Weld County Department of Public Health and Environment. Portable toilets shall be serviced by a cleaner licensed in Weld County, contain hand sanitizers and be screened from public view. (Department of Public Healthand Environment) 18. Any On -site Wastewater Treatment System located on the property must comply with all provisions of the Weld County Code, pertaining to On -site Wastewater Treatment Systems. (Department of Public Health and Environment) 19. The facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as delineated in 25-12-103 C.R.S. The facility shall operate in accordance with the accepted noise report. (Department of Public Health and Environment) 20. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 21. Lighting shall be maintained in accordance with the approved Lighting Plan (Department of Planning Services) 22. Sources of light shall be shielded so that light rays will not shine directly onto adjacent properties where such would cause a nuisance or interfere with the use on the adjacent properties in accordance with the plan. Neither the direct, nor reflected, light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets. No colored lights may be used which may be confused with, or construed as, traffic control devices. (Department of Planning Services) 23. Building permits shall be required for any new construction or set up manufactured structure, per Section 29-3-10 of the Weld County Code. A building permit application must be completed and submitted. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently, the following have been adopted by Weld County: 2018 International Building Codes; 2018 International Residential Code; 2006 International Energy Code; 2017 National Electrical Code; and Chapter 29 of the Weld County Code. A plan review shall be approved, and a permit must be issued prior to the start of construction. (Department of Building Inspection) 24. The property owner or operator shall be responsible for complying with the Design and Operation Standards of Chapter 23 of the Weld County Code. 25. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. 26. The Use by Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards, as shown or stated, shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. USR21-0002, Orr— Housewolf, LLC, Page 8 of 10 27. The property owner or operatorshall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 28. Construction or USE pursuant to approval of a Use by Special Review Permit shall be commenced within three (3) years from the date of approval, unless otherwise specified by the Board of County Commissioners when issuing the original Permit, or the Permit shall be vacated. The Director of Planning Services may grant an extension of time, for good cause shown, upon a written request by the landowner. 29. A Use by Special Review Permit shall terminate when the use is discontinued fora period of three (3) consecutive years, the use of the land changes or the time period established by the Board of County Commissioners through the approval process expires. The landowner may notify the Department of Planning Services of a termination of the use, or Planning Services staff may observe that the use has been terminated. When either the Department of Planning Services is notified by the landowner, or when the Department of Planning Services observes that the use may have been terminated, the Planner shall send certified written notice to the landowner asking that the landowner request to vacate the Use by Special Review Permit. 30. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy; (b) the populous counties of the state face a critical shortage of such deposits; and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. Mineral resource locations are widespread throughout the County and person moving into these areas must recognize the various impacts associated with this development. Often times, mineral resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 31. WELD COUNTY'S RIGHT TO FARM STATEMENT: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long -standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long -established agricultural practices to accommodate the intrusions of urban users into a rural area. Well -run agricultural activities will generate off -site impacts, including noise from tractors and equipment; slow -moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; f lies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. USR21-0002, Orr— Housewolf, LLC, Page 9 of 10 Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and county roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and f ire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sandburs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. USR21-0002, Orr— Housewolf, LLC, Page 10 of 10 February 18, 2021 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.weldgov.com E-MAIL: cgathman@weldgov.com PHONE: (970) 400-3537 FAX: (970) 304-6498 Orr Cassidy Erie, CO 80516 Subject: USR21-0002 - A Site Specific Development Plan and Use by Special Review Permit for a Commercial Recreational Facility (Dock Diving Facility for Dogs) in the A (Agricultural) Zone District. On parcel(s) of land described as: SUBDIVISION EXEMPT SE -962, BEING PART NE4 SECTION 6, Ti N, R68W of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on March 16, 2021 at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on April 14, 2021 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://accela- aca.co.weld.co.us/CitizenAccess Respectfully, ris Gathman Planner Hello