Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20210320.tiff
Cdn+ract lb -4‘.5ayq FACILITIES DEPARTMENT PHONE: (970) 400-2020 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 September 30, 2021 To: Board of County Commissioners From: Toby Taylor Subject: Public Works Storage Building Design Change Order #2 (2021-0320) During the preparation of the Purchase Order, it was discovered there was a $10.00 addition error in the executed document. This was corrected and the vendor signed the corrected Change Order. This comes before the board only to correct this $10.00 difference. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director es2)ne-n+ (0/09 /al cam: E36CTT/SCE), Pv R lots/91 aoa I - 0330 aGoo �3 Date: CHANGE ORDER # 2 TO SERVICE AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC September 15, 2021 Original Agreement: Weld County document no. 2021-0320 County Department: Facilities The parties hereby agree to amend the work to be completed pursuant to the Original Agreement in accordance with the terms of this Change Order. 1. Contractor agrees to provide the amended services as described in the attached Exhibit, which is hereby incorporated into the Agreement. 2. Department agrees to compensate Contractor for said amended services in accordance with the Exhibit. 3. The amount of the contract/Task Order is adjusted as follows: $ 56,760.00 Original Contract/Task Order Amount $ 1,945.00 Previously Approved Change order(s) Amount $ 3,690.00 Current Change Order Amount $ 62,395.00 New Contract/Task Order Total 4. All other terms and conditions of the Original Agreement remain unchanged. CONTRACTOR: By, - Name: Title: Director of Engineering Kenneth R. Caudle, PE ATTEST: d.•d) v• Weld County Clerk to th BY: Deputy Clerk to the Date 09/29/2021 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Steve Moreno, Chair OCT 04 2021 Page 1 of 1 OoD t-p3�© Covrd'u0.Ck (`Di1sa[q FACILITIES DEPARTMENT PHONE: (970) 400-2020 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 September 15, 2021 To: Board of County Commissioners From: Toby Taylor Subject: Public Works Storage Building Design Change Order #2 (2021-0320) Cairn Design, LLC was awarded the on -call design work for the Public Works Storage Building. The design scope changed, due to Weld County use needs, resulting in additional architectural design work. The additional design work has been quoted at $3,690.00 using the fees identified in their bid. Therefore, the Facilities Department is recommending approving this Change Order in amount of $3,690.00 If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director aoocitzitiozi rw5rwideActo c: PuR GG OnBasa ogi99(a► - 03 a0 �3C-� CUS Date: CHANGE ORDER # 2 TO SERVICE AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC September 15, 2021 Original Agreement: Weld County document no. 2021-0320 County Department: Facilities The parties hereby agree to amend the work to be completed pursuant to the Original Agreement in accordance with the terms of this Change Order. By: Name: Title: 1. Contractor agrees to provide the amended services as described in the attached Exhibit, which is hereby incorporated into the Agreement. 2. Department agrees to compensate Contractor for said amended services in accordance with the Exhibit. 3. The amount of the contract/Task Order is adjusted as follows: $ 56,760.00 Original Contract/Task Order Amount $ 1,945.00 Previously Approved Change order(s) Amount $ 3,690.00 Current Change Order Amount $ 62,385.00 New Contract/Task Order Total 4. All other terms and conditions of the Original Agreement remain unchanged. CONTRACTOR: Kenneth R. Caudle, PE Director of Engineering ATTEST: >r/,dttfn) v• XIA4•(0k. Weld County Clerk to the Board BY: 04., a. l i Deputy Clerk to the Boa Date 09/15/2021 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Moreno, Chair SEP 2 7 2021 Page 1 of 1 �a�-o3�0 Exhibit: Change Order # 2 CAIRN DESIGN, LLC September 14, 2021 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Vehicle Storage - Architectural and Engineering Additional Services In accordance with the fees identified in our bid, our lump sum price for this on call work for this project is $3,690.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Vehicle Storage Building in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural design, Civil, Plumbing, Mechanical and Electrical engineering design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests or unknown field conditions. The additional services scope includes: • The addition of a sprinkler room within the building, the addition of a sprinkler line from the 8" water line at the street and a design build specification for the interior fire protection system. Scope of Services: The scope of services included in this proposal are limited to the following: • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. Compensation: Total Design Fee - $3,690.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Sincerely, Ken Caudle, PE Engineering Principal 1805 Sheehy Drive Fort Collins, Colorado 80526 M01286-1968 Storage Facility Add Services Total hours Principal PM ArchlEng Drafter 0 Add for Sprinklers 32 2 6 8 16 b 0 c 0 d 0 e 0 f 0 g 0 h 0 32 2 6 8 16 hours $175.00 $150.00 $125.00 $90.00 rates $350.00 $900.00 $1,000.00 $1,440.00 $3,690.00 total fee Contract Form Entity Information Entity Marne* CAIRN DESIGN LLC New Contract Request Entity ID* 800039527 Contract Name* PUBLIC WORKS STORAGE DESIGN (2021-0320) Contract Status CT6 REVIEW Contract Description* CHANGE ORDER # 2 Contract Desorption 2 Contract Type* CHANGE ORDER Amount* S3,690.00 Renewable* NO Automatic Renewal Grant Department BUILDINGS AND GROUNDS Department Email CM- BuildingGrounds@weldgov.c Om Department Head Email CM-BuildingGrounds- DeRtHeadgwel dgay.com County Attorney GENERAL COUNTY ATTORNEY EMAIL County Attorney Email CM- COUNTYATTORNEY@WELDG OV.COM New Entity? Contract ID 5249 Contract Lead* SGEESAMAN Contract Lead Email sgeesamanOco.weld.co.us Requested BOCC Agenda Date* 09 27 2021 Parent Contract ID Requires Board Approval YES Department Project # Due Date 09232021 Will a work session with BOCC be required?* NO Does Contract require Purchasing Dept. to be included? YES Bid J RFP #* B1900100 If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID Note: the Previous Contract Number and Master Serofices Agreement Number should be left blank if those contracts are not in On Base Contract Dates Effective Date Review Date* Renewal Date 11;01 2021 Termination Notice Period Committed Delivery Date Expiration Date' 11 01;2021 Contact Information Contact Info Contact Name Purchasing Purchasing Approver ROB TURF Approval Process Department Head TOBY TAYLOR DH Approved Date 09/15 2021 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 09,'27 ' 2021 Originator SGEESAMAN Contact Type Contact Email Finance Approver CHRIS D'OVIDIO Contact Phone 1 Purchasing Approved Date 09 21 ,`2021 Finance Approved Date 09 15:'2021 Tyler Ref it AG 092 721 Legal Counsel BOB CHOATE Contact Phone 2 Legal Counsel Approved Date 09/15-2021 (b-#1/4,33 FACILITIES DEPARTMENT PHONE: (970) 400-2020 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 April 9, 2021 To: Board of County Commissioners From: Toby Taylor Subject: Weld County Public Works Storage Building Design - Change Order (2019-2250) Cairn Design, LLC was awarded the bid to design the Centennial Courtroom remodel and subsequent on - call design work. One of those approved design projects is the Public Works Storage building design. During the design process, Public Works desired the building's location on the lot be moved. Due to this movement, additional civil engineering services are needed. This additional design work has been quoted at $1,945.00 using the fees identified in their bid. Therefore, the Facilities Department is recommending approving this task order in amount of $1,945.00 If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 46( o,o,?4 _ 030-0 66-0 6.2-3 TASK ORDER 3-2021 PURSUANT TO AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC Date: April 6, 2021 Project Title: Weld County Vehicle Storage - Architectural and Engineering Additional Services Completion Date: June 30, 2021 Compensation: $1,945.00 Original Agreement: Weld County document no. 2019-2250 Pursuant to the "Original Agreement", the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as -needed basis. Any such Task Order shall be signed by the Weld County Facilities Director before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year, unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The original project involves full architectural and engineering design and construction administration of the Weld County Vehicle Storage. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Civil engineering design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests or unknown field conditions. The additional services scope includes: Additional grading and topographic design due to the owner's requested building relocation.: • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. Contractor agrees to perform the services identified above and on the attached Exhibit in accordance with the 'terms and conditions contained herein and in the Original Agreement between the parties. The amount of the contract is adjusted as follows: $ 58,160.00 Original Contract Amount $ 345,112.50 Previously Approved Task order(s) Amount $ 1,945.00 Current Task Order Amount Page 1 of 2 TASK ORDER 3-2021 PURSUANT TO AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC $ 347,057.50 New Contact Total CONTRACTOR: By: Name: Title: ATTEST: iddrAwki v•o� Weld • u ty Clerk to the B and BY: Date 2,321 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Deputy Cle r to t e Bo.�'►% ' /� �� eve Moreno, Chair Page 2 of 2 APR 2 1 2021 02 -0021 -e7.3. -e2 Exhibit: TO 3-2021 CAIRN DESIGN, LLC Qeui.9 ko,1240. 6.x.9 .ezeivs, April 6, 2021 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Vehicle Storage - Architectural and Engineering Additional Services In accordance with the fees identified in our bid, our lump sum price for this on call work for this project is $1,945.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Vehicle Storage Building in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Civil engineering design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests or unknown field conditions. The additional services scope includes: • Additional grading and topographic design due to the owner's requested building relocation. Scope of Services: The scope of services included in this proposal are limited to the following: • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. Compensation: Total Design Fee - $1,945.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Sincerely, Ken Caudle, PE Engineering Principal 1805 Sheely Drive Fort Collins, Colorado 80526 [910]2861968 Contract Form New Contract Request Entity Information Entity Name* CAIRN DESIGN LLC Entity ID* g'00039527 Contract Name* WELD COUNTY PW VEHICLE STORAGE 2019-2250 Contract Status CTB REVIEW ❑ New Entity? Contract ID 4633 Contract Lead* SGEESAMAN Contract Lead Email sgeesamanco.weld.co.us Parent Contract ID Requires Board Approval YES Department Project # Contract Description* ADDITIONAL DESIGN WORK FOR THE PUBLIC WORKS VEHICLE STORAGE BUILDING (TO 3-2021.) Contract Description 2 Contract Type* TASK ORDER Amount* $1,945.00 Renewable* NO Automatic Renewal Grant IGA Department BUILDINGS AND GROUNDS Department Email CM- BuiidingGrounds@weldgov.c Onl Department Head Email CM-BuildingGrounds- DeptHeadPiNeldgov.com County Attorney GENERAL COUNTY ATTORNEY EMAIL County Attorney Email CM- COU NTYATTO RN EY,@WELDG OV.COM If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID Requested BOCC Agenda Date* 04.'19/2021 Due Date 04/15%2021 Will a work session with BOCC be required?* NO Does Contract require Purchasing Dept. to be included? Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in OnBase Contract Dates Effective Date Review Date* 09/06?2021 Renewal Date Termination Notice Period Committed Delivery Date Expiration Date ir 09!06,'2021 Contact Information Contact Info Contact Name Purchasing Purchasing Approver Approval Process Department Head TOBY TAYLOR DH Approved Date 04;16/2021 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 04/2112021 Originator SGEESAMAN Contact Type Contact Email Contact Phone 1 Contact Phone 2 Finance Approver BARB CONNOLLY Purchasing Approved Date Legal Counsel BOB CHOATE Finance Approved Date Legal Counsel Approved Date 04j19;'2021 04 19 2021 Tyler Ref # AG 042121 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 400-2023 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 January 27, 2021 To: Board of County Commissioners From: Toby Taylor Subject: Public Works Storage Building — Design Services (2019-2250) Carin Design LLC was one of four vendors awarded the on -call design services for the Weld County (2019-2250). There is a need to design the new Public Works Equipment Storage building. Carin Design LLC has quoted the total for accomplishing this work at $56,760.00 using the rates identified in their bid. Buildings & Grounds is recommending approval of this contract amendment for this scope of work. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director al-/- o2J 2021-0320 ,BGooa3 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Date: January 21, 2021 Task Order Number: Cairn Design LLC —1-2021 Project Title: Weld County Public Works Storage Facility - Architectural & Engineering Design Services Completion Date: Design Compensation: $56,760.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the Weld County Public Works Storage Facility in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, structural mechanical, electrical, civil and plumbing design for the project. This proposal is for the full scope of work detailed in the exhibit Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: Cairn Design LLC By: Date I/ 2� / ZI Name: Keane+4r Caudle, Title: ngineerinq ManarAer PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Weld WELD COUNTY, COLORADO BY: Deputy rk to he Bteve Moreno, Chair FEB 0 12021 APPROVED AS TOTUNDI // ; '� APPROVED ATO SUBSTANCE: Controller APPROVED AS TO FORM: l7' �,1.•a✓1 t_ County Attorney Elected Ida' or Department Head Exhibit: Task Order 1-2021 CAIRN DESIGN, LLC 6,61 qt,12.40,kintalce 6169 ufattom January 19, 2021 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Public Works Storage Facility - Architectural and Engineering Services In accordance with the fees identified in our bid, our lump sum price for this on call work for this project is $56,760.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Public Works Storage Facility. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, structural, civil, mechanical, electrical and plumbing design for the project. This proposal is for the scope of services including: • Full design services per the attached scope of work. Compensation: Total Design Fee - $56,760.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. The hourly breakdown per the on call contract is attached. Reimbursable expenses, +/- $500 (mileage and printing services) invoiced at cost + 10%. Exclusions: • Design of any system not listed above. • Design changes, layout changes, or value engineering requested by client or owner after the final submission. Sincerely, Ken Caudle, PE Engineering Principal 1805 Shealy Drive Fort Collins, Colorado 80526 19101286-1968 Weld County is soliciting proposals for the design of a new Public Works Storage Building. The scope of the project includes: 1. Design of a 90' by 175' clear span steel framed building to include all electrical, mechanical and plumbing as described herein. 2. The building height, headroom, roof pitch, and color are to match the existing buildings. 3. Sidewalls and roof system are to be 24-26 gauge (minimum) painted steel. Colors to match existing blue building in Public Works Complex. 4. Building site plan will be developed. 5. Building will consist of equipment storage bays. Six of these will be accessed and exited by using 14' by 14' insulated garage doors. 6. There will two trench drains that run the lengthwise distance of the building. These will be tied into sanitary sewer via a sand/oil separator. 7. The building will not include toilet, office, break room or other facilities. 8. The building will be insulated to current codes. 9. Electrical power will include standard 120 -volt power duplex outlets between all roll up doors, four duplex outlets on the short ends. 10. There will be three 220 volt receptacles installed. One on each short end and one in the center of the building. 11. One water spigot will be provided on the north interior wall. 12. Interior lighting will consist of LED lighting fixtures. These we be appropriately zoned and have the capability to switch all the on/off from any walk-in door. 13. Building will have a 6 -inch thick (minimum) reinforced concrete floor to allow for dump trucks to be driven on it. And will have four foot wide, 6 -inch thick apron on the sides of the building 14.6 -inch steel bollards filled with concrete will be required on both sides of the garage door bay entries (and inside and outside). In addition, a bollard will be placed at the corners of the building on the approach side. Bollards will be painted yellow. 15. All prints will be engineered/stamped as required to be accepted and approved by the Weld County Building Inspection Department. 16. There will be two exhaust fans located at one end of the building to allow for positive ventilation of exhaust fumes. This fan will be connected to a detector to turn on automatically if the exhaust vapors reach an unsafe level. In addition, the fans will be connected to a switch for manual on/off activation. 17. The exterior lighting will contain four each wall packs on each long side of the building and three each wall pack on the ends. 18. There will be a total of four each 36 -inch wide walk-in doors, one per each side. 19. Coordination with utilities (power, gas, etc.) will be provided. 20. There will be four each all weather electrical boxes that contain two duplexes each installed on the long ends of the building and two each all weather electrical boxes that contain two duplexes each installed on the short ends of the buildings. 21. The building will be heated with a natural gas tube heat system designed for the space. 22. The distance between the existing building and new building will be 50 feet to allow for a drive pathway. Project: Storage Building Architecture Principal Site Visit Space Planning / Architectural Revisions Code Forms Permit Comments Design Meetings Construction Meetings Hours 4 6 36 8 4 4 20 4 Total 86 hours Project Management General Project Management Design Meetings Construction Meetings Electrical Principal Site Visit Power and Lighting Telecom and FA Revisions Code Fonns/Calculations Permit Comments Design Meetings Construction Meetings Principal PM ArchlEng Drafter Assumptions 4 2 2 6 12 24 8 4 4 18 2 2hours / mtgs / 10 mtgs 2hours / mtg / 2 mtgs 8 0 54 24 hours $175.00 $150.00 $125.00 $90.00 rates Architecture $1,400.00 $0.00 $6,750.00 $2,160.00 $10,310.00 Total Hours Principal PM Arch/Eng Drafter Assumptions 15 15 10 10 2hours / mtgs / 5 mtgs 10 10 2hours/mtg/ 5 mtgs 35 hours Hours 6 4 27 4 4 4 4 2 2 Total 57 hours Mechanical PM Principal Site Visit Balance/Calcs/Evaluation Design Revisions Code Forms/Schedules Permit Comments Design Meetings Construction Meetings 0 35 0 0 hours $175.00 $150.00 $125.00 $90.00 rates Project Management $0.00 $5,250.00 $0.00 $0.00 $5,250.00 Total Principal PM Arch/Eng Drafter Assumptions 6 4 12 15 4 4 4 4 2 2hours / mtgs / 1 mtgs 2 2hours / mtg / 1 mtgs 10 0 32 15 hours $175.00 $150.00 $125.00 $90.00 rates $1,750.00 $0.00 $4,000.00 $1,350.00 $7,100.00 Total Arch/Else/PM Fee Hours 4 2 0 9 48 2 2 2 2 2 Total 73 hours Electrical $7,100.00 Total Principal PM Arch/Eng Drafter Assumptions 4 2 3 6 16 32 2 2 2 2 2 2hours / mtgs / 1 mtgs 2hours / mtg / 1 mtgs 2 4 29 38 hours $175.00 $150.00 $125.00 $90.00 rates Mechanical $350.00 $600.00 $3,025.00 $3,420.00 $7,995.00 Total Structural PM Principal Site Visit Calcs/Evaluation Design Revisions Code Forms/Schedules Permit Comments Design Meetings Construction Meetings Hour 4 4 4 7 46 4 6 6 4 4 Total 89 hours Civil PM Principal Site Visit Calcs/Evaluation Design Revisions Code Forms/Schedules Permit Comments Design Meetings Construction Meetings Total Hour 2 2 4 39 60 16 4 14 4 4 Principal PM Arch/Eng Drafter Assumptions 4 4 4 4 3 16 30 2 2 4 2 4 2 4 4 2hours / mtgs / 2 mtgs 2hours / mtg / 2 mtgs 4 4 42 39 hours $175.00 $150.00 $125.00 $90.00 rates Structural $700.00 $000.00 $5,250.00 $3,510.00 $10,060.00 Total Principal PM Arch/Eng Drafter Assumptions 2 2 4 15 24 24 36 8 8 2 2 6 8 4 4 2hours / mtgs / 2 mtgs 2hours / mtg / 4 mtgs 149 hours 2 2 67 78 hours $175.00 $150.00 $125.00 $90.00 rates $350.00 $300.00 $8,375.00 $7,020.00 Architectural A/E Project Management Electrical Mechanical/Plumbing Structural Civil Survey $10,310.00 Total Architectural $5,250.00 Total PM Fee $7,100.00 Total Elec./PM Fee $7,995.00 Total M and P hie $10,060.00 Total Struct. fee $16,045.00 Total Civil fee $0.00 Total Surveyor hie $56,760.00 Total NE fee Civil $18,045.00 Total Invoicing Schedule and Submissions 30% $17,028.00 SD 30% $17,028.00 DD 30% $17,028.00 CD 10% $5,676.00 Construction $56,760.00 Total
Hello