HomeMy WebLinkAbout20213029.tiffPvbl(c Re-v:ew
/al
CDPHE
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
1150 O St
PO Box 758
Greeley, CO 80632
October 20, 2021
To Whom it May Concern:
RECEIVED
OCT 252021
WELD COUNTY
COMMISSIONERS
On October 21, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for
PDC Energy, Inc. - Sunlight 8 Sec HZ. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
G PLCTP), t-ILCOSI TR),Pt,J(3rr,ERIGFI ICIS),
Oes Caen)
I O/95191
2021-3029
Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: PDC Energy, Inc. - Sunlight 8 Sec HZ - Weld County
Notice Period Begins: October 21, 2021
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: PDC Energy, Inc.
Facility: Sunlight 8 Sec HZ
Well Production Facility
NWSW SEC 8 T5N R64W
Weld County
The proposed project or activity is as follows: Applicant proposes the construction and permitting of a new
oil &t gas well production facility in Weld County, CO. The facility will consist of eleven (11) wells;
permitted equipment will include a condensate storage tank battery (21WE0133), hydrocarbon liquid
loadout (21WE0134), a produced water storage tank battery, and three spark -ignition reciprocating internal
combustion engines (GP02).
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 21WE0133 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe.commentsapcd@state.co.us
• Send comments to our mailing address:
Ben Fischbach
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.01
ISO
COLORADO
Department of Public
Health Et Environment
Hello