HomeMy WebLinkAbout20212077.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF
TEMPORARY CLOSURE OF COUNTY ROAD 13 BETWEEN COUNTY ROADS 42
AND 44 FOR APPROXIMATELY AN ADDITIONAL THREE (3) MONTHS, FOR
UNANTICIPATED DELAYS DUE TO COMPLICATIONS WITH AN EXISTING
WATERLINE RELOCATION
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of
Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on
County roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic
thereon for the safety of the general public and that said traffic control devices shall conform to
the Federal Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that the temporary closure of County Road 13, between
County Roads 42 and 44, be extended, with said extended closure being effective December 16,
2020, for approximately an additional three (3) months through October 31, 2021, for
unanticipated delays due to complications with an existing waterline relocation, and further, that
standard official traffic control devices shall be erected at said closure giving notice of the
restrictions.
CG:So(RS),D:sPo•-tok, CSP
2021-2077
EG0024
TEMPORARY CLOSURE — COUNTY ROAD 13
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 19th day of July, A.D., 2021, nunc pro tunc September 23, 2020.
BOARD OF COUNTY COMMISSIONERS
WELD OUNTY, COLORADO
ATTEST: ,d4J W XLiok.
Weld County Clerk to the Board
County''torney
Date of signature: O7/9-7/a-
--1-12--1--•-e--
Steve reno, Cha'
Sc mes, Pro- e
Perry L. k
2021-2077
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: July 15, 2021
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
DCP Operating Company is requesting permission to extend the closure of CR 13 between CR 42 and CR
44 from 7/31/2021 through 10/31/2021 in order to complete remediation due to a major natural gas
pipeline leak and complete reconstruction of CR 13 and CR 42. A temporary shoo fly has been
constructed to keep traffic moving. VMB's will be in place. The request is due to new requirements from
the COGCC which is requiring new testing data and complications with an existing waterline relocation.
The original approval was Resolution 2020-2930 and was extended under Resolution 2020-3662.
See attached closure diagram.
2021-2077
LOVELAND
BARRICADE
g�ma� sad:,ef.ur_
Traffic Control • Sit MarxAact
Pavement Malang -
Contractor
nng 8 InsiaNxior -
Supplies
4Th Wail Ate
Lrieland. CO80638
R1one: (970) 663-6311
FD: (970) 663-66270
TRAFFIC CONTROL PLAN
MHT
#1
Location:
City:
F or
[)ate:
WCR I3 k VCR 43
Johnstown, CO
Gerard Excavating
October 2nd,2oz0
NOT DRAWN TO
SCALE
NOTE:
- Sign spacing will be determineci according to
Table 6H-3 in the Manual on Uni'orm Traffic
Control Devices (MUTCD).
- Loveland Barricade L.L.C. Does Net Accept
Any Liability If Another Company Or Individual
Sets Up The Traffic Control Rep•esented On This
Plan/M.H.T.
t
r
cc
U
a
swain
Naha
NI
a.a+wn.
CR 13
CLOSED
ATCR44
OCT. 5TH
-HRU
DEC. 16TH
USE
DETOUR
ROUTE
/:ELP
WR
25
CONCRETE
BARRIER
WCR 44
Tabulation of Devices:
5 - Road Work Ahead
1 - Road Closed Ahead
2 - Detour Ahead
2 - Two Way Traffic
1 - Right Curve
1 - Left Curve
2 - Speed Limit 25
2 - Speed Limit 40
1 - Speed Limit 55
6 - Caution Heavy Cross Traffic
2 - Thank You
2 - Detour Tracker Left
1 - Detour Tracker Right
1 - Type III Barricade Road Closed
To Thru Traffic Detour Right
2 - Type III Barricade Road Closed
1 - Type Ill Barricade Road Closed
Right Arrow
1 - Type III Barricade Plain
3 - Message Boards
6 - Chevron
32 -Drum Channelizers
WCR 42
It
CR 13
CLOSED
AT CR 44
OCT. 5TH
THRU
DEC. 16TH
USE
DETOUR
ROUTE
CONCRETE
BARRIER
WORK
AREA
CR 42C
CR 13
CLOSED
AT CR 42
OCT. 5TH
THRU
DEC. 16TH
USE
DETOUR
ROUTE
arion.com
Hello