Loading...
HomeMy WebLinkAbout20212077.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROAD 13 BETWEEN COUNTY ROADS 42 AND 44 FOR APPROXIMATELY AN ADDITIONAL THREE (3) MONTHS, FOR UNANTICIPATED DELAYS DUE TO COMPLICATIONS WITH AN EXISTING WATERLINE RELOCATION WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the temporary closure of County Road 13, between County Roads 42 and 44, be extended, with said extended closure being effective December 16, 2020, for approximately an additional three (3) months through October 31, 2021, for unanticipated delays due to complications with an existing waterline relocation, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CG:So(RS),D:sPo•-tok, CSP 2021-2077 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 13 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 19th day of July, A.D., 2021, nunc pro tunc September 23, 2020. BOARD OF COUNTY COMMISSIONERS WELD OUNTY, COLORADO ATTEST: ,d4J W XLiok. Weld County Clerk to the Board County''torney Date of signature: O7/9-7/a- --1-12--1--•-e-- Steve reno, Cha' Sc mes, Pro- e Perry L. k 2021-2077 EG0024 MEMORANDUM TO: Clerk to the Board DATE: July 15, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item DCP Operating Company is requesting permission to extend the closure of CR 13 between CR 42 and CR 44 from 7/31/2021 through 10/31/2021 in order to complete remediation due to a major natural gas pipeline leak and complete reconstruction of CR 13 and CR 42. A temporary shoo fly has been constructed to keep traffic moving. VMB's will be in place. The request is due to new requirements from the COGCC which is requiring new testing data and complications with an existing waterline relocation. The original approval was Resolution 2020-2930 and was extended under Resolution 2020-3662. See attached closure diagram. 2021-2077 LOVELAND BARRICADE g�ma� sad:,ef.ur_ Traffic Control • Sit MarxAact Pavement Malang - Contractor nng 8 InsiaNxior - Supplies 4Th Wail Ate Lrieland. CO80638 R1one: (970) 663-6311 FD: (970) 663-66270 TRAFFIC CONTROL PLAN MHT #1 Location: City: F or [)ate: WCR I3 k VCR 43 Johnstown, CO Gerard Excavating October 2nd,2oz0 NOT DRAWN TO SCALE NOTE: - Sign spacing will be determineci according to Table 6H-3 in the Manual on Uni'orm Traffic Control Devices (MUTCD). - Loveland Barricade L.L.C. Does Net Accept Any Liability If Another Company Or Individual Sets Up The Traffic Control Rep•esented On This Plan/M.H.T. t r cc U a swain Naha NI a.a+wn. CR 13 CLOSED ATCR44 OCT. 5TH -HRU DEC. 16TH USE DETOUR ROUTE /:ELP WR 25 CONCRETE BARRIER WCR 44 Tabulation of Devices: 5 - Road Work Ahead 1 - Road Closed Ahead 2 - Detour Ahead 2 - Two Way Traffic 1 - Right Curve 1 - Left Curve 2 - Speed Limit 25 2 - Speed Limit 40 1 - Speed Limit 55 6 - Caution Heavy Cross Traffic 2 - Thank You 2 - Detour Tracker Left 1 - Detour Tracker Right 1 - Type III Barricade Road Closed To Thru Traffic Detour Right 2 - Type III Barricade Road Closed 1 - Type Ill Barricade Road Closed Right Arrow 1 - Type III Barricade Plain 3 - Message Boards 6 - Chevron 32 -Drum Channelizers WCR 42 It CR 13 CLOSED AT CR 44 OCT. 5TH THRU DEC. 16TH USE DETOUR ROUTE CONCRETE BARRIER WORK AREA CR 42C CR 13 CLOSED AT CR 42 OCT. 5TH THRU DEC. 16TH USE DETOUR ROUTE arion.com Hello