Loading...
HomeMy WebLinkAbout20210595.tiffFACILITIES DEPARTMENT PHONE: (970) 400-2020 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 February 23, 2021 To: Board of County Commissioners From: Toby Taylor Subject: Fleet Services Parking Lot Design (2019-2250) Robert Shreve Architects and Planners (RSAP) was awarded the bid design the Wash Bay and Welding Shop building as well as subsequent on -call design work. There is a need to design a parking lot area around the new building to fully use the DOLA grant funding. This design work has been quoted at $17,800.00 using the fees identified in their bid. Therefore, the Facilities Department is recommending approving this task order in amount of $17,800.00 If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director dolze,r- /Wild t p3/o/ a.t O_, _ca.' c&..P T/s 2021-0595 10600x3 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND ROBERT SHREVE ARCHITECTS & PLANNERS Date: February 10, 2021 Task Order Number: Robert Shreve Architects & Planners — 3-2021 Project Title: Fleet Services- Design Services — Parking lot Revision Completion Date: Design Compensation: $17,800.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve paving the area between the Hazardous Waste Building, the Fleet Services Building and the New Truck Wash & Welder building under construction. located at 1399 N. 17th Ave. in Greeley, CO. to include: 1. Survey existing site 2. Proposed Site and Grading plan for additional pavement around Fleet Services Building 3. Redesign of existing Fleet Services Detention pond 4. Revising Existing Approved Drainage Report 5. Acquiring City of Greeley Approval for Revisions Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CO RACTOR: Robert reve Archie & Planning By: \ SiAL Name: R01'-,IZT S(-1 tVIJ Title: Date PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND ROBERT SHREVE ARCHITECTS & PLANNERS Weld BY: Deputy CI APPROVED AS TO FUNDING: LYE Controller APPROVED AS TO FORM: County Attorney ELD COUNTY, COLORADO oreno, Chair MAR 0 1 2021 OVEDTO SUBSTANCE: ElecteOfficial or Department Head RSA= Exhibit: T. O.3-2021 ROBERT SHREVE ARCHITECTS & PLANNERS MADISON & MAIN BUILDING 801 8TH STREET, STE. 120 GREELEY, COLORADO 80631 970-346-0151 FAX 970-352-8761 Weld County Buildings and Grounds 1105 H Street Greeley, Co 80631 Attention: Toby Taylor Re: Fleet Services Parking Lot Revision 1311 17'11 Avenue, Greeley, CO Dear Toby, February 8, 2021 This proposal is in response to our discussion regarding the need to pave the area between the Hazardous Waste Building, the Fleet Services Building and the New Truck Wash & Welder building under construction. I have asked Wernsman Engineering and Land Development LLC to provide the necessary engineering and appropriate construction documents for this project. This are the same firm that will be providing the design services for the Truck Wash and Welding Building, the Weld County Crime Lab Storage Facility, and the Startec Pavement Replacement project. 1. Survey existing site 2. Proposed Site and Grading plan for additional pavement around Fleet Services Building 3. Redesign of existing Fleet Services Detention pond 4. Revising Existing Approved Drainage Report 5. Acquiring City of Greeley Approval for Revisions Items that are not included, that could be required: Potholing/ Location of existing utilities Pavement Designs Soils report or soft spot remediation recommendations. Landscape plan Any Weld County Approval Process Specification Book for the project. The proposed cost for doing the design phase of the work is $17,800.00. The cost to review shop drawings and normal construction contract administration are induded in this proposal. Time has also been induded to assist with responses to questions that arise during the bidding and the construction of the project. Any additional work will require an amendment to the contract. Upon receipt of written notice or a task order, we will begin to prepare the appropriate documents. Thank you for considering RSAP/ G2 forthis work. Slncrly Robert J. Shreve, AIA Robert Shreve Architecture & Planners Hello