Loading...
HomeMy WebLinkAbout20210890.tiffCOLORADO Department of Public Health 8 Environment Weld County - Clerk to the Board 1150 0 St PO Box 758 Greeley, CO 80632 March 17, 2021 To Whom it May Concern: RECEIVED MAR 2 2 2021 WELD COUNTY COMMISSIONERS On March 18, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for Enerplus Resources (USA) Corporation - Saskatchewan Pad. A copy of this public notice is enclosed. Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of this notice is required by Colorado Air Quality Control Commission regulations. The notice must be available for public inspection for a period of thirty (30) days from the beginning of the public notice period. Please reference the public notice for instructions on submitting comments. 4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director Pub1tc Rev;et,J 3/31/21 Cc: pL(Tp) H i(DS /rR) Plnl(S14(ER /c H /cK) oG(SM) ` .3/2_4 al 2021-0890 Air Pollution Control Division Notice of a Proposed Project or Activity Warranting Public Comment Website Title: Enerplus Resources (USA) Corporation - Saskatchewan Pad - Weld County Notice Period Begins: March 18, 2021 Notice is hereby given that an application for a proposed project or activity has been submitted to the Colorado Air Pollution Control Division for the following source of air pollution: Applicant: Enerplus Resources (USA) Corporation Facility: Saskatchewan Pad Well production facility SESE Section 34, T8N R66W Weld County The proposed project or activity is as follows: New well production facility in the ozone non -attainment area. Permitted equipment are condensate storage tanks, produced water tanks, loadout of condensate to trucks, and flaring of separator gas when the gas pipeline is not available. Permit -exempt equipment associated with this project is a 49 hp Cummins G5.9 engine used for compression. APEN-exempt equipment associated with this project are two (2) 1.5 MMBtu/hr heaters, fugitives, compressor blowdowns, and dessicant dehy venting. Operation of the facility began on April 21, 2020, according to the APENs submitted 7/20/2020. The Division has determined that this permitting action is subject to public comment per Colorado Regulation No. 3, Part B, Section III.C due to the following reason(s): • permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area) • the source is requesting a federally enforceable limit on the potential to emit in order to avoid other requirements The Division has made a preliminary determination of approval of the application. A copy of the application, the Division's analysis, and a draft of Construction Permits 20WE0771, 20WE0772, 20WE0774, and 20WE0775 are available on the Division's website at https://www.colorado.gov/cdphe/air- permit-public-notices The Division hereby solicits submission of public comment from any interested person concerning the ability of the proposed project or activity to comply with the applicable standards and regulations of the Commission. The Division will receive and consider written public comments for thirty calendar days after the date of this Notice. Comments may be submitted using the following options: • Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page.also includes guidance for public participation • Send an email to cdphe.commentsapcd@state.co.us • Send comments to our mailing address: 2.01 1 i a COLORADO Department of Public Health 6 Environment Andy Gruel Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South, APCD-SS-B1 Denver, Colorado 80246-1530 2.01 2 I a COLORADO Department at Public Health 6 Environment Hello