Loading...
HomeMy WebLinkAbout20194763.tiffDEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 January 27, 2021 To: Board of County Commissioners From: Toby Taylor Subject: GSG Architecture Inc. — Health Lab Design Services; (2019-2250) GSG Architecture Inc was awarded the on -call design services for the Health Laboratory Remodel. During design process, the Health Department identified changes with desiring a different type of storage for inert gasses that are used in the laboratory operations. To incorporate this new desire into the construction plans, additional design work is needed. GSG Architecture has identified those design costs as $5,030.00. Buildings & Ground is recommending approval of this change order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director LP ,20/9-47L0 ��l '� (z% p602-1 CONTRACT AGREEMENT EXTENSION/AMENDMENT BETWEEN THE WELD COUNTY DEPARTMENT OF BUILDINGS & GROUNDS AND GSG ARCHITECTURE INC. This Agreement Amendment ("Amendment"), made and entered into 25th day of January, 2021, by and between the Board of Weld County Commissioners, on behalf of the Weld County Department of Buildings and Grounds, hereinafter referred to as the "Department", and GSG Architecture Inc. hereinafter referred to as the "Contractor". WHEREAS the parties entered into an agreement (the "Original Agreement") identified by the Weld County Clerk to the Board of County Commissioners as document No. 2019-4763, approved on December 9, 2020. WHEREAS the parties hereby agree to amend the terms of the Original Agreement in accordance with the terms of the Original Agreement, which is incorporated by reference herein, NOW THEREFORE, in consideration of the premises, the parties hereto covenant and agree as follows: • The Amendment, together with the Original Agreement, constitutes the entire understanding between the parties. The following change is hereby made to the Contract Documents: 1. Change Order #1, dated January 25th, 2021 is hereby incorporated as an exhibit to the agreement and the terms are included in the Agreement. • All other terms and conditions of the Original Agreement remain unchanged. IN WITNESS WHEREOF, the parties hereto have duly executed the Agreement as of the day, month, and year first above written. CONTRACTOR: James G Holloway Principal / C.E.O.; GSG Architecture Printed Name Signature ATTEST: Weld BY: Deputy Cle to th Boar APPROVED AS TO FUNDING: Controller APPROVED AS TO FORM: 7l County Attorney BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO Steve Moreno, Chair APPROVED AS FEB 0 12021 O UBSTANCE: Elected %ffi al or Department Head i9- � 7‘03 Exhibit: Change Order #1 Weld County Department of Public Health & Environment GSG Architecture Proposal for Additional A & E Services Project No. 2085 January 25, 2021 GsGarchitecture DESIGN ARCHITECTURE/PLANNING Explanation of Additional Service Request: Based on the County's decision to revise completed construction drawings to accommodate argon gas canister relocation outside the laboratory, GSG Architecture and our Engineering Consultant IMEG respectfully request the following fees associated with these additional services through the completion of the redesign and the preparation of completed Construction Documents: GSG Architecture IMEG GSG Admin Fee (10% of IMEG Fee) $ 2,830 $ 2,000 $ 200 TOTAL $ 5,030 No additional expenses are anticipated, and no changes are requested to the Bidding or Construction Administration portions of the existing agreement. This request is not inclusive of any previous additional service request and all other aspects of the original agreement remain in force with the exception of the schedule. We will provide an updated schedule to complete the design portion of the project as soon as possible. Please call to discuss at your convenience with any questions. We are happy to discuss how this request was derived. Sincerely, James Holloway, AIA, LEED AP CEO / Principal Page 1 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 December 7, 2020 To: Board of County Commissioners From: Toby Taylor Subject: GSG Architecture Inc. — Health Lab Design Services; (2019-2250) GSG Architecture Inc was awarded the design services for the Health Laboratory Remodel. During design process, the Health Department identified changes in the design work scope that would optimize their workflow. To accommodate these changes in design, a change order in the amount of $12,790.00 is needed. Buildings & Ground is recommending approval of this change order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director ei)r)Soi-t- 09 I FIO /3&. err/ s QO19-97673 660091 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND GSG ARCHITECTURE INC. Date: December 3, 2020 Task Order Number: GSG Architecture Inc. — 2-2020 Project Title: Weld County Health - Design Services - Additional Mechanical Engineering & Architectural Services Completion Date: Design Compensation: $12,790.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will provide additional revised Architecture and Engineering drawings to accommodate the new laboratory layout Complete services for the project as described in the attached Exhibit -Task Order 2-2020. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: GSG Architecture INC. By: fl� Date 12/03/2020 Name: James G. Holloway Title: Principal, CEO GSG Architecture PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND GSG ARCHITECTURE INC. Weld BY: Deputy Clef' APPROVED AS TO FUNDING: Controller APPROVED AS TO FORM: f� m County Attorney WELD COUNTY, COLORADO Mike Freeman, Chair DEC 0 0 2020 APPROVED • = TO SUBSTANCE: icial or Department Head 9- itc 6.3 Exhibit: Task Order #2-2020 Weld County Department of Public Health & Environment GSG Architecture Proposal for Additional A & E Services Project No. 2085 November 24, 2020 GSGarchitecture DESIGN ARCHITECTURE/PLANNING Explanation of Additional Service Request: Based on the County's decision to revise completed construction drawings to accommodate a new laboratory layout, GSG Architecture and our Engineering Consultant IMEG respectfully request the following fees associated with these additional services through the completion of the redesign and the preparation of completed Construction Documents: GSG Architecture IMEG GSG Admin Fee (10% of IMEG Fee) $ 3,440 $ 8,500 $ 850 TOTAL $12,790 No additional expenses are anticipated, and no changes are requested to the Bidding or Construction Administration portions of the existing agreement. This request is not inclusive of any previous additional service request and all other aspects of the original agreement remain in force with the exception of the schedule. We will provide an updated schedule to complete the design portion of the project as soon as possible. Please call to discuss at your convenience with any questions. We are happy to discuss how this request was derived. Sincerely, James Holloway, AIA, LEED AP CEO / Principal Page 1 •IMEG November 23, 2020 Mr. James Holloway GSG Architecture 3535 West 12th Street Greeley, CO 80634 RE: Amendment Number 2 for Additional Services (Lab Redesign) Weld County Public Health Lab Remodel Greeley, CO IMEG #19005214.00 Dear James: As we discussed, you would like IMEG to provide additional mechanical and electrical engineering services for the redesign of the lab space per the sketch provided by the Lab Manager on October 15th and subsequent site visit conducted on November 10t". Scope includes revisions to the current mechanical, plumbing and electrical drawings, as well as a 95% CD review meeting before finalizing drawings for bidding. All other services, terms, and conditions shall remain as stated in our original Agreement dated November 18, 2019. COMPENSATION We propose to provide the additional services described above for a fixed fee of $8,500. Total fees for the project will now be $28,000. Reimbursable expenses remain as stated in our original Agreement. 7600 East Orchard Road, Suite 250-S, Greenwood Village, CO 80111 >303 796 6000 >Fax, 720 501 6713 > imegcorp com Amendment Number 2 for Additional Services (Lab Redesign) Greeley, CO Weld County Public Health Lab Remodel November 23, 2020 We will begin our services following acceptance of this Amendment for Additional Services. Acceptance may be conveyed via e-mail to the address listed below, by fax, or by signing this offer and returning it to our office. Sincerely, IMEG CORP. 9044i. Eric J. Stoerger Associate Principal / Project Executive eric.j.stoerger®imegcorp.com EJS/jac WilesWctive\Projects\2019\19005214 OOWrojectMenegement\ContractsAmendmentslAmendment 2 (Lab Redesign)\20201123 Weld Cty Public Health Lab Redesign MEP Proposal docx GSG ARCHITECTURE Accepted: Signature Title Date Page 2 of 2 4AI( ei-<< r� 4 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 October 1, 2020 To: Board of County Commissioners From: Toby Taylor Subject: GSG Architecture Inc. - Design Services; (2019-2250) GSG Architecture Inc is currently an awarded on -call design services consultant. There is a need to design HVAC system enhancements to support the planned laboratory expansion. The cost of these design services is $5,225.00. Buildings & Ground is recommending approval. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director C s � MOT/s 1ofo7 o /o-07—� ootq-ynco3 ��21 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND GSG ARCHITECTURE INC. Date: September 30, 2020 Task Order Number: GSG Architecture Inc. —1-2020 Project Title: Weld County Health - Design Services - Additional Mechanical Engineering Services Completion Date: Design Compensation: $5,225.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will provide additional mechanical engineering services for the investigation and peer review into the mechanical systems serving the Public Health Lab suite. Complete services for the project as described in the attached Exhibit -Task Order 1-2020. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: GSG Architecture INC. By: Name: James G. Holloway Title: Principal / C.E.O Date September 30, 2020 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND GSG ARCHITECTURE INC. Weld BY: Deputy CIk to e APPROVED AS 0 F /DING: a AO Controller APPROVED AS TO FORM: County Attorney WELD COUNTY, COLORADO Steve Moreno, Chair Pro-Tem APPROVED AS TO SU:STANCE: OCT O 7 2020 d Offici. or Department Head Exhibit: Task Order 1-2020 Weld County Deparment of Public Health & Environment GSG Architecture Proposal for Additional Services - Mechanical Project #2085 September 29, 2020 Explanation of Fees: GSGarchitecture DESIGN ARCHITECTURE/PLANNING See attached IMEG Proposal for Additional Services related to the evaluation of the recently installed RTU. Note the total proposal for Additional Services includes a 10% Administrative Fee, due to adding this to the current Health Lab contract. PROPOSAL FOR ADDITONAL SERVICES: IMEG Proposal GSG 10')/0 Administrative Fee $ 4,750.00 $ 475.00 Total Proposal for Additional Services $ 5,225.00 Please issue a change order to the original Health Lab contract for this work. We are prepared to proceed upon email confirmation of this proposal, while the change order is being processed. Please call if you have any questions. Sincerely, .47 -e-71=--?- James Holloway, AIA, LEED AP CEO / Principal Page 1 of 1 �IMEG September 28, 2020 Ms. Kim Lambrecht GSG Architecture 3535 West 12th Street Suite C Greeley, CO 80634 RE: Amendment Number 1 for Additional Services Weld County Public Health Lab Peer Review Greeley, CO IMEG #19005214.00 Dear Kim: As we discussed, you would like IMEG to provide additional mechanical engineering services for the investigation and peer review into the mechanical systems serving the Public Health Lab suite. Scope includes the following items: • Conversation with the existing temperature controls contractor to review sequence of operation. • Review of the rooftop unit equipment selection, including the building envelope and internal heating and cooling loads. • Review of the ductwork serving this suite, including sizing of the supply and return ductwork as well as the fan sizing. • Review air balance for the suite between the outside air and exhaust air, including economizer capability and airflow measurement, as well as the individual room pressure relationships. • Conclusions will be provided to Weld County in a summarized draft report, including any recommendations for ductwork, equipment and/or temperature control revisions. After review and discussion, a final report will be generated. • Draft report can be issued approximately three to four weeks after the proposal is accepted. • Design of any recommended systems is NOT included in this proposed scope of services. IMEG would welcome the opportunity to design should any of the recommendations be accepted. All other services, terms, and conditions shall remain as stated in our original Agreement dated November 18, 2019. 7600 Fast Orchard Road, Suite 250-S, Greenwood Village, CO 80111 >303.796.6000 >Fax 720.501.6713 >imegcorp.com Amendment Number 1 for Additional Services Greeley, CO Weld County Public Health Lab Peer Review September 28, 2020 COMPENSATION We propose to provide the additional services described above for a fixed fee of $4,750. Total fees for the project will now be $19,500. Reimbursable expenses remain as stated in our original Agreement. We will begin our services following acceptance of this Amendment for Additional Services. Acceptance may be conveyed via e-mail to the address listed below, by fax, or by signing this offer and returning it to our office. Sincerely, IMEG CORP. Eric J. Stoerger Associate Principal / Project Executive eric.j.stoerger@imegcorp.com EJS/jac Wiles\Active\Projects\2019\19005214.00 TrojectManagement\Contracts\Amendments\20200928 Weld Cty Public Health Peer Review.docx GS ARCHITECTURE Accepted: Signature Steve Moreno, Chair Pro-Tem, Board of Weld County Commissioners Title OCT 0 7 2020 Date • .20/9 .4-7G3 Page 2 of 2 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 November 6, 2019 To: Board of County Commissioners From: Toby Taylor Subject: Health Laboratory Expansion Design Services — Task Order Weld County awarded on -call design services to four different vendors. There is a need for design services for expanding the laboratory located on the second floor at the Health Department. GSG Architecture has used the labor rates identified in their bid and quoted a lump sum of $36,790.00 to perform this design work. The attached amendment to the contract to accomplish this work requires BOCC approval. Therefore, Buildings & Grounds is recommending approving this task order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director GG �CTT / SG) 11/14(19 2019-4763 6aaa�/ PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND GSG ARCHITECTURE INC Date: November 4, 2019 Task Order Number: GSG Architecture Inc W 2-2019 Project Title: Public Health Lab Renovation Commencement Date: Completion Date: Design Compensation: $36,790.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: 1. Demolition of the existing offices, to be replaced with cabinetry for future equipment. 2. Enclosure of the small 'break room' for a new testing room. 3. Addition of new exhaust fans for new equipment. 4. Addition of new power sources for new equipment. 5. Moving of the gas supply lines to a new closet 6. New seamless flooring throughout the space, wall finishes, and the necessary modifications to the existing acoustic tile ceiling as required by the renovations. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND GSG ARCHITECTURE INC CONTRACTOR: GSG Architecture Inc Date Name: J 7ite{ea" G. /4-Ot..t-C.ulM--.1 Title: pal el rig e Zr I G• E O. Weld County Clerk to the Board �I-1: '�� WELD COUNTY, COLORADO BY: a uty Clerk to the Boa Controller APPROVED AS TO FORM: 7 6. ett,..0.4..,_ County Attorney Freeman, Chair Pruivnii 3 1013 OVE O SUBSTANCE: Ele ed Official or Department Head 070 /y_ 4713 Weld County Deparment of Public Health & Environment GSG Architecture Proposal for Architectural Design BDC 0115 October 18, 2019 Exhibit GsGarchitecture DESIGN ARCHITECTURE/PLANNING Explanation of Fees: This proposal encompasses the following phases, services and deliverables listed below and is based on the programmatic and design criteria presented during two visits to the Public Health Lab — September 11, and September 23, 2019 (with a representative from IMEG — the MEP consultant). This project includes interior renovation work at the existing Weld County Department Public Health and Environment Lab, located at 1555 North 17th Avenue, Greeley, CO 80631. Located on the upper level of the building, the Lab includes approximately 3,000 SF of offices, workspaces and testing equipment. Renovation work is slated for various components of the space, including: • Demolition of the existing offices, to be replaced with cabinetry for future equipment. • Enclosure of the small 'break room' for a new testing room. • Addition of new exhaust fans for new equipment. • Addition of new power sources for new equipment. • Moving of the gas supply lines to a new closet where the canisters will be moved to. • Verification of the existing backup generator/UPS system for the new equipment. • New seamless flooring throughout the space, wall finishes, and the necessary modifications to the existing acoustic tile ceiling as required by the renovations. Work will be completed in a consistent and ongoing manner and will require close coordination with Weld County Staff in order to understand the space and equipment needs. We look forward to the opportunity to discuss our findings with you, and the scope of work and fees based on those findings. SCOPE OF SERVICES Kick-off Meeting • Initial meeting on -site to review project parameters. • Field verify existing conditions. Architectural, Mechanical/Electrical/Plumbing Plans • Our team will create architectural and MEP base plans, based on the field verification of existing conditions, to be used to develop elevations and details. • Initially, a schematic plan, including mechanical, electrical and equipment/plumbing layouts, will be developed for review and approval by Weld County. • A 50% complete construction drawing set will be provided to the County for review and comment. • Existing exterior window glazing will be removed, and insulated metal panels added back, so a new perimeter wall can be added along the west side of the lab. • A schedule of interior finishes, materials and colors will be included, that are in line with the needs of the Health Department Lab. • Coordination with consultant team and Health Department will occur to assure the requirements of the proposed equipment are being met. • Standalone specifications will be included. • Deliverables will include electronic drawings and specifications. • The Design Team will respond to RFI's during bidding. Construction Administration • GSG and the Consultant Team will respond to RFI's, submittals and shop drawings during construction. Page 1 of 2 Weld County Deparment of Public Health & Environment GSG Architecture Proposal for Architectural Design BDC 0115 October 18, 2019 GSGarchitecture DESIGN ARCHITECTURE/PLANNING • The Design Team (architectural, mechanical/plumbing and electrical) have included a total of 10 site visits/construction meetings during construction, including a final punch list walk-thru. Assumptions • Cut sheets for Health Department equipment will be provided by the County for use in calculating mechanical and electrical loads. • Drawings for recent mechanical and electrical work will be provided to the Design Team. Exclusions • Evaluation of existing structural system and/or structural design for the addition of new equipment. • Building Permit Submittal • Hazardous material investigations reports, and abatement FIXED FEE PROPOSAL FOR ARCHITECTURAL SERVICES: Kick-off Meeting Construction Drawings Bidding Construction Administration Total Services Expenses for limited printing and mileage for consultant team (estimate only) Grand Total $ 2,020.00 $23,670.00 $ 1,735.00 $ 9,015.00 $ 36,440.00 $ 350.00 $ 36,790.00 Please call to discuss at your convenience. We are always willing to discuss this fee and scope to suit the best interests of your project. Sincerely, James Holloway, AIA, LEED AP CEO / Principal Page 2 of 2 Hello