January 27, 2021
To: Board of County Commissioners
From: Toby Taylor
Subject: GSG Architecture Inc. — Health Lab Design Services; (2019-2250)
GSG Architecture Inc was awarded the on -call design services for the Health Laboratory Remodel. During
design process, the Health Department identified changes with desiring a different type of storage for
inert gasses that are used in the laboratory operations. To incorporate this new desire into the
construction plans, additional design work is needed. GSG Architecture has identified those design costs
as $5,030.00. Buildings & Ground is recommending approval of this change order.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
LP
,20/9-47L0
��l '� (z% p602-1
CONTRACT AGREEMENT EXTENSION/AMENDMENT BETWEEN
THE WELD COUNTY DEPARTMENT OF BUILDINGS & GROUNDS
AND GSG ARCHITECTURE INC.
This Agreement Amendment ("Amendment"), made and entered into 25th day of January, 2021, by and between the
Board of Weld County Commissioners, on behalf of the Weld County Department of Buildings and Grounds, hereinafter referred to
as the "Department", and GSG Architecture Inc. hereinafter referred to as the "Contractor".
WHEREAS the parties entered into an agreement (the "Original Agreement") identified by the Weld County Clerk to the
Board of County Commissioners as document No. 2019-4763, approved on December 9, 2020.
WHEREAS the parties hereby agree to amend the terms of the Original Agreement in accordance with the terms of the
Original Agreement, which is incorporated by reference herein,
NOW THEREFORE, in consideration of the premises, the parties hereto covenant and agree as follows:
• The Amendment, together with the Original Agreement, constitutes the entire understanding between the parties. The
following change is hereby made to the Contract Documents:
1. Change Order #1, dated January 25th, 2021 is hereby incorporated as an exhibit to the agreement and the terms
are included in the Agreement.
• All other terms and conditions of the Original Agreement remain unchanged.
IN WITNESS WHEREOF, the parties hereto have duly executed the Agreement as of the day, month, and year first above written.
CONTRACTOR:
James G Holloway Principal / C.E.O.; GSG Architecture
Printed Name
Signature
ATTEST:
Weld
BY:
Deputy Cle to th Boar
APPROVED AS TO FUNDING:
Controller
APPROVED AS TO FORM:
7l
County Attorney
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
Steve Moreno, Chair
APPROVED AS
FEB 0 12021
O UBSTANCE:
Elected %ffi al or Department Head
i9- � 7‘03
Exhibit: Change Order #1
Weld County Department of Public Health & Environment
GSG Architecture Proposal for Additional A & E Services
Project No. 2085
January 25, 2021
GsGarchitecture
DESIGN
ARCHITECTURE/PLANNING
Explanation of Additional Service Request:
Based on the County's decision to revise completed construction drawings to accommodate argon gas
canister relocation outside the laboratory, GSG Architecture and our Engineering Consultant IMEG
respectfully request the following fees associated with these additional services through the completion of
the redesign and the preparation of completed Construction Documents:
GSG Architecture
IMEG
GSG Admin Fee
(10% of IMEG Fee)
$ 2,830
$ 2,000
$ 200
TOTAL $ 5,030
No additional expenses are anticipated, and no changes are requested to the Bidding or Construction
Administration portions of the existing agreement. This request is not inclusive of any previous additional
service request and all other aspects of the original agreement remain in force with the exception of the
schedule. We will provide an updated schedule to complete the design portion of the project as soon as
possible.
Please call to discuss at your convenience with any questions. We are happy to discuss how this request
was derived.
Sincerely,
James Holloway, AIA, LEED AP
CEO / Principal
Page 1
DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 304-6531
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
December 7, 2020
To: Board of County Commissioners
From: Toby Taylor
Subject: GSG Architecture Inc. — Health Lab Design Services; (2019-2250)
GSG Architecture Inc was awarded the design services for the Health Laboratory Remodel. During design
process, the Health Department identified changes in the design work scope that would optimize their
workflow. To accommodate these changes in design, a change order in the amount of $12,790.00 is
needed. Buildings & Ground is recommending approval of this change order.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
ei)r)Soi-t-
09 I FIO
/3&. err/ s
QO19-97673
660091
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
GSG ARCHITECTURE INC.
Date: December 3, 2020
Task Order Number: GSG Architecture Inc. — 2-2020
Project Title: Weld County Health - Design Services - Additional Mechanical Engineering &
Architectural Services
Completion Date:
Design Compensation: $12,790.00
Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional
Task Order Work. In addition to that work described in section 2.1, the Parties may agree
to additional work to be provided by Contractor pursuant to an appropriately executed
Task Order, which shall be negotiated between the Parties on an as needed basis. Any
such Task Order shall be signed by the Weld County Director of Buildings and Grounds
before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in
any calendar year unless first approved by the Board of County Commissioners. Any
appropriately executed Task Order shall be automatically incorporated herein and
enforceable.
Scope of Task Order:
The project will provide additional revised Architecture and Engineering drawings to accommodate the
new laboratory layout
Complete services for the project as described in the attached Exhibit -Task Order 2-2020.
Contractor agrees to perform the services identified above and on the attached exhibit in
accordance with the terms and conditions contained herein and in the Original Agreement
between the parties.
CONTRACTOR:
GSG Architecture INC.
By: fl� Date 12/03/2020
Name: James G. Holloway
Title: Principal, CEO GSG Architecture
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
GSG ARCHITECTURE INC.
Weld
BY:
Deputy Clef'
APPROVED AS TO FUNDING:
Controller
APPROVED AS TO FORM:
f�
m
County Attorney
WELD COUNTY, COLORADO
Mike Freeman, Chair
DEC 0 0 2020
APPROVED • = TO SUBSTANCE:
icial or Department Head
9- itc 6.3
Exhibit: Task Order #2-2020
Weld County Department of Public Health & Environment
GSG Architecture Proposal for Additional A & E Services
Project No. 2085
November 24, 2020
GSGarchitecture
DESIGN
ARCHITECTURE/PLANNING
Explanation of Additional Service Request:
Based on the County's decision to revise completed construction drawings to accommodate a new
laboratory layout, GSG Architecture and our Engineering Consultant IMEG respectfully request the
following fees associated with these additional services through the completion of the redesign and the
preparation of completed Construction Documents:
GSG Architecture
IMEG
GSG Admin Fee
(10% of IMEG Fee)
$ 3,440
$ 8,500
$ 850
TOTAL $12,790
No additional expenses are anticipated, and no changes are requested to the Bidding or Construction
Administration portions of the existing agreement. This request is not inclusive of any previous additional
service request and all other aspects of the original agreement remain in force with the exception of the
schedule. We will provide an updated schedule to complete the design portion of the project as soon as
possible.
Please call to discuss at your convenience with any questions. We are happy to discuss how this request
was derived.
Sincerely,
James Holloway, AIA, LEED AP
CEO / Principal
Page 1
•IMEG
November 23, 2020
Mr. James Holloway
GSG Architecture
3535 West 12th Street
Greeley, CO 80634
RE: Amendment Number 2 for Additional Services (Lab Redesign)
Weld County Public Health Lab Remodel
Greeley, CO
IMEG #19005214.00
Dear James:
As we discussed, you would like IMEG to provide additional mechanical and electrical engineering
services for the redesign of the lab space per the sketch provided by the Lab Manager on October 15th
and subsequent site visit conducted on November 10t". Scope includes revisions to the current
mechanical, plumbing and electrical drawings, as well as a 95% CD review meeting before finalizing
drawings for bidding. All other services, terms, and conditions shall remain as stated in our original
Agreement dated November 18, 2019.
COMPENSATION
We propose to provide the additional services described above for a fixed fee of $8,500. Total fees for
the project will now be $28,000. Reimbursable expenses remain as stated in our original Agreement.
7600 East Orchard Road, Suite 250-S, Greenwood Village, CO 80111
>303 796 6000 >Fax, 720 501 6713 > imegcorp com
Amendment Number 2 for Additional Services (Lab Redesign) Greeley, CO
Weld County Public Health Lab Remodel November 23, 2020
We will begin our services following acceptance of this Amendment for Additional Services. Acceptance
may be conveyed via e-mail to the address listed below, by fax, or by signing this offer and returning it to
our office.
Sincerely,
IMEG CORP.
9044i.
Eric J. Stoerger
Associate Principal / Project Executive
eric.j.stoerger®imegcorp.com
EJS/jac
WilesWctive\Projects\2019\19005214 OOWrojectMenegement\ContractsAmendmentslAmendment 2 (Lab Redesign)\20201123 Weld Cty Public Health Lab Redesign MEP
Proposal docx
GSG ARCHITECTURE
Accepted:
Signature
Title
Date
Page 2 of 2
4AI( ei-<<
r�
4
DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 304-6531
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
October 1, 2020
To: Board of County Commissioners
From: Toby Taylor
Subject: GSG Architecture Inc. - Design Services; (2019-2250)
GSG Architecture Inc is currently an awarded on -call design services consultant. There is a need to design
HVAC system enhancements to support the planned laboratory expansion. The cost of these design
services is $5,225.00. Buildings & Ground is recommending approval.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
C s � MOT/s
1ofo7 o /o-07—�
ootq-ynco3
��21
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
GSG ARCHITECTURE INC.
Date: September 30, 2020
Task Order Number: GSG Architecture Inc. —1-2020
Project Title: Weld County Health - Design Services - Additional Mechanical Engineering
Services
Completion Date:
Design Compensation: $5,225.00
Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional
Task Order Work. In addition to that work described in section 2.1, the Parties may agree
to additional work to be provided by Contractor pursuant to an appropriately executed
Task Order, which shall be negotiated between the Parties on an as needed basis. Any
such Task Order shall be signed by the Weld County Director of Buildings and Grounds
before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in
any calendar year unless first approved by the Board of County Commissioners. Any
appropriately executed Task Order shall be automatically incorporated herein and
enforceable.
Scope of Task Order:
The project will provide additional mechanical engineering services for the investigation and peer review
into the mechanical systems serving the Public Health Lab suite. Complete services for the project as
described in the attached Exhibit -Task Order 1-2020.
Contractor agrees to perform the services identified above and on the attached exhibit in
accordance with the terms and conditions contained herein and in the Original Agreement
between the parties.
CONTRACTOR:
GSG Architecture INC.
By:
Name: James G. Holloway
Title: Principal / C.E.O
Date September 30, 2020
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
GSG ARCHITECTURE INC.
Weld
BY:
Deputy CIk to e
APPROVED AS 0 F /DING:
a AO
Controller
APPROVED AS TO FORM:
County Attorney
WELD COUNTY, COLORADO
Steve Moreno, Chair Pro-Tem
APPROVED AS TO SU:STANCE: OCT O 7 2020
d Offici. or Department Head
Exhibit: Task Order 1-2020
Weld County Deparment of Public Health & Environment
GSG Architecture Proposal for Additional Services - Mechanical
Project #2085
September 29, 2020
Explanation of Fees:
GSGarchitecture
DESIGN
ARCHITECTURE/PLANNING
See attached IMEG Proposal for Additional Services related to the evaluation of the recently installed
RTU. Note the total proposal for Additional Services includes a 10% Administrative Fee, due to adding
this to the current Health Lab contract.
PROPOSAL FOR ADDITONAL SERVICES:
IMEG Proposal
GSG 10')/0 Administrative Fee
$ 4,750.00
$ 475.00
Total Proposal for Additional Services
$ 5,225.00
Please issue a change order to the original Health Lab contract for this work. We are prepared to proceed
upon email confirmation of this proposal, while the change order is being processed.
Please call if you have any questions.
Sincerely,
.47 -e-71=--?-
James Holloway, AIA, LEED AP
CEO / Principal
Page 1 of 1
�IMEG
September 28, 2020
Ms. Kim Lambrecht
GSG Architecture
3535 West 12th Street
Suite C
Greeley, CO 80634
RE: Amendment Number 1 for Additional Services
Weld County Public Health Lab Peer Review
Greeley, CO
IMEG #19005214.00
Dear Kim:
As we discussed, you would like IMEG to provide additional mechanical engineering services for the
investigation and peer review into the mechanical systems serving the Public Health Lab suite. Scope
includes the following items:
• Conversation with the existing temperature controls contractor to review sequence of operation.
• Review of the rooftop unit equipment selection, including the building envelope and internal
heating and cooling loads.
• Review of the ductwork serving this suite, including sizing of the supply and return ductwork as
well as the fan sizing.
• Review air balance for the suite between the outside air and exhaust air, including economizer
capability and airflow measurement, as well as the individual room pressure relationships.
• Conclusions will be provided to Weld County in a summarized draft report, including any
recommendations for ductwork, equipment and/or temperature control revisions. After review
and discussion, a final report will be generated.
• Draft report can be issued approximately three to four weeks after the proposal is accepted.
• Design of any recommended systems is NOT included in this proposed scope of services. IMEG
would welcome the opportunity to design should any of the recommendations be accepted.
All other services, terms, and conditions shall remain as stated in our original Agreement dated
November 18, 2019.
7600 Fast Orchard Road, Suite 250-S, Greenwood Village, CO 80111
>303.796.6000 >Fax 720.501.6713 >imegcorp.com
Amendment Number 1 for Additional Services Greeley, CO
Weld County Public Health Lab Peer Review September 28, 2020
COMPENSATION
We propose to provide the additional services described above for a fixed fee of $4,750. Total fees for
the project will now be $19,500. Reimbursable expenses remain as stated in our original Agreement.
We will begin our services following acceptance of this Amendment for Additional Services. Acceptance
may be conveyed via e-mail to the address listed below, by fax, or by signing this offer and returning it to
our office.
Sincerely,
IMEG CORP.
Eric J. Stoerger
Associate Principal / Project Executive
eric.j.stoerger@imegcorp.com
EJS/jac
Wiles\Active\Projects\2019\19005214.00 TrojectManagement\Contracts\Amendments\20200928 Weld Cty Public Health Peer Review.docx
GS ARCHITECTURE
Accepted:
Signature
Steve Moreno, Chair Pro-Tem, Board of
Weld County Commissioners
Title
OCT 0 7 2020
Date
•
.20/9 .4-7G3
Page 2 of 2
DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 304-6531
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
November 6, 2019
To: Board of County Commissioners
From: Toby Taylor
Subject: Health Laboratory Expansion Design Services — Task Order
Weld County awarded on -call design services to four different vendors. There is a need for design services
for expanding the laboratory located on the second floor at the Health Department. GSG Architecture
has used the labor rates identified in their bid and quoted a lump sum of $36,790.00 to perform this design
work. The attached amendment to the contract to accomplish this work requires BOCC approval.
Therefore, Buildings & Grounds is recommending approving this task order.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
GG �CTT / SG)
11/14(19
2019-4763
6aaa�/
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
GSG ARCHITECTURE INC
Date: November 4, 2019
Task Order Number: GSG Architecture Inc W 2-2019
Project Title: Public Health Lab Renovation
Commencement Date:
Completion Date:
Design Compensation: $36,790.00
Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional
Task Order Work. In addition to that work described in section 2.1, the Parties may agree
to additional work to be provided by Contractor pursuant to an appropriately executed
Task Order, which shall be negotiated between the Parties on an as needed basis. Any
such Task Order shall be signed by the Weld County Director of Buildings and Grounds
before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in
any calendar year unless first approved by the Board of County Commissioners. Any
appropriately executed Task Order shall be automatically incorporated herein and
enforceable.
Scope of Task Order:
1. Demolition of the existing offices, to be replaced with cabinetry for future equipment.
2. Enclosure of the small 'break room' for a new testing room.
3. Addition of new exhaust fans for new equipment.
4. Addition of new power sources for new equipment.
5. Moving of the gas supply lines to a new closet
6. New seamless flooring throughout the space, wall finishes, and the necessary
modifications to the existing acoustic tile ceiling as required by the renovations.
Contractor agrees to perform the services identified above and on the attached exhibit in accordance
with the terms and conditions contained herein and in the Original Agreement between the parties.
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
GSG ARCHITECTURE INC
CONTRACTOR:
GSG Architecture Inc
Date
Name: J 7ite{ea" G. /4-Ot..t-C.ulM--.1
Title: pal el rig e Zr I G• E O.
Weld County Clerk to the Board �I-1: '�� WELD COUNTY, COLORADO
BY:
a
uty Clerk to the Boa
Controller
APPROVED AS TO FORM:
7 6. ett,..0.4..,_
County Attorney
Freeman, Chair Pruivnii 3 1013
OVE O SUBSTANCE:
Ele ed Official or Department Head
070 /y_ 4713
Weld County Deparment of Public Health & Environment
GSG Architecture Proposal for Architectural Design
BDC 0115
October 18, 2019 Exhibit
GsGarchitecture
DESIGN
ARCHITECTURE/PLANNING
Explanation of Fees:
This proposal encompasses the following phases, services and deliverables listed below and is based on
the programmatic and design criteria presented during two visits to the Public Health Lab — September
11, and September 23, 2019 (with a representative from IMEG — the MEP consultant). This project
includes interior renovation work at the existing Weld County Department Public Health and Environment
Lab, located at 1555 North 17th Avenue, Greeley, CO 80631. Located on the upper level of the building,
the Lab includes approximately 3,000 SF of offices, workspaces and testing equipment.
Renovation work is slated for various components of the space, including:
• Demolition of the existing offices, to be replaced with cabinetry for future equipment.
• Enclosure of the small 'break room' for a new testing room.
• Addition of new exhaust fans for new equipment.
• Addition of new power sources for new equipment.
• Moving of the gas supply lines to a new closet where the canisters will be moved to.
• Verification of the existing backup generator/UPS system for the new equipment.
• New seamless flooring throughout the space, wall finishes, and the necessary modifications to
the existing acoustic tile ceiling as required by the renovations.
Work will be completed in a consistent and ongoing manner and will require close coordination with Weld
County Staff in order to understand the space and equipment needs.
We look forward to the opportunity to discuss our findings with you, and the scope of work and fees
based on those findings.
SCOPE OF SERVICES
Kick-off Meeting
• Initial meeting on -site to review project parameters.
• Field verify existing conditions.
Architectural, Mechanical/Electrical/Plumbing Plans
• Our team will create architectural and MEP base plans, based on the field verification of existing
conditions, to be used to develop elevations and details.
• Initially, a schematic plan, including mechanical, electrical and equipment/plumbing layouts, will
be developed for review and approval by Weld County.
• A 50% complete construction drawing set will be provided to the County for review and comment.
• Existing exterior window glazing will be removed, and insulated metal panels added back, so a
new perimeter wall can be added along the west side of the lab.
• A schedule of interior finishes, materials and colors will be included, that are in line with the needs
of the Health Department Lab.
• Coordination with consultant team and Health Department will occur to assure the requirements
of the proposed equipment are being met.
• Standalone specifications will be included.
• Deliverables will include electronic drawings and specifications.
• The Design Team will respond to RFI's during bidding.
Construction Administration
• GSG and the Consultant Team will respond to RFI's, submittals and shop drawings during
construction.
Page 1 of 2
Weld County Deparment of Public Health & Environment
GSG Architecture Proposal for Architectural Design
BDC 0115
October 18, 2019
GSGarchitecture
DESIGN
ARCHITECTURE/PLANNING
• The Design Team (architectural, mechanical/plumbing and electrical) have included a total of 10
site visits/construction meetings during construction, including a final punch list walk-thru.
Assumptions
• Cut sheets for Health Department equipment will be provided by the County for use in calculating
mechanical and electrical loads.
• Drawings for recent mechanical and electrical work will be provided to the Design Team.
Exclusions
• Evaluation of existing structural system and/or structural design for the addition of new
equipment.
• Building Permit Submittal
• Hazardous material investigations reports, and abatement
FIXED FEE PROPOSAL FOR ARCHITECTURAL SERVICES:
Kick-off Meeting
Construction Drawings
Bidding
Construction Administration
Total Services
Expenses for limited printing and mileage
for consultant team (estimate only)
Grand Total
$ 2,020.00
$23,670.00
$ 1,735.00
$ 9,015.00
$ 36,440.00
$ 350.00
$ 36,790.00
Please call to discuss at your convenience. We are always willing to discuss this fee and scope to suit the
best interests of your project.
Sincerely,
James Holloway, AIA, LEED AP
CEO / Principal
Page 2 of 2