HomeMy WebLinkAbout20211059.tiffUICOLORADic
•Department of Public
Health & Environment
RECEIVED
Weld County - Clerk to the Board
1150OSt
PO Box 758
Greeley, CO 80632
April 12, 2021
To Whom it May Concern:
APR 15 2021
WELD TY
COMMISSIONERS
S
On April 13, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for
Bayswater Exploration Et Production, LLC - Thornton 28-H Production Facility. A copy of this public
notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polls, Governor I Jill Hunsaker Ryan, MPH, Executive Director
Fu 'b I Cc. FL(TP),HLcDS/TR),Pw(aw/ERIGH/GK),
OGCSM)
ai/21 /21 oy/tb/2I
e ;9O1
2021-1059
Air Pollution Control Division
• Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Bayswater Exploration Et Production, LLC - Thornton 28-H Production Facility - Weld County
Notice Period Begins: April 13, 2021
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Bayswater Exploration Et Production, LLC
Facility: Thornton 28-H Production Facility
Exploration and Production Well Pad
SWNW Section 28 T7N R66W
Weld County
The proposed project or activity is as follows: This source is requesting permit coverage for the loadout of
produced water. This application was received in February 2019, ahead of the December 2019 rulemaking.
This facility has several other permitted points, covered primarily under general permits. The facility is
synthetic minor for VOC in the ozone nonattainment region.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section
III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area)
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 19WE1007 are available
on the Division's website at https://www.colorado.Qov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe.commentsapcd@state.co.us
• Send comments to our mailing address:
Lauraleigh Lakocy
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
ICOLORADO
2.01 1 I Hea� & Environment
Hello