HomeMy WebLinkAbout20210400.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF EAST 18TH STREET BETWEEN HEMLOCK AVENUE AND WELD
COUNTY PARKWAY (COUNTY ROAD 49), AND THE INTERSECTION AT HOLLY
AVENUE AND WELD COUNTY PARKWAY, FOR APPROXIMATELY ONE (1) MONTH,
FOR ROADWAY AND DRAINAGE IMPROVEMENTS
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads and intersections to through traffic and to regulate, warn and guide vehicular
traffic by posting signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that East 18th Street between Hemlock Avenue and Weld
County Parkway (County Road 49), and the Intersection at Holly Avenue and Weld County
Parkway (County Road 49), be temporarily closed, with said closure being effective February 16,
2021, for approximately one (1) month for roadway and drainage improvements, and further, that
standard official traffic control devices shall be erected at said closure giving notice of the
restrictions.
Cc : soOts), p:s Patc►.,, CS P
02/16/21
2021-0400
EG0024
TEMPORARY CLOSURE - EAST 18TH STREET AND THE INTERSECTION OF HOLLY
AVENUE AND WELD COUNTY PARKWAY (COUNTY ROAD 49)
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 8th day of February, A.D., 2021.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: Wdia.00 G:.440:6k,
Weld County Clerk to the Board
BY:
Deputy Clerk to the Boar
APP I ►VED AS
ounty Attorney
Date of signature: O2 /a/21
Lori Saine
Steve, oreno, hair
es, Pro-Te
Perry L. Buc
e Freeman
2021-0400
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: February 4, 2021
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Interstate Highway Construction is requesting permission to close E 18'x' Street between Hemlock Ave.
and WC Parkway from 2/16/21 through 3/16/21 in order to complete roadway and drainage
improvements for DPG Farms under USR19-0071.
Interstate Highway Construction is requesting permission to close the intersection of Holly Avenue and
the WC Parkway from 2/16/21 through 3/16/21 in order to complete roadway and drainage improvements
for DPG Farms under USR19-0071.
See attached closure diagram.
2021-0400
o 108
eb co.LA,
LEGEND
l INDICATES PLACEMENT OF SIGN
INDICATES FRONT OF SIGN
3M -A BARRICADE
L
WORK ZONE
JILL DEVICES S9OILL *EDT
991VT D J 1/, XDA VAS
❑❑❑❑❑❑❑❑
❑❑❑❑❑❑❑
❑❑❑❑❑❑
MESSAGE BOARD TO BE PLACED NB
It7 DAYS PRIOR TO IMPLEMENTATION
oSOF E. 18TH ST. CLOSURE • MESSAGE
AS DIRECTED BY ENGINEER
SPEED
UMIT
ROAD
WORK
AHEAD
36" X 18" '
HIGH' LAN
CLOSED
AHEAD,
R2-6
(OII«2134
SPEED
LIMIT
X
R2-1(40)
NOTES:
1) SIGNS SHALL BE SPACED A MIN. OF 350'. OR AS SPACE ALLOWS
2) TAPER LENGTH SHALL BE A MIN. OF 320'. WaSl2)160 = L
BASED ON A REDUCED SPEED OF 40 MPH
31 DEVICE SPACING SHALL BE A MIN. OF 40' IN TAPERS AND
MAX. DO' IN TANGENTS
41 PLAN IS FOR 2417 CLOSURE
5) CLOSURE IS FOR INSTALLATION OF TURN LANES AND
SITE IMPROVEMENTS
6) REQUESTED WORK HOURS ARE: 7:U0 AM TO 5:00 PM,
OR AS APPROVED
7) WORK IS ESTIMATED TO TAKE 3 MONTHS. WEATHER PENDING
el MHT IT 1 SHALL WORK IN CONJUNCTION WITH MHT a 1 -A
91 SEE MHT ✓t 1 -A FOR DETOUR ROUTE
10) PLAN DRAWN BASED ON MSS STANDARDS CASE NO. 1U AND
CASE NO. 2U K MUTCD TA -34 8 TA -2U
11) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT ON
SITE CONDITIONS
12) CHANGES SHAH BE IMPLEMENTED WHERE APPLICABLE
13) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL
UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS
14) WORKERS SHALL NOT CROSS LNE LANES OF TRAFFIC: ON FOOT,
WITHOUT THE ASSISTANCE OF FLAGGERS. USING THE "BUDDY
SYSTEM'
15) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE
SHALL BE EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER
I6) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF
THE ROADWAY ON THE SAME SIDE AS THE CLOSURE
171 NON -VEHICULAR ACCESS: BICYCLISTS ARE TO BE TREATED AS A
VEHICLE. PEDESTERIAN FACILITIES DO NOT EXIST WITHIN
CONSTRUCTION ZONE
181 PRNATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN
PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY
PROPERTY OWNER
191 EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON
AS IT IS SAFE TO DO SO
JL
1APER
LEFT 1URN LANE SMALL BE
CLOSED PRIOR TO ROADWAY CLOSURE
TO INCLUDE AND ADDITIONAL 10 DR UMSIVER TIC AL PANELS
FOR A DISTANCE OF APPROX. Mr AT AN SO' SPACING
MINIMUM LENGTH
OF LONGITUDINAL
BUFFER SPACE
SPEED (MPH)
BUFFER
LENGTH (FT)
20
115
25
155
30
200
35
250
40
305
45
360
50
425
55
495
80
570
65 645
70 1 730
75 820
DETOUR
AHEAD
POSTED
R.I.) -
LEFT
TURN LAN
CLOSED
AHEAD
WELD COUNTY
IHC
PREPARED BY
AWP
ROAD
CLOSED
AHEAD
k.)AD CLOSED
J-2 CONTRACTING
DPG SITE - WELD COUNTY PARKWAY
ENTRANCE - USR 19-0071
MHT # 1 - PG 1 OF 2 - E. 18TH ST. RIGHT LANE & ROAD CLOSURE
REVISED 12/16/2020
ROAD CLOSURE AND DETOUR
DEVICES SHALL ONLY BE PLACED UPON
COORDINATION WITH AND APPROVAL FROM WELD COUNTY
ri r�
►i ii
►iiallai.do
Holly Avenue will need to be accessible
for Weld County tricking and operations
at all times.
CoiLo-Ph' rc o -a a
MHT FINAL WITH SIGNATURES
12/16/2020
Area Wide Protective
PREPARED BY:
CAROL MOOSO
Project Manager
ATSSA # 106285 EXP. 08/25/2023
NOT AN ENGINEER
Greeley: 970-356-6881
Direct Line : 970.909-1104
Metro: 303-659-1729 ' Fax: 970.356.5862
AWP
_r
1712 1st Ave • PO Box 490 ' Greeley, Co 80623
cmooso@awptraffic.com
AFTER HOURS EMERGENCY NUMBER 970-356.6881
OWNER
WELD
COUNTY
WytEls?UUNTY
ENTRANCE
PARKWAY PROJECT NUMBER
- USR 19-0071
PRIME CONTRACTOR TRAFFIC CONTROL CONTRACTOR
INTERSTATE HIGHWAY A,AIp
CONSTRUCTION (IHC) AWP
PHONE SHEET NUMBER
DAVID METZGER
970-485-0678-0678 MHT # 1 - REVISED
DATE
12/16/2020
REVISED
12/16/2020
DRUMS SHALL BE USED FOR
LANE CLOSURE AND REMOVED
AS/UNTIL BARRIER IS INSTALLED
BARRIER TO BE
FLAIRED OUTSIDE
SAFE ZONE
320'
TAPER
AREA WIDE PROTECT
SUMMARY OF DEVICES
2 - VARIABLE MESSAG BOARDS
2 - 48" ROAD WORK AHEAD
2 - 48" RIGHT LANE CLOSED AHEAD
2 - 48" REDUCED SPEED (40) ADVISORY
2 - 36" SPEED LIMIT 40
2 - 36" WORK ZONE
2 - 48" LEFT TRANSITION
1 - 48" LEFT TURN LANE CLOSED AHEAD
1 - 48" ROAD CLOSED AHEAD
1 - 48" DETOUR AHEAD
2 - 48" ROAD CLOSED
1 - 30" ROAD CLOSED TO THRU TRAFFIC
2 - 48" BLANK ARROW (LEFT)
1 - 24" NO LEFT TURN
1 - 24" NO RIGHT TURN
2 - 36" END ROAD WORK
2 - FLASHING ARROW PANEL
7 - 3M -A BARRICADES
100 - CHANNELIZING DRUM
ANY CONFLICTING SIGNS
SHALL BE COVERED
❑❑❑❑EID❑0
❑❑❑❑❑❑❑❑
❑❑❑❑❑❑❑o
MESSAGE BOARD TO BE PLACED SB
7 DAYS PRIOR TO IMPLEMENTATION
OF E. 18TH ST. CLOSURE - MESSAGE
AS DIRECTED BY ENGINEER
SPEED
UM"
40
RIGHT LANE
CLOSED
AHEAD
ROAD
WORK
AHEAD
Date: 7/28/2020 Author: E. Amerine Project: Coun Road 49 and Holly Avenue - Ureeley, CO
Customer: J-2 Contracting Company ATSSA#: 342 53 Job#: 18144
Comments:
Type of Road Rural
Traffic Volume: Light to Moderate
All signs & devices shall be placed in accordance with the latest provisions of the Manual
on Uniform Traffic Control Devices (MUTCD) &/or Colorado Department of Transportation
(CDOT)-M&S Standard Drawings with respect to any applicable provisions from the City
of Greeley.
Access to residential and commercial driveways to be maintained at all times.
Parking ban shall be coordinated with the city of Greeley Police Department.
PLANS ARE NOT TO SCALE Sheet 1 of 2
LEGEND
IS INDICATES PLACEMENT OF SION
INDICATES FRONT OF SIGs:
WORK ZONE
ALL CM:VICES S2CALL AfeE
Minna) STOMA RAS'
NOTES:
1) SIGNS SHALL BE SPACED A MIN. OF 350'. OR AS SPACE ALLOWS
2) TAPER LENGTH SHALL BE MIN. OF 320', WxS(2)/60 = L.
BASED ON A REDUCED SPEED OF 40 MPH
3) DEVICE SPACING SHALL BE A MIN. OF 40' IN TAPERS AND
MAX. 80' IN TANGENTS
4) PLAN IS FOR 24/7 CLOSURE
5) CLOSURE IS FOR INSTALLATION OF TURN LANES AND
SITE IMPROVEMENTS
6) REQUESTED WORK HOURS ARE: 7:00 AM TO 5:00 PM,
OR AS APPROVED
7) WORK IS ESTIMATED TO TAKE 3 MONTHS, WEATHER PENDING
8) MHT # 1 - A SHALL WORK IN CONJUNCTION WITH MHT # 1
9) SEE MHT # 1 FOR LANE CLOSURE AND ROAD CLOSURE DETAILS
10) PLAN DRAWN BASED ON M&S STANDARDS CASE NO. 10 AND
CASE NO. 20 & MUTCD TA - 34 & TA -20
11) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT ON
SITE CONDITIONS
12) CHANGES SHALL BE IMPLEMENTED WHERE APPLICABLE
13) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL
UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS
14) WORKERS SHALL NOT CROSS LIVE LANES OF TRAFFIC ON FOOT.
WITHOUT THE ASSISTANCE OF FLAGGERS, USING THE "BUDDY
SYSTEM"
15) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE
SHALL BE EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER
16) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF
THE ROADWAY ON THE SAME SIDE AS THE CLOSURE
17) NON -VEHICULAR ACCESS: BICYCLISTS ARE TO BE TREATED AS A
VEHICLE, PEDESTERIAN FACILITIES DO NOT EXIST WITHIN
CONSTRUCTION ZONE
18) PRIVATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN
PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY
PROPERTY OWNER
19) EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON
AS IT IS SAFE TO DO SO
ROAD
CLOSED
HEAD
500'
Hemlock Avenue
s
ROAD
WORK
AHEAD
DEIOUR
AHLAD
DETOUR
AHEAD
ROAD
CLOSURE
ROAD
WORK
AHEAD
ROAD CLOSED
TO
THRU TRAFAC
DETOUR
M4-10 (L)
SEE MHT #1
FOR ON SITE
TRAFFIC CONTROL
DETAILS
J-2 CONTRACTING
DPG SITE - WELD COUNTY PARKWAY
ENTRANCE - USR 19-0071
MHT # 1 - A - PG 2 OF 2 - E. 18TH ST. ROAD CLOSURE DETOUR
12/16/2020
Fern Avenue
1.14
otTOUW
Date: 7/28/2020 Author: E. Amerine Project: County Road 49 and Holly Avenue - Greeley, CO
Customer: J-2 Contracting Company ATSSA#: 342253 Job#: 18144
Comments:
Type of Road. Rural
Traffic Volume: Light to Moderate
All signs & devices shall be placed in accordance with the latest provisions of the Manual
on Uniform Traffic Control Devices (MUTCD) &/or Colorado Department of Transportation
AWP
ce
(CDOT)-M&S Standard Drawings with respect to any applicable provisions from the City
of Greeley.
Access to residential and commercial driveways to be maintained at all times.
Parking ban shall be coordinated with the city of Greeley Police Department.
PLANS ARE NOT TO SCALE Sheet 2 of 2
WELD COUNTY
IHC
PREPARED BY
AWP
4:38'16.77-Ni/ e
AREA IDE PROTECTIVE
I
SUMMARY OF DEVICES
2 - 48" ROAD WORK AHEAD
1 - 48" ROAD CLOSED AHEAD
2 - 48" DETOUR AHEAD
2 - 30" ROAD CLOSED TO THRU TRAFFIC
1 - 30" DETOUR ARROW LEFT
7-30" DETOUR MARKER ARROW
1 STRAIGHT
3 LEFT
3 RIGHT
Cano-P/! Tao-o--aa
MHT FINAL WITH SIGNATURES
12/16/2020
Area Wide
PREPARED BY:
CAROL MOOSO
Project Manager
ATSSA # 106285 EXP. 08/25/2023
NOT AN ENGINEER
Greeley: 970-356-6881
Direct Line : 970.909-1104
Metro: 303-659-1729 •Fax: 970.356.5862
1st Ave • PO Box 490 • Greeley,
cmooso@awptraffic.com
HOURS EMERGENCY NUMBER
Protective
Co 80623
970-366-6881
AW
ri
P
1712
AFTER
OWNER
WELD
COUNTY
PROJECT
WELD
FNTRANC;E
NAME
COUNTY
- USR
PARKWAY
'9-0071
PROJECT NUMBER
PRIME CONTRACTOR TRAFFIC CONTROL CONTRACTOR
INTERSTATE HIGHWAY W
CONSTRUCTION (INC) MYY
P
PHONE SHEET
DAVID METZGER
970-485-0678
NUMBER DATE
MHT # 1 - A 12/16/2020
Hello