Loading...
HomeMy WebLinkAbout20210400.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF EAST 18TH STREET BETWEEN HEMLOCK AVENUE AND WELD COUNTY PARKWAY (COUNTY ROAD 49), AND THE INTERSECTION AT HOLLY AVENUE AND WELD COUNTY PARKWAY, FOR APPROXIMATELY ONE (1) MONTH, FOR ROADWAY AND DRAINAGE IMPROVEMENTS WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads and intersections to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that East 18th Street between Hemlock Avenue and Weld County Parkway (County Road 49), and the Intersection at Holly Avenue and Weld County Parkway (County Road 49), be temporarily closed, with said closure being effective February 16, 2021, for approximately one (1) month for roadway and drainage improvements, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. Cc : soOts), p:s Patc►.,, CS P 02/16/21 2021-0400 EG0024 TEMPORARY CLOSURE - EAST 18TH STREET AND THE INTERSECTION OF HOLLY AVENUE AND WELD COUNTY PARKWAY (COUNTY ROAD 49) PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 8th day of February, A.D., 2021. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: Wdia.00 G:.440:6k, Weld County Clerk to the Board BY: Deputy Clerk to the Boar APP I ►VED AS ounty Attorney Date of signature: O2 /a/21 Lori Saine Steve, oreno, hair es, Pro-Te Perry L. Buc e Freeman 2021-0400 EG0024 MEMORANDUM TO: Clerk to the Board DATE: February 4, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Interstate Highway Construction is requesting permission to close E 18'x' Street between Hemlock Ave. and WC Parkway from 2/16/21 through 3/16/21 in order to complete roadway and drainage improvements for DPG Farms under USR19-0071. Interstate Highway Construction is requesting permission to close the intersection of Holly Avenue and the WC Parkway from 2/16/21 through 3/16/21 in order to complete roadway and drainage improvements for DPG Farms under USR19-0071. See attached closure diagram. 2021-0400 o 108 eb co.LA, LEGEND l INDICATES PLACEMENT OF SIGN INDICATES FRONT OF SIGN 3M -A BARRICADE L WORK ZONE JILL DEVICES S9OILL *EDT 991VT D J 1/, XDA VAS ❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑ ❑❑❑❑❑❑ MESSAGE BOARD TO BE PLACED NB It7 DAYS PRIOR TO IMPLEMENTATION oSOF E. 18TH ST. CLOSURE • MESSAGE AS DIRECTED BY ENGINEER SPEED UMIT ROAD WORK AHEAD 36" X 18" ' HIGH' LAN CLOSED AHEAD, R2-6 (OII«2134 SPEED LIMIT X R2-1(40) NOTES: 1) SIGNS SHALL BE SPACED A MIN. OF 350'. OR AS SPACE ALLOWS 2) TAPER LENGTH SHALL BE A MIN. OF 320'. WaSl2)160 = L BASED ON A REDUCED SPEED OF 40 MPH 31 DEVICE SPACING SHALL BE A MIN. OF 40' IN TAPERS AND MAX. DO' IN TANGENTS 41 PLAN IS FOR 2417 CLOSURE 5) CLOSURE IS FOR INSTALLATION OF TURN LANES AND SITE IMPROVEMENTS 6) REQUESTED WORK HOURS ARE: 7:U0 AM TO 5:00 PM, OR AS APPROVED 7) WORK IS ESTIMATED TO TAKE 3 MONTHS. WEATHER PENDING el MHT IT 1 SHALL WORK IN CONJUNCTION WITH MHT a 1 -A 91 SEE MHT ✓t 1 -A FOR DETOUR ROUTE 10) PLAN DRAWN BASED ON MSS STANDARDS CASE NO. 1U AND CASE NO. 2U K MUTCD TA -34 8 TA -2U 11) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT ON SITE CONDITIONS 12) CHANGES SHAH BE IMPLEMENTED WHERE APPLICABLE 13) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS 14) WORKERS SHALL NOT CROSS LNE LANES OF TRAFFIC: ON FOOT, WITHOUT THE ASSISTANCE OF FLAGGERS. USING THE "BUDDY SYSTEM' 15) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE SHALL BE EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER I6) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF THE ROADWAY ON THE SAME SIDE AS THE CLOSURE 171 NON -VEHICULAR ACCESS: BICYCLISTS ARE TO BE TREATED AS A VEHICLE. PEDESTERIAN FACILITIES DO NOT EXIST WITHIN CONSTRUCTION ZONE 181 PRNATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY PROPERTY OWNER 191 EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON AS IT IS SAFE TO DO SO JL 1APER LEFT 1URN LANE SMALL BE CLOSED PRIOR TO ROADWAY CLOSURE TO INCLUDE AND ADDITIONAL 10 DR UMSIVER TIC AL PANELS FOR A DISTANCE OF APPROX. Mr AT AN SO' SPACING MINIMUM LENGTH OF LONGITUDINAL BUFFER SPACE SPEED (MPH) BUFFER LENGTH (FT) 20 115 25 155 30 200 35 250 40 305 45 360 50 425 55 495 80 570 65 645 70 1 730 75 820 DETOUR AHEAD POSTED R.I.) - LEFT TURN LAN CLOSED AHEAD WELD COUNTY IHC PREPARED BY AWP ROAD CLOSED AHEAD k.)AD CLOSED J-2 CONTRACTING DPG SITE - WELD COUNTY PARKWAY ENTRANCE - USR 19-0071 MHT # 1 - PG 1 OF 2 - E. 18TH ST. RIGHT LANE & ROAD CLOSURE REVISED 12/16/2020 ROAD CLOSURE AND DETOUR DEVICES SHALL ONLY BE PLACED UPON COORDINATION WITH AND APPROVAL FROM WELD COUNTY ri r� ►i ii ►iiallai.do Holly Avenue will need to be accessible for Weld County tricking and operations at all times. CoiLo-Ph' rc o -a a MHT FINAL WITH SIGNATURES 12/16/2020 Area Wide Protective PREPARED BY: CAROL MOOSO Project Manager ATSSA # 106285 EXP. 08/25/2023 NOT AN ENGINEER Greeley: 970-356-6881 Direct Line : 970.909-1104 Metro: 303-659-1729 ' Fax: 970.356.5862 AWP _r 1712 1st Ave • PO Box 490 ' Greeley, Co 80623 cmooso@awptraffic.com AFTER HOURS EMERGENCY NUMBER 970-356.6881 OWNER WELD COUNTY WytEls?UUNTY ENTRANCE PARKWAY PROJECT NUMBER - USR 19-0071 PRIME CONTRACTOR TRAFFIC CONTROL CONTRACTOR INTERSTATE HIGHWAY A,AIp CONSTRUCTION (IHC) AWP PHONE SHEET NUMBER DAVID METZGER 970-485-0678-0678 MHT # 1 - REVISED DATE 12/16/2020 REVISED 12/16/2020 DRUMS SHALL BE USED FOR LANE CLOSURE AND REMOVED AS/UNTIL BARRIER IS INSTALLED BARRIER TO BE FLAIRED OUTSIDE SAFE ZONE 320' TAPER AREA WIDE PROTECT SUMMARY OF DEVICES 2 - VARIABLE MESSAG BOARDS 2 - 48" ROAD WORK AHEAD 2 - 48" RIGHT LANE CLOSED AHEAD 2 - 48" REDUCED SPEED (40) ADVISORY 2 - 36" SPEED LIMIT 40 2 - 36" WORK ZONE 2 - 48" LEFT TRANSITION 1 - 48" LEFT TURN LANE CLOSED AHEAD 1 - 48" ROAD CLOSED AHEAD 1 - 48" DETOUR AHEAD 2 - 48" ROAD CLOSED 1 - 30" ROAD CLOSED TO THRU TRAFFIC 2 - 48" BLANK ARROW (LEFT) 1 - 24" NO LEFT TURN 1 - 24" NO RIGHT TURN 2 - 36" END ROAD WORK 2 - FLASHING ARROW PANEL 7 - 3M -A BARRICADES 100 - CHANNELIZING DRUM ANY CONFLICTING SIGNS SHALL BE COVERED ❑❑❑❑EID❑0 ❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑o MESSAGE BOARD TO BE PLACED SB 7 DAYS PRIOR TO IMPLEMENTATION OF E. 18TH ST. CLOSURE - MESSAGE AS DIRECTED BY ENGINEER SPEED UM" 40 RIGHT LANE CLOSED AHEAD ROAD WORK AHEAD Date: 7/28/2020 Author: E. Amerine Project: Coun Road 49 and Holly Avenue - Ureeley, CO Customer: J-2 Contracting Company ATSSA#: 342 53 Job#: 18144 Comments: Type of Road Rural Traffic Volume: Light to Moderate All signs & devices shall be placed in accordance with the latest provisions of the Manual on Uniform Traffic Control Devices (MUTCD) &/or Colorado Department of Transportation (CDOT)-M&S Standard Drawings with respect to any applicable provisions from the City of Greeley. Access to residential and commercial driveways to be maintained at all times. Parking ban shall be coordinated with the city of Greeley Police Department. PLANS ARE NOT TO SCALE Sheet 1 of 2 LEGEND IS INDICATES PLACEMENT OF SION INDICATES FRONT OF SIGs: WORK ZONE ALL CM:VICES S2CALL AfeE Minna) STOMA RAS' NOTES: 1) SIGNS SHALL BE SPACED A MIN. OF 350'. OR AS SPACE ALLOWS 2) TAPER LENGTH SHALL BE MIN. OF 320', WxS(2)/60 = L. BASED ON A REDUCED SPEED OF 40 MPH 3) DEVICE SPACING SHALL BE A MIN. OF 40' IN TAPERS AND MAX. 80' IN TANGENTS 4) PLAN IS FOR 24/7 CLOSURE 5) CLOSURE IS FOR INSTALLATION OF TURN LANES AND SITE IMPROVEMENTS 6) REQUESTED WORK HOURS ARE: 7:00 AM TO 5:00 PM, OR AS APPROVED 7) WORK IS ESTIMATED TO TAKE 3 MONTHS, WEATHER PENDING 8) MHT # 1 - A SHALL WORK IN CONJUNCTION WITH MHT # 1 9) SEE MHT # 1 FOR LANE CLOSURE AND ROAD CLOSURE DETAILS 10) PLAN DRAWN BASED ON M&S STANDARDS CASE NO. 10 AND CASE NO. 20 & MUTCD TA - 34 & TA -20 11) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT ON SITE CONDITIONS 12) CHANGES SHALL BE IMPLEMENTED WHERE APPLICABLE 13) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS 14) WORKERS SHALL NOT CROSS LIVE LANES OF TRAFFIC ON FOOT. WITHOUT THE ASSISTANCE OF FLAGGERS, USING THE "BUDDY SYSTEM" 15) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE SHALL BE EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER 16) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF THE ROADWAY ON THE SAME SIDE AS THE CLOSURE 17) NON -VEHICULAR ACCESS: BICYCLISTS ARE TO BE TREATED AS A VEHICLE, PEDESTERIAN FACILITIES DO NOT EXIST WITHIN CONSTRUCTION ZONE 18) PRIVATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY PROPERTY OWNER 19) EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON AS IT IS SAFE TO DO SO ROAD CLOSED HEAD 500' Hemlock Avenue s ROAD WORK AHEAD DEIOUR AHLAD DETOUR AHEAD ROAD CLOSURE ROAD WORK AHEAD ROAD CLOSED TO THRU TRAFAC DETOUR M4-10 (L) SEE MHT #1 FOR ON SITE TRAFFIC CONTROL DETAILS J-2 CONTRACTING DPG SITE - WELD COUNTY PARKWAY ENTRANCE - USR 19-0071 MHT # 1 - A - PG 2 OF 2 - E. 18TH ST. ROAD CLOSURE DETOUR 12/16/2020 Fern Avenue 1.14 otTOUW Date: 7/28/2020 Author: E. Amerine Project: County Road 49 and Holly Avenue - Greeley, CO Customer: J-2 Contracting Company ATSSA#: 342253 Job#: 18144 Comments: Type of Road. Rural Traffic Volume: Light to Moderate All signs & devices shall be placed in accordance with the latest provisions of the Manual on Uniform Traffic Control Devices (MUTCD) &/or Colorado Department of Transportation AWP ce (CDOT)-M&S Standard Drawings with respect to any applicable provisions from the City of Greeley. Access to residential and commercial driveways to be maintained at all times. Parking ban shall be coordinated with the city of Greeley Police Department. PLANS ARE NOT TO SCALE Sheet 2 of 2 WELD COUNTY IHC PREPARED BY AWP 4:38'16.77-Ni/ e AREA IDE PROTECTIVE I SUMMARY OF DEVICES 2 - 48" ROAD WORK AHEAD 1 - 48" ROAD CLOSED AHEAD 2 - 48" DETOUR AHEAD 2 - 30" ROAD CLOSED TO THRU TRAFFIC 1 - 30" DETOUR ARROW LEFT 7-30" DETOUR MARKER ARROW 1 STRAIGHT 3 LEFT 3 RIGHT Cano-P/! Tao-o--aa MHT FINAL WITH SIGNATURES 12/16/2020 Area Wide PREPARED BY: CAROL MOOSO Project Manager ATSSA # 106285 EXP. 08/25/2023 NOT AN ENGINEER Greeley: 970-356-6881 Direct Line : 970.909-1104 Metro: 303-659-1729 •Fax: 970.356.5862 1st Ave • PO Box 490 • Greeley, cmooso@awptraffic.com HOURS EMERGENCY NUMBER Protective Co 80623 970-366-6881 AW ri P 1712 AFTER OWNER WELD COUNTY PROJECT WELD FNTRANC;E NAME COUNTY - USR PARKWAY '9-0071 PROJECT NUMBER PRIME CONTRACTOR TRAFFIC CONTROL CONTRACTOR INTERSTATE HIGHWAY W CONSTRUCTION (INC) MYY P PHONE SHEET DAVID METZGER 970-485-0678 NUMBER DATE MHT # 1 - A 12/16/2020 Hello