HomeMy WebLinkAbout20210501.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROAD 6 BETWEEN COUNTY ROADS 17 AND 19 FOR APPROXIMATELY AN ADDITIONAL TWO (2) WEEKS, FOR UNANTICIPATED DELAYS DUE TO WEATHER WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the temporary closure of County Road 6, between County Roads 17 and 19, be extended, with said extended closure being effective February 26, 2021, for approximately an additional two (2) weeks through March 12, 2021, for unanticipated delays due to weather, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. ec: 5O (136)• WC O;5patch, CO Stu+e. Prx.•1-rd 1 3/9 /21 2021-0501 EG0024 EXTEND TEMPORARY CLOSURE — COUNTY ROAD 6 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 22nd day of February, A.D., 2021, nunc pro tunc November 2, 2020. BOARD OF COUNTY COMMISSIONERS WELDOUNTY, COLORADO ATTEST: diatio �', XL:el Weld County Clerk to the Board BY: Stev oreno, Chair mes, Pro -T -m Deputy Clerk to the Board��!��+.�`�, erry L.:Pck APPBAVED Date of signature: O3/O I /P -I torney Lori Sai 2021-0501 EG0024 MEMORANDUM TO: Clerk to the Board DATE: February 17, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 6 between WCR 17 and WCR 19 will continue to be closed from 2/26/21 thru 3/12/21 for bridge replacement work. Original closure dates were 11/2/20 thru 2/26/21 by Resolution #2020-3189. WCR 6 between WCR 15 and WCR 17 is closed from 3/8/2021 thru 3/19/2021 for 2 culvert replacements. WCR 62 between WCR 41 and WCR 43 is closed from 3/8/2021 thru 3/12/2021 for a culvert replacement. See attached closure diagrams. 2021-0501 EG ooay www.invarion.com anoisn LiarsalGral ROAD WORK AHEAD O 0 attt,[,4`.$ 0 w 0 • UV 3H . MizIOM cave/ 4-- ano130 DETOUR ROAD WORK AHEAD Cr. rZ 0 0 wIMI a ri- f -64 i s 7f y -ire e 1/4'it t 4 -41-4- WCR 6/ 13 to 19 scheduled for FDR, CTB, pave project spring 2021. Bridge replacement scheduled to finish 3/12/2021 Culvert replacements scheduled all 3 miles beginning 2/22/2021 Pavement milling scheduled to begin 2/22/2021 FDR, CTB, Pave to begin in conjunction of completed prep work. "R j boa f f ROAD WORK AHEAD - .r .. ar a a.s-4-4 s Al a.411.-.1....111• r UV3HV N iiOM OV06 DETOUR -a anat30 ROAD WORK AHEAD PROJECT # HRP-80 ROAD CLOSURE DESCRIPTION closed or will bridge CR 2 CR remain culvert 6 6 replacement between 3/8/2021 between closed replacements thru WCR WCR for 3/19/2021 continued work 15 17 and and WCR WCR 17 19 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE est WCR WCR WCR East WCR WCR WCR 19 8 13 13 4 19 between between between between between between WCR WCR WCR WCR WCR WCR 19 13 6 and and 6 and 6 and and 6 and WCR WCR WCR WCR WCR WCR 8 13 8 4 19 4 1 3 1 1 3 1 mile mile mile mile mile mile paved gravel paved paved gravel paved NOTES: Culverts Mag Culverts DT of Chloride WCR replaced are 50' 6 is: to be and 3190/2018 are used irrigation: .2 east for dust of WCR with control new 15 on 15" & WCR 18" 6 RCPA Prepared 2/17/2021 by: Lee Stephen Hello