HomeMy WebLinkAbout20210501.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF
TEMPORARY CLOSURE OF COUNTY ROAD 6 BETWEEN COUNTY ROADS 17 AND
19 FOR APPROXIMATELY AN ADDITIONAL TWO (2) WEEKS, FOR UNANTICIPATED
DELAYS DUE TO WEATHER
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of
Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on
County roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic
thereon for the safety of the general public and that said traffic control devices shall conform to
the Federal Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that the temporary closure of County Road 6, between
County Roads 17 and 19, be extended, with said extended closure being effective February 26,
2021, for approximately an additional two (2) weeks through March 12, 2021, for unanticipated
delays due to weather, and further, that standard official traffic control devices shall be erected at
said closure giving notice of the restrictions.
ec: 5O (136)• WC O;5patch,
CO Stu+e. Prx.•1-rd 1
3/9 /21
2021-0501
EG0024
EXTEND TEMPORARY CLOSURE — COUNTY ROAD 6
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 22nd day of February, A.D., 2021, nunc pro tunc November 2, 2020.
BOARD OF COUNTY COMMISSIONERS
WELDOUNTY, COLORADO
ATTEST: diatio �', XL:el
Weld County Clerk to the Board
BY:
Stev
oreno, Chair
mes, Pro -T -m
Deputy Clerk to the Board��!��+.�`�,
erry L.:Pck
APPBAVED
Date of signature: O3/O I /P -I
torney
Lori Sai
2021-0501
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: February 17, 2021
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 6 between WCR 17 and WCR 19 will continue to be closed from 2/26/21 thru 3/12/21 for bridge
replacement work. Original closure dates were 11/2/20 thru 2/26/21 by Resolution #2020-3189.
WCR 6 between WCR 15 and WCR 17 is closed from 3/8/2021 thru 3/19/2021 for 2 culvert replacements.
WCR 62 between WCR 41 and WCR 43 is closed from 3/8/2021 thru 3/12/2021 for a culvert replacement.
See attached closure diagrams.
2021-0501
EG ooay
www.invarion.com
anoisn
LiarsalGral
ROAD
WORK
AHEAD
O
0
attt,[,4`.$
0
w
0
•
UV 3H .
MizIOM
cave/
4--
ano130
DETOUR
ROAD
WORK
AHEAD
Cr.
rZ
0
0
wIMI
a
ri- f -64 i s 7f y -ire e 1/4'it t 4 -41-4-
WCR 6/ 13 to 19 scheduled for FDR, CTB, pave project spring 2021.
Bridge replacement scheduled to finish 3/12/2021
Culvert replacements scheduled all 3 miles beginning 2/22/2021
Pavement milling scheduled to begin 2/22/2021
FDR, CTB, Pave to begin in conjunction of completed prep work.
"R
j
boa
f
f
ROAD
WORK
AHEAD
- .r .. ar a a.s-4-4 s Al a.411.-.1....111•
r
UV3HV
N iiOM
OV06
DETOUR
-a
anat30
ROAD
WORK
AHEAD
PROJECT
# HRP-80
ROAD CLOSURE DESCRIPTION
closed
or
will
bridge
CR
2
CR
remain
culvert
6
6
replacement
between
3/8/2021
between
closed
replacements
thru
WCR
WCR
for
3/19/2021
continued
work
15
17
and
and
WCR
WCR
17
19
NOTICE
TO PUBLIC
Road
Message
signs
and
boards
barricaded
to
be
used
DETOUR ROUTE
est
WCR
WCR
WCR
East
WCR
WCR
WCR
19
8
13
13
4
19
between
between
between
between
between
between
WCR
WCR
WCR
WCR
WCR
WCR
19
13
6 and
and
6 and
6 and
and
6 and
WCR
WCR
WCR
WCR
WCR
WCR
8
13
8
4
19
4
1
3
1
1
3
1
mile
mile
mile
mile
mile
mile
paved
gravel
paved
paved
gravel
paved
NOTES:
Culverts
Mag
Culverts
DT
of
Chloride
WCR
replaced
are
50'
6 is:
to
be
and
3190/2018
are
used
irrigation:
.2
east
for
dust
of
WCR
with
control
new
15
on
15"
&
WCR
18"
6
RCPA
Prepared
2/17/2021
by:
Lee Stephen
Hello