Loading...
HomeMy WebLinkAbout20210704.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY CLOSURE OF COUNTY ROAD 6 BETWEEN COUNTY ROADS 13 AND 19 FOR IMPROVEMENTS AND ROAD CONSTRUCTION WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon, and WHEREAS, various portions of County Road 6, between County Roads 13 and 19, have been temporarily closed since November 2, 2020. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the various previous closures of County Road 6, between County Roads 13 and 19, be superseded, with said closure as described herein being effective November 2, 2020, through May 4, 2021, for ;necessary improvements and road construction, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. CC: So(Rs)‘D;SPe.),tch0CSP 3/17/2► 2021-0704 EG0024 TEMPORARY CLOSURE — COUNTY ROAD 6 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 8th day of March, A.D., 2021, nunc pro tunc November 2, 2020. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: ditifet) G..�C,L�o•� Weld County Clerk to the Board eputy Clerk to the Board APPPVED AS��_ County • `''rney Date of signature: 3 /17/2 Steve oreno, C . it mes, Pro-Tem 2021-0704 EG0024 MEMORANDUM TO: Clerk to the Board DATE: March 1, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 6 between WCR 13 and WCR 19 is closed from 3/8/2021 thru 5/4/2021 for road construction. See attached closure diagrams. 2021-0704 ab 60a4 ita•r. I: anonci .+? Y Kiwgza,/ [4...imanosaa v et DETOUR QC O w 0 • 1' V a t VVCR 6113 to 19 scheduled for FDR, CTB, pave project spring 2021. Bridge replacement scheduled to finish 3/12/2021 Culvert replacements scheduled all 3 miles beginning 2/22/2021 culverts: 13 to 15 thru 3/5/21, 15 to 17 thru 3/19/21, 17 to 19 yet to be determined Pavement milling scheduled to begin 2/22/2021 FDR, CTB, Pave to begin in conjunction of completed prep work Road scheduled to reopen May 5, 2021. } P 'NCR L " r �•-a— fI"�..� � ir. w -04 _maw.. t 7i:i -•Q -ea CIVBFIV )*30M atiOel 'VCR 4 is ins y -pY lR "' as. M 40 'olt"'lliN40•10• lg. 81 41 -4-1 , � �..^ �S^ '9 • ;y ^•^fk..s^¢"'.a.� �" �j" f:� ."t � �� nee � �'" r DETOUR IMMIN www.invarion.com PROJECT # HRP-80 ROAD CLOSURE DESCRIPTION WCR closed for 5" Repave WCR6 will bridge culvert asphalt remain 6 replacement between 2/22/2021 between with replacements removal, closed new WCR thru asphalt WCR for CTB work 5/4/2021 17 continued 13 all treated thru and and 3 mile 3/12/21 WCR WCR base 19 19 NOTICE TO PUBLIC Road Message signs and boards barricaded to be used DETOUR ROUTE Vilest WCR WCR WCR East WCR WCR WCR bound bound 19 8 13 13 4 19 between between between between between between traffic: traffic: WCR WCR WCR WCR WCR WCR 19 13 6 and and 6 and 6 and and 6 and WCR WCR WCR WCR WCR WCR 8 13 8 4 19 4 1 3 1 1 3 1 mile mile mile mile mile mile paved gravel paved paved gravel paved NOTES: ADT Culverts Vag Culverts of Chloride WCR replaced are 6 to 50' is: be and 3190/2018 are used .2 irrigation: east for of dust WCR with control new 15 on 15" & WCR 18" 6 RCPA Prepared 3/1/2021 by: Lee Stephen Chloe Rempel From: Sent: To: Cc: Subject: Attachments: Good afternoon, Chloe Rempel Wednesday, March 3, 2021 2:05 PM Amy Mutchie; Dawn Anderson; Bruce Barker; Bob Choate Esther Gesick; Cheryl Hoffman; Isabella luanicorena Request for Review - Temporary Road Closure Reso Temporary Closure - CR 6.docx CR 6, between CRs 13 and 19, has been closed (in -part and in -full) for various reasons (bridge repair, culverts, etc.) since November 2, 2020. Public Works is now ready to begin a road construction project that requires an additional closure, but we have three current closures already in place for this stretch of road, some of which overlap, throughout the month of March. Esther and I drafted the attached Reso, with changes to the typical closure Reso highlighted, to supersede the four other Resos for this stretch of road by combining them all into one closure. If this path forward is agreeable to everyone, please review for placement on the March 8, 20201, Agenda, and make any edits necessary. Closure History: 1. Agenda 10/28/2020: Tyler Doc #2020-3189 • CR 6 between CRs 17 and 19 • Closed 11/2/20 through 2/26/21 • Bridge replacement 2. Agenda 02/10/2021: Tyler Doc #2021-0430 • CR 6 between CRs 13 and 19 • Closed 2/22/21 through 3/5/21 • Culvert replacements 3. Agenda 02/22/2021: Tyler Doc #2021-0501 • Extension of closure of CR 6 between CRs 17 and 19 • Closed 2/26/21 through 3/12/21 • Bridge replacement 4. Agenda 02/22/2021: Tyler Doc #2021-0502 • CR 6 between CRs 15 and 17 • Closed 3/8/21 through 3/19/21 • Culvert replacements 5. Agenda 03/08/2021: Pending • CR 6 between CRs 13 and 19 • To be closed 3/8/21 through 5/4/21 • Road construction Thank you, Chloe A. Rempel Deputy Clerk to the Board Supervisor Clerk to the Board's Office Weld County 1150 O Street Greeley, CO 80631 Tel: (970) 400-4213 Email: crempel@weldgov.com i Hello