HomeMy WebLinkAbout20212635.tiffNtiof
COLORADO
Department of Public
Health Et Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
August 30, 2021
To Whom it May Concern:
RECEIVED
SEP 0 3 2021
COMMISSIONERS
On August 31, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for
K.P. Kauffman Company - FACILITY #4. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, Co 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Polis, Governor I Jill Hunsaker Ryan, MPH, Executive Director
Pubt; a gevec"1
o°I/t3/21
cc: PL(TO) HL -(DS /TR), f W(TM/ER/cH/cI),
oG(an)
x9/03/3-1
2021-2635
Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: K.P. Kauffman Company - FACILITY #4 - Weld County
Notice Period Begins: August 31, 2021
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: K.P. Kauffman Company
Facility: FACILITY #4
Exploration and Production Well Pad
NWNW Section 36 T2N R68W
Weld County
The proposed project or activity is as follows: This source is requesting permit coverage for the venting of
produced gas at this site, and gas produced at other facilities that come through this facility on the way to
the central facility which compresses the gas to the sales pipeline. Based on the APEN submittal, this
emission point began operating January 15, 2021. The gas that is vented during bypass is sent to a dedicated
bank of enclosed combustion devices. Also permitted at this facility are condensate storage tanks. This
facility is a synthetic minor source for VOCs in the ozone nonattainment region.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• permitted emissions exceed public notice threshold values in Regulation No. 3, Part B, Section
III.C.1.a (25 tpy in a non -attainment area and/or 50 tpy in an attainment area)
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 21WE0093 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe.commentsapcd@state.co.us
• Send comments to our mailing address:
Lauraleigh Lakocy
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.01 1
COLORADO
Department of Public
Health @ Environment
Hello