Loading...
HomeMy WebLinkAbout20211711.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF INTERSECTION AT COUNTY ROADS 58 AND 53 FOR APPROXIMATELY TWO (2) MONTHS, FOR TURN LANE CONSTRUCTION AND PAVING WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road intersection to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the intersection at County Roads 58 and 53, be temporarily closed, with said closure being effective July 6, 2021, for approximately two (2) months for turn lane construction and paving by J2 Contracting Company, Inc., and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc:so(Rs) D;SFb-+c►,, CS 07/s4/.21 2021-1711 EG0024 TEMPORARY CLOSURE - INTERSECTION AT COUNTY ROADS 58 AND 53 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 30th day of June, A.D., 2021. BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ATTEST: di w �C,uo;t1 Weld County Clerk to the Board EXCUSED Steve Moreno, Chair Date of signature: O7/14 0-- 2021-1711 EG0024 MEMORANDUM TO: Clerk to the Board DATE: June 25, 2021 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item J2 Contracting is requesting permission to close the Intersection of CR 58 and CR 53 from 7/6/21 through 9/2/21 for turn lane construction and paving. See attached closure diagram. 2021-1711 000/30 E600D9 LEGEND t WORK AREA SIGN PANEL NO PARKS BARRICADES TO BE PLACED ON THE N.E. CORNER OF HWY 283 & WELD COUNTY PARKWAY O I -- w 0 TO BE PLACED ON THE S.E. CORNER OF HWY 283 & WELD COUNTY PARKWAY DETOUR MN+ 1) TRAFFIC PLAN IS BASED ON MUTCD TA NO. 20 2) EXACT PLACEMENT OF DEVICES WILL BE DEPENDENT ON SITE CONDITIONS CHANGES ARE TO BE IMPLEMENTED WHERE APPLICABLE 3) ALL WORKERS ON FOOT INSIDE OF THE WORK ZONE SHALL UTILIZE PROPER PPE IN ACCORDANCE WITH OSHA REGULATIONS 4) ALL VEHICLES AND EQUIPMENT MOVING INSIDE OF THE CLOSURE SHALL BE EQUIPPED WITH BACK UP ALARMS OR UTILIZE A SPOTTER 5) ALL VEHICLES AND CONSTRUCTION EQUIPMENT SHALL PARK OFF THE ROADWAY ON THE SAME SIDE AS THE CLOSURE 6) PLAN IS FOR UTILITY WORK AND SITE DEVELOPMENT 7) WORK IS ESTIMATED TO TAKE _ DAYS; WORKING HOURS ARE DAYLIGHT HOURS; PLAN IS FOR 24/7 CLOSURE 8) PRIVATE ACCESS IS TO BE MAINTAINED AT ALL TIMES WITHIN PROJECT LIMITS UNLESS OTHERWISE AGREED UPON BY PROPERTY OWNER 9) EMERGENCY VEHICLES WILL BE GIVEN THE RIGHT OF WAY AS SOON AS IT IS SAFE TO DO SO TO BE PLACED ON THE N.W. CORNER OF HWY 34 & WELD COUNTY PARKWAY 21f10130 TO BE PLACED ON THE N.E. CORNER OF HWY 34 & W.C.R 51 [4.1111lemoiaa \L_IGi•-- bl‘ *1--)t-. HTFIELO ENTERPRISES = Concrete !L Construction Services' TTONER@LIGHTFIELDENTERPRISES.COM NOT AN ENGINEER CITY, COUNTY, C -DOT - WELD COUNTY DATE 06/21/2021 PRIME CONTRACTOR: J-2 CONTACT: RYAN MCCONNELL PHONE NUMBER: 970-978-9052 JOB NAME: COLLE MHT # JOB LOCATION: HWY 34, CR 53 TO 283 1 \i TSA CENT # 465303 AT 1 SA EXP- 12/11!2023 MHT PREPARED BY: ''Onga 477 70nC1 26 TO BE PLACED ON THE N.E. CORNER OF HWY 34 & WELD COUNTY PARKWAY 1 2 U www.invarion.com Hello