HomeMy WebLinkAbout20212478.tiff,cp.41.40
00LORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
1150 O St
PO Box 758
Greeley, CO 80632
August 11, 2021
To Whom it May Concern:
RECEIVED
AUG 16 2021
WELD COUNTY
COMMISSIONERS
On August 12, 2021, the Air Pollution Control Division will begin a 30 -day public notice period for
Verdad Resources LLC - Bringelson Fed 2021 Et 2029 Pad. A copy of this public notice is enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
4300 Cherry Creek Drive S., Denver, Co 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Publ;c Rev ew
o g /23 /21
Jared Polls, Governor
I Jill Hunsaker Ryan, MPH, Executive Director
cc: Ps-C-rPi, HL-CDS trR), Pwat-t /ER/c H /G K)
og/l b /21
014
2021-2478
•
Air Pollution Control Division
Notice of a Proposed Project or Activity Warranting Public
Comment
Website Title: Verdad Resources LLC - Bringelson Fed 2021 a 2029 Pad - Weld County
Notice Period Begins: August 12, 2021
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Verdad Resources LLC
Facility: Bringelson Fed 2021 it 2029 Pad
Well production facility
SESE Section 20 T9N R58W
Weld County
The proposed project or activity is as follows: Applicant requests construction permit coverage for a new
well production facility in the attainment area portion of Weld County. The facility receives production from
ten (10) wells; one of those wells is API # 05-123-50599. Permitted equipment are crude oil tanks, produced
water tanks, venting from a heater -treater, and venting from a VRT. APEN-exempt equipment associated
with this project are oil truck loadout, three (3) 1.25 MMBtu/hr separator heaters, two (2) 1.50 MMBtu/hr
heater -treater heaters, fugitive emissions, and pneumatic devices.
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permits 21WE0357, 21WE0358,
21WE0359, and 21WE0360 are available on the Division's website at https://www.colorado.gov/cdphe/air-
permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
• Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
• Send an email to cdphe.commentsapcd®state.co.us
• Send comments to our mailing address:
Andy Gruel
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
2.01 1 i
COLORADO
Department of Public
Health @ Environment
Hello