HomeMy WebLinkAbout20211236.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF
TEMPORARY CLOSURE OF COUNTY ROAD 84 BETWEEN COUNTY ROAD 33 AND
U.S. HIGHWAY 85 FOR AN ADDITIONAL SIX (6) WEEKS, FOR UNANTICIPATED
DELAYS DUE TO WEATHER -RELATED CONSTRUCTION ISSUES
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of
Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on
County roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic
thereon for the safety of the general public and that said traffic control devices shall conform to
the Federal Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that the temporary closure of County Road 84, between
County Road 33 and U.S. Highway 85, be extended, with said extended closure being effective
May 7, 2021, for approximately an additional six (6) weeks, through June 18, 2021, for
unanticipated delays due to weather -related construction issues, and further, that standard official
traffic control devices shall be erected at said closure giving notice of the restrictions.
CC•.so(R&),D;spb. ti,CSP
05 /18121
2021-1236
EG0024
EXTEND TEMPORARY CLOSURE — COUNTY ROAD 84
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 5th day of May, A.D., 2021, nunc pro tunc April 12, 2021.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: dithiv i,
Weld County Clerk to the Board
BY:
Deputy Clerk to the Boar
APP' e ED AS
ounty - ttorney
Date of signature: O5/i7/4.t
Steve %repo, Chair
Lori Saine
2021-1236
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: April 30, 2021
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
C&H Excavation is requesting permission to continue the previously approved closure of CR 84 between
CR 33 and US 85 through 6/18/21 in order to complete turn lane additions and ditch reconstruction for
Highland Industrial Park.
Weather conditions and an unexpected construction issue has delayed their schedule.
See attached closure diagram.
2021-1236
www.lovela -dbarricade.com
LOVELAND
46War,e
BARRICADE
Per sates-
Serrlce
Loveland, CO 80638
Phone: (970) 663-6311
Traffic Control - S gn Manufacturing S InR.allation - Fax: (970) 663-6270
Pavement Marking -Contractor Supplies
TRAFFIC
CONTROL PLAN
MHT
#3
Location: 1\'CR 33 & %VCR w
City: kult, CO
Fill: C&H Excavation
Pair: \ur,ust 20. 2020
Rrtisrd: \Iarch24,2021
NOT DRAWN TO
SCALE
NOTE:
- Sign spacing will be determined according to
Table 6H-3 in the Manual on Uniform Traffic
Control Devices (MUTCD).
- Loveland Barricade L.L.C. Does Not Accept
Any Liability If Another Company Or Individual
Sets Up The Traffic Control Represented On This
Plan/M.H.T.
Contractor Will Coordinate
With Homeowner For
Work Zone Entry/Exit
Tabulation of Devices:
6 -48"x48" Road Work Ahead
2 -48"x48" Road Closed Ahead
2 -48"x48" Detour Ahead
4 - 30"x30" Detour Tracker Right
4 - 30"x30" Detour Tracker Left
1 - Type III Barricade Road Closed
To Thru Traffic Double Detour
1 - Type III Barricade Road Closed
Double Detour
1 - Type III Barricade Road Closed
2 - Type III Barricade Plain
16 - Channelizers
WO 2101
To
1111/ ROW.