HomeMy WebLinkAbout20212976.tiffRESOLUTION
RE: APPROVE IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT
ACCORDING TO POLICY REGARDING COLLATERAL FOR IMPROVEMENTS,
AUTHORIZE CHAIR TO SIGN, AND ACCEPT COLLATERAL FOR ACCESS PERMIT,
AP21-00535 - CEDAR CREEK II, LLC / BP WIND ENERGY NORTH AMERICA, INC. /
CEDAR CREEK II WIND ENERGY, LLC
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, on May 19, 2010, the Weld County Board of Commissioners approved Use
by Special Review Permit, USR-1723, for Cedar Creek II, LLC, do BP Wind Energy North
America, Inc., Attn: David Gonzalez, 700 Louisiana Street, 33rd Floor, Houston, Texas 77002, for
a Major Facility of a Public Utility (a wind energy facility with a generating capacity up to 250.8
megawatts [MW] along with a 230 -kilovolt [kV] electric transmission line, an interconnection facility
to tie into an existing 72 mile transmission line, existing collector transmission lines, up to five [5]
permanent 80 meter meteorological towers, one [1] substation, an operations and maintenance
building/facility, along with one [1] temporary batch plant and construction facility) in the
A (Agricultural) Zone District on the following described real estate, to wit:
Wind Energy Facility:
Section 6, Township 10 North, Range 57 West; Sections 1, 2, 3, 4,
and 5, Township 10 North, Range 58 West; Sections 5, 6, 8, and
17, Township 11 North, Range 56 West; Sections 1, 2, 3, 5, 6, 7, 8,
9, 10, 11, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 26, 27, 28, 29, 30,
31, 32, and 33, Township 11 North, Range 57 West; Sections 3, 4,
10, 11, 12, 13, 14, 15, 16, 24, 25, 27, 34, and 36, Township 11
North, Range 58 West; Sections 28, 32, and 33, Township 12 North,
Range 56 West; and Sections 34 and 36, Township 12 North,
Range 57 West of the 6th P.M., Weld County Colorado
Transmission Line:
Sections 1, 2, 3, 4, 5, 7, 8, and 9, Township 10 North, Range 58
West; Sections 4, 9, 10, 11, and 12, Township 10 North, Range 59
West; Sections 5 and 6, Township 10 North, Range 59 West;
Section 2, Township 10 North, Range 60 West; Section 7,
Township 11 North, Range 57 West; Sections 12, 13, 24, 25, and
36, Township 11 North, Range 58 West; Sections 31 and 32,
Township 11 North, Range 59 West; and Sections 35 and 36,
Township 11 North, Range 60 West of the 6th P.M., Weld County,
Colorado
4786327 Pages: 1 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII I�.rIL'R� iLlll�a'M+u�I���F N I�' LtiF�lS ��IYk �I II
4773483 Pages: 1 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clark and Reoorder, Weld County , CO
lIII I r.�I�'RQ lii n h���'Rl' iei I� 6fhi kh�i�I i "III
cc PL(TP/DR/5TM)
I /L7/22
2021-2976
PL2059
IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT - CEDAR CREEK II, LLC / BP
WIND ENERGY NORTH AMERICA, INC. / CEDAR CREEK II WIND ENERGY, LLC
PAGE 2
WHEREAS, pursuant to certain Conditions of Approval, the Board has been presented
with an Improvements and Road Maintenance Agreement According to Policy Regarding
Collateral for Improvements between the County of Weld, State of Colorado, by and through the
Board of County Commissioners of Weld County, and Cedar Creek II, LLC, BP Wind Energy
North America, Inc., and Cedar Creek II Wind Energy, LLC, with further terms and conditions
being as stated in said agreement, and
WHEREAS, the Board has been presented with two (2) bonds representing total collateral
required for off -site improvements in the amount of $3,000,000.00, split evenly between the two
funding parties, BP Wind Energy North America, Inc., in the form of Performance Bond
#285067599, in the amount of $1,500,000.00, and Cedar Creek II Wind Energy, LLC, in the form
of Performance Bond #285065197, in the amount of $1,500,000.00, both issued by Liberty Mutual
Insurance Company, 175 Berkeley Street, Boston, Massachusetts 02116, and
WHEREAS, after review, the Board deems it advisable to approve said agreement and
accept said Performance Bonds as stated above, copies of which are attached hereto and
incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that the Improvements and Road Maintenance Agreement According to
Policy Regarding Collateral for Improvements between the County of Weld, State of Colorado, by
and through the Board of County Commissioners of Weld County, and Cedar Creek II, LLC, BP
Wind Energy North America, Inc., and Cedar Creek II Wind Energy, LLC, be, and hereby is,
approved.
BE IT FURTHER RESOLVED that the two (2) bonds representing total collateral required
for off -site improvements in the amount of $3,000,000.00, split evenly between the two funding
parties, BP Wind Energy North America, Inc., in the form of Performance Bond #285067599, in
the amount of $1,500,000.00, and Cedar Creek II Wind Energy, LLC, in the form of Performance
Bond #285065197, in the amount of $1,500,000.00, both issued by Liberty Mutual Insurance
Company, 175 Berkeley Street, Boston, Massachusetts 02116, be, and hereby are, accepted.
BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized
to sign said agreement.
4786327 Pages: 2 of 106
12/17/2021 02:55 PMCarly Koppes, Clerk d Recorder, e:$O.O0Weld County Co
1111 Ieen II ill
4773483 Pages: 2 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
liIIII���I�'�QKuii�11�E �I k� Ur+1iiJ4�'i�'�Gl �'I J 11111
2021-2976
PL2059
IMPROVEMENTS AND ROAD MAINTENANCE AGREEMENT - CEDAR CREEK II, LLC / BP
WIND ENERGY NORTH AMERICA, INC. / CEDAR CREEK II WIND ENERGY, LLC
PAGE 3
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 20th day of October, A.D., 2021.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST:dia./O4:A
Weld County Clerk to the Board
ni .uCAN-tik-
Deputy Clerk to the Board
APP' • ' ED AS
County orney
Date of signature:'
4786327 Pages: 3 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
HVAN 'Wvh 1I II 1
4773483 Pages: 3 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII�1RW�'h'���'h�Lh�Y':I�Y�a�iFK�� �I III
Steve reno, Chair
Scott . James, Pro-Tem
Perry L. Buck
Ike Freeman
EXCUSED
Lori Saine
2021-2976
PL2059
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: BOCC Agenda Item - Approve Improvements and Road Maintenance Agreement for:
Cedar Creek II, LLC — AP21-00535
DEPARTMENT: Planning Services DATE: September 21, 2021
PERSON REQUESTING: Jazmyn Trujillo -Martinez
Brief description of the problem/issue:
The Departments of Planning Services and Public Works received a request from the applicant, Cedar Creek II,
LLC, requesting that the Board of County Commissioners consider approving the Improvements and Road
Maintenance Agreement for (AP21-00535). Collateral in the amount of $2,934,380.00 is required with this
agreement for off -site improvements. Collateral has been provided in the amount of $3,000,000.00 in the form
of two bonds, split evenly between the two funding parties, BP Wind Energy North America, Inc (Performance
Bond, Bond No. 284067599, issued by Liberty Mutual Insurance Company, 175 Berkeley Street, Boston, MA
02116) and Cedar Creek II Wind Energy, LLC (Performance Bond, Bond No. 285065197, issued by Liberty
Mutual Insurance Company, 175 Berkeley Street, Boston, MA 02118).
Weld County Public Works, Planning Services and the County Attorney's Office have reviewed the above
mentioned signed original document and observed the following:
• All Public Works related items, of the "Improvements & Road Maintenance Agreement According To
Policy Regarding Collateral For Improvements", are found to be acceptable.
This Agreement complies with the terms of the Access Permits, as issued by Planning Services.
What options exist for the Board? (include consequences, impacts, costs, etc. of options):
1. Have this BOCC Hearing item be placed on the next available agenda as part of the Consent Agenda.
2. Have this BOCC Hearing item be placed on the next available agenda as part of the Regular Agenda.
Recommendation:
Option 2. The Departments of Public Works, Planning Services and the County Attorney's Office are
recommending approval of the Improvements & Road Maintenance Agreement According To Policy Regarding
Collateral For Improvements for AP21-00535, and that this item be placed on the next regularly scheduled BOCC
Hearing, as part of the Regular Agenda.
Approve
Recommendation
Perry L. Buck
Mike Freeman
Scott K. James, Pro -Tern
Steve Moreno, Chair
Lori Seine
Schedule
Work Session Other/Comments:
2.021-2976
1O/0�O
PL 0059
Bond No. 285067599
PERFORMANCE BOND FOR
BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORADO
KNOW ALL PERSONS BY THESE PRESENTS, that (name)BP Wind Energy
North America, Inc., (address)201 Helios Way, Houston, TX 77079, a
(corporation, limited liability company, etc.)Corporation, organized
under the laws of the State of Delaware, with its principal office
located at (address) 201 Helios Way, Houston, TX 77079, hereinafter
called "Principal", and (name of surety)Liberty Mutual Insurance
Company, of (address of surety)175 Berkeley Street, Boston, MA 02116,
hereinafter called "Surety" are held and firmly bound unto Board of
County Commissioners of Weld County, Colorado, on behalf of Weld
County, Colorado, hereinafter called "Obligee" in the full and penal
sum of One Million five hundred thousand and 00/100 ---Dollars
($1,500,000.00), lawful money of the United States for the payment of
which well and truly made, we bind ourselves, our heirs,
administrators, successors and assigns, jointly and severally, firmly
by these presents.
WHEREAS, the above -bound Principal has obtained or is about to
obtain from the Obligee a land use permit, namely (insert the specific
permit and number - USR, SPR etc) AP21-00535 , and pursuant to the
requirements of said permit, has entered into an Improvements
Agreement, dated , with Obligee, and
WHEREAS, The Improvements Agreement requires Principal to obtain
a performance bond in an amount equal to the total cost of the
improvements for which Principal is responsible and naming Obligee as
beneficiary, and
WHEREAS, the value of improvements for which Principal is
responsible equals One Million five hundred thousand and 00/100 ---
Dollars, ($1,500,000.00), and
WHEREAS, at completion of the Project Collateral phase of the
Agreement, the amount of this Bond shall be reduced, by rider, to 15%
of the original amount throughout the Warranty Collateral phase of the
Bond, and shall be held in total by the County for two (2) years
following its written acceptance of the improvement(s).
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if
Principal shall well, truly and faithfully perform its duties, and all
of its undertakings, covenants, terms, and conditions as set forth in
the Improvements Agreement, and if Principal shall satisfy all claims
and demands set forth in said agreement, and shall fully indemnify and
save harmless Obilgee from all costs and damages which it may suffer by
reason of Principal's failure to perform as agreed, and shall reimburse
and repay Obligee all outlay and expense which Obligee may incur in
making good any default, then this obligation shall be null and void;
PROVIDED FURTHER, that if Principal shall default in any of its
obligations set forth in the Improvements Agreement, and thereafter
fail to fully indemnify and save harmless Obilgee from all costs and
damages which it may suffer by reason of said default, this obligation
shall remain in full force and effect;
PROVIDED FURTHER, regardless of the number of years this Bond is in force, or
the number of continuation certificates issued, the liability of the Surety
shall not be cumulative in amounts from period to period and shall in no event
exceed the amount set forth above, or as amended by rider;
PROVIDED FURTHER, that Surety, for value received hereby stipulates and
agrees that no change, extension of time, alteration or addition to the
terms of the Improvements Agreement to the work to be performed
thereunder, shall in any way affect its obligations on this bond, and
it does hereby waive notice of any such change, extension of time,
alteration or addition to the terms of the Improvements Agreement.
PROVIDED FURTHER, this bond is NONCANCELLABLE, and shall renew
annually automatically, from the date of this bond until its release by
Obligee, to guarantee that Principal shall well, truly and faithfully
perform its duties, and all of the undertakings, covenants, terms, and
conditions set forth in the Improvements Agreement, and any extensions
thereof which may be granted by Obligee with or without notice to
Surety.
The parties to this Performance Bond acknowledge that through the
Improvements Agreement, Obligee reserves the right to require Principal
to obtain a different Performance Bond from a financial institution
other than Surety in the event that the rating of Surety by AM Best
falls below a B+ rating.
IN WITNESS WHEREOF, this instrument is executed in four (4)
counterparts, each one of which shall be deemed an original, this 17th
day of September, 2021.
BP Wiri 7'nergy North America, Inc.
Principal Secretary/Witness
(SEAL)
AON Risk .olutions
ga Attorney -in -Fact
ss as to Surety
Pr' 1
1/P e`sZ ��.►s J
Title
Liber
By:
Sandra M. Winsted, Attorney -in -Fact
Mutual Insurance Company
20East Randolph Street 175 Berkeley Street
A•dress Address
Chicago, Illinois 60601
Address
Boston, MA 02116
Address
IMPORTANT: Surety company executing bond must appear on the Treasury
Department's most current list (Circular 570 as amended) and be authorized
to transact business in the State of Colorado.
Bond must be accompanied with Attorney -in Fact's authority from the surety
company certified to include the date of the bond.
Liberty
Mutual®
SURETY
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
Certificate No: 8205928-285057
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Christina L.
Sandoval; Diane M. O'Leary; James B. McTaggart; Jennifer L. Jakaitis; Jessica B. Dempsey; Judith A. Lucky-Eftimov; Kristin L. Hannigan; Roger Paraison; Samantha
Chierici; Sandra M. Nowak; Sandra M. Winsted; Susan A. Welsh
all of the city of Chicago state of IL each individually if there be more than one named, its true and lawful attorney -in -fact to make,
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 9th day of July , 2021 .
By:
State of PENNSYLVANIA
County of MONTGOMERY ss
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
David M. Carey, Assistant Secretary
On this 9th day of July , 2021 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
Commonwealth of Pennsylvania - Notary Seal
Teresa Pastella, Notary Public
Montgomery County
My commission expires March 28, 2025
Commission number 1126044
Member, Pennsylvania Association of Notaries
By:
ipvadj Ltez,
areas Pastella, Notary Public eresa Public
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV — OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney -in -fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 1-1 day o
By:
Renee C. Llewellyn, Assistant Secretary
(A�
W O
C U
CO
C
•— =
CE
Off,
C6
U a)
74)
d0
>—
Cf6
O N
Q O
OO
L
O N
(29
O N
ace)
,
00
-a
C CD
a)=
C U
O a)
- Cl)
t0
oW
LLO-
LMS-12873 LMIC OCIC WAIC Multi Co 02/21
Bond No. 285065197
PERFORMANCE BOND FOR
BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY, COLORAD
KNOW ALL PERSONS BY THESE PRESENTS, that Cedar Creek II Wind
Energy, LLC, 1 Riverside Plaza, Columbus, OH 43215, a limited liability
company, organized under the laws of the State of Delaware, with its
principal office located at 1 Riverside Plaza, Columbus, OH 43215,
hereinafter called "Principal", and Liberty Mutual Insurance Company,
of 175 Berkeley Street, Boston, MA 02116, hereinafter called "Surety"
are held and firmly bound unto Board of County Commissioners of Weld
County, Colorado, on behalf of Weld County, Colorado, hereinafter
called "Obligee" in the full and penal sum of One Million Five Hundred
Thousand and 00/100 ---Dollars ($1,500,000.00), lawful money of the
United States for the payment of which well and truly made, we bind
ourselves, our heirs, administrators, successors and assigns, jointly
and severally, firmly by these presents.
WHEREAS, the above -bound Principal has obtained or is about to
obtain from the Obligee a land use permit, namely AP21-00535, and
pursuant to the requirements of said permit, has entered into an
Improvements Agreement, dated September 17, 2021, with Obligee, and
WHEREAS, The Improvements Agreement requires Principal to obtain
a performance bond in an amount equal to the total cost of the
improvements for which Principal is responsible and naming Obligee as
beneficiary, and
WHEREAS, the value of improvements for which Principal is
responsible equals One Million Five Hundred Thousand and 00/100---,
($1,500,000.00), and
WHEREAS, at completion of the Project Collateral phase of the
Agreement, the amount of this Bond shall be reduced, by rider, to 15%
of the original amount throughout the Warranty Collateral phase of the
Bond, and shall be held in total by the County for two (2) years
following its written acceptance of the improvement(s).
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if
Principal shall well, truly and faithfully perform its duties, and all
of its undertakings, covenants, terms, and conditions as set forth in
the Improvements Agreement, and if Principal shall satisfy all claims
and demands set forth in said agreement, and shall fully indemnify and
save harmless Obilgee from all costs and damages which it may suffer by
reason of Principal's failure to perform as agreed, and shall reimburse
and repay Obligee all outlay and expense which Obligee may incur in
making good any default, then this obligation shall be null and void;
PROVIDED FURTHER, that if Principal shall default in any of its
obligations set forth in the Improvements Agreement, and thereafter
fail to fully indemnify and save harmless Obilgee from all costs and
damages which it may suffer by reason of said default, this obligation
shall remain in full force and effect;
PROVIDED FURTHER, regardless of the number of years this Bond is in force, or
the number of continuation certificates issued, the liability of the Surety
shall not be cumulative in amounts from period to period and shall in no event
exceed the amount set forth above, or as amended by rider;
PROVIDED FURTHER, that Surety, for value received hereby stipulates and
agrees that no change, extension of time, alteration or addition to the
terms of the Improvements Agreement to the work to be performed
thereunder, shall in any way affect its obligations on this bond, and
it does hereby waive notice of any such change, extension of time,
alteration or addition to the terms of the Improvements Agreement.
PROVIDED FURTHER, this bond is NONCANCELLABLE, and shall renew
annually automatically, from the date of this bond until its release by
Obligee, to guarantee that Principal shall well, truly and faithfully
perform its duties, and all of the undertakings, covenants, terms, and
conditions set forth in the Improvements Agreement, and any extensions
thereof which may be granted by Obligee with or without notice to
Surety.
The parties to this Performance Bond acknowledge that through the
Improvements Agreement, Obligee reserves the right to require Principal
to obtain a different Performance Bond from a financial institution
other than Surety in the event that the rating of Surety by AM Best
falls below a B+ rating.
IN WITNESS WHEREOF, this instrument is executed in four (4)
counterparts, each one of which shall be deemed an original, this 17th
day of September, 2021.
Cedar Creek II Wind Energy, LLC
Principal
,. DocuSigned by:
$av'al. 14.1igh.Ustu,
c426cccmraoaoa...
Witness
(SEAL)
775 Yard Street, Suite 200
Columbus, OH 43212 Address
as to Surety
By:
T—DocuSigned by:
206 A4.014001.
VP
Title
Liberty Mutual Insurance Company
Surety
By: L-a,/,(A‘ Le
Paula M. Eby, Attorney- Fact
175 Berkeley Street
Boston, MA 02116
Address
IMPORTANT: Surety company executing bond must appear on the Treasury
Department's most current list (Circular 570 as amended) and be authorized
to transact business in the State of Colorado.
Bond must be accompanied with Attorney -in Fact's authority from the surety
company certified to include the date of the bond.
This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Not
valid for mortgage, note, loan, letter of credit, bank deposit, currency rate, interest rate or residual value guarantees. For bond and/or Power of Attorney (POA) verification
inquiries, please call 610-832-8240 or email HOSUR@iibertymutual.com.
Liberty
Mutual.
SURETY
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty
Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under
the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint,Paula M. Eby
of the city of Columbus , state of OH its true and lawful attorney -in -fact, with full power and authority hereby conferred to sign, execute and acknowledge the following
surety bond:
Principal Name: Cedar Creek II Wind Energy, LLC
Obligee Name: Board of County Commissioners of Weld County, Colorado
Bond Amount: See Bond Form
Surety Bond Number: 285065197
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 12?^ day of March, 2021.
By:
STATE OF PENNSYLVANIA ss
COUNTY OF MONTGOMERY
The Ohio Casualty Insurance Company
Liberty Mutual Insurance Company
Wesjt4merican Insurance Company
Davidy, Assistant Secretary
On this 12th day of March, 2021, before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The
Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained
by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Kino of Prussia. Pennsylvania. on the day and vear first above written.
-‘1��'ySYL�P��t
11y p0Member, Pennsylvania Association of Notaries
This Power ofAttomeytistnade and executed pursuant to and by authority of the following By-laws and Authorizations of Liberty Mutual Insurance Company, I he Ohio Casualty Insurance
Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
ARTICLE IV — OFFICERS — Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and
subject to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute,
seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their
respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.
When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. My power or authority granted to any representative or attorney -
in -fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII — Execution of Contracts — SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president,
and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fad, as may be necessary to act in behalf of the Company to make, execute,
seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their
respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When
so executed such instruments shall be as binding as if signed by the president and attested by the secretary.
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in -
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization — By unanimous consentof the Companys Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, of Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company
do hereby certify that this power of attorney executed by said Companies is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 17th day of September 2021
•
Commonwealth of Pennsylvania - Notary Seal
Teresa Paste8a, Notary Public
Montgomery County
My commission expires March 28, 2025
Commission number 1126044
By: /,e4
Teresa Pasteila, Notary Public
By:
Renee C. Llewellyn, Assistant Secretary
IMPROVEMENTS & ROAD MAINTENANCE AGREEMENT ACCORDING TO
POLICY REGARDING COLLATERAL FOR IMPROVEMENTS
Cedar Creek II, LLC. - AR21-00535
THIS AGREEMENT is made this day of 202 % , by and between Cedar Creek
II, LLC, a limited liability company organized under the aw� State of Colorado, whose address is
201 Helios Way, Houston, Texas 77079, hereinafter referred to as "Property Lessee," authorized to do
business in the State of Colorado, the County of Weld, a body corporate and politic of the State of Colorado,
by and through its Board of County Commissioners, whose address is 1150 "O" Street, Greeley, Colorado
80631 hereinafter referred to as "County", and BP Wind Energy North America, Inc., a corporation
organized under the laws of Delaware with a principal place of business at 201 Helios Way, Houston, Texas
77079 ("BP") and Cedar Creek II Wind Energy, LLC, a limited liability company organized under the laws
of Delaware with a principal place of business at 1 Riverside Plaza, 29th Floor, Columbus, Ohio 43215
("AEP"). BP and AEP will be referred to collectively as the "Funding Parties".
WITNESSETH:
WHEREAS, Property Lessee is the lessee of the following described property in the County of
Weld, Colorado:
Wind Energy Facility:
Section 6, Township 10 North, Range 57 West
Sections: 1, 2, 3, 4, 5, Township 10 North, Range 58 West
Sections: 5, 6, 8, 17, Township 11 North, Range 56 West
Sections:1-3, 5-11, 14-23, 26-33, Township 11 North, Range 57 West
Sections: 3, 4, 10-16, 24, 25, 27, 34, 36, Township 11 North, Range 58 West
Sections: 28, 32, 33, Township 12 North, Range 56 West
Sections: 34, 36, Township 12 North, Range 57 West
of the 6th P.M., Weld County, Colorado.
hereinafter referred to as "the Property," and
2
O
U
c�
0
U
—
(D
v4 ca,
On
•oso.
LL
KKK=�
�
an.
eo
e r
No
all
WHEREAS, Property Lessee has received the Department of Planning Services conditional
approval of AP21-00535 ("Permit"), and
WHEREAS, Property Lessee acknowledges that the final approval of AP21-00535 is conditional
upon Property Lessee's funding and/or construction of the off -site improvements and road maintenance
described in this Agreement and depicted in the following incorporated exhibits:
Exhibit A - Off -Site Costs of Construction,
Exhibit B - Off -Site Construction Schedule,
Exhibit C — Construction Plans,
Exhibit D — Plat Map,
Exhibit E — Decommissioning Plan,
Exhibit F — Haul Route Map,
Exhibit G - Stockpiles, and
Exhibit H — Gravel Roads Maintenance and Reclamation Plan, and
WHEREAS, Property Lessee acknowledges it may not operate and County will not finalize
AP21-00535 until said improvements have been completed and accepted by County, and
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
---1of16
4773483 Pages: 4 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Reoorder, Weld County , CO
llll Ailkli:Or ilinP40101216'6 "Ill
02,00,21-0297
WHEREAS, Property Lessee acknowledges that pursuant to the provisions of Weld County Code,
the failure to commence construction of the improvements outlined herein within one (1) year of the
approval and issuance of AP21-00535 may result in the rescinding of AP21-00535, upon consideration and
order of the Department of Planning Services, and
WHEREAS, the parties agree that the Property Lessee shall provide collateral for off -site
improvements as required by this Agreement when the Board of County Commissioners (BOCC) approves
this Agreement, and
WHEREAS, Property Lessee acknowledges that the Permit is conditional upon, inter alia, Property
Lessee's construction of certain improvements to certain County Roads (the "County Roads") which are
necessary for Property Lessee's construction of their project and which are more particularly described on
the attached Exhibit C, as well as certain improvements to the Property (the "On -Site" Improvements) as
more particularly described in the attached Exhibit C, and
WHEREAS, the parties agree that except as set forth herein, Property Lessee shall not be required
to commence construction of the off -site road improvements, as herein defined, until Property Lessee
receives a permit for grading and/or a Right -of -Way Use (ROW) Permit from County, and
WHEREAS, the parties agree that Property Lessee shall be responsible for damages their project
causes to County Rights -of -Way, including the County Roads, and agrees to keep them open and passable
for public use, all as contemplated herein, and
WHEREAS, the Funding Parties are the indirect parent companies of the Property Lessee and will
be responsible for all financial obligations of the Property Lessee under this Agreement.
NOW, THEREFORE, IN CONSIDERATION OF the foregoing and of the promises and covenants
contained herein, the parties hereto promise, covenant, and agree as follows:
PART I: SITE SPECIFIC PROVISIONS
7 MZE
O 1
Uy
et03y
wi Ca
r.Z
O VL
LLv
maso mil
a -a
NN�^
N
c0 CV
`r▪ aa
•`N L
A. Off -Site Improvements (as required by the BOCC): The Property Lessee shall be responsible
for the construction of certain off -site safety improvements as identified by the USR hearing Resolution,
which may include, but are not limited to: construction of adequate turning radii of sixty-five (65) feet at
the main entrances and exits which extend into County road ROW connecting to the County road system,
and off -site drainage and signage installations, as indicated on the accepted Exhibit D and future Exhibit
C, as required. On -site improvements that create more run-off than the historical amount may require off -
site drainage improvements to roads and ROWs. Any approved access point(s) improvements will include
standard County approved tracking control, and may include a double cattle guard set (one right after the
other), placed back to back across the entire width of the access, to ensure a complete revolution of the
truck tires in order minimize the tracking of mud and debris onto the adjacent County road.
1.0 Road Improvements Defined. The "Road Improvements" shall mean those improvements to
County Roads that are required by Property Lessee in order to construct its project, all as more particularly
described on Exhibit C. By way of example, the Road Improvements will generally consist of grading,
improvements to the turning radii as designated intersections, improvements to existing cattle guards, and
the installation of warning signs at designated locations. Upon completion of the project, or a portion thereof
which will no longer utilize a portion of the County Roads for construction purposed, the Road
Improvements shall include the return of the County Roads to their pre -project condition as evidenced by
the pre -construction survey required in Section D.3.0., except as may otherwise be agreed to by County.
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 2 of 16
U
U
:9 -ft
{OO
33
mm
• 40-
O1. 0
LLti
'
a
a n L
a_ In o
0
N
PI 02
N o
N
m_. a
NN• Lm
er.-.U-
2.0 Road Improvements Responsibilities. Property Lessee is solely responsible for the required off -site
designated improvements. These responsibilities may include but are not limited to the following: design,
surveys, utility locates, acquisition of ROW(s), dedication of ROW(s), ROW and Access Permits and fees,
coordination with oil and gas operators and facilities and affected irrigation facilities, and utilities, traffic
control, and project safety during construction. Property Lessee shall obey all applicable regulations issued
by the Occupational Safety and Health Administration (OSHA), Colorado Department of Transportation
(CDOT), the Colorado Department of Public Health and the Environment (CDPHE), and other federal,
state, or county regulatory agencies.
3.0 Cost of Construction Exhibit. The cost of construction estimates (engineer's estimate) identified as
Exhibit A shall be submitted when triggered. The Property Lessee shall detail the costs used in determining
the collateral requirement for the off -site improvements related to the development. A registered Colorado
Engineer must sign and stamp the construction cost Exhibit A. If more than three (3) years have passed
since the last construction cost estimate was provided, the Property Lessee shall provide an updated
construction cost estimate prior to the start of construction.
4.0 Construction Schedule Exhibit. Exhibit B shall be provided when triggered by the Property Lessee,
and indicating the construction schedule for off -site improvements, including an anticipated completion
date. Property Lessee shall not commence construction of any improvements, record plat, or receive any
permitting prior to approval of this Agreement. Exhibit C shall be provided when triggered by the Property
Lessee and indicating the receipt of the appropriate Grading Permit, Access Permit, and/or ROW Permit, if
applicable. Property Lessee shall substantially complete all improvements in accordance with Exhibit C in
order to request the warranty period begin. In the event that the construction schedule is not current, the
Property Lessee shall submit a revised construction schedule.
5.0 Off -Site Improvements Collateral. As required, collateral is accepted and released by the BOCC
pursuant to the Weld County Code. Additional information about collateral is outlined in Part II.B of this
Agreement.
6.0 As -Built Plans. "As -built" plans shall be submitted at the time the letter requesting release of
collateral is submitted or once the Property Lessee has completed improvements as described in Part II.B,
Subsection 3.2.3, of this Agreement. Property Lessee shall also provide an electronic copy of the as -built
drawings. The as -built drawings shall be stamped, signed, and dated by a licensed and registered
Professional Land Surveyor or Professional Engineer.
B. On -Site Improvements:
1.0 On -Site Improvements Defined. The On -Site Improvements shall mean those improvements to the
Property described in Exhibit C.
2.0 On -Site Improvements Responsibilities. Property Lessee is solely responsible for the cost and
construction of required On -Site Improvements and any expenses associated therewith. These
go•. responsibilities may include but are not limited to the following, as applicable: design and construction of
the On -Site Improvements, surveys, utility locates, ROW clearances and permits, coordination with oil and
is
.m3 gas operators and facilities and affected irrigation facilities and utilities, traffic control, and project safety
during construction. On -Site Improvements construction shall be in accordance with all applicable
uLL o regulations issued by OSHA, CDOT, CDPHE, and other federal, State, or County regulatory agencies.
•
�26,a• 3.0 On -Site Improvements Construction Standards. All construction and materials for the On -Site
ia EA Improvements shall conform to the standards and specifications for the On -Site Improvements set forth in
o� a Exhibit C.
ti;( -73
N ?Le -me Cedar Creek II, LLC — AP21-00535 - OFFSIA21-0005
ooNoPage 3 of 16 Z... 'U
4.0 Decommissioning Plan. Each party hereto agrees that the project shall be decommissioned, and
security therefore shall be provided, in accordance with the terms and conditions set forth in Exhibit E.
C. Haul Routes. The Property Lessee shall be financially responsible for its proportional share of the
associated costs for maintaining and/or improving designated haul/travel routes on the terms set out below
in this Section C and Section D.
1.0 Haul Routes. The following roads are designated as haul/travel routes for the Property:
1.1 Property Lessee shall take reasonable steps to prevent heavy truck and equipment traffic
associated with the project form using any County Roads other than those shown on the
attached Exhibit F, and any changes there to under Section C.4.0, below (the "Approved
Haul Routes").
1.2 Property Lessee recognizes that first use priority to certain Approved Haul Routes belongs
to the United States Air Force as approved Defense Access Roads (DAR).
2.0 Weight Limits. No travel vehicles may exceed CDOT required specifications for pounds -per -axle
and axle configurations, unless overweight permits have been applied for and granted and shall also comply
with Chapter 8, Article XV of the Weld County Code.
3.0 Haul Route Signage. Property Lessee shall install travel route signs, if applicable, as per Manual
of Uniform Traffic Control Devices standards, at all exit points of the Property which can be clearly seen
by drivers leaving the facility and which clearly depict County approved travel routes.
o�o
ii
.o
Ga.
• L'
r" 0
mg3
•aA-
uY
do
Cu
-.
alic No
er\YL
Min M
•.0
4.0 No Deviation from Permitted Haul Routes. Except as expressly set forth herein, no deviation in the
use of any roads other than the Approved Haul Routes by vehicles accessing the project shall be permitted
without the prior written approval of Weld County, not to be unreasonably withheld, conditioned, or
delayed. Without limiting the foregoing, in the event any changes to the Approved Haul Routes are accepted
by Weld County, Property Lessee shall be required to address, at Property Lessee's expense, any impacts
associated with the use of such revised haul routes, including dust control, upgrading, or maintenance of
such revised haul routes in a manner consistent with this Agreement. Property Lessee shall recommend that
passenger vehicles and light trucks use the Approved Haul Routes to access the project whenever possible.
When passenger vehicle and light trucks access the project via non -approved haul routes without the prior
approval of Weld County, Property Lessee shall provide dust suppression at required locations or reimburse
Weld County Public Works for any incremental impacts associated with the use of such routes, including
dust control and maintenance if Weld County Public Works advises Property Lessee that such project traffic
has increased traffic counts beyond the applicable threshold per Weld County Code Section 8-6-100.
4.1 Property Lessee may request deviation, modification, or termination of or from one or more
of the Approved Haul Route(s) by submitting, in writing to Weld County Planning Services, a
request detailing the dates and locations of the proposed changes in the Approved Haul Route(s).
In the case of a deviation or modification, the written request shall identify the specific proposed
new haul route(s) and interval(s) for the proposed new haul route by identifying the bounding roads
(road number X between road number Y and road number Z). The written request should include
identification of any site and road limitations of which the Property Lessee is aware. Weld County
Planning Services (in coordination with Weld County Public Works) will evaluate the request,
perhaps by field visit, and respond to the requested change(s) in writing, within five (5) working
days. The Property Lessee shall be responsible for any road improvements identified by Weld
County Public Works that may be necessary to render the new proposed haul route(s) serviceable
for the project traffic.
Cedar Creek II, LLC — AP21-00535 - OFFSIA21-0005
Page 4 of 16
D. Maintenance Requirements:
1.0 Obligation to Maintain Current and Future Routes. Property Lessee shall promptly repair or cause
to be repaired any material damage to the Approved Haul Routes that is caused by project traffic. The type
and method of repair shall be consistent with the applicable standard set forth in Exhibit C. Should a
relevant conflict exist, Weld County's Engineering and Construction Criteria per Weld County Code
Chapter 8 Appendix Q, will control.
2.0 Dust Control. Property Lessee shall be financially responsible for dust control on unpaved
designated haul/travel routes from commencement of operation until Property Lessee has satisfied its
obligations under Section D.5.0 (Post -Construction) with County inspection and acceptance, which
acceptance shall not be unreasonably withheld or delayed. The amount and extent of dust control will be
determined on an equitable basis by site -specific conditions at the time, as determined exclusively by
County personnel. Dust abatement along the relevant haul/travel routes is expected to occur approximately
two to five times per year. Dust abatement is required for roads with more than 200 vehicles per day, per
section 8-6-100 of the Weld County Code.
2.1 Dust Control During Construction. If necessary, as determined by the County, the Property
Lessee shall cause to be performed within fourteen (14) days of notification, at its sole expense,
dust control by a contractor approved by Weld County Public Works during the construction period
of the development.
3.0 Preconstruction Survey. Property Lessee and County have jointly inspected the Approved Haul
Routes and established a baseline of current road conditions on the Approved Haul Routes so that
subsequent inspections will be able to identify any material damage or maintenance issues on the Approved
Haul Routes that are attributable to Property Lessee's use of the Approved Haul Routes.
4.0 Stockpiling of Repair Materials. During construction of the project, Property Lessee will maintain
a stockpile of repair materials on the Property, primarily consisting of three (3) gravel stockpiles of not less
than one thousand (1,000) cubic yards per stockpile for road repairs at the locations set forth on the attached
Exhibit G. Property Lessee shall replenish each stockpile until such time as Property Lessee has notified
Weld County Public Works that heavy hauling operations for the project has ceased and Weld County
Public Works has concurred.
2
o Y
T
831
0
U
as7
✓ ela_
14. • "a;
OLL
LL0
co
ra▪ a�L
BU
ANYo.
Min ›M
5.0 Post -Construction. Upon completion of construction of the project, Property Lessee shall return the
Approved Haul Route roadways to pre -construction County standards, as set forth on the attached Exhibit
H. Operator shall account for the worst -case scenario of roadway conditions from project related traffic.
6.0 Repair. Property Lessee shall be financially responsible for its proportional share of excavation,
patching, and pavement repair, and gravel replenishment on designated haul/travel routes. The amount and
extent of repair and paving and re -gravelling measures will be determined by site -specific conditions at the
time, as determined exclusively by County personnel.
7.0 Need for Immediate Repairs. In the event of damage to a designated haul/travel route by project
traffic that causes an immediate threat to public health and safety or renders the road impassible
("Significant Damage"), County shall, after inspection, notify Property Lessee of such Significant Damage.
Property Lessee shall identify the repair required and shall consult with County on the extent, type, timing,
materials, and quality of repair (i.e., temporary versus permanent) within twenty-four (24) hours after
receipt of such notice and shall commence such repair within forty-eight (48) hours after receipt of such
notice. If Property Lessee identifies Significant Damage prior to receiving notice thereof from County,
Cedar Creek [I, LLC - AP21-00535 - OFFSIA21-0005
Page 5 of 16
Property Lessee may commence repair of such Significant Damage and shall concurrently notify County
of the extent, type, timing, materials, and quality of repair (i.e., temporary versus permanent).
8.0 Repair of Road. On or before December 31, of the calendar year in which County staff has
determined through site analysis and/or pavement testing that a particular haul/travel route road portion will
require grading measures in order to protect the public health, safety, and welfare, and the County has
budgeted sufficient funds for the following calendar year to pay its share of the Off -Site
Improvement/Repair Costs, County shall notify Property Lessee in writing that the Off -Site
Improvements/Repairs shall be undertaken. Within ninety (90) days of its receipt of County's notice of the
need to undertake the road maintenance repairs and/or improvements, Property Lessee shall submit Off -Site
Construction Plans and Cost Estimates to County for review. Property Lessee shall have sole responsibility
for the completion of the repairs and/or improvements on or before December 15, of the year following
County's notice of the need for repairs.
8.1 In County's sole discretion, County may undertake the repairs and/or improvements.
Property Lessee's payment for its Proportional Share of the road repairs/improvements will be
calculated as determined in this Agreement. Property Lessee will be invoiced accordingly for those
proportional share costs.
9.0 Calculation of Property Lessee's Proportional Share of Costs. The County shall notify Property
Lessee of County's preliminary determination and assessment of Property Lessee's proportional share of
costs of maintenance, repair, or improvements to Property Lessee's designated haul/travel routes. Prior to
County's final determination and assessment, County shall provide Property Lessee with a reasonable
opportunity to review, comment upon and supplement County's data, collection methodology, and
determinations. The County shall review and consider Property Lessee's input prior to making a final
determination and assessment. The County shall have sole responsibility for determination of Property
Lessee's proportional share of costs. Property Lessee agrees to pay such proportional share of costs within
30 days of receiving an invoice from County.
10.0 Annual Road Inspection. County may conduct a road inspection annually with the cooperation of
Property Lessee and all other Property Lessees and/or Lessees who are required by County to participate in
road improvement/maintenance agreements for the haul routes designated in this Agreement. As a result of
the annual inspection, County, in its sole discretion, shall determine actual conditions and shall further
determine what road repair/improvement/maintenance work is to be performed during that construction
season. Notification to the Property Lessee of the required roadway repairs will be given as soon as the data
becomes available.
11.0 Notification. The County shall notify Property Lessee of County's preliminary determination and
assessment of Property Lessee's proportionate share of costs of maintenance, repair, or improvements to
Property Lessee's designated haul/travel routes. Prior to County's final determination and assessment,
County shall provide Property Lessee with a reasonable opportunity to review, comment upon and
supplement County's data, collection methodology, and determinations. The County shall review and
consider Property Lessee's input prior to making a final determination and assessment.
12.0 Any references in this Agreement to Proportional Share shall be construed to mean the share of
necessary road maintenance that can reasonably be attributed to Property Lessee's traffic, when such
maintenance is determined to be necessary or appropriate in County's reasonable judgment.
Cedar Creek II, LLC-AP21-00535 - OFFSIA21-0005
Page 6 of 16
8
c L
J
O MU
m-.�
M• .L^i
ova
LL 0) mid
ea R
'Vat 31
din.
0am-
N
"
NO a
N
wrgN0MI
PART II: GENERAL PROVISIONS
A. Engineering and Construction Requirements:
1.0 Engineering Services. Property Lessee shall furnish to County, at its own expense, all engineering
services in connection with the design and construction of the off -site improvements and all on -site
drainage -related structures if required by any Municipal Separate Storm Sewer System (MS4) permit, as
identified on the accepted Construction Plans and according to the construction schedule set forth in the
construction schedule exhibits. The required engineering services shall be performed by a Professional
Engineer and Land Surveyor registered in the State of Colorado and shall conform to the standards and
criteria established by the County for public improvements. The required engineering services shall consist
of, but not be limited to: surveys, designs, plans and profiles, estimates, construction supervision, and the
submission of necessary documents to the County.
2.0 Rights -of -Way and Easements. Before commencing the construction of any off -site improvements
herein agreed upon for permanent public ROW or easements, if any, Property Lessee shall, if and where
necessary, acquire, at its sole expense, good and sufficient ROW and easements made necessary for
permanent improvements. The County will not exercise eminent domain on behalf of Property Lessee.
3.0 Construction. Property Lessee shall furnish and install, at its own expense, the improvements (and
any drainage -related structures required by any MS4 permit) identified on the accepted Exhibits and shall
be solely responsible for the costs listed on the cost of construction exhibits, with the. improvements being
completed also in accordance with the schedule set forth in the construction schedule exhibits. The BOCC,
at its option, may grant an extension of the time of completion set forth in construction schedule exhibits
stated herein upon application by the Property Lessee. Said construction shall be in strict conformance to
the plans and drawings accepted by the County and the specifications adopted by the County.
4.0 Testing. Property Lessee shall employ, at its own expense, a qualified testing company previously
approved by the County to perform all testing of materials or construction; and shall furnish copies of test
results to the County. If County discovers inconsistencies in the testing results, Property Lessee shall
employ at its expense a third -party qualified testing company approved by County. Such third party shall
furnish the certified results of all such testing to the County. At all times during said construction, the
County shall have the right to test and inspect material and work, or to require testing and inspection of
material and work at Property Lessee's expense. Any material or work not conforming to the approved
plans and specifications, including but not limited to damages to property adjacent to the construction plan
area shall be repaired, removed, or replaced to the satisfaction of the County at the expense of Property
Lessee.
5.0 Construction Standards. Design and construction of all off -site improvements shall conform to the
current version of CDOT' s "Standard Specifications for Road and Bridge Construction" and the Weld
County Engineering and Construction Criteria. Should a relevant conflict exist, Weld County's Engineering
and Construction Criteria per Weld County Code Chapter 8 Appendix Q will control.
6.0 Traffic Control. Prior to any construction in County and/or State ROW, and as a condition of
issuance of any ROW or Access Permit, the Property Lessee shall submit a traffic control plan for County
review. During construction, appropriate safety signage shall be posted in accordance with the then -current
version of the Manual of Uniform Traffic Control Devices.
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 7 of 16
MI
a
o. •
aZ
B. Collateral:
1.0 General Requirements for Collateral. Property Lessee shall provide to County the necessary
collateral to guarantee all of Property Lessee's obligations under this Agreement: (1) Project Collateral is
required for completion of off -site improvements, as described in this Agreement; (2) Warranty Collateral
is required for all off -site improvements during the two-year warranty period. Collateral acceptance and
release is governed by the Weld County Code. The Funding Parties will each be responsible for and provide
on behalf of the Property Lessee, one half (50%) of the Project Collateral and the Warranty Collateral. In
the event that the County makes a claim against the Project Collateral or the Warranty Collateral, the County
will make a claim for one-half of the amount due against the collateral provided by each of BP and AEP.
1.1 Project Collateral shall be submitted to guarantee completion of off -site improvements
identified in the Exhibits. Project Collateral must be submitted in an amount equal to 100% of the
value of the improvements, as calculated in the cost of construction exhibits. Project Collateral
must be submitted at the time of execution of the Agreement, unless otherwise directed by the
BOCC. In the event that Property Lessee fails to adequately complete the required improvements,
County may, in its sole discretion, access Project Collateral for the purpose of completing such
improvements. It may be necessary to provide additional collateral in the event the cost estimate is
older than three (3) years. NO WORK SHALL COMMENCE UNTIL PROJECT COLLATERAL
HAS BEEN SUBMITTED AND ACCEPTED BY THE COUNTY.
1.2 Warranty Collateral shall be submitted and held by the County until release after the two-
year warranty period following the County's initial approval of the improvements. Warranty
Collateral shall be in an amount equal to 15% of Project Collateral. In the event that Property Lessee
fails to adequately complete or repair improvements during the warranty period, County may, in
its sole discretion, access Warranty Collateral for the purpose of completing such improvements.
2.0 Form of Collateral. Collateral may be in the form of a letter of credit, a surety bond, or a cash
deposit, subject to the requirements and restrictions of Section 2-3-30 of the Weld County Code, as that
section may be amended from time to time. Property Lessee shall have the right to change the form of
Collateral to another type that complies with this Agreement, subject to BOCC acceptance in accordance
with Weld County Code Section 2-3-30.A.9.
3.0 Release of Collateral. Collateral shall be released in accordance with Section 2-3-30 of the Weld
County Code. For collateral release, the Departments of Planning Services and Public Works conducts
inspections for all on -site and off -site improvements.
3.1 Timing of Release. Project Collateral may be released upon completion of all
improvements required by the Exhibits after initial approval by the County. Warranty Collateral
shall be withheld by County at the time of release of Project Collateral or may be submitted
separately by Property Lessee. Warranty Collateral may be released upon the approval of the
County at the end of the two-year warranty period.
3.2 Request for Release of Collateral. Prior to release of collateral by Weld County for the
entire project or for a portion of the project, the Property Lessee must present a Statement of
Substantial Compliance from an Engineer registered in the State of Colorado. The Statement of
Substantial Compliance shall state that the project or a portion of the project has been completed
in substantial compliance with accepted plans and specifications documenting the following:
Cedar Creek II, LLC — AP21-00535 - OFFSIA21-0005
Page 8of16
a
Jt
O.
mOOn..
N .3i
i—
o a_gs
.-I1i 0
•-1 mIZ
tomM
s .Rti
duo
nil
No
m
N
NNo
Ih�Y�
n
=
r-NL
3.2.1 The Property Lessee's Engineer or his representative has made a site visit at the
completion of construction and the construction plans utilized are the same as those
accepted by Weld County.
3.2.2 For the improvements to public ROW or easements, test results must be submitted
for all phases of this project as per Colorado Department of Transportation
(CDOT) Schedule for minimum materials sampling, testing and inspections found
in CDOT Materials Manual.
3.2.3 "As -built" plans shall be submitted at the time the letter requesting release of
collateral is submitted or at such time as the Property Lessee has completed
improvements as shown on the Exhibit C and/or Exhibit D, and shall be stamped
and approved by an Engineer registered in the State of Colorado, if an Engineer
was initially required for the project. The Property Lessee's Engineer shall certify
that the project "as -built" is in substantial compliance with the plans and
specifications as approved, or that any material deviations have received prior
written acceptance from the County Engineer.
3.3 County's Response to Request for Release of Collateral. Following a written request for
release of collateral, County personnel will inspect the improvements as provided in this
Agreement. Upon approval, the BOCC may release said collateral.
C. Acceptance of Improvements:
1.0 Acceptance of Off -Site Improvements. Upon completion of the off -site improvements, Property
Lessee shall contact the Weld County Development Review Team and request an inspection of such
improvements. Upon request, County personnel will initiate the inspection, approval, and acceptance
process.
2.0 Inspection, Approval, and Acceptance Process.
o
o
U
ci
0
U
amo
.I
O _
�L
CI 4,2
NU.P.
•
•as
ismrt
0 -in 0
co
N
NY`s
4.4.mM
L=
2.1 Upon completion of construction of all off -site improvements as described in the
Construction Plans, Property Lessee shall submit to the Weld County Department of Planning
Services a Statement of Substantial Compliance by Property Lessee's Engineer along with "as -
built" drawings as required in subsection B.3.2.3, above, and shall request County inspection of the
off -site improvements. County personnel shall then inspect the improvements. If the County
determines the improvements were not constructed in accordance with the Construction Plans, the
County shall direct the Property Lessee to correct the deficiencies. If the County determines the
improvements were constructed in accordance with the Construction Plans, the County shall
initially approve the off -site improvements.
2.2 Two -Year Warranty Period. Such initial approval begins the two-year warranty period.
Upon completion of the two-year warranty period, County personnel shall, upon request by the
Property Lessee, inspect the subject improvements, and notify the Property Lessee of any
deficiencies caused by defects in workmanship. If any deficiencies caused by defects in
workmanship attribute to Property Lessee are discovered, the Property Lessee shall correct the
deficiencies. County personnel shall re -inspect the improvements after notification from the
Property Lessee that said deficiencies have been corrected. If the County personnel finds that the
improvements are constructed according to County standards, he or she shall approve the
improvements. Such final approval shall authorize the Property Lessee to request the BOCC to
release the Warranty Collateral.
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 9of16
2
o
00
3
U
13
mam
�y -3
B
44. •
L
O a..
re a
a
as
dInom
No ti
N®
r)o.
Co, a
q•
2.3 Placement of Improvements into Service Prior to County Approval. If requested by the
Property Lessee and agreed by the County, portions of the improvements may be placed in service
when completed according to the schedule shown on the construction schedule exhibit, but such
use and operation shall not alone constitute an approval or acceptance of said portions of the
improvements. County may, at its option, issue building permits for construction for which the
improvements detailed herein have been started but not completed according to the schedule shown
on the construction schedule exhibit and may continue to issue building permits so long as the
progress of work on the improvements is satisfactory to the County, and all terms of this Agreement
have been faithfully kept by Property Lessee.
D. Permits: The Property Lessee is required to apply for, receive, and comply with all permits
required by the County or any other applicable local, State, or federal permit, including but not limited to:
1.0 Access Permits. Property Lessee shall not use any access onto any County road or construct, change
or make improvements to any access unless and until an access permit has been issued by the Department
of Planning Services. Planning Services may condition the issuance of an updated access permit on the
amendment of this Agreement if the updated access permit authorizes the use of an additional access point,
or if there is a change in use of the current access point, as permitted by Article XIV of Chapter 8 of the
Weld County Code.
2.0 ROW Permits. Per Article XIII of Chapter 8 of the Weld County Code, any work occurring within
County ROW requires a ROW permit issued by the Department of Public Works. No work shall occur
without said ROW permit.
3.0 Transport Permits. Per Article XV of Chapter 8 of the Weld County Code, a Weld County Transport
Permit is required for extra -legal vehicles using Weld County roadways to ensure the operation and
movement of extra -legal Vehicles and Loads occurs in a safe and efficient manner.
E. Enforcement and Remedies:
1.0 Violation of Terms of Agreement. If in County's opinion, Property Lessee has violated any of the
terms of this Agreement, County shall notify Property Lessee of its belief that the Agreement has been
violated and shall state with specificity the facts and circumstances that County believes constitute the
violation. Property Lessee shall have fifteen (15) days within which to either cure the violation or
demonstrate compliance. If, after fifteen (15) days have elapsed, County believes in good faith that the
violation is continuing, County may consider Property Lessee to be in breach of this Agreement.
2.0 Remedies for Breach by Property Lessee. In the event that County determines that Property Lessee
has violated the terms of this Agreement, and has failed to correct said violation or demonstrate compliance,
County may exercise any or all of the following remedies, or any other remedy available in law or equity.
2.1 Access and Use of Collateral. County may access and use collateral to address the issues
specific to the violation. For example, the County may access and use Project Collateral in order to
complete improvements as required by the Construction Plans, when such improvements have not
been completed in accordance with the Construction Schedule.
2.2. Withholding Permits. County may "lock" any or alllots within the Property, which
precludes the continued issuance of building permits, zoning permits, septic permits, or any other
permit issued by any department of the County.
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 10 of 16
2.3 Court Action. County may seek relief in law or equity by filing an action in the Weld
District Court or Federal District Court for the District of Colorado, except that no such civil action
or order shall be necessary to access collateral for the purpose of completing improvements as
described above.
2.4 Revocation of Permit. Property Lessee acknowledges that failure to comply with the terms
of this Agreement constitutes cause to revoke the Permit, and County may exercise this option in
its sole discretion by proceeding with revocation under the then current provisions of the Weld
County Code.
2.5 Limitation on Damages. Any damages to either party for a breach of this Agreement shall
be limited to actual damages. Neither party shall be liable to the other for any consequential,
incidental, punitive, or direct damages arising out of this Agreement.
3.0 Termination of Agreement. This Agreement shall terminate upon the earliest of the following
events:
3.1 Failure to Commence. County may terminate this Agreement upon or after revocation of
the underlying land use approval under Weld County Code. However, County may still exercise
all necessary activities under this Agreement that the County determines necessary to protect the
health, safety, and welfare of the residents of Weld County.
3.2 Cessation of all Permit Related Activities. Termination of this Agreement shall occur upon
Property Lessee's complete cessation of all activities permitted including any clean up or
restoration required. A partial cessation of activities shall not constitute a Termination of this
Agreement, nor shall County's issuance of a partial release/vacation constitute a Termination.
Unless informed in writing by the Property Lessee of cessation of activities, and verified by the
County, cessation shall only be presumed if the County determines that the operation has been
inactive for three (3) years. Property Lessee shall not be entitled to a release of Project or Warranty
Collateral unless and until the improvements required by this Agreement are completed.
MI
3.3 Execution of Replacement Agreement. This Agreement shall terminate following County's
execution of a new Improvements Agreement with a new property owner or operator who has
purchased or leased the Property and/or has assumed the operation of the business permitted as,
and intends to make use of the rights and privileges available to it.
3.4 Revocation of Permit. This Agreement shall terminate following County's revocation of
Property Lessee's Permit, except that the Property Lessee shall only be released from this
Agreement after the successful completion of all improvements required under this Agreement,
which may be completed by County after accessing Property Lessee's collateral if Property Lessee
fails to complete such improvements.
4.0 Responsibility for Financial Obligations of Property Lessee. Wherever in this Agreement the
Property Lessee is obligated to make payment of any amounts to the County, such amounts shall be paid
by the Funding Parties on behalf of the Property Lessee. The County agrees to look only to the Funding
Parties or the Collateral for payment of any amounts due from the Property Lessee. Notwithstanding the
foregoing, any failure of the Funding Parties to make payments due under this Agreement on behalf of the
Property Lessee will be treated the same as a failure by the Property Lessee for purposes of any alleged
breach or default by the Property Lessee under this Agreement. BP and AEP shall each be responsible on
a several basis for one half (50%) of any amounts due from the Funding Parties under this Agreement.
Cedar Creek II, LLC - AP21-00535 - OFFSIA2I-0005
Page 11 of 16
Property Lessee may at any time following satisfaction of its obligations under Section D.5.0 (Post -
Construction) with County inspection and acceptance give notice to the County that Property Lessee
assumes all obligations of the Funding Parties under this Agreement and, following such notice, the Funding
Parties will be released and discharged from any further obligations under this Agreement.
F. General Provisions:
1.0 Successors and Assigns.
1.1 Property Lessee may not delegate, transfer, or assign this Agreement in whole or in part,
without the prior express written consent of County and the written agreement of the party to whom
the obligations under this Agreement are assigned. Consent to a delegation or an assignment will
not be unreasonably withheld by County. In such case, Property Lessee's release of its obligations
shall be accomplished by County's execution of a new Improvements Agreement with the
successor owner or lessee of the property.
1.2 County's rights and obligations under this Agreement shall automatically be delegated,
transferred, or assigned to any municipality which, by and through annexation proceedings, has
assumed jurisdiction and maintenance responsibility over all roads affected by this Agreement.
2.0 Severability. If any term or condition of this Agreement shall be held to be invalid, illegal, or
unenforceable by a court of competent jurisdiction, this Agreement shall be construed and enforced without
such provision, to the extent that this Agreement is then capable of execution within the original intent of
the parties.
3.0 Governmental Immunity. No term or condition of this contract shall be construed or interpreted as
a waiver, express or implied, of any of the immunities, rights, benefits, protections or other provisions, of
the Colorado Governmental Immunity Act §§24-10-101 et seq., as applicable now or hereafter amended.
4.0 Amendment or Modification. Any amendments or modifications to this agreement shall be in
writing and signed by both parties.
5.0 No Third -Party Beneficiary. It is expressly understood and agreed that the enforcement of the terms
and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly
reserved to the undersigned parties and nothing in this Agreement shall give or allow any claim or right of
action whatsoever by any other person not included in this Agreement. It is the express intention of the
undersigned parties that any entity other than the undersigned parties receiving services or benefits under
this Agreement shall be an incidental beneficiary only.
6.0 Board of County Commissioners of Weld County Approval. This Agreement shall not be valid
a until it has been approved by the BOCC of Weld County, Colorado or its designee.
C
•
8 7.0 Choice of Law/Jurisdiction. Colorado law, and rules and regulations established pursuant thereto,
ao m 9N shall be applied in the interpretation, execution, and enforcement of this Agreement. Any provision included
r+m3� or incorporated herein by reference which conflicts with said laws, rules and/or regulations shall be null
c and void. In the event of a legal dispute between the parties, the parties agree that the Weld County District
In• 0 B Court or Federal District Court for the District of Colorado shall have exclusive jurisdiction to resolve said
U
_mcr g g dispute.
NEB
as •
12. In NI
Go
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 12 of 16
8.0 Attorneys' Fees/Legal Costs. In the event of a dispute between County and Property Lessee,
concerning this Agreement, the parties agree that each party shall be responsible for the payment of attorney
fees and/or legal costs incurred by or on its own behalf.
9.0 Release of Liability. Property Lessee shall indemnify and hold harmless the County from any and
all liability loss and damage, including reasonable attorney's fees and costs, that the County may suffer as
a result of all suits, actions, or claims of every nature and description caused by, arising from, or on account
of the negligent or intentional act of the Property Lessee or its officers, agents, employees, or contractors
connected with this Agreement, except for the liability, loss or damage arising from the negligent or
intentional act of the County or its agents, employees or contractors. All contractors and other employees
engaged in construction of the improvements shall maintain adequate worker's compensation insurance and
public liability insurance coverage and shall operate in strict accordance with the laws and regulations of
the State of Colorado governing occupational safety and health. The obligations of Property Lessee under
this paragraph shall not extend to any judgments against County which are in excess of the limitations on
liability set forth in the Colorado Governmental Immunity Act, C.R.S. Section 24-10-101, et. seq. to the
maximum extent that such limitations on liability are applicable.
10.0 Binding Arbitration Prohibited. Weld County does not agree to binding arbitration by any extra-
judicial body or person. Any provision to the contrary in this Agreement or incorporated herein by reference
shall be null and void.
11.0 Authority to Sign. Each person signing this Agreement represents and warrants that he or she is
duly authorized and has legal capacity to execute and deliver this Agreement. Each party represents and
warrants to the other that the execution and delivery of the Agreement and the performance of such party's
obligations hereunder have been duly authorized and that the Agreement is a valid and legal agreement
binding on such party and enforceable in accordance with its terms. If requested by the County, Property
Lessee shall provide the County with proof of Property Lessee's authority to enter into this Agreement
within five (5) days of receiving such request.
12.0 Acknowledgment. County and Property Lessee acknowledge that each has read this Agreement,
understands it and agrees to be bound by its terms. Both parties further agree that this Agreement, with the
attached or incorporated Exhibits, is the complete and exclusive statement of agreement between the parties
and supersedes all proposals or prior agreements, oral or written, and any other communications between
the parties relating to the subject matter of this Agreement.
13.0 Notwithstanding any other provision contained in this Agreement, for any conflict or potential
conflict between any term in this Agreement and the Resolution of the BOCC approving the underlying
land use permit, the provisions of the Board's Resolution shall control. In the event of a discrepancy
between this agreement and the Weld County Code in effect at the time of the agreement, the terms of the
Weld County Code shall control.
14.0 Property Lessee shall notify the County in the event that the Property Lessee does not proceed with
its partial repower project, such that the road use contemplated by this Agreement will not occur. In the
event that the Property Lessee notifies the County that it will not proceed with its partial repower project,
then this Agreement shall terminate and be of no further force or effect.
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 13 of 16
m
2
oa-
a
0
o
U
10a�..A
19el -V
N .3—
w aSr
Orv—
OIL 8_
^ rx a
3
an
•a.ao
win
No
19 J
ey in
01No
COQ›
r" 4M
PROPERTY LESSEE: Cedar Creek II, LLC
By:
Name: KiVnit' g I mE G kR LAN►6
Title: Ottri14bR.W11,
STATE OF OF /6 X AS
County of nice, is
Date C.)9 /N4202.1
21
SS.
The foregoing instrument was acknowledged before me this fr 7112
ap day of tSEHlt
v i
/i
202 / by , 4 Ti/EF/A)6 £ 1.e2A-A) L7
WITNESS my hand and official seal.
.91 ~ Erika leonor Carrillo
' My Conmission Expires
J.4, 041001242S
%lie ID No.1.31
4786327 Pages: 17 of 106
12/17/2021 02:55 PM
.00
Carly Koppes, Clerk and Recorder, Weld County , CO
I �.rlikiiIkell''lit:�rM Ii�'f SM4�� .14101 h III
4773483 Pages: 17 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Eli NNAVIMillill Ili Bill
Notary Public
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 14 of 16
FUNDING PARTY: BP Wind Energy North America, Inc.
(iJ'oi
By:
Name: PrLtS i Al2 Wf t7J�t C1.�
Title: V k CE PRE 5 t t"31'�v IT
STATE OF / eLa s'
County of H4' rr,cl'
)
Date
ss.
The foregoing instrument was acknowledged before me this/ 44" day of J P,AP/�"'
202 ,by liC /ISa/r— J�4 14h cam{
WITNESS my hand and official seal.
Erica LeonorCanW
r{ ;a
No.1316180(6
4786327 Pages: 18 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
1111 MrdliVIDINNIVILFAM Yoh 11111
Notary Public
4773483 Pages: 18 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
1111 FiN4F!'A4'li C'ENAIllrgligireildliyi 11111
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 15 of 16
FUNDING PARTY: Cedar Creek II Wind Energy, LLC
Joel 'J°�e"
By: Date: September 17, 2021
Name: Joel H Jansen
Title: Vice President
STATE OF OHIO
ss.
County of FRANKLIN )
The foregoing instrument was acknowledged before me this 17th day of September,
2021, by Joel H. Jansen.
WITNESS my hand and official seal.
o►
Sarah Smithhisler
Commission # 2019 -RE -77504
Electronic Notary Public
State of Ohio
My Comm Exp. Apr 29, 2024
Notary Public
WELD COUNTY:
ATTEST:'-eX/ J'e);64. BOARD OF COUNTY COMMISSIONERS
Weld C • . n ' Clerk to the Boar WELD COUNTY, COLORADO
BY: _ L ,4w1
Deputy Cle to— rt.oars 4►
4773483
17 5/42021 10 54ges. 19 of 104
AM R F
1Fes:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
FINF.itiNIMIClililOCIV5PICiliffi aI III
OCT 2 0 2021
4786327 Pages: 19 of 106
12/17/2021
Carly Koppes,O�
Clerk and Recorder, PM R Weld County , CO
1111 ri1in' Mil 41�K=��f��9f� , Y h 11111
Cedar Creek II, LLC - AP21-00535 - OFFSIA21-0005
Page 16of16
002/-0q 7t
DocVerify ID: 4E182D86.2767-420O-8908-00104CA92400
www.docverify.corn
Page 16 of 16 1600104CA92400 ,III MINA II
4773483 Pages: 20 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III rP! Ik''iCIt(
Cedar Creek II Repower Pilot - Civil Grading & Road Work
Scope of Work Description & Estimate
Erosion Control and Dust Management
1.1 Furnish and install all erosion control devices specified in the Civil Plans.
4.1.3
4.1.4
Apply Magnesium Chloride at the rate specified in the Civil Plans or the Weld County Road
Maintenance Agreement, whichever is greater.
Water the roads as needed for dust control. Have a filled water truck available within 15 miles of
the windfarm for the duration of construction activities.
inspect and maintain erosion control devises and maintain the SWPPP on site in the CC2 O&M
Building, modifying as needed per existing conditions.
Perform and document inspections as required by the SWPPP Section 9.0 & 9.1 and include in the
4.1.5 SWPPP in the O&M building as stated in the SWPPP. inspections to be performed by an individual
certified to perform inspections.
Section Subtotal
4.2 Construction Laydown Yard
4.2.1 Trim vegetation in the area of the Construction Laydown yard.
4.2.2 Construct temporary access to the Construction Laydown yard.
Ensure that the Construction Laydown yard meets compaction requirements by performing
Compaction testing and providing results to CC2.
Lower the inlet invert of the detention pond structure to match the bottom of the pond, ensuring
the pipe has a 1% slope or greater.
Upon completion of construction, remove the temporary access to the Construction laydown
4.2.5 yard and return the area to its original condition and reseed with native seed. Also scarify the
laydown yard area and reseed with native seed.
4.2.6 Install silt / snow fencing around the Construction Laydown yard as per the Civil Plans.
4,2.3
4.2.4
4.2.7 Snow removal from the yard.
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
Section Subtotal
County Roads & Improvements
Construct all Weld County Road improvements as per the Civil Plans, following all Weld County
requirements for gravel material specification, testing, and maintenance. (Turn Radius
Improvements). Includes furnish and install gravel needed for this scope.
Comply with permit requirements for improvement and use of County Roads.
Schedule and participate in a pre -construction meeting with Weld County public works.
Perform all construction surveying as needed to layout County Road improvements.
Perform any testing required per Site Roads and Turbine Site Pad Specification - GE North America
or Weld County.
Relocate signage as required. Reinstall signage upon restoration at the end of construction.
Temporarily relocate overhead powerlines as needed, by utility company.
Perform tree trimming, removal, clearing, grubbing, and grading and compacting as needed along
equipment transportation routes (including turbine access roads).
4.3.9 Weekly maintenance of all county roads within the haul route.
4.3.10
Within 48 hours, repair any potholing on the County Roads. React quickly to re air any washout
areas. _.�••'���� "��..
O
C
0"
• •Q 41563
�• .
le/ a 21.
• ' • • . . . . . .
*OVALe
Qty
1
6.5
2000
1
1
4
1
1
1
1
1
100
25000
Included in 4.3.1
Included in 4,3.1
Included in 4.3.1
included in 4.3.1
1
2
I
36
1
Unit of Measurement
LS
Mile
k Gallon
LS
LS
hour
LS
LS
LS
LS
LS
hour
LS
LS
Unit Rate Per Occurrence Per
Plan in Full
LS
Unit Rate Per Week
T&M
Price
$ 134,000.00
$ 16,650.00
4
$ 74.00
p.
$ 76,800.00
$ 90,000.00
$ 120.00
S 10,500.00
$ 500.00
S 5,000.00
S 1,000.00
$ 13,300.00
5 400.00
$ 24.30
$ 15,000.00
$ 10,000.00
4
S 20,000.00
S 28,000.00
$ 6,000.00
Extension
S 134,000.00
S 108,225.00
$ 148,000.00
$ 76,800.00
$ 90,000.00
$ 480.00
$ 10,500.00
500.00
$ 5,000.00
$ 1,000.00
$ 13,300.00
$ 40,000.00
$ 607,500.00
$ 15,000.00
$ 20,000.00
S 20,000.00
5 1,008,000.00
$ 6,000.00
Subtotal
$ 557,025.00
$ 70,780.00
bP
0
Silt Fence
9/10/2021
ACCEPTED BY
PUBLIC WORKS
SEPTEMBER 15,
2021
Dust Control, Mag-Chloride
Dust Control, Water
Erosion Control Supervisor
Erosion Control Maintenance
Mowing
Install and Remove Approach
Testing
Adjust Detention Pond Structure
Install Screening fence
Snow Removal (>3 inches))
County Road - Furnish & Install Gravel
County Pre•Construction Meeting
Survey
Testing
Remove, Relocate & Reset Signs
Adjust Powerlines
Clearing & Grubbing
Gravel Road Maintenance
County Road Repairs
4786327 Pages: 20 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII rid tiliF1 h64 f Cilia Mil WM '
CI�.iN l�.ii�h
lot?
4773483 Pages: 21 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
4.3.11
Traffic Control Plan (TCP) or Method of Handling Traffic (MHT) showing traffic control needed in
accordance with the Manual of Uniform Traffic Control Devises (MUTCD) in drawing form.
Flaggers shall be required at any locations where there is encroachment into a travelling lane or
when working within 10 feet of a county road. If full road closure is needed, then the request
must be prepared by and signed by a Traffic Control Supervisor (ICS). Full road closures shall not
exceed 3 days.
1 LS
$ 445.00
9/10/2021
445.00
Section Subtotal $ 1,676,945.00
4.4 Slgnage
4,4.1 Install/maintain temporary Construction signage as required following MUTCO recommendations. 1
4 4 ? Remove temporary Construction signage upon restoration of the site. 1
Section Subtotal
4.5
4.5.1
4.5.1b
4.5.2
4.5.3
Gravel stockpiles for County Road Maintenance
Furnish and maintain gravel stockpiles (that meet the Weld County Gravel specification) in
number and quantity specified in the Road Maintenance Agreement.
Replenish gravel stockpiles as needed.
Provide gravel for the county roads that meets Weld County Gravel specifications. Follow all
requirements for testing.
At the end of the project, remove all remaining gravel in the stockpile. Use first to repair County
Roads. If any remains, apply to Turbine access roads, blade and compact.
Section Subtotal
4.6 Truck Staging Area Construction
4.6.1 Construct and maintain the truck staging area as per the Civil Plans.
Upon completion of deliveries and equipment removal (confirmed by CO), return the truck
4.6.2 staging area to original, pre -construction condition including removal of imported rock,
decompaction, seeding and grading of drainage ditch.
4.7 Turbine Access Road Improvements
Construct all temporary access widening on the turbine access road, where it meets the County
Road, as per the Civil Plans and following the permit requirements for Temporary Accesses. 1
Includes furnish and install gravel needed for this scope.
Perform all construction surveying as needed to layout turbine access road improvements. GE Included Above
responsible for marking crane walks and material laydown areas on the turbine pads.
Section Subtotal
4.7.1
4.7.2
1
500
Included Above
1
LS
LS
is
Unit Rate Per CY
LS
IS
LS
$ 3,400.00
$ 1,000.00
$ 56.475.00
$ 40.50
$ 21,000.00
$ 106,855.00
$ 35,350.00
5 3,400.00
$ 1,0[X3.00
$ 4,400.00
5 56,475.00
Traffic Control
Build & Remove Gravel Stockpile
$ 20,250.00 Weld Co. Road Base
$ 21,000.00 Haul, place and Compact Gravel Stockpile Materials
$ 97,725.00
S 106,855.00 Install truck staging area
$ 35,350.00
Section Subtotal $ 142,205.00
4.11 Crane Crossing for County Road 132
4.11.1 Perform all grading, road improvement, and traffic control needed for the crane crossing at CR 1
4.11.2 Coordinate crossing construction timing with CC2 and construction details with Weld County 1
Public Works Department and the Crane Contractor.
Install crane matting (provided by GE) at crane road crossing location as per the detail on the Civil
4.11.3 Drawings. Perform all traffic control needed during the construction of the crane crossing and 1
during the crane crossing.
Section Subtotal
4.12 Restoration upon Construction Completion
4.12.1 Return connection of Turbine Access roads at county roads to original configuration
Restore all site disturbed area to original condition, reseeding with Weld County approved seed
4.12.4 mix in the County Road ROW.
After gravel depth testing by Weld County, add gravel to County roads to restore gravel surface to
4.12.7
original, ore -construction depth.
• ENGINEER'S CERTIFICATE •
Section Subtotal
I HEREBY CERTIFY THAT I PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF THIS
ESTIMATE, AND THAT I AM A DULY REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF COLORADO
LANCE T. MARRS, P.E.
COLORADO P.E. NO. 41563
1
LS
LS
LS
LS
LS
30 Unit Rate, Cost Per Acre
5000 Unit Rate, Cost Per CY
$ 50,000.00
$ 6,300.00
$ 500.00
$ 4,500.00
$ 31,500.00
$ 3,000.00
$ 40.50
S 50,000.00
$ 6,300 00
$ 500.00
$ 4,500.00
$ 31,500.00
5 90,000.00
$ 202,500.00
$ 50,000.00
$ 11,300.00
$ 324,000.00
Estimate Total- $ 2,934,380.00
Remove and Reclaim Truck Staging Area
Traffic Control - Crossing @ CR132
Install Crane Matting
Site Reclamation
4786327 Pages: 21 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
IIIrdliriCir1/214 0 ' l
4773483 Pages: 22 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder; Weld County CO
III POrdiNIAN VINWC NY, Wrifri Vivi II III
CC2 Integrated Level 1 Schedule
Control Target - No UAP
EXHIBIT
I 13
Creek er
20Sep21
2021
2022
Jan
Feb
Mar
Apr
May
Jun
t Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
[ Mar
Apr
May
Jun
Jul
Aug _
Sep
Oct
Nov
Dec
Pilot Repower
Enabling Civils
1.6 Civils
Commence
0
2.5 Civils
Deliveries
Civils
1.6s
Maint. & Crane Pads
- GE Repower - Crane 1 (x10)
I
Civils Maintenance
& Crane
Paaillalla
I
L
i 1.6
Installations
1.6s - GE Repower - Crane 2 (x10)
1.6
Installations
2.5s - Nordex Repower - Crane 1 (x6)
Prototyp
(N59)
al
2.5 Installations
2.5s - Nordex Repower - Crane 2 (x6)
2.5 Installations
Equipment Removal
2.5 Removal
t
Civils Reinstatement
1.6 Sc
e
2.5
Scope
4786327 Pages: 22 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
illip.dwriiiiamormaludinanitiyi till
r
X
4773483 Pages: 23 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
kring ��'�� .�iii III HI
4786327 Pages: 23 of 106
12/17/2021 02:55 PMd R a Fee:$0.00
W8 d County CO
Carly Koppes, Clerk ,1111
IIIl�!I 10 All IC& .r
Cedar Creek Wind Repower
i
Weld County, Colorado
Civil Construction Plans
STATE MAP
WYOMING
NEBRASKA
UTAH
COLORADO
7C,
KANSAS
ARI/ONA
NEW MEXICO
OKLAHOMA
TEXAS
DATA SET INFORMATION
Coordinate System
Colorado North NAD83 WARN) SPCS US Feet
BASE FILE
FILE NAME/ NOTES
PROVIDER
DATE
AERIAL IMAGE
World_IMG DL 2021-07-14.jp2
ESRI
9/9/2019
LAND CONTROL
20097036PARCEl5.dwg
Westwood
3/10/2010
IALTA SURVEY
20097036SURV-SP.dwg
Westwood _
7/15/2011
1/1/2017
TOPOGRAPHY
USGS_Puolic_MKP dot40_50.txt
USGS
TURBINE ARRAY
Currently from Record Drawing
•
•
UNDERGROUND COLLECTION
•
•
•
GEN-TIE
•
STREAMS/WFTIANDS
hydrograptly _NHD24K_co123 3930168] O1.1iu
NHD
7/14/2021
CULTURAL RESOURCES
•
'
•
BIOLOGICAL
•
*
`
FEMA INFO
FEMA NO Xshp
FEMA
7/15/2021
VICINITY MAP
WYOMING
NEBRASKA
LARIMI R COLA IY
BOULDER
COUNTY
JEFFERSON
COUNTY
(Th
WELD COUNTY
rJ
SITE
LOGAN COUN I Y
! MORGAN COUNTY
ADAMS COUNTY
WASHINGTON
COUNTY
Know what's below.
Call before you dig.
ACCEPTED BY
PUBLIC WORKS
SEPTEMBER 15, 2021
CONTACT INFORMATION
PROJECT ROLE
CONTACT NAME
COMPANY
PHONE
PROJECT MANAGER
STEVE BAT TAGLIA
WESTWOOD
952 937 5150
PROJECT ENGINEER
KATHERINE GARLAND
BP
832 917 1226
DEVELOPER REVIEW ENGINEER
MIKE MCROBERTS
WELD COUNTY
970 400 3/98
Phone (/1Q 111 IMO 101/0C lurch Ranch Way, Suit I)01
loll I rat OUP 93, S1 SO Wnlm inter, CO 80011
wrUwwdps coal
Wnrwoad P,olnwrol Serve es. Inc
PRI PART O IOR
by
0
BP Wind Energy North America. Inc.
201 Helios Way
Houston, TX 71079
RI VISIONS
I DA II COMMINI
A 08/19/11 ISSUED I OR PI RM II
u 08/16/11 ISSUED I OR RI VII
C OWIV)1 ISSUEDIORRIVuW
Cedar Creek II
Wind Repower
Weld County, Colorado
Cover Sheet
)A.I
09/14/2021
1
4773483 Pages: 24 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes Clerk and Recorder, Weld County , CO
viii l ��I I'� Idill: MITIININCIARTIIIIIInklai �I II I
- 0
-innN
S 0 -
os
NID
II. �
mXI o N
Tta
afil
• IV O
y m
tr. 'ma
, so
so)
4O
SHEET
INDEX
SHEET NUMBER
SHEET TITLE
1
Cover Sheet
2
Sheet Index
3
Overall Plan
4
Delivery Flow Plan
5
Construction Details
6
Construction Details
7
Construction Details
8
Construction Details
9
Construction Details
10
Construction Notes
11
Dust Control Notes
12
Magnesium Chloride Plan for Dust Control
13
Site Plan T11N, R57W, SS
14
Site Plan T11N, R58W, S11
15
Site Plan T11N, R57W, S9
16
Site Plan T11N, R57W, S10
17
Site Plan T11N R57W S11
18
Site Plan T11N, R58W, S14
19
Site Plan T11N, R58W, S13
20
Site Plan T11N, R57W, S15
21
Site Plan T11N, R58W, S24
22
Site Plan T11N, R57W, S21
23
Site Plan T11N, R57W, S22
24
Site Plan T11N, R58W S27
25
Site Plan T11N, R58W, S25
26
Site Plan T11N, R57W, S27
27
Site Plan T11N, R58W, S36
28
Site Plan T10N, R58W, S4
29
Site Plan T10N, R58W, S3
30
Site Plan T10N, R58W, S2
31
Public Intersection 1
32
Public Intersection 2
33
Public Road Widening 1
34
Public Intersection 3
35
Public Intersection 4
36
Public Intersection 5
37
Public Intersection 6
38
Public Intersection 7
39
Public Intersection 8
40
Public Intersection 9
41
Public Intersection 10
42
Public Intersection 11
43
Public Intersection 12
44
Public Intersections 13A & 13B
45
Public Intersection 14
46
Public Intersections 15 & 16
47
Public Intersection 17
48
Staging Area
Know what's below.
Call before you dig.
Phone (/2q S!1 11SO
lollliet (RUM/SEW
SOt/O Chutch lunch Way, Stow Slot
Weston ante,. C O 80021
westwoud(n tom
Westwood Pt olns.onnl Serve el, Inc
PRE MARID FOR
bp
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
RI VISIONS
DA1l COMMINI
A 06/19/!1 ISSUE D IOR PI RAID
B 06/2W21 ISSU11)IOR REVIEW
C 09/14/21 ISSUIDIORRIVIlW
Cedar Creek II
Wind Repower
Weld County, Colorado
Sheet Index
A
09/14/2021
2
4773483 Pages: 25 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and R'oorder, Weld County , CO
In II)CriliiirdlairikrAnhAlkliinili.i3/411% Ii iii
/ Co Rd 138
Co Rd 136
Co Rd 124
Co Rd 134
0-.
640
O' $70
GRAVEL STOCKPILE
N-10
N 11
Own
O N-11
Co Rd 130
Co Rd 116
00.11
00.34
6.8
/7'
Co Rd 138/
LAYDOWN
/ YARD
X41.
0 0 1.
4786327 Pages: 25 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
In INA II'I 111111
Co Rd 132
7 41
N.40
Nl. ON I.
O
Co Rd 120
Tower Rd
TRUCK STAGING
AREA
GRAVEL STOCKPILE
Co Rd 128 1/2
Co Rd 124
LEGEND:
PROJECT BOUNDARY
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
• EXISTING TURBINE LOCATION
N•XX
REPOWER FOR GE 127 TURBINE
EXISTING NORDEX TURBINE
EXISTING GE TURBINE
EXISTING TURBINE ACCESS ROAL
PROPOSED CRANE PATH
PROJECT FACILITIES
SHEET NUMBER REFERENCE
West wood
Phone
I oil 1 in
I/14 S)1 .)SO
waa$S150
10110CI auIl NaM1yi4.%Ul
Wn1w0nvn (O1p0.1
seUrindp, lum
Wnwulal PRolnlnlui Srnes lag
by
0
BP Wind Energy North America. Inc
201 Helios Way
Houston, 1X /7079
RI VISIONS
I OA il COMMiNI
A 04/1401 ISSUI I)1 OR 111 1Vo1 i I
01/16/!1 ISSUI I) ION Ri4/11 W
C 07/14/)l 155141I) ION RIVII W
X
1000
bah
Cedar Creek II
Wind Repower
Weld County, Colorado
Overall Plan
DATE
09/14/2021
3
4773483 Pages: 26 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III NJ�11YtiF1�7�4'k'IN��FTRIi'Atilil���FRa+W�141�Y4�
i
/ Co •Rd 138;'
/Co Rd 736 d
Co Rd 134
//////iii/
/ Co Rd 132 /.
0
Co Rd 130
INTERSECTION 14
(SEE SHEET 45)
/////////
INTERSECTION 17
(SEE SHEET 47)
Co Rid) yq
:Co Rd 738
/ / ///////////////iii///////////%d
^% (SEE SHEET 40)
INTERSECTION 9
/
ct /
u
/ INTERSECTION 8
G-17 (SEE SHEET 39) --.-te.
G-16
G-15
G-14 6.19
INTERSECTION 13 /
(SEE SHEET 44) /
INTERSECTION 16
(SEE SHEET 46)
4
Co Rd 116
INTERSECTION 12
(SEE SHEET 43) %'
t////////_
GRAVEL STOCKPILE /-
/
hill �i/
LAYDOWN YARD
1 V/ 7
/ INTERSECTION 6
(SEE SHEET 37)
G-53mP
-52 6.54
INTERSECTION 4
(SEE SHEET 35)
INTERSECTION 5
(SEE SHEET 36)
INTERSECTION 7
- - (SEE SHEET 38)
INTERSECTION 11
(SEE SHEET 42)
59
N-541
N -Si
N -i0
o
G�
/
GRAVEL STOCKPILE
/
/ TRUCK STAGING
r////////////////////%/::
INTERSECTION 1 (SEE SHEET 31) /
//////////////
%:Tower Rd /0,55,2
/
INTERSECTION 2 (SEE SHEET 32)
,,,,,,//`:,
PUBLIC ROAD WIDENING 1 (SEE SHEET 33) /-
r
Co Rd 128 1/2
7,
/co Rd 124 / /
// ,.
%i p//��/
CR 11
LEGEND:
r///////1
•64
•
iii
4 -
'Wray Wilr4
•
PROJECT BOUNDARY
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE ACCESS ROAD
DELIVERY ROUTE (INGRESS)
DELIVERY ROUTE (EGRESS)
EXISTING NON -DELIVERY RD.
EXISTING HIGHWAY
EXISTING GRAVEL DELIVERY RD.
INTERSECTION IMPROVEMENT
PROJECT FACILITIES
GRAVEL STOCKPILE LOCATION
PUBLIC ROAD WIDENING
Westwood
Phone (/J0, 5716150
loll flee (66p 93/ 5110
101 /0 Chows Ranch Wy. Suite sl/01
Wntal,mtn, CO 60071
westsvuodps tom
Westwood Ptoless.onal Sown. inc
IJL,
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
RI VISIONS
o DAII COMMINI
A 06119/11 ISSUI D I OR PI RMII
P 06//6/21 ISSUIDIORRIVIIW
09/ 14/11 ISSUE D I OR RI Val w
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 26 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Delivery Flow Plan
09/14/2021
4
iu
4773483 Pages: 27 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII PiPatWV, iti.looLidinNifi owiript,iniiivi III III
Westwood
W
U
t Z
0
W
0C
I
d xisTIN
GROUND
A 1 MAX
SLOPE
TIN
GROUND
A 1 MA%
SLOPE
NOTES.
f
I -
6a
W W
uz
0<
W a.
0
1OO'
25'
CL
-�f
I% SLOPE
1% SLOPE
COMPACTED
NATIVE MATERIAL
- REQUIRED FOR
CRANE TRAVEL
E
IX SLOPE
COMPACTED NATIVE MATERIAL -
REOUIRED FOR CRANE TRAVEL
1O0
25'
Z
0
a
Iv
uz
Da
W cc
U
u
6
a
W
0 %
0j
W U 1
0
TIN
GROUND
4 I MAX
SLOPE
TIN
GROUND
A I MAX
SLOPE
NTS
2.
CONTRACTOR SHALL CONSTRUCT CROSS -SLOPE ROAD SECTION WHERE CRANE PATHS ARE CONSTRUCTED ON A SIDE SLOPE, AND WHERE
OTHERWISE NOTED ON PLANS, TO ENSURE THAT CRANE PATHS REMAIN WELL DRAINED AT ALL TIMES.
MAXIMUM CROSS SLOPE FOR CRANE TRAVEL IS 1 O%
TYPICAL CRANE PATH
RD01
SILT FENCE OR- CONTRACTOR TO HAVE
OTHER APPROVED i� OPEN AND CLOSE AREA
PERIMETER CONTROL - - -- DURING STOCKPILING
i
N.
MAXIMUM
2
t
a01 10 SCALL
S O'
MINIMUV
.49
SOIL THAT IS STOCKPILED ONSITE SHALL BE
ENCLOSED WITH SILT FENCE OR OTHER APPROVED
PERIMETER CONTROL STABILIZE STOCKPILE WITHIN
TIMEFRAME OF CONSTRUCTION GENERAL PERMIT AND
SWPPP STABILIZATION REQUIREMENTS
SILT FENCE OF
OTHER
APPROVED
PERIME TER
CON TROL
TYPICAL SOIL STOCKPILE
PROTECTON
REFERENCE GE RENEWABLE ENERGY TECHNICAL DOCUMENTATID•,
WINO TURBINE GENERATOR SYSTEM I x-87/91/97 -6OHz FO'?,
THE CUT- THROUGH TURNING RADIUS FOR THE REPOWER
COMPONENTS
BLADE
SWING
-LEAR ZONE
{
AM AM II Cu 1500
Aj'A
I
EDGE OF TEMPORARY GRAVEL
INSTALL SILT FENCE OR FIBER
ROLLS AT EXPOSED EDGE
BETWEEN ROAD AND DITCH
NQL
1 UPON DELIVERY VEHICLE COMPLE TION,
TEMPORARY INTERSECTION WIDENING TO BE
REMOVED AND ALL DISTURBED AREA RESTORED
TO NATIVE CONDITIONS.
2 CULVERTS AND PERIMETER SEDIMENT CONTROL
SHALL BE INSTALLED AND MAINTAINED AT INTER
SECTIONS WHERE THE ACCESS ROAD IS CROSSIN.:
AND EXISTING COUNTY DITCH
liWawed
GE -97 CUT- THROUGH TURNING
RADIUS
R008 -B
- ROAD AGGREGATE
COMPACTED SURGRADI
TEMPORARY INTERSECTION AND TRUCK STAGNQ
(UREA CROSS SECTION
EXISTING AGGREGATE
EXISTING SUBGRADE
EXISTING ACCESS ROAD AND LAYDOWN YARD
CROSS SECTION
NOTE
1 STRUCTURAL SECTIONS SHOWN ARE THE MINIMUM THICKNESS
REOUIREMENTS DURING NORMAL FIELD CONDITIONS THE
SECTIONS MAY NEED TO BE INCREASED BASED ON ACTUAL
FIELD CONDITIONS Al THE TIME OF CONSTRUCTION
CONDITIONS INCLUDING BUT NOT LIMITED TO CONSTRUCTION
DURING THE FREEZE/THAW CYCLE. UNUSUALLY WE I
PERIODS, OR IN LOW/WET AREAS.
2 CONTRACTOR TO CONTACT ENGINEER IF GRAVEL ROAD
SECTION uPGRADES ARE NECESSARY
-- - I TYPICAL STRUCTURAL CROSS SECTION
TS05
REFERENCE GE RENEWABLE ENERGY TECHNICAL DOCUMENTATION
WIND TURBINE GENERATOR SYSTEM 1 x-87/91/91 -6OHz FOR
THE 90 DEGREE TURNING RADIUS FOR THE REPOWER
TOMPONENTS
I
BLADE
SWING
rlEAR ZONE -I
roc AOP.no. AM AM AM_A M / •
EDGE OF TEMPORARY GRAVEL
INSTALL SILT FENCE OR FIBER ROLLS AT EXPOSED
EDGE BETWEEN ROAD AND DITCH
1
NOTE
1 UPON DELIVERY VEHICLE COMPLETION,
TEMPORARY INTERSECTION WIDENING TO BE
REMOVED AND ALL DISTURBED AREA RESTORED
TO NATIVE CONDITIONS
2 CULVERTS AND PERIMETER SEDIMENT CONTROL
SHALL BE INSTALLED AND MAINTAINED AT INTER
SECTIONS WHERE THE ACCESS ROAD IS CROSS".'
AND EXISTING COUNTY DITCH
Wailimed
GE -97 90 DEGREE TURNING
RADIUS
RD08-C
EDGE OF GRAVEL
TEMPORARY INTERSECTION -
WIDENING (SEE PLANS
FOR LOCATION)
TEMPORARY RADIUS
TEMPORARY
CULVERT
INSTALL SILT FENCE
OR FIBER ROLLS AT
EXPOSED EDGE BETWEEN
ROAD AND DITCH
EXISTING ROAD
INSTALL NEW CULVERT AND EXTEND BEYOND
TEMPORARY INTERSECTION WIDENING AS REQUIRED,
MATCH EXISTING CULVERT SIZE OR 15• MINIMUM
NOTE:
ERMANENT
CULVERT
Si L7
FENCE
20' PERMANEN T
RADIUS
JPON DELIVERY VEHICLE COMPLE TION, TEMPORARY INTERSECTION
WIDENING AND TEMPORARY CULVERT TO BE REMOVED AND ALL
DISTURBED AREA RESTORED TO NATIVE CONDITIONS
2 CULVERTS AND SILT FENCE SHALL BE INSTALLED AND MAINTAINED AT
INTERSECTIONS WHERE THE ACCESS ROAD IS CROSSING AN EXISTING
COUNTY DITCH
Vamitirood
TURBINE ACCESS ROAD
TYPICAL INTERSECTION WIDENING
RD05
7' MIN.
EXISTING FENCE -\
LINE OR
PROPERTY/CROP
t'NE
EDGE OF COMPACTED
SHOULDER
NOTE
CRANE WALK COMPACTED NATIVE MATERIAL SHALL BE RETURNED TO
NATIVE CONDITION FOLLOWING TURBINE GENERATOR CONSTRUCTION
2 THE CRANE WALK MAY NEED TO BE CONSTRUCTED FARTHER FROM
THE PROPERTY LINE IF OBSTRUCTIONS SUCH AS TREES FOLLOW THE
PROPERTY LINE
CRANE WALK ALONG
FENCE/PROPERTY/CROP LINE
RDO7
INSTALL SILT
FENCE OR FIBER
ROLLS AT
EXPOSED EDGE
BETWEEN ROAD
AND DITCH
a
BLADE SWING J
CLEAR ZONE
16 00'
REFERENCE GE RENEWABLE ENERGY TECHNICAL DOCUMENTATION
WIND TURBINE GENERATOR SYSTEM 1.x-87/91/97 -6OHz FOR
I IS' THE JUG HANDLE TURNING RADIUS FOR THE REPOWER
COMPONENTS
LCx;c OF TEMPORARY GRAVEL
r
2500 2500' 25.00 25.00 25.00' 2500' 25.00' 2500'
AAr
iS 7r
Air
400
2500' 250O 2500' 2500
NOTE
Sasses, a;°,�t is• e4"l.' -�--
zl9r -1-197Y -17W' .3000
25 00'
25 00' 2500
2500'
UPON DELIVERY VEHICLE COMPLETION, TEMPORARY INTERSECTION
WIDENING TO BE REMOVED AND ALL DISTURBED AREA RESTORED TO
NATIVE CONDITIONS
2 CULVERTS AND PERIMETER SEDIMENT CONTROL SHALL BE INSTALLED
AND MAINTAINED AT INTER SECTIONS WHERE THE ACCESS ROAD IS
CROSSING AND EXISTING COUNTY DITCH
lembi .o.4
GE -97 JUG HANDLE TURNING RADIUS
RD08-A
INSTALL Sal FENCE OR
FIBER ROLLS AT
EXPOSED EDGE
BETWEEN ROAD AND
DITCH
1
BLADE
SWING
CI FAR ZONE
ofir hi
no A..nv r.W�nw'nw r.w'nw'n.wxw
riw :•.w
• REFERENCE GE RENEWABLE ENERGY TECHNICAL DOCUMENTATION
WIND TURBINE GENERATOR SYSTEM 1x/2: - 116 /127
REPOWER -6OHz FOR THE JUG -HANDLE TURBINE RADIUS F^R
THE 127 ROTOR DIAMETER COMPONENTS
Fh
/SW""ACV �AUI ,Li "GU OU
nw
r,w nw nw 7500 ?SOU
nW
1S00
NOTE`
t UPON DELIVERY VEHICLE COMPLETION, TEMPORARY INTERSECTION
WIDENING TO BE REMOVED AND ALL DISTURBED AREA RESTORED TO
NATIVE CONDITIONS
2 CULVERTS AND PERIMETER SEDIMENT CONTROL SHALL BE INSTALLED
AND MAINTAINED AT INTER SECTIONS WHERE THE ACCESS ROAD IS
CROSSING AND EXISTING COUNTY DITCH
GE -I27 JUG HANDLE TURNING RADIUS
RD09-A
Phone i1JQ Si, &ISO
Lou Ien (Me 9i/ SI SD
10110C Such Asti, W. LIMP PM
West', mmM,. CO 406/1
+nhII1WIO (OS
WnMou1 P,OI(:LONI S,,,E f1. I M
PRI PART D 'OP
by
0
BP Wind Energy North America. Inc
201 Helios Way
Houston. IX /7079
MI VISIONS
VAIl COMMINI
A 08/19111 ISSUI U IOR PI RMI I
9 01/16/71 ISSUI D I OR ILI VII W
C 09/14//1 iSSUID IOR KIVII W
Cedar Creek II
Wind Repower
d County, Colorado
We
4786327 Pages: 27 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III ?'ivFiiIL' WiVN11 Fit v11 Ill III
Construction Details
09/14/2021
5
4773483 Pages: 28 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
i
Prdlq11,411,411,1KI MI Pk Id!+1�Pd�Flh� Y4�
u
REFERENCE GE RENEWABLE ENERGY ILCHN,CAL DOCUMENTATION
WIND TURBINE GENERATOR SYSTEM 1.x/2 x - 116 /127
REPOWER -60Hz FOR THE 120 DECREE TURNING RADIUS FOR
THE 127 ROTOR DIAMETER COMPONENTS
c•I
BLADE
SWING
CLEAR ZONE
n•4.flea -;Tar-n�•
4
EDGE OF TEMPORARY GRAVEL
INSTALL SILT FENCE OR FIBER ROLLS AT
EXPOSED EDGE BETWEEN ROAD AND DITCH
NOTE
UPON DELIVERY VEHICLE COMPLETION,
TEMPORARY INTERSECTION WIDENING 10 BE
REMOVED AND ALL DISTURBED AREA RESTORED
TO NATIVE CONDITIONS.
2 CULVERTS AND PERIMETER SEDIMENT CONTROL
SHALL BE INSTALLED AND MAINTAINED AT INTER
SECTIONS WHERE THE ACCESS ROAD IS CROSSING
AND EXISTING COUNTY DITCH
CE -127 CUT -THROUGH TURNING
RADIUS
RDO9-B
REFERENCE CE RENEWABLE ENERGY TECHNICAL DOCUMENTATION
WIND TURBINE GENERATOR SYSTEM 1 x/2 x - 116 /127
REPOWER -60Hz FOR THE 120 DEGREE TURNING RADIUS FOR
THE 127 ROTOR DIAM TER COMPONENTS
BLADE
SWING
CLEARZONE —
k
a
'4,
47.
EDGE OF
TEMPORARY GRAVEL
NOTE
1 UPON DELIVERY VEHICLE COMPLE HON,
TEMPORARY INTERSECTION WIDENING TO BE
REMOVED AND ALL DISTURBED AREA
RESTORED TO NATIVE CONDITIONS
2 CULVERTS AND PERIMETER SEDIMENT
CONTROL SHALL BE INSTALLED AND
MAINTAINED AT INTER SECTIONS WHERE THE
ACCESS ROAD IS CROSSING AND EXISTING
COUNTY DITCH
GE -127 120 DEGREE TURNING
RADIUS
RDO9-D
• REFERENCE GE RENEWABLE ENERGY TECHNICAL DOCUMENTAIiUN
WINO TURBINE GENERATOR SYSTEM 1 x/2 x - 116 /127
REPOWER -60Hz FOR THE 90 DEGREE TURNING RADIUS FOR
THE 127 ROTOR DIAMETER COMPONENTS
BLADE
SWING
.EAR ZONE
4 -
EDGE OF TEMPORARY GRAVEL
- INSTALL SILT FENCE OR FIBER ROLLS AT
':` EXPOSED EDGE BETWEEN ROAD AND DITCH
NOTE,
1 UPON DELIVERY VEHICLE COMPLETION,
TEMPORARY INTERSECTION WIDENING TO BE
REMOVED AND ALL DISTURBED AREA RESTORED
TO NATIVE CONDITIONS.
2 CULVERTS AND PERIMETER SEDIMENT CONTROL
SHALL BE INSTALLED AND MAINTAINED AT INTER
SECTIONS WHERE THE•ACCESS ROAD IS CROSSING
AND EXISTING COUNTY DITCH
1ommemomd
GE -127 90 DEGREE TURNING
RADIUS
RD09-C
6"
Mk
MAXIMUM ALLOWABLE DIP
ON FLAT TERRAIN
S0
6•'
MAXIMUM ALLOWABLE BUMP
ON FLAT TERRAIN
VINIMUM K VALUE = 16 7
6
MAXIMUM ALLOWABLE DIP
ON SLOPED TERRAIN
6's
MAXIMUM ALLOWABLE BUMP
ON SLOPED TERRAIN
MAXIMUM DEFLECTION FOR
TURBINE ACCESS ROAD
RDO4
EXISTING
GROUND
4H IV MAX
SLOPE
EXISTING
GROUND
4N 1V MAX
SLOPE
NOTES
t CONTRACTOR TO ENSURE THAT ROADS AND SHOULDERS REMAIN WELL DRAINED
2 CONTRACTOR SHALL CONSTRUCT CROSS SLOPE WHERE ROADS ARE CONSTRUCTED ON A SIDE SLOPE. AND WHERE OTHERWISE NOTED ON PLANS
3 SLOPES SHOWN ARE TYPICAL SOME ROAD LOCATIONS MAY REQUIRE VARIATIONS IN SLOPE
4 CROWN/CROSS SLOPE IS 1% MAXIMUM FOR CRANE TRAVEL
5 ROADS TO GENERALLY FOLLOW EXISTING CONTOURS EXCEPT IF GRADES EXCEED TURBINE DELIVERY VEHICLE CAPABILITIES, IF THIS OCCURS CONTRACTOR MAY PROVIDE ASSIST VEHICLE OR
MODIFY GRADE
6 ALL DISTURBED GROUND NOT COVERED WITH GRAVEL SHALL BE STABILIZED PER THE PROJECT SWPPP
7 PERMANENT SLOPES IN AGRICULTURAL AREAS MAY REQUIRE REMEDIATION TO MINIMIZE AGRICULTURAL IMPACTS COOROtNATE REQUIREMENTS WITH OWNER
S ADDITIONAL AGGREGATE AND/OR ROAD MAINTENANCE MAY BE REQUIRED ON THE EXISTING TURBINE ACCESS ROADS PRIOR TO TURBINE Of LIVERIES
O
4
20
200 7Yp!CA.
net
g
w�
8
I% SLOPE 1% SLOPE
20
O
4
COMPACTED NATIVE
MATERIAL REQUIRED
FOR CRANE TRAVEL
1% SLOPE
'.% SLOPE
TING
GROUND
4H I V MAX
SLOPE
EXISTING
cactouNO
4H1V NAM
SLOPE
C
V.
TYPICAL EXISTING ACCESS ROAD WITH CRANE PATH
Not lOSLAII
RD15
4786327 Pages: 28 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
II rjSPI' III
i
4 1 MAX
FILL SLOPE
•
•
•
•
•
•
•
• NOTES:
•
•
•
•
STABILIZE FILL SLOPES
WITH EROSION
CONTROL BLANKETS
✓ROPOSLO TEMPORARY CULVERT
STABILIZE FILL SLOPES WITH EROSION
CONTROL BLANKETS
•
INSTALL SILT FENCE
ALONG IMPROVEMENT.
REFER TO DETAIL G003
FOR SPECIFICATIONS
TEMPORARY CRANE TRAVEL PATH
CULVERT
FILL SLOPE
w
CRANE PATH
PLAN VIEW
SILT FENCE
' 1 CULVERT INSTALLATION SHALL CONFORM WITH MANUFACTURERS RECOMMENDATION FOR INSTALLATION
2 MINIMIZE
3 RIP RAP
NEEDED
4 UPON REMOVAL OF
CONDITIONS REFER
DISTURBANCE TO THE STREAM/DITCH DURING CULVERT INSTALLATION/REMOVAL
WITH GEOTEXTILE FABRIC MAY BE SUBSTITUTED FOR THE EROSION CONTROL BLANKETS WHERE
TEMPORARY STREAM CROSSING. THE DISTURBED
TO THE PROJECT SWPPP
AREA SHALL BE RESTORED TO NATIVE
YMrRroed
TYPICAL TEMPORARY CRANE TRAVEL PATH DITCH/STREAM CROSSING 11TH EROSION CONTROL BLANKETS
RD13
SILT FENCE
OR FIBER
ROLLS
•
• •
•
•
•
• •
EXISTING
WA TERBOOY/WE TL AND
•
•
• •
•
•
•
•
•
TEMPORARY DITCH/
SWALE IMPACT
�NOTE 4
•
SHAPE DITCH/SWALE TO PRE - CONSTRUCTION
CONDITION/SMOOTH GRADE, PERMANENTLY SEED
SLOPES AND INSTALL EROSION CONTROL
BLANKETS ALONG DISTURBED SLOPES
•
-EROSION CONTROL BLANKETS SHALL BE INSTALLED PARALLEL TO
THE WATER FLOW OF THE CHANNEL REFER TO DETAIL GD22 FOR
INSTALLATION REQUIREMENTS
NOTES:
1 DRAWING is NOT TO SCALE
2 UPON REMOVAL OF TEMPORARY DITCH/SWALE
CROSSING, THE DISTURBED AREA SHALL BE
RESTORED TO PRE -CONSTRUCTION CONDITIONS
REFER TO THE PROJECT SWPPP FOR
RESTORATION AND SEEDING SPECIFICATIONS
(ALTERNATE PRE APPROVED SEED MIXES MAY
BE USE IN LIEU OF WHAT IS CALLED OUT IN
THE SWPPP)
3 REMOVE RIP RAP, FILL MATERIAL AND SHAPE
CHANNEL TO PRE -CONSTRUCTED CONDITION
PERMANENTLY SEED ALL DISTURBED SLOPES IN
CONFORMANCE WITH THE PROJECT SWPPP
NARRATIVE INSTALL EROSION CONTROL ON ALL
DISTURBED SLOPES, WHERE ANY FLOWS ARE
CONCENTRATED ANO WITHIN THE DITCHES
WETTED PERIMETER
4 DECOMPACT. REAPPLY TOPSOIL AND TILL
DISTURBED AREA TO RESTORE TO
PRE -CONSTRUCTION AGRICULTURAL CONDITION
AND RESTORE ANY VEGETATED BUFFER THAT
EXISTED PRE -CONSTRUCTION
5 REMOVE SILT FENCE ONCE FINAL STABILIZATIO%
HAS OCCuRREO WITH A MINIMUM OF 7076
VEGETATION uPSLOPE OF SILT FENCE
MODIFIED TEMPORARY DITCH/SWALE CROSSING RESTORATION
RD14-1
Westwood
Phone I12Q SSI •IS0 101/0 C hula Maw. W, Suite •201
toll I,ee TINA 9S1 SI SO Wnt•l mantes . CO .0021
Wt %wom P,ula,onal Seen a. IK
bp
0
BP Wind Energy North America, Inc.
201 hellos Way
Houston, TX 1/0/9
RI VISIONS
a DAII (OMMI NI
A 06/19/21 ISSUED IOR PI ANTI
a 06/2W/I ISSUtDIOA RI VIIW
09/14//t ISSUED ION RI
Cedar Creek II
Wind Repower
Weld County, Colorado
Construction Details
A-_
09/14/2021
6
4773483 Pages: 29 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
111eJiWikR'iIN}& II III
West wood
k
r
•LXAMPLE ONLY - ACTUAL LAYOUT MAY VARY
DUE TO SITE TERRAIN AND CONDITIONS*
EDGE OF CRANE PATH
EDGE OF GRAVEL
OF ROAD
DISTURBANCE LIMITS WIDTHS
FOR CRANE WALKS AND
ACCESS ROADS WILL VARY
NOTE
200' RADIUS CLEARED AND
GRADED TO TX OR LESS
SIZE OF CLEARED AREA MAY BE
ADJUSTED AT CONTRACTOR'S /
DISCRETION BASED ON SITE
CONDITIONS
/
•
250' RADIUS DISTURBANCE FOR \
TAGLINE USE DURING ROTOR
LIFT •
/
•
ACTUAL CRANE PAD & COMPONENT LOCATIONS TO BE DETERMINED BY CONTRACTOR
DISTANCE BETWEEN CENTER OF TURBINE AND EDGE OF GRAVEL ROAD VARIES BY TURBINC-SITE
COMPONENT STACANG SHOULD BE ADJUSTED AS NEEDED BASED ON ACTUAL SITE CONDITIONS
--
60' DIAMETER FOUNDATION
•
•
•
•
\
•
/
60'X60' (TYP) CRANE
PAD- LOCATION TO BE
DETERMINED IN FIELD
TYPICAL WIG SITE - PLAN VIEW
TS01
GRAVE ROAD
42' CRANE PA IH
"PENDING FINAL APPROVAL FROM
UTILITY COMPANY
EXISTING PIPELINE/UTILITY
PLAN
MAX DEFLECTION SHALL BE 9"
I PER 100'
�/ COVER SHALL BE INCREASED TO
BE 4O" OR GREATER OVER PIPE
DEPTH OF PIPE VARIES. EXISTING PIPELINE/UTILITY
VERIFY IN FIELD
NOTE: QBOEJLE MINIMUM K VALUE - 16.5
I. CROSSING DETAIL FOR INFORMATION ONLY CROSSING MUST BE
APPROVED BY UTILITY COMPANY PRIOR TO CROSSING
2 LOCATION AND DEPTH OF EXISTING UTILITY SHALL BE FIELD VERIFIED
BY EXISTING UTILITY OWNER/OPERATOR.
3 EARTH COVER PROTECTION FOR EXISTING UTILITIES SHALL BE USED
WHERE THE COVER OVER THE EXISTING UTILITY IS LESS THAN 400
WSW I
EARTH COVER PROTECTION FOR
UTILITY CROSSING
1 U T01
480 COVER MIN
EXISTING UTILITY
'PENDING PENAL APPROVAL PROM
UTILITY COMPANY,
EDGE OF COMPACTED-7le
NATIVE MATERIAL ,C//
PROFIT F
20'
PROPOSED GRAVEL SURFACE
EDGE OF COMPACTED
NATIVE MATERIAL
b
16' GRAVEL
ROAD
42' CRANE
PATH
NOTE:
EXISTING YTILITY d
CROSS SECTION
_ III 1111/1111 III
I i H
,.in.* 1 I 1 IMF;
1 f / 7 wei1r.
P
III IIII'UIII III -
EXISTING UTILITY
EDGE OF COMPACTED
NATIVE MATERIAL
EDGE OF PROPOSED
CRAWL
CROSSING DETAIL FOR INFORMATION ONLY CROSSING MUST BE
APPROVED BY UTILITY COMPANY PRIOR TO CROSSING
2 DEPTH AND LENGTH OF FILL VARIES PER PIPELINE/UTILITY COMPANIES
RECOMMENDATION
3 CRANE MAT PROTECTION FOR UTILITY CROSSING SHALL BE USED WHERE
THE COVER OVER THE EXISTING UTILITY IS 48" OR CRTATFR
CRANE MAT PROTECTION FOR
UTILITY CROSSING
UTO2-1
TEMPORARY CULVERT TO BE REMOVED
FOLLOWING CONSTRUCTION (TYP )
NOTE:
SAND BLISTER TO BE CENTERED
UNDER THE CRANE'S TRACKS AND
EXTEND A MINIMUM OF 2' OUTSIDE
OF THE CRANE MAT FOOTPRINT
2 ALL DISTURBED AREA WITHIN THE
COUNTY ROW TO BE RETURNED TO
EXISTING CONDITONS.
3 ALL DISTURBED AREA TO BE
RESTORED ACCORDING TO THE
PROJECT SWPPP AND NARRATIVE
4 THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY REPAIRS
TO THE ROAD BASED ON DAMAGE
CAUSED BY THE CRANE CROSSING
DIMENSIONS SHOWN ARE
APPROXIMATE AND MAY CHANGE
BASED ON ACTUAL CRANE
UTILIZED BY CONTRACTOR
6 ALTERNATIVE METHODS MAY BE
USED FOLLOWING APPROVAL FROM
OWNER AND COUNT*/
UPON REMOVAL OF CROSSING
APPLY SEED AND EROSION
CONTROL BLANKET TO FINAL
GRADE TO RESTORE DITCHES AND
SLOPES TO PRE -CONSTRUCTION
CONDITION
EXISTING
GROUND
EXISTING ROAO
ADD CRANE MATS AS REQUIRED
CRANE MATS MAY BE USED AT CONTRACTO4.
DISCRETION BASED ON FIELD CONDITIONS
r.\\wait
c
OF EXISTING ROAD
TEMPORARY COMPACTED FILL TO BE
REMOVED FOLLOWING CONSTRUCTION (TYP )
TEMPORAR
FOLLOWING
TEMPORARY
CRANE PATH
LI
i
ii W
TEMPORA
RLANKE'
CE PER DETAIL GD03 (TYP )
r CULVERT TO BE REMOVED
CONSTRUCTION (TYP)
RY EROSION CONTROL
FOR EXPOSED SOILS (TYP )
Iftlembraml
TYPICAL TEMPORARY CRANE PATH EXISTING ROAD CROSSING
I RD22-A
200'
200'
FOUNDATION PEDESTAL ELEVATION
ERECTION/LAYOOWN AREA
GRADE FINISHED GROUND LESS THAN 1%
TERRACE IF NECESSARY
----\- EXISTING GROUND LESS THAN SX SLOPE
CONTRACTOR TO PROTECT EXISTING
BEAUTY RING AROUND TURBINE TOWER
CRANE PAD
COMPACT NATIVE MATERIAL TO WITHIN 1"
FLATNESS AND 1' FOUNDATION PEDESTAL
ELEVATION
(TEMP CRANE MATS MAY BE REQUIRED)
INrrneosi
TYPICAL WTG SITE - PROFILE VIEW
I TS03
r
200'
200'
FOUNDATION PEDESTAL ELEVATION
ERECTION/LAYDOWN AREA
GRADE FINISHED GROUND LESS THAN 1X
TERRACE IF NECESSARY
CRANE PAD
COMPACT NATIVE MATERIAL TO WITHIN I"
FLATNESS AND 1' FOUNDATION PEDESTAL
ELEVATION
(TEMP CRANE MATS MAY BE REQUIRED)
CONTRACTOR TO PROTECT EXISTING
BEAUTY RING AROUND TURBINE TOWER
EXISTING GROUND GREATER THAN 5X SLOPE
WiimIlasod
TYPICAL WTG SITE. EXISTING GROUND GREATER THAN 5% - PROFILE VIEW
1 TSO4
?OCK WEEPER
;)PTIONAL)
DRAINAGE DIRECTION
TO LOCAL LOW POINT
NOTE:
PLAN
3'
SECTION A -A
CONTRACTOR
TO STRIP TOP
SOIL OUT TO
CREATE BERM
r
3/4' MINUS STONE
(OR EQUIVALENT)
ON UPSLOPE (INSIDE)
3 1 SIDE SLOPE
STRIPPED TOP
SOIL
3 1 SIDE SLOPE
3" MINUS STONE
(OR EQUIVALENT)
ON DOWNSLOPE
(OUTSIDE)
ROCK WEEP SECTION
I ADDITIONAL SILT FENCE (ESC01) IS RECOMMEND AT TURBINE SITES WITHIN CLOSE PROXIMITY TO WATERWAYS
2 BERMS SHOULD BE PLACED AROUND DOWN GRADE PERIMETER OF PAD AREA TO PROVIDE PERIMETER SEDIMENT
CONTROL
3 TERMINAL ENOS OF BERM SHOULD BE HIGHER IN an/ATHA THAN THE TOP OF BERM
4 TEMPORARY STABILIZATION OF TOP SOIL BERM COULD CONSIST OF HYDROMULCH OR STRAW MULCH (WEED FREE)
AS NECESSARY.
MULTIPLE ROCK WEEPERS MAY BE NEEDED. CONTRACTOR TO FIELD FIT AS NECESSARY. ROCK WEEPERS ARE
OPTIONAL TO MINIMIZE WATER ACCUMULATION WITH IN TURBINE PAD AREA.
TYPICAL EARTHEN BERM AND ROCK WEEPER
1 EC07
AqW UXI SII US0 T0I rocMuc$ Ra w.I. s.s nc'
Id i.te (MIeW SISO Woftesw,COSMIP
.w-wuodp..,"
WR11 o P anodwl Sewtn. I,o
PRI PAR1 U I Q4'
bp
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
Rlns:�tis
I DAIL C0MMINI
A 011/19/11 ISSWONJR RANI!
A OWWDI ISSIADIOR UVIIS
C 0WW)1 ISWLDDWRMRW
Cedar Creek II
Wind Repower
Id County, Colorado
We
4786327 Pages: 29 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III rarhill'AWhifuriLliiiir.VRIVINIA 11111
Construction Details
09/14/2021
7
4773483 Pages: 30 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII mr,dritik/vmpermorimiliklian tit',
Westwood
i
v
so.
tiiw174
io
4,
ACT
ti
40' RADIUS (TYP.)
MIRAFI HP270 GEOTEXTILE OR
APPROVED EQUAL (AS NEEDED)
6" MINIMUM DEPTH \NY
1" 3" WASHED ROCK
NOTES
ROCK CONSTRUCTION ENTRANCE SHOULD BE A MINIMUM THICKNESS OF 6" AND
CONTAIN MAXIMUM SIDE SLOPES OF 4.1 ROCK ENTRANCE SHOULD BE INSPECTED
AND MAINTAINED REGULARLY ROCK ENTRANCE LENGTH MAY NEED TO BE
EXTENDED IN CLAY SOILS
IB/d ROCK CONSTRUCTION ENTRANCE
GD0S
SPACING FOR STAPLES
Si OPE RATIO STAPI FG/YARD
2:1 (H:V)> 1 2 STAPLES
2:1 - 1 1 1 7 STAPLES
.
MIN e
OVERLAP
TYPICAL SLOPE
SOIL STABILIZATION
'SOME TRIO viEw
NOTE:
1 REFER TO THE PROJECT SWPPP FOR IMPLEMENTATION REQUIREMENTS
2 MATS/BLANKETS SHOULD BE INSTALLED VERTICALLY DOWNSLOPE
3 SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICK AND CRASS
4 MATS/BLANKETS SHALL HAVE GOOD SOIL CONTACT
5 LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT
WITH THE SOIL
6 DO NOT STRETCH.
7 BLANKET TYPE ANO WEIGHT MUST BE CHOOSEN BASED ON SITE CONDITIONS AND
MANUFACTURERS RECOMMENDATIONS.
STAPLE LENGTHS SHALL CONFORM TO MANUFACTURERS RECOMMENDATIONS
• •_ • •
•
TAMP DIRT
OVER MAT/
BLANKET
GENERAL
STAPLE
PATTERN
FILE NB $tR
souRCE
NON -WOVEN GEOTEXTILE
FILTER FABRIC UNDER
TYPICAL TREATMENT
�T 4X 'w
WATER TABLE
8
SOS
TEMPORARY EROSION BLANKETS G D 2 1
TURF REINFORCEMENT MATS FOR SLOPES
maa:r.afafta7t
r�
enal r COLT IR F IRRD1tS
NOTE
GROOVES WILL CATCH SEED, FERTILIZER, MULCH. RAINFALL AND DECREASE RUNOFF RATE
USE SLOPE TRACKING FOR SLOPES 4:1 AND 50 FEET LONG OR STEEPER/LONGER.
USE TEMPORARY CONTOUR FURROWS FOR SLOPES 3 I AND 75 rEET LONG OR
STEEPER/LONGER
w11th..d
SURFACE ROUGHENING
FOR ALL SLOPES GREATER THAN 4:1
GDO9
LONGITUDINAL
6
TERMINALSLOPE AND INITIAL CHANNEL
ANCHOR TRENCH CHANNEL ANCHOR TRENCH ANCHOR TRENCH
CHANNEL MAY DR
MAY NOT HAVE A
CULVERT
NOTE:
REFER TO THE PROJECT SWPPP FOR IMPLEMENTATION REQUIREMENTS.
2. CHECK SLOTS TO BE CONSTRUCTED PER MANUFACTURERS SPECIFICATIONS.
3 STAKING OR STAPLING LAYOUT PER MANUFACTURERS SPECIFICATIONS
4 MINIMUM OF 3.5 STAPLES/YARD.
5 BLANKET TYPE AND WEIGHT MUST BE CHOOSEN BASED ON SITE CONDITIONS
AND MANUFACTURERS RECOMMENDATIONS
STAPLE LENGTHS SHALL CONFORM TO MANUFACTURERS RECOMMENDATIONS
EROSION CONTROL BLANKETS SHALL EXTEND TO THE EDGE OF THE
DISTURBANCE LIMITS
-CHECK SLOT AT 25'
INTERVALS. INTERMITTENT CHECK SLOT
6
7
TEMPORARY EROSION BLANKETS
TURF REINFORCEMENT MATS FOR CHANNELS
GD22
NOTES
FIBER ROLLS SHALL 8E INSTALLED PRIOR TO UPSLOPE DISTURBANCE
ACTIVITIES COMMENCING
2 FIBER ROLLS SHALL BE PREFABRICATED AND MADE FROM WEED FREE
RICE STRAW, FLAX, OR A SIMILAR AGRICULTURAL MATERIAL BOUND INTO
A TIGHT TUBULAR ROLL BY NETTING USE A 6" OR 12" DIA ROLL
3 TRENCHES SHALL BE CREATED ALONG THE SLOPE OF THE PERIMETER
THE TRENCH DEPTH SHOULD BE 1/4 TO 1/3 OF THE THICKNESS OF THE
ROLL, AND THE WIDTH SHOULD EQUAL THE ROLL DIAMETER, IN ORDER TO
PROVIDE AREA TO BACKFILL THE TRENCH
4 STAKE FIBER ROLLS INTO THE TRENCH. DRIVE STAKES AT THE END OF
EACH FIBER ROLL AND SPACED 4 FEET MAXIMUM ON CENTER USE WOOD
STAKES WITH NOMINAL CLASSIFICATION OF 0.75 IN BY 0.75 IN AND A
MINIMUM LENGTH OF 24 IN.
ROLLS SHALL BE INSTALLED PERPENDICULAR TO WATER MOVEMENT, AND
PARALLEL TO THE SLOPE CONTOUR.
TURN THE ENDS OF THE FIBER ROLLS UP SLOPE TO PREVENT RUNOFF
FROM GOING AROUND THE ROLL THE UPSLOPE POINT SHOULD BE A
MINIMUM 6" HIGHER IN ELEVATION THAN THE LOW POINT
7 IF MORE THAN ONE FIBER ROLL IS PLACED IN A ROW, THE ROLLS
SHOULD BE OVERLAPPED A MINIMUM OF 6 INCHES, NOT ABUTTED.
FIBER ROLLS ENCASED WITH PLASTIC NETTING ARE USED FOR A
TEMPORARY APPLICATION ONLY AND SHOULD BE REMOVED FOLLOWING
STABILIZATION. FIBER ROLLS USED IN A PERMANENT APPLICATION SHALL
BE ENCASED WITH A BIODEGRADABLE MATERIAL ANO MAY BE LEFT IN
9 TEMPORARY INSTALLATIONS SHOULD ONLY BE REMOVED WHEN UP
GRADIENT AREAS ARE STABILIZED PER GENERAL PERMIT REQUIREMENTS.
AND/OR POLLUTANT SOURCES NO LONGER PRESENT A HAZARD BUT,
THEY SHOULD ALSO BE REMOVED BEFORE VEGETATION BECOMES TOO
MATURE SO THAT THE REMOVAL PROCESS DOES NOT DISTURB MORE
SOIL AND VEGETATION THAN IS NECESSARY
FIBER ROLLS MUST BE INSPECTED IN ACCORDANCE WITH GENERAL
PERMIT REQUIREMENTS FOR THE ASSOCIATED PROJECT TYPE AND RISK
LEVEL. IT IS RECOMMENDED THAT AT A MINIMUM, THE BMPS BE
INSPECTED WEEKLY, PRIOR TO FORECASTED RAIN EVENTS, DAILY DURING
EXTENDED RAIN EVENTS, AND AFTER THE CONCLUSION OF RAIN EVENTS
5
6
B
UPSLOPE DISTURBED
AREA/PROJECT SITE
WRAP ENDS UPSLOPE TO
CONTAIN RUNOFF FROM
CONSTRUCTION AREA
0.75"
DRIVEN WOODEN
STAKES TO BE
PERPENDICULAR
TO SURFACE FLOW
FLOW
UNDISTURBED AREA
SLOPE
(H: V)
< 4:1
4:1 - 2:1
MAX SPACING
FT
20
15
> 2:1
10
• A CLOSER SPACING IS MORE EFFECTIVE
OVERLAP ROLLS
A MINIMUM 6"
12. REPAIR OR REPLACE SPLIT, TORN. UNRAVELING. OR SLUMPING FIBER ROLLS.
13. SEDIMENT THAT ACCUMULATES UPSLOPE OF THE BMP SHOULD BE PERIODICALLY REMOVED
IN ORDER TO MAINTAIN BMP EFFECTIVENESS. SEDIMENT SHOULD BE REMOVED WHEN
SEDIMENT ACCUMULATION REACHES ONE-THIRD THE DESIGNATED SEDIMENT STORAGE DEPTH
14. RILLS OR GULLIES MAY BEGIN TO FORM FOLLOWING MAJOR STORM EVENTS WHERE RUNOFF
HAS OVERTOPPED THE FIBER ROLLS THESE RILLS OR GULLIES SHOULD BE PROMPTLY
REPAIRED
Yhall�od
TYPICAL FIBER ROLLS FOR PERIMETER CONTROL OF CONSTRUCTION AREA LIMIT
GD42
4786327 Pages: 30 of 106
12/17/2021 02:55 PM Fe0.0 d County , CO
Carly Koppes, Clerk and Recorder, �I
niKirtifg ION!
�
i
i
SPACING BETWEEN CHECK DAYS
.6
TOPSOIL BERM SHALL BE
STABILIZED PATH MULCH/SEED
ROCK CHECK SHALL BE USED WHERE NEEDED AS A FILTER MEDIA, OR
WHERE EROSION CONTROL BLANKETS AND/OR FIBER ROLLS DO NOT
PROVIDE ADEQUATE EROSION AND SEDIMENT CONTROL
RIP RAP
PLACE FILTER FABRIC "A
UNDER ROCK VIEW LOOKING UPSTREAM
KEY STONE INTO THE DITCH BANKS AND EXTEND IT
BEYOND THE ABUTMENTS A MINIMUM OF 18" TO
PREVENT OVER FLOW AROUND DAM
A
t—�
KEY IN ENDS OF
FILTER FABRIC
MINIMUM OF 5"
SECTION A — A GEOTEXTILE FABRIC
= THE DISTANCE SUCH THAT POINTS 'A'
AND 'B' ARE OF EQUAL ELEVATION
W atseOla
TEMPORARY ROCK CHECK DAM
0D18
WHERE THERE IS POSITIVE DRAINAGE DISCHARGING TO
THE EXISTING DITCH FROM THE LAYDOWN YARD, THE
DITCH SHALL BE PROTECTED FROM EROSION AND
SEDIMENT DEPOSITION
FLOW
DIRECTION
EXISTING PUBLIC ROAD
INGRESS/EGRES
6 '
) F TO
r }T a ),
a?' 0
(TOPSOIL STOCst'l lCc')
ii'
NOTE:
'aft.
N
LAYDOWN YARD
SHALL BE 6" BASE
OF IDOT GRADATION
14 SECTION 4123
SILT FENCE SHALL BE INSTALLED AROUND
THE PERIMETER WHERE STORMWATER RUNOFF
WILL DISCHARGE FROM LAYDOWN YARD
REFER TO PROJECT SWPP PLAN FOR SPECIFICATIONS OF EROSION AND
SEDIMENT CONTROL
vgandi
TYPICAL LAYDOWN/STAGING AREA EROSION
AND SEDIMENT CONTROL
GD31
7'c 7 Munthr
Fat sift% "W:.c u..s, ' .,
Cbw.W dnmt aid calory
INN 'Mn
ta'.w .r Van]
We. me Mel
whit ,w fella! t
uwW d.aMdtl
bulgur
11 gauge 4
late[ lens L6 a
4000 sbpty lit
sedy cog)
:
9 Made
3Itpat 11, 211, len thaI
>0 axe toy, dtdla wt
wa41wis of 21 w lea mid
vrinothot Ins Wt. i 5 i.)-
Mrs* .r v.ro]
Ate, cc ado]
(wine
11 gaup, 4
Ndic keg Lear
B IPds ocplsi tut
w arl7
t
9 Alt&1,
t; rye< 1 I, 2 i 1, non then
;u Ito Ieee dtdto with
044wul3 d SH A ka awl
v.k<atr.3 los tun 4 i R'm
will, last be, ? Iwhe 31
tkw dwth
Raw r ,,nn3
Mo. droo* ode]
tv:14ac
t t easy, a rrh
awls a mch
tcrtatdv xtL•T
4
I 'el ran
S ry.* p I' 7 1 ihtchoc
wtta t ads[ s 0t 4a x lex,
ns vokr<Yns lc that IS
Ws. wet .au dart ) inch.
et Sow dct
)n rem, 'k1,6
mulut x n sa
veb:ty ♦ s$
tbsi with JwUIs
aced agar[
fl gtiU,., a wtrh
..39W IY Tub
Iirsadysok)
I 'c T y et
each balm: wth p.diadc
of 444 S las. (kw
v4vstyc I+a lbw, V. It' .
Intl los hat 4 oche. A
tkw data rd wahr . Sc.
bstk: withal to nYtral
flow dram,
Xi v in., 3044
osrontt with
.r.4J. vdel
raft,
11 g.gn, = rich
Spies
o
Vkav that 3
n
•lte
Zekrce,wrd
Mat -TIM)
ONO' bssLt.: a ah yndn•L
„t 4t .n4 lerc, U.vt
vek vwt kas tor, c 1 R's
ahM =AN A !Ohl, <.1 floes
4.;t
Straw I r'aoccut a'
wind DMr I.
.tmcsia.d
Inn%
II gwp, S inch
sight*
_
Matthew 3
pawn
elleT
•:Ptit.YcfMn
'4 !FL.:
LOA batons wtb gradient:
vg Tr ad la:, Dew
windern l.a thin 7 t. r
ar.1 tons , ,R•nr it bnv
'l Ai
Canul ar wool
bbl,
i-nmwnwnw
tering
11 st31, ::r. .
SO'
1AletWood
TEMPORARY EROSION BLANKETS I
(TYPES AND APPLICATIONS)
E�+_ 7C
l�
SLOPE STABILIZED W/MULCH OR
EROSION CONTROL BLANKET
SEDIMENT,
ORGANIC MATTER.
NATIVE
CAPTUREDAND BEHIND
SEEDS ARE
THE WATTLES
STRAW WATTLES
MUST BE PLACED
ALONG SLOPE
CONTOURS.
NOTE;
3' - S'
STRAW WATTLES
OVERLAP MIN. 4"
1' x i" STAKE OR REBAR AND/OR LIVE
WILLOW STAKE 3/4" - 1 1/2" DIA.
SPROUTED WILLOW STAKE
(FOR WET SLOPES/ HIGH
GROUND WATER TABLE)
STRAW WATTLES ARE TUBES MADE FROM STRAW BOUND
ARE APPROX 8" DIA AND 20 - 30 FT LONG
7 STRAW WATTLES TRAP SEDIMENT AND REDUCE SHEET &
SLOPE LENGTH, INCREASING INFILTRATION RATES AND
ENVIRONMENT FOR PLANT ESTABLISHMENT.
W/ PLASTIC NETTING. THEY
RILL EROSION BY REDUCING
BY PROOUCING A FAVORABLE
S STRAW WATTLE INSTALLATION REQUIRES THE PLACEMENT AND SECURE STAKING OF THE
WATTLE IN A TRENCH, I" - 3` DEEP, DUG ON CONTOUR. RUNOFF MUST NOT BE
ALLOWED TO RUN UNDER OR AROUND WATTLE.
4 STRAW WATTLES USED FOR SLOPES MINIMUM SOFT LONG AND 3 1 SLOPE
5 WOOD FIBER LOGS CAN BE SUBSTITUTED FOR STRAW.
VAntMood
TEMPORARY FILTER LOG
SLOPE BREAK
GD20
CATEGORY 3 EROSION
CONTROL
4 X 4" TRENCH BACKFILLEO
OVER EROSION CONTROL.
3LANKET
STRAW OR WOOD FIBER 6` -
OR 12" DIA ROLL
ENCLOSED IN PLASTIC OR
POLYESTER NETTING
BIOROLL MIN. 10' LONG
NQTE:
REFER TO THE PROJECT SWPPP FOR IMPLEMENTATION REQUIREMENTS.
2 POINT "A" MUST BE HIGHER THAN POINT "B" TO ENSURE THAT WATER
FLOWS OVER THE DIKE AND NOT AROUND THE ENOS
3 TYPE OF MATERIAL FOR EROSION CONTROL BLANKET IS SUBJECT TO FIELD
CONDITIONS AND MANUFACTURERS RECOMMENDATION
PQIN T
A
OINT
8", 11 GA STAPLES
SPACED 1' 0" ON CENTER
2"X2" X 18" LONG
WOODEN STAKES AT 2' 0"
SPACING. DRIVE
THROUGH NETTING AND
FIBER ROLL
Wee -
TEMPORARY BIOROLL BLANKET SYSTEM I GD23
3
(DITCH APPLICATION)
OVERLAP BIOROLL ENDS A
M:NOL UM or 6"
FIELD STANDPIPE ---
STRAW OR W000 FIBER 6" OR
12" DIA ROLL ENCLOSED IN
PLASTIC OR POLYESTER
NETTING
BIOROLL MIN 10' LONG
2"X2" X 18" LONG WOODEN
STAKES AT 2' 0" SPACING
DRIVE THROUGH NETTING AND
FIBER ROLL
NOTE:
• INLET PROTECTION SHALL BE USED FOR FIELD STANDPIPES THAT HAVE SOIL
DISTURBANCE WITHIN 200' OF INLET
2 INSPECT AND REPAIR BIOROLL AFTER EACH STORM EVENT AND REMOVE
SEDIMENT WHEN ACCUMULATED TO 1/2 THE HEIGHT OF THE FABRIC OR MORE
3 REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT
CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED
If- -
INLET PROTECTION WITH BIOROLL
GD30
Phone COQ S31435O 101 /O Chooch Ranch Wirt Sun, OM
loll lroe (4443931 S15O Westin visit., CO 40011
westwaadpcso.
Westwood Ptolessionsl Swains
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
KL VISIONS
a OAT& COMMTNI
A 0//19/71 ISSUED 108 Pt RM I I
8 01/2N11 ISSUED FOR REVIEW
C 09/14/71 ISSUED IOR REVKW
Cedar Creek II
Wind Repower
Weld County, Colorado
Construction Details
09/14/2021
8
4773483 Pages: 31 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
iiiridDe I WrIELIERICIINAgilyi 1111
GATE AT FIELD
EXISTING FENCE
FENCE
C]
4
O.
is
(n
(n
U
a
CROSSINGS
ikGATE TYPE GA01 OR GA03
TO BE DETERMINED BY
CONTRACTOR
GATE AT ROW FENCE CROSSINGS
GATE TYPE
CA01 OR GAD3
TO BE DETERMINED BY CONTRACTOR
N
TEMPORARY FENCE
ExISTING FENC
O
Q
o
a
in
(n
u
u
Q
EXISTING ROAD
NOTE:
• FOLLOWING TURBINE CONSTRUCTION TRAFFIC, THE TEMPORARY FENc
AND GATE SHALL BE REMOVED AND REINSTALLED TO MATCH THE
PRECONSTRUCTION CONFIGURATION
GATE AT ROW/FIELD FENCE
CROSSINGS
FNO1
Illewwwil
44'
EXISTING BARBED I _
WIRE NEW BARBED WIRE
- / f POST
18'
NATURAL
GROUND
z
0
a
NOTE
•
VER TICAL BARBED WIRE
REMOVABLE FENCE FASTENERS WITH
TENSIDNERS
U -CHANNEL POST, MINIMUM 3 0 LB./FT .
S' LONG, GALVANIZED (TYP)
9'-B" DIRECT BURIED PRESSURE TREATED,
FOR A MIN 20 YEAR LIFE, TIMBER FENCE
POST (SEE NOTE)
ALL FITTINGS, HARDWARE AND OTHER APPURTENANCES SHALL BE
FABRICATED AND FITTED IN ACCORDANCE WITH THE MANUFACTURES
RECOMMENDATIONS
2 TO BE USED AT CRANE PATH ONLY CROSSINGS
3 BARBED WIRE SHALL MATCH EXISTING 4, 5. OR 6 WIRE FENCE
4 REMOVE U -POST AND TEMPORARY FASTENERS AND REPAIR FENCE T
PRE -CONSTRUCTION PROJECT CONDITIONS AFTER FACILITIES ARE
NSTA: :_ED
TEMPORARY FENCE CROSSING
FN02
200' RADIUS CLEARED AND GRADED TO 1%
OR LESS ADJUSTED AT CONTRACTORS
DISCRETION BASED ON SITE CONDITIONS
5
'S,
60. SO FTYP) CRANE PAD
LOCATION TO BE
DETERMINED IN THE
FIELD
i
e TRUCK TURNAROUND
AREA
TYPICAL TRUCK TURNAROUND
TRUCK \\\
TURNARL'%1(40 LANE
I
I
I
TURBINE /
LOCATION /
^o
1
TS05
EXISTING
BARBED
WIRE
AL
GROUND
8" RATED 10 LBS (EOIJVALENT CF a THOOESS)
13" SADDLE, EACH r APART, C TO C
FOLDING
(COLLAPSIBLE)
WINGS
5
T
20'
NOTE.
z
2 i" PIPE
13 PIPES ON A 7"
WIDE CATTLE GUARD
A -A
1
ALL FITTINGS. HARDWARE AND OTHER APPURTENANCES SHALL BE FABRICATED
AND FITTED IN ACCORDANCE WITH THE MANUFACTURES RECOMMENDATIONS
2 BARBED WIRE SHALL MATCH EXISTING 4, 5, OR 6 WIRE FENCE
3 5 I- BEAM RUNNERS FOR BASE. 5' APART FOR A 20' SPAN. ADD ANOTHH
I -BEAM FOR EVERY 5' COVER I -BEAM WITH FACEPLATES ON BOTH
APPROACHES, WITH MINIMUM FACEPLATE OF j'X8"X LENGTH OF GUARD
4 CALL ROAD SUPERINTENDENT IF PIPE EXCEEDS SPECIFICATIONS
Westwood
CATTLE GUARD ONLY
CG03
L)(ISl1NG BARBED
5'
/
WIRE REMOVABLE POST
EXISTING TIMBER
POST
5 24' (CRANE PATH)
LATCH
HINGE SID
18' (ACCESS ROAD)
5'
5'
The
Z-
S
I -
>K>c
-
---
a n-
?
r.4
_
24' REMOVABLE
BARBED WIRE (ONLY
REQUIRED IF CRANE
PATH IS ADJACENT
NA I
GROUNDTO ACCESS ROAD)
J
18' CATE MATCH EXISTING
GATE MATERIAL OR
LANDOWNERS PREFERENCE
_
_
NEW BARBED HARE -
NOTE:
MATCH TO EXISTING POST MATCH TO EXISTING POST
TYPES TYPES
EMBED 4'-6' PVC PIPE SLEEVE
18" MIN DIAMETER CONCRETE EMBEDDED
FOR POST (TYPICAL WIRE GAP POLE
EMBEDMENT)
1 H -BRACING SHALL BE CONSTRUCTED ON EACH END OF THE GATE
2 GATES ARE ONLY REQUIRED TO CONTAIN LIVESTOCK
3 DO NOT INSTALL 24' REMOVABLE BARBED WIRE GATE SECTION IF CRANE TRAVEL IS NOT EXPECTED
Wrtwal
TYPICAL FENCE CROSSING WITH ACCESS ROAD/CRANE PATH AND GATES INSTALLED
r
GA02
48" MIN
2"K2- WOOD OR
STEEL 'T- POST
POST SPACING
/ MAX ON OPEN RUNS
•1 MAX ON POOLING AREAS
36 WIDE FILTER FABRIC
FLOW
FLO'N
48 MIN POST
INSTALLED ON SLIGHT
ANGLE TOWARD
RUNOFF SOURCE
12' MIN
24" IN POOLING AREAS
PONDING HEIGHT (2' MAX)
FILTER FABRIC, ATTACH
SECURELY TO UPSTREAM
SIDE OF POST WITH
3 SOIb TENSILE STRENGTH
PLASTIC ZIP TIES PER
POST WITHIN TOP 8. OF
FABRIC RUNOFF
6
FABRIC SLICED INTO SOIL
WITH COMPACTED BACKFILL
ON BOTH SIDES OF FENCE
NOTES
r&IT FENCE MATERIAL SHOULD Bf POLYPROPYLENE, POLYETHYLENE OR POtYAMWDE WOVEN OR NONWOVEN FABRIC THE
FABRIC WIDTH SHOULD OE 36 INCHES. WITH A MINIMUM UNIT WEIGHT OF 4 5 at/YD. MULLEN BURST STRENGTH EXCEEDING
190 LB/IN 2. ULTRAVIOLET STABILITY EXCEEDING 70% AND MINIMUM APPARENT OPENING SIZE OF U S SIEVE NO 30
2 SILT FENCE SHOULD BE SECURELY FASTENED TO EACH SUPPORT POST THERE SHOULD BE A 3F1 OVERLAP. SECURELY
FASTENED WHERE ENDS OF FABRIC MEET
1 SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFIOENCY
4 ALL ENDS OF THE SILT F{NCE SHALL BE WRAPPED uPSLOPE SO THE ELEVATION Of THE BOTTOM Of FABRIC IS HIGHER THAN
'PONDING HEIGHT -
INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN ACCUMULATED TO 1/3 HEIGHT Of
THE FABRIC OR MORE
6 REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF SITE AND CAN Bf
PERMANENTLY STABILIZED
7 SILT FENCE SHOULD REMAIN IN PLACE AND MAINTAINED UNTIL THE DISTURBED AREA IS PERMANENTLY STABIL IZED
5 INSTALL A SECOND ROW OF SILT FENCE APPROXIMATELY S' FROM INITIAL ROW WHEN REDUNDANT PROTECTION IS
REQUIRED WITHIN 50' OF WETLANDS AND STREAMS
Sil T FENCE
NOT IO SIMI,
ESCO1
NSTEO GALVANIZED p9
NRE DIAGONAL BRACE
ExISrIN(
BARBED
WIRE
20' GATE
~ PROViDE 2 7/8" • STEEL CROSS
BRACINGS FOR LATERAL SUPPORT
LATCH SIDE HINGE SIDE
TWWSIED GALVANIZED
/9 *IRE DIAGONAL
BRACE
_r
(
1
7I
I
•IN:;Y\1
in
I
1
-
_
8�
THEAVYDUTYTUBEGATEJ
CHAINED WITH TWO (2) LOCKS
42" MIN - 5 RAILS
.,,B.E:
t
a
4 5' IAN l
12" MIN
DIME TER
NOTE:
\-9 1/2'-5 1/2` STEEL FENCE POST t
18" MIN DIAMETER
9 1/2'-3 1/2" STEEL FENCE POST
12 MIN
DIAME TER
ALL FITTINGS, HARDWARE AND OTHER APPURTENANCES SHALL BE FABRICATED
AND FITTED IN ACCORDANCE WITH THE MANUFACTURES RECOMMENDATIONS
ALL DIRECT BURIED POSTS SHALL BE BACKFILLED WITH APPROx 5 CF OF OuICKRFTF R.
OR APPROVED EQUAL
BARBED WIRE SHALL MATCH EXISTING 4, 5, OR 6 WIRE FENCE
H -FRAME MUST BE PLACED IN EXISTING FENCE LINE & EXISTING FENCE ATTACHED 10
NEW SUPPORTS PRIOR TO CUTTING OF EXISTING FENCE
NS TALL GATE HINGES SO THAT GATE OPENS FULLY (180 DECREES) BACK TO THE FENCE
Westwood
GATE TYPE A - SINGLE GATE
I GA01
Westwood
Phan. (//Q 111 II ISO
lull l,,, (/6!) 41/ '.ISO
101 /0C luu h Ranch Way, Sun. 1)01
Wltlw lade,. (0 40021
•r.Iwahlpt(om
wn.w,n.l P,ol.awnal Serve a. IM
. . J!I 11 lOll
Up
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, IX /1079
RI VISIONS
I Mn (OMMtNI
A 04/ 19//I !MID IOR Pt MCI
6 06//W)1 ISSUI I) ION RI VII W
C 09/14//1 ISSUI n I OR NI VII
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 31 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
ill IV !JIM: 011 Wel tlf I re kil kir I It I 1O
i
i
Construction Details
A
09/14/2021
9
4773483 Pages: 32 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III AVFAIF.iiillANTIMPArleidliiiinimi
a
I
I
i
ROAD DESIGN PARAMET$RS
EXISTING PROJECT ACCESS ROADS ARE PROPOSED FOR USE OF TURBINE COMPONENT DELIVERIES. ROAD
MAINTENANCE CAN BE EXPECTED DURING THE TIMEFRAME OF THE REPOWER PROJECT AND MAY INCLUDE
BLADING AND REPLACEMENT OF AGGREGATE MATERIAL
EXECUTION
1 CLEARING AND GRUBBING
A THE CONTRACTOR SHALL BE REQUIRED TO GRUB/MULCH ALL TREES. STUMPS. BRUSH.
THE GRADING AREAS SHOWN ON THE PLANS THE CONTRACTOR IS TO REMOVE ONLY
WHICH ARE DESIGNATED BY THE OWNER'S REPRESENTATIVE FOR REMOVAL. AND SHALL
CARE AROUND EXISTING TREES TO BE SAVED
B SIDE SLOPES GREATER THAN 4 1 WILL NOT BE PERMITTED, UNLESS OTHERWISE NOTED
AND DEBRIS WITHIN
THOSE TREES
EXERCISE EXTREME
ON THE PLAN
TOPSOIL S TRIPPING
A ANY TOPSOIL THAT HAS BEEN STRIPPED. SHALL BE STOCKPILED WITHIN GRADING AREAS AS
DIRECTED BY THE ENGINEER ALL TOPSOIL SHALL BE REDISTRIBUTED TO THE LAND OWNER'S
PROPERTY OF WHERE IT ORIGINATED FROM
STORM WATER DESIGN PARAMETERS
ALL TEMPORARY PIPE CULVERTS SHALL BE INSTALLED PER COLORADO DEPARTMENT OF TRANSPORTATION
AND/OR WELD COUNTY STANDARD SPECIFICATIONS AND SHALL BE MANUFACTURED OF CORRUGATED METAL
PIPE OR AS REQUESTED BY LANDOWNERS OR LOCAL JURISDICTIONS
STORMWATER POLLUTION NTION PLAN (SWPrn
THE CONTRACTOR SHALL PROVIDE EROSION CONTROL MEASURES AS PLANNED AND SPECIFIED FOLLOWING
BEST MANAGEMENT PRACTICES AS OUTLINED BY THE STATE OF COLORADO AND BEING IN CONFORMANCE
WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL STORMWATER PERMIT
2 REFER TO THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR THE CEDAR CREEK II WIND
PROJECT. FOR EROSION CONTROL AND RESTORATION SPECIFICATIONS, SEDIMENT AND EROSION CONTROL
PROCEDURES. LOCATIONS OF BMPS. DETAILS. AND INSPECTION INFORMATION
3 ALL PASTURES AND DRAINAGE SWALES DISTURBED DURING CONSTRUCTION ACTIVITIES SHALL BE SEEDED IN
ACCORDANCE WITH THE SWPPP PLAN
4 ANTICIPATED CULVERTS HAVE BEEN SHOWN ON THE CONSTRUCTION PLAN ADDITIONAL CULVERTS MAY NEED
TO BE INSTALLED IN AREAS WHERE CONCENTRATED FLOW IS EXPECTED DUE TO CONSTRUCTION ACTIVITIES
5 ANTICIPATED LOW WATER CROSSINGS HAVE BEEN SHOWN ON THE CONSTRUCTION PLAN ADDITIONAL LOW
WATER CROSSINGS MAY NEED TO BE INSTALLED IN AREAS WHERE CONCENTRATED FLOW IS EXPECTED DUE
TO CONSTRUCTION ACTIVITIES
TABLE 1: COUNTY ROAD AGGREGATE
SIEVE SIZE
PERCENT PASSING
11"
100
t'
90-100
}"
55-80
f4
45-65
f8
33-53
940
15- 35
9200
4-15
PLASTICITY
INDEX
4-12
LA WEAR
TIST (196)
40 MAX
TESTING:
I TESTING SHALL BE PERFORMED BY A DESIGNATED INDEPENDENT TESTING AGENCY
2 SUBMIT ONE SET OF TESTING AND INSPECTION RECORDS SPECIFIED TO THE CIVL ENGINEER OF RECORD
DEFINITIONS
1 PROOF ROLLING
SHALL BE PERFORMED IN THE PRESENCE OF THE GEOTECHNICAL ENGINEER OR QUALIFIED GEOTECHNICAL
REPRESENTATIVE USING A FULLY LOADED TANDEM AXLE DUMP TRUCK OR WATER TRUCK WITH A MINIMUM
GROSS WEIGHT OF 53.000 LBS (24 METRIC TONS) OR A FULLY LOADED BELLY DUMP WITH AN
EQUIVALENT AXLE LOADING PROOF -ROLLING ACCEPTANCE STANDARDS INCLUDE NO RUTTING GREATER
THAN 1 5 INCHES. AND NO "PUMPING" OF THE SOIL BEHIND THE LOADED TRUCK
2 SIEVE ANALYSIS
SHALL BE CONDUCTED IN ACCORDANCE WITH AASHTO T27
3 PROCTORS.
SHALL BE DETERMINED IN ACCORDANCE WITH AASHTO 199
4 ATTERBERG LIMITS,
SHALL BE DETERMINED IN ACCORDANCE WITH AASHTO
5 MOISTURE DENSITY (NUCLEAR DENSITY)
SHALL BE DONE IN ACCORDANCE WITH AASHTO 1310
6 DYNAMIC CONE PENETROMETER (DCP) TESTING:
SHALL BE DONE IN ACCORDANCE WITH ASTM D6951-03
T59 AND T90
7 STATIC CONE PENETROMETER (SCP) TESTING
SHALL BE DONE IN ACCORDANCE WITH ASTM D3441-16
REQUIREMENTS
FILL MATERIAL
A SOILS USED AS FILL MATERIAL SHALL BE TESTED FOR GRAIN SIZE ANALYSIS, MOISTURE CONTENT,
ATTERBERG LIMITS ON FINES CONTENT, AND PROCTOR TESTS
B IF STRUCTURAL FILL IS REOUIRED, GEOTECHNICAL ENGINEER SHALL BE CONSULTED BY GENERAL
CONTRACTOR FOR DETERMINATION OF SUITABILITY
2 COMPACTED SUBGRADE (INTERSECTION IMPROVEMENTS)
A THE ENTIRE SUBGRADE SHALL BE COMPACTED AND PROOF -ROLLED OVER THE ENTIRE AREA PRIOR TO
THE PLACEMENT OF AGGREGATE TO IDENTIFY AREAS OF UNSTABLE SUBGRADE.
C PROVIDE 2 MOISTURE DENSITY COMPACTION TESTS PER INTERSECTION PER LIFT COMPACTED SuBGRADE
MUST BE COMPACTED TO A MINIMUM OF 95Z STANDARD PROCTOR MAXIMUM DRY DENSITY
3 AGGREGATE BASE (ACCESS ROAD AND INTERSECTION IMPROVEMENTS)
A AGGREGATE BASE SHALL BE PROOF -ROLLED OVER THE ENTIRE AREA PROVIDE 1 SIEVE ANALYSIS PER
2,500 CY OF AGGREGATE BASE DELIVERED
B IF PROOF ROLLING DE TERMINES THAT THE SECTION IS UNSTABLE, ADDITIONAL AGGREGATE SHALL BE
ADDED UNTIL THE UNSTABLE SECTION IS ABLE TO PASS A PROOF ROLL CONTRACTOR SHALL BE
RESPONSIBLE FOR MAIN TAINING EXISTING DRAINAGE PATTERNS
4 CRANE TRAVEL SHOULDERS
A CRANE TRAVEL SHOULDER COMPACTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR ALL
CRANE SHOULDER COMPACTION PROCEDURES AND TESTING PROCEDURES SHALL BE THE CONTRACTOR'S
MEANS AND METHODS
5 CRANE PADS
A CRANE PAD COMPACTION SHALL BF THE RESPONSIRIIITY of THE CONTRACTOR All CRANF PAD
COMPACTION PROCEDURES AND TESTING PROCEDURES SHALL BE THE CONTRACTOR'S MEANS AND
METHOOS
PRODUCTS
I AGGREGATE FOR TEMPORARY INTERSECTIONS SHALL CONFORM TO THE WELD COUNTY ROAD
AGGREGATE GRADATION, SEE TABLE 1
2 SHOULDERS AND CRANE PADS SHALL CONSIST OF COMPACTED NATIVE SOILS
3 CULVERTS CULVERTS SHALL MEET THE MINIMUM SPECIFICATIONS SET FORTH BY THE COLORADO
DEPARTMENT OF TRANSPORTATION AND/OR WELD COUNTY. ALL CULVERTS SHALL BE
MANUFACTURED OF 16 -GAGE CORRUGATED METAL PIPE UNLESS NOTED OTHERWISE
TABLE 2: TESTING SCHEDULE SUMMARY
LOCATION
TEST
FREQUENCY
GENERAL FILL
GRAIN SIZE ANALYSTS. MOISTURE CONTENT,
ATTERBERG LIMITS ON FINES CONTENT. AND
PROCTOR
1 PER MAJOR SOIL TYPE
MOISTURE DENSITY TEST (NUCLEAR DENSITY)
I PER 2500 SO FT PER LIFT
COMPACTED SUBGRADE
PROOF -ROLL
ENTIRE AREA
MOISTURE DENSITY TEST (NUCLEAR DENSITY)
2 PER INTERSECTION
AGGREGATE BASE
PROOF -ROLL
ENTIRE AREA
SIEVE ANALYSIS AND PL
I PER 2.500 CY
CRANE SHOULDERS
CONTRACTORS MEANS AND METHOOS
CRANE PADS
CONTRACTORS MEANS AND METHODS
4786327 Pages: 32 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
■III rafillirimerigurtripennerifirerriodiyi, !III
GENERAL NOTE&
I THE GROUND SURFACE CONTOURS (AT TWO -FOOT INTERVALS) AND ELEVATIONS ARE BASED ON LiUAR
DATA OBTAINED FROM USGS
2 WHERE SECTION OR SUBSECTION MONUMENTS ARE ENCOUNTERED, THE OWNER SHALL BE NOTIFIED
BEFORE SuCH MONUMENTS ARE REMOVED THE CONTRACTOR SHALL PROTECT AND CAREFULLY
PRESERVE ALL PROPERTY MARKERS AND MONUMENTS UNTIL THE OWNER. AN AUTHORIZED SURVEYOR
OR AGENT HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATION THE CONTRACTOR IS
RESPONSIBLE FOR REPLACING DAMAGED PROPERTY MARKERS AND MONUMENTS
.3 EFFORTS SHALL BE MADE TO MINIMIZE SOIL DISTURBANCE TO AREAS OUTSIDE OF THE CRANE TRAVEL
PATH AND ACCESS ROAD GRADING LIMITS AND TURBINE SITES TYPICAL DISTURBANCE SHALL BE
LIMITED TO 150' WIDE FOR ACCESS ROADS AND 200' CRANE PATHS (100' ON EACH SIDE OF
CENTERLINE) AND A 250' RADIUS AROUND EACH TURBINE SITE THE GRADING LIMITS SHALL BE
CENTERED ON THE CRANE PATH CENTERLINES AND WIND TURBINES UNLESS OTHERWISE SHOWN ON Trif
PLANS
4 THE CONTRACTOR SHALL MAKE ALL EFFORTS 10 KEEP ACTIVITIES WITHIN THE ERECTION AREAS SHOWN
ON THE PLANS SOIL DISTURBANCES OUTSIDE OF THESE AREAS ARE NOT ALLOWED SEE DETAIL TSOI
FOR TYPICAL ERECTION AREAS
5 ANY FACILITIES REMOVED TO ALLOW FOR CONSTRUCTION (MAILBOXES, SIGNS. FENCES, ETC ) SHALL BE
REPLACED BY THE CONTRACTOR IN A CONDITION AS GOOD AS EXISTING
6 THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING DRAINAGE THROUGHOUT THE CONSTRUCTION OF
THIS PROJECT CONSTRUCTION ACTIVITIES SHALL NOT BLOCK THE NATURAL OR MANMADE CREEKS OR
DRAINAGE SWALES CAUSING RAINWATER TO POND DEPENDING ON FIELD CONDITIONS, ADDITIONAL
CULVERTS IN EXCESS OF THOSE ON THE PLANS MAY BE REQUIRED
7 CONTRACTOR SHALL DISPOSE EXCESS SOIL IN AN APPROVED MANNER EXCESS TOPSOIL SHALL BE
DISTRIBUTED INTO A THIN LAYER ON LAND IMMEDIATELY ADJACENT TO WHERE THE TOPSOIL
ORIGINATED WHILE DOING SO THE CONTRACTOR SHALL AVOID CAUSING RIDGES OR MOUNDS THAT
WOULD MAKE IT DIFFICULT FOR STORM WATER RUNOFF TO DRAIN THE FINAL SURFACE OF THE
DISTURBED TOPSOIL SHALL BE SMOOTH AND FOLLOW THE NATURAL CONTOUR OF THE LAND
8 THE CONTRACTOR SHALL NOTIFY COLORADO ONE CALL 811 AT LEAST TWO BUSINESS DAYS BEFORE
EXCAVATION ACTIVITIES COMMENCE
9 TEMPORARY INTERSECTION WIDENING SHALL. UPON COMPLETION OF ALL PROJECT CONSTRUCTION OR
UPON NOTIFICATION OF THE ENGINEER. BE REMOVED AND THE AREA RESTORED TO ITS ORIGINAL LINES
AND GRADES WITH THE UPPER FOOT OF THE RESTORED GROUND BEING TOPSOIL, EXCEPT WHERE
REQUESTED BY THE TOWNSHIP OR COUNTY TO PERMANENTLY REMAIN DISTURBED AREAS OUTSIDE OF
THE FINAL ROADWAY SHALL BE SEEDED AND MULCHED, WITH THE EXCEPTION OF AGRICULTURAL AREAS
WHICH SHALL BE RETURNED TO FARMABLE CONDITIONS
10 UPDATED WETLAND DELINEATIONS HAVE NOT BEEN PROVIDED A CORRESPONDING WETLAND REPORT
HAS NOT BEEN PROVIDED CONTRACTOR AND OWNER ARE RESPONSIBLE FOR PERMITTING ALL
PROPOSED WETLAND/WATERBODY CROSSINGS AND ABIDE BY ALL PERMIT REQUIREMENTS ANY
ADDITIONAL ENVIRONMENTAL CORRIDORS WILL BE CLEARED FOR WETLANDS/WATERBODIES BY OTHERS
CULTURAL RESOURCE REPORTS HAVE NOT BEEN PROVIDED CONTRACTOR AND OWNER ARE
RESPONSIBLE FOR IDENTIFYING ALL CULTURAL RESOURCE AREAS OF CONCERN PRIOR TO COMMENCING
CONSTRUCTION
12 THREATENED AND ENDANGERED SPECIES REPORTS HAVE NOT BEEN PROVIDED CONTRACTOR AND
OWNER ARE RESPONSIBLE FOR IDENTIFYNG ALL THREATENED AND ENDANGERED SPECIES AREAS OF
CONCERN PRIOR TO COMMENCING CONSTRUCTION
13 AN ALTA SURVEY HAS NOT BEEN COMPLETED CONTRACTOR AND OWNER ARE RESPONSIBLE FOR
LOCATING ALL UTILITIES AND VERIFYING LOCATION OF CONSTRUCTION ACTIVITIES PRIOR TO COMMENCING
WORK
14 ALL FENCE REPAIR SHALL BE MADE TO MATCH PRE CONSTRUCTION CONDITIONS OF THE EXISTING
FENCE
15 CURRENT LAND CONTROL FILES HAVE NOT BEEN PROVIDED CONTRACTOR AND OWNER TO VERIFY
CURRENT PROJECT LAND CONTROL WITH PROJECT DISTURBANCE AREAS PRIOR TD CONSTRUCTION
16 FLOODPLAIN PERMITS FOR TEMPORARY AND PERMANENT IMPACTS HAVE NOT BEEN OBTAINED ALL
NECESSARY FLOODPLAIN PERMITS FROM THE COLORADO DNR, US ARMY CORPS OF ENGINEERS, WELD
COUNTY. AND COLORADO DNR SOVEREIGN LANDS MUST BE OBTAINED PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITIES WITHIN THE FLOODPLAIN
17 FOR ALL DISTURBED AREAS OUTSIDE OF EXISTING ACCESS ROADS AND WIND TURBINE PADS. USE SEED
Mix REQUIRED BY WE! Tt minor FIR RESTORATION, SFF TART F
11
TABLE 3: GENERAL SEED Mix FOR WELD COUNTY
AREAS NORTH OF COUNTY ROAD 68
TYPE
LBS PLS/ACRE
BUFFALO GRASS (TEXOKA, SHARPS IMPROVED)
15
LITTLE BLUESTEM (BLAZE. CIMARRON. CAMPER)
1 5
SIDEOATS GRAMA (VAUGHN, BUTTE, ',FINER. EL RENO, HASKELL)
2
BLUE GRAMA (HACHITAL. LOVINGTON)
3 5
WESTERN WHEATGRASS (ARRIBA, BARTON, ROSANA)
3
SWITCHGRASS (NEBRASKA 28, BLACK WELL)
1 5
PERENNIAL RYE GRASS (CALIBRA OR GARIBALDt TE TRAPLOID)
0 7c
SAND DROPSEED
0 25
TDTAt
14
Westwood
Atone (FM S)1 $E.O
Ian tter (bap I)) SIS0
IOW)OC With Rosh Wsy. Sue 0101
Wrsim Attn. CO 60:)1
woreem.xlin to..
Westwood Pofnsio.vl Senn I"
I"Na PANT D {OR
by
0
BP Wind Energy North America, Inc.
201 Hellos Way
Houston, IX 77079
AI VISIONS
0 QAIL COMMINI
A 06119/11 ISSUI U rOA PI AMU
N OW/Wit ISSUI I) ION ***VII W
09/14/11 ISSUI ()Wit RIVIIW
Cedar Creek II
Wind Repower
Weld County, Colorado
Construction Notes
S
09/14/2021
10
4773483 Pages: 33 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III J!j%p'j 4IiN1NIfiIO iIifrkhshsi'dInivi II II
CANLIZOITMDL
THE CONTRACTOR IS RESPONSIBLE FOR OUST CONTROL RELATED TO PROJECT CONSTRUCTION THE
CONTRACTOR is ALSO RESPONSIBLE FOR COMPLIANCE WITH THE COLORADO AIR QUALITY CONTROL ACT
2 DUST CONTROL BEST MANAGEMENT PRACTICES (BMP) SHALL BE USED TO PREVENT AIRBORNE
PARTICULATES (DUST) FROM LEAVING THE CONSTRUCTION SITE OR ACCESS ROADS
3 REFER TO THE MAGNESIUM CHLORIDE PLAN FOR DUST CONTROL (SHEET 12) AND ASSOCIATED
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
4 THE INSPECTOR (RESPONSIBLE PERSON AUTHORIZED WITHIN THE SWPPP) WILL MONITOR THE
CONSTRUCTION SITE AND LET THE CONTRACTOR KNOW IF DUST CONTROL MEASURES ARE INADEQUATE
5 REASONABLE COMPLAINTS RECEIVED BY THE COUNTY OR CONTRACTOR FROM ADJACENT LANDOWNERS
OR THE TRAVELING PUBLIC SHALL BE ADDRESSED BY THE CONTRACTOR IN 24 HOURS OR LESS.
FAILURE TO RESPOND TO REASONABLE REQUESTS (AS DETERMINED BY THE COUNTY) TO PROVIDE DUST
CONTROL OR FAILURE TO PROVIDE A WATER TRUCK ON THE CONSTRUCTION SITE CAN RESULT IN A
WRITTEN SUSPENSION OF WORK ORDER
6 THE CONTRACTOR SHALL BE RESPONSIBLE
HAS LEFT THE CONSTRUCTION SITE
DUST GENERATING ACTIVITIES
71 TREE CLEARING/GRUBBING TREE CLEARING AND GRUBBING CONSISTS OF FELLING TREES,
REMOVING UNDERBRUSH. AND REMOVING FELLED TIMBER THROUGH SKIDDING. CHIPPING, OR
STACKING DUST MAY BE GENERATED BY VEHICLE TRAFFIC, EXPOSURE OF UNDERLYING SOILS,
CHIPPING OF TREES AND OTHER VEGETATION, OR SKIDDING OF TREES OVER EXPOSED SOILS
7 2 GRADING. GRADING CONSISTS OF CUTTING, FILLING, TRENCHING. AND GRADING SOILS IN
PREPARATION FOR INSTALLATION OF FINAL SITE FEATURES, INCLUDING ACCESS ROADS, WIND
TURBINES. STAGING AND STORAGE AREAS, UTILITIES, AND OTHER SITE STRUCTURES GRADING
ACTIVITIES GENERATE DUST BY ACTIVE EARTHMOVING AND LEAVING GRADED SOILS EXPOSED
7 3 STOCKPILING. STOCKPILING MAY BE NECESSARY FOR TEMPORARY STAGING OF SOILS DURING
GRADING ACTIVITIES DuST MAY BE GENERATED BY THE uNCOMPACTED, uNSTABILIZED NATURE OF
THE STOCKPILES
7 4 GRAVEL ROADS/ CRANE PATHS VEHICLES AND EQUIPMENT HAVE THE POTENTIAL TO GENERATE
DUST WHEN TRAVELING OVER AND DISTURBING EXPOSED SOILS ON UNSTABILIZED ROADS AND
PATHS VEHICLES AND EQUIPMENT MAY INCLUDE CONSTRUCTION EQUIPMENT (INCLUDING CRANES),
DELIVERY VEHICLES, OR PERSONAL VEHICLES. VEHICLES MAY ALSO FACILITATE TRANSPORT OF DUST
BY TRAPPING DIRT IN TIRE TREADS AND ON OTHER PARTS OF THE VEHICLE. WHICH HAS THE
POTENTIAL TO TRACK DUST ONTO PAVED PUBLIC ROADWAYS
15 TRANSPORT OF BULK MATERIALS TRANSPORT OF BULK MATERIALS THAT MAY GENERATE DUST
INCLUDES OPEN TRUCK TRANSPORT OF SOILS ACROSS THE SITE DUST MAY BE GENERATED DURING
LOADING AND UNLOADING OF TRUCK BEDS, AS WELL AS FROM MATERIAL BLOWING OUT OF OPEN
TRUCK BEDS
DUST MTITIGATLO1LMHASUR S
FOR CLEANING UP AND REMOVING ANY DIRT OR DUST THAT
1 BMPs FOR CLEARING. GRADING, AND SOIL MOVING.
THE FOLLOWING PRACTICES SHOULD BE IMPLEMENTED TO MINIMIZE DUST GENERATION DURING
CLEARING, GRADING, AND SOIL MOVING ACTIVITIES
EARTHWORK SHOULD BE PHASED TO MINIMIZE THE AMOUNT OF SOIL EXPOSED AT ANY GIVEN
TIME
• EARTHWORK SHOULD BE LIMITED DURING PERIODS OF HIGH WINDS (15 MPH OR GREATER)
• EXPOSED SOILS SHOULD BE SPRINKLED WITH WATER DURING CLEARING AND GRADING ACTIVITIES
WHENEVER VISIBLE DUST IS BEING GENERATED.
• IF VISIBLE DUST IS A CONSISTENT CONCERN IN SPECIFIC AREAS. MORE ROBUST CONTROLS SUCH
AS APPLICATION OF SOIL ADHESIVES) MAY BE USED. COUNTY APPROVAL IS REQUIRED FOR USE
OF SUCH TREATMENTS
• STOCKPILES SHOULD BE COVERED TO PREVENT WINO EROSION
• AREAS IN WHICH EARTHWORK HAS TEMPORARILY CEASED SHALL BE STABILIZED WITH MULCH,
EROSION CONTROL BLANKET, OR TEMPORARY VEGETATION 10 PREVENT DUST GENERATION
2 BMPs FOR GRAVEL/DIRT ROADS AND VEHICLE TRAFFIC
THE FOLLOWING PRACTICES SHOULD BE IMPLEMENTED TO MINIMIZE DUST GENERATED BY VEHICLE
TRAFFIC ON GRAVEL/DIRT ROADS AND IN CONSTRUCTION AREAS.
ON4ITE 11C7,sLSIAn:
• WHEN TRAVELING IN CONSTRUCTION AREAS OF EXPOSED SOIL, VEHICLE TRAFFIC SHOULD BE
LIMITED TO DESIGNATED ROUTES TO THE GREATEST EXTENT POSSIBLE AND MAINTAIN SPEEDS OF
10 MPH OR LESS
• HAUL ROUTES OR OTHER EXPOSED AREAS DISTURBED BY VEHICLE TRAFFIC SHALL BE SPRINKLED
WITH WATER WHEN VISIBLE DUST IS GENERATED
IF VISIBLE DUST IS A RECURRING ISSUE AND CANNOT BE CONTROLLED WITH WATER ALONE,
MORE ROBUST CONTROLS (SUCH AS APPLICATION OF SOIL ADHESIVES OR GEOTEXTILE BARRIERS)
MAY BE USED
SECURITY MEASURES SHOULD BE IMPLEMENTED TO PROHIBIT UNAUTHORIZED VEHICLES FROM
ENTERING THE SITE DURING NON -WORKING HOURS
• TEMPORARY HAUL ROUTES THAT ARE NO LONGER NEEDED SHALL BE PERMANENTLY STABILIZED
WITH VEGETATION
S
• MEASURES SHALL BE TAKEN TO PREVENT TRANSPORT OF DIRT AND DUST TO PUBLIC ROADWAYS
t0 THE GREATEST EXTENT POSSIBLE THESE MEASURES MAY INCLUDE DRY BRUSHING OF
TRUCKS. COVERING OF TRUCK BEDS. USE OF CONSTRUCTION ENTRANCES, AND STREET
SWEEPING
• VEHICLES SHALL MAINTAIN POSTED SPEED LIMITS ON ALL PUBLIC ROADS IF VISIBLE DUST IS
GENERATED ON PUBLIC ROADS WHILE TRAVELING AT POSTED SPEEDS. LOWER SPEEDS SHALL BE
CONSIDERED
• DIRT AND GRAVEL ROADWAYS SHALL BE SPRINKLED WITH WATER WHENEVER VISIBLE DUST IS
BEING GENERATED
• REFER TO MAGNESIUM CHLORIDE PLAN FOR DUST CONTROL. SHEET 12
BMPs DURING INACTIVE OPERATION
PRIOR TO THE END OF THE WORK DAY, WEEKENDS, AND HOLIDAYS IN DRY CONDITIONS (WHEN
VISIBLE DUST IS GENERATED THROUGH WIND ACTION ALONE). WATER SHOULD BE APPLIED TO
DISTURBED SURFACE AREA TO FORM A VISIBLE CRUST IF SOIL TYPE IS NOT CONDUCIVE TO
FORMING A "CRUST," ALTERNATIVE BMPs SHOULD BE IMPLEMENTED ON EXPOSED AREAS.
STOCKPILES SHOULD BE COVERED WITH TARPS OR OTHER COVERS TO PREVENT WIND EROSION
4786327 Pages: 33 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
(IV/WNW till
West wood
'Montt (/J(II S)1 l)SO
Inn Jter (111111) 91/ SISO
101/0C hutch Ranch Way, Sur •l01
Wining male,. co WW1
wrUwoudps cons
Wnwo,a) P,olnwonal Seine', Iry
- !!ARI I)I(1P.
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston. TX 7/079
• I)AIl
COMMINI
A Ol/1,/JI ISSUI I) IOR PI Noll
R 061/ 6/11 ISSUI I) I OR RI VIt W
C 09/1V)1 ISSUIU ION HI VOW
Cedar Creek II
Wind Repower
Weld County, Colorado
Dust Control Notes
09/14/2021
11
4773483 Pages: 34 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder: Weld County : CO
III 111111
r
9
. t, . .
iii%//// ;24
, / :./ /
/„////, . ,
,iw/../4„
2, .
� ..
, .., „,
-7 �/i%
yioRd 130
G-17
6-19
G-20
////
///V
I1
V
Co Rd 114
/CoRd 118
1
a
Co Rd 130
Co Rd 134
G-43
Co Rd 132
0 R i22 1�j
////: Co Rd 116
•
Co Rd 116
.140
Tower Rd
Tower Rd
Co Rd 128 1/2.'
7
..
/
LEGEND:
•
A
♦
NOTE:
PROJECT BOUNDARY
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED INTERSECTION
MAGNESIUM CHLORIDE APPLICATION
100 LF FROM CENTERLINE
PROPOSED FARM HOMESTEAD
DRIVEWAY ENTRANCE MAGNESIUM
CHLORIDE APPLICATION 1320 L
EACH DIRECTION OF DRIVEWAY
PROPOSED MAGNESIUM CHLORIDE
APPLICATION ON TRUCK STAGING
AREA
PROPOSED MAGNESIUM
CHLORIDE APPLICATION
EXISTING NON DELIVERY RD
EXISTING HIGHWAY
EX GRAVEL DELIVERY RD
PROJECT FACIUTIES
THE COUNTY WILL DETERMINE THE QUANTITY,
FREQUENCY. AND LOCATIONS OF OUST TREATMENTS
THE CONTRACTOR IS REQUIRED TO USE A COUNTY
APPROVED VENDOR WHICH HAS A RIGHT OF WAY
PERMIT WITH THE COUNTY FOR THE APPLICATION
West wood
Pharr (/1Q S31 uSO
(+)IMAM S1vl
t01/OChwth RachWa.SullrS701
Wnhw+.00. maw 1
wuw/ps lash
Westosoca P u4+wnal Seen re.
FPRI PAR! D I OP.
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, IX /10I9
MI VISIONS
DAII COMMINI
A 08/19/)1 ISSUIO IOR PIMMII
8 0e/ril/n ISSU1111 UN RI VIIW
09/7V7f ISSULDIOMMIVRW
X
Cedar Creek II
Wind Repower
d County, Colorado
We
34 of 106
412863202s 02:55 PM Pages: R Fee $0.00
Carly Koppes, Clerk and Recorder, Weld County CO
III ridrillINNI[iIIINNINVIVIlliik Bill
Magnesium Chloride
Plan for Dust Control
DATE
SHEET
09/14/2021
12
4773483 Pages: 35 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III IicPi III
I I
EXISTING TURBINE
ACCESS ROAD
EXTEND EXISTING CULVERT BEYOND CRANE
PATH AS REQUIRED MATCH EXISTING CULVERT
SIZE OR 1S" MINIMUM
'/
CONTRACTOR TO LOWER PIPE INLET INVERT TO
BOTTOM OF POND REFER TO CEDAR CREEK II
POND MEMO DATED AUGUST 24.2021 FOR
POND INLET DESIGN
k
EJ0STING
SUBSTATION
PROPOSED GATE
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
.11 81113/
OWNER AND CONTRACTOR TO
COORDINATE CRANE CROSSING
WITH COUNTY
PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
NOTES:
LEGEND:
G XX
N-XX
WWI Ides
III IDIN/•auIli
to
w.a
t0
CAS
44
E. -
FASTING TURBINE LOCATION
REPOWER FORGE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWERFOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
a
EX
INDEX CONTOUR
INTERVAL CONTOUR
TREELINE
ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
WATER EDGE LINE
WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
WHERE FEASIBLE CONTRACTOR 1O GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILI/ATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING ANT) Wit RE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT TER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS. COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NONAGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WIT H A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AF TER APPLICATION OF SEED.
/ SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WIT H TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WIIH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMI I AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENI BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVAIIONS.
KEY MAP
Westwood
Phmr (IJQ UI £SSO
lotII.n IMQ 1l/St SO
tot /OC hutch Rath WIy SuM IJpi
Wntn mutt, CO WWI
westwtndpt turn
Wntwtxxl P,otnt.unal Server, Int
PRI PMU D 100
by
0
BP Wind Energy North America, Inc
201 Helios Way
Houston, TX //0/9
RI VISIONS
▪ UA I I
COMMINI
A OVIW 1
ISSUI O TOR Pl IV/ I I
▪ ON1S/II
ISSUI D FOR MVO
C 01/14/P
ISSUI D I OR RI V II W
ss
0
Ix
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 35 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
Ill III
Site Plan T11 N, R57W,
S5
DA
SHEEI
09/14/2021
13
4773483 Pages: 36 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
POININXIIII: ithirAWANITII4
i
i
SEE SHEET 18
i
b
S•
\ EXISTING TRAILBLAZER PIPELINE
S,
Mfr
Sr
\
d
c4z 4t5
15
1
I
I
s' 0*
C,
�o
et
flir
PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
M,.
0
'x
S»0
S 9+/
rThscrit9
.)
S'I
A}
PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
CRANE PATH UTILITY CROSSING SEE
DETAIL UT0I & UT02 I SHEET 7
\ �f
T \
•
`t.
11 t. 11N, R. 58W
EXISTING WETLAND
g
PROPOSED CRANE
PATH (TYP)
\P/P
fitL
r
NII
N
-19
6
Is,
PROPOSED GE -97 TEMPORARY
INTERSECTION IMPROVEMENT
18
9
na:
PUG
•
PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
PVC
EXISTING TRAILBLAZER
PIPELINE CROSSING
EXISTING TURBINE
ACCESS ROAD
LEGEND:
G XX EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
N-XX EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
FASTING TURBINE ACCESS ROAD
� c 4l Ili al a 12 PROPOSED CRANE PATH
1
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
v-s.uMxMr EX TREELINE
EX ROAD
EX FENCE
t'a EX. CULVERT
u —4 EX OVERHEAD POWER
EX UNDERGROUND POWER
.o EX. FIBER OPTIC LINE
:AL EX GAS PIPELINE
EX TELEPHONE UNE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
C—�$ EX WETLAND
':BIM4tI SENSITIVE AREA
NOTES:
RAPTOR NEST LOCATION
1. WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICUI TURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLAT TER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT TER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE Vt.GE TAT ION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WIl H SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT l EAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILI/ATION MUST BE STABILIZED WITH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WIT H
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDII IONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS. WEATHER. PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
I u1l I Tee
1/14 Sit 4110
la 9l/ St 10
101ro COW(is RawII Way. S,r 1)01
Wens rites. CO SOOT t
sowtsouept cow
wef .pots] Rolrn,o,ul Soren. In
40 PAIN O OP,
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, IX 110/9
O VISIONS
c MU COMMINI
n 01/19/11 ISSUt 01 OM Pt PSI I
01/24/11 ISSUI D IOR R1 V 4 W
09/14/11 :SSW D KOMMVIW
X
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 36 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III MINK iii1071116CIFFNCIPlitiMsafinisi 1111
Site Plan T11 N, R58W,
S11
DATE
SHEET.
09/14/2021
14
4773483 Pages: 37 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III Igifi1/21116414ETIA NI'lliiiii714110PLiiivii III
C
I
V
PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
EXISTING TURBINE
ACCESS ROAD
be•.
PROPOSED CRANE
PATH(TYP)
a
4)
EXISTING WETLAND
EXISTING TURBINE
ACCESS ROAD
40
'PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
53cC. 9 T. 11N, R. 57W
51
III) 11/
PROPOSED GE 97 TEMPORARY
INTERSECTION IMPROVEMENT
a\ 4i4ta e a ae
1
\
\
436
1
SEE SHEET 16
1
1
0
\
r- y
I 1 1 ` `,\,`1 (Y ee f
I
LEGEND:
G-XX
N-XX
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
4ISi13iYGiGg PROPOSED CRANE PATH
d
110
4— sal —41-
NOTES:
. 0 _
GAS _
'uG _
WA.
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
DC OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
DC WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
1.
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS 1O ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 1.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION Of
VEGETATION SPECIES AND FARMING AC I IVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT TER,
INCLUDING BUT NO1 LIMITED TO CRANE PATHS, COMPACTED SHOULDERS. AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION SIORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWAFER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS. WEATHER, PRECIPITATION, CONSTRUE LION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
S.
1.
KEY MAP
30
Westwood
Phone &2i7 Sal 63S0
loll l,oe (666)V3/ S SO
10110 C huith Ranch Way. Su4e 1101
Wntm Imte,. CO 60021
westwooaps ton'
Westwood P,olnwnal Seines. Inc
PRI PAR! D 1 OR
by
BP Wind Energy North America, Inc.
201 Helios Way
Houston, IX 1/0/9
e IAII
(OMMINI
A 06/19/71 ISSUI D IOR PI RMII
a 06/16/21 ISSUI U IOR RI VII W
• 09/14/71 ISSUI D IOR RIVII W
X
r
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 37 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Site Plan T11 N, R57W,
S9
09/14/2021
15
iii rjp Liii'P+I r*'vLrA:iyj, liii
4773483 Pages: 38 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
�IIII�NIL g I 1411#1 AN rill "hitt "Ili
PROPOSED CRANE
PATH (TYP)
6
SEE SHEET 20
4786327 Pages: 38 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII rid NI ill ill W.INNtiTV I INeIi ill II III
CONTRACTOR TO AVOID OR
PROTECT EXISTING CATTLE GUARD
LEGEND:
G XX
N XX
r
tawt
So
•o
GAS
•u.
C-�
falgglaal
NOTES:
EXISTING TURBINE LOCATION
REPOWER FORGE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
DC WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
1. WHERE FEASIBLE CONTRACTOR 1O GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2 TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 1.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
fN(FNTRATF(l FI (lWS MI1ST RF WITH FR(lSIf1N rfNTRllI RI ANKFT AND SFFTI
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
1. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MAT ERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
29
30
Westwood
Phone (/IQ S31 63S0 10110 (hutch Ranch Way, Sure 1701
oll her (666)931',IS0 Wnlm,mtre (0 500;1
wrttwoodpt tom
Weulwoud Prolntbnal Serves, Int
PRl VAR! D I OR
bp
BP Wind Energy North America. Inc.
201 Helios Way
Houston, TX 77079
RI VISIONS
I DAII COMM! NI
A 06/19/71 ISSUlDIOR Pt RMII
6 06/76/71 ISSUI D FOR RI VII W
F 09/14/11 iSSUIU FOR RI VIIW
r
I
i
Cedar Creek II
Wind Repower
Weld County, Colorado
Site Plan T11 N, R57W,
S10
y._
09/14/2021
16
4773483 Pages: 39 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII MeV,Mit OCIE 11liii
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
CAUTION EVIDENCE OF
CITGO GAS PIPELINE
_r_'wa"' l " ie --
.o Sae, (Pal.
a.— /}06) JJS-aY'
Uri' a FPO
II
SEC. 11 T 11N, R SOW
4786327 Pages: 39 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes Clerk and Recorder, Weld County , CO
4
PROPOSED STOCKPILE /
LOCATION
EXISTING WIND TURBINE
ACCESS ROAD
1I
LEGEND:
-{ G-XX
N-XX
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
■■MItIBU PROPOSED CRANE PATH
a
110
+-90
-Sc
10
415
.,A
-•---_-
s -a a-a•a-a-a
NOTES:
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
INDEX CONTOUR
INTERVAL. CONTOUR
TREEUNE
ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
WATER EDGE LINE
WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
1.
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
1. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICUL T URAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE I.INFR WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION SIORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER. PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
5.
7.
KEY MAP
19
Westwood
Phone (!)Q S31 £ O 101 MC boon Rants Way, Wile 0201
loll 1 ree (661 91/ SI SO Verson ante., CO &W I
ueT..wdp%toa
Westwood P,oleswnal Sewn Int
.'NI 'AML I) t(JP
bp
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX /70/9
R( VISIONS
(JAI1 COMMLNI
A 06/19/11 ISSU( O(OR PI 61,611
06/J6Ji' ISSUIU I ORRIVILW
( OS/ 14/(11 (SSW U IOR RI VIIW
Cedar Creek II
Wind Repower
Weld County, Colorado
Site Plan T1 1 N R57W
S11
DATE
SHEET
09/14/2021
17
III EVAPILiiiiiiIIIIWICNPriviOi II I
4773483 Pages: 40 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
'AiiCitICF'47Y4lIin,
/
L
BFl1==== OEM
m
I
Zia
SEE SHEET 14
PROPOSED CRANE
PATH (TYP)
/ 1 N
EXISTING I HAIL 81AZEP
PIPELINE. CROSSING
EXISTING TURBINE
ACCESS ROAD
EAISTINV
TRAILBLAZER
PIPEUNE
T£T GM OJ
3.
LEGEND:
• G-XX
▪ NXX
v.uuwi.w
V
u
0
GAS
NOTES:
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EX0STING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION ONES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE uNE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX
WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
1 WHERE FEASIBLE CONTRACTOR 1O GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 Of THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK 1O TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
2) 4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
1 S. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
mVEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NONAGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
1. SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULIURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MAIERIAL.ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WIIH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER. PRECIPITATION. CONSTRUCTION
METHODS. OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
Phone 1/1Q 111 6110
toil lme JAC 11/1110
t 01 /0 Chwth torah Way. S.4e ea01
Well win CO WI1I
wearoodpssoe
WntwWd PTOl %WMI Senn, Int
PRt aNU U IO
bp
BP Wind Energy North America, Inc
201 Helios Way
Houston, TX 77079
ill VISIONS
DAN WSW' NI
A 06/)9//l ISSUI U TOR PI RMII
6 06/!W/I 6WIUIORRIv6W
09/ 14/! I ISSU1 U I OR R1 VI W
X
Cedar Creek II
Wind Repower
Id County, Colorado
4786327 Pages: 40 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Site Plan T11 N, R58W,
S14
DATE
SHEET
09/14/2021
18
III minI'aM0FIrhrECIINtihf1:Wlr114'fIRl111
4773483 Pages: 41 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III FPM' I
EXISTING
TRAILBLAZER
PIPELINE
i
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
PROPOSED GRAVEL
STOCKPILE LOCATION
s.
DOSTING TRAILBLAZER
PIPELINE
EXISTING WETLAND
•
•
ROAD AK
SEE SHEET 21
a
LEGEND:
-{ GXX
- N XX
1•II8 IIIII
■
a
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
1-0‘....../.1-4-14-9-44-1•0 EX TREELINE
EX ROAD
■ EX FENCE
no EX CULVERT
}—w —4- EX OVERHEAD POWER
sk,o EX UNDERGROUND POWER
to EX FIBER OPTIC LINE
e+a EX GAS PIPELINE
'.4 EX TELEPHONE LINE
DC WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
CEX WETLAND
ri',r' `fir,71 SENSITIVE AREA
NOTES:
RAPTOR NEST LOCATION
1. WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP Of BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENIRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICUL TURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMUI CFI WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APR R I)
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDI I IONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE- INSPECTION OBSERVATIONS.
KEY MAP
West wood
Phone (11(1 531 5IS0 I0l/0C hutch Ilan1h Wy.Sune 1101
loll l ,ee (44491/ S1 SO Westin Mgt,. CC, II00II
waMwendps/oh
Wniwoul P,uln,Wnal Serven In,
f'A/U U WO
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, 1X 1/079
,u v,SIC/Ns
* OAT COMMI NI
A mown 'SSW O ;OR PImilt
I 0W1W?l ISSUE O 1O1t 14 V4 W
c 01/14/11 !SSW DIORRIVIIW
X
Cedar Creek II
►Ind Repower
Id County, Colorado
4786327 Pages: 41 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III
Site Plan T11 N, R58W,
S13
09/14/2021
19
4773483 Pages: 42 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
1
SEE SKINT 16
I
I
i
Lou
1860
145
Eau
1 /
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
-"••••.6
o� .
•
I
EXISTING WIND TURBINE
ACCESS ROAD
4
I
as.
I I
//;
SEC. 15 T. 17N R. 57W
T
(
r
CONTRACTOR TO AVOID OR
PROTECT EXISTING CATTLE GUARD
{
„mu
4910,/,
i
4
4950
///
Opt
0
//
/
CAUTION: EVIDENCE OF
CITGO GAS PIPELINE
wore.» Print Av
,.grno'. Canomeroo
affi rrep (+ep
eeewr rSale 24$- Hai
W! H 1O,C
SEE SHEET 13
LEGEND:
- G XX EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
-� N-XX EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
ii &E ® PROPOSED CRANE PATH
NOTES:
Va
RAG
,a
GM
NAG
w
dab
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE UNE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
1 WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2 TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3 STABILIZATION OF DITCHES (FROM TOP OF BANK 1O LOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRS]
4 TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING Of
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON -AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE ST RAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED
1. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MAIFRIM .ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
,T.a.e (00 111 6150 101I0 (Punch kale WM. Unit M/91
I Oa free (MA • 1.1S0 Wr.tw any, CO60O)1
svretwoodpt (o.
WnnM oal'hair% uottaI Seine.. Inc
:AREDIOP
ci
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
RI VISIONS
I DAII (.OMMINI
A 06/ty)I ,SSUIUIORPIRMII
I 06/1601 ISSUI U I (M RI VII W
C 09/Iwt ISSUIUIORRIVRW
X
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 42 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
i
Site Plan T11 N, R57W,
S15
)A
09/14/2021
20
4773483 Pages: 43 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
2
z
Ill )!J I'II IN't1 hiYi1.111411",hiriii 111111
ROAD AQ
~#- EXISTING TRAILBLAZER PIPELINE
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
01
4786327 Pages: 43 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
EXISTING WINO TURBINE
ACCESS ROAD
SENSITIVE AREA
NOTES:
LEGEND:
GXX
-{ NXX
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
a■■■aaaa PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELiNE
EX ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELNE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
t WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICUL TURAI AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE 1O CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLAT TER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8, CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER. PRECIPITATION. CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
Phony (W(/ S31 /ISO 101/0 Church Ranch Way. Soar .701
lull l Ire Ma9 S/ Si SO Wnlsowlet, CO !0071
wrcSwoodPc corn
Wr wnuf VrolnaunalSmnn. In
PHI PARI U I (SP
BP Wind Energy North America, Inc.
201 Hellos Way
Houston. TX 7/079
-.: VISIONS
0 ()All (OMMI NI
A 0R/19/!I ISSUI U IOK WRMII
B 0R//W)I ISSUIO ION RI VII
C 09O4/11 ISSUIO I OR Al VII
X
Cedar Creek II
Ind Repower
d County, Colorado
Site Plan T11 N, R58W,
S24
09/14/2021
21
III 11111
4773483 Pages: 44 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
III 1410J:ill :4i1 iifr' Pali 11 111
EXISTING WIND TURBINE
ACCESS ROAD 1
4. I
/ 1 1
PROPOSED GE -127 TEMPORARY
IN I ERSEC HON IMPROVEMEN I
NOTES:
LEGEND:
GXX
N XX
to
4-'. -4)-
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
1 WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMII AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. SIABII I/AIION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. I EMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
1. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NONAGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIB' R MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION. CONSTRUCTION
ME THUDS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
West wood
Pnone
Tod free
(/XI $11 61S0
(666191/ S1 SO
101 /0O,w till IUmn WaySuite .X11
Wi,t. .inter. C (1600)1
erdwoodpa con
Westwood PrSaw Sena n In.
I'it1 PARED 1 OP.
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
41 VISIONS
DAII COMMINI
A 05/19/11 ISSUI 0 I OR norm'
6 06/26X71 ISSUI D 1 OR RI VII W
C4/14/ ISSU I D I OR RI Vd W
X
Cedar Creek II
Wind Repower
d County, Colorado
4786327 Pages: 44 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III POF.rI' COMM NT 15 NAP WIMill
Site Plan T11 N, R57W,
S21
09/14/2021
22
4773483 Pages: 45 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III rjip' ,lc1,s II
a
•
I
1
I
II
•I
II
II
440t,
_.._ ever sG•
EXISTING WIND TURBINE
ACCESS ROAD
4960
SEE SHEET 26
/ a
4c5o PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
7
PROPOSED CRANE
PATH (TYPI
3940
4950
3960
SEE SHEET 20
EXISTING TRAILBLAZER PIPELINE
4786327 Pages: 45 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Kopp's, Clerk and Recorder, Weld County , CO
LEGEND:
GXX
--// NXX
l _
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
a INTERVAL CONTOUR
c./.4-/-t.../.4-.A....ws EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
—p —$ EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
ac
,0
CAS
uG
WA,
C-�
NOTES:
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WIT HIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORAT ION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXEILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CON TRACTOR TO IMPLEMENT FOR COMPLIANCE WIT H
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY RI
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
S.
110
KEY MAP
Phony (/10I S31 6150 101/0Chu,sh Ranch Way. Suite .101
loll hey (666)93#-51S0 Wrap!, did el. (O6001I
wrslwowld% corn
Westwood P,olessunal Serwcn, In[
PRI PARI D I OR
by
BP Wind Energy North America, Inc.
201 Hellos Way
Houston, TX 7/0/9
RI VISIONS
a DAII COMMINI
A 06/19/71 ISSUED FOR PINMII
6 06/16/11 ISSUI U FOR RI VII W
t 09/14/11 ISSUIU I OR RI VII
X
Cedar Creek II
Ind Repower
d County, Colorado
Site Plan T11 N, R57W,
S22
09/14/2021
23
III IC 11111
4773483 Pages: 46 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III rdNOLI 'rill 7'flPit VNt'hISi (M'i!'t
)
.P
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
PROPOSED ' IEMP'ORARY
INTERSECTION IMPROVEMENT
4786327 Pages: 46 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes; Clerk and Recorder Weld County
III N��1I�H}I'+WF4��IN�{ V'+01���Ir4���i1�rlllr�Y4� 11 111
PROPOSED GRAVEL
STOCKPILE LOCATION
FISTING TRAP BIA7FP PIPFIINF
•
NOTES:
LEGEND:
--{ G-XX
-{ N XX
X
DOSING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
DOSING TURBINE
EXISTING TURBINE ACCESS ROA[
)M Di ■ i ! Es ■ PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMEN FS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
INDEX CONTOUR
INTERVAL CONTOUR
v-w..w..e-Sx.s EX TREELINE
ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
WATER EDGE LINE
EX
EX
tro EX
EX
n,o EX
0 EX
w EX
NIL EX
wu EX
EX
EX
SENSITIVE AREA
RAPTOR NEST LOCATION
1 WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO I NSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PURI IC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DE TAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE AC I IVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DIICHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUSE BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRICUL IURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS. AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTI-I LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH Al LEAST A 12 MONTH LONGEVITY SHOULD BE APPI II D
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZAT ION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS. WEATHER, PRECIPITATION. CONSTRUCTION
Mf THODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
W.unr (//Q )fl 11H0 101/0(lurth Aimee WIT5unr inn
lute err MC 911 )ISO Wntuxnirr CO &COPP
.rv+.ragt Co.
WeilrvooG Prolntortrl Sr.r. n IF
• NO Il UP
tip
0
BP Wind Energy North America. Inc.
201 Hellos Way
Houston, IX //0/9
v15iONS
t UAII LOMMINI
A os/19/)1 ISSUI U ION PI WAIT
II O!l)W7l MU' UIOIIWVIIW
t 09/14401 ISSUIU ItJII IUVNW
X
0
Cedar Creek II
Wind Repower
Weld County, Colorado
Site Plan T11 N, R58W
S27
09/14/2021
24
4773483 Pages: 47 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
SEE SHEET 21
III NP1hNP4!':}CIsKCIMLNSRIYJhhi,4hiWPN:MW �I III
-
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
P +
EXISTING TRAILBLAZER PIPELINE CROSSING
e„yr
r
4
ite
PROPOSED CRANE
PATH (Tr))
a
EXISTING WIND TURBINE
ACCESS ROAD
PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
SEE SHEET 27
a
N
SENSITIVE AREA
y
NOTES:
LEGEND:
{ G XX
—4( N XX
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
is al r al tri ti 4 ,6 PROPOSED CRANE PATH
4
C.
rw
nr1
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
EX OVERIICAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
DC WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
2.
WHERE FEASIBLE CONTRACTOR 1O GRADE INTERSECTIONS AND DRIVEWAYS 1O ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
TEMPORARY STABILIZATION MUSE BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE AC T IVI TY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST
4. II MPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUSE BE WITH EROSION CONTROL BLANKS 1 AND SEED.
IEMPORARY STABILIZATION OF A AGRICUL TURAL AREAS SHOULD INCLUDE SURFACI
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING DI
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION Of
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS. AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
/ SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NET TING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALT ERNAT fl/ELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPL LANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
5.
KEY MAP
1
West wood
Phone (/IQ 111 61SU
Toll lirr (4/q 91/ SI SO
101/OCh,,rch R.nh Way. Su dr.JOI
Wnhn mite,, CO 8OOJI
weawou,Ip.,ole
Wnlw„W P.olnw,nal irrv.n lnc
44186
z
I'MI PARI D'OP
by
0
BP Wind Energy North America, Inc.
101 Helios Way
Houston, TX 77079
RI VISIONS
/ WI COMMINI
A 06/191/I ISSUI 1) TOR PIANO
6 0677Wll 6SUlDIORMMvnW
C 09/14/)1 ISSUED IORIUVIIW
X
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 47 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Site Plan T11 N, R58W,
S25
;nt
09/14/2021
25
iii MI:INA!' NIACIN', PM EMI Ifil Tr' 111 iu
4773483 Pages: 48 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III litiraPPI'd 401'1141. Vir.Nvoi III III
+yso PROPOSED GE 127 TEMPORARY
INTERSECTION IMPROVEMENT
EXISTING WIND TURBINE
ACCESS ROAD
PROPOSED CRANE
PATH (TYP)
SEE SHEET 23
4786327 Pages: 48 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
NOTES:
LEGEND:
G-XX
-# N-XX
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
:,.:II, a 4 g9 ₹l 10 PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
v wwa-r EX TREELINE
EX ROAD
EX FENCE
+io EX CULVERT
$—� ----4h DC OVERHEAD POWER
4c EX UNDERGROUND POWER
Fp EX FIBER OPTIC LINE
cos EX GAS PIPELINE
hxt EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATON
1. WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
7 TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
1. STABILIZATION OF DITCHES (FROM TOP OF BANK 1O TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFAI I WHICHEVER IS FIRST
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMUICH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER T"HAN 4:1 IN
NON-AGRICUI TURAL AREAS SHOULD BE RESTORED WITH A DOUBT E SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIIIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS. r -
KEY MAP
// /7 /7/7
West wood
Phone (I1Q S31 6350 10110 Church Lentil Way, Suite 4101
to Fee (666,93/ S1W0 Wntminl n. CU 40011
wedvroudpc tom
Wnlwutcl ISolnwtial Se ecn. lnt
i•RI PAR' I) I OR
c.
L9 44186
4
es;..--- •
siONAI ,
� I, iii `t�
bp
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX /7079
i(i VISIONS
• DAN IONIAN NI
A 06/+9/11 ISSUED I OR Pt RMI I
a 06/16/11 ISSUI U TOR RI VIL W
( 09/14/11 'SSW t) 1O11 RI VtI W
Cedar Creek II
'i nd Repower
Id County, Colorado
Site Plan T11 N, R57W,
S27
09/14/2021
26
III POrdPilhilliCifil NV\ KilliMPOiNktflivill In
4773483 Pages: 49 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
frjjjp I"!'$¼ 1!
a
Tz
a
ytr
5740
,430
5220
PROPOSED CRANE
PATH (TYP)
/
p . EXISTING WINO TURBINE ,
:CO • ACCESS ROAD
1
1
1
\
SEE SKEET 25
4786327 Pages: 49 of 106
12/17/2021 02:55 PM d Recorder, Fee:$0.00
$0 We d County , CO
Ca Clerk Carly Noppe¢ Gi�rn and
poraprithileiree, �--- awl apto
i
GAS
EXISTING TRAILBLAZER PIPELINE
GAS
LEGEND:
GXX
N XX
4-A"
,O
GAS
WA,
NOTES:
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX. FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZAIION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT TER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONE ROl BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
5.
8.
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
IMunr (PC SS* X350 MI NC noon Ranch Way, Suite •101
lull I ler (888,931 S I SO Walminuel, CO 80071
wrstwuxlpi tom
Westwood hole -spa naI Serif CPS. Inc
PRI PART I) I OR.
fib)
irAnsiv
sat
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX /10/9
RI VISIONS
e DAII COMMFNI
A 08/19/11 IS5U1 D FOR Pi FUN 11
ft 08R6N1 ISSUIDIORR1VitW
l 09/1A/11 155141DTOR IUVIIW
0
Cedar Creek II
Wind Repower
Weld County, Colorado
9IX)
Site Plan T11 N, R58W,
S36
DATE
SHEET:
09/14/2021
27
4773483 Pages: 50 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Pordrom.No suwirminicoririatiga n
1
PROPOSED GE 127
TEMPORARY INTERSECTION
IMPROVEMENT
ROAD BL
yr-
A
Ex
N
NOTES:
N 4.
N 5.
w�
M 6.
LEGEND:
GXX
N XX
oi n'1 irk :ri
F�e6
10
Atk
0
ex
WA'
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
WHERE FEASIBLE CON TRAC TOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCT ION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON -AGRICUL I URAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
Phone COCO Sil 61W 101/0Church Rands Way Suite 0101
lull f ree (666,94/ 51 S0 Wntm roster. CO 60011
westwoodp. tom
Westwood Proleswonal Semen, lest
PRI I'ARI () I OR
BP Wind Energy North America, Inc.
201 Helios Way
Houston, IX 1/019
RI VISIONS
DAII COMMINI
A 06/19//1 ISSUIU I OR PIRMII
B 011//6/M ISSUI D I OR RI VII W
( 09/14/11 ISSUI DI OR RIVIIW
X
Cedar Creek II
ind Repower
d County, Colorado
4786327 Pages: 50 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Site Plan T10N, R58W,
S4
DA
09/14/2021
28
Ill l'I\ I1CW?'I tYlli 1'PivI JUl
4773483 Pages: 51 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Ill liltNANA!:CI MAI
i
X
X
('At
1
EXISTING WIND TURBINE
ACCESS ROAD
I.
1
lor...-- EXISTING TRAILBLAZER PIPELINE
3
0r , -
I
a
•
a
EXISTING TRAILBLAZER
PIPELINE CROSSING
GM
w
SEC 3 . T 104 a..\►58W
I
4786327 Pages: 51 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
fer
earPfirr
1
a
u.
1
•
S.
X 1 4
as
)
'On
/
1
I
I'
S
:X
4
et
sts
I
•
LEGEND:
GXX
-{ N XX
"non
X
ro
4—
.0--4
10
rrs
Si
e
Sib
C.=.�
3 fl
NOTES:
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXSTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EXISTING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
INDEX CONTOUR
INTERVAL CONTOUR
TREELINE
ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
WATER EDGE LINE
WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE fIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF AAGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON. CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 91O 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL Al TER APPLICATION OF SEED.
7. SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPI EMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAI PE RMI I AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN, ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
30
Westwood
'Tine (/7Q SII O)S0
IUII Iree
LOW 9ii SISO
MI o c lw1.11 Month Wry. Sldo. .701
We.lw+mel.000OOl1
wewlaidp.< con
We.lwwil P1ule.u,Nl Serve e. I nl
"RI PAR' I) I Op
BP Wind Energy North America, Inc
201 Helios Way
Houston, TX //0/9
DU VISIONS
I DIM COMMINI
A 04/19/71 ISSUI D IOR PIRMII
R °O/7W1 ISSUED IOft RIYYW
c 09O4//1 ISSUI DFOR RIVItW
:edar Creek II
Wind Repower
(Veld County, Colorado
Site Plan T1ON, R58W,
S3
JA i
09/14/2021
29
4773483 Pages: 52 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
kiriffinil4111.11001rillA iirmwrilivoilia
\
I
1
EXISTING WIND FARM
ACCESS ROAD
•
s•ca
I
5
I
PROPOSED CRANE
PATH LTW)
I
•
•
I
•
SEC. 2 T. 10N, k\ 58W
•
•
•
•
•
•
1
/
I
1
1
I
I
„a ---r- C"L'
EXISTING TRAILBLAZER PIPELINE
1
•
NN„
1
I
I
I
LEGEND:
G XX
N XX
K
TIIIaGT
P
wow
t10
-4-
NOTES:
IAA
•o
t+t
w"
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FORGE 127 TURBINE
EASING TURBINE
EXISTING TURBINE ACCESS ROAD
PROPOSED CRANE PATH
TEMPORARY RADIUS IMPROVEMENTS
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT OF WAY LINES
EASEMENT LINES
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
INDEX CONTOUR
INTERVAL CONTOUR
TREELINE
ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
WATER EDGE LINE
EX WETLAND
SENSITIVE AREA
RAPTOR NEST LOCATION
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE.
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARYSTABILIZAIION MUST BECOMPEL TED WITHIN THE 1TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION /.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLE TED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4 TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICUL 1 URAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE. TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6 SI OPFS 41 AND H ATTFR AND NnN-rnNr FN !RATED AREAS WITH 4.1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PAT HS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 1O 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MAT ERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATE R POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION. CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
8.
KEY MAP
West wood
Phone (/1Q 131 L1S0
log firer CAM931 S130
101 /0 C hat n Aim Way, SAW .101
Write m.r,. C O 1W??
ae..rtalos to.
Writroo0 Ptotn,.onal Sera et. In
�•Rt PAR/ O I OR
by
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX //079
4I VISIONS
I L MI!
COMMENT
A 06/11/21 ISSUEDIORPERMII
II 06116111 65.030 FOR R(VI* W
c �9l'yll ISSUIDIORRLVIIW
X
rrimimIsemma
0
300
Cedar Creek II
Wind Repower
Weld County, Colorado
4786327 Pages: 52 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
kilidirffiliialk,511411,MV III
Site Plan T10N, R58W,
S2
09/14/2021
30
4773483 Pages: 53 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III 1CridrillIALIC 1101,EZEILLACIArrhillilkilik liii
a
ao
1
1\:c
k\,\\
\\
�L c(
1
Co Rd 132
1
-
r 'J
EXISTIPG FENCE LINE
a
rLrL
0 o ^
USE EXISTING INTERSECTION FOR
TURBINE COMPONENT DELIVERY
CONTRACTOR TO REPLACE EXISTING SIGN
WITH TEMPORARY REMOVABLE SIGN
COORDINATE TIMING FOR RESTORATION TO
PRE CONSTRUCTION CONDITIONS WITH CC2
USE EXISTING INTERSECTION FOR
TURBINE COMPONENT DELIVERY
sol
A
504
RIGHT OF WAY
EXISTING FENCE LINE
RIGHT OF WAY
---- - --ate.-•�-., „ -`/ �_54 1-::::::-S7:47
„..
....,r,...„..._ _________, ____,,r,„.:____
• "_ r- �, I. ; Tom!— r n
r
fi
---•, Jot
4786327 Pages: 53 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
■III10:011141hMllictlriLliiiiinsifiNiiiidivii,
NOTES:
LEGEND:
1//////4
,a a. .
v-vwJ�t�r
CO
-411-.0-
PVC
DO
CAC
ILL
WA,
i — 900 -- —
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
E)CSTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
a
a
EX
a
EX
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CON TOUR
1. WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FIAT TER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
/. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
40
/,4 17A -V//
38 36 34 32
33
Westwood
Phone (/7q Sl1-!!S0 10110 [hooch Ranch Way. Sidle a70;
loll Free Mal III SOSO Weals octal. CO 100R1
-Co.
Westwood ProtesoonaI Serve's, Inc
PRI PART 11 1 OR
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX /7079
REVISIONS
I DAN COMMENI
A 06/19/11 ISSUE() FOR PERM I
6 01/26/21 ISSUED FOR MAIM
W
C 09/14111 ISSUEDFOR REYRW
X
10 80
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 1
09/14/2021
31
4773483 Pages: 54 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
LORMAIIS "Ill
PRO [Lc T LXIST'NC TELEPII NE PEDESTAL
CONTRACTOR TO AVC
EXISTINCicAT TLe
PROPOSED SILT FENCE
4786327 Pages: 54 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
LONTRACTOR TO REPLACE EXISTING SIGN WITH
TEMPORARY REMOVABLE SIGN COORDINATE
TIMING FOR RESTORATION TO
PRE•CONSTRUCTION CONDITIONS WITH CU
EDGEOF TEMPORARY. GRAVEL
GE 127 90 DEGREE
TURNING RADIUS SEE
DETAIL RD® C SHEET 6
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
.?NDITI,4Th:5 WITH CC
INTERSECTION 2
PROPOSED
TEMPORARY
GRAVEL
LEGEND:
1///////1
NOTES:
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATERLINE
EX STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CON TOUR
PROPOSED INTERVAL CONTOUR
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOL)
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCT ION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
Phone (IM Sf1 13X1 101/OCho,th IUnth Wp, Sune 1101
loll I,ee (Elq 9 f/ 51X1 Weshnmue,. CO 10021
wntwootlpt turn
Westwood P,ule+uonal Sew". Ins
MU PARI I) I OR
by
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
Il, VISIONS
e OAR COMMINI
n 04119/JI ISSUIO IOR PIRMII
R 0l/la// l ISSUI n I OR NI VII W
( 09O411 ISSUE II IOM RIViW
X
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 2
DATE
09/14/2021
32
IIIhYIrIYA1N+AGWJML''RI4Wi III III
4773483 Pages: 55 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder; Weld County , CO
i
ii RPM:NI AlAk ANUIALF.5414 II III
4786327 Pages: 55 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
iscrJNIIIM1/4111,5% irIIPt II
60 c - _ __,../
Public Widening 1
PROPOSED
TEMPORARY GRAVEL
EXISTING GROUND
LEGEND:
V/r///4
NOTES:
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CON TOUR
EX INTERVAL CONTOUR
DC TREELINE
DC PAVED ROAD
EX GRAVEL ROAD
DC FENCE
DC CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC UNE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.30E THE PROJECT SWPPP.
3. STABILIZATION Of DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS Of
CONCENTRATED FLOWS MUST BE WIIH I-ROSION CONTROL BLANKET AND SEW.
TEMPORARY STABILIZ.AIION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANfICIPAI ED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON CONCENTRATED AREAS WITH 4:1 SLOPES AND FIAI Ilk
INCLUDING BUT NOT LIMI TED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 11
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH IACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
CONCENTRATED FLOW AREAS RI QUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CON1ROT BLANKET AFTER APPLICATION OR SE ED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY RI QUIRE AGEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS. WEATHER, PRECIPITATION, CONSTRU( TION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
Phone /IQ SIl 61S0
lull 'Crl(SSC 9)1 S/SO
'VI IOC hula Ranch Way. Suitt #101
Wnim mqr'. C O 600)1
wrstwt*xlpn tom
Wnw'uri YudntnnuI Srrr. n in
'RI I'ARI U TOP
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 17079
R) VISIONS
6 °A11 (OMMI NI
A 0/119/11 ISSU1 0 IOR PI W.11I
I WON) 1 ISSUI U I OR RI VR W
( O9/14/11 ISSUI U IORiUVIIW
L_
0
.r.
X
C./
Cedar Creek II
Wind Repower
Id County, Colorado
Ills
Public Road Widening
1
DATE
SHE£1
09/14/2021
33
4773483 Pages: 56 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes. Clerk and Recorder; Weld County , CO
i
it r•.. ,III %i WAY
Q
\ 3'+
PROTECT Exl TING SIGN
V 9
rr
N
2
0
C
O
W
N
BLADE SWING CLEAR
ZONE (TYP)
PROPOSED sIL1 RN( ON ALL INIERSE(:IIOW,
EDGE OF TEMPORARY GRAVEL
GE • 97 90 DEGREE TURNING RADIUS
SEE DETAIL. R008 -C SHEET S
PROPOSED SILT FENCE
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC2
J
GE 97 90 DEGREE
TURNING RADIUS ITYPI
5180
3
5170
5160
0
N
•S
1
I
N
G-53 \\
INTERSECTION 3
EXISTING GROUND
N'a
b aft
�.-
PROPOSED
TEMPORARY
GRAVEL
-0.55%
I
2
5180
5170
5160
9
LEGEND:
rawe
r.
wxxxA A -A/
to
•°.
0
La
900
NOTES:
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
INTERVAL CONTOUR
TREELINE
PAVED ROAD
GRAVEL ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE UNE
WATER LINE
STREAM CHANNEL
WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CON TOUR
T_ WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSIRUC IION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP Of BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPEL TED OR PRIOR TO A FORECASI I II
RAINFALL. WHICHEVER IS FIRST.
4. I EMPORARY SIABILILAI ION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRCULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING Of
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICUL TURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOL)
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER II IAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXIILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUC ; YXN
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
38 ,f//
36 •34
West wood
Pnun< (pg%Si 111SO 101/0 (Moth Ranch Wry. Suer tt01
Intl, tee (!W 93/ SI SO Wntm non. CO WWI
MMWwnodptcom
Westwood P,ofnunnal Sens n. Int
PRf PAW U / (M
BP Wind Lnergy North America, Inc
201 ITelios Way
Houston, TX 17019
VISIONS
a UAlI COMM' NI
A O5/111/1 ISSUIO I OR MAMA
E O6//b//1 ISSUIO IORRIVRW
( 091141/1 ISSU I I I OR MYOSIN
X
0
Cedar Creek II
Wind Repower
d County, Colorado
4786327 Pages: 56 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Public Intersection 3
09/14/2021
34
III IIPARIAltilid 111111
4773483 Pages: 57 of 104
11/@5/2021 100
i ® 4 AM d R coeder$,0 Weld ® County CO
Carly Koppes,
I fordakial:gigrisimikkr: IiJ'RlI'I1
u
i
/
1
)
1
Co Rd 132
ei
F
/ 1
5190
4786327 Pages: 57 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
II rid %WWI Mill IA1:0 � I LIIVICI &MIA III III
i
•
EDGE DE TEMPORARY (,RAVEL.
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC2
I 97 90 DEGREE TURNING RADIUS
EE DETAIL RDOB C SHEET S
PROPO PENCE /
QED SILT �E.a._E
r
C -6
P
1 1
GE -97 40 DEGREE
TURNING RADIUS 11$ Fa
5180
5170
0
/
N.
\ N.
/ 1!
INTERSECTION 4
EXISTING GROUND
N
-160%
1
PROPOSED
TEMPORARY
GRAVEL
G-51
2
3190
5180
5170
awn 900
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2 TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
3, STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. It MPORARY STABILIZAI ION AND RESTORATION FOR DITCHES AND OIHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4.1 AND FLAT TER AND NON CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED 1O CRANE PATHS. COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS 1O BE ESTABLISHED (NON -AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON-CONCENT RATED AREAS WITH SLOPES STEEPER THAN 4,1 IN
NONAGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH Ai LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICAT ION.
CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABS( IZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CON I ROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER Willi RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
1HE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
SIORMWAIER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS. OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
NOTES:
LEGEND:
I/////r4
wars.,
NN *
■ _
YO
0
w
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
DC PAVED ROAD
DC GRAVEL ROAD
DC FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
a FIBER OPTIC LINE
a GAS PIPEUNE
EX TELEPHONE LINE
DC WATER LINE
EX STREAM CHANNEL
DC WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
5.
8
KEY MAP
//
•
40 38 • /
/
Westwood
Phone (1Ka S.1144W 101/0(. huuh l4nch Way, Suite 0/01
10111 lee 0)41/ 'WAR Wcnlm,mlrl.(O 400)1
wrUW,x'dp{ I nm
Wei ha. ona) 0•04 11.0).141 1 Seer,rt Int
PRI PARS I) I OR
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
W VISIONS
l)AII (OMNINI
A 04/19/1 (SSW D I OR PIRMII
B 06/16/11 ISSUI I) ICR RI VII W
( 09/1Nll ISSUI D (OR RI VII
X
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 4
09/14/2021
35
4773483 Pages: 58 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
!VI ciiiIiinNAlliiiIN3/4.9NA 11 III
klCgHI .rl `WYAv uv;.
PROTECT EXISTING SIGN
PROI EL_T DOS ING CATTLE GUARD
4786327 Pages: 58 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
GE 97 90 DEGREE TURNING RADIUS
SEE DETAIL RDOB C SHEET S
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION 'TO PRE CONSTRUCTION
CONDITIONS WITH CC.?
PRGvsi:, r.T IENCE
II MIMI: JOWi1CAP. 4 J4111111
INTERSECTION 5
5190 5190
EXISTING GROUND
1.4%
PROPOSED
TEMPORARY
GRAVEL
LEGEND:
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANC LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
wxw wr EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
1'a EX CULVERT
EX OVERHEAD POWER
ea. EX UNDERGROUND POWER
•a EX FIBER OPTIC UNE
EX GAS PIPELINE
EX TELEPHONE UNE
EX WATER LINE
EX STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
NOTES:
1. WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2 TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUC IION GENERAL PERMIT AND AS DE TAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN lilt SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECAST( 11
RAINFALL WHICHEVER IS FIRST.
4. I EMPORARY SIABILIZAI ION AND RLSIORAI ION FUR DI ICHES AND UI HER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
S. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLAT TER AND NON•CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS. AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NONAGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
/. SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICUI.1URAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WIT H WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKE 1 AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION
9. 1 HE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWAIER GENERAL PERMII AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BF
NECESSARY BASED UPON FIELD CONDI I IONS, WEATHER. PRECIPITATION, CONSIRUC 1 it
METHODS, OR SEQUENCING AND ROUIE INSPECTION OBSERVATIONS.
KEY MAP
West wood
Pilau
Toll tree
111Q $31 1150
1110 93/ sIS0
101I0 C W rch Rah War. %At CV,
Virus wwe.. CO Wit
istes0adM cow
Wetk.00a I1alnmrul Sera aWV
441496
10NAt
1T' t1i '2.7t
PRLPMIDIoR
BP Wind Energy North America. Inc.
201 Helios Way
Houston, TX /10/9
RI VISIONS
e LIAR COMM, NI
A 0N19/71 ISSUI D IOR PI RMII
1 011JW11 ISsU10 Rik RI VU W
( CPTI/ii/E ASUI 0 WA RIVIIW
X
Cedar Creek II
Wind Repower
Id County, Colorado
Public Intersection 5
DATE
SHEET
09/14/2021
36
i
4773483 Pages: 59 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
I rPP'3PI1c lIII
I
I
I I
I
I
I 1
1 I
I
1 1
\
I
rnGHT-CF WAY (I'r
I�
Co Rd 732 \
71-
/
/71
a
C
5200
N
5190
5180
INTERSECTION 6
v PROPOSED
% EXISTING GROUND / TEMPORARY
_ 1 _ 0269E GRAVEL
5200
5190
5180
0 1
2
7i
4786327 Pages: 59 of 106
12/17/2021 02:55 aMd Recorder,F:$010 d County CO
Carly Koppes, Clerk ,IIII
lirrili'll'a4,1010101,!Klitlereiiiilik P'#1
73
C
O
G1
\
/2
/
CONTRACTOR TO REPLACE EXISTING SIGN WITH TEMPORARY
REMOVABLE SIGN COORDINATE TIMING FOR RESTORATION
TO PRE CONSTRUCTION CONDITIONS WITH CC2
I ,
I
/
PROPOSED SILT FENCE
CONTRACTOR TO TEMPORARILY RELOCATE
COSTING FENCE COORDINATE TIMING FOR
, RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC2
EDGE OF TEMPORARY GRAVEL
GE -97 90 DEGREE TURNING RADIUS
SEE DETAIL RD% C SHEET 5
BLADE SWING CLEAR
ZONE
NOTES:
LEGEND:
r//////J
rare..
NNNN 1
u-V�V+l.ra.i-lr
C
I'0
on. 90e
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
DC PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
DC TELEPHONE LINE
DC WATER LINE
DC STREAM CHANNEL
DC WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION /.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABIl IZAT ION OF A AGRICUL1 URAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND Wilt RE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULIURAI AREAS IS NOT ANTICIPATED DUE TO CROSS CON IAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND HATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AF TER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CON TROI BLANKET WITH WOOD FIBER MATERIAL. AL TERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON IHE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR 10 IMPLEMENT FOR COMPLIANCE WIT H
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WE AI HER, PRECIPITATION, CONSTRUCTION
S.
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
38 36
32
33
Westwood
Phony WC. Sit *350
ION Itrr WILD) OW 51 S0
10110 [norm Ranth Wiry •10I
West owlet. CO SOON
wedwraxlp. lnn
Wn'waul P,nlnuonal Servers Int
BP Wind Energy North America, Inc.
201 Helios Way
Houston. TX /10/9
Ml VWS:ON%
• OA I
COMMENT
A OVIHJt 6SSU1OIOR Pc *MIT
II 011/J6/11 ISSUt O FOR RI WO W
09/14//1 MOW IORR1VfW
X
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 6
09/14/2021
37
4773483 Pages: 60 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes; Clerk and Recorder, Weld County
CO
u
I AMOUR MK WEI,
i
i
/ r"
Rd 732
PROPOSED TEMPORARY ENTRANCE
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC'
/
CONSTRUCTION FENCING
r
\t
5150
5140
5130
I
1
I
II
I
I
I
J
hI-,'1T ,..f wnr
/
s!J0 -
i
INTERSECTION 7
EXISTING
GROUND
•131%
at
Al
Al
PROPOSED
TEMPORARY
GRAVEL
/
5150
5140
5130
0
1
2
V
LEGEND:
watteraw.wr
MSS
no
'O' 4
A16
'0
a/
I,q
wV
*D0 -
NOTES:
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FEN:
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVE
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
2.
3.
WHE-REFEASIBLI CONTRACTOR TO GRADE IN IL RSEC lIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
STABILIZATION OF DITCHES (FROM 1OP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4 TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF AAGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6- SLOPES 4:1 AND FLATTER AND NON CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT TER,
INCLUDING BUI NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WI III A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CON IROL AFTER APPLICAIION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATE R POI I UT ION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEARIER, PRECIPITATION, CONSTRUCTION
METHODS. OR SEQUENCING AND ROUTE INSPECIION OBSERVATIONS.
KEY MAP
1
8.
4786327 Pages: 60 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
rd MEI I iihN
Westwood
Pna w I7?Q )S1 tllSD
IotU,er Min 93/ Y1S0
I0t7DC IUICA IRS%h Way. Sue .7O1
wnln enter CUX W1
arY_o dpc tom
WrowoW Plotetuonal Servcn Inc
ITP
BP Wind Energy North America, Inc,
201 Helios Way
Houston. IX 7/0/9
RI VISIONS
• DA II COMMI NI
A 01/19,711 (SSW D 1O41 PI RMI I
I 06/7W?t KSUio wit w
01/14/.01 ISSUI D ID* RI Vol W
:edar Creek II
Wind Repower
'Veld County, Colorado
Public Intersection 7
09/14/2021
38
4773483 Pages: 61 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
vi %ifYlivirligilinYklikleifilki,
N
N
N
N\
vn
L
I
1
I
USE EXISTING RADIUS
IMPROVEMENT
51 i FENCE
POLES HAVE BEEN REMOVED
CONTRACTOR TO VERIFY
EDGE OF TEMPORARY GRAVEL
OWNER 10 COORDINATE WITH EXISTING PROPERTY
OWNER AND SEPARATE PROJECT DEVELOPER
4786327 Pages: 61 of 106
12/17/2021 02:55 Xand Recorder,
0 Weld County CO
Carly Koppes, Clerk
I� ROM Dikiihal
ligl CIA 14, liii
5160
5150
5140
0
INTERSECTION 8
f _ __ __
EXNc `vnJUND
PROPOSED
TEMPORARY
Z.93x GRAVEL
1
2
---•/',
1
i
5160
5150
5140
NOTES:
LEGEND:
1///////1
ricarfl J
NNN N
S,O
Put
GS
900'
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
INDEX CONTOUR
INTERVAL CONTOUR
TREELINE
PAVED ROAD
GRAVEL ROAD
FENCE
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE UNE
WATER LINE
STREAM CHANNEL
WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
5.
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 1.3 OF THE PROJECT SWPPP,
STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANK' I AND SEED.
TEMPORARY STABIL VAT ION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NW ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NONAGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL N It II APPLICATION OF SEED.
1. SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL.. ALTERNATIVELY: A WOOD
HYDROMULCH WITH EACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION 5TORMWAIER GENERAI PERMIT AND ASSOCIATED PROJECT
SIORMWATER POLLUTION PREVENTION PLAN, ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS. OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
40/ . �.'/
38 36
Westwood
'Stone (/N1 SSI 1SSO
ion lmr int 93/ $150
I01 /0 C rant Ranch WM. War #101
Welt. untrr, C O SOO.? I
wruwaldpc ton
WnlwuoU P,olnturui Serer n. Inc
PRI PMII I) f OP
bp
BP Wind Energy North America, Inc.
201 Helios Way
Houston. TX 7/0/9
41 VILONS
c Mll COMMINI
A 01/11/11 ISSUED FORPIRMU
9 00/11/11 ISSUED IORRIVYW
L 0N/ I M )1 ISSU E D FOR RI V R W
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 8
S!ILLI
09/14/2021
39
4773483 Pages: 62 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
I N111I rielfifiniNIMPriEliiik 111
I
110(1
N
PROTECT EXISTING SIGN
PROTECT EXISTING UTTUTY POLE
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC:
11 \,
RIGHT OF WAY (TYP)
1\\
PROPOSED SILT FENCE
EDGE OF TEMPORARY GRAVEL
200' TURNING RADIUS OW)
PROTECT EXISTING UTILITY POLE
5140
5130
5120
5110
0
INTERSECTION 9
v
N
EXISTING GROUND
PROPOSED
TEMPORARY
GRAVEL
-156%
1
2
I I,
5140
5130
5120
5110
I
I
LEGEND:
rawer
co
—4-
E -
L
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX
WETLAND
FEMA FLOOD ZONE
OD a — PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
NOTES.
WHERE FEASIBLE CONTRACTOR TO GRADE IN IF RSECTIONS AND DRIVEWAYS 10 f NSURi
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING Of
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FIAT IF
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPAC IED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH Al LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAI PERMIT AND ASSOCIATED PROJECT
STORMWATE R POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSIRUC I ION
5.
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
4786327 Pages: 62 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII PigdNiVir1/21,4111,41111144.kAlleithVA IA Iliii
38 36
32
33
Westwood
Phone 11/Q S11 a950 101/OCIr.,aa Ass Is Wry, Swat 8101
I M1 I ,n (MO 93/ SI SO Weston ,nae,. (0 Kant
wr1ronlpe 1a.
W.,n.a.n P,utease: a1 San vs, Int
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
RI VISIONS
■ DAII
COMMINI
A 06119111 ISSUI I) OR PI Rhin
a OaiN11 ISSUI D /OR R! Vf W
I. 09/I4/11 ISSUID/ORR1V9W
X
ISi:
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 9
0AT%
SHEET
09/14/2021
40
4773483 Pages: 63 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes Clerk and Recorder, Weld County , CO
i
II IFJMII: III ill', 111111
BLADE SWING CLEAR
ZONE LTYP,
Th1� iRAR't cuLVERT EXTENSION
GE 127 90 DEGREE TURNING
RADIUS DETAIL RD09 C SHEE i h
T EXISTING SIGN
ti
1
4950
4940
4930
0
-4
ROAD TO N-56
INTERSECTION 10
a v
r EXISTING GROUND
016%
1
PROPOSED
TEMPORARY
GRAVEL
2
4950
4940
4930
NOTES:
LEGEND:
//////4
,a r
cN
SVy5i4:
v -t.1- d-L..xr
S'0
'°"
est
•0
cat
w.•
90C
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENC:
DISTURBANCE LIMITS
NON PARTICIPATING LAND
IEMPURARV RAUIUS IMPROVEMEN 15
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
INDEX CONTOUR
INTERVAL CONTOUR
TREELINE
PAVED ROAD
GRAVEL ROAD
ECNCL
CULVERT
OVERHEAD POWER
UNDERGROUND POWER
FIBER OPTIC LINE
GAS PIPELINE
TELEPHONE LINE
WATER LINE
STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED IN I ERVAL CONTOUR
WHERE FEASIBLE CONTRACTOR 1O GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE IIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 1.3 OF THE PROJECT SWPPP
3 STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPI CIES AND IARMING ACTIVITIES.
6. SLOPES 4:1 AND HATTER AND NON -CONCENTRATED ARIAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUI NOI IIMIIED 1O CRANE PATHS, COMPACIEI) SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AF TER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICUL TURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER. DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWAIER POLLUTION PREVENTION PLAN. ADDI1IONAI OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Westwood
ITonr
lolll,rr
{,!Q 111 .LSO
{6/q 9)/ 51 SO
10110 ((with tints Wrr, Show 1101
Weds wafer, COMMIT
wr woodpt rum
Westwood I',olnuonll Seem es irw
'M.l I'AW I) I QA
BP Wind Energy North America, Inc
201 Helios Way
Houston, TX 71019
RI VISIONS
e ❑AIL COMMINI
A 06/11/11
CAUL") (OR PI Wall
1 06/ISM ISSUIDIORRIVUIW
01/14111 ISSUIO IORRL VIIW
60
110
:edar Creek II
Wind Repower
Held County, Colorado
4786327 Pages: 63 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
Public Intersection 10
DATE
SHEET:
09/14/2021
41
III IgAill'AIIIMIALKillifiifiltVANikhikyi 111111
4773483 Pages: 64 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Et,
i
Co Rd 130
INTERSECTION 11
5170
I
5170
5160
5150
PROPOSED
EXISTING GROUND
TEMPORARY
GRAVEL --------
5160
5150
0 1
2
1
N.
n
O
BLADE SWING CLEAR
ZONE Owl
PROTECT EXISTING
UTILITY POI F
.at d' a • .---ear
— Is
(
k,,It. I .• WA,
`,:
EDGE OF TEMPORARY GRAVEL
GE 127 90 DEGREE TURNING
RADIUS DETAIL RD09 C SHEET6
."'"eirme—��`
i
N
•
•
NOTES:
LEGEND:
K//////j
ISO
t,o
111.
NAG
,0
GAS
w,
liamo
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WETLAND
FE MA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS 1O ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WIT HIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICUL 1 URAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING Of
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4.1 SLOPES AND FLATTER.
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION Of SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NONAGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH Al LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE AGEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION SIORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER. PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
Max V/O S 163S0
lob I,ee (MC 93/ SIS0
101/OC1b,<h Rana WNP, La OAT
Wets „Me,. C O 600/ I
rmmdps <w
Wntroot P,a& SWN I Serve n In
BP Wind Energy North America, Inc
201 Hellos Way
Houston, TX 77079
RI VISIONS
I (ATI COMMENT
A 06/19//1 ;SUMO IOR PIIIMII
6 06//6/)1 155UIGIORWVIW
C 09/14//1 ISSuIOIOA Rtvww
X
40
:edar Creek II
Wind Repower
Veld County, Colorado
Public Intersection 11
DATE
SHEET
09/14/2021
42
4786327 Pages: 64 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III till
4773483 Pages: 65 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes; Clerk and Recorder, Weld County , CO
•
III Pj jjpi III
CONTRACTOR TO REPLACE i
TEMPORARY REMOVABLE SIGN CC'ORUNA IL
TIMING FOR RESTORATION TO
PRE CONSTRUCTION CONDITIONS WITH CC
F•,:E;:)F i!'.iPORA.R'rGRA`d;l
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE. COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC2
\
29
PROPOSED Su. i FENCE
/
/
/
J
I
I
7
/
O
v
•
o -r
BLADE SWING CLEAR
ZONE ;TV,.
A
GE -127 90 DEGREE TIANINCI
RADIUS DETNF RD09-I ;r,:L 1 €.
/
LONTRACTOR 1O REPLACE EX1511NC, SIt;N WAII
TEMPORARY REMOVABLE SIGN COORDINATE
TIMING FOR RESTORATION TO
PRE <(_) Nc?RUCTION (_,NIA 1K:NS Wirth CC?
i'F,:PO>E L+ >II I F ENCE
4786327 Pages: 65 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
IH !MOO.
Co Rd 130
`r ';
--f rte- • Y
INTERSECTION 12
5260
r EXISTING GROUND
5250
5240
PROPOSED
TEMPORARY GRAVEL
/`\
/
5260
5250
5240
NOTES:
LEGEND:
AWNNW
-
C
sw
.o
GAS
WAT
on—- 900
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
DC PAVED ROAD
DC GRAVEL ROAD
DC FENCE
DC CULVERT
DC OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
DC GAS PIPEUNE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
DC WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
3. STABILIZATION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
7. SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
5.
KEY MAP
Westwood
Phone UM Sit ISSO 10110Chunk Ranch Wry. Suns *701
Ion l lee MO tit SISO Westin 'aut.CO/0021
werwoodpsco.
Westwood P,olnswnal Sean. Inc
PRt PNU O I OR
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
RI irtiUm
I OAT! COMM( NI
A 01/19/71 ISSUI DICMPI RPM
ft 01/76/21 ISSUED I OR REVII W
C 09/14/71 !SSW) 1 OR RI V I W
X
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersection 12
09/14/2021
43
4773483 Pages: 66 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes; Clerk and Recorder, Weld County , CO
i
II rW!' 6khJll IMd rfl?I III
./
•
•
/
BLADE SWING CLEAR
TONE (TYP)
PROTECT DUSTING UTIUTY POLE
1
CONTRACTOR TO REPLACE EXISTING SIGN WITH
TEMPORARY REMOVABLE SIGN COORDINATE
TIMING FOR RESTORATION TO PRE CONSTRUCTION
I URBAN( E uMiTS
GE 127 90 DEGREE TURNING
RADIUS DETAIL RD09 C SHEET6
1F, ,,!t
tint -z 'c2r!
Co Rd 126
n
tit
O
v
1 _ -
PROPOSED SILT FENCE
CONTRACTOR TO TEMPORARILY RELOCATE
EXISTING FENCE COORDINATE TIMING FOR
RESTORATION TO PRE CONSTRUCTION
CONDITIONS WITH CC2
PROTECT EXISTING SIGN
limmr
/
INTERSECTION 13B
INTERSECTION 13A
5240
5240
N
N
5230
5220 I
0
O,
N N
EXISTING GROUND
PROPOSED
TEMPORARY
GRAVEL
1 2
5230
3
5220
5240
5240
5230
5220
EXISTING GROUND
-145%
PROPOSED
TEMPORARY GRAVEL
5230
5220
0
1
2
NOTES:
LEGEND:
I///r7/j
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
a EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
-.o- -¢ EX OVERHEAD POWER
EX UNDERGROUND POWER
'o EX FIBER OPTIC LINE
�++ EX GAS PIPELINE
.,c EX TELEPHONE LINE
e+ EX WATER LINE
EX STREAM CHANNEL
C
Va
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CON TOUP
1.
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP
3. STABII I/AT ION OF DITCHES (FROM TOP OF BANK TO TOP OF BANK) SHOULD BE COMPLETED
WITHIN I H E SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR 10 A FORECASTED
RAINI All WIIICHFVFR IS FIRST
TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
SLOPES 4:1 AND FLATTER AND NON -CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT TER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 10 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NONAGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AF TER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE AGEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY 81
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
7.
ME TIIODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
4786327 Pages: 66 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
II iticEll'ili7k9)g, iW4
38 36 34 32
33
Westwood
Phone
Ion tee MA 9)/ SIS0
1011OC C Ih,,, h Ilan. h Way. Sva elpt
Wens swan. C O X0O/1
wuwuodpl ton
WeSS wo l P,o,enwwNI Servant In.
PRE PARE U I OR
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, IX 1/019
RI V,SIONS
I I)A(I COMMI NI
A 06/19.01 ISSUI U IO14 PI kW
E O6/A/P ISSUI O FOR RIYR W
C O9/1VJl ISSU(UIORRIYYW
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersections
13A & 13B
A'=
09/14/2021
44
i
4773483 Pages: 67 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
i
II KAPIN !NM IRlitte, 111111
C
I
41
rti
ff
1
BLADE SWING CLEAR
ZONE (TVPI
NN ''NN../-,- --
\N
PROPOSED SILT FENCE
S1',9
EDGE OF TEMPORARY GRAVEL
GE 127 9O DEGREE TURNING RADIUS
DETAIL RDO9 C SHEET 6
4786327 Pages: 67 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III INPAPIANAL VIthialifiZiri1/41.11,y), "Ill
J
q
L,
Co Rd 726
INTERSECTION 14
5270
5270
v,
5260
3250
oo
IN
r D)0STING GROUND
-1.76%
_
PROPOSED
TEMPORARY
GRAVEL
5260
5250
0
1
3
NOTES:
LEGEND:
r//////j
ICJ
txr�.l�xr
5'o
+N.
,o
GAS
Wu
E_
900
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
E)0STING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPELINE
EX TELEPHONE LINE
EX WATER LINE
EX STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
1. WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE. IIMEFRAMES OE THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 1.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK 1O TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4 TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL RI AND T AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CON TAMINATION OF
VEGETATION SPECIES AND IARMING ACTIVITIES.
6. SLOPES 4:1 AND FLAIl HR AND NON CONCENTRATED AREAS WITH 4:1 SLOPES AND FLAT [ER,
INCLUDING BUT NOI LIMITED TO CRANE PATHS, COMPAC I E D SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 1O 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL AFTER APPLICATION OF SEED.
1. SLOPES AND NON CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NON-AGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE WIT H
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER. PRECIPITATION. CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
40.
38 36
V.
Westwood
,Monr (I 11:1 Sfl MVO
i ull I,ee (NISI 9U S1 SO
10110 C Iu,c* Knit Wry.W9. 9201
Wrap" inae,. CO 6001
wruuwwvlpc con
We -l.400/ P,olnwnll Senn(R. In,
BP Wind Energy North America. Inc.
201 Hellos Way
Houston. TX 11019
AI VISIONS
I °Ail
(OMMINI
A 08/19O1 ASIA i OR PI RMII
,f 06IIW1t ISSUID IORIUVRW
0V 14/1 ISSUI D IOR RIVOW
X
1U 50
Cedar Creek II
Wind Repower
Weld County, Colorado
110
Public Intersection 14
:n',
09/14/2021
45
4773483 Pages: 68 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
III
i
0
n
O
Do
i
4�k
SOS
BLADE SWING CLEAR
ZONE (MI
INTERSECTION 15
r E)GSTINGGROUND
061%
1
PROPOSED
TEMPORARY GRAVEL
INTERSECTION 16
2
5350
5340
5330
5330
EXISTING GROUND
0.68%
1
c'ROPoSFL
IFMIC)RARV
uRAVE
5320
5310
0
3
LEGEND:
agratial
warn
ILO
no
,0
Gat
C=�
900
NOTES:
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
DC PAVED ROAD
EX GRAVEL ROAD
EX FENCE
EX CULVERT
EX OVERHEAD POWER
EX UNDERGROUND POWER
EX FIBER OPTIC LINE
EX GAS PIPEUNE
EX TELEPHONE UNE
EX WATER LINE
EX STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
1 WHERE FEASIBLE CONTRAC TOR TO GRADE IN IL RSEC LIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2 TEMPORARY STABILIZATION MUST BECOMPLETEDWITHIN THE TIMEFRAMESOF THE
CONSTRUCTION GENERAL PERMII AND AS DE TAILED IN SECTION /.3 OF THE PROJECT SWPPP
3. STABILIZATION OF DITCHES (FROM TOP OF BANK 1O TOP OF BANK) SHOUI I) BE COMPLETED
WITHIN 1 HE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A FORECASTED
RAINFALL WHICHEVER IS FIRST.
4. TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
5. TEMPORARY STABILIZATION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:1 AND FLATTER AND NON CONCE NTRATED AREAS WITH 4:1 SLOPES AND FLATTER,
INCLUDING BUT NOT LIMITED TO CRANE PATHS, COMPACTED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON-AGRICULTURAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CON IROL AFTER APPLICATION OF SEED.
1. SLOPES AND NON -CONCENTRATED ARIAS WITH SLOPES STEEPER THAN 4:1 IN
NON AGRICULIURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NET TING
EROSION CONTROL BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIER WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPLIED
AFTER SEED APPLICATION.
8 CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WIII1 RIPRAP FOR
STABILIZATION.
9. THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIMUM
ANTICIPATED CONTROLS FOR THE CON TRACTOR TO IMPLEMENT FOR COMPLIANCE WITH
THE CONSTRUCTION STORMWATER GENERAL PE RMIT AND ASSOCIATED PROJECT
STORMWAIER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS, WEATHER, PRECIPITATION, CONSTRUCTION
METHODS. OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
KEY MAP
4786327 Pages: 68 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder; Weld County , CO
Zvi d 1P'IWO mit iclownviikdo
i
40Q''��
38 36
West wood
P..we vw SJ1 US0
I oil 1 f,, (MIN 9!/ S1S0
101/0C1luusn Ruin W11. S S .101
Wnue man. CO 5011
aestrAndos cos
Wnhr.af e.olnsq.Vl Sences. Ix
by
0
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 7/079
Iu Vn+UN5
I OAR
COM MINI
A 06/19/11 ISSUED I OR P1 NMI I
a 011116111 ISSUM D I OR RI VII W
C 05/14/11 ISSUE() FOR
X
sa
Cedar Creek II
Wind Repower
Weld County, Colorado
Public Intersections 15
&16
09/14/2021
46
4773483 Pages: 69 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
TEMPORARY CULVERI EXTENSION
AS NECESSARY
EDGE OF TEMPORARY GRAVEL
GE 127 90 DEGREE TURNING RADIUS
DETAIL RDO9 C SHEET 6
FEN�L cOuRUINAIL iUMiNCr FOR R .1OW1tI'N (V
PRE CONSTRUCTION CONDITIONS WITH Cr:
I rdliell'ARN.IclunnThivitillXVIC
/'
600
ROAD BL i
.2
\ ROAD TO N-2
1.
5290
w
5280
2270
INTERSECTION 17
v,
P
FASTING GROUND 2 37%
PROPOSED
TEMPORARY
GRAVEL
5290
5280
5270
0
1
2
I
9.
NOTES:
LEGEND:
1///////1
_ sis
nr. _.
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED CONSTRUCTION FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
TEMPORARY RADIUS IMPROVEMENTS
DELIVERY CLEARANCE AREAS
EXISTING TEMPORARY
RADIUS IMPROVEMENTS
RIGHT OF WAY LINES
EASEMENT LINES
EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX TREELINE
EX PAVED ROAD
EX GRAVEL ROAD
EX FENCE
ro EX CULVERT
4—'o EX OVERHEAD POWER
EX UNDERGROUND POWER
•a EX FIBER OPTIC LINE
rn EX GAS PIPELINE
EX TELEPHONE UNE
EX WATER LINE
EX STREAM CHANNEL
EX WETLAND
FEMA FLOOD ZONE
PROPOSED INDEX CONTOUR
PROPOSED INTERVAL CONTOUR
C
—900-
1
WHERE FEASIBLE CONTRACTOR TO GRADE INTERSECTIONS AND DRIVEWAYS TO ENSURE
POSITIVE DRAINAGE OFF OR AWAY FROM PUBLIC ROADS.
2. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN THE TIMEFRAMES OF THE
CONSTRUCTION GENERAL PERMIT AND AS DETAILED IN SECTION 7.3 OF THE PROJECT SWPPP.
STABILIZATION OF DITCHES (FROM TOP OF BANK 1O TOP OF BANK) SHOULD BE COMPLETED
WITHIN THE SAME WORKING DAY AS THE ACTIVITY COMPLETED OR PRIOR TO A f ORE CASTED
RAINFALL WHICHEVER IS FIRST
TEMPORARY STABILIZATION AND RESTORATION FOR DITCHES AND OTHER AREAS OF
CONCENTRATED FLOWS MUST BE WITH EROSION CONTROL BLANKET AND SEED.
TEMPORARY STASH I/AI ION OF A AGRICULTURAL AREAS SHOULD INCLUDE SURFACE
ROUGHENING AND WHERE NECESSARY A WOOD MATERIAL HYDROMULCH. SEEDING OF
AGRICULTURAL. AREAS IS NOT ANTICIPATED DUE TO CROSS CONTAMINATION OF
VEGETATION SPECIES AND FARMING ACTIVITIES.
6. SLOPES 4:I AND FLAT TI -R AND NON-CONCENTRAJED ARIAS WITH 4:1 SLOPES AND I'LAIItR,
INCLUDING BUT NO1 LIMITED 1O CRANE PATHS, COMPAC I ED SHOULDERS, AND TURBINE
PADS WHERE VEGETATION IS TO BE ESTABLISHED (NON AGRICUL I URAL AREAS) SHOULD BE
RESTORED WITH A WEED -FREE STRAW MULCH OR A HYDROMULCH WITH A LEAST A 9 TO 12
MONTH LONGEVITY FOR TEMPORARY EROSION CONTROL Al TER APPLICATION OF SEED.
SLOPES AND NON -CONCENTRATED AREAS WITH SLOPES STEEPER THAN 4:1 IN
NONAGRICULTURAL AREAS SHOULD BE RESTORED WITH A DOUBLE SIDED NETTING
EROSION CONTROL. BLANKET WITH WOOD FIBER MATERIAL. ALTERNATIVELY: A WOOD
HYDROMULCH WITH TACKIFIIR WITH AT LEAST A 12 MONTH LONGEVITY SHOULD BE APPL Ill)
AFTER SEED APPLICATION.
8. CONCENTRATED FLOW AREAS REQUIRING STABILIZATION MUST BE STABILIZED WITH WOOD
FIBER, DOUBLE SIDED EROSION CONTROL BLANKET AFTER APPLICATION OR SEED. SLOPES
GREATER THAN 8% IN STEEPNESS MAY REQUIRE A GEOTEXTILE LINER WITH RIPRAP FOR
STABILIZATION.
THE BEST MANAGEMENT PRACTICES (BMPS) CALLED OUT ON THE PLANS ARE THE MINIM
ANTICIPATED CONTROLS FOR THE CONTRACTOR TO IMPLEMENT FOR COMPLIANCE Will -
THE CONSTRUCTION STORMWATER GENERAL PERMIT AND ASSOCIATED PROJECT
STORMWATER POLLUTION PREVENTION PLAN. ADDITIONAL OR DIFFERENT BMPS MAY BE
NECESSARY BASED UPON FIELD CONDITIONS. WEATHER, PRECIPITATION. CONSTRUCTION
METHODS, OR SEQUENCING AND ROUTE INSPECTION OBSERVATIONS.
M
West wood
I,w.n. (I2(1 %I1 IOS0
roll l ow MIN 91/%IS0
10110(uttP Ural. War Sot. .101
Wain Mat.. C 0 60W I
wtvwtndp. con
WetAnood Halnwlul SPIVS vs. in
•11!Alt ititiV
BP Wind E nergy North America. Inc
201 Helios Way
Houston. TX 770/9
4t vrwNS
• DAII COMMINI
A 04/19/21 ISSUI U I OR PI II/All
e 06/2/21 ISSuIUIORRIVOW
[ 09/I{/21 ISSU(DIORRIVRW
X
:edar Creek II
Wind Repower
Neld County, Colorado
4786327 Pages: 69 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
inIedHP1'IigF�III N &ilk "Ill
Public Intersection 17
09/14/2021
47
4773483 Pages: 70 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes: Clerk and Recorder, Weld County
CO
u
IMAM V% lifiCriftlitillirl1/41%1611/4 NI L
k
PROPOSED TEMPORARY CULVER 1
MINIMUM 15" Cut VER1
SEE SHEET 9 FOR TEMPORARY
FENCE AND GATE DETA;LS
i
u
i
PROPOSED TEMP. . )RAiV'
PORTABLE TRAU i :I
PROPOSED TEMPORARY
PARKING AREA
-a
PROPOSED TEMPORARY
TRICK <TAI;ING AREA
4786327 Pages: 70 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III IN 4C? 1�1 WNW !KIT INVir liii
i
DISTURBANCE LIMITS
PROPOSED SILT FENCE
PROPOSED TEMPORARY
ACCESS ROAD
PROPOSED TEMPORARY CULVERT
MINIMUM 15*CULVERT
1871 --
Co Rd 132
SEE SHEET 9 FOR TEMPORARY
FENCE AND GATE DETAILSr-
LEGEND:
G XX
NXX
f—�
rIZCSIeNEs
am —is
E70STING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EX0SIING 1URBINE LOCATION
REPOWER FOR GE 127 1URBINE
EXISTING TURBINE
PROPOSED TEMPORARY ACCESS ROAD
PROPOSED TEMPORARY TRUCK STAGING ARIA
PROPOSED CULVERT
PROPOSED SILT FENCE
DISTURBANCE LIMITS
NON PARTICIPATING LAND
SECTION LINES
RIGHT Of WAY LINES
EASEMENT LINES
— 900 — — EX INDEX CONTOUR
EX INTERVAL CONTOUR
EX FENCE
ro EX CULVERT
—4 —� EX OVERHEAD POWER
EX UNDERGROUND POWER
Westwood
Stow I'm 5.11 also
loll I let lMp 917 $1%0
101 at) (Koch Raab Way. t,a e1Oi
Wnlln ^ntri. CO WW1
K4w.wdp. tom
WntwInri Pioin.nlnal Serval% Inc
PRI PARI 111011.
by
0
HP Wind I nergy North America, Inc.
201 Hellos Way
Houston. TX 770/9
141 VIMONS
DAIL COMMINI
A OM19/!I iSSUID/ORPERMII
I OMJV)1 ISSUI DI OR REVIEW
[ O9/IWI KSUIDIORRLVRW
X
Cedar Creek II
Wind Repower
d County, Colorado
Staging Area
09/14/2021
48
•
4773483 Pages: 71 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III PAK VAIMcuICirkhil:Fraohlr
0
O
CO
CO
O
I III
USR - 1723
• 2010 W, nod Prohnniond sa tin, Inc
tier: 011st;l3 ituaa 1%11 tltttit
74
Cedar Creek 11 Wind Farm
PLOT PLAT
Weld County, Cobra do
GENERAL DRA WINGS
DWG NO. TITLE
SHEETS 2 - .3 PROJECT SITE LA YOU T; GENERAL NOTES AND C RTIF/CA TlON
SHEETS 4 - 26 SECTIONAL DETAIL SHEETS
bP
a!ternativenergy
4786327 Pages: 71 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
VIII P)41li.' 4�I�GIW I*I lye M M�hi PJ MAO III II
Vicinity Map
l
511-1 7-1
r
,u.•. :0 S4411.1
(e1
EXHIBIT
&,r Creel(
Westwood
w.rw..Iw/alsoo1 b.a w.
a Asa owo
is warn 'D.
TONI
MU PS
�-ein
iwm4111.
w+......... a.w•
• at 0,••1� i_ _
CWw
S
tarlstaa
-
-_
.'ei:1venergy-
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Colorado
Plot Plat
❑r. June it 2010
a.... 01 op n
4773483 Pages: 72 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III jflWRA1111:%7 RW' M:?CIh41L��K�4Y4�
a2019 Waetr4ar Pra/arrd Sw.bw.
I
I
I
'w
r
.1.
'1
•
•4.x'
3
4
Ir II ius„1f t f'Jw 1 1 P LI1.iiiI• SAWS COM ern MAMA OSA MIMIC
Vicinity Map
1
•.j 1 a1
•
•
La...
b
tin
•-.1.111 - • -• t,
S--
1- i
t
USR - 1723
1 1 11-
iI----Lele.........-•wr"•••••
..4; dieser rim
•
It.
San
a
,r
1
F
7
•e
•:
General Surveyors Notes -
1) a nrlq• aro se meow of w c' l i tier, Rini Call+I. Sala Mu r. laws Mee Santrr awe•
IMY/007 SC) t.• woe or pot aeon N M W. M..w. MGS •..•beet$ 1414. (e sIMrM0 bee/ in .•r•e••
• f ea rot eel ..I0 I.9. 4 ante... frr/r I.+. J and 1.117.1• ,r..•rr.t aiee eM •. ratweM e••w_a. Ella)
'SW) PHA Sww•'9 ....d •S tirrl' t E•
.P1 Pe Ant era.... Sere He waee. On/00M 01 01,1411:1‘ e7r77N•O'A/C a.. 404:440040. asst
heel r ea l*. 0 (SON .1 MMrr.'I•M H paean Peas a rtil
J) .w/._oi'•r ear rye Pi* M.s, eM• Maned of ;seers w.M.r •p Nn..ru 0.0.0.r.! Jess w
4) e✓ ew /w.• M NOW. re. •••w are *!Peer. a Set st • I w.ee Wart Jr .e: •.w0 II*0 a .0000
1•�fa/ arnwwrr W M,ryrN•r Mete M•M./ e! F. <\vM• rr;nw•=ri►►^w'
SJ 144104444 metre ro MSS a (•ti.Hy IM P.•ea
4) L•Jwl .+awed, . rite$', )ww•• a sa t...ea.' per se ..I. /.tree Ala ewer .rr••a• saws
7) IM M•.'r'AN ...a ~in ..r err..vrste, Se eve sea.,. ,.,..Maw .Y r`.rr eery. r+.• ✓.s
wow r gkew•lr And Me mow.. race Ors nirvana d rb.11 .Ire.. a. M. to I e+. .• M -r4 r
prat•_ S. werP {/Neer aw N: .e•w S I 4 .r.er.Marwt ..new s er an w the pear Peeler
carted rile w -N•4 a t Met Fr an s- r r aos/ww, r pNYM ►•w. nr...'e. ..enter hid
ors► Imo ti' ask'••, rs•ta tr..•.►n ...wan Moot ...Ws MSa77,
Prop-aur
era Gown fans
swiss I. balms* totem Iege 17 Smelt S•cliwort. &I 4 4 ranW '0 Mir" Have SI Iwd Jo ant./ l 4
4 r{ rw+Ip It cell\ News 1• INC SWOPS '. 1 S 1 e )• A I. Ml 'r. '* IA M 11 r4 74 f 71. 22. Si
as at. 14 it. .n J'. aL 1.1 toe 'I 15* onto fl *.i. 5..b., -1 1 IC It, 4. 1.1 Jt 1* '4 M 1*
11 sr. Y. leak. rr Me* Man pi b Amen Scree, M 41. Al rani. 111510. Pell. 91 Met. w'• Ache.
14, a. roes. I: ,wet nor iv aes• IF raa In. ✓r. — Camara Cse.a.b
PsiOnsolliS
*KW I. 1 1 a S. 7. 4 $ reel y rC wen •reyr 311 r•.•. rase, a r. r0 of ri holey b ems efo a
St Mt Bevels e. S t Fri, PO Peel., Pep H e.. Z ear Sarrtae./,• t0 liraPrq SI e p IAA .•Nero .
New. A.•. Sr wet Swr1. •t II to :1 Sd. . If N. rr le . Ae.M L •..l 10104 1•0 J1, N.
,snip It r.wae 4' a •K' one Su JJ Jt Irw.wew II Mures r1..9r et' UAW sr sea IM ►A. SA
gavot Sores.
At
1
nr
net a
OAK W COST SAY attl.C*N7r
clue w Pea rte* w.l lw Set M Cw,e, C.sawa_ n. wW Canes Ca.NM Mee twee (NW r..•et A. *lure,
O.r•w..we vow M um N 4taaa bin a.. Aeaeaaaet Slowr.w w Ms at .inn.Ld A.one NM I clop W
Asir SA 10:0 - `_ -
- M
cdt
nap
-, ,
1
rutair
'
;;
— 't
0i rsitt
beIr CVVJJ v WOr-YI
94/491/0
-IVPl!' aer air WOOS
ne 'rrey'r .oiler .'testy arts) w ray arm N a. Sy boot Alwls•.re Pun as w• b bad Ire a•erlln s'
Steam • .•..*-J Mae. nPe . Pei/ Mr M :i . c f 7Y(!e
:!L APtS%•a9
v
CIPMCA now
n• r I....enil SO( MY Cower Mews) CV-.aw. on n9..a roan and Illsa wawa .aswararJ k /s. NO. ei C.wly
flew tsarist CWWW4 or A cr•ww.44 w. ewe» .••.r airway" ire 400 Irdr P.,.a.nr•M M VW Ur n,
Anew at roan anal b.r.od Pis Pe I .Nr vI _idle xi all rf _ 1•`R
/S. y' 1 y ,.e .I0.. INY's
WNW
$t
n1► e
nil
W
Iliestwood
7,0,-0001
w t+.Ll. AN •Mil
mom
ma
Tali NU(
OW ion sir
$WW -$411
r an/ S1SC
Awn _a_t-1 t1
inr<Wa
Calif
a
'for
Pa reel r -s.
45
Cedar Creek II
Wind Farm &
Transmission Line
4786327 Pages: 72 of 106
12/17/2021 02:55 end Recorder, M R$0 We d County y CO
Carly Koppes, Clerk II I
in !PFAU
I APO UP It1+1,411041,11411
i
Plot Plat
Us June 16,2010
as 02 or 26
. ..Y wit �. �•
4773483 Pages: 73 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
io'#�I��ititrc��,i1
VIII MOE, �144E
i
i
e 20; 0 Westwood Professional Services inc._
I IIN 11111 INII, Id Pill �Idl Will (III ' III
J7Jt.., I I/2ory3l i it ZA weer Can, tt
3 w h fl is• a' O b ices teaga(Cate a hworat,
USR-1723
Development Plan Permit USR #1723
Seto Spet Sc 0w.atapeuert Roo Use by Sprve, Ae.na. Puma L•a,.laptneet Stones Cad& Cress 11. LEO. c/o 8P Mod frusegy Nartn
America. Inc USR 1.775
I A Ste Specific Desempm.nt Plan and Ors by *Wife Renee Poona if 1723 ii (Oro s oja F«dity of o Pubic utt:ly (a wind energy
facility with t gar.eroting opacity up to 7508 megawatt, (NN) are wed a 23Q—kftotcet (►v) erectrec transmission in an
interconnection fealty to he into an .rnf.'q 1: 'mie frunvn.ssion wrw, ewe"; cGI'tcfer ftansmifston Mn. up to rile. (D) pe^mgnet1
d0 —meter n..e.arotobay tons, air (1) nc.rta!ton. an cp .rodent and mon tenant• by vwng/foc a.t,, leeng *NM brie (1) teerpa►vy
batch plant and reneLUCt,an lat4dy) in the A (Age ,curtufalt Zane Destnct os eKticarwt w' Me opplrccla' mafes's) on Me and subvert
f. th! Dewt'rieat Standards stated 'Wean
1 Appro.•pr at t,n pion may create a twitted properly eigAt purtuort to Section 2S -A-10 at the Vela County Cane
J 41( figura and soma remind, us °erased n the Solid wastes tl..eposa Sates and Satihtim Act. Section -W--20- :002. C.R5.. Mr ea
atom and removed 'sr rind d'snos& at a manner wn•o' protects ogarnd sb/kce one relinSalew contpnesetkin.
4 'so prrrone.'t dsposd of scatty seed be nonwhite of this mote INN PS not neay,t fe include hose .motet g.cJcolty ewdvded
Own the dehni',on of u aalnr waste in the 5014 Wean Ouene S•bs bed sode•f4r Act. Section lO-19-little C.R.5
5 Nude motenrs rag be handled, sfefqX4 one bibbeent or te 0 made that contras fugltln dust. bgif:vr oort.eufate eendnoay,
Weeny dyers and other potential nu4y.ee conditions
6 The xa;can is Mae aner i, eccrdonc• 4Mh Ike opprodut Sent Manning Pion
• fugitive dust and fugr(Iy, patictda'e emiss(a,s rod be controlled on this sift /M tocltty snot De operated el gnom n . tern Me
tppesuW Oust Abatement Pr or all Genes
d Inc oc ceteris sad. 'Jinn, to the maemlWn oe m sstte noise levers town N toe Fratrrl lone District. as astinebtod N Staiga
to -9 •-.1Q of lilt Weld C:rn .v Code
9. A . nlrieu u:t Ncfc' ,,.'sf SQOtWe 30.0 ac p'u.xted get QY'nhlg ,YI: trefr) Piesviaeti 'µ• 'n. r'.rmcn.rt r^CMIy
' ••. t .,.-- . •.\ C,. •'e .»... ..' eater CA. Me'cr.t .e
. • ... . - Y, '. • f 1'S ..!Q:e f •".^t -e'. .•.t:•., n. sn•w
. L r, • r -• •m•. • •.\• , y, flirer•C w ., •'e vv.(
r - • s .d:t- i .•j•••,$a eer.• •4 ty 1!•• isdrr's:. t.voi.t ten, t'
enco.regee fr telt Mee arnPv.q new Chair to conslrntc ton no pr.odlcoly
;;' • • '. w .-. •.• v..;' • 'e .:y hr ; •.t'. •.t
\}.ivy'.\•• e•: tr .::er •...A;.,r LX leiVre •rr:y
• • rC . 64 (it,- •. . yen.• •asern" . .f. ,c• ever•
'••J f •.• ! .. X:erne r. •n(• 'tf,tar,rid' .t \n,a'i•J
fhreut•e
1t Strove tapped for :nor hrceit, shat be by apt.: syefre Any septic .Jstem Is:ated on the waosrry must cenp'y .'Ih aft
ro.'scr's o/ the Ind County Cads, prtar'n9 to M.Aidvaf Sinop 0lpoeo( Syetere' (15.0 S) Regulations.
17 8otttea eater Own be bridled for inners awing construction et file project.
IS Arequela parer'r toter foci"Nee (pelme torts) and hand raw*" rat MOW be p'oWde.1 .sumo the consfrvct.or at the
propel.
le Any wtt/W r aariortimt easing areas SS rew4n ae etevw.l pad prevent dsch&aea frorr, drum .oehm pin Me wowing el
'i#',C??s ', arrrrlv:•_e .rte the r-eeet an? minor/em :9 the Stier ata'fy Crlyte Cnmm.s(.oi ant the tnvvoc•nelft$ Prm:.et:an
15 A.• :hQr.-,i$t ":,." :e ft:rr:.' tt Urc. rte 'a'e A"4Ne,0v) suflcce. 0n? r O(CO''dance art :nil mayf.rl:tclu'r! I.t:arwneeithat•Ye1b.
1R If uppricabJA Me opoferes secs iDlen v Sfortotratto Decherpe Pr.m'f from me Cat&oda Department o/ Pala SOW tn and
(nwuMtent. Miler Ovate Canine Division
IT the fepticont Nat comply ono oe previlwne a/ the Staf• and rywna Ond Atonegraund Storage took Rtgetatdne
15 Any fern ten aop'K'onrt .a Wave the egnt-of-ao,r w cross the right -of -dot a Ivied Canty right-or-airseny airs shoe be
g' pigs petit spier afa be rauv
eed 4w era e.eeaqar +t an o.aidth hams uNYNng county roosts oe rphle-of-.my. The
oopt.cent, scruff contort Me Wad Counts Public flprks 0tteartme't. p.0 Eke TM Creete, Cataodo. 8063. of no-at-J7Tti roc the
net, nil?", peewit Ih4 permit seen be N aline proof to ony work bean; dant wino me tort -of -way
IA the °apf'can' eye comply with Me tarns and conditions Of Me lmaro,tmente Agreement
20 Nye eat be no 3!pee'g rte poring al etttupweent ce estirarr Si mento✓ted County 'aO0W ill gephcanl Wad Olaf am -site
lacalians and pirate right -art- sop
t If o sow, -vie( a depllred. a I5 -inch cortigotea meta' pp. a the County's module: Pie rebueemant II the cpptrcont CeOnSdn
to piece a lefeee n,le1. Me NW Cans,* De(•oetrr.e,f e/ Public Wets shod be ccnlact.d to adea.,otely in me clwwt
22. The lotoffon at scene rasa ma be oa•Yet tad wi(ner the 'raw, aNments Agreement and through the access Oann.lrnq protest.
73 Adequate tutting owwlli store be decoded of ea c"r'.t',ces to accommodate near trteat motddtal!
74. fin oft-st•tet parking era wodeng lanes vimr;rt tie surfaced with ;navel or the en••'.dS't and Mae be avant to present Q•anoge
Onagers.
75. Piesuo. t to Chapter 13, Afhcties r ?no h of M. lead County Coo.. sr nos'ays send e5Mf on the properly a DacM'N estobtvhad
Its a rosier at Ins proposed de.erccment, the rpeetcy!Vf,rdawlerf snot be reprsale ter rut'.' 'g noa,Ooa Weds
26 Me rlapi<r.ts shut; user e the (MUr(9) theme Minva to oppr,pr'ately otgn Constructing, tones MO snaring* odper' to County
rue*
?.� The redone& floe poorer and run-off ,ro.,nts red 0e mortared on the vie w ova. o ~new (hot A ern teosanooly prettev
the natural thwarter of the sem aria praetor sr peaty damage at the type generally of WOW.° to earned rote and lewavty increases.
&Wres s, eoncen tratian a,d!ar unfuonned pointing or storm runoff
2* The .ppsicont recast robe into conWorolon stafm.arer cap fwejquant,ty and provide occoldergty ter Beat AIdAnWnetil Practices
29 the gort.cants NOti Okra an frown Contra Ptcr brit/ ear lotion .1 astablsfttfl in the we
30 Tracesnq pods oft rfqurea at an constructbn baritone seeee tare vs heavy traffic abating constructor a•Ns ante d County
road the purposes of fie frocking pant .a to key mud and deters Nan beating the site ono tepckmq on er$ing County roods
conturnnotng Inc rusting raver rccars) with mud acid dabria
r' A ,.'a.cr.t: ,,..''•.': !v p. tt at tern•: Dial to fee inn:.••,.:e.Mi Of (Pip .a e earrings aid en, cup rwi4Ay y RtruMw.i at
!' .. - 46•11 •.•'.. - F`•.'.:..' /n 'd wa ,.Or tO teat eiblOte:f7 "Oa. tr: ,err• Me Ly'o. :.m Nc' WOO ...ore!'. w'1•:
•I.,'r , •'••lest .. .:11'4 ; :n').: C^ -)•f. /a.,...'aIM!::Atlirn fu'.tts, at ricatIc, ?.••9 ✓•n •.primer: i. fir.'',. , w.„ rn•e!
:.. v• , ..'u!: . •a' •.. .'. -,•\
.. .•%•r' wen. •te.&.4. 'LC'•: I ::- \,:• slab t• m.'.I rent N at.Cire '1._, ■ V•:r :a•e l.w4r.d. rice. • '°t• -q. .•r, t; '11.1.0:•11• e:
as Cut.'•:N el 110M1an.1(:Cettan mutwcn
Jt (Ifeefive anus? f, 1O0J• auddn; perm is ,sauce On Me fats won pa required to inmate (o the to st'uctws of the County- Mide
Qooa Impact fin Prefeq'r
.t7 CllecI've euqurt 1• 2SO.S oudwbg berme: issued 4n Its. proposed tale elf be required to adhere to the low dructurt of the
Carta Ceeent+ra'I meet Fee end the Stameolr/Oranaye impact lee
JO the properly Derr or mrrota sn'7H oe re'kocr./ble for coefplynq Milt •rte Design Stro&ds 01 Section 23-7-240. of the Weld
Calnty Cods.
.7 1'.e proper'/ owner ne nhrrtor i.h]tl fen respentiele tar eo yOjenQ with tnf otwotioa Standards of Secret ZJ-7-150, of Me silo
. ..'•f. :Jet -
.fit red .tern','" .TAO. ,'a-lpry rile a' a:ash'•cab'e ',IN.'S ?nil 'ttqu,dinda of Srof• and ('ectru' *yentas on: Ms Pe(a County Code
.59. IWM Cameo Gorrn'enl yawner( Mat be re lea seven onto the property al any rnscrtob/e time n Cider to resew the
4Ct'Nfgs Carried Owl on the prtperty comply NM ,n. DONroemPit Signs• Stilted Ann rand gel OpprrtaWe lade/ Courtly ergvloflatS
40 Rua Ur ay sipec,a Row, are. Moil be topeted to toe pone shown hereon and governed by the 4wegone standards and cm
Qypegapie well Coc.nt regWgtions. Sastenlsll changes from Me are of 0.,w(apmw,t Sta'Qsrds of Mean a elated. Mat recur.
oppro.a( of on omenQmant al led Penner by the Melo County chard of County Can'ni.wanrs bear eacA changes from the plat
Dowelopn,tnt Stanoords ae annuities( Any °Ms changes Walt be feed In the arks M Ma Ppalment al Plainng Somas
er the wvprry a.rur w geetotr shod be responsible hr compltw.q men eft ar is. 4seego.g Cse.eslop'nsnt Serfage Neneenttece
meth any or red taagos•g Develop'nant $londords maw be reason Ice reweottan 0/ the Permit Dr the 80ord of County Cernmiaa're
42. Meld County $$SI not be repponsibe for t,e monisnonce of on-s.r. .s'anaoe retest hscjreies
41. tlentlapsr ant nee an d'gepan0ent engross' to yar.Jt s estimate of Inc savage See Of Its. turret (whine( acrd °asocial&
technic oe woe as at' eltt,wle of the d►Canm'APrrq reciomar.en eases (ar lA. peopct awry Ave peon salc.wel yew f0 of the
orojeet I( the decem'nsessorsrq and raetamof,en costs canna (ne estrro/.d e°/ridge ,clue DI I. tonert turbines and associated
ta'ctl/lfet Os.tllfi ' eel net rat ngWa Jes✓ghee for the difference bolero, the sol.vpe ,edge of lie townsturbines odd oSlac,OteQ
hanot'es end She scan russianng and redomofmaw costs
the
oe
W
Westwood
Viha are w.t..to.l arab Inc.
tees Anisren' Orley
se.. rv.rl► YM '1444
moth
ra s
mu Mt
'saes, SIN
e1t-41t1-st72
:•er1TI.1IW
..ware ersawaad,sa se
Pala
Cat
Lases(
itit!.t�
uesit2eiriS*e
IMO
Son
= . 32—
tarr,.
.•a•.t'tfergy•
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Colorado
4786327 Pages: 73 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
114 I II I
Plot Plat
One. June 18, 2010
Ma 03 are 26
aooern}I o1e•.C) see
4773483 Pages: 74 of 104
11/05/2021 10:e5 k AM d Recoeder$,OWe Fee:$0.00
County CO
Carly Koppes, C1
III
� !� .rNl�
i
i
02010 M4steoad Prot•nlond 5 r AFe1. fr,&
SEC SHEET 05
•
f.
•e
/1/4> fie
7.
?il�l'1Ut{I ,;►i<<; lttu tit l',") f
% ilti
4yrsi.`(E. R W. m C 7.1C tiro
Sonya Rtercer
.y�
•
. r
0 r
USR — 1723
ti. A a MO
Pw ICs.a' FH.. ♦ G (i. NiaCE n111 IIG7i
""4"."c6- Myna Or W
., FRtrate J at.ra2 2 sr r
bbt (,r OAT O Ant 2tl 2001 k -- —
SxetMAN d a »axe • ,
ARcr1•e C. a SICK!'
(ref
Cao lRUSRFS .7P lit /
OA 0 ail 20, ! ) i . r . S.:: . f ti
sP.rr�ner6
. 7�:. ...Pe
I�
et ye-
�� M0.frU �
n Eft ..1•04C. 77l(fum 1 Otter
••.•• a .• t 4 r001®
-- n.c0• ma .7 .•tt ••f
SEE SHEET 06
�-1 t"d C. SC(' .11
41grtNY 4a rkcKt t A(Kf)tt (.;.
(7- And TEES Cf. M "SUSAN%J
nor ®/500 OA PEP AMC 28. 2002 t
X f rMIAN J. a war a AHttsi t..
amt GO-MIUSrfi'S of TN�' ARUM- C.
a1.$V r(E IlVS► Cal) AS 21 7602)
• CP 132
4786327 Pages: 74 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
rel 114114 ON YlPiTJ III II I
, sat an
•o.P
tWa (151. -Cope,
-Oa If a
MOO
1
9•.1 W9•
'^•r
SEE SHEET 23
Property Descriptions:
A. Of Swt.0o .CC. ro••iMp f j North. gams 57 *.tt of the 6(h PM. n She County o7 Mad.
SIN* of C. NOraaa
Carfob..p 6444 oast mete or Ins
Ae of Section P. fowrle,Ip If lforfn. Pays 57 Weft of me 6th PM, Cwnty at 7fhtd. Vote of
tofcracio. soca: (nose pavans Conveyed is ?her V OVf".nt of M.ffheoyt, ST010 of Cofacdo ay
coats re.:a'ded Sepeem0er f6. 1957 ., Rot* less of Pogo SWC ass Apr.? 10. INS ,o O•+ 1587
o: Poly 173
canwoinirp 44,28 oow more o Ewe
(hp ;$00(h Nut: a .ore Yofthnys/ ;Coffer, the Warn Haf of the SOYtnent Cyewry, the
So..fnseff stater at fore Scythian, ()wrier. the Scythe's.? Otorfte and the C07t Alfrif of I O
5vvrneest Coin*. of Sect !OA 2. Tarrnu, IT North. kanpe 57 Elba( of the GM P.Y., Cowl" of
Mae;{ 5?OM l Cofrodo
Cr,rtamM9 .1274 art( mof a toss
GeneralNotes:
I; Pr ne.d a...iwe an ••7• r✓.M•. OffaSOITIC owass07iSC. 066110Intage me odonne02d0. saint
yf:a1.• .. e.fr•.• !O,t !' tarn.. a 5% Wrfler nit ponet. R4µ• R•7.rtno
is
tY 3'C•f►.9•C .y' .'7p
•••'•• 1 .. • • . .• ..rr.. J.J./ . fir..
1p •: ... O. .P.Ir i..rt N• •.J•" ..***•••••
A- Is-. /•Y':' • •,...1 . .. r. . •w. •.•• :.t •'•!I"N V.e•i% fir .. ry,
.rt•:a •.:... Y4 •10 a 7 •••}. .0 :. n.. -t ♦..e n w1'•I.
OIe• but. P,, ..".a*•S.IM: dei r.r -c—rf !a.at the Mer•rnse4 .r4Oot M••.•• an • I.. 4.10 I•r7ria.
bath* etfn•1O1 re* ass CSf ty mot ,Mt we Ioru7N 04 SC4WSMJ• tat oofolowe non mwnl•r,oe OrNob- orb
9•400••* tar.. Asr p./r<etr leas. Mr .••.e'...•e •.1a a flint r.ent.► 1033417)
9./ 40 beetf. Ore ono bins.• no A. Calmed. ;sett P7..• COUwwn Wen; Wass. 1tns. a 9•f. 4e.efcer Cols,
MMrr7W7 ettt;. 714 bee ✓ for awPI.t a Me re bears.* en lnerasnt. Yale (a .(O.sl•.• err tee .sofa.. n
• f has pc pie se spy 14 stomp.° Y.)e 11104, awl t?JtJ' (e .(Pttrd der at r ranee(. 11a11/.o 1P2
1lnn! 'Ike be.•1'.f Deng •S 67'rf' Q" f •
I) .ocosa.r el Set Chdotoo. t.a., o. Mt ., o. &.iron A •e".4 *,e r Set 71 -J -A(0. serest .-C a *el
Sea e•••••.n Ret o••a..AO
71 S.. poet 1 of •O A7 ma e... Ca,.tet.et est ne.. Ise m. C•••••••• hope[ CleuWin mad •J/t••• PN.
/, ass ..,.•, M • .. r S. r..tVN•M/ Iv tr. .len•••••r . 0 .Ie••4I1 ewoge 'IN:b •Arlan
0
6J1
W
Westwood
.IYeb....e Ple1•eb. I Senn% I t
is Mne11QM
Eden Plant Off 0304
MO*
/Ax
MIA •Kt
1.14314150
163-41 7902
1#►•A7 at se
www•wrt. or
4.10444
1/074- _.. _ . .
01•4 Mewl 71.11)
Preparesi tut
;,reneigyr O
GI
V
O
•
` S
-ea
Wit
• surf
S•4 .u...
:nee?. YA
itit Art Kr
1 Yt MC 9•Y Y•'
MYR rM,1<' a faPetluo
!Varsk J s+,'bret•dNO
new wl[w1.Ile
MON Cate
OAp.:4 sg*D
•a _7 Ise
■f0.;.001
0Pla,rr 91 w.a..laorlhr
ftivtrs !WC mRgry .fM/A.C. t
.(MORE •I BOAS
aMOrl S1.1.7(111 My•re Wr•f•17
a'eus.p/r Of Mr IAMB s.UL or rest
eons •+iec* 7aaeol•r
areal Ian( Milva4.ar
sleets Pliondit rfA..n..r CIA .CI,
flocs Agaaoity .can SPIV
OL4041 .eo osVO
Min( l0•0 AY"
a as POIOW t,QucRath.
fa.sc7 :.e/
N•oM5 s•st#GYP a4eK•0
lOes nyln. con(
arwJ)rf 1 r 'OPf• 4 L.C. Its
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Colanado
Plot Plat
amit June 10, 2010
%sat 4 of 26
.��:<•'".A..-_ ':..•.4 as.
4773483 Pages: 75 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppel, Clerk and Reoorder, Weld County , CO
■III MrdralkaP PAI. 11 MAIM' IRMA BIM
I
USR 1723
•2010 Profts.onel Note.
2'
--1I : r= '-`J - -
1. —
5£E SHEET- 07
Ii
OMR DIG.
SEE SHEET 06
4786327 Pages: 75 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
NAB 111
Property Descriptions
General Notes
w
Warramod
410.11.1.1
.w.L
tee_
101.0
1.0
Cedar Creek II
Wind Farm is
Ttnumiesion Line
Weld Ca®ty, Colorado
Plot Plat
or Jura IL MO
.... X. X
4773483 Pages: 76 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppel, Clerk and Recorder, Weld County , CO
VIIII �.rI�YY��:ti1��W�II��+�Ya9�f�i�lr�+�11f��1��S��K�LI1 II III
USR - 1723
010,0....... m.....,,., 50,0•01. Inc
I�IM�011101mt0111d.
SEE SHEET 05
SEE SHEET rr
71‘—
t ,--\ •
amr.
l/ ! uru'aw ., // s %
4a__1_ __-, %
$
(f
1,5 C .. T H ' HALE
ori
4786327 Pages: 76 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII IiratinAgIliklinDNAMITIA4il4wlti II III
SEE SHEET 0
anfa.r m--4 v Ls \
.. } 500,4011 lES rrow nal. WED • 4 •
Mr..
2, Or WS, careo Awl hi JdW O
5!£ SHEET 29
t
I 7
Property Aarcrfpliottc
.. ", N.M. ,I ..m Amn ...1 m. s.. v... m. c l el w.. se...
Carew.
wnw.. 9«.. .... ',moos ..,
. a cw...w•" .n n....«. r 00,00.. x...o sT *at ...n. a. v.....7 me cw,v.
Gera, 314J was ..s. CI HU
w....y .w .n...... AN
General Abler
r, Fr ......_....,._............., — ��od.g
Cr as nm .em
wir
wwr. r..Ponfolkio. 001 NMI
we.....•....,.......
Cedar Creek II
Wind Farm &
TYanamisdon Line
Weld County, Colordo
Plot Plat
or Noe V, 2010
..r Of ox
Pa: 77 of 104
171/05/203 21 10:54gAM R Fee $0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
1111INFIIII'W+ail:I'A4N,N IAA MM;4114314 .14ilik �I III
USR - 1723
uirman
in .,,. •....rw
SEE SHEET 08
SEC SMCEI 11
4786327 Pages: 77 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk ��ll d Recorder, Weld County CO
F1Ititi�� nR NICIIIA INII lt11111
SEE SHEET 05
Property DWcripMmur
s,7.,1 aeo.Io .0) r.0ro. Se. Sr war or MO eO Pe tires Cw..yo wee
.10.4 oeree Melo sr we.
0 . At, Mary1 V w 0 I el . IT P.w. n m. Cowry o
.07 or ww
.3 ? A 0o.n.71r SwIt. u,.., 441 01 row am P... ,� 0. C7.4'
e :raw or
C.06,lq ,r37 op. mw. a I«
we sn. or „may_ Il, 77.000 0 I.. II.. Sy I..1 or ln. [1n P..[ Coro. of
cmrerw. ,r90 omm men ale
General Notar
,.....1 a .. nao .a rr.. r.........r..
softer
71 . of Olos
1200'
N
b�L
iOr.4C *MN
swerro.s. ear
ar
m...AMU*.
orr=orr wow.
w.. « w...w
Cedar Creek II
Wind Farm &
Transmission Lime
Weld Comity, Colorado
Plot Plat
or Id 1;
0 va{
4773483 Pages: 78 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppel, Clerk and Recorder, Weld County , CO
seed Rolm.. intl..
IIIIA�MY��110WY
Property Llscriytlaax
Cm*. ema we.o.. Me
smn , el eon e. Tow.. ,r Norma non n Nee or u.n sm nN.. County a .aa
General Nodes
478632Paes: 78 of 106
12/17021 02:559 PM R Fee:$0.00
Carly Koppes, Clerk and Reoorder, Weld County , CO
NOM 11114,14.*
MAMA sa•YOZI.Slyi
err
mac..
',energy cy
MOOD
- MAMAS
1••••II poor. Renew remago•
*same ay. rem
Cedar Creek II
Wind Farm &
Tranamiesian Line
Wald County, Calatado
Plot Plat
um. Ism 12 WO
r Moe g
4773483 Pages: 79 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
USR-1723
iet�en�n�uusa�au
0 //.1161 6110. YrgeriaSSomw
POOP
NW* AS E'Sr100
KW:
4AStK 4044 ffQM094
�
/y1 0 R ' I Mme: tot"-Mv
-
L II
SEE SHEET 13
POPS
4786327 Pages: 79 of 0 00
12/17/2021 arlyKoppeOClerr5k and M Reoords$ Weld County , CO III III
Carly Koppes,
Property Deseriptkeue
Corta
c..row emu am....+ r - Arrows r« ,. mareOa Er 1;1:1.,01 Sr e/6 0. Soot. rL oo. * .r mrff• SO oho, or ht. If. Pm...
mtw..AO song mw« MI
D. Ott
Sr t/4 el 16ohm II. rowan. 4r MO'm No, 40 .W of w Om P.M.
lmf*.A l now ..4. « Mw
0., e1 r4.w.a If .morn. Y OY
Moo or Me O.n P.M. .M Coto
Ron, C
One... 314.3 a m"4 « w
u « s«rm r.1 ro.r.My rr 0.0 4..t of .rte Oro of M vW Cwnrn Dor m..
0".t.wO..J 10 a.* ow. or Moo . ... .0611 .. n...n..r .r 4.333 ..
36.40..4.. JOIN 4056 men s M.
Cenral Natar
yal ..00,ann. tow ....6.In, ow ..r.1..M owe wow oh... rooto
aa�
ear
.100 1800.
thrt ▪ 400400.4.0
Crd,._.—_—
Moo
b.rl86F. 4M.r
Homed .M.
foam, lave:
uwma-
Cedar Creek II
Wind Fenn &
Tranamisston Line
Weld C/nmry, Colorado
Plot Plat
o6w JIM at POW
n ot. O/ 0I m ]MIMI§(Mw.".
4773483 Pages: 80 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
'Ill WV! r�1Ih'I�IfrS�'�I4wM'r II
USR 1723
Ilmatt ust9giidlua
SEE SHEET 22
o. Jun. II. WAD
... aaai
.4 Le WSW
.1.44 LOWY
MY6 AS PO
Y0Y6Y9
J% &OMSSK re:.
• ——=s�e�
rm
.7/err
rs in a� r• ANY
oe,a
AT 10 r Y1,rmwrONtiJ Y
•teaarY�eihriYsion`
ram JW..Wp G
w rt+
Property Deecriptionte
IA a s+ra..r . . Ft P.O. Ro. Woof a r.• AM r.Y. Y N. r or
m.r..M .ter omit +..r.. Y.
ew▪ er a rloct;n o, om.11 Yom. Ron/. =r wit N n+ BN POI n no
weroo
•.r..... SO of.. rN P.M n No 4mVa
St. of
pw.wwr s4J of... wino
• Siolo of Co..
C....r. VIA .Y+s (ROW mid=
cmr . SI Y room. 0 Nom. m. M Wow or M. PO
I Y. n rMof. fr. or terr
Gm. of
of
General Noter
• low or,
OOPS
TaLLIM 14.161.•
L
rl➢alal/F•
LIMO
rrIrrr Tar
nFAQ AK
Cedar Creek II
Wind Perm &
Transmission Line
Were County, Colorado
ISO. MOO'
4786327 Pages: 80 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Wald County , CO
VIII VirilALAI II
Plot Plat
rdiW+1L ilhIMI ICIPAMICIIMPOI rill Ilk BIM
M
USR
1723
SEE SHEET so
4773483 Pages: 81 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
v rig MRE NA III II
SEE SHEET 07
777:1S`NE :14
TKE :S:' .. It NE
DE THE .
I'
�I .r dens a
,s au E - _ ..xvblrrt ..
Iis - ,., n:EtllN i�
f•' jY
4786327 Pages: 81 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
iaaret�es„�,wyua�n�r� -
:
7HE s "'
SEE SHEET 25
u
qi
I,I
Properly
444 45 yaw mar •-
General Notes
..�...... a .�....efalr ? .44.,,14 444 424.41 »w. Nr4o. 444 I4•44 414 4.4 44 4 ..• xZa ewer.. M .....
4 44.4
.wrr
:Z 4Z a.�.v
.I+w.
MOM
141174.3
TOLLNISI 144,411
.4114.
444
Cedar Creek II
Wind Paint &
Transmission Line
Weld County, Colorado
.aa 140 moo'
Plot Plat
o.. pas 10. 2010
ire lion
4773483 Pages: 82 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
kirdPWIN.14G L IM MILS Iii MIV' *4t Ilk BIM
USR - 1723
elOID luast000dProlgsbnal Syr.. 1.4
IIIYI��I�A1dl�YYI1Y11
SEE SHE£f 08
Y4'T!2 ,x4..0
SEE SHEET 07
2
Ei. j,, ;0[ '1' , ,-;...P''''-Z-- ''
PEW
/�
1
E SHEET 25
4786327 Pages: 82 of 106
arly12/17/2021 Koppes, OCler,5k and M Recoerder,,OWeld County , CO ,1111
Carly
ioNwrir R�� h��1h�4�ta�I�R 4Y41
I \•
Ffl,j* V Desrnphonae
4.2.1e nawil.
Grlerfl Notes
,.......a r..oc se. "",...wY°'°"`...... ,.o.miwc..nm.nn ....�
101114....0* wwar.
0134.111.
45.66 ._....
M.,,1!•�IAVI, -
m Wry
7.
Ef
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Coked*
Plot Plat
o.. New V, AN
— n a ffs
4773483 Pages: 83 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppel, Clerk and Recorder, Weld County , CO
Igi 1'01141A FACIA N11111
111
USR - 1723
e:o,o ..w, Prole,.
IsIIIII®I�dmuN6111Mmin
g.
e ttl ,,..M» W,•M...
SEE SHEET 09
Property Fi Descriptions
• o.....a, •�ro .. ,.•• .w.a.. West ", m. LW P.M.. we c�v. c:wwo
cmpwM u.ow. . or r
st.ewtii �,..•.ni � �nsw Fw. S Wear a m. cn .....we
ta,uxy vast SLAY MTV d m.
General Notes:
• -.
II
� I
n l
511
ESISSESIOSOI
HALF
4I- PP
I,
htr
1 e6
k"
L
�..
I\
I y
00U: H
SEE SHCCT 15
OIL
" I
4786327 Pages: 83 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppel, Clerk and Recorder, Weld County , CO
1111�14+IiriVI IaWvh III II
!lost — ica
:ieenWearritlw
MOM •Iaw.s.slew
Ome. Mil
MwToOf
Cedar Creek II
Wind Farm &
Transmission Line
Weld Canty, Coloes&
Plot Plat
er boa Y,, e7i
Art Is a %
Tale00104,113 'We
4773483 Pages: 84 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
11111
USR - 1723
.2010 Westwood Prd•Amlonei
MYWM=7�Y�YIGI�MW�01�11®
SEE SHEET 63
Property Descziptionar
o/ 6...... J6. ',of.. rt x.tn,Oa, 58 Ha ✓ .M em v. v. n u. Lou, a mod
C.v./ memo. leo
on . r._.0 In .e a ».,g..Of w.r .r ,*. 6...u.rani, oI..a 5,44
Conloinoop 6.4 ace.. mart or .4.4
ter, ea
C...«., ...o Awns ,.... M.
Genera! Notre
roc
12/17/2021 02:55 Pages:
R Fee:$0.00
ary Koppes, Clerk and Reoorder, Weld County , CO
1111 .rl�4�L'�J�N4 i A11,4POIliiille iNf l' 4li'4Y II II
N▪ OW MIX. SIN,
NiOs
end
h opered
Cedar Creek II
Wind Farm &
Tramoniodon Line
Wald County, Colorado
Plot Plat
d• Jam. y. meq
. ... 14 v b
4773483 Pages: 8"f of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
■III rainliar' INN, KW ti� �IQM+� ' iIYRI hk III II I
USR 1723
42010 14.4.041 Prolnalmol t.
��pIYMNI�IIIgMl0PoItl0
Property D cripuang
mo north hoof .f }a 4,4.70., if no. P., SS D. of fWo Ib nK C4444, of 14404 SO . of C✓..
c_24, m.. mon r xr
Sow.ro hoof of Serf. 2, o..n. 'Li moon. ax4r Y Mr of fn Ix vu. Canty Of Mt( Vote .f Goan
farfnnoq Rae eels mon re
n. om4M 1,. 0.r x.. 444-. 94.9e JO Mt o• goo s, .n, ...or,/ Wo% sot. o Cwac Con.n of Soo. A hmfnn 10 helm, Irmo JO .n, of h,. Ix FM. Count, of onb. Slot. Of C.o..
[1nlLL,fy 1412 .vu nom or low
,..4.4rff. .0 of Sot.... o.nxe fo ..a a.0. SS Woof of x. ax o.,... Coco, of IN. Vol. of e✓.omComo., JOSS corn mon [44 I.
Cwta wy 4323 ovr m.. or 1p.
704 Nor* Oaf S•el,on ?Mel, O.94. Iff WM Co.nfr MOO. Vote
General Notex
.0 too., ...,.. x.- w. xmJo. on Ow, Poo* ...roe novar moo
SEE SHEET 16
0
4786327 Pages: 83 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly
Kopp
iIPQ,I�Clerk
iekRecorder,
i�h� � ld County
l IIi4Vti Bill
WM'
SFF SHEET 13
'�°irea�fya
w
Rkl. ISM 4146411.444.44
bn
a.. IVY Warr
Cedar Creek II
Wind Farm &
Transmission Line
Weld County. Colorado
1700. ,Sao
Plot Plat
or Pon U. 30111
Moe ssws
4773483 Pages: 86 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII IMPAIR;IMILL'Iti IIliii i nomad 11111
USR - 1723
..r.a...aa..b..rr. «<
��f�, ��1�1MrYtCMBM
Pittoerty Descriptions.
+arvMrrM ...y so 15.0, .721,.:741 rF w Ir.Z77) wra s%fir d Ln 4, r0
n, N...„ w ,..m Se, SI *se a. We 60 ... 01.04, w wa
a..r.rs m..r.. mow. Wm
h6010.arm IQ wow 0., se 'no a m. .m 9.. cnw,of
Cet06I. 410!4 so.. nu. r ..
naaN.O.,n AVM m.s• ae..o o.,.... P.. C., of W.
WO.. J921 pew
S. ra...o W wrn, MM.. SS W. a/ m. em ... Lou, W..0.
General Notes
tl
co
J
s
4786327 Pages: 86 of 106
12/17/2021 arlyKoppes, 0Cler,�k and Recorrder,,0We0d County , CO III
Carly Koppel, �
�1 ��hEil IIIii0` 11
sr 'WS
.o no, mar
W
Mlogrud
m
Talmo WINWpw.
MOSAIIMINIMIef MM.
ease
r., o.onera..-----...-.._.--
m,....e r
.energy
41.
E0!_ --
...,,r.,,.,,.a.
Cedar Creek II
Wind Farm &
Transmission Line
Weld County. Colo.Wo
Plot Plat
..• Noe t0. eon
s... r< or s
4773483 Pages: 87 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppel!. Clerk and Recorder, Weld County , CO
VIII a!NNA RNIil5',k'Mh IPi!4Id EI II
•ZDIO .,,rood AM.wbq 5.* . K.
minis nr N!ra
0-4
Property Descriptions
Cont.. nce ems ..,arks
O'
w nk.Ms w oiscar .. .,.a .o ...m ..nw o so NW...r i... s,n n.k
...,m*, .n.. w,..... arks
�qk1114 par ,.,._k.
...We tar m..wooer W.
4786327 Pages: 87 of 106
12/17/2021 02:55k PM
Rs Fee:$O.G d County CO
Carly Koppea,1111 IVAN EVI NAM
USR - 1723
General Nolen
Oh,. suss Ms sr *sr SOMMONS SWUM= SOMOOPOOL nOMRIMSHO *on
...., .. ,...... sr am
tIOM
SS' MP
SMIONMS
rm.*Se
rl
(JOIV NET
Xann. a .r.,....
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Colorado
Plot Plat
ak haw a mu
D k as
iwt`4.e .,•%v-,
4773483
Pages:
/2021 10 : 54
1AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII��� YIG.�fl I'�ti+����1h�Wl�l4 W�h �I II
USR - 1723
.2014 *don Po**. ,..,a.. PO,
liarammainurs
Property Descriptions:
rodook4 17•6. mom mmo m t..
�Narmw+, a g a/ ielm A N aono ,0 99k 44ge 49 NM or m4 4111 >.a n. uv
V e. Me4 ilely e/ wmue
Cw,d *Q ,473 amq mma to Poo
Cwm�m.o.t ownm ./ Saab. 4 am Opp r4 Nein, 'knot v Wool a Woo Cm P.M. to m.
W .gd sgm a cwraae
cmr.+g ru.4 m„4 man or r
'C" 1 anal a [ eam, ra.emo g N.m aaaa= »
aeww. If. moo mom or
w sm ran. a m. c wa s n rwaea+, o.m4o l4 Naen. Nang. m Meat .r
wrw. 4444 ee of mon an r
General Notes
4786327 Pages: 88 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
gill I �.rI'M L' 1�14�11 �WI� 11111
Cl
Oar
"M
Leas"
o Ram or poop arraa•p
993 99999 90.
a99904. &owe
Cedar Creek II
Wind Farm &
Transmission Line
W.aa County, C"Iwpdo
Plot Plat
t -m4 u Woo
P.m 4e a 9s
4773483 Pages: 89 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppea, Clerk and Reoorder, Weld County , CO
���� N��.�I'YQIQ4l:' �'� iw WP�'iL�Kik���RS IC4MCrWNh III II
USR - 1723
WOOS
spospounmunn
F an.s 011 rwri u66J.ww
PrepertyDescri,ptions
.Sear. n.57e1,1
ov..i. r to 6dln Nom. SI 66.., Me 6m .'... W r.g Caw, ca,
o.r4
CmI **Q ]MO w.s mss or W.
I 3 Ja, re.oMa rr WM. Ran, 59 We of M 6r. Ps. (awry M Wet Srn. M
mrrohhit MAO w• mr. s 4n
C
m Jr, y. ..��.r! r wrm raw M 6, WM59 MO al OwMb mal M Stn4
m fsps.l:w gnat
... J0. 6r. M Im. N e Peon—eoa.Jf ie
xw9s • •• e . rtrr O..O. rw,. l sn� ',—' •MoJJ• py .wean
Swra IT. IJIJ exc.,
Boa A6 Or /ep•
Ow4Wy 0.RJl ww m«. s 46.
n. M a. rrw v 6sa or. emir pe.Ssf 6 "-" •o wM sm o rn of
am,a, soma e» mss sM
General Notes
,'. _...,.s ......_, raw«.»..r... 6»...
4786327 Pages: 89 of 106
12/17/2021 02:55 PM
Carly Koppea, Clerk and Recorder$0 Weld
County
1111I#P.fNI PAVIIIAl ail 'AlfriNI11114III
w
lialtwead
Yrnr4.wM.
MOM 6v
Fr,* feet
.023 ,LIAM
Cedar Creek II
Wind Farm &
1ranamiddiOn Line
Wdd County, Colorado
Plot Plat
Doe hot IL UN
.. sa26
4773483 Pages: 90 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
KCIVIIIIFICW5g5W Ilk IN
N
USR - 1723
620,0 NN6om M0(6.MM
missossumouips
Pigpen). riesa4f10a :
.,,.6...Om, 60... ..„ Oil isInv Lau, at ...
Cantairig 662I6 wary ...V Or !GP
O. .603 acroi mar..
General Notes:
4786327 Pages: 90 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
iii rJ rah+Wr POCICIIIIMIT'Cajfir t rdvi 11111
WINO
e'tc tueneryyr d
yi
Marrs nato
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Colorado
Plot Plat
— wim r,oao
▪ at .. a
4773483 Pages: 91 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
iii FJI 1MILAIii DWI KIM 11111
USR - 1723
ae,a
Ili
.
I
Ii
I4
!I
iIRl4611�9�1���plA�lEl6
n�:a.w o0
ICI
1;1
SEE SHEET 23
CR AV
i W
4786327 Pages: 91 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Iird NMI4�1�4�h4'CF rl ' WAR kNMa Wyk 11111
I.I
Property Dareeptlans
caroww .1mo awa..w. Or M..
.a# as PMwM. ...ft' qar a, re. a. ✓u,n m. Coun,ya r5b a er
cawn..c 1130 gam more or W.
�.... ,�.... ,.m a No, . door «.l OP M.. era .,,. m Me
CawiaO nx0.n.. ma. wRw
Gie'laeral Notes:
W
tweed
ed.-..------- cww
R'.IA..Y WLI... .... _.
r._w lent
+.--.�r•;:ri;energy je+y�
RPM
MY. teal, Amour
jam. droivr� w..:t�w.
Cedar Creek II
Wind Farm &
Transmission Line
Weld County, Colorado
Plot Plat
fay 12o mac
.s a o. 1e
4773483 Pages: 92 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
II 111
USR - 1723
02010 145444* Prof*4451 Ste411.1
IY��WI�gYp� N�I�NA91�
- —.i-1 eNrl:TI
-solsdeffjzfal,
SEC SHEET t0
I+il I
II�IJ
Wit4t44 J3'
Toe
4786327 Pages: 92 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
I r,i ' rmehalwricorkhiriativirlic 11111
15.441.2
Property Descriptions:
e.. ff r/ ! 55 Ian t la.a II xalM1 0.0. a5 wsr o. 1M
Can o g a o G
145 4511 *45 or lips
5,Iny1 al
e/NK1*01*o J„moo 11 HWIA 205* 58MMr e/ art5IF 50 OrW
cwar,M 180.5 .n.li wen 4441,54
General Norm
L—_
w
Winviwe
mew 5151111111.
11411445. Imse.54340
caw..on.
14,44541
tr
CHOMP
irt
reili* oar
►+y moo
Cedar Creek II
Wind Farm Is
Transmission Line
Weld County, Cdw.do
60V .1W' I6D0
Plot Plat
— NUR n. ]AD
II* nor O{
4773483 Pages: 93 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
iii NRINE M IMI MU 1eh Id "III
11a4R - 1723
o20.0 1.190 Profoodonal
I
I₹�
IKIBILEMEMINSIVin
•i
4786327 Pages: 93 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
SEE S'/EET 2'
1
7
\
`sn ags"
o...ztEr,rmn.�
rdl9+!r LiihwI'bIIk 11111
6.: Properly .".I..T. n. «Id 6. r. I .rN
Cmrslrq -V" rw mm or Ws
nwa. .u. 6. ro n . II Yo.N. Manor 56 YM no' Hm 6,6 P.Y.. Cwmy Of .% blm. of
CwlmYwb AY" cum mum u ln.
M6,1 Lv.rmu l m./w•Alblrm al ip tm N
ru.mm�c rxuln, We.l W
o y�Lo 72 acres mon or Iwo
6.Ym IT .o...N i Ib5,Rope 56 Ymml W N. 615 P.Y. Cam,C al IOWA
� ,ma? mono MIS IPOI
General Naar
rrCol.,�Mw. Yld . .M1. nt MI ,.nm..mmm ..
Mr I/Od 3'00'
N
rarabooed
kW. ble0.11211
nomommoodowom
Emoolmo
!mid foe
Ant/ prow.
Of: MZ6
11661 ape.
ong,d PoOrolln, ...a Moo
Cedar Creek II
Wind Farm do
Transmission Line
Weld County, Colorado
Plot Plat
aft Ms le, MD
r aw a.
4773483 Pages: 94 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
IIICIA tIM16IP.I 'aRJ BIM
1
IIt MINIB Rogratrollta
016 SOEE, 06
1 —
7
/
4786327 Pages: 94 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIIInC4sip' vow' mKii+nvewhi h 11111
VSR - 1723
Property D saiphonu
Genera Notar
47.
tiliebmaiaelealmollorolm
Mei
r.lfaN� .l„h.
IMAM MN OP*
snow worms war p.a..,
5M1OTS MOO
Cedar Creek II
Wind Farm &
1Yansmissian Line
Weld CooetY. Caned.
Plot Plat
o.. ti.xm
.�man
lCalinna
4773483 Pages: 95 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppel, Clerk and Reoorder, Weld County , CO
i %MAPiNI* BMW Ili 11 111
.,,,,OlOOk0 .._ ti` 1tuIFAgIieMINSI IN
*miser ,r loam —
I`
USR - 1723
SEE SHEET ,2
11
Ne.211•• 1111•1
Property Descriptions
600loop MY ono ...woo Joo
At.%..,,••• ,...,n,_«,«,.,.._.. II Moto fro, ,_.,roe
.;.:a.am,.,. ••••An.,*cow u.................,.Nor «...r.
OWE. Iff
4786327 Pages: 93 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppea, Clerk and Recorder, Weld County , CO
mIII KI' I!I'Ail Mgr PAZ I 41 tM�i«N L Mk ail 111
62,2126
SEE SHEET ,,
}
General Notes
„ olliftmoym F. owe below
1•••=1.4= wow. oo Os Ago {now 1 'mow w0000ro pm Ito J.In Oo•Ow nn
e12.eaee
0.011. Ni•NOSIP.
Joo 011.404.0
TOLLPON
.66,...66.._
2.626
6.22126.22 wow
2626.66 I.6
. ,e,iny:Y✓ani,4Y
Lase.
raor
oJ
OINOOS If. Orator
,_o.,..�,,.., ....
X..,...2,.c -
Cedar Creek II
Wind Farm &
Transiesion Line
Weld C...ry, Corral.
Plot Plat
o.. Noe IS, mn
.� rs a es
4773483 Pages: 96 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
IhiliNVIfiligli56111 1I II 1
USR -1723
It"111:71:tl rap pt, ltti..
}pI,
A�ae a..1pa
II
1
E
I' .
Ivw II
.r.
OAS ,.
4786327 Pages: 96 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
KIIINLI4?hfilW4ii.1'7%leh lift i ilk III II
=O Of MulwA
20
Detail of Laydown Area
i
i
4 1NO IOHLeX /
*0 Bt MLOaI,m•
i I..
100 TO
W
nld.>^.J*LEOe19p
L 61,94,10
Cedar Creek II
Wind Fern &
Tram:ixdosi sine
Wad County, Colorado
Plot Plat
oW lee. L. 7010
as x0026
Decommissioning Plan
Proposed Cedar Creek H Wind Farm
Located approximately 25 miles north of New Raymer in Weld County, Colorado
1. Introduction
1.1 Project Description
Cedar Creek II, LLC (Developer) is proposing to construct and operate a wind energy facility,
called the Cedar Creek II Wind Farm (project), located approximately 25 miles north of New
Raymer, Colorado in Weld County, Colorado. The project is sited on private and State lands that
are currently primarily used for agricultural and livestock purposes.
The project would include construction of 123 wind turbines, with a total capacity of 250.8 MW,
on approximately 26,000 acres. 'lb deliver electricity to the grid, the project would build
approximately 20 miles of new 230 kilovolt (kV) transmission infrastructure to tap into an
existing 72 mile 230 kV transmission line that runs from the Cedar Creek wind farm to the
Keenesburg substation. In addition, the project would include the construction of approximately
45 miles of new roads and buried collector lines and an operations and maintenance (O&M)
building.
The term of the power purchase agreement for this project is 25 years, after which time a new
power purchase agreement may be negotiated. At the end of its useful life (which is defined as
the point at which the facility generates no electricity for a continuing period) the site would be
decommissioned and reclaimed within 18 months of Developer filing a Notice of Termination of
Operations with the County.
Developer has negotiated lease agreements and easements with participating property owners.
These agreements provide the rights to develop, construct, maintain, and operate wind energy
systems on the leased property. Separate easements have been established to provide the rights
of access and transmission of electricity across County Road easements. All lease agreements
and easements would be in place for 40 years, with the option to extend. If any material lease
agreement was breached, the participating property owner could give a Notice of Default to
Developer in writing. If the breach continues for thirty (30) days after written notice of default,
or if the cure will take longer than thirty (30) days, the landowner could seek remedies as may be
available at law or equity from Developer, in accordance with the termination provisions of the
lease
1.2 Purpose
This Decommissioning Plan (plan) is being submitted to Weld County to fulfill one of the
requirements of the Use by Special Review (USR 1723) permit issued for the project. The terms
of this Decommissioning Plan shall be binding upon the wind farm owner, Developer and any of
its successors, assigns, or heirs. The plan will be implemented to ensure that the project and
associated structures are removed after operations cease and that the property is reasonably
restored in accordance with the applicable lease agreements.
1850760-9 1
4786327 Pages: 97 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
lII1Ii')PL 0111:41111VATIVA
4773483 Pages: 97 of 104
11/05/2021 10:54 AM R Fee:$0,00
Carly Koppes, Clerk and Recorder, Weld County , CO
III NrJrnli.1•16.1101\1 Phlillit\lr PtiCtisii
This plan generally outlines the procedures for decommissioning the project and restoring lands
to their original condition. Decommissioning procedures involve the physical removal of certain
facilities, structures and components associated with the project, the disposal of solid and
hazardous waste, and identification of physical elements that may remain on the property at the
discretion of the participating property owners. Restoration includes the stabilization or re -
vegetation of the project site to minimize erosion and facilitate subsequent land uses as
determined by the property owner. Provisions for financial assurance for decommissioning and
reclamation activities are described in this plan.
2. Decommissioning
In the context of this plan, decommissioning is the act of removing the wind energy system from
service. Decommissioning is a step-by-step deconstruction process that involves carefully and
safely removing and appropriately salvaging, recycling and disposing of the infrastructure and
appurtenant facilities. It includes the physical removal of facility -associated structures and
components (including portions of the foundations) from the Project Area. In accordance with
existing lease agreements decommissioning of the project will include removal of the following
infrastructure:
• Aboveground equipment, including towers, concrete pads (does not include foundations),
anchors, guy wires, fences, fixtures, materials, buildings, structures, improvements, and
personal property installed by Developer or by its agents, will be removed and recycled
or disposed of at approved off -site facilities.
• Where feasible, wind turbines, including blades and towers, will be removed in a manner
to allow for refurbishment and resale of each component. Removal will require cranes,
construction of temporary crane pads, plus some access road improvements to
accommodate large cranes and trucks.
• Foundations will be removed to a depth of three (3) feet (or such greater depth as
required under the applicable lease agreement) below the surface. Structures and debris
located below the soil surface will also be removed to a depth of three (3) feet (or such
greater depth as required under the applicable lease agreement) below the surface. All pit
holes, trenches or other borings or excavations (but not roads) created during
decommissioning will be properly filled and compacted.
• Underground power and communication lines will be decommissioned in place.
Underground cables will be cut off at ground surface at the cabinets. Transformers will
be removed from the site.
• Solid waste and hazardous material will be disposed of offsite in accordance with
applicable state and federal regulations. Decommissioned gearboxes, transformers, and
hydraulic systems will be drained of fluids, put into appropriate containers before
dismantling, and then transported and disposed of off -site in accordance with state and
federal regulations.
• Should the property owner request that a road(s) constructed for the wind energy system
be removed, the property owner would notify Developer on or before the lease
termination date. Roads requested to be removed and restored will be reclaimed pursuant
to guidelines in Section 3 below.
1850760-9 -2-
4786327 Pages: 98 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk X111 �1Q I��I�1tind Recorder, Weld County , CO
I
4773483 Pages: 98 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
NAV!'kV 1000144411914 11 Ili
3. Reclamation
In the context of this plan, reclamation is the process of restoring lands affected by the project or
its dependent components to a land use condition that satisfies the landowner and complies with
County requirements. The process may require grading, contouring, removal of compacted soils,
stabilization, re -vegetation, and drainage control.
Reclamation of the project will include the following:
• Disturbed on -site soils and vegetation will be restored to their original condition or better.
Reclamation procedures will be based on site -specific requirements and techniques
commonly employed at the time the area is reclaimed. If the area is reclaimed as
agricultural crop land, reclamation may include re -grading, application of soils and
tilling. If the land is to be reclaimed to its natural state, reclamation will include re-
grading, seedbed preparation, and revegetation with native seed.
• Should the property owner request removal of certain wind project roads, these roads will
be scarified, decompacted, and recontoured as needed to provide a condition that will
facilitate revegetation or agricultural use, allow for proper drainage, and prevent erosion.
If requested by the property owner, the area will be reseeded with native grass seed.
4. Schedule
The wind turbines proposed for use in the project are expected to be operational for 25 years. It
is anticipated that as these turbines reach the end of their expected life, technological advances
may allow for a repowering where the existing turbines would be replaced with more efficient
and cost-effective generators that extends the life of the project. Many older wind energy
facilities have been re -powered by upgrading or replacing existing towers and other
infrastructure with more efficient turbines and related equipment.
Should the operation of the project be terminated, Developer would provide County with a
written Notice of Termination of Operations. The date of the Notice of Termination of
Operations is the Termination Date. The notice will be provided within 30 days of terminating
operation of the system. The project will be removed in accordance with the terms of existing
easement and lease agreements with the landowners.
Decommissioning and reclamation prior to the end of the 25 year life -expectancy of the project
could occur under certain unlikely conditions such as condemnation or the cessation of power
generation by the project.
5. Estimated Decommissioning and Reclamation Costs
Total decommissioning and reclamation costs will be offset by the salvage value of towers,
turbines and associated facilities that were sold or reused. Developer will cause the estimated
decommissioning and reclamation costs to be updated by an independent engineer every five
years beginning in year 10 of the project.
6. Responsibility
Developer, and its successors or assigns or heirs, would be responsible for decommissioning the
facility and all costs associated with decommissioning the project and associated facilities.
Developer will be responsible for ensuring that decommissioning activities occurred in
1850760-9 -3-
4786327 Pages: 99 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
liii 01
4773483 Pages: 99 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII IFAII', INI ilk IhO% 10111,146Riallyi iI v
accordance with this plan. Upon completion of decommissioning, Weld County will have the
right to review final decommissioning and reclamation to confirm it was consistent with this
plan. If decommissioning does not proceed in accordance with this plan, Weld County will have
the right to enter the property and cause the appropriate abandonment and decommissioning
measures as determined by this plan. Following satisfactory decommissioning and reclamation,
all requirements for Developer to provide financial assurance hereunder will cease.
6.1 Financial Assurance
Financial assurance will be provided by Developer in a manner sufficient to adequately satisfy
decommissioning and reclamation commitments under this plan. Financial assurance will be
provided in the form of an irrevocable letter of credit, surety bond or cash. To determine the
amount of financial assurance, Developer will hire an independent engineer to provide an
estimate of the salvage value of the towers, turbines and associated facilities as well as an
estimate of the decommissioning reclamation costs for the project every five years beginning in
year 10 of the project. If the decommissioning and reclamation costs exceed the estimated
salvage value of the towers, turbines and associated facilities, Developer will post financial
assurance for 1.2 times the difference between the salvage value of the towers, turbines and
associated facilities and the decommissioning and reclamation costs. Any letter of credit shall be
subject to the requirements of Weld County Code Section 2-3-30 B. Developer shall utilize only
a County approved form when obtaining a letter of credit: (IRREVOCABLE STANDBY
LETTER OF CREDIT FOR BOARD OF COUNTY COMMISSIONERS OF WELD COUNTY,
COLORADO). A copy of said form shall be provided to Developer upon request.
Any surety bond shall be given by a corporate surety authorized to do business in the State of
Colorado. The surety bond shall conform to and be subject to the requirements of Weld County
Code Section 2-3-30 B.4. Developer shall utilize only a County approved form when obtaining a
surety bond: (PERFORMANCE BOND FOR BOARD OF COUNTY COMMISSIONERS OF
WELD COUNTY, COLORADO). A copy of said form shall be provided to Developer upon
request.
The Board of County Commissioners of Weld County reserves the right to reject collateral which
is deemed inappropriate or insufficient, which may be either as collateral in the form of a letter
of credit offered by a banking institution which has at least a "three star" rating as determined by
Bauer Financial or a financial institution or company that is major United States commercial
bank or foreign bank with a United States branch office, with a senior unsecured bond rating
(unenhanced by third party support), equivalent to A- or better as determined by Standard &
Poor's or A3 or better as determined by Moody's, or as collateral in the form of a performance
bond offered by an insurance company which does not have at least a B+ rating given by A.M.
Best. The Board further reserves the right to require Developer to obtain replacement collateral
if the rating of the financial institution providing any collateral drops below the levels stated
above. Replacement collateral shall be submitted by Developer within sixty (60) days of the
Board's notice to Developer that the rating has fallen and that the collateral must be replaced.
Developer may not terminate existing collateral until replacement collateral has been secured.
1850760-9 -4-
4786327 Pages: 100 of 106
12/17/2021 02:66 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII 1 �1RI�iN ti M ihrICI' L'Alu GIA N "III
4773483 Pages: 100 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII NUPAI INteAJIi MILrMiu ll MIR iI ill
4773483 Pages: 101 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County CO
mdimpaveraithIcaliciiimuirovikatiti
EXHIBIT
m 1
\ F
Qajrtk
Westwood
/i%
/ Co Rd 138;
,7
/ Co Rd 136 //
Co Rd 134
'/, %//// /7/77
r /
Rd 732'
/ Co Rd 130
0
_Ni
/ /////- INTERSECTION 13
(SEE SHEET 44)
INTERSECTION 14
(SEE SHEET 45)
C Rd 126'
///
G-16
G-15
G-14 G-19
/
"Co Rd 138
//////// INTERSECTION 8
G-17 (SEE SHEET 39)
GRAVEL
STOCKPILE
ILLE
INTERSECTION 16
(SEE SHEET 46)
4
i/
LAYDOWN YARD
INTERS(SEE SHEET IO)N 6 �% _
G-5?
52 G-54
INTERSECTION 4
(SEE SHEET 35)
INTERSECTION 5 -7
(SEE SHEET 36)
INTERSECTION 7
INTERSECTION 12
(SEE SHEET 43)
////// / INTERSECTION 11
GRAVEL STOCKPILE !?ti (SEE SHEET 42)
N-1• N-17
(SEE SHEET 38)
INTERSECTION 10
(SEE SHEET 41)
GRAVEL STOCKPILE
`TRUCK STAGING
//////// /
INTERSECTION 1 (SEE SHEET 31
///////%//
' "
!7/2/
Tower Rd
INTERSECTION 2 (SEE SHEET 32)
PUBLIC ROAD WIDENING 1 (SEE SHEET 33) /
Y
oRd 1281/2
/ INTERSECTION 17
(SEE SHEET 47) N.7
7
%,</ //.• a)<//
CO Rd 120
/Co Rd 178
:0/
Co Rd 116
/ /
✓/
/
/////c.gli,6 / /.9
LEGEND:
r//////a
•G
•
N-10(
inn rill retail.'
•
•
PROJECT BOUNDARY
EXISTING TURBINE LOCATION
REPOWER FOR GE 97 TURBINE
EXISTING TURBINE LOCATION
REPOWER FOR GE 127 TURBINE
EXISTING TURBINE ACCESS ROAD
DELIVERY ROUTE (INGRESS)
DELIVERY ROUTE (EGRESS)
EXISTING NON DELIVERY RD.
EXISTING HIGHWAY
EXISTING GRAVEL DELIVERY RD
INTERSECTION IMPROVEMENT
PROJECT FACILITIES
GRAVEL STOCKPILE LOCATION
PUBLIC ROAD WIDENING
Phony (/7Q SS1-$SSO
Ioliltee (/!8)93! 11S0
10110 Church Ranch Wert Sun, I/01
Wntm Age r, CO WW1
wrfwwoVs r um
Wnlwood Prolnsronal SeMn, Im.
PRI PMI O IOP
BP Wind Energy North America, Inc.
201 Helios Way
Houston, TX 77079
. l VISIONS
/ IMiI
IOMMINI
A 06/19/71
ISSUE U I OR PI PM I
6 06/76//1
ISSUE O l OR RE V II W
( 09/14/71
ISSUED TOR RI VII W
X
Cedar Creek II
Wind Repower
d County, Colorado
Wel
4786327 Pages: 101 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
Delivery Flow Plan
DA-,
51-1 r
09/14/2021
4
4773483 Pages: 102 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
EXHIBIT
C4ac4- Ccee.c �
Westwood
/ Co Rd 138
��% 732
Co Rd 136
Co Rd 134
Co Rd 124
Co Rd 118
Co Rd 126
N -0O
N-11
""GRAVELT
STOCK'
Co Rd 130
/2 Rd,
Co Rd 132
1 7N41
NCO
N 76 0 N 19
0
Co Rd 120
Tower Rd
TRUCK STAGING
AREA
Co Rd 124
LEGEND:
//.
•XX
PROJECT BOUNDARY
EXISTING TURBINE LOCAI ION
REPOWE R FOR GE 97 TURBINE
• EXISTING TURBINE LOCATION
N' REPOWE R FOR GE 127 TURBINE
►�e�ee e�e�•�e�• e•
m
20
EXISTING NORDEX TURBINI
EXISTING GE TURBINE
EXISTING TURBINE ACCESS ROA,
PROPOSED CRANE PATH
PROJECT FACILITIES
SHEET NUMBER REFERENCE
.•hunt (CIO S11 $ISO 101 IOC IUNh Ranch Way. Suite RIO'
I olll'Pr that 91/ SlSO Wnbe,Mle,,(O60011
weMwnotlp. tool
WnMou1 P,oIe t.oa Serves Inc
(1StimAt
11 -Oat
PNI PANT 1) 1 ON
hp
0
BP Wind Energy North America. Inc
201 Helios Way
Houston, TX 77079
H,VJ (ThI%
UAn (OMMINI
A 06(19/! 1 'SSG! U I ON PI NMI I
6 06/!h//1 ISSUI U IOR NrvN W
09/1V71 65UI 1)tOM NI VIIW
X
Cedar Creek II
Wind Repower
Id County, Colorado
We
4786327 Pages: 102 of 106
12/17/2021 02:55 PM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
liii
Overall Plan
09/14/2021
3
EXHIBIT
Ce&c Ccee, & L
Exhibit H
Gravel Roads Maintenance and Reclamation Plan
Cedar Creek II, LLC
1. Purpose
The Gravel Roads Maintenance and Reclamation Plan (Plan) is attached to the Improvement
and Road Maintenance Agreement (IRMA) between Weld County and Cedar Creek II, LLC to
provide certain standards for the repair and reclamation of Project Haul Routes, as both are
defined in the IRMA. This Plan, together with the Exhibits A -G, outline the procedures and
standards required of Cedar Creek II, LLC and its Contractors (hereinafter referred to
collectively as Contractor) to prepare, maintain, and reclaim all Weld County roadways
utilized for construction, delivery of materials, and daily activities throughout the entire
duration of the Cedar Creek II Technology Upgrade Pilot Project (Project).
2. Responsibility
Weld County Gravel Roads Division will cease normal maintenance of all roadways utilized
for the Project until Substantial Completion and Acceptance of off -site improvements is
submitted and accepted by Weld County. All maintenance of the roadways including issues
caused by weather events and non -project traffic are the responsibility of Contractor.
Contractor is further responsible for all repairs caused by Project traffic as described in
section D.8.0 of Part 1 of the Agreement. If Contractor can reasonably demonstrate that the
need for repair is caused by non -Project related traffic, Weld County will be responsible for
such repairs.
0 NO
U�r
ZE
3
0
ago
. t
.4 -vitae
en • L_M
re a S•as
II in Y�
No -
i
(7.4
N�YNo
COC0
L
3. Procedures
These will define necessary operations during each phase of the Project.
3.1 Preconstruction
Contractor shall place 2" of Weld County Surface Gravel in the locations set forth in the
pre -construction inspection. Gravel placement shall be done in accordance with Weld
County Engineering & Construction Criteria (WCECC), page 123, Table 9-12 and in
accordance with the most current versions of the Colorado Department of
Transportation (CDOT) Standard Specifications for Road and Bridge Construction and
Field Materials Manual.
3.2 Active Construction
Defined as the second phase after all roadways have been updated as necessary to begin
usage for construction activities and component deliveries. Maintenance will include
grading, gravel placement, dust mitigation, and damage repair. A minimum of weekly
maintenance is required for the roadways. No less than twice each month, Contractor
shall provide a schedule detailing the locations and type of maintenance completed and
locations and type of maintenance to be completed. Road damage such as, but not
limited to, potholes, blow outs, soft spots, and wash outs, shall be repaired within 48
hours of either the occurrence of the damage or notification by Weld County.
3.3 Postconstruction
Defined as the final phase, after the Project has been completed, Contractor shall restore
all County roadways, intersections, access locations and roadside drainage affected by
the Project to pre -construction widths, grades, and surface conditions. Such
pre -construction conditions will have been documented by the parties after joint
inspection. After project completion and prior to release of project collateral as
4773483 Pages: 103 of 104
11/05/2021 10:54 AM R Fee:$0.00
Carly Koppes, Clerk and Recorder, Weld County , CO
III14IMIINs510119iMIT' 14:lWalk� !Mi�� liii
described in section B of Part 2 of the Agreement, post -project road conditions shall be
jointly inspected by County and Contractor again to determine if there are any material
deviations in the condition of the County Roads from those contained in the
preconstruction inspection data. In its sole and reasonable exercise of discretion,
County shall inform Contractor of the location and amount of gravel to be placed upon
affected roadways, not to exceed six inches of gravel in any one location. In making
these determinations, County shall endeavor to require only that amount of material
which returns the road to the pre -project condition as documented. Gravel placement
shall be done in accordance with Weld County Engineering & Construction Criteria
(WCECC), page 123, Table 9-12 and in accordance with the most current versions of the
Colorado Department of Transportation (CDOT) Standard Specifications for Road and
Bridge Construction and Field Materials Manual. Acceptance testing for all
postconstruction repairs will be required upon completion of restoration (refer to
section 4 -Testing).
a
0
U
,..
5 -
4. Testing
Required testing processes, methods and resulting procedures.
4.1 General procedures
Contractor shall be responsible for all testing procedures. Sampling and testing shall
follow procedures as identified in the most recent version of the CDOT Field Materials
Manual. All Process Control (PC) and Owners Acceptance (OA) sampling of material
shall be performed on grade. All work will be in conformance with the CDOT Standard
Specifications for Road and Bridge Construction. Surface Gravel placement will require
notification to Weld County a minimum of 48 hours in advance. If a County inspector is
not present during placement, the sample and testing location shall be recorded and
provided in the corresponding testing report. Non -reported or failed testing reports will
require removal and replacement of all material by Contractor.
4.2 Method Statement minimum inclusions
Sample locations using a random number generator
PC and OA sampling frequencies. PC will deliver OA samples to Weld County
Expected turnaround of test results
Limits defining acceptable test results
Three (3) third party laboratories to dispute testing
4.3 Required Tests
Particle size analysis (Gradation)
Atterberg Limits test
Moisture Density Relationship
LA Abrasion
Aggregate soundness
Fractured Faces
In -place Density and Moisture content of Soil and Soil Aggregate by Nuclear Method
5. Inspection
Conditions of all roadways utilized for the project can be inspected at any time throughout
the Project duration. Inspection of roadway conditions may include but is not limited to
roadway fore and back slopes, ditch grade and geometry, travel lane slopes, crown, low
spots/depressions, and gravel coverage. Corrective work resulting from inspections shall be
completed by Contractor within 48 hours of notification by County.
Pages : 104 of 104
4773483 00
11/05/2021 10:54 AM R Fee:$0. Weld County CO
Carly KoPPes � Clerk and Recorder r ,I 111
Iw!V,��1 1 �
�N IV&'P
�jlI 1
UI
l�.�aIl
New Contract Request
Entity Information;
Entity Name*
CEDAR CREEK II LLC
Entity ID*
@00044515
Contract Name*
IMPROVEMENTS AND ROAD MAINTEANCE AGREEMENT
CEDAR CREEK II LLC AP21-00535
Contract Status
CTB REVIEW
❑ New Entity?
Contract ID
5285
Contract Lead*
JITRUJILLOMARTINEZ
Contract Lead Email
jtrujIIomartiez@weldgov c
cm
Parent Contract ID
Requires Board Approval
YES
Department Project #
Contract Description*
IMPROVEMENTS AND ROAD MAINTEANCEAGREEMENT CEDAR CREEK II LLC AP21-00535 $3,000,000 REQUIRED FOR PROJECT
COLLATERAL PROVIDED IN THE FORM OF PERFORMACE BOND NO 284067599 AND PERFORMANCE BOND NO 285065197
BOTH SSUED BY LIBERTY MUTUAL INSURANCE COMPANY
Contract Description 2
Contract Type*
AGREEMENT
Amount*
$3,000,000 00
Renewable*
NO
Automatic Renewal
Grant
IGA
Department
PLANNING
Department Email
CM-Planntng@wetdgov corn
Department Head Email
CM-Plannrng-
DeptHead@weldgov corn
County Attorney
BOB CHOATE
County Attorney Email
BCHOATE@CO.WELD CO US
If this is a renewal enter previous Contract ID
If this is part of a MSA enter MSA Contract ID
Requested BOCC Agenda
Date*
10/11/2021
Due Date
10/07/2021
Will a work session with BOCC be required?*
NO
Does Contract require Purchasing Dept. to be included?
NO
4786327 Pages: 105 of 106
12/17/2021 02 55 PM R Fee $0 00
Carly Koppes, Clerk and Recorder, Weld County , CO
VIII I rdrilla I VM40110 rl'� ICI 0 i:414 yHiI J II II
Note the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in
On Base
Contract' Dates - -
Effective Date
Review Date*
10/11/2022
Renewal Date
1
Termination Notice Period
Committed Delivery Date
Expiration Dates
1 0/11 /2023
Contact Information
'Contact Info '
Contact Name Contact Type
r
,'Purchasing
Purchasing Approver
Approval, Process '
Department Head
TOM PARKO JR
DH Approved Date
, 09/30/2021
Final Approval,
BOCC Approved
BOCC Signed Date
BOCC Agenda Date
10/20/2021
Originator
JTRUJILLOMARTINEZ
Contact Email Contact Phone 1
Purchasing Approved Date
Finance Approver
CHRIS D'OVIDIO
Finance Approved Date
10/01/2021
Tyler Ref #
AG 102021
Legal Counsel
BOB CHOATE
Contact Phone 2
Legal Counsel Approved Date
10/05/2021
5 '•;aMt`i •''-?3.�k_ Vii. �'iw"'�''_-'^. f^Y �,il$�T } Y tshsor^i.. Y"hW'�_ Yr'. �'' F�
.h,� .. . u `.L h.. �'. _a,xn o.'� �?r�.,.3�?i�.�', . �f��t"., r%.€.,� -,' � �. ri��';� .a• ?:•� `r`�..�, ..�.+. .y..
f 122/t7 2021 02 Pages R Fee $0 106
Carly Koppes, Clerk and Recorder, Weld County , CO
hti�eM'��h�dIAN KW W,h III III
Hello