HomeMy WebLinkAbout740572.tiff •
RESOLUTION
WHEREAS, MONTGOMERY ELEVATOR. COMPANY, Denver,
Colorado, has submitted a COMPLETE MAINTENANCE AGREEMENT,
covering one (1) passenger elevator No. CP-SPM-32791 located at the
new Weld County Public Health Building, and
WHEREAS, the Board of County Commissioners,Weld County,
Colorado, has said proposed Maintenance Agreement before it and has
given it careful review and consideration; and
WHEREAS, it is considered that the best interest of said County
of Weld, State of Colorado, will be subserved by the acceptance of said
Agreement;
NOW, THEREFORE, BE IT RESOLVED, by the Board of County
Commissioners, Weld County, Colorado, that the terms of the Mainten-
ance Agreement submitted by MONTGOMERY ELEVATOR COMPANY as
aforesaid be, and the same hereby is accepted on behalf of Weld County,
Colorado.
BE IT FURTHER RESOLVED, that the Chairman of the Board of
County Commissioners of said County hereby is authorized, empowered
and directed to execute said agreement on behalf of said County, and that
the County Clerk hereby is authorized and directed to attest said Mainten-
ance Agreement and to attach to each duplicate original of said Maintenance
Agreement a certified copy of this Resolution.
STATE OF COLORADO )
ss.
COUNTY OF WELD
I, Lee S. Shehee, County Clerk of the County of Weld, State of
Colorado, hereby certify that the above and foregoing is a true, full and
correct copy of a resolution adopted by the Board of County Commissioners
of the County of Weld, State of Colorado, at a meeting held according to
law at the office of the Board of County Commissioners in Greeley, Colo-
rado, on the 24th day of December , A. D. , 1974, as the
same appears on file and of record in this office.
IN TESTIMONY WHEREOF, I have hereunto set my hand and
affixed the seal of the County of Weld, State of Colorado, this 24th
day of December, A. D. , 1974.
County Clerk of the County of Weld
State of Colorado.
1 T 740572
• 1
•
l � �
COMPLETE r:
MAINTENANCE _ ki.
AGREEMENT _.,1. C'
FOR HYDRAULIC ELEVATORS
We will maintain the elevator equipment herein described, using skilled elevator main-
• tenance men under our supervision.They will employ all reasonable care to see that the ,"
elevator equipment is maintained in proper operating condition. .
i l
We will regularly and systematically examine, adjust, lubricate, as required, and if con-
ditions warrant, unless specifically excluded elsewhere in this agreement, repair or re- y
place the following.
Elevator pump, motor, plunger, plunger packing, V-belts, strainers, valves, regulators,
controllers including relays, contacts, timers, coils, magnet frames and control wiring. a :i
We agree to repair and/or replace traveling cable when necessary; to replace car guide , . .;
shoes, gibs and/or rollers when necessary to insure a smooth and quiet operation, and ¢
we will keep the guide rails properly lubricated, when applicable. -
i
We agree to furnish special Montgomery lubricants compounded under our supervision
and specifications. A
i
The following accessory equipment will be examined, lubricated, adjusted, repaired
and/or replaced by us:
0
Door operator.car door hangers,car door contacts,and door protective devices. ,,
We assume no responsibility for the following items of elevator equipment which are not
included in this contract: ' I
Refinishing, repairing or replacement of car enclosure, its gates and/or doors, hoistway (((
enclosure. hoistway doors,door frames and sills, hoistway gates,finished flooring,power ,
feeders, switches, their wiring and fusing, hydraulic cylinder, and undergound piping.
This contract covers all work performed during the regular working hours of regular work-
ing days of the elevator trade, unless otherwise specified. Ep
Overtime call backs ARE NOT included in this agreement. 5i
If you should require, at any time, examinations, minor adjustments, call back services - :;
or repairs to be made on overtime, we will absorb the regular time portion of each over- 4 `
time hour worked.You will be charged only for the difference between our regular hourly c s
billing rate and our regular overtime billing rate applicable, for each overtime hour 1
worked. ,!
1 of 3 Lp
•
IbratEOk 7fearadXVltXtozit' ootttXbowitxxxxtdecathd XXWX 0dX71XOtxwittcestxt oe<
R6 ttocae ctaxt K�X 16Emx:tverott 4P)0l6?CMA1kX k7(dangtaxat�Xtotxt eddi i n tia -
•
DVxkxgrACX49Xte4tXcKXPA>4kx4o
kcexbaeexprioeotatex ixAtti egueoce 4tXV scicAaxJGa 400Citionaka4T1Q4 Vat
xkeegkikedtxxbotektioi ktioecec kViat kyb000000loottoomoaspwomantiumakm ottExomtawa zxltvt�l4crd4di ft 50 0
xg.oeaXriexopKxxtoaMaiid wts`rwk k4exifecac9cotae+eboria>t
zt§not izgw!Vocxbtaapolaiocoaocexd °xxtraeaktktisxxwkaot.
SCHEDULE
PART TO BE PRO-RATED None
PART NAME DATE OF ORIGINAL INSTALLATION
September 17, 1974
Montgomery Elevator Company shall not be obligated to make other safety tests, or to
install new attachments whether or not recommended or directed by insurance com-
panies,or by federal,state,municipal,or other governmental or non-governmental author-
ities. Montgomery Elevator Company shall not be required to snake renewals or repairs
• necessitated by the negligence, misuse or obsolescence of the equipment or any other
cause beyond its control except ordinary wear and tear.
Nothing in this Agreement shall be construed to mean that Montgomery(herein1evcollectively trCoom-
• pony, or its subsidiaries, officers, directors, agents or employees,
referred to as "affiliates") assume any liability for damages or otherwise on account of
accidents to persons or property (including but not limited to accidents arising or result-
ing from the overloading and/or misloading of any elevator or other device covered by
this contract, beyond its rated capacity) except those directly due to the negligence of• Montgomery Elevator Company. You shall be solely responsible for supervising the use
of the equipment and you shall provide whatever attendent personnel,warning signs and
other controls and cautions that may be required or desirable to insure safe operation.
You shall at all times be solely liable for the operation of the equipment and you shall
indemnify, protect and save harmless Montgomery Elevator Company and its affiliates
from and against liabilities, losses and claims of any kind or nature imposed on,incurred
by, or asserted against Montgomery Elevator Company or its affiliates arising out of the
operation of the equipment. You hereby waive any and all rights of subrogation, arising
as a matter of law or otherwise which you might hereafter have against Montgomery
Elevator Company or its affiliates.
Neither Montgomery Elevator Company nor its affiliates shall be liable for any loss,
damage, detention or delay caused by accidents, strikes, lockouts, material shortages
or by any other cause which is beyond its reasonable control, or in any event, for inci-
dental or consequential damages. Montgomery Elevator Company shall not be liable for
any work, service or material other than that specifically mentioned herein.
2 of 3
"-J.-.
PURCHASER: •
_Meld County_
P.O. Box 758 •
-�--- Submission Date Dec- be
Greeley Colorado 80631
Effective Date December 1 l • 4
Attention: Mr. Barton Buss
• Passenger Freight I I OTHER
ESCALATOR
MAKE
Traction Hydro Traction Hydro
MECO I_ One ,���I-
MONTGOMERY ELEVATOR COMPANY, in consideration of $ 66_05 _, payable by you monthly
• in advance, hereby agrees to furnish services as herein described on the above equipment located at
Weld County Public Health Building, 1516 Hospital Road, Greeley, Colo.
At the termination of each one-year period from the date of submission of this Agreement, the price will
be automatically adjusted upward or downward by Montgomery Elevator Company in an amount equal
to the percentage increase or decrease in Montgomery Elevator Company's cost of labor for the services
to be rendered.
You shall pay, in addition to the price, any tax imposed upon you by any existing or future law and the
amount of any tax imposed upon us, our suppliers or you under any statute, court decision, rule or regu-
lation becoming effective after the date of this proposal which is based upon or incident to the transfer,
use, ownership or possession of the materials or equipment involved in the
eperf co
mprehensive hereof
bodily
off or
the
services rendered, hereunder.You shall at all times and at your own cost,
injury and property damage insurance (naming Montgomery Elevator Company as an additional insured),
including bodily injury and property damage caused by the ownership,use or operation of the equipment
i described herein.
The service specified herein will be furnished from the effective date above stated,and shall continue for a
} period of five years and from year tc year thereafter until terminated.Either party may terminate other this agree-
party
I ment either at the end of the first five years or at the end of any subsequent year by giving
ninety (90) days written notice prior to the'anniversary date of the contract.
II
I, This proposal, and the acceptance thereof, shall constitute, exclusively and entirely, the Agreement for
the service described, and all prior representations of agreements relating thereto, whether written or
verbal, shall be deemed to be merged herein and no changes in or additions to this Agreement shall
II bebinding upon Montgomery Elevator Company until approved oy one of its executive officers at
1
I Moline, Illinois.
I Respectfully submitted,
MONTGOMERY ELEVATOR COMPANY
Office Denver, Colorado 80216
. Address 6100 t Teton Drive South
ACCEPTANCE The foregoing proposal and con- By
tract is hereby signed and accepted in triplicate. R. E. R ec , Sales Manager
_ --) 4 APPROVED:
Date /a'
: MONTGOMERY ELEVATOR COMPANY
_/ Purchaser's Fri egal tear By
/I l ti l i i I''� I•A'•), LL ( Moline, Illinois; Date:
Bye Signature) WheriiedOtlicialand To0� 3 of 3
j •
montgomery elevator company
MOLINE, ILLINOIS 61265
DENVER BRANCH
6{00 K STAPLETON DRIVE SO.
DENVER,COLORADO 60216
PHONE: 6Ot•DYt.6466
December 9, 1974
Mr. Barton Buss
Finance Officer
Weld County
P.O. Box 758
Greeley, Colorado 80631
Subject: Weld County Public Health Building
1516 Hospital Road
Greeley, Colorado
Dear Mr. Buss:
With reference to the Montgomery passenger elevator #CP-SPM-32791 , located
at your new Weld County Public Health Building, we wish to advise that we
are approaching the end of our 3 months free maintenance services, provided
by us as an obligation of the original purchase agreement.
This elevator has been completed by us and turned over for use on September
17, 1974, a copy of our Uniform Final Acceptance Form is attached hereto.
.Our enclosed Complete Maintenance Agreement is based on regular semi-monthly
examinations and includes major and minor repairs, parts and labor, and reg-
ular time emergency call back service whenever needed.
Our contract also includes all necessary annual work, such as cleaning of
hoistways and periodic load and safety tests, as required by the American
Standard Safety Code for Elevators.
A careful preventive maintenance program, performed by thoroughly trained and
experienced personnel , will maintain your elevator equipment in a first class
state of repair, in accordance with factory specifications, and will assure
you of dependable and correct operation. It also gives you our unconditional
guarantee that this equipment will be kept in a first class condition for an
infinite period of time.
Our Denver office is a factory branch office and is considered as one of the
largest elevator companies in the entire Rocky Mountain area. We are maintain-
ing a sub-office in Greeley, with a resident mechanic, who is available within
a minimum of time in case of emergency.
dependable elevators and escalators
r
Mr. Barton Buss
Page 2
December 9, 1974
We trust that our proposal meets with your approval and request that you return
3 signed copies to this office and we will then obtain one fully executed copy
for your file. We will very much appreciate the opportunity of providing our
services for your fine building and assure you that it will receive our very
best efforts .
Very truly yours,
MONTGOMERY ELEVATOR COMPANY
R. E. Rueck
Sales Manager
RR/yf
Enc.
••eft
•
•
•
•
•
•
t, 1
1 ORM 102 '�
C. UI.IFORM FINAL ACCEPTANCE
MONTGOMERY ELEVATOR CO.,
Contract No. CP-32791
Moline, Ill.
Date ll 1T
Dear Sirs: 1
We have examined the passenger elevator No. installed
by you in the Weld County Public Health Bldg. building,
16th St_ & Hospital Road Greeley CO
Street City State
and find same satisfactory and in accordance with the contract and we accept the elevator under the terms and guarantees
of said contract.
By mutual agreement, legal time of lien rights will not commence until free service period specified in this contract has
been completed.
Notice is hereby served that lien will be filed if payments are not made in accordance with contract terms.
Livingston,,Const. Inc.
Purchaser
Instructions for the operation and core of the elevator have been given to
(Engineer or Operator sign here)
Ralph Hewitt
Erector
Hello