HomeMy WebLinkAbout20221444.tiffCon -Iva c,-1IDtt5gs1 FACILITIES DEPARTMENT PHONE: (970) 400-2020 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 May 17, 2022 To: Board of County Commissioners From: Toby Taylor Subject: 1105 H Street Generator Design - Task Order (2022-0530) Cairn Design, LLC was awarded the bid for architectural design/engineering for the Probation Offices remodel and subsequent on -call design work. The Facilities Building at 1105 H Street will be the new location for the county security office. This will require the need for generator power backup. Design work is needed to provide this additional service. Cairn Design has provided a quote for this additional design work at $5,305.00 using the fees identified in their bid. Therefore, the Facilities Department is recommending approving this task order in amount of $5,305.00 If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director Con7A-n4" 65/ Z3/ ZZ ,/oujelal 2022-1444 gC-106Zs-t Date: TASK ORDER #2 PURSUANT TO AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC May 16, 2022 Project Title: Facilities Generator - Architectural and Engineering Services Completion Date: September 16, 2022 Compensation: $5,305.00 Original Agreement: Weld County document no. 2022-0530 Pursuant to the "Original Agreement", the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as -needed basis. Any such Task Order shall be signed by the Weld County Facilities Director before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year, unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the Weld County Facilities Generator. Cairn Design, LLC will provide architectural and electrical engineering design under this agreement including: • Survey of existing conditions • Development of existing conditions plans • Development of plans and details for the generator pad • Development of One -Line diagram • Development of Lighting and Power plans • Load calculations Contractor agrees to perform the services identified above and on the attached Exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. Page 1 of 2 TASK ORDER #2 PURSUANT TO AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC The amount of the contract is adjusted as follows: $ 141,800.50 Original Contract Amount $ 12,850.00 Previously Approved Task order(s) Amount $ 5,305.00 Current Task Order Amount $ 159,955.50 New Contact Total CONTRACTOR: By: Ken Caudle, PE Name: Title: Engineering Manager ATTEST: Weld BY: datrA44) .z140;ve. Date 05/17/2022 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO ctt K. James, Chair MAY 2 3 2022 Page 2 of 2 oZoaa-/441/'1' Exhibit A: Task Order # 2 CAIRN DESIGN, la euctat9 fit, ohm Gulteat9 auttit1 May 16, 2022 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Buildings and Grounds Generator - Architectural and Engineering Additional Services In accordance with the fees identified in our bid, our lump sum price for this on -call work for this project is $5,305.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Building and Grounds Generator in Greeley, CO. Cairn Design, LLC will provide architectural and electrical engineering design under this agreement including: • Survey of existing conditions • Development of existing conditions plans • Development of plans and details for the generator pad • Development of One -Line diagram • Development of Lighting and Power plans • Load calculations Scope of Services: The scope of services included in this proposal are limited to the following: • Confirming existing generator characteristics • Coordinating with the client to determine loads to be powered • Coordination with the utilities • Coordination with the client as required to execute the scope of work Compensation: Total Design Fee - $5,305.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Sincerely, Ken Caudle, PE Engineering Principal 1805 Shealy Drive Fort Collins, Colorado 80526 [9101286-1968 Project: B&G Generator Architecture Principal Site Visit Existing Conditions / Backgrounds Site Details /Architectural Revisions Code Forms Permit Comments Design Meetings Construction Meetings Total Project Management General Project Management Design Meetings Construction Meetings Electrical Principal Site Visit Power and Lighting Generator and One -Line Revisions Code Forms/Calculations Permit Comments Design Meetings Construction Meetings Total Hours Hours Hours 0 2 4 6 0 0 0 0 0 Principal PM Arch/Eng Drafter Assumptions 2 4 4 2 12 0 0 6 6 hours $185.00 $175.00 $165.00 $110.00 rates Architecture $0.00 S0.00 $990.00 $660.00 $1,650.00 Total Principal PM Arch/Eng Drafter Assumptions 2 2 2 2 2hours / mtgs / 1 mtgs 2 2 2hours / mtg / 1 mtgs 6 0 6 0 0 hours $185.00 $175.00 $165.00 $110.00 rates Project Manage' $0.00 $1,050.00 50.00 $0.00 $1,050.00 Total Principal PM Arch/Eng Drafter Assumptions 1 1 1 1 6 2 4 2 2 1 1 1 1 1 1 2 2 2hours / mtgs / 1 mtgs 2 2 2hours / mtg / 1 mtgs 17 1 0 12 4 hours $185.00 $175.00 $165.00 $110.00 rates $185.00 $0.00 $1,980.00 $440.00 Architectural A/E Project Management Electrical Mechanical/Plumbing Structural $1,650.00 $1,050.00 $2,605.00 $5,305.00 Electrical $2,605.00 Total Invoicing Schedule and Submissions 30% $1,591.50 SD 30% $1,591.50 DD 30% $1,591.50 CD 10% $530.50 Construction $5,305.00 Total Contract Form New Contract Request Entity information Entity Name* CAIRN DESIGN LLC Contract Name* Entity ID* g00039527 Cl New Entity? Contract ID ARCHITECTURAL/ENGINEERING DESIGN 12022-05301 5831 Contract Status CTB REVIEW Contract Description* TASK ORDER # 2- FACILITIES GENERATOR DESIGN Contract Description 2 Contract Type* TASK ORDER Amount* $5,305.00 Renewable* NO Automatic Renewal Grant IGA Contract Lead* SGEESAMAN Contract Lead Email sgeesarnanOco.weld.co.us Parent Contract ID Requires Board Approval YES Department Project # Department Requested BDCC Agenda Due Date BUILDINGS AND GROUNDS Date* 05121/2022 05/25/2022 Department Email CM - Build i ngGrounds@weldgov.c orn Department Head Email CM-BuildingGrounds- DeptHead Pweldgov.com ['.minty Attorney GENERAL COUNTY A I I ORNEY EMAIL County Attorney Email CM- COUNTYA I I ORNEYVWELDG OV.COM Will a work session with BOCC be required?* NO Does Contract require Purchasing Dept. to be included? YES Bid JRFP #* B2200050 If this is a renewal enter previous Contract ID If this is part of a A►NSA enter MSA Contract ID Note. the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in Onlase Contract Dates Effective Date Review Date* Renewal Date 09:1612022 Termination Notice Period Committed Delivery Date Expiration Date r 09:16/2022 Contact Information Contact Info Contact Name Purchasing Purchasing Approver CHERYL PATTELLI Approval Process Department Head TORY TAYLOR DH Approved Date 05;17/2022 Final Approval BOCC Approved BOCC Signed Date BOCC Agenda Date 05;'23,'2022 Originator SGEESAMAN Contact Type Contact Email Finance Approver CHERYL PA E E ELLE Contact Phone 11 Purchasing Approved Date 05;18,/2022 Finance Approved Date 05/18/2022 Tyler Ref # AG 052322 Legal Counsel BRUCE BARKER Contact Phone 2 Legal Counsel Approved Date 05/18,"2022 Hello