Loading...
HomeMy WebLinkAbout20220396.tiffDEPARTMENT OF PLANNING SERVICES 1555 N 17th Ave, Greeley, CO 80631 Phone (970) 400-6100 Fax (970) 304-6498 USE BY SPECIAL REVIEW (MINING OPERATION) APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: RECEIPT # /AMOUNT # 1$ CASE # ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: To be completed by APPLICANT is accordance with procedural guide requirements: 1. I (we), the undersigned, hereby request a hearing before the Weld County Planning Commission concerning a proposed sand & gravel (gravel, coal, borrow pit, etc.) mining operation for the following described unincorporated area of Weld County: Legal Description Part of , Section 7 , Township 8 North, Range 65 West Flood Plain: n/a Zone District: X , Total Acreage: 522 , Overlay District: Weld Geological Hazard: n/a Airport Overlay District: nla 2. Surface owner(s) of area of land described Name: North Weld Gravel RLLP Address: 13480 CR 100 Phone: 970-897-2252 Name: Address: Nunn, CO 80648 Phone: 3. Owner(s) of mineral rights or substance to be mined 4 Name: North Weld Gravel RLLP Name: Applicant's name: C&H Aggregate, LLC Address; 46335 CR 39, Nunn, CO 80648 Address: 13480 CR 100 Phone: 970-897-2252 Address: Nunn, CO 80648 Phone: Email Address_derek@chexcavation.com 5. Identify any prior permits for mining held by applicant or affiliated person: SUP -298 Phone: 970-834-2247 I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal authority to sign for the corporation. A i / 2f ignature: wner or Authorized Agent Date Sign er or Authorized Agent ate DEPARTMENT OF PLANNING AND BUILDING DEPARTMENT OF PUBLIC HEALTH AND ENVIRONNMENT 1555 NORTH 17T" AVENUE GREELEY, CO 80631 AUTHORIZATION FORM FOR BUILDING, PLANNING AND HEALTH DEPARTMENT PERMITS AND SERVICES I, (We), X10 �`-� �t�P�l� rsteY L L give permission to Applegate Group, Inc. (Owner — please print) (Applicant/Agent — please print) to apply for any Planning, Building or Health Department permits or services on our behalf, for the property located at (address or parcel number): 055107000018 and 055107000019 Legal Description: Subdivision Name: n/a a of Section 7, Township__8__N, N, Range 65_w 5 W Property Owners Information: North Weld Gravel RLLP Lot Block Phone:j�9o) 7-2s E-mail: �b��� ,o Applicant/Agent Contact Information: Derek Daniels (C&H Aggregates) Phone: (970) 834-2247 E -Mail: derek@chexcavatiorj.com Email correspondence to be sent to: Owner Applicant/Agent Postal service correspondence to be sent to: (choose only one) Owner Additional Info: Both X Applicant/Agent X Owner Signature: Date: - / - 2. Owner Signature: Date: -_.. _ _ - June 202 I AG File 18-136 . ; Applegate SOLUTIONS Group, Inc. 43646 WCR 45 WoterResomre AdW�iif�rthe West Ault CO, 80610 www.applegategroup.com 303-452-6611 ITEM 1 APPLICATION FORM See attached Use by Special Review (USR) application for a mining operation. The purpose of this USR application is to amend and expand the North Weld Gravel Pit that is currently authorized by Weld County Special Use Permit (SUP) 298. The North Weld Gravel Pit and the recent expansion were approved by the Division of Reclamation, Mining, and Safety (DRMS) under DRMS Permit No. M-1976-018. It was the subject of a pre -application USR consultation under PRE21-0087. The purpose of the proposed expansion of the North Weld Gravel Pit is to allow C&H Aggregates to continue providing aggregate material to Colorado and the region. The site will be mined dry using excavators and loaders; material processing (including crushing and sorting) will occur onsite before the processed materials is hauled off site. The mine will encompass 522 acres of Section 7, Township 8 North, Range 65 West of the 6t" P.M. in Weld County, Colorado. The site will be mined in 5 distinct phases. The size of the phases vary from 22 acres to 126 acres. The depth of the resource is approximately 24' below surface grade. C&H Aggregates anticipates mining approximately 800,000 tons of material per year, with each phase being mined for approximately 5 years (depending on market conditions). The lift of the mint is expected to be roughly 20 years (again, depending on market conditions). No slurry walls or compacted clay liners will be necessary, as C&H Aggrcgatcs dots not anticipate mining into the groundwater table. The overburden material extends to approximately 6' below surface grade. The expansion to the existing North Weld Gravel Pit will benefit the County by providing construction materials at an economic cost, providing local jobs, and generating tax revenue for County programs. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application ITEM 3 QUESTIONNAIRE C&H Aggregates is planning to enlarge the existing sand and gravel mint located in Section 7, Township 8 North, Range 65 West of the 6th P.M. in Weld County, Colorado. The existing North Weld Gravel Pit encompasses 80 acres in the East V2 of the Northeast '/4 of Section 7 and is authorized by Weld County SUP -298. By this permit amendment application, C&H Aggregates is seeking to add an additional approximately 442 acres in Section 7, for a new total permitted acreage of approximately 522 acres all located within that Section. The amended permit area will encompass Weld County Parcel Nos. 055107000018 and 055107000019. The North Weld Gravel Pit may also accept material from other mints for processing, such as from the adjacent Lone Tree Creek Pit (USR1 1-0020). Please see the answers to all of Weld County's Use by Special Review application questions below. A detailed description of the method of mining operation a. The structures to be erected on site will include a scale house and processing equipment for sorting, crushing, stockpiling, and loading of material. Such processing equipment will include conveyors, screcners, crushers, and generators. b. The maximum number of employees anticipated to be on site is 12 at any one time. The hours of operation are planned to be 24 hours per day, seven days per wcck. By seeking authorization to actively mint and process and haul material 24 hours a day, seven days a wcck, C&H Aggregates is requesting to operate beyond the standard Mining Operation Policy in Section 23-4-290.B of the Weld County Code, which typically limits sand and gravel operations to daylight hours. The mining operations is remote from population centers and there only two residences nearby; therefore all -day operations would have minimal impact on Weld County citizens while allowing C&H Aggrcgatcs to minimize the lifespan of the mint in order to reclaim the site to rangeland as soon as possible. c. The operation will be a dry pit with an estimated mining amount of 800,000 tons per year. d. Shipping of the mined material will be performed using WCRs 39, 94, and 90. No County bridges arc anticipated to be regularly used while transporting material from the site. The primary site entrance will continue to be the existing entrance on WCR 39. A secondary site cntrancc may be constructed on WCR 37 to allow transportation of material to the North Weld Gravel Pit from the adjacent Lone Tree Pit. c. The area of the mint is 522 acres in Section 7. Mining operations will occur in 5 distinct phases that arc 22 acres to 125 acres in size. At any one time only one phase will be actively mined, one phase will house the processing cquipmcnt, and one phase will be in active reclamation. f. Depending on market conditions, C&H Aggregates anticipates that it will take approximately five years to mine an individual phase and one year to reclaim an individual phase. g. Based on subsurface explorations, it was observed that topsoil and overburden extends to approximately 6' BSG (below surface grade) while the target sand and gravel deposit cxtcnds to approximately 24' BSG. Mint slopes will be 1H:1 V. h. The completed mine will be reclaimed to rangeland similar to its current status. Topsoil and overburden from the first phase will be stockpiled for use at final reclamation. After that, topsoil and overburden stripped from the active mine phase will be used to reclaim the previously mined phase. Reclaimed slopes will be no steeper than 3H:1 V. i. The Colorado Division of Reclamation, Mining, and Safety was the source of technical advice for the type and methods of reclamation for this site. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application 2. A statement which explains how the proposal is consistent with the Weld County Comprehensive Plan. a. Per the current Weld County Comprehensive Plan (Chapter 22 of the Home Rule Charter for the County of Weld, Colorado), the County recognizes that mineral resource extraction is an essential industry. b. The proposed mint complies with the goals and policies for general commercial mineral deposits as defined in Section 22-5-80: i. The land on which the mine is located has to this point been conserved for exploitation of the commercial mineral deposit on which it is located. ii. The proposed mine promotes the reasonable and orderly exploration and development of mineral resources. iii. The proposed mine minimizes the impact of surface mining activities on the surround land, land uses, roads, and highways. iv. The proposed mine minimizes hazardous conditions related to mining activities and at the mining site. A statement which explains how the proposal is consistent with the intent of the district in which the use is located. a. The site is in an area zoned agricultural. The intent of this zone district is not only for the conduct of agricultural activities, but also for natural resource extraction and energy development without the interference of other, incompatible land uses. The proposed mint is for natural resource extraction, which is consistent with the intent of the agricultural zone district. 4. A statement which explains what efforts have been made, in the location decision for the proposed use, to conserve productive agricultural land in the agricultural zone district. a. Although located in the agricultural zone, this parcel is not cultivated or irrigated. Instead, it is operated as open rangeland. Only the phases that are actively being mined, housing the processing equipment or in active reclamation will be unavailable for continued open rangeland use. Once a phase has been reclaimed; rangeland use of that phase may restart. Once the entire site has been mined and rcclaimcd, the cntirc parcel will have been returned to open rangeland. 5. A statement which explains there is adequate provision for the protection of the health, safety and welfare of the inhabitants of the neighborhood and the County. a. The proposed mint is in a remote part of unincorporated Weld County. By sheer virtue of its location, it will post minimal danger to County residents. Additionally, operations at the mine will be conducted with safety being the highest priority. 6. A statement describing the existing surrounding land uses and explaining how the proposal will be compatible. a. The surrounding land uses are generally open rangeland. One adjacent parcel is the site of an existing gravel pit (Lone Tree Pit, USR 11-0020) and another adjacent parcel is the site for a recreational horse racing track (1MUSR18-17-0024A). The proposed gravel mine on the site will not interfere with these surrounding land uses. 7. A statcmcnt describing the existing land use. a. The existing land use of the parcel is open rangeland. 8. Describe, in detail, the following: a. How many people (employees, visitors, buyers, ctc.) will use this site? i. C&H Aggregates anticipates that up to 17 people, including employccs, contractors, truck drivers, customers, visitors, ctc., will use this site. b. What arc the hours of operation? i. The operation is anticipated to be 24 hours per day. c. What type and how many animals, if any, will be on this site. i. No animals will be on this site. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application d. What kind (type, size, weight) of vehicles will access this site and how often? i. Passenger cars of typical weight (approximately 12 roundtrips per day) and OTR tractor trailers weighting roughly 80,000 to 85,000 lbs (approximately 150 roundtrips per day) will access and depart the site to haul material and personnel. Some trucks may be permitted to haul up to 90,000 to 110,000 lbs. Excavators and loaders will operate internally within the mine. c. Who will provide fire protection for the site? i. The site is in the Nunn Fire Protection District, who will provide fire suppression on an as -needed basis. Additionally, C&H Aggregate's dust control operations will provide supplemental fire protection. f. What is the water source on the property? i. C&H Aggregates is seeking a Substitute Water Supply Plan approved through the Division of Water Resources to allow water diverted from nearby Lone Tree Creek to be used for non -potable purposes on the site such as dust suppression, material washing, and landscape irrigation. Potable bottled water will be provided for employee use. g. What is the sewage disposal system on the property? i. There are currently no permanent sewage disposal systems on the property. Instead, C&H Aggregates utilizes portable toilets and contracts with Fuzion Field Services for disposal of sewage generated at the mining site. h. If storage or warehousing is proposed, what type of items will be stored? i. The only storage will be open stockpiles of topsoil and overburden. These stockpiles will be stabilized to prevent erosion until they arc replaced during reclamation operations. i. Explain where storage and/or stockpile of wastes will occur on this site. i. Reject material will be stored within the active processing phase. This waste material may be sold and, if not, will eventually be used for reclamation purposes to grade the final topography. j. Explain the proposed landscapinglscreening for the site. The landscaping shall be separately submitted as a landscape plan map as part of the application submittal. i. Topsoil and overburden will be stockpiled along the cast and southern perimeter of the site. Screening will be unnecessary on the site because this site falls under the industrial noise standards that does not require berms. Landscaping will be limited to stabilizing stockpiles to prevent erosion. k. Explain how long it will take to construct this site and when construction and landscaping is scheduled to begin. i. C&H Aggregates anticipates that initial stripping of the first phase and construction of any additional screening bcrms will occur within two months of the USR being approved. 1. Explain the proposed reclamation procedures when termination of the Use by Special Rcvicw activity occurs. i. Reclamation will be on -going during the entire mine operation, which the mined - out phase being reclaimed while a new phase is opened for mining. Upon final reclamation, all mint slopes will be graded to no steeper than 3H:1 V. All processing equipment will be removed, and the area re -seeded with a native grass mix. The entire parcel will be reclaimed to rangeland, which is the current use of the parcel. m. Explain how the storm water drainage will be handled on the site. i. During mining and at reclamation the mine site will be graded to drain internally, thus retaining stormwatcr and allowing it to percolate slowly into the ground. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application n. Method and time schedule of removal or disposal of debris, junk and other wastes associated with the proposed use. i. The mine site is not anticipated to generate debris, junk, or wastes. All material stripped and stockpiled will be used during reclamation activities. o. A statement delineating the nccd for the proposed use. i. Weld County and the State of Colorado has a need for aggregate for various construction projects; this gravel pit will meet that need. 9. A statement which explains the Use by Special Review area is not located in a flood plain, geologic hazard and Weld County Airport overlay district area; or that the application complies with Chapter 23, Article V. Overlay District Regulations as outlined in the Weld County Code. a. The proposed mine is not located in a defined flood plain, geologic hazard area, or Weld County Airport overlay district area. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application ITEM 8 LEGAL RIGHT TO ENTER See the attached "Source of Legal Right to Enter" document (signed by North Wcld Gravel RLLP) granting C&H Excavation LLC authorization to conduct mining and reclamation operations on the parcels. C&H Aggrcgatcs is a subsidiary of C&H Excavation LLC. C&H Aggrcgatcs North Weld Gravel Pit Weld County USR Permit Application Source of Legal Right to Enter In accordance with the terms of a Real Estate Contract for the following described property, between the undersigned, as owner of said property and C&H Excavation LLC, the undersigned hereby agrees to the inclusion of said property by C&H Excavation LLC, in all necessary federal, state, and local permit applications required to conduct mining & reclamation operation on this property. Section 7, Township 8 North, Range 65 West, County of Weld, State of Colorado, Parcels 055107000018 & 05107000019. North Wed Gravel, RLLP State of Colorado ) ) SS. County of Weld ) The foregoing instrument was acknowledged before me this 3 by North Weld Gravel, RLLP. Witness my hand and official seal. (SEAL) My commission expires: l/— TROY =PUBLIC NOT STATE NOTARYMY C0MP+�SS10N 1 Date day of /A 2020 // Notary Public ITEM 9 DRMS PERMIT See the attached approval letter from the DBMS for the North Weld Gravel Pit amendment under DBMS Permit No. M-1976-018. The entire DRMS permit application and adequacy review information can be viewed at https://dnrwcblink.state.co.us/drms/search.aspx?cr-1; input "M1976018" in the Permit No. starch bar. The final approved reclamation plan (Exhibit E) and reclamation plan map (Exhibit F) arc attached. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application DN� April 14, 2021 COLORADO Division of Reclamation, Mining and Safety Department of Natural Resources 1313 Sherman St. Room 215 Denver, CO 80203 Mr. Cliff Simpson C & H Aggregate, LLC 46335 CR 39 Nunn, CO 80648 Re: North Weld Gravel, Permit No. M-1976-018, Amendment Approval, Revision No. A1\1-1 Dear Mr. Simpson: On March 18, 2021 the Division of Reclamation, Mining and Safety approved the Amendment application submitted to the Division on October 22, 2020, addressing the following: The terms of the Amendment No. 1 approved by the Division are hereby incorporated into Permit No. M-1976-018. All other conditions and requirements of Permit No. M- 1976-018 remain in full force and effect. If the revised liability amount exceeds the performance bond currently held (see below), please submit additional bond. The revision will not be final until the bond is approved by the Division. Bond Held: Prior Liability: Change in Liability: Revised Liability: If you have any questions, please contact me. Sincerely, Daniel J. Cunningham Environmental Protection Specialist $263,452.00 $236,452.00 $415,108.00 $651,560.00 1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov 'i Jared Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director ITEM 10 OIL & GAS AGREEMENTS This is not applicable; there are no oil and gas facilities on the property and no known utility or oil & gas encumbrances on the property. ITEM 11 DITCH / IRRIGATION AGREEMENT There are no ditches or irrigation on the property itself. However, the Pierce Lateral runs along the southeast border of the mint. C&H Aggregates received approval from the Pierce Lateral Ditch Company to bring the edge of the mined land within 50 feet of the ditch bank. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application ITEM 13 NOTICE OF IGA INQUIRY This is not applicable; the property does not fall within any Intergovernmental Agreement boundaries. ITEM 14 APPLICATION FEE The $15,240 application fee is attached, corresponding to $5,000 for the first 10 acres and $20 per acre for the remaining 512 acres on the property. ITEM 15 INVESTIGATION FEE This is not applicable; no permitted activities have occurred or will occur prior to obtaining a permit. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application ITEM 16 DRAINAGE REPORT This drainage report was prepared for the North Weld Gravel Pit (pre -application USR number of PRE21- 0087). The purpose of this drainage report is to document the approximate historical runoff rate from the undeveloped site and the anticipated new runoff rate post-dcvelopmcnt, and to identify allowable exceptions to stormwater detention in Weld County Code. The North Weld Gravel Pit as proposed will encompass 522 acres in Section 7, Township 8 North, Range 65 West. See the USR Plat Map prepared in response to Item 2 for existing and proposed topography. Drainage conditions at the site will be similar during both active mining operations and during final reclamation. During the active mining operation phase this site will qualify for an cxccption to stormwatcr detention pursuant to Weld County Codc §8-11-40.1.6 (gravel pits with internal drainage). Following reclamation, this site will qualify for an exception to stormwatcr detention pursuant to Weld County Codc §8-11-40.1.6 (gravel pits with internal drainage) and §8-11-40.1.8 (dcvclopmcnt that dots not increase the imperviousness of the site). As required by code, the following drainage narrative supporting these cxccptions is provided: 1. Any existing and proposed improvements on the property a. A portion of the existing property is an active sand & gravel pit, while the remainder is undeveloped open rangeland. The proposed improvements to the site include mining activities on 522 acres. The primary commodity to be mined is sand and gravel, which will be processed on site within one of the active mine phases. Temporary structures for processing equipment and employee offices will be erected but will be removed upon reclamation; no permanent structures will be built. During active mining operations, all mined areas will drain internally, and any stormwater collected will be allowed to step naturally into the ground; no dewatering is proposed for this site. Following reclamation, the entire site will be graded to slope internally and will be reclaimed to a similar land use to cxisting conditions (open rangeland). 2. The exception being rcqucstcd for consideration a. The exception being rcqucstcd is the gravel pit exception under Weld County Codc §8-11- 40.1.6 ("Gravel pits if the stormwater drains into the gravel pit. Releases from the site shall comply with the Weld County Storm Drainage Criteria, including dcwatcring. Topographical information shall be provided") and §8-11-40.1.8 ("Development of sites where the change of use dots not increase the imperviousness of the site"). Topographical information for the cxisting conditions and proposed conditions is provided in response to Item 2 (USR Plat Map). 3. Where the water originates if it flows onto the property from an off -site source a. There are no significant sources of inflow onto the property. 4. Whcrc the water flows as it leaves the property a. Thcrc are no significant points of outflow from the property. 5. The direction of flow across the property a. Generally speaking, in its current undeveloped status the parcel gently slopes to the southeast. Typically, the parcel generates minimal surface runoff. During severe storm events, some surface runoff may sheet flow on the property towards the southeast until reaching the barriers created by WCR 94 and a raised berm along the Pierce Lateral, at which point the water may be directed to either Lone Tree Creek to the west or into the Pierce Lateral itself. Such runoff is a rare occurrence, however. During active mining operations, runoff from the mined areas will drain internally to the mine phases. During mining activities, all stormwatcr will drain internally to the mined areas. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application 6. Previous drainage problems with the property, if any a. To my knowledge there have been no previous drainage problems with this property. 7. The location of any irrigation facilities adjacent to or near the property a. The Pierce Lateral runs along the southeast edge of the property. An irrigation reservoir and several areas of irrigated land exist on adjacent parcels. 8. Any additional information pertinent to the development a. The proposed mint is within the non -urbanizing drainage area; therefore, the release of detained water shall not exceed the historic runoff rate of the 1 -hour, 10 -year storm for an undeveloped site (defined as having an imperviousness of 2%). b. According to NOAA Atlas 14, the 1 -hour 10 -year storm in this area drops a total precipitation depth of 1.46 inches. c. The weighted runoff coefficient was calculated using runoff coefficient guidance from Weld County.' Based on the soil survey, the property is underlain by well -drained soils that are 100% in hydrologic soil group B. of the following proportions: 19.8% Type A, 62.7% Type B, 10.8% Type C, and 6.7% Type D. Therefore, for 2% imperviousness in a 10 -year storm the weighted runoff coefficient is 0.17 d. Utilizing the Rational Method (Q — CiA) where C is the runoff coefficient (set to 0.17 for this parcel), i is the rainfall intensity in inches per hour (set to 1.46 inches for the 1 -hour 10 -year storm for this analysis), and A is the drainage area in acres (set to 522 acres for this parcel), the estimated historical peak discharge Q is approximately 130 cfs. Given the circumstances and proposed operations at the site, in my opinion the North Weld Gravel Pit qualifies for an exemption to stormwatcr detention during both active mining operations and after final reclamation. My investigation indicates that the historical runoff from the proposed North Weld Gravel Pit will be unchanged between historical conditions and post -development conditions. The technical material in this report was prepared by Applegate Group, Inc. based on investigations and review of available information concerning the existing and proposed drainage conditions on the property. We reserve the right to update, supplement, or revise our analysis should new or additional information become available. This drainage report was prepared under the supervision and direction of the undersigned below: Jared Dains, P.E. Water Resource Engineer ' Weld County Engineering and Construction Criteria, prepared by Atkins, January 2021 C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application ITEM 17 TRAFFIC STUDY This preliminary traffic impact analysis was prepared for the North Weld Gravel Pit (pre -application USR number of PRE21-0087). The intent of this analysis is to assist the County in determining the project's cumulative development impacts, appropriate project mitigation, and improvements necessary to offset this project's impacts. 1. Describe how many roundtrips per day are cxpcctcd for each vehicle type: a. Passenger Cars/Pickups: 20 roundtrips per day b. Material Trucks: 150 roundtrips per day 2. Describe the expected travel routes or haul routes for site traffic a. Starting at the main site entrance on the cast side of the site, the primary transportation route will be south on WCR 39 to WCR 90, thence west on WCR 90 to Highway 85. b. Starting at the alternate site entrance on the west side of the site, the secondary transportation route will be south on WCR 37 to WCR 94, thcncc west on WCR 94 to Highway 85. 3. Describe the travel distribution along the routes a. Approximately 90% of traffic will take the primary transportation route. b. Approximately 10% of traffic will take the secondary transportation route. 4. Describe the time of day that you expect the highest traffic volumes a. The highest traffic volume of the passenger carts is cxpcctcd to occur at the beginning and ending of each shift when employees clocking out leave the site and employees clocking in arrive. Day shift will likely begin at 8am and end at 4pm. Afternoon shift will likely begin at 4pm and end at midnight. Night shift will likely begin at midnight and end at 8am. b. The highest traffic volume of the material trucks is cxpcctcd to occur during the daylight hours and on rare occasions the material will hauled at nighttime as well. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 Prepared By: Sustainable Traffic Solutions, Inc. http://www. sustainabletrafficsolutions.com/ Joseph L. Henderson, PE, PTOE 303.589.6875 ioe(cDsustainabletrafficsoIutions.com Joseph L. Henderson's electronic or digital seal and signature is effective only as to that version of this document as originally published by Joseph L. Henderson. Joseph L. Henderson is not responsible for any subsequent modification, corruption, or unauthorized use of this document. To verify the validity or applicability of the seal and signature, contact Joseph L. Henderson. Table of Contents Page 1.0 Introduction...................................................................................................1 2.0 Study Assumptions.......................................................................................1 3.0 Existing Conditions....................................................................................... 2 3.1 Existing Traffic Volumes.......................................................................... 2 3.2 Level of Service Analysis......................................................................... 3 3.3 Crash Data..............................................................................................4 4.0 Site Generated Traffic Volumes...................................................................4 4.1 Trip Generation........................................................................................ 4 4.2 Trip Distribution and Assignment.............................................................4 5.0 Auxiliary Lanes..............................................................................................4 6.0 Year 2022 Traffic Conditions........................................................................ 5 7.0 Year 2041 Traffic Volumes............................................................................6 8.0 Sight Distance Review..................................................................................6 9.0 Haul Route Review........................................................................................7 10.0 Traffic Signal Warrant Study........................................................................8 11.0 Conclusions................................................................................................... 8 List of Tables Table 1 — Existing and Projected Daily Traffic Volumes Table 2— Intersection Operational Summary Table 3— Trip Generation Estimate Table 4— Determination of Need for Auxiliary Lanes for Movements Impacted by the North Weld Gravel Pit Table 5— Auxiliary Lane Lengths Table 6— US 85 / WCR 90 Auxiliary Lane Lengths Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 Table of Contents (Continued) List of Figures Figure 1 — Vicinity Map Figure 2 — Site Plan Figure 3— Existing Traffic Volumes — Morning Peak Hour Figure 4 — Existing Traffic Volumes — Evening Peak Hour Figure 5 — Laneage and Traffic Control — Existing Figure 6 — Trip Distribution Figure 7 — Trip Assignment — Morning Peak Hour Figure 8 — Trip Assignment — Evening Peak Hour Figure 9 — Year 2022 Background Traffic Volumes — Morning Peak Hour Figure 10— Year 2022 Background Traffic Volumes — Evening Peak Hour Figure 11 — Year 2022 Total Traffic Volumes — Morning Peak Hour Figure 12 — Year 2022 Total Traffic Volumes — Evening Peak Hour Figure 13— Laneage and Traffic Control — Year 2022 Total Traffic Volume Scenarios Figure 14 —Year 2041 Background Traffic Volumes — Morning Peak Hour Figure 15— Year 2041 Background Traffic Volumes — Evening Peak Hour Figure 16— Year 2041 Total Traffic Volumes — Morning Peak Hour Figure 17— Year 2041 Total Traffic Volumes — Evening Peak Hour Figure 18 — Laneage and Traffic Control — Year 2041 Total Traffic Volume Scenarios Figure 19— WCR 37 Access Intersection Sight Distance — Combination Truck Figure 20 — WCR 39 Access Intersection Sight Distance — Combination Truck List of Appendices Appendix A CDOT Data Appendix B Traffic Count Data Appendix C VISTRO Analysis Results Appendix D Traffic Signal Warrant Analysis Sustainable Traffic Solutions, Inc. ii North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 North Weld Gravel Pit Traffic Impact Study 1.0 Introduction The North Weld Gravel Pit is currently operating northeast of Pierce in Weld County. The site is bounded by WCR 37, WCR 39, WCR 96 and WCR 94. The location of the pit is shown in Figure 1 and the site plan is contained in Figure 2. Access to the pit is from WCR 37 and WCR 39. The pit is currently operating on weekdays from 6:00 a.m. to 5:00 p.m. The primary haul route includes WCR 39 and WCR 90 between the pit and US 85. The secondary haul route includes WCR 37 to WCR 94 between the pit and US 85. In the future, the pit will operate every day for 24 -hours per day. Gravel will primarily be hauled during daylight hours and occasionally at night. The additional traffic that will be generated by the expansion of the North Weld Gravel Pit will use the primary haul route. No new traffic will use the secondary haul route. The study has been prepared based on the Weld County traffic impact study requirements'. 2.0 Study Assumptions The following assumptions were utilized for this study. Adjustment of Traffic Count Data for COVID 19. Historic traffic count data were used to determine if it is necessary to adjust the traffic counts collected for this project to compensate for the effect of COVID 19. The historic data were obtained from Count Station 215, a continuous count station on US 85 north of WCR 108. The data from the count station showed that volumes in July 2021 increased by 9% compared to the average of July 2018 and 2019. Therefore, it isn't necessary to adjust the volumes collected for this project. A table with the data from Count Station 215 is contained in Appendix A. • Short -Term Study Horizon. The pit is expected to be operational in the Year 2022, therefore, the short-term horizon is Year 2022. • Long -Term Study Horizon. The Year 2041 will be the long-term horizon because it is 20 years in the future. Growth in Background Traffic. This site and the roads providing access to the site are not included in any planning area, so it was necessary to rely on CDOT resources to make traffic growth assumptions. For US 85, an annual growth rate of 1.6% was calculated based on a 20 -year factor of 1.38 that Weld County Engineering and Construction Criteria — Section 8.1.3. Weld County. January2021. Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 was obtained from the straight-line diagram for US 85. WCR 90 is a paved road that extends from US 85 to SH 14. Considering the connectivity of WCR 90 with US 85 and SH 14, an annual growth rate for WCR 90 of 2.3% was determined using the 20 -year factor of 1.57 for SH 14. Traffic isn't expected to grow on WCR 39 because it is a gravel road that serves very sparsely populated area. The straight-line diagrams are contained in Appendix A. Future Improvements to the Study Area Intersections. The 2045 Weld County Transportation Plane identified improvements to auxiliary lanes at US 85 / WCR 90. They are planned between Year 2036 and 2045. The intersection has left turn and right turn deceleration lanes on both of the US 85 approaches along with a westbound to northbound right turn acceleration lane. The passenger car equivalents show that westbound left turn and right turn deceleration lanes are currently warranted and northbound to eastbound right turn acceleration lane is expected to be warranted by the Year 2022 background traffic (see Section 5.0). • Saturation Flow Rate. The saturation flow rate was assumed to be 1,600 passenger cars / hour / lane which is typical in rural areas. • Peak Hour Factor (PHF). The PHF used in the analysis are based on the peak hour counts that were collected for the project. For low volume approaches, a PHF of 0.85 was assumed. Truck Percentage. The data collected for the study shows that there are approximately 37% trucks on WCR 39. On US 85, the straight-line diagram reports 16% trucks. Data wasn't collected on WCR 90, so the truck percentage on SH 14 was used since both roads are east/west roads. The straight-line diagram for SH 14 reports 20% trucks. 90% trucks were assumed for both accesses to the pit. 3.0 Existing Conditions 3.1 Existing Traffic Volumes Traffic count data for the study were collected on Tuesday July 20, 2021 by All Traffic Data. The existing and future daily volumes are summarized in Table 1, and the existing peak hour volumes are contained in Figures 3 and 4. The majority of the existing traffic generated by the North Weld Gravel Pit utilizes the primary haul route that includes WCR 39 and WCR 90. The peak hour count data have been converted to passenger car equivalents and the summary is contained in Appendix B. The classification data were collected by Miovision when the traffic count data for the study were processed. The following FHWA vehicle classifications apply to the Miovision categories; Lights - 1 through 3, Mediums - 4 through 7, Articulated Trucks -8 through 13. 2045 Weld County Transportation Plan. Public Works Department. Adopted November 9, 2020. Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 An estimate of the existing traffic generated by the North Weld Gravel Pit is contained in the following table. The estimate was developed based on the following information that was provided by the operator. • Hours of operation — Monday through Friday from 6:00 a.m. to 5:00 p.m. • 15 employees • 96 trucks / day • 95% of the traffic uses the WCR 39 haul route and 5% uses the WCR 37 haul route 3.2 Level of Service Analysis To evaluate the performance of the study area intersections, the level of service (LOS) was calculated using PTV VISTRO software. This software package utilizes criteria described in the Highway Capacity Manual3. LOS is a measure used to describe operational conditions at an intersection. LOS categories ranging from A to F are assigned based on the predicted delay in seconds per vehicle for the intersection as a whole, as well as for individual turning movements. LOS A indicates very good operations, and LOS F indicates poor, congested operations. Acceptable intersection operation in urban areas is typically considered LOS C or better. The following table shows that all of the study area intersections are operating at LOS A and LOS B. The level of service for stop -controlled intersections is based on the lowest letter grade for the side -street movements. Figure 5 contains the existing laneage and traffic control at the study area intersections. Table 2 summarizes the operational analysis and the VISTRO output is contained in Appendix C. Highway Capacity Manual. 6th Edition. Transportation Research Board. 2016. Sustainable Traffic Solutions, Inc. 3 North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 3.3 Crash Data Crash data were obtained from CDOT for the signal warrant analysis at US 85 / WCR 90. The time period provided was from January 1, 2019 through December 31, 2019. One crash was reported during this time period. It was a broadside crash that resulted in one death and two injuries. The data are contained in Appendix A. 4.0 Site Generated Traffic Volumes 4.1 Trip Generation Quarries are not a land use that is addressed in the ITE Trip Generation manual4, therefore, the trip generation was determined based on information that was provided by Applegate Group, Inc. The truck and passenger vehicle traffic are summarized in Table 3. When the quarry is fully operational, the daily traffic volumes are expected to include 212 truck trips and 66 passenger vehicle trips. The trip generation for the shift changes and the hours between the morning and evening peak hours are included in a separate table. Shift changes are expected to occur at 8:00 a.m., 4:00 p.m., and midnight. 4.2 Trip Distribution and Assignment The trip distribution that is contained in Figure 6 is based on information that was provided by Applegate Group, Inc. The traffic entering and exiting the pit is expected to be primarily from the south on US 85. The peak hour trip assignment is contained in Figures 7 and 8. 5.0 Auxiliary Lanes STS reviewed the need for auxiliary lanes at the study area intersections based on Weld County and CDOT criteria. Table 4 summarizes the movements that are impacted by the traffic from the pit. Each volume is expressed in passenger car equivalents. The table shows when each lane will be warranted. It should be noted that several auxiliary lanes are warranted by existing traffic. Warranted by Existing Traffic • WCR 39 / Site Access — northbound left turn deceleration lane • WCR 90 / WCR 39 o southbound left turn deceleration lane (This movement will not be impacted by traffic from the pit.) o southbound right turn deceleration lane o eastbound left turn deceleration lane o southbound to westbound right turn acceleration lane • US 85 / WCR 90 Trip Generation, 111 Edition. Institute of Transportation Engineers. September 2021. Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 o westbound left turn deceleration lane o westbound right turn deceleration lane • US 85 / WCR 94 — northbound right turn deceleration lane Warranted by Year 2022 Background Traffic • US 85 / WCR 90 — northbound to eastbound right turn acceleration lane Based on the analysis that is contained in Table 4, the expansion of the North Weld Gravel Pit will not warrant any new auxiliary lanes. Table 5 shows the length of each new auxiliary lane. A review of the auxiliary lanes at US 85 / WCR 90 that will be impacted by the expansion of the North Weld Gravel Pit was performed and the summary is contained in Table 6. It shows: • The northbound right turn deceleration lane is extremely short. • The southbound left turn deceleration lane meets the requirements for the Year 2041 total traffic volume scenarios. • The westbound to northbound right turn acceleration lane is longer than required by the Year 2041 total traffic volume scenarios. 6.0 Year 2022 Traffic Conditions The Year 2022 background traffic volumes (without the development traffic) were estimated by inflating the existing volumes by the growth rates discussed in Section 2.0. Figures 9 and 10 contain the Year 2022 background traffic volumes. The projected peak hour volumes at the completion of the project were estimated by adding the traffic that is expected to be generated by the North Weld Gravel Pit to the background traffic volumes. The Year 2022 total traffic volumes are contained in Figures 11 and 12. Laneage and traffic control assumed in the total traffic volume scenarios is contained in Figure 13. Results of the analysis of the background and total traffic volume scenarios are summarized in the following table and a detailed summary is contained in Table 2. Refer to Appendix C for the VISTRO output. All of the intersections are expected to operate at LOS A and LOS B during the background and total traffic volume scenarios. The level of service for stop -controlled intersections is based on the lowest letter grade for the side -street movements. The northbound left turn deceleration lane on WCR 39 at the site access was assumed in the analysis. Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 7.0 Year 2041 Traffic Volumes The Year 2041 background and total traffic volumes were developed as discussed in Section 6.0. Figures 14 and 15 contain the background traffic volume scenarios, and the total traffic volume scenarios are contained in Figures 16 and 17. Laneage and traffic control assumed in the total traffic volume scenarios is contained in Figure 18. Results of the analysis of the background and total traffic volume scenarios are summarized in the following table and a detailed summary is contained in Table 2. Refer to Appendix C for the VISTRO output. All of the intersections are expected to operate at acceptable levels of service during the background and total traffic volume scenarios. The level of service for stop -controlled intersections is based on the lowest letter grade for the side -street movements. In addition to the auxiliary lane that was assumed in the Year 2022 traffic volume scenarios, the following new auxiliary lanes were assumed in the analysis. • WCR 90 / WCR 39 o southbound left turn deceleration lane (This movement will not be impacted by traffic from the pit.) o southbound right turn deceleration lane o eastbound left turn deceleration lane o southbound to westbound right turn acceleration lane • US 85 / WCR 90 o westbound left turn deceleration lane o westbound right turn deceleration lane o northbound to eastbound right turn acceleration lane 8.0 Sight Distance Review The intersection sight distance was measured at the site accesses to determine if adequate sight distance exists for vehicles to safely enter WCR 37 and WCR 39. The methodology for the analysis is contained in Section 9.5 of A Policy on the Geometric Design of Highways and Streets, 7th Editions. The sight distance evaluation is documented in Figures 19 and 20. Those figures show that adequate sight distance exists for combination trucks to safely enter WCR 37 and WCR 39 A Policy on the Geometric Design of Highways and Streets, 7th Edition. American Association of State Highway and Transportation Officials. 2018. Sustainable Traffic Solutions, Inc. 6 North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 from the site. Sight distance evaluations were not performed for passenger vehicles and single unit trucks because the requirements for combination vehicles are greater than for the other vehicle types. 9.0 Haul Route Review A review of the haul routes was performed to identify deficiencies. The following possible issues were identified. • US 85 / WCR 90. The following auxiliary lanes are warranted as noted. o westbound left turn deceleration lane — warranted by existing traffic o westbound right turn deceleration lane — warranted by existing traffic o northbound to eastbound right turn acceleration lane — expected to be warranted by Year 2022 background traffic Bridge on WCR 90 East of US 85. This two-lane bridge exists between the railroad tracks and WCR 33. It has an optimal rating of 40 tons, is rated for 36 tons, and doesn't have any restrictions. The bridge will have to be widened to accommodate the westbound left and right turn auxiliary lanes plus the northbound to eastbound right turn acceleration lane. Refer to Section 5.0 for a discussion of the auxiliary lanes. • WCR 90 / WCR 39. The following auxiliary lanes are warranted by existing traffic. o southbound left turn deceleration lane (This movement will not be impacted by traffic from the pit.) o southbound right turn deceleration lane o eastbound left turn deceleration lane o southbound to westbound right turn acceleration lane • WCR 39 / Site Access. The northbound left turn deceleration lane is warranted by existing traffic. • WCR 37 North of WCR 94. The roadway is constructed outside of the right- of-way due to drainage issues. Based on a discussion with Melissa King, the north leg will need to be reconstructed so that it is within the right-of-way if the traffic volumes increase dramatically. The drainage would need to be accommodated with the addition of a culvert. Data collected for the traffic study showed that there were 22 vehicles on WCR 37 during a 24 -hour period. The current traffic volumes on WCR 37 north of WCR 94 are very low and not expected to increase as a result of the expansion of the gravel pit, so reconstruction of WCR 37 north of WCR 94 by the operator of the pit will not be necessary. Sustainable Traffic Solutions, Inc. 7 North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 Paving Threshold. The threshold to pave roadways in Weld County is 400 vehicles per day (VPD). Considering this threshold, WCR 39 north of WCR 90 currently requires paving (see Table 1). • Dust Suppression Threshold. The threshold for dust suppression in Weld County is 200 vehicles per day (VPD). Considering this threshold, there are no roadways on the haul route that currently require dust suppression or will require it in the future assuming that WCR 39 will be paved north of WCR 90. 10.0 Traffic Signal Warrant Study A traffic signal warrant study was performed at US 85 / WCR 90 based on the requirements contained in the Manual on Uniform Traffic Control Devices6. The eight hour, four hour, peak hour, and crash warrants were evaluated using the following assumptions. • Speed Limit. The posted speed limit is 40 MPH. • Number of Main -Street Lanes. Two lanes were assumed in each direction. • Number of Side -Street Lanes. One side street lane was assumed. • Side -Street Right Turning Traffic. 50% of the right turning traffic was included in the warrant. • Crash Data. Crash data were obtained from CDOT for the period beginning on January 1, 2019 and ending on December 31, 2019. One crash was reported during this time period. It was a broadside crash that resulted in one death and two injuries. Turning movement count data were collected on November 10, 2021 from 6:00 a.m. to 6:00 p.m. for this analysis. The data are contained in Appendix D. The analysis shows that a traffic signal is not expected to be warranted by the Year 2041 total traffic volume scenarios. The traffic signal warrant analysis is contained in Appendix D. 11.0 Conclusions STS has drawn the following conclusions based on the analysis performed in the study. Intersection Operation. The study area intersections are currently operating at acceptable levels of service and are expected to continue to operate at acceptable levels of service through the Year 2041 total traffic volume scenarios. Manual on Uniform Traffic Control Devices. Federal Highway Administration. Revised May 2012. Sustainable Traffic Solutions, Inc. 8 North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 Auxiliary Lanes. The following auxiliary lanes are expected to be warranted at the study area intersections. Warranted by Existing Traffic • WCR 39 / Site Access — northbound left turn deceleration lane • WCR 90 / WCR 39 o southbound left turn deceleration lane (This movement will not be impacted by traffic from the pit.) o southbound right turn deceleration lane o eastbound left turn deceleration lane o southbound to westbound right turn acceleration lane • US 85 / WCR 90 o westbound left turn deceleration lane o westbound right turn deceleration lane • US 85 / WCR 94 — northbound right turn deceleration lane Warranted by Year 2022 Background Traffic • US 85 / WCR 90 — northbound to eastbound right turn acceleration lane Intersection Sight Distance. The intersection sight distance is adequate for passenger vehicles, single unit trucks, and combination trucks at both site accesses. Traffic Signal Warrant Study at US 85 / WCR 90. A traffic signal is not expected to be warranted by the Year 2041 total traffic volumes. Haul Route Review. The following conclusions were noted in the haul route review. • Bridge on WCR 90 East of US 85. The bridge will have to be widened to accommodate the westbound left and right turn deceleration lanes and the northbound to eastbound right turn acceleration lane. Refer to the discussion in Section 5.0. • WCR 37 North of WCR 94. The current traffic volumes on WCR 37 north of WCR 94 are very low and not expected to increase as a result of the expansion of the gravel pit, so reconstruction of WCR 37 north of WCR 94 by the operator of the pit will not be necessary. • Paving Threshold. WCR 39 north of WCR 90 currently requires paving since the current traffic volumes exceed the paving threshold. • Dust Suppression Threshold. There are no roadways on the haul route that currently require dust suppression or will require it in the future assuming that WCR 39 will be paved north of WCR 90. Sustainable Traffic Solutions, Inc. 9 North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 Tables Table 1 — Existing and Projected Daily Traffic Volumes Table 2— Intersection Operational Summary Table 3— Trip Generation Estimate Table 4— Determination of Need for Auxiliary Lanes for Movements Impacted by the North Weld Gravel Pit Table 5— Auxiliary Lane Lengths Table 6— US 85 / WCR 90 Auxiliary Lane Lengths Sustainable Traffic Solutions, Inc North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc Weld County, Colorado November 22, 2021 Table 1. Existing and Projected Daily Traffic Volumes Note 1. Daily volumes collected for the study are highlighted in yellow. The other volumes were estimated assuming a peak hour to daily ratio of 10% for the evening peak hour. North Weld Gravel Pit 10-15-21 11/17/2021 1 - Daily Volumes 4:52 PM Table 2. Intersection Operational Summary Notes 1. The level of service for intersections with side -street stop -control is determined by the movement with the highest delay value. North Weld Gravel Pit 10-15-21 11/18/2021 2 -LOS 1:44 PM Table 3. Trip Generation Estimate Notes: 1. The maximum traffic will occur following the expansion of the mining operations. Approximately 212 trips (86%) will be by trucks and 34 by passenger vehicles. 2. An estimate of the existing traffic generated by the quarry was provided by the operator. 3. The additional traffic that will result from the expansion of the mining operations. Trip Generation for New Traffic 6:00 a.m. .. .. . .. . .. . . .. . .. . . .. . . .. . . .. . 0 0 0 0 7:00 a.m. - Shift Change 7 1 8 0 10 0 8:00 a.m. - Shift Change 5 1 1 1 6 3 8 9:00 a.m. 1 1 1 1 3 3 10:00 a.m. 1 1 1 1 3 3 11:00 a.m. 1 1 1 1 3 3 12:00 p.m. 1 1 1 1 3 3 1:00 p.m. 1 1 1 1 3 3 2:00 p.m 1 1 1 1 3 3 3:00 p.m. - Shift Change 5 1 1 6 1 8 3 4:00 p.m. - Shift Change 7 1 1 1 8 3 10 5:00 p.m. 1 0 1 0 3 11:00 p.m. - Shift Change 5 5 0 5 0 12:00 a.m. - Shift Change 5 0 5 0 5 North Weld Gravel Pit 10-15-21 11/16/2021 3 - Trip Gen 12:47 PM Table 4. Determination of Need for Auxiliary Lanes for Movements Impacted by the North Weld Gravel Pit 1 - WCR 39l Site Access NBLT Decal' 10 10 24 8 1 10 3 r r 10 24 20 27 10 24 20 27 SBLT Decal' 10 23 23 0 0 0 0 23 23 23 23 23 23 23 23 2-WCR90/WCR39 SBRT Decal' 25 58 52 0 8 0 10 58 52 58 62 Se 52 58 62 EBLT Decel2 10 52 31 8 8 10 10 52 31 62 41 52 31 62 41 SB to WB RT Accel z 50 58 52 0 8 0 10 58 52 58 52 58 52 58 62 NBRT Decal Existing 31 29 7 1 9 2 32 29 40 32 43 40 52 43 SBLT Decal Existing 39 9 1 0 1 0 40 9 41 9 54 12 55 13 3 - US 851 WCR 90 WBLT Decal 2 10 86 38 0 7 0 9 67 39 87 48 103 60 103 68 WBRT Decal' 25 38 18 0 1 1 1 39 to 40 17 60 25 61 26 NB to EB RT Accel 50 31 29 7 1 9 2 67 39 87 48 103 60 103 68 WB to NB RT Accel Existing 38 16 0 1 1 1 39 16 40 17 60 25 61 26 SBRT Decal' 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 WCR 371 WCR 94 EBLT Decal' 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SB to WB RT Accel' Applicable 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NBRT Decal' >10 4 11 0 0 0 0 4 11 4 11 6 15 6 15 SBLT Decal' >10 2 1 0 0 0 0 2 1 2 1 3 1 3 1 US851 WCR94 WBLTDecel' 10 7 4 0 0 0 0 7 4 7 4 7 4 7 4 WBRT Decal' 25 2 1 0 0 0 0 2 1 2 1 2 1 2 1 NB to EBRTAccel' 50 4 11 0 0 0 0 4 11 4 11 6 15 6 15 WBto NB RT Accel' >10 2 1 0 0 0 0 7 4 7 4 2 1 2 1 Notes XX Threshold Met or Exceeded 1. The need for the auxiliary lane was determined based on Weld County criteria for local roads. 2. The need for the auxiliary lane was determined based on Weld County criteria for collector roads. 3. The need for the auxiliary lane was determined based on COOT criteria for an EX roadway. 4. The existing and site generated volumes are expressed in passenger car equivalents (PCE). 5. Refer to Table 3 for the conversion of site generated traffic to passenger car equivalents. North Weld Gravel Pit 10-15-21 11/17/2021 4 -Turn Lane Summary 1:52 PM Table 5. Auxiliary Lane Lengths .. 1 - WCR 39/Site Access NBLT Decel Weld County 55 27 600 222 27 627 2-WCR 90 /WCR 39 SBLT Decel Weld County 55 23 600 222 23 623 SBRT Decel 55 62 600 222 0 600 EBLT Decel 55 62 600 222 62 662 SB to WB RTAccel 55 62 960 222 0 960 3-US85/WCR90 WBLT Decel Weld County 55 103 600 222 103 703 WBRT Decel 55 61 600 222 0 600 NB to EB RTAccel 55 103 960 222 0 960 US 85 / WCR 94 NBRT Decel CDOT 40 15 370 144 0 514 Notes 1. Refer to Table 4 for the peak hour volumes expressed in passenger car equivalents. 2. A 12' wide lane was assumed to determine the taper length. North Weld Gravel Pit 10-15-21 11/18/2021 5 -Turn Lane Geometry 2:36 PM Table 6. US 85 / WCR 90 Auxiliary Lane Lengths Existing Auxiliary Lane Geometry 1 Year 2041 Auxiliary Lane Geometry Note 1. The existing geometry was estimated using aerial photos obtained from Google Maps. North Weld Gravel Pit 10-15-21 11/17/2021 6 - US 85-WCR 90 5:25 PM Figures Figure 1 —Vicinity Map Figure 2— Site Plan Figure 3— Existing Traffic Volumes — Morning Peak Hour Figure 4— Existing Traffic Volumes — Evening Peak Hour Figure 5— Laneage and Traffic Control — Existing Figure 6— Trip Distribution Figure 7— Trip Assignment — Morning Peak Hour Figure 8 — Trip Assignment — Evening Peak Hour Figure 9— Year 2022 Background Traffic Volumes — Morning Peak Hour Figure 10— Year 2022 Background Traffic Volumes — Evening Peak Hour Figure 11 — Year 2022 Total Traffic Volumes — Morning Peak Hour Figure 12— Year 2022 Total Traffic Volumes — Evening Peak Hour Figure 13— Laneage and Traffic Control — Year 2022 Total Traffic Volume Scenarios Figure 14 — Year 2041 Background Traffic Volumes — Morning Peak Hour Figure 15— Year 2041 Background Traffic Volumes — Evening Peak Hour Figure 16 —Year 2041 Total Traffic Volumes — Morning Peak Hour Figure 17— Year 2041 Total Traffic Volumes — Evening Peak Hour Figure 18— Laneage and Traffic Control — Year 2041 Total Traffic Volume Scenarios Figure 19 — WCR 37 Access Intersection Sight Distance — Combination Truck Figure 20 — WCR 39 Access Intersection Sight Distance — Combination Truck Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc. Weld County, Colorado November 22, 2021 Scale 1" = 5,000' North Weld Gravel Pit Traffic Impact Study VICINITY MAP Date November 22, 2021 Drawn by JLH Job # Applegate Group Figure Scale NTS Date North Weld Gravel Pit Traffic Impact Study SITE PLAN November 22, 2021 Drawn by JLH Job # Applegate Group Generated with • • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 3 — Existing Traffic Volumes — Morning Peak Hour WCR 39/Site Access WCR 90/WCR 39 US 85/WCR 90 0 �f 27J 4 , 9 8 O6 _i 1 29 7 ~- 8 tr 1 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with M ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 4 — Existing Traffic Volumes — Evening Peak Hour WCR 39/Site Access O O 1s 2 WCR 90/WCR 39 JNJ�ww y� �ir ONO 23 1 C?J 18 21 US 85/WCR 90 15 30 • 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with m ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 5 — Laneage and Traffic Control — Existing WCR 39/Site Access WCR 90/WCR 39 } US 85/WCR 90 ® 11/21/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study TRIP DISTRIBUTION Scale 1" = 5,000Date November 22, 2021 Drawn by JLH Job # Applegate Group I Figure Generated with M • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 7 — Trip Assignment — Morning Peak Hour WCR 39/Site Access O o0 0 J -�1 ODo WCR 90/WCR 39 -'oo 8 J 0 —y 0 o-- 0 tr / 000 i US 85/WCR 90 00 � 0 J 0 0 t 1 oo • 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with M • • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 8 — Trip Assignment — Evening Peak Hour WCR 39/Site Access WCR 90/WCR 39 WOO 0 0 --- 0 tr 000 US 85/WCR 90 • 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 9 — Year 2022 Background Traffic Volumes — Morning Peak Hour WCR 39/Site Access O oW 0 a °D o / 28 37 WCR 90/WCR 39 mir Nf. � US 85IWCR 90 G 4 19 9 � � 42 ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with LW, • • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 10 — Year 2022 Background Traffic Volumes — Evening Peak Hour WCR 39/Site Access O O A r)1 0 W J WCR 90/WCR 39 I_TJ J V•V/ 18 J 2 - 13 ONO 1 18 21 US 85/WCR 90 ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 11 — Year 2022 Total Traffic Volumes — Morning Peak Hour WCR 39/Site Access O 36 0 WCR 90/WCR 39 1 30 4 9 US 85/WCR 90 18 • 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 12 — Year 2022 Total Traffic Volumes — Evening Peak Hour WCR 39/Site Access i WCR 90/WCR 39 ONO JIB. 14J 18 2 23 tr ONO US 85/WCR 90 ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with II'AIJ11jfffl North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 13 — Laneage and Traffic Control — Year 2022 Total Traffic Volume Scenarios WCR 39/Site Access WCR 90/WCR 39 f -1- US 85/WCR 90 7J\ i.' �Ir • 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with M ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 14 — Year 2041 Background Traffic Volumes — Morning Peak Hour WCR 39/Site Access O O W A 0-) 8 WCR 90/WCR 39 0 42J k 6 p7 s- 28 tr \ NPR / US 85/WCR 90 O moo+ 6—' \+ 28 ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with • • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 15 — Year 2041 Background Traffic Volumes — Evening Peak Hour WCR 39/Site Access O WCR 90/WCR 39 J Jl� 20 J2 3s ~ 36 ,1r ONO US 85/WCR 90 WN 2 28 —� 24 47 I$U � • 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with ' • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 16— Year 2041 Total Traffic Volumes — Morning Peak Hour WCR 39/Site Access WCR 90/WCR 39 50J �6 O 26 mir 6 11 14 US 85/WCR 90 m— 28 65 ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions. Inc. Generated with M • • North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 17— Year 2041 Total Traffic Volumes — Evening Peak Hour WCR 39/Site Access (1 16 W J WCR 90/WCR 39 21-) s 3 ~ 36 �ir ONO J' US 85/WCR 90 24 21 54 NW N a' ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with 11S'A&TRINrt•7 North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Figure 18 — Laneage and Traffic Control — Year 2041 Total Traffic Volume Scenarios WCR 39/Site Access WCR 90/WCR 39 US 85/WCR 90 �1 r ® 11/22/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Adequate sight dist using AASHTO ass The arrow indicate: intersection sight di North Weld Gravel Pit Traffic Impact Study WCR 37 ACCESS INTERSECTION SIGHT DISTANCE - COMBINATION TRUCK Scale NTS Date November 22, 2021 Drawn by JLH Job # Applegate Group Figure IQ = ISD=849' Adequate sight disc Design Vehicle - Combination Truck using AASHTO ass V = 55 MPH The arrow indicate: t9 = 10.5 seconds intersection sight di Scale NTS Sight Distance for Vehicles Turning Left North Weld Gravel Pit Traffic Impact Study WCR 39 ACCESS INTERSECTION SIGHT DISTANCE - COMBINATION TRUCK Date November22, 2021 I Drawn by JLH I Job # Applegate Group I Figure 20 Appendix A CDOT Data Traffic Solutions, Inc North Weld Gravel Pit Traffic Impact Study Weld County, Colorado Route 014C From 165 to 167 167 nway ' i County Rnad 90 1 - In a z 0 (_) 5 j County Road 88 County Road 88 Legend Route ■ Milepoint Structures 40 Major Structure O Minor Structure Created: Date: 9/15/2021 Time: 4:06:14 PM 0 0.1 0.2 0.3 0.4 Miles N WE £9 The information contained in this map is based on the most currently available data and has been checked for accuracy. CDOT does not guarantee the accuracy of any information presented, is not liable in any respect for any errors or omissions, and is not responsible for determining "fitness for use". 165 166 Route 014C From 165 To 166 ORomps Overpass — — Underpass • Structures CLASSIFICATION Access Control y - R A Regional Highway ; r ' y -'� c' Functional Class .. - 3 Pnnap'el Artenel - Other - - r TRAFFIC AADT ' � s - 2300, ., Off Peak Truck _ t - Percentage - -� ' 19 70 - Peak Track Percentage n 126 f u i n L - „ z Year 20 Factor -ti _ - . - - 157 c - _ It may appear that information is missing from the straight line diagram If so reduce the number of miles/page and re submit the request 166 Route 014C From 166 To 167 O Ramps Overpass - - Underpass Structures CLASSIFICATION Access Control - -1� R A Regional Highway - r Functional Class - � 3 Pnnapal Arlenal Other, TRAFFIC AADT 1 2300 U Off Peak Truck - 1970 r : i U Percentage - Peak Truck Percentage , _ , r ^ 126 r i ^ - Year20 Factor - ' 167 i ._r �- .. It may appear that information is missing from the straight line diagram If so reduce the number of miles/page and re submit the request 167 Route 085E From 283 to 286 286 County Road 94 285 o o cr T V B -17 -DD J 085L284180BL1 284 B -17 -AZ County Road County Road 90 County Road 90 Shafer Ave v: U,, Pi Ce MC � a. rn V, _ r) 283 z County Road 88 County Road 88 H County fto D C Legend • Route ■ Milepoint Structures • Major Structure ® Minor Structure Created: Date: 8/3/2021 Time: 2:11:18 PM 0 0.25 0.5 0.75 Miles x WE S CDOT 1 The information contained in this map is based on the most currently available data and has been checked for accuracy. CDOT does not guarantee the accuracy of any information presented, is not liable in any respect for any errors or omissions, and is not responsible for determining "fitness for use". 283 Route 085L From 283 To 284 O Ramps Overpass I- Underpass • Structures CLASSIFICATION Access Control Functional Class Highway Designation 3 Principal Arterial - Other U.S. ri SAFETY Primary Speed Limit 65 50 I 40 65 Off Peak Truck I 78.70 11.50 15.70 Percentage L Peak Truck Percentage I 104 090 130 Year 20 Factor 1 30 1.26 1.38 It may appear that information is missing from the straight line diagram. If so, reduce the number of milesipage and re -submit the request. Route 085L From 284 To 285 O Ramps Overpass - I - Underpass • Structures CLASSIFICATION Access Control Functional Class Highway Designation SAFETY Primary Speed Limit TRAFFIC Off Peak Truck Percentage Peak Truck Percentage Year 20 Factor 284 E -X Expressway, Major Bypass 3 Principal Arterial - Other U.S. 15.70 1.30 1.38 It may appear that information is missing from the straight line diagram. If so, reduce the number of miles/page and re -submit the request. fl 0 285 85 Route 085L I From 285 To 286 O Ramps Overpass - Underpass • Structures CLASSIFICATION Access Control E -X: Expressway, Major Bypass Functional Class 3 Principal Arterial - Other Highway Designation U.S. SAFETY Primary Speed Limit • 65 TRAFFIC Truck 1e 15.70 Peak Truck Percentage 130 Year 20 Factor I 1.38 It may appear that information Is missing from the straight line diagram. If so, reduce the number of miles/page and re -submit the request. PS Count Station 000215 -Average Daily Volumes on US 85 North of WCR 108 FH:in. 2021 2,488 2,439 2,848 2,898 3,076 3,628 4,024 3,743 2020 3,137 3,040 2,887 2,527 2,943 3 298 3,214 3,226 3,199 3,054 2,630 2,387 2019 2,929 3,075 3,311 3,282 3,466 3,805 4,085 3,743 3,603 3 446 3,253 2,935 2018 2,575 2,661 2,886 2,769 2,873 3,112 3,283 3,120 3,127 3,171 2,945 2,918 2018/2019 Average 2,752 2,868 3,099 3,026 3,170 3,459 3,684 3,432 3,365 3,309 3,099 2,927 2021 - 2018/2019 Average -264 -429 -251 -128 -94 170 340 312 % Increase -10% -15% -8% -4% -3% 5% 9% 9% TrafficVolume 9/14/2021 Adjustment 3 21 PM Colorado Department of Transportation 11/0912021 DiExSysTM Roadway Safety Systems General Summary of Crashes Report Job #: 20211109125318 Location: 85 L Begin:283.88 End:283.90 From:01/01/2019 To:12/31/2019 Severity Crash Type Weather Conditions PDO: 0 Overturning: 0 None: 1 INJ: 0 2 :Injured Other Non Collision: 0 Rain: 0 FAT: 1 1 Killed Pedestrians: 0 Snow/Sleet/Hail: 0 Total: 1 Broadside: 1 Fog: 0 Head On: 0 Dust: 0 Number of Vehicles Rear End: 0 Wind: 0 One Vehicle: 0 Sideswipe Same: 0 Unknown: 0 Two Vehicles: 1 Sideswipe Opposite: 0 Approach Turn: 0 Total: 1 Three or More: 0 pp Unknown: 0 Overtaking Turn: 0 Road Conditions Parked Motor Vehicle: 0 Dry: 1 Total: 1 Railway Vehicle: 0 Wet: 0 Location Bicycles: 0 Muddy: 0 On Road: 1 Domestic Animal: 0 Snowy: 0 Off Road: 0 Wild Animal: 0 Icy: 0 Unknown: 0 Fixed Objects: 0 Slushy: 0 Other Objects: 0 Foreign Material: 0 Total: 1 Unknown: 0 With Road Treatment: 0 Mainline/Ramps/Frontage Rds Total: 1 Unknown: 0 Mainline: 1 [i17i1 Ramps: 0 Vehicle Types Vehicle 1 - Vehicle 2 - Vehicle 3 Frontage/Ramp Intsx: 0 Passenger CarNan: 0 0 0 Frontage Roads: 0 Passenger Car/Van w/Trailer: 0 0 0 HOV Lanes: 0 Pickup Truck/Utility Van: 0 0 0 Unknown: 0 Pickup Truck/Utility Van w/Trailer: 0 0 0 Total: 1 SUV: 1 0 0 SUV w/Trailer: 0 0 0 Lighting Conditions Truck 10k lbs or Less: 0 0 0 Daylight: 1 Trucks > 10k lbs/Busses > 15 People: 0 1 0 Dawn or Dusk: 0 School Bus < 15 People: 0 0 0 Dark -Lighted: 0 Non School Bus < 15 People: 0 0 0 Dark - Unlighted: 0 Motorhome: 0 0 0 Unknown: 0 Motorcycle: 0 0 0 Total: 1 Bicycle: 0 0 0 Crash Rates Motorized Bicycle: 0 0 0 PDO: 0.00• PerMVMT Farm Equipment: 0 0 0 •* Per 100 MVMT Hit and Run - Unknown: 0 0 0 INJ: 0.00* Other: 0 0 0 FAT: ***.**** Total: 18.65 Unknown: 0 0 0 Total: 1 1 0 ADT: 4,739 Length: 0.03 Any intentional or inadvertent release of this data or any data derived from Page 1 its use shall not constitute a waiver of privilege pursuant to 23 USC 409. User: claytonp on Appendix B Traffic Count Data Sustainable Traffic Solutions, Inc North Weld Gravel Pit Traffic Impact Study Applegate Group, Inc Weld County, Colorado November 22, 2021 Existing Peak Hour Counts Converted to Passenger Car Equivalents I - WCR 39/Site Access NBLT Decel 7 0 1 10 0 0 8 24 SBLT Decel 11 3 2 23 11 3 2 23 2 WCR 90 /WCR 39 SBRT Decel 14 1 14 58 20 1 10 52 EBLT Decel 14 1 12 52 4 0 9 31 SB to WB RT Accel 14 1 14 58 20 1 10 52 NBRT Decel 16 0 5 31 23 0 2 29 SBLT Decel 9 0 10 39 9 0 0 9 3 85/WCR90 WBLT Decel 28 1 12 66 25 2 3 38 -US WBRT Decel 8 0 10 38 11 1 1 16 NB to EB RT Accel 16 0 5 31 23 0 2 29 WB to NB RT Accel 8 0 10 38 11 1 1 16 SBRT Decel 0 0 0 0 0 0 0 0 WCR 37 / WCR 94 EBLT Decel 0 0 0 0 0 0 0 0 SB to WB RT Accel 0 0 0 0 0 0 0 0 NBRT Decel 4 0 0 4 11 0 0 11 SBLT Decel 2 0 0 2 1 0 0 1 US 85 / WCR 94 WBLT Decel 7 0 0 7 4 0 0 4 WBRT Decel 2 0 0 2 1 0 0 1 NB to EB RT Accel 4 0 0 4 11 0 0 11 WB to NB RT Accel 2 0 0 2 1 0 0 1 Notes 1 The classification data were collected by Miovision when the traffic count data for the study were processed The following FHWA vehicle classifications apply to the Miovision categories Lights -1 through 3, Mediums 4 through 7 Articulated Trucks -8 through 13 2 The peak hour counts were converted to passenger car equivalents based on the State Highway Access Code Section 2 3(4)(e) North Weld Gravel Pit 10-15-21 11/19/2021 4 -Turn Lane Summary 5 50 PM All Traffic Data Services 1 WCR 39 & WCR 90 AM Tuesday, July 20, 2021 Peak Hour 07:30 AM - 08:30 AM Peak 15 -Minutes 07:30 AM - 07:45 AM Traffic Counts - All Vehicles WCR 90 Time Eastbound U -Turn Left Thru Right RTOR 7:00 AM 0 6 5 0 0 7:15 AM 0 4 3 0 0 7:30 AM 0 6 11 0 7:45 AM 0 3 8 0 0 8:00 AM 0 13 10 0 0 8:15 AM 0 5 7 0 0 8:30 AM 0 5 5 0 0 8:45 AM 0 5 4 0 0 Peak Hour 27 WCR 90 Westbound U -Turn Left Thru Right RTOR U -Turn 0 0 7 3 0 0 0 0 5 3 0 0 0 0 12 2 0 0 0 0 5 1 0 0 0 0 8 0 0 0 0 1 4 1 0 0 0 0 5 3 0 0 0 0 5 1 0 0 Peak Rolling Hour Flow Rates Eastbound Westbound Vehicle Type U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR Articulated Trucks 0 12 22 0 0 0 0 11 0 0 Lights 0 14 13 0 0 0 1 18 3 0 Mediums 0 1 1 0 0 0 0 0 1 0 Total 0 27 36 0 0 0 1 29 4 0 WCR 39 Northbound Left Thru Right RTOR 0 2 0 0 0 0 0 0 1 0 0 0 1 3 1 0 0 1 0 0 0 3 0 0 0 2 0 0 0 3 0 0 WCR 39 Southbound _ U -Turn Left Thru Right RTOR 0 1 2 8 0 0 0 2 5 0 0 0_ 0 9 0 0 5 4 6 0 0 1 1 4 0 0 1 1 10 0 0 2 1 7 0 0 1 1 14 0 29 Total 34 22 41 37 38 33 30 34 Northbound Southbound U -Turn Left Thru Right RTOR U Turn Left Thru Right RTOR Total 0 0 0 1 0 0 3 2 14 0 65 0 2 6 0 0 0 3 3 14 0 77 0 0 1 0 0 0 1 1 1 0 7 0 2 7 1 0 0 7 6 29 0 149 All Traffic Data Services 2 US85&WCR90AM Tuesday, July 20, 2021 Peak Hour 07:00 AM - 08:00 AM Peak 15 -Minutes 07:30 AM - 07:45 AM Traffic Counts - All Vehicles WCR 90 WCR 90 US 85 U585 Time Eastbound Westbound Northbound Southbound Total U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR 7:00 AM 0 1 4 3 0 0 8 6 2 0 0 3 44 8 0 0 2 36 0 0 117 7:15 AM 0 1 1 1 0 0 7 4 6 0 0 3 52 3 0 0 1 42 2 0 123 7:30 AM 0 2 0 3 0 0 15 4 4 0 0 4 41 7 0 0 7 40 1 0 128 7:45 AM 0 0 2 2 0 0 11 4 6 0 0 3 50 3 0 0 9 32 1 0 123 8:00 AM 0 1 3 0 0 0 4 7 1 0 0 4 38 6 0 0 10 33 3 0 110 8:15 AM 0 2 3 3 0 0 13 4 2 0 0 6 43 5 0 0 6 25 0 0 112 8:30 AM 0 0 2 3 0 0 9 0 2 0 0 5 29 2 0 0 6 39 0 0 97 8:45 AM 0 0 2 3 0 0 13 5 4 0 0 0 29 7 0 0 2 30 2 0 97 Peak Hour 41 18 21 19 Peak Rolling Hour Flow Rates Eastbound Vehicle Type U -Turn Left Thru Right RTOR U -Turn Left Articulated Trucks 0 0 1 0 0 0 12 Lights 0 4 5 9 0 0 28 Mediums 0 0 1 0 0 0 1 Total 0 4 7 9 0 0 41 Westbound Thru Right RTOR U -Turn Left 6 10 0 0 3 9 8 0 0 10 3 0 0 0 0 18 18 0 0 13 Northbound Thru Right RTOR 44 5 0 131 16 0 12 0 0 187 21 0 Southbound U -Turn Left Thru Right RTOR Total 0 10 22 0 0 113 0 9 125 4 0 358 0 0 3 0 0 20 0 19 150 4 0 491 All Traffic Data Services 3 WCR37&WCR 94 AM Tuesday, July 20, 2021 Peak Hour 07:00 AM - 08:00 AM Peak 15 -Minutes 07:00 AM - 07:15 AM Traffic Counts - All Vehicles Time 7:00 AM 7:15 AM 7:30 AM 7:45 AM 8:00 AM 8:15 AM 8:30 AM 8:45 AM Peak Rolling Hour Flow Rates Vehicle Type Articulated Trucks Lights Mediums Total WCR 94 Eastbound U -Turn Left Thru Right RTOR U -Turn Left 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Eastbound U -Turn Left Thru Right RTOR U -Turn Left 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 WCR 94 Westbound Thru Right RTOR U -Turn Left 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 WCR 37 Northbound Thru Right RTOR U Turn Left 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 WCR 37 Southbound Total Thru Right RTOR 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 Westbound Northbound Southbound Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 All Traffic Data Services 4 US 85 & WCR 94 AM Tuesday, July 20, 2021 Peak Hour 07:15 AM - 08:15 AM Peak 15 -Minutes 07:15 AM - 07:30 AM Traffic Counts - All Vehicles WCR 94 WCR 94 US 85 US 85 Time Eastbound Westbound Northbound Southbound Total U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR 7:00 AM 0 0 0 0 0 0 0 1 1 0 0 0 44 0 0 0 1 35 0 0 82 7:15 AM 0 0 0 0 0 0 2 0 1 0 1 0 49 1 0 0 0 46 0 0 100 7:30 AM 0 0 0 0 0 0 2 0 0 0 0 0 43 2 0 0 0 41 0 0 88 7:45 AM 0 0 0 0 0 0 2 0 0 0 0 0 53 1 0 0 0 44 0 0 100 8:00 AM 0 0 0 1 0 0 1 0 1 0 0 0 43 0 0 0 2 45 0 0 93 8:15 AM 0 0 0 0 0 0 0 0 3 0 0 0 47 1 0 0 1 37 0 0 89 8:30 AM 0 0 0 1 0 0 1 0 0 0 0 0 33 0 0 0 0 35 0 0 70 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 30 3 0 0 0 29 0 0 62 Peak Hour 4 Peak Rolling Hour Flow Rates Eastbound Westbound Northbound Southbound Vehicle Type U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR Total Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 54 0 0 0 0 44 0 0 98 Lights 0 0 0 1 0 0 7 0 2 0 0 0 128 4 0 0 2 128 0 0 272 Mediums 0 0 0 0 0 0 0 0 0 0 1 0 6 0 0 0 0 4 0 0 11 Total 0 0 0 1 0 0 7 0 2 0 1 0 188 4 0 0 2 176 0 0 381 All Traffic Data Services 1 WCR 39 & WCR 90 PM Tuesday, July 20, 2021 Peak Hour 04:00 PM - 05:00 PM Peak 15 -Minutes 04:00 PM - 04:15 PM Traffic Counts - All Vehicles Time WCR 90 Eastbound WCR 90 Westbound WCR 39 Northbound WCR 39 Southbound Total U -Turn Left Thru Right RTOR UTurn Left Thru Right RTOR U Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR 4:00 PM 0 3 6 1 0 0 0 5 1 0 0 0 1 0 0 0 9 2 12 0 40 4:15 PM 0 1 5 0 0 0 0 4 1 0 0 0 0 0 0 0 1 2 5 0 19 4:30 PM 0 5 3 0 0 0 0 7 1 0 0 0 1 0 0 0 2 1 7 0 27 4:45 PM 0 4 4 1 0 0 1 7 1 0 0 0 0 0 0 0 4 0 7 0 29 5:00 PM 0 7 5 0 0 0 0 3 4 0 0 0 1 0 0 0 3 2 3 0 28 5:15 PM 0 5 2 0 0 0 0 5 1 0 0 0 0 0 0 0 4 1 4 0 22 5:30 PM 0 3 6 0 0 0 0 9 0 0 0 0 1 0 0 0 5 0 2 0 26 5:45 PM 0 1 8 0 0 0 0 7 2 0 0 0 0 0 0 0 0 0 8 0 26 Peak Rolling Hour Flow Rates Eastbound Westbound Northbound Southbound Vehicle Type U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR Total Articulated Trucks 0 9 0 0 0 0 0 0 1 0 0 0 0 0 0 0 2 0 10 0 22 Lights 0 4 18 2 0 0 1 22 1 0 0 0 2 0 0 0 11 5 20 0 86 Mediums 0 0 0 0 0 0 0 1 2 0 0 0 0 0 0 0 3 0 1 0 7 Total 0 13 18 2 0 0 1 23 4 0 0 0 2 0 0 0 16 5 31 0 115 All Traffic Data Services 2 US 85 & WCR 90 PM Tuesday. July 20. 2021 Peak Hour 04:30 PM - 05:30 PM Peak 15 -Minutes 04:30 PM - 04:45 PM Traffic Counts - All Vehicles Time 4:00 PM 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 545 PM Peak Rolling Hour Flow Rates WCR 90 Eastbound U -Turn Left Thru Right RTOR U -Turn Left 0 1 6 4 0 0 7 0 1 2 4 0 0 7 0 0 3 4 0 0 7 0 0 8 12 0 0 11 0 1 2 2 0 0 4 0 0 5 3 0 0 8 0 1 3 3 0 0 4 0 0 2 5 0 0 9 Eastbound VehicleType U -Turn Left Thru Right RTOR U -Turn Left Articulated Trucks 0 0 10 4 0 0 3 Lights 0 1 5 16 0 0 25 Mediums 0 0 3 1 0 0 2 Total 0 1 18 21 0 0 30 WCR 90 US 85 Westbound Northbound Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left 5 4 0 0 4 43 3 0 0 4 6 5 0 0 9 48 7 0 0 3 4 4 0 0 6 52 5 0 0 0 4 3 0 0 3 56 5 0 0 6 3 3 0 0 2 47 11 0 0 2 4 3 0 0 5 58 4 0 0 1 4 7 0 0 6 40 14 0 0 2 6 3 0 0 0 31 9 0 0 7 Westbound Northbound Thru Right RTOR U -Turn Left 1 1 0 0 3 12 it 0 0 13 2 1 0 0 0 15 13 0 0 16 US 85 Southbound Thru Right RTOR Total 45 0 0 126 48 1 0 141 72 0 0 157 49 0 0 157 62 0 0 139 51 1 0 143 63 2 0 149 53 0 0 125 Southbound Thru Right RTOR U -Turn Left Thru Right RTOR Total 15 2 0 0 0 13 0 0 52 195 23 0 0 9 218 1 0 529 3 0 0 0 0 3 0 0 15 213 25 0 0 9 234 1 0 596 All Traffic Data Services 3 WCR 37 & WCR 94 PM Tuesday, July 20, 2021 Peak Hour 04:00 PM - 05:00 PM Peak 15 -Minutes 04:00 PM - 04:15 PM Traffic Counts - All Vehicles Time WCR 94 Eastbound WCR 94 Westbound WCR 37 Northbound U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR 4:00 PM 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 5:15 PM 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Peak Rolling Hour Flow Rates Eastbound Westbound Northbound Vehicle Type U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Lights 0 0 1 0 0 0 0 3 0 0 0 0 0 0 0 Mediums 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 1 0 0 0 0 3 0 0 0 0 0 0 0 WCR 37 Southbound Total U -Turn Left Thru Right RTOR 0 0 0 0 0 2 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0 Southbound U -Turn Left Thru Right RTOR Total 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4 All Traffic Data Services 4 US85&WCR 94 PM Tuesday, July 20, 2021 Peak Hour 04:45 PM - 05:45 PM Peak 15 -Minutes 04:45 PM - 05:00 PM Traffic Counts - All Vehicles 4:00 PM 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM Peak Rolling Hour Flow Rates Vehicle Type Articulated Trucks Lights Mediums Total WCR 94 WCR 94 US 85 US 85 Eastbound Westbound Northbound Southbound Total U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR U Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR 0 0 0 0 0 0 0 0 1 0 0 0 52 1 0 0 0 54 0 0 108 0 0 0 0 0 0 1 0 0 0 0 0 56 1 0 0 1 55 0 0 114 0 1 0 0 0 0 0 0 1 0 0 1 46 1 0 0 0 68 0 0 118 0 0 0 0 0 0 0 0 0 0 0 0 63 2 0 0 0 60 0 0 125 0 0 0 0 0 0 3 0 1 0 0 0 43 2 0 0 0 59 0 0 108 0 0 0 0 0 0 0 0 0 0 0 0 59 5 0 0 0 53 0 0 117 0 0 0 0 0 0 1 0 0 0 0 0 51 2 0 0 1 68 0 0 123 0 0 0 0 0 0 1 0 0 0 0 0 29 0 0 0 0 68 0 0 98 Eastbound Westbound Northbound Southbound U -Turn Left Thru Right RTOR U -Turn Left Thru R Y1t RTOR U -Turn Left Thru Right RTOR U -Turn Left Thru Right RTOR Total 0 0 0 0 0 0 0 0 0 0 0 0 15 0 0 0 0 11 0 0 26 0 0 0 0 0 0 4 0 1. 0 0 0 198 11 0 0 1 224 0 0 439 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 5 0 0 8 0 0 0 0 0 0 4 0 1 0 0 0 216 11 0 0 1 240 0 0 473 c*%d ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alltrafficdata.net Location: 1 WCR 39 & WCR 90 AM Date: Tuesday, July 20, 2021 Peak Hour: 07:30 AM - 08:30 AM Peak 15 -Minutes: 07:30 AM - 07:45 AM Peak Hour -All Vehicles (86) 42 0.69 38 (75) 1 t NJ (116) 0 ,J 1 1. Ii (66) 4 60 N I 34 29 0.68 27 J W 0.91 E 0.68 63 36 ~ S 1r 1 44 (100) 0 i t rC 0 (65) O N V J.TP 3. 1 t (13) 7 0.55 10 (17) Note: Total study counts contained in parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles on Crosswalk I Interval Start Time U -Turn WCR 90 Eastbound Left Thru Right U -Turn WCR 90 Westbound Left Thru Right U -Turn WCR 39 Northbound Left Thru Right U -Turn WCR 39 Southbound Left Thru Right Total Rolling Hour Pedestrian West East Crossings South North 7:00 AM 0 6 5 0 0 0 7 3 0 0 2 0 0 1 2 8 34 134 0 0 0 0 7:15 AM 0 4 3 0 0 0 5 3 0 0 0 0 0 0 2 5 22 138 0 0 0 0 7:45 AM 0 3 8 0 0 0 5 1 0 1 3 1 0 5 4 6 37 138 0 0 0 0 8:00 AM 0 13 10 0 0 0 8 0 0 0 1 0 0 1 1 4 38 135 0 0 0 0 8:15 AM 0 5 7 0 0 1 4 1 0 0 3 0 0 1 1 10 33 0 0 0 0 8:30 AM 0 5 5 0 0 0 5 3 0 0 2 0 0 2 1 7 30 0 0 0 0 8:45 AM 0 5 4 0 0 0 5 1 0 0 3 0 0 1 1 14 34 0 0 0 0 Count Total 0 47 53 0 0 1 51 14 0 2 14 1 0 11 12 63 269 0 0 0 0 Peak Hour 0 27 36 0 0 1 29 4 0 2 7 1 0 7 6 29 149 0 0 0 0 c*%d ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alItrafficdata.net Location: 2 US 85 & WCR 90 AM Date: Tuesday, July 20, 2021 Peak Hour: 07:00 AM - 08:00 AM Peak 15 -Minutes: 07:30 AM - 07:45 AM Peak Hour -All Vehicles (329) 173 0.94 209 (360) 1 i A ='. > o m (71) `,� 1 L 18 (141) 0 35 - N 18 ~ 4 77 0.69 J W 0.96 E 0.84 7 ~ T41 20 S 47 0 (42) 9 1 t rCm (101) v 1 i (375) 200 0.95 221 (395) Note: Total study counts contained in parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles on Crosswalk Interval Start Time U-Tum WCR 90 Eastbound Left Thru Right U -Turn WCR 90 Westbound Left Thru Right U -Turn US 85 Northbound Left Thru Right U -Turn US 85 Southbound Left Thru Right Total Rolling Hour Pedestrian West East Crossings South North 7:00 AM 0 1 4 3 0 8 6 2 0 3 44 8 0 2 36 0 117 491 0 0 0 0 7:15 AM 0 1 1 1 0 7 4 6 0 3 52 3 0 1 42 2 123 484 0 0 0 0 7:45 AM 0 0 2 2 0 11 4 6 0 3 50 3 0 9 32 1 123 442 0 1 0 0 8:00 AM 0 1 3 0 0 4 7 1 0 4 38 6 0 10 33 3 110 416 0 0 0 0 8:15 AM 0 2 3 3 0 13 4 2 0 6 43 5 0 6 25 0 112 0 0 0 0 8:30 AM 0 0 2 3 0 9 0 2 0 5 29 2 0 6 39 0 97 0 0 0 0 8:45 AM 0 0 2 3 0 13 5 4 0 0 29 7 0 2 30 2 97 0 0 0 0 Count Total 0 7 17 18 0 80 34 27 0 28 326 41 0 43 277 9 907 0 1 0 0 Peak Hour 0 4 7 9 0 41 18 18 0 13 187 21 0 19 150 4 491 0 1 0 0 c*%d ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alltrafficdata.net Location: 3 WCR 37 & WCR 94 AM Date: Tuesday, July 20, 2021 Peak Hour: 07:00 AM - 08:00 AM Peak 15 -Minutes: 07:00 AM - 07:15 AM Peak Hour - All Vehicles (1) 0 0.25 0 0 1 1 1 ooao� (2) 0 ,�.11 Lh`a (,) N 1 0 0.00 0 y W 0.25 E a 0.25 0 S r 1 0 rl'1 o a ,i rC a o 0 0 1 i o a o.00 0 O Note: Total study counts contained in parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles on Crosswalk 10 Or iN WE o 1 S 1 0 :0 0 I Interval Start Time U -Turn WCR 94 Eastbound Left Thru Right U -Turn WCR 94 Westbound Left Thru Right U -Turn WCR 37 Northbound Left Thru Right U -Turn WCR 37 Southbound Left Thni Right Rolling Total Hour Pedestrian West East Crossings South North 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 800 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Count Total 00 0 0 0 0 10 0 0 0 0 0 0 0 1 2 0 0 0 0 Peak Hour 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0 00 0 a th ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alltrafficdata.net Location: 4 US 85 & WCR 94 AM Date: Tuesday, July 20, 2021 Peak Hour: 07:15 AM - 08:15 AM Peak 15 -Minutes: 07:15 AM - 07:30 AM Peak Hour -All Vehicles (316) 178 0.95 190 (348) ! i wP =a O m N o (1) 0 �J 1 �. U 2 (15) 0 4 O J N r0 9 0.50 O y W 0.95 E 7 0.75 1 y S r 6 0 (2) 1 '1 1 i f cm (12) O - a II (323) 185 0.90 193 (351) Note: Total study counts contained in parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles on Crosswalk � �0 L 0 1 N WE o J,iS 0 WCR 94 WCR 94 US 85 US 85 Interval Eastbound Westbound Northbound Southbound Rolling Pedestrian Crossings Start Time U -Turn Left Thru Right U -Turn Left Thru Right U -Turn Left Thru Right U -Turn Left Thru Right Total Hour West East South North 7:00 AM 0 0 0 0 0 0 1 1 0 0 44 0 0 1 35 0 82 370 0 0 0 0 7:30 AM 00 0 0 0 2 0 0 0 0 43 2 0 0 41 0 88 370 0 0 00 7:45 AM 0 0 0 0 0 2 0 0 0 0 53 1 0 0 44 0 100 352 0 0 0 0 8:00 AM 0 0 0 1 0 1 0 1 0 0 43 0 0 2 45 0 93 314 0 0 0 0 8:15 AM 0 0 0 0 0 0 0 3 0 0 47 1 0 1 37 0 89 0 0 0 0 8:30 AM 0 0 0 1 0 1 0 0 0 0 33 0 0 0 35 0 70 0 0 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 30 3 0 0 29 0 62 0 0 0 0 Count Total 0 0 0 2 0 8 1 6 1 0 342 8 0 4 312 0 684 0 00 0 Peak Hour 0 0 0 1 0 7 0 2 1 0 188 4 0 2 176 0 381 0 0 0 0 c*%d ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alltrafficdata.net Location: 1 WCR 39 & WCR 90 PM Date: Tuesday, July 20, 2021 Peak Hour: 04:00 PM - 05:00 PM Peak 15 -Minutes: 04:00 PM - 04:15 PM Peak Hour - All Vehicles (84) 52 0.57 19 (44) ! t ; 1, lJL 4 __(528 9) N 0.77 13 J W 0.72 E ~ 23 0.86 18 y r 1 _► 34 (70) 2 ,' 1 1 1 1 0 0 (67) O O N O ! i (11) 8 0.50 2 (4) Note: Total study counts contained in parentheses. Traffic Counts WCR 90 Interval Eastbound Start Time U -Turn Left Thni WCR 90 Westbound U -Turn Left Thru 4:15 PM 0 1 5 0 0 0 4 1 4:30 PM 0 5 3 0 0 0 7 1 4:45 PM 0 4 4 1 0 1 7 1 5:00 PM 0 7 5 0 0 0 3 4 5:15 PM 0 5 2 0 0 0 5 1 5:30 PM 0 3 6 0 0 0 9 0 5:45 PM 0 1 8 0 0 0 7 2 CountTotal 0 29 39 2 0 1 47 11 Peak Hour 0 13 18 2 0 1 23 4 Peak Hour - Pedestrians/Bicycles on Crosswalk WCR 39 Northbound U -Turn Left Thru N Wa E o S 0 WCR 39 Southbound U-Tum Left Thru Rolling Pedestrian Crossings Total Hour West East South North 0 0 0 0 0 1 2 5 19 103 0 0 0 0 0 0 1 0 0 2 1 7 27 106 0 0 0 0 0 0 0 0 0 4 0 7 29 105 0 0 0 0 0 0 1 0 0 3 2 3 28 102 0 0 0 0 0 0 0 0 0 4 1 4 22 0 0 0 0 0 0 1 0 0 5 0 2 26 0 0 0 0 0 0 0 0 0 0 0 8 26 0 0 0 0 0 0 4 0 0 28 8 48 217 0 00 0 0 0 2 0 0 16 5 31 115 0 0 0 0 c*%d ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alltrafficdata.net Location: 2 US 85 & WCR 90 PM Date: Tuesday, July 20, 2021 Peak Hour: 04:30 PM - 05:30 PM Peak 15 -Minutes: 04:30 PM - 04:45 PM Peak Hour - All Vehicles (472) 244 0.85 227 (411) I. i NJ A O O (75) 0 D� 1 h IJL 13 (125) 32 t• 1_s , N 15 4• 58 0.56 y W 0.95 E 0.93 18 Jr 30 40 21 S 52 (72) �^ * n 1 rC 0 (114) -1O - N N O N O ! i (537) 285 0.95 254 (468) Note: Total study counts contained in parentheses. Traffic Counts WCR 90 WCR 90 US 85 US 85 Interval Eastbound Westbound Northbound Southbound Rolling Pedestrian Crossings Start Time U -Turn Left Thru Right U -Turn Left Thru Right U-Tum Left Thru Right U -Turn Left Thru Right Total Hour West East South North 4:00 PM 0 1 6 4 0 7 5 4 0 4 43 3 0 4 45 0 126 581 0 0 0 0 4:15 PM 0 1 2 4 0 7 6 5 0 9 48 7 0 3 48 1 141 594 0 0 0 0 4:45 PM 0 0 8 12 0 11 4 3 0 3 56 5 0 6 49 0 157 588 0 0 0 0 5:00 PM 0 1 2 2 0 4 3 3 0 2 47 11 0 2 62 0 139 556 0 0 0 0 5:15 PM 0 0 5 3 0 8 4 3 0 5 58 4 0 1 51 1 143 0 0 0 0 5:30 PM 0 1 3 3 0 4 4 7 0 6 40 14 0 2 63 2 149 0 0 0 0 5:45 PM 0 0 2 5 0 9 6 3 0 0 31 9 0 7 53 0 125 0 00 0 Count Total 0 4 31 37 0 57 36 32 0 35 375 58 0 25 443 4 11137 0 0 0 0 Peak Hour 0 1 18 21 0 30 15 13 0 16 213 25 0 9 234 1 596 0 0 0 0 Peak Hour - Pedestrians/Bicycles on Crosswalk Location: 3 WCR 37 & WCR 94 PM -,...- Date: Tuesday, July 20, 2021 ALL TRAFFIC DATA SERVICES Peak Hour: 04:00 PM - 05:00 PM (303) 216-2439 www.alltrafficdata.net Peak 15 -Minutes: 04:00 PM - 04:15 PM Peak Hour - All Vehicles Peak Hour - Pedestrians/Bicycles on Crosswalk 0 0 0.00 0 (1) ! i o 0 0 o (4) o �«! 1 1. �L 0--- (4) 3 N a. 3 0.50 0 J W 0.50 E 3 0.75 1 y 1 ~ S* �+tr0 (3) 0 ,' 1 ~1 1 1 0 0 (2) a o 0 0 F ! I 0 0 0.00 0 0 Note: Total study counts contained in parentheses. Traffic Counts Interval StartTime 4:15 PM 4:30 PM 4:45 PM 5:00 PM 5:15 PM 5:30 PM 5:45 PM WCR 94 Eastbound U -Turn Left Thru Right 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 WCR 94 WCR 37 WCR 37 Westbound Northbound Southbound Turn Left Thru Right 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 U -Turn Left Thru Right 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U -Turn Left Thru Right - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Rolling Pedestrian Crossings Total Hour West East South North 1 3 0 0 0 0 1 3 0 0 0 0 0 3 0 0 0 0 1 3 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 Count Total 0 1 2 0 0 0 4 0 0 0 0 0 0 0 0 0 7 0 00 0 Peak Hour 0 0 1 0 0 0 3 0 0 0 0 0 0 0 0 0 4 0 00 0 c*%d ALL TRAFFIC DATA SERVICES (303) 216-2439 www.alltrafficdata.net Location: 4 US 85 & WCR 94 PM Date: Tuesday, July 20, 2021 Peak Hour: 04:45 PM - 05:45 PM Peak 15 -Minutes: 04:45 PM - 05:00 PM Peak Hour - All Vehicles (487) 241 0.90 217 (403) I a O O - O (1) 0 ���JL 1 (9) 0 0 J N I0 5 0.25 0 y W 0.95 E r4 0.38 0 y S y 12 "' 0 "n n i r� 0 (16) O O N O II (491) 244 0.87 227 (414) Note: Total study counts contained in parentheses. Traffic Counts Peak Hour - Pedestrians/Bicycles on Crosswalk WCR 94 WCR 94 US 85 US 85 Interval Eastbound Westbound Northbound Southbound Rolling Pedestrian Crossings Start Time U -Turn Left Thru Right U-Tum Left Thru Right U -Turn Left Thru Right U -Turn Left Thru Right Total Hour West East South North 4:00 PM 0 0 0 0 0 0 0 1 0 0 52 1 0 0 54 0 108 465 0 0 0 0 4:15 PM 0 0 0 0 0 1 0 0 0 0 56 1 0 1 55 0 114 465 0 0 0 0 4:30 PM 0 1 0 0 0 0 0 1 0 1 46 1 0 0 68 0 118 468 0 0 0 0 5:00 PM 0 0 0 0 0 3 0 1 0 0 43 2 0 0 59 0 108 446 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 59 5 0 0 53 0 117 0 0 0 0 5:30 PM 0 0 0 0 0 1 0 0 0 0 51 2 0 1 68 0 123 0 0 0 0 5:45 PM 0 0 0 0 0 1 0 0 0 0 29 0 0 0 68 0 98 0 0 0 0 CountTotal 0 1 0 0 0 6 0 3 0 1 399 14 0 2 485 0 911 0 00 0 Peak Hour 0 0 0 0 0 4 0 1 0 0 216 11 0 1 240 0 473 0 0 0 0 %0'0 %0'0 %0'0 %9'0 %L'9L %0'L %£'£ %Z'L %0'L %9'0 %6'L %L'Z9 %0'0 }uaoJad 61.170 0 0 Z OL b 140£ 17 Z ££ 09Z 0 lelo! pueJE) 9E L 8 £ £ £ L L 9 oz Ion oo:EL 00:9L 00:EL 00:tit 00:EL 00:t7L OO:ZL 00:9L 00:8L OO:ZL dead Wd 017 8 £ 17 L L 9 sz Ion 00:01. 00:90 00:80 00:90 00:o 00:1.1. 00:L0 00:80 dead iv %0'0 %0'0 %0'0 %9'0 %L'9L %0'L %£'£ %Z'L %0'L %9'0 %6'L %VZ9 %0'0 luaaad 6Lt" 0 0 0 Z OL 17 bL 0£ 17 Z £E 09Z 0 lelo! step 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:£Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OO:ZZ Z 0 0 0 0 0 0 0 0 0 0 L L 0 00:LZ 17 0 0 0 0 0 0 0 0 0 0 0 17 0 00:0Z E 0 0 0 0 0 0 0 0 0 0 0 £ 0 00:6L ZL 0 0 0 L 0 0 0 0 0 0 S 9 0 00:8L bL 0 0 0 0 L 0 L 0 0 0 L LL 0 00:LL 91. 0 0 0 L Z L 0 Z 0 0 0 6 0 00:9L 0£ 0 0 0 0 9 0 0 £ 0 L £ 81. 0 00:9L ££ 0 0 0 0 9 S 0 £ 0 0 L OZ 0 00:b1 S£ 0 0 0 0 a 0 S Z 0 0 Z OZ 0 OO:£L PC 0 0 0 0 9 0 Z Z 6 0 E OZ 0 Wd ZL LE 0 0 0 0 9 0 L E L L L bZ 0 00:1.1. OP 0 0 0 0 8 0 £ £ L 0 L bZ 0 00:01. 9£ 0 0 0 0 8 0 0 E 0 0 Z ZZ 0 00:60 6£ 0 0 0 0 L 0 £ £ 0 0 L SZ 0 0080 93 0 0 0 0 E 0 L L 6 0 9 L L 0 00:LO ZE 0 0 0 0 9 0 0 L 0 0 E OZ 0 00:90 ZZ 0 0 0 0 Z 0 0 P 0 0 b 31. 0 00:90 Z 0 0 0 0 0 0 0 0 0 0 0 Z 0 00:b0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oo:£0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OO:ZO L 0 0 0 0 0 0 0 0 0 0 0 L 0 00:L0 L 0 0 0 0 0 0 0 0 0 0 0 L 0 LZ/OZ/LO 18101 IllnlN lllnW ItlnLN algnoa algnoa elgnop el ulS el uls an19 SOSfl buol sJalleJj sa)118 awl! IX`d 9< a1XV 9 IXV 9> IXV 9< 9PXV 9 IXV 9> aPV b alXV £ alxv Z elxv Z '8 sJe3 7pels 8N t76 2iOM O'N 6E 2IOM 9 :a1 UO!1els 9 :apo0 a}IS LZ-Inr-o :1.e3S awa lau elepo!geillle-MMM 1.OBed sa3I/Uas a;ea 3!J4eal IId All Traffic Data Services Page 2 www.alltrafficdata.net Date Start: 20 -Jul -21 Site Code: 5 Station ID: 5 WCR 39 N.O. WCR 94 Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 AxI 5 Axle >6 Axl <6 AxI 6 Axle >6 Axl Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total 07/20/21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 10 1 0 0 1 0 0 1 0 0 0 1 14 06:00 0 17 1 0 1 1 1 0 3 0 0 0 1 25 07:00 0 24 3 0 0 3 2 1 2 1 0 0 1 37 08:00 0 23 1 0 3 2 2 0 0 2 0 0 1 34 09:00 0 21 1 0 1 0 0 0 3 1 0 0 1 28 10:00 0 37 3 0 2 6 1 0 2 1 0 0 0 52 11:00 0 25 4 0 4 1 5 0 4 0 0 0 2 45 12 PM 0 18 0 0 3 3 0 1 1 2 0 0 1 29 13:00 0 17 3 0 1 1 1 1 7 2 0 0 1 34 14:00 0 20 1 0 2 2 2 0 4 2 0 0 1 34 15:00 0 16 2 0 2 2 2 1 5 0 0 0 2 32 16:00 0 15 1 0 0 2 0 0 1 0 0 0 0 19 17:00 0 8 6 0 1 0 0 0 2 0 0 0 1 18 18:00 0 7 1 0 1 1 0 0 0 0 0 0 0 10 19:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 20:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 21:00 0 2 0 0 1 0 0 0 0 0 0 0 0 3 22:00 0 4 0 0 0 0 0 0 0 0 0 0 0 4 23:00 0 1 1 0 0 0 0 0 0 0 0 0 0 2 Day Total 0 269 29 0 22 25 16 4 35 11 0 0 13 424 Percent 0.0% 63.4% 6.8% 0.0% 5.2% 5.9% 3.8% 0.9% 8.3% 2.6% 0.0% 0.0% 3.1% AM Peak 10:00 11:00 11:00 10:00 11:00 07:00 11:00 08:00 11:00 10:00 Vol. 37 4 4 6 5 1 4 2 2 52 PM Peak 14:00 17:00 12:00 12:00 14:00 12:00 13:00 12:00 15:00 13:00 Vol. 20 6 3 3 2 1 7 2 2 34 Grand 0 269 29 0 22 25 16 4 35 11 0 0 13 424 Total Percent 0.0% 63.4% 6.8% 0.0% 5.2% 5.9% 3.8% 0.9% 8.3% 2.6% 0.0% 0.0% 3.1% All Traffic Data Services Page 1 www.alltrafficdata.net Date Start: 20 -Jul -21 Site Code: 5 Station ID: 5 WCR 39 N.O. WCR 94 Start 1 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 999 Total Percent Percent 07/20/21 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 39 39 01:00 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 39 39 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 04:00 0 0 0 0 2 0 0 0 0 0 0 0 0 0 2 34 34 05:00 2 6 11 3 0 0 0 0 0 0 0 0 0 0 22 24 28 06:00 16 3 8 3 1 1 0 0 0 0 0 0 0 0 32 25 32 07:00 12 6 4 2 2 2 0 0 0 0 0 0 0 0 28 29 36 08:00 21 9 7 2 0 0 0 0 0 0 0 0 0 0 39 22 25 09:00 14 7 11 3 0 0 0 0 0 0 0 0 0 0 35 23 27 10:00 12 14 11 3 0 0 0 0 0 0 0 0 0 0 40 23 26 11:00 16 6 8 5 1 1 0 0 0 0 0 0 0 0 37 26 30 12 PM 10 7 10 3 2 1 0 0 0 0 0 0 0 1 34 26 33 13:00 11 13 6 4 0 1 0 0 0 0 0 0 0 0 35 24 29 14:00 13 10 7 2 1 0 0 0 0 0 0 0 0 0 33 23 28 15:00 13 7 4 4 1 1 0 0 0 0 0 0 0 0 30 26 32 16:00 5 3 5 2 0 0 0 0 0 0 0 0 0 0 15 24 28 17:00 6 2 0 3 1 2 0 0 0 0 0 0 0 0 14 34 38 18:00 4 2 0 1 4 1 0 0 0 0 0 0 0 0 12 33 36 19:00 0 0 0 1 1 0 1 0 0 0 0 0 0 0 3 42 44 20:00 1 0 0 3 0 0 0 0 0 0 0 0 0 0 4 29 29 21:00 0 0 0 0 1 0 1 0 0 0 0 0 0 0 2 43 44 22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * Total 156 95 92 44 17 12 2 0 0 0 0 0 0 1 419 Percent 37.2% 22.7% 22.0% 10.5% 4.1% 2.9% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2% AM Peak 08:00 10:00 05:00 11:00 04:00 07:00 10:00 PM Peak Vol. 14:00 13:00 12:00 13:00 13 13 10 4 18:00 4 17:00 2 19:00 1 12:00 13:00 1 35 Grand Total 156 95 92 44 17 12 2 0 0 0 0 0 0 1 419 Percent 37.2% 22.7% 22.0% 10.5% 4.1% 2.9% 0.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2% 15th Percentile: 6 MPH 50th Percentile: 17 MPH 85th Percentile: 26 MPH 95th Percentile: 32 MPH Statistics 10 MPH Pace Speed: 16-25 MPH Number in Pace: 187 Percent in Pace: 44.6% Number of Vehicles > 55 MPH: 1 Percent of Vehicles > 55 MPH: 0.2% Mean Speed(Average) : 18 MPH HdIN 81 : (e6eJeAy)paadS uea1N HdIN 99 < sa!o!4an 101ua3Jad I. : HdIN 9S < saIo!4an;o iagwnN %7'7£ : aoed u! lua3Jad 917L : aoed u! JagwnN Hd1J 9Z -9L : paadS aoed HdW 01. s011s!lelS HdIN 6£ : al!lua3Jad 4156 HdIN 8Z : a!!lueoJad 4159 HdIN 91 : al!luaoJad 4105 HdIN 4 : aI!luao.iad 4191 %0'0 %0'0 %0'0 %0'0 %Z'0 %9'0 %L'0 %S'£ %1.C %8'£ %9'9 %1.61. %C91. %£'S7 lua3Jad 7Z7 0 0 0 0 1 Z £ SL EL 91. 9£ 1.8 99 Z61 1e101 pue�O V. 1 7 Z E L 6 8 LL 10A 00:£1 00:EZ 00:LL 00:EL 00:Z1 00:91 00:LL 00:EL 00:SL 0071 dead lNd ZS 1 L L L Z Z 9 91. 8 £Z 10A 00:01 00:80 00:10 00:90 00:40 00:90 00:90 00:60 00:01 00:01 0001 dead Iv %0'0 %0'0 %0'0 %0'0 %Z'0 %S'0 %L'0 %5E %1'£ %9'£ %9'8 %161 %E'SL %£'S7 luaOJad 7Z7 0 0 0 0 1. Z £ 91. CI. 91. 9£ 18 99 Z6 L lelol 7S E5 Z 0 0 0 0 0 L 0 1 0 0 0 0 0 0 00:EZ 6£ L£ 7 0 0 0 0 0 0 0 0 L 0 L L 0 L 00:z Pt' Z7 E 0 0 0 0 0 0 0 1 0 0 0 L 0 1 00: LZ 71 Z 1 1. 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:02 6£ 6£ 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 00:61 L7 Z7 0L 0 0 0 0 0 0 1 L 0 0 Z E 0 £ 00:81 S7 L£ 9L 0 0 0 0 0 0 L 1 0 1 L 7 1. £ 00:LL S£ ZZ 6 L 0 0 0 0 0 0 0 0 1. 0 1 Z Z CI. 0091 L£ 0E ZE 0 0 0 0 0 0 0 1. 1. E £ Z 8 71 0051. 9£ 7Z 7£ 0 0 0 0 0 0 0 1. I. 0 Z 6 7 LL 007L Z7 6Z b£ 0 0 0 0 0 0 0 7 0 1 L 6 9 74 00£1 9£ 6Z 6Z 0 0 0 0 0 0 0 0 Z Z Z S 9 ZL L1d Z1 LE 7Z 57 0 0 0 0 0 0 0 L 0 Z Z 01. 8 ZZ 00:14 8Z 7Z ZS 0 0 0 0 0 0 0 1. 0 0 7 91 8 EZ 00:01. 6Z LZ 8Z 0 0 0 0 0 0 0 L 0 0 9 9 9 0L 0060 17 7Z 7£ 0 0 0 0 1 0 0 1. 1. Z 0 S 9 61. 0080 0£ 7Z L£ 0 0 0 0 0 L 0 0 0 L E 7 9 ZZ 00:L0 6C E£ SZ 0 0 0 0 0 0 L 0 Z Z 1 E 9 1.1. 00:90 9£ 7E 7L 0 0 0 0 0 0 0 0 Z Z 4 Z 1 9 00:90 77 77 L 0 0 0 0 0 0 0 1 0 0 0 0 0 0 00:70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:£0 6C 6C 4 0 0 0 0 0 0 0 0 1 0 0 0 0 0 00:Z0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:1.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1Z/OZ/LO lua0Jad lua3Jad I101 666 9L 0L 59 09 95 05 97 07 S£ 0E SZ OZ 51 aw!1 4196 4198 9L LL 99 L9 9S L9 97 17 9£ LE 9Z 1Z 91. 1. Pe1S 76 IOM O'N 6£ M 5 :O1 uORelS S :ap03 al!S l.?-Inr-0? :lpe1S ale0 oueepoIJeJ1IIeMMM e' Z a6ed S03!AJOS e4ea 3I}}eJl IId All Traffic Data Services www.alitrafficdata.net Page 1 Date Start: 20 -Jul -21 Site Code: 5 Station ID: 5 WCR 39 N.O. WCR 94 Start 20 -Jul -21 Time Tue NB SB Total 12:00 AM 1 0 1 01:00 1 0 1 02:00 0 1 1 03:00 0 0 0 04:00 2 1 3 05:00 22 14 36 06:00 32 25 57 07:00 28 37 65 08:00 39 34 73 09:00 35 28 63 10:00 40 52 92 11:00 37 45 82 12:00 PM 34 29 63 01:00 35 34 69 02:00 33 34 67 03:00 30 32 62 04:00 15 19 34 05:00 14 18 32 06:00 12 10 22 07:00 3 1 4 08:00 4 1 5 09:00 2 3 5 10:00 0 4 4 11:00 0 2 2 Total 419 424 843 Percent 49.7% 50.3% AM Peak - 10:00 10:00 - - - - - - 10:00 Vol. - 40 52 - - - - - - 92 PM Peak - 13:00 13:00 - - - - - - 13:00 Vol. - 35 34 - - - - - - 69 Grand Total 419 424 843 Percent 49.7% 50.3% ADT ADT 843 AADT 843 All Traffic Data Services Page 1 www.alltrafficdata.net Date Start: 20 -Jul -21 Site Code: 6 Station ID: 6 WCR 37 N.O. WCR 94 Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 AxI 5 Axle >6 AxI <6 Axl 6 Axle >6 AxI Time Bikes Trailers Long Buses 6 Tire Single Single Double Double Double Multi Multi Multi Total 07/20/21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 07:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:00 0 1 0 0 1 0 0 0 0 0 0 0 0 2 10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 0 1 1 0 0 0 0 0 0 0 0 0 0 2 12 PM 0 0 2 0 0 0 0 0 0 0 0 0 0 2 13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 15:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 18:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 19:00 0 1 0 0 0 0 0 0 0 0 0 0 0 1 20:00 0 0 1 0 0 0 0 0 0 0 0 0 0 1 21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Day Total 0 8 4 0 1 0 0 0 0 0 0 0 0 13 Percent 0.0% 61.5% 30.8% 0.0% 7.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 06:00 11:00 09:00 09:00 Vol. 1 1 1 2 PM Peak 14:00 12:00 12:00 Vol. 1 2 2 Grand 0 8 4 0 1 0 0 0 0 0 0 0 0 13 Total Percent 0.0% 61.5% 30.8% 0.0% 7.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% %0'0 %0'0 %0'0 %0'0 %L' I. L %0'0 %0'0 %0'0 %Z'ZZ %0'0 %Z'ZZ %Vi t' %0'0 lua3Jad 6 0 0 0 0 L 0 0 0 Z 0 Z P 0 lelol pueio Z L L L Ion 00:91. OO:ZL 00:£L 00:1L plead Wd L L L L 'Ion 00:90 00:90 00:1.1. 0090 plead WV %0'0 %0'0 %0'0 %0'0 %VI.1. 1. %0'0 %0'0 %0'0 %Z'ZZ %0'0 %Z'ZZ %b'PP %0'0 Wed 6 0 0 0 0 L 0 0 0 Z 0 Z b 0 lelol �(ea 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:£Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OO:ZZ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:1.Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:0Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:61. Z 0 0 0 0 0 0 0 0 0 0 L L 0 00:91. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:LL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0091. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:SL L 0 0 0 0 0 0 0 0 0 0 0 L 0 00:tiL L 0 0 0 0 0 0 0 0 0 0 L 0 0 00:£1. L 0 0 0 0 0 0 0 0 1. 0 0 0 0 WdZL L 0 0 0 0 0 0 0 0 1. 0 0 0 0 00:LL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0001. L 0 0 0 0 0 0 0 0 0 0 0 L 0 0060 L 0 0 0 0 L 0 0 0 0 0 0 0 0 0080 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00L0 0 0 0 0 0 0 0 0 0 0 0 L 0 00:90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:£0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 oo:zo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 001.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LZ/OZ/LO lelol IllnW !IlnlN IIInW elgnoQ algnoQ elgnoa el uiS al uiS an19 sasne buol sJelleJJ sa)ll8 ewll IXV 9< 0IXV 9 IXV 9> IXV 9< OIXV 9 IXV 9> 0IXV ti alXV £ aIXV Z aIXV Z '8 sJe0 PS 8S b6 2lOM'O'N LE 2lOM 9 :01 uo!lelg 9 :8po3 e!S LZ-ir-oz :1JelS ales lau' elep0!J4eJll le'MMM Z abed seo!MOS eWO 3!UeJl IIY All Traffic Data Services Page 1 www.alltrafficdata.net Date Start: 20 -Jul -21 Site Code: 6 Station ID: 6 WCR 37 N.O. WCR 94 Start 1 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 999 Total Percent Percent 07/20/21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 06:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 12 14 07:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 08:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 09:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 19 19 10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 0 0 1 1 0 0 0 0 0 0 0 0 0 0 2 28 29 12 PM 0 0 0 0 2 0 0 0 0 0 0 0 0 0 2 34 34 13:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 14:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 29 29 15:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 29 29 16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 17:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 29 29 18:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 12 14 19:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 29 29 20:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 29 29 21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 2 2 1 6 2 0 0 0 0 0 0 0 0 0 13 Percent 15.4% 15.4% 7.7% 46.2% 15.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% AM Peak 06:00 09:00 11:00 11:00 09:00 Vol. 1 2 1 1 PM Peak 18:00 14:00 12:00 12:00 Vol. 1 1 2 9 Grand 2 2 1 6 2 0 0 0 0 0 0 0 0 0 13 Total Percent 15.4% 15.4% 7.7% 46.2% 15.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 15th Percentile: 14 MPH 50th Percentile: 26 MPH 85th Percentile: 30 MPH 95th Percentile: 33 MPH Statistics 10 MPH Pace Speed: 26-35 MPH Number in Pace : 8 Percent in Pace: 61.5% Number of Vehicles > 55 MPH: 0 Percent of Vehicles > 55 MPH: 0.0% Mean Speed(Average) : 24 MPH All Traffic Data Services Page 2 www alltrafficdata net Date Start 20 -Jul -21 Site Code 6 Station ID 6 WCR 37 N O WCR 94 Start 1 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 999 Total Percent Percent 07/20/21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * 01 00 0 0 0 0 ' , 0- 0_ , 0 0- - 0 , 0 , 0 0 0 _ 0 ' 0 * * 0200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 0300 0 0 0 0 0 0 0 0 0 0 '0 0 '0 0 0 * * 0400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0500 0 0 ,,0' 0 0 0' 0' 0 0 '0 0 0 0 0- 0 ` 0600 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 19 19 0700 0 0, 0_ 0- -0 0 0 0 0, 0 0 0 0 0 ,0 * * 0800 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 24 24 0900 0 0 0 0 0 0 0 - 0 ' 1 0 ,0 0_ 0 0 1 54 54 1000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 00 0 0 0 0 0 0 0 1 '0 0 0 0 ,0 0 1 49 49 12 PM 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 34 34 1300 0 0 _ 0- 0, 0 0 , 0 1 0 0- 0 0 0 0 1_ 49 49 1400 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 44 44 1500 0 -0' 0- ," 0 0, 0 ,0 ', '0 0- 0 0 0 0 0 0 1600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * ` 1700' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 1800- 1 0 0 0 0 1 0 0 0 0 0 0 0 0 2 38 39 1900 0 '0 0 0 0 0 0 0 0 ,, 0 0 0, 0- 0 0 , * 2000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * 21 00 ' _ _ 0_ 0 _ _ _ 0 0 ,0 _ _0 _ _ 0 _ _ 0, _0 0 0 0 0 '0 _0 * * 2200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2300- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 1 1 1 0 1 1 1 2 1 0 0 0 0 0 9 Percent 111% 111% 111% 00% 111% 111% 111% 222% 111% 00% 00% 00% 00% 00% AM Peak 0600 0800 11 00 0900 0600 PM Peak 1800 1200 1800 1400 1300 Grand 1 1 1 0 1 1 1 2 1 0 0 0 0 0 Total Percent 111% 111% 111% 00% 111% 111% 111% 222% 111% 00% 00% 00% 00% 00% 15th Percentile 16 MPH 50th Percentile 37 MPH 85th Percentile 49 MPH 95th Percentile 52 MPH Statistics 10 MPH Pace Speed 46-55 MPH Number in Pace 3 Percent in Pace 33 3% Number of Vehicles > 55 MPH 0 Percent of Vehicles > 55 MPH 0 0% Mean Speed(Average) 35 MPH 1800 All Traffic Data Services Page 1 www.alItrafficdata.net Date Start: 20 -Jul -21 Site Code: 6 Station ID: 6 WCR 37 N.O. WCR 94 Start 20 -Jul -21 Time — Tue NB _ SB Total 12:00 AM 0 0 0 01:00 0 0 0 02:00 0 0 0 03:00 0 0 0 04:00 0 0 0 05:00 0 0 0 06:00 1 1 2 07:00 0 0 0 08:00 0 1 1 09:00 2 1 3 10:00 0 0 0 11:00 2 1 3 12:00 PM 2 1 3 01:00 0 1 1 02:00 1 1 2 03:00 1 0 1 04:00 0 0 0 05:00 1 0 1 06:00 1 2 3 07:00 1 0 1 08:00 1 0 1 09:00 0 0 0 10:00 0 0 0 11:00 _ __ 0 0 0 Total 13 9 22 Percent 59_1% 40.9% AM Peak - 09:00 06:00 - - - - - - 09:00 Vol. - 2 1 - - - - - - 3 PM Peak - 12:00 18:00 - - - - - - 12:00 Vol. _ - 2 2 - - - - - 3 Grand Total 13 9 _:-- _ 22 Percent 59.1% 40.9% ADT ADT 22 AADT 22 Appendix C VISTRO Analysis Results Sustainable Traffic Solutions, Inc. North Weld Gravel Pit Traffic Impact Study Sustainable Traffic Solutions Weld County, Colorado November 22, 2021 Generated with Scenario 1: 1 Existing AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.4 Level Of Service: A Volume to Capacity (v/c): 0.011 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration 4j 1 T Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 30 34 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 30 34 0 0 8 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 9 10 0 0 2 Total Analysis Volume [veh/h] 9 35 40 0 0 9 Pedestrian Volume [ped/h] 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with •jVAIIi1•i Scenario 1: 1 Existing AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance Na Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.64 9.40 Movement LOS A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.03 95th -Percentile Queue Length (Mn] 0.50 0.50 0.00 0.82 d_A, Approach Delay [s/veh] 1.56 0.00 9.40 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.65 Intersection LOS A ® 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 1: 1 Existing AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 11.0 Level Of Service: B Volume to Capacity (v/c): 0.014 Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration I 1 + e'1• Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 EntryPocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 2 7 1 7 6 29 27 36 0 1 29 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 2 7 1 7 6 29 27 36 0 1 29 4 Peak Hour Factor 0.5500 0.5500 0.5500 0.6900 0.6900 0.6900 0.6800 0.6800 0.6800 0.6800 0.6800 0.6800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 3 0 3 2 11 10 13 0 0 11 1 Total Analysis Volume [veh/h] 4 13 2 10 9 42 40 53 0 1 43 6 Pedestrian Volume [ped/h] 0 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with W� Scenario 1: 1 Existing AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.00 0.01 0.01 0.05 0.03 0.00 d_M, Delay for Movement [s/veh] 10.88 10.85 9.06 10.70 11.01 9.21 7.55 7.49 Movement LOS B B A B B A A A A A A 95th -Percentile Queue Length [veh/In] 0.09 0.09 0.09 0.24 0.24 0.24 0.09 0.09 0.00 0.00 0.00 95th -Percentile Queue Length [ft/In] 2.24 2.24 2.24 5.98 5.98 5.98 2.13 2.13 0.05 0.05 0.05 d_A, Approach Delay [s/veh] 10.67 9.72 3.25 0.15 Approach LOS B A A A d_I, Intersection Delay [s/veh] 4.96 Intersection LOS B O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IYM1iSi Scenario 1: 1 Existing AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 14.0 Level Of Service: B Volume to Capacity (v/c): 0.045 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration '111 r '111 r «h u Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Wdth [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 0 0 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 13 187 21 19 150 4 4 7 9 41 18 19 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/hj 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 13 187 21 19 150 4 4 7 9 41 18 19 Peak Hour Factor 0.9500 0.9500 0.9500 0.9400 0.9400 0.9400 0.6900 0.6900 0.6900 0.8400 0.8400 0.8400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 49 6 5 40 1 1 3 3 12 5 6 Total Analysis Volume [veh/h] 14 197 22 20 160 4 6 10 13 49 21 23 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IjYAIIi(.i Scenario 1: 1 Existing AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.01 0.02 0.01 0.10 0.05 0.03 d_M, Delay for Movement [s/veh] 7.77 7.92 12.41 13.22 9.26 13.35 14.02 10.37 Movement LOS A A A A A A B B A B B B 95th -Percentile Queue Length [vehAn] 0.03 0.00 0.00 0.05 0.00 0.00 0.15 0.15 0.15 0.60 0.60 0.60 95th -Percentile Queue Length [ft/In] 0.81 0.00 0.00 1.22 0.00 0.00 3.79 3.79 3.79 14.89 14.89 14.89 d_A, Approach Delay [s/veh] 0.47 0.86 11.28 12.76 Approach LOS A A B B d I, Intersection Delay [s/veh] 3.30 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 1: 1 Existing PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.5 Level Of Service: A Volume to Capacity (v/c): 0.011 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration I Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 11 44 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 11 44 0 0 8 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 3 13 0 0 2 Total Analysis Volume [veh/h] 9 13 52 0 0 9 Pedestrian Volume [ped/h] 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 1: 1 Existing PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.67 9.47 Movement LOS A A A A 95th -Percentile Queue Length [veh/ln] 0.02 0.02 0.00 0.03 95th -Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.84 d_A, Approach Delay [s/veh] 3.14 0.00 9.47 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.86 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =lYM3l(S1 Scenario 1: 1 Existing PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 10.4 Level Of Service: B Volume to Capacity (v/c): 0.012 Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Veh ides Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Peak Hour Factor 0.5000 0.5000 0.5000 0.5700 0.5700 0.5700 0.7700 0.7700 0.7700 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 0 7 2 14 4 6 1 0 7 1 Total Analysis Volume [veh/h] 0 4 0 28 9 54 17 23 3 1 27 5 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =VMIi(•i Scenario 1: 1 Existing PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.03 0.01 0.06 0.01 0.00 d_M, Delay for Movement [s/veh] 9.98 9.96 10.42 9.25 7.48 7.44 Movement LOS A A B A A A A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.35 0.35 0.35 0.04 0.04 0.04 0.00 0.00 0.00 95th -Percentile Queue Length [ft/In] 0.42 8.66 8.66 8.66 0.88 0.88 0.88 0.05 0.05 0.05 d_A, Approach Delay [s/veh] 9.98 9.59 2.96 0.23 Approach LOS A A A A d_I, Intersection Delay [s/vehl 6.12 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IM Scenario 1: 1 Existing PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 15.6 Level Of Service: C Volume to Capacity (v/c): 0.085 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration '111 r "11 l r " + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 0 0 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 16 213 25 9 234 1 1 18 21 30 15 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips (veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 16 213 25 9 234 1 1 18 21 30 15 13 Peak Hour Factor 0.9500 0.9500 0.9500 0.8500 0.8500 0.8500 0.5600 0.5600 0.5600 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 4 56 7 3 69 0 0 8 9 8 4 3 Total Analysis Volume [veh/h] 17 224 26 11 275 1 2 32 37 32 16 14 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =� Scenario 1: 1 Existing PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.01 0.00 0.08 0.04 0.08 0.04 0.02 d M, Delay for Movement [s/veh] 8.07 7.99 14.55 15.55 10.37 15.03 15.41 10.39 Movement LOS A A A A A A B C B C C B 95th -Percentile Queue Length [veh/In] 0.04 0.00 0.00 0.03 0.00 0.00 0.46 0.46 0.46 0.46 0.46 0.46 95th -Percentile Queue Length [ft/In] 1.09 0.00 0.00 0.68 0.00 0.00 11.49 11.49 11.49 11.62 11.62 11.62 d_A, Approach Delay [s/veh] 0.51 0.31 12.83 14.08 Approach LOS A A B B d I, Intersection Delay [s/veh] 2.92 Intersection LOS C 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 2: 2 2022 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.4 Level Of Service: A Volume to Capacity (v/c): 0.011 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration i'i "► «.. Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 30 34 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/hl 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 30 34 0 0 8 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 9 10 0 0 2 Total Analysis Volume [veh/h] 9 35 40 0 0 9 Pedestrian Volume [ped/h] 0 0 0 ® 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IIjYjKIirt.i Scenario 2: 2 2022 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.64 9.40 Movement LOS A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.03 95th -Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.82 d_A, Approach Delay [s/veh] 1.56 0.00 9.40 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.65 Intersection LOS A O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IJScenario 2: 2 2022 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Delay (sec / veh): 11.1 Analysis Method: HCM 6th Edition Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.014 Intersection Setup Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 2 7 1 7 6 29 27 36 0 1 29 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips (veh/h) 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume (veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 2 7 1 7 6 29 28 37 0 1 30 4 Peak Hour Factor 0.5500 0.5500 0.5500 0.6900 0.6900 0.6900 0.6800 0.6800 0.6800 0.6800 0.6800 0.6800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 3 0 3 2 11 10 14 0 0 11 1 Total Analysis Volume [veh/h] 4 13 2 10 9 42 41 54 0 1 44 6 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with I2i�7 Scenario 2: 2 2022 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.00 0.01 0.01 0.05 0.03 0.00 d_M, Delay for Movement [s/veh] 10.92 10.89 9.07 10.74 11.05 9.22 7.56 7.50 Movement LOS B B A B B A A A A A A 95th -Percentile Queue Length (vehAn] 0.09 0.09 0.09 0.24 0.24 0.24 0.09 0.09 0.00 0.00 0.00 95th -Percentile Queue Length [ft/In] 2.26 2.26 2.26 6.01 6.01 6.01 2.18 2.18 0.05 0.05 0.05 d_A, Approach Delay [s/veh] 10.70 9.74 3.26 0.15 Approach LOS B A A A d_I, Intersection Delay [s/veh] 4.93 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IYAIIi(.i Scenario 2: 2 2022 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 14.1 Level Of Service: B Volume to Capacity (v/c): 0.045 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration '111 r # 11 r + 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Wdth [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 0 0 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 13 187 21 19 150 4 4 7 9 41 18 19 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 13 191 21 19 153 4 4 7 9 42 18 19 Peak Hour Factor 0.9500 0.9500 0.9500 0.9400 0.9400 0.9400 0.6900 0.6900 0.6900 0.8400 0.8400 0.8400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 50 6 5 41 1 1 3 3 13 5 6 Total Analysis Volume [veh/h] 14 201 22 20 163 4 6 10 13 50 21 23 Pedestrian Volume [ped/h] 0 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with A!iIYMIl1SI Scenario 2: 2 2022 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.01 0.02 0.01 0.10 0.05 0.03 d_M, Delay for Movement [s/veh] 7.77 7.93 12.48 13.30 9.28 13.46 14.14 10.43 Movement LOS A A A A A A B B A B B B 95th -Percentile Queue Length [vehAn] 0.03 0.00 0.00 0.05 0.00 0.00 0.15 0.15 0.15 0.61 0.61 0.61 95th -Percentile Queue Length [ftAn] 0.81 0.00 0.00 1.22 0.00 0.00 3.81 3.81 3.81 15.26 15.26 15.26 d_A, Approach Delay [s/veh] 0.46 0.85 11.33 12.87 Approach LOS A A B B d_I, Intersection Delay [s/veh] 3.30 Intersection LOS B O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 2: 2 2022 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Delay (sec / veh): 9.5 Analysis Method: HCM 6th Edition Level Of Service: A Analysis Period: 15 minutes Volume to Capacity (v/c): 0.011 Intersection Setup Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration F Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 11 44 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 11 44 0 0 8 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 3 13 0 0 2 Total Analysis Volume [veh/h] 9 13 52 0 0 9 Pedestrian Volume [ped/h] 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with 12M Scenario 2: 2 2022 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.67 9.47 Movement LOS A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.03 95th -Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.84 d_A, Approach Delay [s/veh] 3.14 0.00 9.47 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.86 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with I Scenario 2: 2 2022 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90IWCR 39 Control Type: Two-way stop Delay (sec / veh): 10.4 Analysis Method: HCM 6th Edition Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.012 Intersection Setup Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration + 11* 4fi. 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Peak Hour Factor 0.5000 0.5000 0.5000 0.5700 0.5700 0.5700 0.7700 0.7700 0.7700 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 0 7 2 14 4 6 1 0 7 1 Total Analysis Volume [veh/h] 0 4 0 28 9 54 17 23 3 1 27 5 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IIIYiIIi.i Scenario 2: 2 2022 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.03 0.01 0.06 0.01 0.00 d_M, Delay for Movement [s/veh] 9.98 9.96 10.42 9.25 7.48 7.44 Movement LOS A A B A A A A A A A 95th -Percentile Queue Length [vehAn] 0.02 0.35 0.35 0.35 0.04 0.04 0.04 0.00 0.00 0.00 95th -Percentile Queue Length [ft/In] 0.42 8.66 8.66 8.66 0.88 0.88 0.88 0.05 0.05 0.05 d_A, Approach Delay [s/veh] 9.98 9.59 2.96 0.23 Approach LOS A A A A d_I, Intersection Delay [s/veh] 6.12 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 2: 2 2022 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 15.7 Level Of Service: C Volume to Capacity (v/c): 0.086 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration i I I r I I I r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 0 0 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 16 213 25 9 234 1 1 18 21 30 15 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 16 217 26 9 239 1 1 18 21 31 15 13 Peak Hour Factor 0.9500 0.9500 0.9500 0.8500 0.8500 0.8500 0.5600 0.5600 0.5600 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 4 57 7 3 70 0 0 8 9 8 4 3 Total Analysis Volume [veh/h] 17 228 27 11 281 1 2 32 37 33 16 14 Pedestrian Volume [pedlh] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with FIYAI*i(.i Scenario 2: 2 2022 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.01 0.00 0.09 0.04 0.08 0.04 0.02 d_M, Delay for Movement [s/veh] 8.09 8.00 14.70 15.73 10.42 15.21 15.60 10.46 Movement LOS A A A A A A B C B C C B 95th -Percentile Queue Length [vehAn] 0.04 0.00 0.00 0.03 0.00 0.00 0.47 0.47 0.47 0.48 0.48 0.48 95th -Percentile Queue Length [ft/In] 1.09 0.00 0.00 0.69 0.00 0.00 11.65 11.65 11.65 12.03 12.03 12.03 d_A, Approach Delay [s/veh] 0.51 0.30 12.93 14.25 Approach LOS A A B B dl, Intersection Delay [s/veh] 2.92 Intersection LOS C 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with lir%l•i Scenario 3: 3 2022 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.4 Level Of Service: A Volume to Capacity (v/c): 0.013 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration ii I., or Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 0 0 0 Entry Pocket Length [ft] 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 30 34 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 8 0 0 0 0 1 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 16 30 34 0 0 9 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 5 9 10 0 0 3 Total Analysis Volume [veh/h] 19 35 40 0 0 11 Pedestrian Volume [ped/h] 0 0 0 ® 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with 12MW Ii ti7 Scenario 3: 3 2022 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.66 9.41 Movement LOS A A A A 95th -Percentile Queue Length [veh/In] 0.04 0.00 0.00 0.04 95th -Percentile Queue Length [ftAn] 1.05 0.00 0.00 1.01 d A, Approach Delay [s/veh] 2.70 0.00 9.41 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.37 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 3: 3 2022 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 11.3 Level Of Service: B Volume to Capacity (v/c): 0.015 Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration 4.11* IjI* 41j114. ljll. Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 2 7 1 7 6 29 27 36 0 1 29 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 1 8 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 2 7 1 7 6 30 36 37 0 1 30 4 Peak Hour Factor 0.5500 0.5500 0.5500 0.6900 0.6900 0.6900 0.6800 0.6800 0.6800 0.6800 0.6800 0.6800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 3 0 3 2 11 13 14 0 0 11 1 Total Analysis Volume [veh/h] 4 13 2 10 9 43 53 54 0 1 44 6 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IiI'M&IlSI Scenario 3: 3 2022 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.00 0.02 0.01 0.05 0.04 0.00 d_M, Delay for Movement (s/veh] 11.21 11.14 9.08 11.00 11.31 9.24 7.58 7.50 Movement LOS B B A B B A A A A A A 95th -Percentile Queue Length [veh/n] 0.09 0.09 0.09 0.25 0.25 0.25 0.11 0.11 0.00 0.00 0.00 95th -Percentile Queue Length [ft/In] 2.35 2.35 2.35 6.21 6.21 6.21 2.85 2.85 0.05 0.05 0.05 d_A, Approach Delay [s/veh] 10.94 9.82 3.75 0.15 Approach LOS B A A A d_l, Intersection Delay [s/veh] 5.13 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 3: 3 2022 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 14.2 Level Of Service: B Volume to Capacity (v/c): 0.046 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration '111 r '11 I r + + Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Wdth [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 0 0 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 13 187 21 19 150 4 4 7 9 41 18 19 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/hl 0 0 7 1 0 0 0 0 0 1 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 13 191 28 20 153 4 4 7 9 43 18 19 Peak Hour Factor 0.9500 0.9500 0.9500 0.9400 0.9400 0.9400 0.6900 0.6900 0.6900 0.8400 0.8400 0.8400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 50 7 5 41 1 1 3 3 13 5 6 Total Analysis Volume [veh/h] 14 201 29 21 163 4 6 10 13 51 21 23 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IA!jVAI1i1.i Scenario 3: 3 2022 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.01 0.02 0.01 0.10 0.05 0.03 d M, Delay for Movement [s/veh] 7.77 7.96 12.52 13.42 9.28 13.52 14.20 10.46 Movement LOS A A A A A A B B A B B B 95th -Percentile Queue Length [vehAn] 0.03 0.00 0.00 0.05 0.00 0.00 0.15 0.15 0.15 0.62 0.62 0.62 95th -Percentile Queue Length [ftAn] 0.81 0.00 0.00 1.29 0.00 0.00 3.84 3.84 3.84 15.53 15.53 15.53 d_A, Approach Delay [s/veh] 0.45 0.89 11.38 12.93 Approach LOS A A B B d_I, Intersection Delay [s/veh] 3.30 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 3: 3 2022 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.5 Level Of Service: A Volume to Capacity (v/c): 0.023 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration "1 I I ► Turning Movement Left Thru Thru Right Left Right Lane Wdth [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 0 0 0 Entry Pocket Length [ft] 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input (veh/h] 8 11 44 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 1 0 0 0 0 8 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 9 11 44 0 0 16 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 3 13 0 0 5 Total Analysis Volume (veh/h] 11 13 52 0 0 19 Pedestrian Volume [ped/h] 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with I!AVAIIl(.I Scenario 3: 3 2022 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.02 d_M, Delay for Movement [s/veh] 7.67 9.53 Movement LOS A A A A 95th -Percentile Queue Length [vehAn] 0.02 0.00 0.00 0.07 95th -Percentile Queue Length [ftAn] 0.61 0.00 0.00 1.79 d_A, Approach Delay [s/veh] 3.52 0.00 9.53 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.79 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 3: 3 2022 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 10.5 Level Of Service: B Volume to Capacity (v/c): 0.012 Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration ifs + s f . Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] _ Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 8 1 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 2 0 16 5 39 14 18 2 1 23 4 Peak Hour Factor 0.5000 0.5000 0.5000 0.5700 0.5700 0.5700 0.7700 0.7700 0.7700 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 0 7 2 17 5 6 1 0 7 1 Total Analysis Volume [veh/h] 0 4 0 28 9 68 18 23 3 1 27 5 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with II!jViI. •7 Scenario 3: 3 2022 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.03 0.01 0.07 0.01 0.00 d_M, Delay for Movement [s/veh] 10.00 10.04 10.51 9.33 7.48 7.44 Movement LOS A B B A A A A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.40 0.40 0.40 0.04 0.04 0.04 0.00 0.00 0.00 95th -Percentile Queue Length [ft/In] 0.42 10.06 10.06 10.06 0.93 0.93 0.93 0.05 0.05 0.05 d_A, Approach Delay [s/veh] 10.00 9.62 3.06 0.23 Approach LOS A A A A d_I, Intersection Delay [s/veh] 6.41 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 3: 3 2022 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 15.8 Level Of Service: C Volume to Capacity (v/c): 0.041 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration '111 r i I I r + 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 0 0 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 16 213 25 9 234 1 1 18 21 30 15 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 1 0 0 0 0 0 0 7 0 1 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 16 217 27 9 239 1 1 18 21 38 15 14 Peak Hour Factor 0.9500 0.9500 0.9500 0.8500 0.8500 0.8500 0.5600 0.5600 0.5600 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 4 57 7 3 70 0 0 8 9 10 4 4 Total Analysis Volume [veh/h] 17 228 28 11 281 1 2 32 37 41 16 15 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with I1!jIYM3I(SI Scenario 3: 3 2022 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.01 0.00 0.09 0.04 0.10 0.04 0.02 d_M, Delay for Movement [s/veh] 8.09 8.00 14.71 15.75 10.42 15.45 15.84 10.70 Movement LOS A A A A A A B C B C C B 95th -Percentile Queue Length [veh/In] 0.04 0.00 0.00 0.03 0.00 0.00 0.47 0.47 0.47 0.57 0.57 0.57 95th -Percentile Queue Length [ft/In] 1.09 0.00 0.00 0.69 0.00 0.00 11.66 11.66 11.66 14.16 14.16 14.16 d_A, Approach Delay [s/veh] 0.50 0.30 12.94 14.55 Approach LOS A A B B d I, Intersection Delay [s/veh] 3.09 Intersection LOS C 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 4: 4 2041 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.4 Level Of Service: A Volume to Capacity (v/c): 0.011 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration i "► T Turning Movement Left Thru Thru Right Left Right Lane Wdth [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 30 34 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage (%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 30 34 0 0 8 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 9 10 0 0 2 Total Analysis Volume [veh/h] 9 35 40 0 0 9 Pedestrian Volume [ped/h] 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with K,iiIi(.i Scenario 4: 4 2041 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.64 9.40 Movement LOS A A A A 95th -Percentile Queue Length [vehAn] 0.02 0.02 0.00 0.03 95th -Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.82 d_A, Approach Delay [s/veh] 1.56 0.00 9.40 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.65 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 4: 4 2041 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Delay (sec / veh): 12.1 Analysis Method: HCM 6th Edition Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.008 Intersection Setup Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Welsttbbo►und Lane Configuration di, '11 r astI � 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 1 1 0 0 0 Entry Pocket Length [ft] 100.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 2 7 1 7 6 29 27 36 0 1 29 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 2 7 1 7 6 29 42 57 0 2 46 6 Peak Hour Factor 0.5500 0.5500 0.5500 0.6900 0.6900 0.6900 0.6800 0.6800 0.6800 0.6800 0.6800 0.6800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 3 0 3 2 11 15 21 0 1 17 2 Total Analysis Volume [veh/h] 4 13 2 10 9 42 62 84 0 3 68 9 Pedestrian Volume [ped/h] 0 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =lYAI3ltSI Scenario 4: 4 2041 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.02 0.00 0.02 0.02 0.05 0.04 0.00 d_M, Delay for Movement [s/veh] 12.09 11.90 9.29 11.52 11.75 9.19 7.66 7.56 Movement LOS B B A B B A A A A A A 95th -Percentile Queue Length [vehAn] 0.11 0.11 0.11 0.05 0.05 0.15 0.14 0.00 0.01 0.01 0.01 95th -Percentile Queue Length [ft/In] 2.63 2.63 2.63 1.36 1.26 3.67 3.43 0.00 0.16 0.16 0.16 d_A, Approach Delay [s/veh] 11.67 9.95 3.25 0.28 Approach LOS B A A A d_l, Intersection Delay [s/veh] 4.33 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 4: 4 2041 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 16.4 Level Of Service: C Volume to Capacity (v/c): 0.194 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration 11 r , I I r F i I r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 1 1 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 13 187 21 19 150 4 4 7 9 41 18 19 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.3800 1.3800 1.3800 1.3800 1.3800 1.3800 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 18 258 29 26 207 6 6 11 14 64 28 30 Peak Hour Factor 0.9500 0.9500 0.9500 0.9400 0.9400 0.9400 0.6900 0.6900 0.6900 0.8400 0.8400 0.8400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 5 68 8 7 55 2 2 4 5 19 8 9 Total Analysis Volume [veh/h] 19 272 31 28 220 6 9 16 20 76 33 36 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =A Scenario 4: 4 2041 Back AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.02 0.02 0.05 0.02 0.19 0.09 0.04 d_M, Delay for Movement [s/veh] 7.94 8.18 15.20 15.91 9.89 16.42 15.78 9.51 Movement LOS A A A A A A C C A C C A 95th -Percentile Queue Length [vehAn] 0.05 0.00 0.00 0.07 0.00 0.00 0.30 0.30 0.30 0.71 0.29 0.14 95th -Percentile Queue Length (ft/In] 1.16 0.00 0.00 1.86 0.00 0.00 7.55 7.55 7.55 17.79 7.36 3.38 d_A, Approach Delay [s/veh] 0.47 0.90 13.09 14.56 Approach LOS A A B B d I, Intersection Delay [s/veh] 4.02 Intersection LOS C 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with FOLVAN ii (.1 Scenario 4: 4 2041 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.5 Level Of Service: A Volume to Capacity (v/c): 0.011 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration «I f ► "r Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 0 0 0 0 Entry Pocket Length [ft] No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 11 44 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 8 11 44 0 0 8 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 2 3 13 0 0 2 Total Analysis Volume [veh/h] 9 13 52 0 0 9 Pedestrian Volume [ped/h] 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with FMEI i Scenario 4: 4 2041 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.67 9.47 Movement LOS A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.02 0.00 0.03 95th -Percentile Queue Length [ft/In] 0.50 0.50 0.00 0.84 d_A, Approach Delay [s/veh] 3.14 0.00 9.47 Approach LOS A A A d_I, Intersection Delay [s/veh] 1.86 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 4: 4 2041 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90/WCR 39 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 10.4 Level Of Service: B Volume to Capacity (v/c): 0.013 Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration ,.F► -1 r st 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 1 1 0 0 0 Entry Pocket Length [ft] 100.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips (veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 2 0 16 5 31 20 28 3 2 36 6 Peak Hour Factor 0.5000 0.5000 0.5000 0.5700 0.5700 0.5700 0.7700 0.7700 0.7700 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 0 7 2 14 6 9 1 1 10 2 Total Analysis Volume [veh/h] 0 4 0 28 9 54 26 36 4 2 42 7 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =IYM3i;(•i Scenario 4: 4 2041 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.04 0.01 0.06 0.02 0.00 d_M, Delay for Movement [s/veh] 10.36 10.06 10.39 9.10 7.53 7.47 Movement LOS B B B A A A A A A A 95th -Percentile Queue Length [vehAn] 0.02 0.12 0.04 0.18 0.05 0.00 0.00 0.00 0.00 0.00 95th -Percentile Queue Length [ftAn] 0.45 2.95 1.01 4.60 1.37 0.00 0.00 0.10 0.10 0.10 d_A, Approach Delay [s/veh] 10.36 9.52 2.97 0.29 Approach LOS B A A A dl, Intersection Delay [s/veh] 5.28 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 4: 4 2041 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 21.3 Level Of Service: C Volume to Capacity (v/c): 0.182 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration 1 1 r I II r + # 1 r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 1 1 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 r 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ftJ Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 16 213 25 9 234 1 1 18 21 30 15 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.3800 1.3800 1.3800 1.3800 1.3800 1.3800 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 22 294 35 12 323 1 2 28 33 47 24 20 Peak Hour Factor 0.9500 0.9500 0.9500 0.8500 0.8500 0.8500 0.5600 0.5600 0.5600 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 6 77 9 4 95 0 1 12 15 13 6 5 Total Analysis Volume [veh/h] 23 309 37 14 380 1 4 50 59 51 26 22 Pedestrian Volume [ped/h] 0 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with I!jYMIi(.i Scenario 4: 4 2041 Back PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.01 0.01 0.18 0.08 0.19 0.09 0.03 d_M, Delay for Movement [s/veh] 8.41 8.27 20.32 21.31 12.91 21.30 18.66 9.57 Movement LOS A A A A A A C C B C C A 95th -Percentile Queue Length [veh/In] 0.07 0.00 0.00 0.04 0.00 0.00 1.09 1.09 1.09 0.68 0.29 0.08 95th -Percentile Queue Length [ft/In] 1.63 0.00 0.00 0.95 0.00 0.00 27.27 27.27 27.27 16.93 7.34 2.09 d_A, Approach Delay [s/veh] 0.52 0.29 16.89 18.00 Approach LOS A A C C d_I, Intersection Delay [s/veh] 4.10 Intersection LOS C O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 5: 5 2041 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way Stop Delay (sec / veh): 9.4 Analysis Method: HCM 6th Edition Level Of Service: A Analysis Period: 15 minutes Volume to Capacity (v/c): 0.013 Intersection Setup Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration "11 �'► ..�.► Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 0 0 0 Entry Pocket Length [ft] 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 30 34 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 8 0 0 0 0 1 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 16 30 34 0 0 9 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 5 9 10 0 0 3 Total Analysis Volume [veh/h] 19 35 40 0 0 11 Pedestrian Volume [ped/h] 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with IiiYANVUI .i Scenario 5: 5 2041 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.01 d_M, Delay for Movement [s/veh] 7.66 9.41 Movement LOS A A A A 95th -Percentile Queue Length [vehAn] 0.04 0.00 0.00 0.04 95th -Percentile Queue Length [ft/In] 1.05 0.00 0.00 1.01 d_A, Approach Delay [s/veh] 2.70 0.00 9.41 Approach LOS A A A d I, Intersection Delay [s/veh] 2.37 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with I!1 'Ifii i i Scenario 5: 5 2041 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 90IWCR 39 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 12.4 Level Of Service: B Volume to Capacity (v/c): 0.008 Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration i ji* '11 r i I 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 1 1 0 0 0 Entry Pocket Length [ft] 100.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 2 7 1 7 6 29 27 36 0 1 29 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 1 8 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 2 7 1 7 6 30 50 57 0 2 46 6 Peak Hour Factor 0.5500 0.5500 0.5500 0.6900 0.6900 0.6900 0.6800 0.6800 0.6800 0.6800 0.6800 0.6800 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 1 3 0 3 2 11 18 21 0 1 17 2 Total Analysis Volume [veh/h] 4 13 2 10 9 43 74 84 0 3 68 9 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with =&ViIIii Scenario 5: 5 2041 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.03 0.00 0.02 0.02 0.05 0.05 0.00 d_M, Delay for Movement [s/veh] 12.44 12.20 9.31 11.83 12.04 9.20 7.68 7.56 Movement LOS B B A B B A A A A A A 95th -Percentile Queue Length [vehAn] 0.11 0.11 0.11 0.06 0.05 0.15 0.17 0.00 0.01 0.01 0.01 95th -Percentile Queue Length [ft/In] 2.75 2.75 2.75 1.42 1.32 3.76 4.13 0.00 0.16 0.16 0.16 d A, Approach Delay [s/veh] 11.95 10.04 3.60 0.28 Approach LOS B B A A dl, Intersection Delay [s/veh] 4.52 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 5: 5 2041 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85IWCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 16.5 Level Of Service: C Volume to Capacity (v/c): 0.198 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration 111 r '111 r *h '11 r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 1 1 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 13 187 21 19 150 4 4 7 9 41 18 19 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.3800 1.3800 1.3800 1.3800 1.3800 1.3800 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 7 1 0 0 0 0 0 1 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 18 258 36 27 207 6 6 11 14 65 28 30 Peak Hour Factor 0.9500 0.9500 0.9500 0.9400 0.9400 0.9400 0.6900 0.6900 0.6900 0.8400 0.8400 0.8400 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 5 68 9 7 55 2 2 4 5 19 8 9 Total Analysis Volume [veh/h] 19 272 38 29 220 6 9 16 20 77 33 36 Pedestrian Volume [ped/h] 0 0 0 0 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with lii!lyiiii i Scenario 5: 5 2041 Total AM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.03 0.02 0.05 0.02 0.20 0.09 0.04 d_M, Delay for Movement [s/veh] 7.94 8.21 15.26 16.06 9.90 16.53 15.83 9.51 Movement LOS A A A A A A C C A C C A 95th -Percentile Queue Length [veh/n] 0.05 0.00 0.00 0.08 0.00 0.00 0.30 0.30 0.30 0.73 0.30 0.14 95th -Percentile Queue Length [ft/In] 1.16 0.00 0.00 1.94 0.00 0.00 7.61 7.61 7.61 18.17 7.39 3.38 d_A, Approach Delay [s/veh] 0.46 0.93 13.16 14.64 Approach LOS A A B B d_I, Intersection Delay [s/veh] 4.02 Intersection LOS C 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 5: 5 2041 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 1: WCR 39/Site Access Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 9.5 Level Of Service: A Volume to Capacity (v/c): 0.023 Name WCR 39 WCR 39 Site Access Approach Northbound Southbound Eastbound Lane Configuration #1 1 1' Turning Movement Left Thru Thru Right Left Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 0 0 0 0 0 Entry Pocket Length [ft] 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 Crosswalk Yes Yes Yes Volumes Name WCR 39 WCR 39 Site Access Base Volume Input [veh/h] 8 11 44 0 0 8 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 90.00 90.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 In -Process Volume [veh/h] 0 0 0 0 0 0 Site -Generated Trips [veh/h] 1 0 0 0 0 8 Diverted Trips [veh/h] 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/hl 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 Total Hourly Volume [veh/h] 9 11 44 0 0 16 Peak Hour Factor 0.8500 0.8500 0.8500 0.8500 0.8500 0.8500 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 3 3 13 0 0 5 Total Analysis Volume [veh/h] 11 13 52 0 0 19 Pedestrian Volume [ped/h] 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with II!jVM3i;l.i Scenario 5: 5 2041 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.01 0.00 0.02 d_M, Delay for Movement [s/veh] 7.67 9.53 Movement LOS A A A A 95th -Percentile Queue Length [veh/In] 0.02 0.00 0.00 0.07 95th -Percentile Queue Length [ft/In] 0.61 0.00 0.00 1.79 d_A, Approach Delay [s/veh] 3.52 0.00 9.53 Approach LOS A A A d_I, Intersection Delay [s/veh] 2.79 Intersection LOS A 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions. Inc. Generated with �IYAI1i.i Scenario 5: 5 2041 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 2: WCR 901WCR 39 Control Type: Two-way stop Delay (sec / veh): 10.4 Analysis Method: HCM 6th Edition Level Of Service: B Analysis Period: 15 minutes Volume to Capacity (v/c): 0.013 Intersection Setup Name WCR 39 WCR 39 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration ,.f► '11 r i � 1 Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 0 0 1 1 1 0 0 0 Entry Pocket Length [ft] 100.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name WCR 39 WCR 39 WCR 90 WCR 90 Base Volume Input [veh/h] 0 2 0 16 5 31 13 18 2 1 23 4 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehicles Percentage [%] 37.00 37.00 37.00 37.00 37.00 37.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 0 0 0 8 1 0 0 0 0 0 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 0 2 0 16 5 39 21 28 3 2 36 6 Peak Hour Factor 0.5000 0.5000 0.5000 0.5700 0.5700 0.5700 0.7700 0.7700 0.7700 0.8600 0.8600 0.8600 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 0 1 0 7 2 17 7 9 1 1 10 2 Total Analysis Volume [veh/h] 0 4 0 28 9 68 27 36 4 2 42 7 Pedestrian Volume [ped/h] 0 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Iiiiiyiiii t7 Scenario 5: 5 2041 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Stop Stop Free Free Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.00 0.01 0.00 0.04 0.01 0.07 0.02 0.00 d_M, Delay for Movement [s/veh] 10.38 10.08 10.41 9.16 7.53 7.47 Movement LOS B B B A A A A A A A 95th -Percentile Queue Length [vehAn] 0.02 0.12 0.04 0.24 0.06 0.00 0.00 0.00 0.00 0.00 95th -Percentile Queue Length (ft/In] 0.45 2.96 1.01 5.88 1.42 0.00 0.00 0.10 0.10 0.10 d A, Approach Delay [s/veh] 10.38 9.51 3.03 0.29 Approach LOS B A A A d_I, Intersection Delay [s/veh] 5.54 Intersection LOS B 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with Scenario 5: 5 2041 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Level Of Service Report Intersection 3: US 85/WCR 90 Control Type: Two-way stop Analysis Method: HCM 6th Edition Analysis Period: 15 minutes Intersection Setup Delay (sec / veh): 21.8 Level Of Service: C Volume to Capacity (v/c): 0.214 Name US 85 US 85 WCR 90 WCR 90 Approach Northbound Southbound Eastbound Westbound Lane Configuration 11 i r '111 r 411 r Turning Movement Left Thru Right Left Thru Right Left Thru Right Left Thru Right Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 No. of Lanes in Entry Pocket 1 1 1 1 0 0 1 1 Entry Pocket Length [ft] 290.00 120.00 425.00 420.00 100.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 0 0 Exit Pocket Length [ft] Speed [mph] 30.00 30.00 30.00 30.00 Grade [%] 0.00 0.00 0.00 0.00 Crosswalk Yes Yes Yes Yes Volumes Name US 85 US 85 WCR 90 WCR 90 Base Volume Input [veh/h] 16 213 25 9 234 1 1 18 21 30 15 13 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Heavy Vehides Percentage [%] 16.00 16.00 16.00 16.00 16.00 16.00 20.00 20.00 20.00 20.00 20.00 20.00 Growth Factor 1.3800 1.3800 1.3800 1.3800 1.3800 1.3800 1.5700 1.5700 1.5700 1.5700 1.5700 1.5700 In -Process Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Site -Generated Trips [veh/h] 0 0 1 0 0 0 0 0 0 7 0 1 Diverted Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Pass -by Trips [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Other Volume [veh/h] 0 0 0 0 0 0 0 0 0 0 0 0 Total Hourly Volume [veh/h] 22 294 36 12 323 1 2 28 33 54 24 21 Peak Hour Factor 0.9500 0.9500 0.9500 0.8500 0.8500 0.8500 0.5600 0.5600 0.5600 0.9300 0.9300 0.9300 Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Total 15 -Minute Volume [veh/h] 6 77 9 4 95 0 1 12 15 15 6 6 Total Analysis Volume [veh/h] 23 309 38 14 380 1 4 50 59 58 26 23 Pedestrian Volume [ped/h] 0 0 0 0 O 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Generated with)SI Scenario 5: 5 2041 Total PM North Weld Gravel Pit TIS Version 2022 (SP 0-0) Weld County, CO Intersection Settings Priority Scheme Free Free Stop Stop Flared Lane No Storage Area [veh] Two -Stage Gap Acceptance No No Number of Storage Spaces in Median Movement, Approach, & Intersection Results V/C, Movement V/C Ratio 0.02 0.01 0.01 0.18 0.08 0.21 0.09 0.03 d_M, Delay for Movement [s/veh] 8.41 8.27 20.35 21.33 12.92 21.83 18.66 9.58 Movement LOS A A A A A A C C B C C A 95th -Percentile Queue Length [veh/ln] 0.07 0.00 0.00 0.04 0.00 0.00 1.09 1.09 1.09 0.79 0.29 0.09 95th -Percentile Queue Length [ftAn] 1.63 0.00 0.00 0.95 0.00 0.00 27.31 27.31 27.31 19.80 7.34 2.19 d_A, Approach Delay [s/veh] 0.52 0.29 16.90 18.43 Approach LOS A A C C d_I, Intersection Delay [s/veh] 4.25 Intersection LOS C 11/18/2021 Joseph L. Henderson, PE, PTOE Sustainable Traffic Solutions, Inc. Appendix Traffic Signal Warrant Analysis Sustainable Traffic Solutions, Inc North Weld Gravel Pit Traffic Impact Study Sustainable Traffic Solutions Weld County, Colorado November 22, 2021 Traffic Signal Warrant Analysis Volumes Existing Volumes 600AM 5 160 25 13 150 4 flJLL 3 16 8 --J 31 13 13 700AM 43 164 31 20 190 18 4 14 47 31 26 12 8 00 AM 40 141 25 7 130 18 10 9 63 34 9 15 9 00 AM 17 128 19 7 120 3 2 11 14 16 12 9 1000AM 11 127 8 14 118 3 2 14 12 16 18 11 1100 AM 11 107 25 9 143 3 3 19 9 24 9 11 12 00 PM 8 128 18 13 125 5 4 5 11 23 6 11 100 PM 11 142 22 7 141 4 7 8 19 17 16 8 2 00 PM 42 143 24 9 155 9 2 7 15 28 17 18 3 00 PM 31 163 26 12 178 15 26 29 77 30 21 14 4 00 PM 1 B 222 25 21 191 9 6 14 22 49 15 18 5 00 PM 23 167 26 11 229 10 10 14 11 25 12 21 The data were collected on Wednesday November 10 2021 Year 2041 Background Volumes 6 00 AM 7 221 35 18 207 6 3 __ 16 8 49 20 20 700AM 59 226 43 28 262 25 4 14 47 49 41 19 800AM AM 55 195 35 10 179 25 10 9 63 53 14 24 900AM AM 23 177 26 10 166 4 2 11 14 25 19 14 1000AM 15 175 11 19 163 4 2 14 12 25 28 17 11 00 AM 15 148 35 12 197 4 3 19 9 38 14 17 12 00 PM 11 177 25 18 173 7 4 5 11 36 9 17 100 PM 15 196 30 10 195 6 7 8 19 27 25 13 2 00 PM 56 197 33 12 214 12 2 7 15 44 27 28 3 00 PM 43 225 36 17 246 21 26 29 77 47 33 22 4 00 PM 25 306 35 29 264 12 6 14 22 77 24 28 500 PM 32 230 36 15 316 14 10 14 11 39 19 33 Year 2041 Total Traffic 6 00 AM 7 221 35 18 207 6 3 16 8 49 20 20 700AM 59 226 50 29 262 25 4 14 47 49 41 19 8 00 AM 55 195 36 10 179 25 10 9 63 58 14 25 9 00 AM 23 177 27 10 166 4 2 11 14 26 19 14 1000AM 15 175 12 19 163 4 2 14 12 26 28 17 1100 AM 15 148 36 12 197 4 3 19 9 39 14 17 12 00 PM 11 177 26 18 173 7 4 5 11 37 9 17 100 PM 15 196 31 10 195 6 7 8 19 28 25 13 2 00 PM 58 197 34 12 214 12 2 7 15 45 27 28 3 00 PM 43 225 41 18 246 21 26 29 77 48 33 22 4 00 PM 25 306 36 29 264 12 6 14 22 84 24 29 5 00 PM 32 230 36 15 316 14 10 14 11 40 19 33 24621 - PIERCE -PM -15 -Minute Summary 11/18/2021 Hourly Summary 1 04 PM Location: 1 US 85 & CR 90 AM Date: Wednesday, November 10, 2021 Peak Hour: 07:30 AM - 08:30 AM (303) 216-2439 www.alltrafficdata.net Peak Hour - All Vehicles (534) 124 0.53 116 (547) (2,114) 217 0.84 195 (2,032) Peak 15 -Minutes: i J O 1. 1; (659) ` 14 — 77 N 12JI 24 y W 0.87 E 13 39 S r 93 ,^ fl 1 r Co t fcc I (2,503) 311 0.89 274 (2,326) 0.85 56 (577) Note: Total study counts contained in parentheses. Traffic Counts 07:45 AM - 08:00 AM Peak Hour - Pedestrians/Bicycles on Crosswalk 14.=�L 4_0 0 IC 0 o WVE o 1 S 1 0 4_0 0�� Interval Start Time U -Turn CR 90 Eastbound Left Thru Right U -Turn CR 90 Westbound Left Thru Right U -Turn US 85 Northbound Left Thni Right U -Turn US 85 Southbound Left Thru Right Total Rolling Hour Pedestrian West East Crossings South North 6:00 AM 0 1 1 2 0 7 4 2 0 1 40 6 0 2 23 1 90 441 0 0 0 0 6:15 AM 0 1 3 2 0 9 3 3 0 1 39 4 0 5 37 1 108 477 0 0 0 0 6:30 AM 0 0 2 2 0 10 2 4 0 1 31 10 0 5 47 0 114 490 0 0 0 0 6:45 AM 0 1 10 2 0 5 4 4 0 2 50 5 0 1 43 2 129 531 0 0 1 0 7:00 AM 0 0 5 3 0 4 6 3 0 3 43 5 0 9 43 2 126 600 0 0 0 0 7:15 AM 0 1 2 8 0 10 5 2 0 6 32 3 0 6 43 3 121 666 0 0 0 0 7:30 AM 0 0 2 9 0 9 5 3 0 18 41 10 0 3 51 4 155 686 0 0 0 0 8:00 AM 0 6 1 37 0 12 7 3 0 28 41 5 0 2 37 13 192 501 0 0 0 0 8:15 AM 0 3 5 20 0 10 2 4 0 7 39 8 0 0 38 5 141 417 0 0 0 0 8:30 AM 0 1 2 3 0 9 0 6 0 3 38 9 0 2 23 0 96 368 0 0 0 0 8:45 AM 0 0 1 3 0 3 0 2 0 2 23 3 0 3 32 0 72 345 0 0 0 0 9:00 AM 0 1 3 3 0 5 2 2 0 4 44 7 0 2 33 2 108 358 0 0 0 0 915 AM 0 0 3 4 0 4 4 1 0 3 29 5 0 4 35 0 92 333 0 0 0 0 9:30 AM 0 0 3 2 0 5 3 2 0 7 24 2 0 0 25 0 73 324 0 0 0 0 9:45 AM 0 1 2 5 0 2 3 4 0 3 31 5 0 1 27 1 85 356 0 0 0 0 10:00 AM 0 0 2 2 0 6 5 3 0 5 27 3 0 4 26 0 83 354 0 0 0 0 10:15 AM 0 0 4 5 0 5 3 2 0 2 32 1 0 1 28 0 83 365 0 0 0 0 10:30 AM 0 1 7 3 0 3 4 4 0 1 37 3 0 3 38 1 105 382 0 0 0 1 10:45 AM 0 1 1 2 0 2 6 2 0 3 31 1 0 6 26 2 83 377 0 0 0 0 11.00 AM 0 1 11 3 0 3 1 1 0 5 27 6 0 5 30 1 94 373 0 0 0 0 11:15 AM 0 0 1 2 0 9 3 5 0 1 25 9 0 2 42 1 100 353 0 0 0 0 11:30 AM 0 2 5 1 0 10 5 3 0 3 25 8 0 0 38 0 100 350 0 0 0 0 11:45 AM 0 0 2 3 0 2 0 2 0 2 30 2 0 2 33 1 79 350 0 0 0 0 12:00 PM 0 0 0 4 0 7 0 2 0 1 27 3 0 0 29 1 74 357 0 0 0 0 12:15 PM 0 2 2 4 0 4 2 5 0 2 37 3 0 6 28 2 97 366 0 0 0 0 12:30 PM 0 0 2 0 0 5 3 0 0 2 36 4 0 5 42 1 100 374 0 0 0 0 12:45 PM 0 2 1 3 0 7 1 4 0 3 28 8 0 2 26 1 86 371 0 0 0 0 1:00 PM 0 4 0 4 0 6 4 1 1 0 26 5 0 1 29 2 83 402 0 0 0 0 1:15 PM 0 2 2 10 0 6 3 3 0 3 32 10 0 2 31 1 105 431 0 0 0 0 1:30 PM 0 1 0 4 0 2 5 3 0 4 41 3 0 2 31 1 97 423 0 0 0 0 1:45 PM 0 0 6 1 0 3 4 1 0 3 43 4 0 2 50 0 117 451 0 0 0 0 2:00 PM 0 0 4 1 0 6 0 7 0 6 43 5 0 1 39 0 112 469 0 0 0 0 2:15 PM 0 0 1 5 0 4 1 4 0 4 37 6 0 3 32 0 97 511 0 0 0 0 2:30 PM 0 2 2 2 0 8 4 3 0 9 35 8 0 2 50 0 125 588 0 0 0 0 245 PM 0 0 0 7 0 10 12 4 300 PM 0 4 11 17 0 5 6 4 315 PM 0 15 8 39 0 10 6 2 330 PM 0 2 4 8 0 11 4 4 345 PM 0 5 6 13 0 4 5 4 400 PM 0 2 2 4 0 16 4 4 415 PM 0 2 5 3 0 15 2 2 430 PM 0 1 2 6 0 9 7 4 445 PM 0 1 5 9 0 9 2 8 500 PM 0 2 6 2 0 10 4 3 515 PM 0 5 5 4 0 6 6 7 530 PM 0 2 3 3 0 5 0 6 545 PM 0 1 0 2 0 4 2 5 0 23 28 5 0 3 34 9 135 597 0 0 0 0 0 14 33 4 0 5 42 9 154 622 0 0 0 0 0 5 26 9 0 1 51 2 174 619 0 0 0 0 0 7 51 5 0 2 34 2 134 577 0 0 0 0 0 5 53 8 0 4 51 2 160 609 0 0 0 0 0 6 58 5 0 5 43 2 151 610 0 0 0 0 0 5 49 5 0 4 39 1 132 619 0 0 0 0 0 5 59 9 0 4 59 1 166 627 0 0 0 0 0 2 56 6 0 8 50 5 161 606 0 0 0 0 0 4 42 9 0 3 73 2 160 559 0 0 0 0 0 6 43 5 0 5 44 4 140 0 0 0 0 0 10 39 9 0 0 65 3 145 0 0 0 0 0 3 43 3 0 3 47 1 114 0 0 0 0 Count Total 0 79 160 308 0 324 174 161 1 259 1,792 274 0 143 1,870 101 5,646 0 0 1 1 Peak Hour 0 12 13 93 0 39 24 14 0 69 169 36 0 7 179 31 686 0 0 0 0 Traffic Signal Warrant Analysis . Major Street Name . US 85 North/South or East/West N/S Speed Limit 40 mph # of Approach Lanes 2 or more % of Right Turn Traffic to Include 100% Minor Street Name WCR 90 # of Approach Lanes 1 % of Right Turn Traffic to Include 50% Isolated Community < 10,000 pop Yes Warrant 3, •- ... Peak Hour (A - Vol. and Delay) Yes Warrant 4, Pedestrian Volume No Warrant 5, School Crossing No Warrant 6, Coordinated Signal System No Warrant 7, Crash Experience Yes Warrant 8, Roadway Network No Warrant Grade 9, Intersection Near a Crossing No All -Way Stop Warrant No Sustainable Traffic Solutions, Inc. Traffic Signal Warrant Analysis US 85 (Major Street) Volume Time .. Left Turns Through Right Turns Peds/Bikes 12-1 AM 1-2AM 2-3AM 3-4AM 4-5AM 5-6AM 6-7AM 7 221 35 7 -SAM 59 226 50 8 - 9AM 55 195 36 9 -LOAM 23 177 27 10 -HAM 15 175 12 11-12 PM 15 148 36 12-1 PM 11 177 26 1-2PM 15 196 31 2 - 3 PM 58 197 34 3-4PM 4PM 43 225 41 4 - 5 PM 25 306 36 5 - 6PM 32 230 36 6-7PM 7-8PM 8-9PM 9-10 PM 10-11 PM 11-12 AM Total Vehicles (unadjusted) 3,231 0 Time .. Left Turns Through Right Turns Peds/Bikes 12-1 AM 1-2AM 2-3AM 3-4AM 4 -SAM 5-6AM 6-7AM 18 207 6 7 -SAM 29 262 25 8-9AM 9AM 10 179 25 9 -LOAM 10 166 4 10-11 AM 19 163 4 11-12 PM 12 197 4 12-1 PM 18 173 7 1-2PM 10 195 6 2-3 PM 12 214 12 3-4PM 18 246 21 4 - 5 PM 29 264 12 5 -GPM 15 316 14 6-7PM 7-8PM 8-9PM 9-10 PM 10 - 11 PM 11-12AM Total Vehicles (unadjusted) 2,922 0 WCR 90 (Minor Street) Volume Time Left Turns Through Right Turns Peds/Bikes 12-1AM 1-2AM 2-3AM 3-4AM 4-5AM 5-6AM 6-7AM 3 16 8 7-8AM 4 14 47 8-9AM 10 9 63 9 -LOAM 2 11 14 10 -HAM 2 14 12 11-12 PM 3 19 9 12-1 PM 4 5 11 1-2PM 7 8 19 2-3 PM 2 7 15 3 - 4PM 26 29 77 4-SPM 6 14 22 5-613M 10 14 11 6-7PM 7-8PM 8-9PM 9-1OPM 10-11 PM 11-12 AM Total Vehicles (unadjusted) 547 0 Time • Left Turns Through Right Turns Peds/Bikes 12-1 AM 1-2AM 2-3AM 3-4AM 4-5AM 5-6AM 6 - 7AM 49 20 20 7-8AM 49 41 19 8-9AM 9AM 58 14 25 9 -LOAM 26 19 14 10-11 AM 26 28 17 11-12 PM 39 14 17 12-1 PM 37 9 17 1-2PM 28 25 13 2 - 3 PM 45 27 28 3-4PM 48 33 22 4 - 5 PM 84 24 29 5-6PM 40 19 33 6-7PM 7-8PM 8-9PM 9-10 PM 10 -11 PM 11-12 AM Total Vehicles (unadjusted) 1,056 0 Sustainable Traffic Solutions, Inc. Traffic Signal Warrant Analysis Additional Inputs for Warrants 3 to 9 and the Multi -Way Stop Warrants T -intersection or 4 -le ed? 4 Peak Hour Reviewed? AM Peak US 85 (Major Street) Data Combined Approach Volume I 651 WCR 90 (Minor Street) Data High Volume Side Volume 109 High Volume Side Average Delay (Sec.) 15.6 High Volume Side # of Approach Lanes 2 or more Low Volume Side Volume (leave blank if T) 65 .- •.. Include Right Turn Reduction for Vehicular No Volume? 300 feet or more to nearest traffic control signal or STOP sign controlling the street No that pedestrians desire to cross? If no, will a traffic control signal restrict N/A the progressive movement of traffic?' 15th -percentile crossing speed o pedestrians less than 3.5 feet per second? •' No If yes, then percent reduction to apply to N/A crossing volume? u to 50% 'Include supporting documentation of no progressive movement impact. "Not common. Include supporting documentation of low crossing speed. Schoolchildren (elementary through high No school) crossing the major street (US 85)? onsi era ion given to other remedial measures (warning signs/flashers, school speed zones, school crossing guards, or a No grade -separated crossing)? 300 feet or more to nearest traffic control signal or STOP sign controlling the street No that pedestrians desire to cross? If no, will a traffic control signal restrict N/A the progressive movement of traffic?* Minimum of 20 schoolchildren crossing No Burin the highest crossing hour? number of adequate gaps in the traffic stream during the period when schoolchildren are using the crossing is less No than the number of minutes in the same period?*' * Include supporting documentation of no progressive movement impact. •• May need to include supporting documentation of inadequate gaps in traffic. One-way or Two-way Street? Two -Way Adjacent traffic control signals do not provide the necessary degree of platooning, but will collectively provide a progressive No operation with the proposed traffic control signal? Resultant spacing of traffic control signals No 1,000 feet or more? Number of reportable crashes es susceptible to correction by a traffic control 4 or less signal) within a 12-monthperiod? ' Adequate trial of alternatives with satisfactory observance and enforcement No failed to reduce crash frequency? Include Right Turn Reduction for Vehicular No Volume? • May need to include supporting documentation of crash details. "Ma y need to include supporting documentation of alternative trail(s) and results. Common intersection of two major routes? No Projected entering volume of at least 1,000 vehicles per hour during the peak hour of a No typical weekda ? 5 -Year projected traffic volumes meet one or more of Warrants 1, 2, and 3 during an No averse weekday? Total existing or immediately projected entering volume of at least 1,000 vehicles per hour for each of any 5 hours of a non - No normal business day (Saturday or Sunday)? • Major Route defined as: - Part of the street or highway system that serves as the principal roadway network for through traffic flow. - Rural or suburban highways outside, entering, or traversing a city. - Appears as a major route on an official plan, such as a major street plan in an urban area traffic and transportation study. Sustainable Traffic Solutions, Inc. Tracks cross which WCR 90 approach? Southbound Consideration given to other alternatives/trial of alternative failed to No alleviate the safety concerns?* Distance between STOP or YIELD controlled approach and center of track nearest to the No intersection within 140 feet? Clear storage distance Distance D) between 70 feet the tracks and the intersection? (See Below) Number of approach lanes at the crossing? 2 or more Rail traffic per day? 35 Percentage of high -occupancy buses?** 0`Y* Percentage of Tractor -Trailer Trucks? 7.6%-12.5% • Alternatives to consider or try should include: - Providing additional pavement that would enable vehicles to clear the track or provide space for an evasive maneuver. - Reassigning the stop controls at the intersection to make the approach across the track non -stopping. High -occupancy is defined as a bus occupied by at least 20 people. Minor Street 6n 'Traffic control signal warranted & justified No with existing traffic? Number of correctable crashes* in 12- 4 month period? Peak Hour high volume approach average 15.6 delay (Sec.) • Crashes include right -turn and left -turn collisions as well as right-angle collisions. Traffic Signal Warrant Analysis Warrants 1- 3 (Volume Warrants) • US85/WCR90 • C&H Excavation • Year 2041 Total - AM Peak Major Street (N/S Road) US 85 Minor Street (E/W Road) WCR 90 Analyzed with 2 or more approach lanes Analyzed with 1 Approach Lane Total Approach Volume 6153 vehicles Total Approach Volume 1603 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 0 percent applied Right turn reduction of 50 percent applied Reduction applied to Volume Warrant thresholds due to isolated community. Condition Satisfied? Required values reached for Condition A 1 hour Condition B 3 hours I Condition A+B* 5 (Cond. A) & 5 (Cond. B) Criteria - Major Street (veh/hr) 420 630 336 (Cond. A) & 504 (Cond. B) Criteria - Minor Street (veh/hr) 105 53 84 (Cond. A) & 42 (Cond. B) Should a applied only after an adequate trial of other alternatives that could cause less delay and inconvenience to traffic has failed to solve the traffic problems. • Condition A Condition B Condition Satisfied? Required values reached for - 825 total, 109 minor, 0.5 delay 0 hours Criteria - Total Approach Volume (veh in one hour) 800 See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) 150 Criteria - Minor Street High Side Delay (veh-hrs) 5 I -000 900 c s 800 Q 700 w 600 z E 500 0 > 400 r v ✓` 300 I- C C 200 11 500 1000 1500 2000 2500 Major Street Volume (Both Approaches) Sustainable Traffic Solutions, Inc. P e Traffic Signal Warrant Analysis Warrants 7-9 (Crash, Network, Rail Crossing) •• US 85/WCR90 • C&H Excavation • Year 2041 Total - AM Peak Major Street (N/S Road) US 85 Minor Street (E/W Road) WCR 90 Anal zed with 2 or more approach lanes Analyzed with 1 Approach Lane Total A roach Volume 6153 vehicles Total Approach Volume 1603 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 0 percent applied Right turn reduction of 0 percent applied Reduction applied to Crash and Roadway Network Warrant thresholds due to high speed on US 85. Condition Satisfied? Required values reached for Alternatives not tried, 4 or less correctable crashes, 7 hours (Veh. Vol.), 0 hours (Ped 4 -Hour), and 0 hours (Ped Peak Hour) Criteria - Alternatives Adequate trial has failed to reduce the crash frequency Criteria - Reported Crashes (within 12 -month period) 5 or more crashes susceptible to correction by a traffic control signal Criteria - Major Street (veh/hr) - Minor Street (veh/hr) From Warrant 1: 336 From Warrant 1: 84 (Cond. A), 504 (Cond. B) (Cond. A), 42 (Cond. B) (Alternative Volume Requirement) Criteria - Pedestrian Volume 80 percent of the Pedestrian Volume Warrant requirements Condition Satisfied? Not Examined Required values reached for Criteria - Common Intersection of Two Major Routes Criteria - Existing or Immediately Projected Entering Volume Criteria - Warrants (Alternative Requirement) Criteria - Non -normal Business Day Condition Satisfied? Not Examined Required values reached for Criteria _ -_Alternatives Alternatives Criteria - Max. Distance to Nearest Controlled Crossing Criteria - Major Street Volume and Crossing Volume �Vv T — —Grade Crossing Threshold • Intersection Volume ti-I5O. o � V o a a on a 100 c y . O t 50 Y - L y o 0 0 100 200 j 9% nifPhB pp a5 ) *9 700 800 900 Ma tree[ Volu o[h A ro s Vehicle*9r Hour Sustainable Traffic Solutions, Inc. Traffic Signal Warrant Analysis . . Major Street Name US 85 North/South or East/West N/S Speed Limit 40 mph # of Approach Lanes 2 or more % of Right Turn Traffic to Include 100% Minor Street Name WCR 90 # of Approach Lanes 1 % of Right Turn Traffic to Include 50% Isolated Community < 10,000 pop Yes Warrant 3, ..I ... Peak Hour (A - Vol. and Delay) Yes Warrant 4, Pedestrian Volume No Warrant 5, School Crossing No Warrant 6, Coordinated Signal System No Warrant 7, Crash Experience Yes Warrant 8, Roadway Network No Warrant Grade 9, Intersection Near a Crossing No All -Way Stop Warrant No Sustainable Traffic Solutions, Inc. Traffic Signal Warrant Analysis US 85 (Major Street) Volume Time .. Left Turns Through Right Turns Peds/Bikes 12-1 AM 1-2AM 2-3AM 3-4AM 4 -SAM 5-6AM 6 - 7AM 7 221 35 7 -SAM 59 226 50 8 - 9AM 55 195 36 9 - l0 AM 23 177 27 10 -HAM 15 175 12 11-12 PM 15 148 36 12 - 1 PM 11 177 26 1-2 PM 15 196 31 2-3PM 3PM 58 197 34 3-4PM 4PM 43 225 41 4 - 5PM 25 306 36 5-6PM 6PM 32 230 36 6-7PM 7-8PM 8-9 PM 9-10 PM 10-11 PM 11-12 AM Total Vehicles (unadjusted) 3,231 0 Time .. Left Turns Through Right Turns Peds/Bikes 12-lAM 1-2AM 2-3AM 3-4AM 4 -SAM 5-6AM 6-7AM 18 207 6 7-8AM 8AM 29 262 25 8-9AM 9AM 10 179 25 9 -LOAM 10 166 4 10 -HAM 19 163 4 11-12 PM 12 197 4 12-1PM 18 173 7 1-2 PM 10 195 6 2-3PM 12 214 12 3-4PM 18 246 21 4 - 5PM 29 264 12 S-6PM 15 316 14 6-7PM 7-8PM 8-9 PM 9-1OPM 10- 11 PM 11-12AM Total Vehicles (unadjusted) 2,922 0 WCR 90 (Minor Street) Volume Time Left Turns Through Right Turns Peds/Bikes 12-1AM 1-2AM 2-3AM 3-4AM 4 -SAM 5-6AM 6-7AM 3 16 8 7 -SAM 4 14 47 8-9AM 10 9 63 9 -LOAM 2 11 14 10-11 AM 2 14 12 11-12 PM 3 19 9 12-1PM 4 5 11 1-2 PM 7 8 19 2-3PM 2 7 15 3-4PM 4PM 26 29 77 4-5PM 6 14 22 5 -GPM 10 14 11 6-7PM 7-8PM 8-9 PM 9-10 PM 10-11 PM 11-12 AM Total Vehicles (unadjusted) 547 0 Time Left Turns Through Right Turns Peds/Bikes 12-1 AM 1-2AM 2-3AM 3-4AM 4 -SAM 5-6AM 6-7AM 7AM 49 20 20 7-8AM 49 41 19 8 - 9AM 58 14 25 9 -LOAM 26 19 14 10-11 AM 26 28 17 11-12 PM 39 14 17 12-1PM 37 9 17 1-2 PM 28 25 13 2 - 3PM 45 27 28 3 - 4PM 48 33 22 4-5PM 84 24 29 5-6PM 40 19 33 6-7PM 7-8PM 8-9PM 9-10 PM 10-11 PM 11-12 AM Total Vehicles (unadjusted) 1,056 0 Sustainable Traffic Solutions, Inc. Traffic Signal Warrant Analysis Additional Inputs for Warrants 3 to 9 and the Multi -Way Stop Warrants T -intersection or 4 -legged? 4 Peak Hour Reviewed? PM Peak US 85 (Major Street) Data Combined Approach Volume j 643 WCR 90 (Minor Street) Data High Volume Side Volume 92 High Volume Side Avera a Dela Sec. 22.03 High Volume Side # of Approach Lanes 2 or more Low Volume Side Volume (leave blank if T) 35 Include Right Turn Reduction for Vehicular No Volume? 0 eet or more to nearest tra is contro signal or STOP sign controlling the street No that pedestrians desire to cross? If no, will a traffic control signal restrict N/A the ro ressive movement of traffic?` -percen i e crossing spee o pedestrians less than 3.5 feet per second?" No If yes, then percent reduction to apply to N/A crossing volume? u to 50% * Include supporting documentation of no progressive movement impact. "Not common. Include supporting documentation of low crossing speed. •Schoolchildren (elementary through high No school) crossin the ma or street (US 85)? Consideration given to other remedial measures (warning signs/flashers, school speed zones, school crossing guards, or a No grade -separated crossing)? 300 feet or more to nearest traffic control signal or STOP sign controlling the street No that pedestrians desire to cross? If no, will a traffic control signal restrict N/A the progressive movement of traffic?' Minimum of 20 schoolchildren crossing No durin the hi hest crossin hour? number of adequate gaps in the traffic stream during the period when schoolchildren are using the crossing is less No than the number of minutes in the same period? ' * Include supporting documentation of no progressive movement impact. "May need to include supporting documentation of inadequate gaps in traffic. One-wa or Two-wa Street? wo- TWa A jacent tra it contro signa s o not provide the necessary degree of platooning, but will collectively provide a progressive No operation with the proposed traffic control signal? Resultant spacing of traffic control signals No 1,000 feet or more? Number of reportable crashes (types susceptible to correction by o traffic control 4 or less si nal) within a 12 -month period?' Adequate trial of alternatives with satisfactory observance and enforcement No failed to reduce crash fre uen ?" Include Right Turn Reduction for Vehicular No Volume? ' May need to include supporting documentation of crash details. "May need to include supporting documentation of alternative trail(s) and results. Common intersection of two ma or routes?' No Projected entering volume of at least 1,000 vehicles per hour during the peak hour of a No typical weekda ? 5 -Year projected traffic volumes meet one or more of Warrants 1, 2, and 3 during an No average weekday? Total existing or immediately projected entering volume of at least 1,000 vehicles per hour for each of any 5 hours of a non- No normal business da Saturda or Sunda ? ' Major Route defined as: - Part of the street or highway system that serves as the principal roadway network for through traffic flow. - Rural or suburban highways outside, entering, or traversing a city. - Appears as a major route on an official plan, such as a major street plan in an urban area traffic and transportation study. Sustainable Traffic Solutions, Inc. Tracks cross which WCR 90 a roach? Southbound Consideration given to other alternatives/trial of alternative failed to No alleviate the safety concerns?' Distance between STOP or YIELD controlled approach and center of track nearest to the No intersection within 140 feet? Clear storage distance (DistanceD) between 70 feet the tracks and the intersection? (See Below) Number of a roach lanes at the crossin ? 2 or more Rail traffic per day? 3-5 Percentage ofhi h-occu an buses?" 0% Percentage of Tractor -Trailer Trucks? 7.6%-12.5% 'Alternatives to consider or try should include: - Providing additional pavement that would enable vehicles to clear the track or provide space for an evasive maneuver. - Reassigning the stop controls at the intersection to make the approach across the track non -stopping. High -occupancy is defined as a bus occupied by at least 20 people. Minor Street o -- an Traffic control signal warranted & justi ied No with existin traffic? Number of correctable crashesin 12- 4 month period? Peak Hour high volume approach average 22.03 delay Sec. " Crashes include right -turn and left -turn collisions as well as right-angle collisions. Traffic Signal Warrant Analysis Warrants 1- 3 (Volume Warrants) Major Street (N/S Road) US 85 Minor Street (E/W Road) WCR 90 Analyzed with 2 or more approach lanes Analyzed with 1 Approach Lane Total Approach Volume 6153 vehicles Total Approach Volume 1603 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 0 percent applied Right turn reduction of 50 percent applied Reduction applied to Volume Warrant thresholds due to isolated community. Condition A I Condition B Condition A+B* Condition Satisfied? 4 Required values reached for 1 hour 3 hours 5 (Cond. A) & 5 (Cond. B) Criteria - Major Street (veh/hr) 420 630 336 (Cond. A) & 504 (Cond. B) Criteria - Minor Street (veh/hr) 105 53 84 (Cond. A) & 42 (Cond. B) Should a aoolied only after an a eauate trial of other alternatives that could cause less delay and inconvenience to traffic has failed to solve the traffic problems. Condition Satisfied? Required values reached for 1 hour Criteria See Figure Below A Condition B Condition Satisfied? Required values reached for . 770 tir, 0.6 delay 0 hours Criteria - Total Approach Volume (veh in one hour) See Figure Below Criteria - Minor Street High Side Volume (veh in one hour) Criteria Minor Street High Side Delay (veh-hrs) 1,000 Warrant 2 Threshold —Warrant 3 Threshold • Intersection Volumes 900 T 800 tR a 700 a con 600 E 500 > 400 300 200 100 OIP 0 500 1000 1500 2000 Major Street Volume (Both Approaches) 2500 t I C c 0 C Sustainable Traffic Solutions, Inc. Traffic Signal Warrant Analysis Warrants 7-9 (Crash, Network, Rail Crossing) Major Street (N/S Road) US 85 Minor Street (E/W Road) WCR 90 Analyzed with 2 or more approach lanes Anal zed with 1 Approach Lane Total Approach Volume 6153 vehicles Total A roach Volume 1603 vehicles Total Ped/Bike Volume 0 crossings Total Ped/Bike Volume 0 crossings Right turn reduction of 0 percent applied Right turn reduction of 0 percent applied Reduction applied to Crash and Roadway Network Warrant thresholds due to high speed on US 85. Condition Satisfied? • Required values reached for Alternatives not tried, 4 or less correctable crashes, 7 hours Veh. Vol.), 0 hours (Ped 4 -Hour), and 0 hours (Ped Peak Hour) Criteria - Alternatives Adequate trial has failed to reduce the crash frequency Criteria - Reported Crashes (within 12 -month period) 5 or more crashes susceptible to correction by a traffic control signal Criteria - Major Street (veh/hr) From Warrant 1: 336 (Cond. A), 504 (Cond. B) - Minor Street (veh/hr) From Warrant 1: 84 (Cond. A), 42 (Cond. B) (Alternative Volume Requirement) Criteria - Pedestrian Volume 80 percent of the Pedestrian Volume Warrant requirements Condition Satisfied? Not Examined Required values reached for Criteria - Common Intersection of Two Major Routes Criteria - Existing or Immediately Projected Entering Volume Criteria - Warrants (Alternative Requirement) Criteria - Non -normal Business Day Condition Satisfied? Not Examined Required values reached for Criteria - Alternatives Criteria - Max. Distance to Nearest Controlled Crossing Criteria - Major Street Volume and Crossing Volume LVV '--" Grade Crossing Threshold • Intersection Volume s 150 o O 0 n. 2 a c 100 y U U > 50 r C p C 0 i 0 100 200 Maj P%trees VolunifcPfkIoth Approa s) - Vehicle�$r Hour 700 800 900 Sustainable Traffic Solutions, Inc. Sustainable Traffic Solutions �T3 November21, 2021 Jared Dains, PE Applegate Group, Inc. 1490 West 12151 Avenue, Suite 100 Denver, CO 80234 RE: North Weld Gravel Pit TIS Response to Comments Dear Jared, Joseph L. Henderson PE, PTOE Traffic Engineer 1 Principal Allyson Young with CDOT provided comments on the North Weld Gravel Pit Traffic Impact Study that is dated October 21, 2021. The following comments were provided by email to Derek Daniels with C&H Excavation on November 2, 2021. The comments have been addressed as follows. Comment 1 WCR 94/CO 85: While it was mentioned that this access to CO 85 will not be utilized, the study states that it is a secondary haul route. 1) Define secondary haul route? What types of vehicles/frequency, etc. 2) Define the percentage of use from each direction on CO 85. Specifically identifying the number of trucks/large vehicles (in excess of 30 feet). Full analysis of the intersection may be requested similarly to WCR 90. Response No new traffic will use the secondary haul route that includes WCR 37 and WCR 94. The existing traffic on this haul route is very light. Vehicle classification data collected on WCR 37 north of WCR 94 are contained in Appendix B. A summary of the daily traffic volumes on WCR 37 and WCR 94 are included in Table 1. The introduction in Section 1.0 has been updated to clarify the use of the primary and secondary haul routes. The peak hour count data have been converted to passenger car equivalents and the summary is contained in Appendix B. The classification data were collected by Miovision when the traffic count data for the study were processed. The following FHWA vehicle classifications apply to the Miovision categories; Lights - 1 through 3, Mediums -4 through 7, Articulated Trucks - 8 through 13. Comment 2 WCR 90/CO 85: Primary haul route; north and south bound entrance for vehicles? Define the percentage of use from each direction on CO 85 rather than solely EBIWB traffic on the CR. Specifically identifying the number of trucks/large vehicles (in excess of 30 feet). 823 West 124th Drive Westminster, Colorado 80234 303.589.6875 joe@sustainabletrafficsolutions.com Jared Dains, PE November 21, 2021 Page 2 Response The haul route runs between US 85 / WCR 90 and the site access on WCR 39, so all of the traffic is entering the site from the south. When the traffic leaves the site, it will go south along the haul route. Please refer to Figures 7 and 8 for the trip assignment. Refer to Figure 6 for the distribution of traffic on US 85. Table 4 has been updated with passenger car equivalents for the existing and future traffic. Comment 3 Full analysis of all existing auxiliary lane storage lengths at the CR 90 intersection; particularly addressing storage capacity/queue lengths with the number of large trucks/vehicles in excess of 30 feet being added to existing traffic counts at the intersection. Response Table 6 includes the existing and Year 2041 lane geometry for auxiliary lanes that are impacted by traffic from the North Weld Gravel Pit. It shows: • The northbound right turn deceleration lane is extremely short. • The southbound left turn deceleration lane meets the requirements for the Year 2041. • The westbound to northbound right turn acceleration lane is longer than required. Comment 4 A wheel path analysis of the right northbound turning radius for the gravel mine trucks-- will the curb line/any delineators or signs be impacted? Response Trucks are making that movement now, so it doesn't seem necessary to perform this analysis. CDOT should already know if the delineators or signs are being impacted by trucks. Comment 5 Has a signal warrant analysis been completed for this intersection? Response A signal warrant analysis was completed and the intersection is not expected to warrant signalization through the Year 2041 total traffic volume scenarios. Refer to Section 10.0. Comment 6 Will the WCR 39/CO 14 be used at all? Response No. This intersection is not on the haul route. Comment 7 It should be noted that CDOT will not accept LOS/Delays as sole justification for negating any and all roadway improvements. All counts should be displayed in passenger car equivalents. Peak hour counts in PCE's associated with the gravel mine site at both WCR 94/CO 85 and WCR 90/CO85 intersections need to be identified and differentiated. Response The study doesn't attempt to negate any improvements based on level of service or delay. Refer to Table 4 to review the need for auxiliary lanes. Analysis of both of the intersections on US 85 is included in the table. Comment 8 It is noted that 90% of site traffic will be trucks. Both truck and passenger vehicle counts in PCEs should be included in peak hour counts at each intersection-- Jared Dains, PE November 21, 2021 Page 3 whether or not auxiliary lanes exist at the intersection is irrelevant to this requirement. This section of CO 85 is categorized as expressway, meaning auxiliary lane thresholds are extremely low. Response Refer to Table 4 to review the need for auxiliary lanes. Allyson Young with CDOT provided comments on the North Weld Gravel Pit Traffic Impact Study that is dated October 21, 2021. The following comments were provided by email to Derek Daniels with C&H Excavation on November 8, 2021. The comments have been addressed as follows. Comment 9 The study addresses improvements on CR intersections primarily. CDOT is primarily concerned with improvements/traffic associated with CO 85. Numbers 2 and 5 in the previous email need to be completed within the study and once included, the study needs to be resubmitted to CDOT for a second round of review. Response All comments were addressed and incorporated into the November 22, 2021 version of the report. At US 851 WCR 90, most of the auxiliary lanes have been constructed on US 85. An analysis was also performed at US 85 / WCR 94 even though no new traffic will be passing through that intersection. Comment 10 WCR 90/CO 85: Full analysis of all existing auxiliary lane storage lengths at the CR 90 intersection; particularly addressing storage capacity/queue lengths with the number of large trucks/vehicles in excess of 30 feet being added to existing traffic counts at the intersection (all counts in PCE's). Response Refer to Section 5.0 and Table 6. Comment 11 Hasa signal warrant analysis been completed for this intersection? CDOT will not accept a statement via email simply stating that the signal is not warranted. CDOT expects that either a warrant analysis or a statement explaining why the warrant is not met according to the engineer's judgement be included in the engineer stamped study. Response A traffic signal warrant study was completed and a traffic signal is not expected to be warranted at US 851 WCR 90 through the Year 2041 total traffic volume scenarios. Refer to Section 10.0. Comment 12 CDOT is aware of Table 4. Throughout the entirety of the study (all figures included) are traffic counts in PCE's? CDOT does require that all counts be listed in PCE's. In the snippet of the study below, it is noted that the site will be generating up to 212 trucks and 66 passenger vehicles/day. Please thoroughly explain how this large amount of site traffic culminates in less than 10 vehicles in a peak hour. From what CDOT sees within the figures and tables, the peak hour counts do not align with the total site generated traffic. Is the peak hour traffic reflected in the table only Jared Dains, PE November 21, 2021 Page 4 representative of the expansion of the site? Peak hour should reflect the total site generated traffic. Response An updated Table 4 is included in this version of the study that converts all volumes to PCE's. The figures are the traffic volumes that were analyzed by VISTRO software (uses Highway Capacity Manual algorithms) to evaluate the level of service. Trucks are accounted for as a percentage of the traffic volumes. Table 3 contains the trip generation that is evaluated in this study. Only 54 new trips are expected with the expansion of the quarry. Figures 16 and 17 are the Year 2041 total traffic volumes. The figures for all of the scenarios are included to enable the reviewer to check the math. Refer to Section 3.0 for a discussion of the existing daily traffic volumes and Section 4.1 for a discussion of the daily trip generation. Please contact me with questions. Sincerely, ------------ Joseph L. Henderson, PE, PTOE Project Manager / Principal North Weld Gravel Pit TIS Response to Comments From: Jared Dains <jareddains@applegategroup.com> Sent: Monday, October4, 2021 2:26 PM To: Kim Ogle <kogle@weldgov.com> Cc: Derek Daniels <derek@chexcavation.com>; Cliff Simpson <cliff@chexcavation.com>; Abdullah Javed <ajaved@applegategroup.com> Subject: Haul Route Changes for USR21-0013 (North Weld Gravel Pit) Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Kim, In the original USR application submitted to the County in June 2021, item's 3 and 17 indicated that C&H Aggregates expected to use a secondary transportation route that sent a small amount of traffic westbound on WCR 94 to Hwy 85. Based on further study, C&H has elected to eliminate this secondary transportation route and will instead rely solely on the primary transportation route, which will send all truck traffic south on WCR 39 to WCR 90, then west on WCR 90 to Hwy 85. The Traffic Impact Study that is being prepared for this project will reflect this change. Please let me know if you have any questions about this change to the initial application. Regards, Jared Dail -is, f'.f. . Applegate Group, Inc. 1490 West 121s' Avenue, Suite 100 Denver, CO 80234 Phone: (303) 452-6611 Fax: (303) 452-2759 ITEM 18 WASTE HANDLING PLAN Sec the attached waste handling plan. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application ITEM 18 Waste Handling Plan Solid Non -Hazardous Waste Disposal C&H Aggregate LLC shall comply in accordance with Chapter 14, Article 1 of the Weld County Code regarding handling, and disposing of litter/waste. Solid hazardous waste removal will be contracted through a commercial entity, Fuzion Field Services. Waste will be stored in industrial sized dumpsters and/ or roll -off units and disposed at minimum once per week. Frequency of waste disposal may increase to keep up with storage levels & waste compliance. Waste storage areas will be located within screened enclosures to minimize the potential for wind-borne dispersion of materials. Fuzion Field Services Contact Information: General (970]-539-4201 2435 2nd Ave Greeley, CO 80631 Waste Oils & Other Materials Waste oils, antifreeze, hydraulic oil, and transmission fluid will be removed from site immediately after equipment is serviced. Removal will be accomplished using C&H Aggregate, LLC mobile lube truck waste fluid reservoirs. Waste oil will be transported using said lube truck to disposal facilities where oil and fluids will be recycled. ITEM 19 DUST ABATEMENT PLAN As outlined in Item 4, Kicwit anticipates using up to 200 acre-feet per year of non -potable water for dust abatement and material processing purposes around the site. The water will be applied to haul roads and processing equipment in order to minimize fugitive dust emissions from the site. This water will be obtained from nearby Lone Tree Creek in accordance with a temporary Substitute Supply Plan and the decree for Case No. 18CW3021. C&H Aggregates will submit an Air Pollutant Emission Notice (APEN) to the Colorado Department of Health's Air Pollution Control Division; the APEN will indicate that C&H Aggregates has this fugitive dust control plan in place for its mining activities. ITEM 20 FLOOD HAZARD DEVELOPMENT PERMIT The proposed mint is located on the Flood Insurance Rate Map (FIRM) 08123C0940E. According to the Federal Emergency Management Agency (FEMA) National Flood Hazard Layer Viewer, the entire parcel and surrounding area is located in Zone X ("Arta of Minimal Flood Hazard"). Such a designation is used for areas that arc outside of the Special Flood Hazard Area and higher than the elevation of the 0.2% annual chance flood. Therefore, a flood hazard development permit is not warranted. ITEM 21 GEOLOGIC HAZARD DEVELOPMENT PERMIT This is not applicable; the proposed mint is not located within a geologic hazard area. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application North Weld Gravel Pit Noise Modeling Report May 21, 2021 Prepared for: C&H Excavation, Inc PO Box221 Ault, Colorado 80610 Prepared by: Behrens and Associates, Inc. 9536 E. 1-25 Frontage Road Longmont, Colorado 80504 Simon Kim Senior Acoustical Engineer Jason Peetz Engineering Manager Corporate Office: Hawthorne, California Carson, California - Aledo. Texas - Napa California - Longmont, Colorado McDonald, Pennsylvania - Calgary, Canada Phone: 800-679-8633 - Fax: 310-331-1538 www.environmental-noise-control.com — www.drillingnoisecontrol.com Behrens and Associates, Inc. Environmental Noise Control 1. Introduction The following report provides a noise modeling assessment of the mining operations at the proposed North Weld Gravel Pit to be operated by C&H Excavation. Per the pending Weld County Use by Special Review (USR) permit application, the project will be assessed in relation to the Colorado Revised Statutes (CRS) 25-12-103 noise regulations. The assessment includes two modeling analyses of the proposed excavation and process equipment expected to be operational at the site. The proposed North Weld Gravel Pit parcel (40.674292 N, 104.706036 W) is located west of County Road 39 and north of County Road 94, in Weld County, Colorado. The site is bordered by agricultural zones. Figure 1-1 identifies the proposed site location. To assess the operational noise levels of the proposed activities, processing equipment sound level data previously collected by Behrens and Associates during an equipment survey of a similar sand and gravel mine to be equivalent to the proposed operations, was utilized in the noise modeling. Additionally, construction equipment sound level data sourced from the UK Department for Environment, Food, and Rural Affairs and the U.S. Department of Transportation Federal Highway Administration was utilized in the noise modeling for the proposed construction equipment to be operated at the site. The noise models were developed using SoundPLAN 8.2 software. The following is provided in this report: • A brief introduction of the fundamentals of noise. • A review of the applicable CRS noise standards. • Discussion of noise modeling methodology and results. Figure 1-1 Proposed Site Location Introduction Behrens and Associates, Inc. Environmental Noise Control 2. Noise Fundamentals Sound is most commonly experienced by people as pressure waves passing through air. These rapid fluctuations in air pressure are processed by the human auditory system to produce the sensation of sound. The rate at which sound pressure changes occur is called the frequency. Frequency is usually measured as the number of oscillations per second or Hertz (Hz). Frequencies that can be heard by a healthy human ear range from approximately 20 Hz to 20,000 Hz. Toward the lower end of this range are low-pitched sounds, including those that might be described as a "rumble" or "boom". At the higher end of the range are high-pitched sounds that might be described as a "screech" or "hiss". 2.1 Environmental Noise Environmental noise generally derives, in part, from a combination of distant noise sources. Such sources may include common experiences such as distant traffic, wind in trees, and distant industrial or farming activities. These distant sources create a low-level "background noise" in which no particular individual source is identifiable. Background noise is often relatively constant from moment to moment but varies slowly from hour to hour as natural forces change or as human activity follows its daily cycle. Superimposed on this low-level, slowly varying background noise is a succession of identifiable noisy events of relatively brief duration. These events may include the passing of single -vehicles, aircraft flyovers, screeching of brakes, and other short-term events. The presence of these short-term events causes the noise level to fluctuate. Typical indoor and outdoor A -weighted sound levels are shown in Figure 2-1. Detailed acoustical definitions have been provided in Appendix A — Glossary of Acoustical Terms. COMMON OUTDOOR NOISE LEVEL SOUND LEVELS dB (A) B-747-200 Takeoff at 2 mi. Gas Lawn Mower at 3 ft. Diesel Truck at 150 ft. OC-9.30 Takeoff at 2 mi. Noisy Urban Daytime — B-757 Takeoff at 2 mi. S - Commercial Area e .'3 Quiet Urban Daytime Quiet Urban Nighttime Quiet Suburban Nighttime Quiet Rural Nighttime COMMON INDOOR SOUND LEVELS �' 110 Rock Band. ^ y i 100 Inside Subway Train(N) (New York) 90 Food Blender at 3 ft. 80 Garbage Disposal at 3 ft. Shouting at 3 ft. 70 Vacuum Cleaner at l0 ft.� Normal Speech �I 60 at 3 ft. Large Business Office 50 Dishwasher Next Room 40 Small Theatre. Large Conference Room r (Background) 30 Library Bedroom at Nig t Concert Hall (Backgroundj_ 20 Broadcast & Recording 10 Studio 0 Threshold of Hearing Figure 2-1 Typical Indoor and Outdoor A -Weighted Sound Levels Noise Fundamentals Behrens and Associates, Inc. Environmental Noise Control 2.2 Relative Loudness of Environmental Noise Published data exists describing how humans generally respond to changes in relative loudness. Table 2-1, adapted from the Highway Traffic Noise: Analysis and Abatement Guidance (revised December 2011) published by the Federal Highway Administration, shows typical responses to changes in relative loudness. Table 2-1 Decibel Changes, Loudness, and Relative Loudness' Sound Level Change Relative Loudness 0 dB(A) Reference -3 dB(A) Barely Perceptible Change -5 dB(A) Readily Perceptible Change -10 dB(A) Half as Loud -20d8(A) 1/4 as Loud -30 dB(A) 1/8 asLoud The table describes reductions in noise levels, but the opposite holds true for increases in noise level. 'Table adapted from FHWA Highway Traffic Noise: Analysis and Abatement Guidance, revised December 2011 Noise Fundamentals Behrens and Associates, Inc. Environmental Noise Control 3. Project Noise Standards The modeling analysis was developed to predict operational noise levels along the parcel property line and assess compliance of the proposed operations with the applicable noise standards of the Colorado Revised Statutes (CRS) 25-12-103 per the pending Weld County Use By Special Review (USR) permit application. At the time of this analysis, The Department of Public Health and Environment for Weld County has not yet provided the developmental standards or prescribed noise level standards for this land use application and therefore the results of this analysis will not be referenced against the code until such a time that the noise level standards have been prescribed for this application. 3.1 CRS 25-12-103 Noise Standards The CRS code establishes permissible sound levels by type of property and hours of the day. The measurement location is defined in Section 25-12-103(1) as "sound levels of noise radiating from a property line at a distance of twenty-five feet or more therefrom in excess of the dB(A) established for the following time periods and zones shall constitute prima facie evidence that such noise is a public nuisance". The allowable daytime and nighttime noise level limits are listed in Table 3-1. Table 3-1 Colorado Noise Related Statutes 25-12-103 (1) — Maximum Permissible Noise Levels Zone Maximum 7:00 am to Noise (dBA) next 7:00 pm Maximum Noise (dBA) 7:00 pm to next 7:00 am Residential 55 dBA 50 dBA Commercial 60 dBA 55 dBA Light Industrial 70 dBA 65 dBA Industrial 80 dBA 75 dBA 3.2 Adjacent Parcels The proposed North Weld Gravel Pit will be located within a rural area of Weld County, adjacent to agricultural zones. Two parcels adjacent to the proposed development owned by C&H Excavation, Inc., have residential dwelling structures. Figure 3-1 shows the location of the proposed development in relation to the referenced surrounding USR's. Project Noise Standards Behrens and Associates, Inc. Environmental Noise Control Figure 3-1 Surrounding USR's According to Weld County GIS Project Noise Standards Behrens and Associates, Inc. Environmental Noise Control 4. North Weld Gravel Pit Noise Model 4.1 Noise Modeling Methodology The noise modeling was completed with use of three-dimensional computer noise modeling software. All models in this report were developed with SoundPLAN 8.2 software using the ISO 9613-2 standard. Noise levels are predicted based on the locations, noise levels and frequency spectra of the noise sources, and the geometry and reflective properties of the local terrain, buildings and barriers. SoundPLAN 8.2 software simulates light downwind conditions in all directions to ensure conservative assessments. The predicted noise levels represent only the contribution of the proposed mining operations and do not include ambient noise or noise from other facilities. Actual field sound level measurements may vary from the modeled noise levels due to other noise sources such as traffic, other facilities, other human activity, or environmental factors. Processing equipment sound level data used in the North Weld Gravel Pit modeling was sourced from an equipment survey previously conducted by Behrens and Associates of an existing sand and gravel mine to be equivalent to the proposed operations. Construction equipment octave -band frequency sound level data utilized in the modeling was based on construction equipment data published in the UK Department for Environment, Food, and Rural Affairs (DEFRA) Construction Noise Database, revised September 2008. The sound level data was then calibrated to match the construction equipment maximum sound levels tabulated in the U.S. Department of Transportation, Federal Highway Administration Construction Noise Handbook, updated August 2017. Per C&H Excavation, the processing equipment will be stationed at the processing area and the excavation equipment will be positioned in the closest location to the nearest property line in the noise models to represent a worst case to the receptors ensuring a conservative assessment. The modeled equipment and associated sound power levels are listed in Table 4-1. The modeling results predicted are dependent on the equipment and orientation. Figure 4-1 shows the North Weld Gravel Pit Plan Map provided by Applegate Group, Inc. Table 4-1 Equipment Modeled for the Proposed North Weld Gravel Pit Area Quantity Proposed Equipment Data Source Source Sound Power Level (Lw,dBA) Usage Factor (%) Process Area I Crusher Survey 118.8 50 Process Area I Generator Survey 105.1 50 Process Area 25 Conveyor Survey 90.8 50 Process Area I Screen Plat I Survey 114.5 50 Process Area I Screen Plat 2 Survey 113.2 50 Process Area I Screen Plat 3 Survey 113.2 50 North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control 1 \1tI\ 1 I I / I i\ (- Source Sound Usage Factor Area Quantity Proposed Equipment Data Source Power Level ( Lw dBA FHWA Process Area 2 Front End Loader Construction * 114.4 50 Handbook FHWA Process Area 2 Haul Truck Construction *119.2 50 Handbook FHWA Process Area I Skid Steer Construction * 116.1 25 Handbook FHWA Process Area I Dozer Construction *116.1 25 Handbook FHWA Excavation Area I Excavator Construction *116.0 50 Handbook FHWA Excavation Area 1 Haul Truck Construction *119.2 50 Handbook FHWA Excavation Area I Front End Loader Construction *114.4 50 Handbook *Sound power level calibrated according to the U.S. Department of Transportation, Federal Highway Administration, Construction Noise Handbook; https://www.fhwa.dot.gov/environment/noise/construction_noise/handbook/handbook09.cfin 4.2 Noise Sensitive Receptors The noise sensitive receptors have been chosen to be consistent with the requirements of the CRS 25-12-103 noise standards. The requirements indicate that "sound levels of noise radiating from a property line at a distance of twenty- five feet or more therefrom in excess of the dB(A) established for the following time periods and zones shall constitute prima facie evidence that such noise is a public nuisance". As such, receptor locations were chosen along the eastern and southern property lines toward existing dwelling structures in adjacent properties around the north weld gravel pit site to represent potential regulatory measurement points should a complaint be made. Figure 4-2 shows the dBA noise sensitive receptor locations. North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control UN Ltnd r ' R66W I R65K' A TC- xl I ri i 1 Figure 4-1 North Weld Gravel Pit Plan Map North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control Figure 4-2 Noise Sensitive Receptor Locations North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control 4.3 Noise Modeling Results Two modeling scenarios were created to predict the sound levels at compliance points surrounding the proposed site and are described in Table 4-2. The modeled equipment layout is illustrated in Figure 4-3. Table 42 Modeled Scenarios Modeled Scenario Description • Processing equipment (Crusher, Screen Plat, Generator, and Conveyers) is stationed in the processing area (Figure 4-3). Scenario 1 • Excavation equipment (Excavator, Front end loader, Bulldozer) is positioned in southwest corner of Phase 2 area. • No equipment modifications or acoustical mitigation options are included. Scenario 2 • Same conditions for the processing equipment as Scenario 1. • Excavation equipment is positioned in northeast corner of Phase 3 area. • No equipment modifications or acoustical mitigation options are included North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control Processing Equipment •Excavation Equipment (Scenario 11 .Excavation Equipment (Scenario 2) •1•8N k * I Rb>A% __. .. U: ..__�•I I I 2 Figure 4-3 Modeled Equipment Layout North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control The results of the noise modeling are presented in Table 4-3. The locations in the tables correspond to the receptor locations identified in Figure 4-2. The predicted noise levels represent only the contribution of the proposed operations and do not include ambient noise or noise from other facilities. The results of the noise modeling are also shown as noise contour maps. Figure 4-4 shows the Scenario I Noise Contour Map in dBA and Figure 4-5 shows the Scenario 2 Noise Contour Map in dBA. The noise contours are provided in 5 dB increments with the color scale indicating the sound level of each contour. Table 43 Noise Modeling Results (dBA) Receptor Location Description Scenario I Scenario 2 Location I East Property Line 66 66 Location 2 South Property Line 67 46 The modeling results for Scenario 1 indicate that the predicted noise levels of the proposed mining operations at Phase 2 area will reach up to 67 dBA along the southern property line. The modeling results for Scenario 2 indicate that the predicted noise level of the proposed mining operations in Phase 3 area will reach up to 66 dBA along the eastern property line. North Weld Gravel Pit Noise Modeling Figure 4-4 Scenario 1 Noise Contour Map (dBA) Behrens and Associates, Inc. Environmental Noise Control Noise Level, dBA = 30.0 35.0 = 40.0 = 45.0 = 50.0 = 55.0 = 60.0 = 65.0 = 70.0 = 75.0 = 80.0 = 85.0 = 90.0 0 0.1 0.2 0.3 miles North Weld Gravel Pit Noise Modeling Figure 4-5 Scenario 2 Noise Contour Map (dBA) Behrens and Associates, Inc. Environmental Noise Control Noise Level. dBA = 30.0 = 35.0 = 40.0 = 45.0 = 55.0 = 60.0 = 65.0 = 70.0 = 75.0 = 80.0 = 85.0 = 90.0 0 01 02 0.3 miles North Weld Gravel Pit Noise Modeling Behrens and Associates, Inc. Environmental Noise Control 5. Conclusion A predictive noise model was created to represent the proposed operations of the North Weld Gravel Pit to be operated by C&H Excavation. The proposed equipment consisted of a processing equipment and various construction equipment. Sound level data collected during an equipment survey of a similar sand and gravel operation to be equivalent to the proposed operations was used as a basis for the noise modeling as well as construction equipment sound level data sourced from the UK Department for Environment, Food, and Rural Affairs and the U.S. Department of Transportation Federal Highway Administration. Noise sensitive receptor locations included in the model were placed in compliance with the applicable CRS 25-12-103 noise standards. At the time of this analysis, the Department of Public Health and Environment for Weld County has not yet provided the developmental standards or prescribed noise level standards for this land use application and therefore the results of this analysis will not be referenced against the code until such a time that the noise level standards have been prescribed for this application. The modeling results for Scenario I indicate that the predicted noise levels of the proposed excavation and processing operations will reach up to 67 dBA along the southern property line without any mitigation. The modeling results for Scenario 2 show that the predicted noise levels of the proposed excavation and processing operations will reach up to 66 dBA along the eastern property line without any mitigation. Conclusion Behrens and Associates, Inc. Environmental Noise Control Appendix A - Glossary of Acoustical Terms Appendix A — Glossary of Acoustical Terms Behrens and Associates, Inc. Environmental Noise Control Ambient Noise The all -encompassing noise associated with a given environment at a specified time, usually a composite of sound from many sources both near and far. Average Sound Level See Equivalent -Continuous Sound Level A -Weighted Sound Level, dB(A) The sound level obtained by use of A -weighting. Weighting systems were developed to measure sound ina way that more closely mimics the ear's natural sensitivity relative to frequency so that the instrument is less sensitive to noise at frequencies where the human ear is less sensitive and more sensitive at frequencies where the human ear is more sensitive. C -Weighted Sound Level, dB(C) The sound level obtained by use of C -weighting. Follows the frequency sensitivity of the human ear at very high noise levels. The C -weighting scale is quite flat and therefore includes much more of the low -frequency range of sounds than the A and B scales. In some jurisdictions, C -weighted sound limits are used to limit the low -frequency content of noise sources. Decibel (dB) The basic unit of measurement for sound level. Equivalent -Continuous Sound Level (Leq) The average sound level measured over a specified time period. It is a single -number measure of time -varying noise over a specified time period. It is the level of a steady sound that, in a stated time period and at a stated location, has the same A -Weighted sound energy as the time -varying sound. For example, a person who experiences an Leq of 60 dB(A) for a period of 10 minutes standing next to a busy street is exposed to the same amount of sound energy as if he had experienced a constant noise level of 60 dB(A) for 10 minutes rather than the time -varying traffic noise level. Frequency The number of oscillations per second of a sound wave Inverse Square Law A rule by which the sound intensity varies inversely with the square of the distance from the source. This results in a 6dB decrease in sound pressure level for each doubling of distance from the source. Octave The frequency interval between two sounds whose frequency ratio is 2. For example, the frequency interval between 500 Hz and 1,000 Hz is one octave. Octave -Band Sound Level For an octave frequency band, the sound pressure level of the sound contained within that band. One -Third Octave The frequency interval between two sounds whose frequency ratio is 2^(1/3). For example, the frequency interval between 200 Hz and 250 Hz is one-third octave. Appendix A — Glossary of Acoustical Terms Behrens and Associates, Inc. Environmental Noise Control One -Third -Octave -Band Sound Level For a one -third -octave frequency band, the sound pressure level of the sound contained within that band. Point Source A source that radiates sound as if from a single point. Receiver A person (or persons) or equipment which is affected by noise. Sound A physical disturbance in a medium (e.g., air) that is capable of being detected by the human ear. Sound Level Meter (SLM) An instrument used for the measurement of sound level, with a standard frequency -weighting and standard exponentially weighted time averaging. Sound Power Level A physical measure of the amount of power a sound source radiates into the surrounding air. It is measured in decibels. Sound Pressure Level A physical measure of the magnitude of a sound. It is related to the sound's energy. The terms sound pressure level and sound level are often used interchangeably. Sound Transmission Class (STC) A single number rating used to compare the sound insulation properties of walls, floors, ceilings, windows, or doors. This rating is designed to correlate with subjective impressions of the ability of building elements to reduce the overall loudness of speech, radio, television, and similar noise sources in offices and buildings. Appendix A — Glossary of Acoustical Terms ITEM 22 ADDITIONAL INFORMATION Attached is an authorization form between C&H Aggregates and Applegate Group, Inc.. Also attached is an emergency contact form. Also attached arc existing structure agreements that have been obtained to date. No other crossing, casement, or setback agreements have bccn obtained. Sign plan: a sign no smaller than 2'x4' will be posted at the primary entrance designating the mine name, DRMS permit number, and USR number. Internally, standard traffic signs will be used to route customer and hauling traffic. The location and number of such signs will vary as mining operations progress. Lighting plan: C&H Aggregates will utilize portable generators to power the site. As such, C&H Aggregates will also be using portable light towers to provide illumination during working hours. The lights will only be operated as needed during mining and processing operations after sundown and before sunrise. C&H Aggregates does not anticipate utilizing chemicals during the mining process. As required by the DRMS, all neighboring property owners were informed of the proposed mine expansion during the DRMS permitting process. Additionally, the proposed mine expansion was advertised in the Greeley Tribune on November 20 and 27, 2020 and on December 4 and 11, 2020. No comments were received. C&H Aggregates anticipates that fuel storage on site will include a 75k gallon fuel tank with secondary containment located near the primary access point. The secondary containment, most likely in the form of a berm surrounding the fuel tank, will protect the tank from accidental collisions from vehicular traffic. C&H Aggregates North Weld Gravel Pit Weld County USR Permit Application EXHIBIT E RECLAMATION PLAN The total area for which the mining permit is being requested is approximately 522 acres. At any given time the unreclaimed area will not be exceeding 125 acres, which consists of 90 acres of mining and 35 acres for the processing plant and stockpiles. Once C&H Solutions reaches the threshold of 125 acres they will start grading the site bottom to prevent ponding of storm runoff. The headwalls will be reclaimed to a slope of no steeper than 3H:1 V. The overburden and topsil that is stripped from new mining areas will be placed in the exhausted area for reclamation. Once the topsoil and overburden have been placed, the reclaimed area will be seeded with native grasses suitable for this region (per the vegetation and soils reports, the seed mixture shall be approximately 2.70 PLS per acre Sideots Grama, 4.0 PLS per acre Western Wheatgrass, 2.0 PLS per acre Green Needlegrass, 0.45 PLS per acre Blue Grama, and 0.40 PLS per acre Switchgrass). Drilled seeding will be implemented and straw mulch will be applied to the site; if broadcast seeding methods are used, the seed application rate will be increased by 20%. Finally, weed control to prevent noxious weeds will be sprayed at the time of seeding. Erosion control measures including silt fencing along the north side of the lateral as well as the mulch and weed control will continue to be maintained until the grasses are established over 60% of the ground surface. This process will be repeated for the rest of the mining area as they are depleted. Upon depletion of the portion of the mining site, the topsoil that was removed and stockpiled at the beginning of the mining site will be used to cover the last mined area in the same manner outlined above. All construction and crushing equipment will be removed from the site upon reclamation. C&H Solutions or its successors will remain legally and financially responsible for the final decommissioning of the site. Once vegetation is established, the BMP's will be removed and all security held by the County and or the DRMS will be released back to C&H Solutions. See Sheet F for the reclamation plan map with the anticipated topography following reclamation. Contours for the mining area were derived based assuming the mining area would be mined to 19' BSG around the permiter of the mine and and to a maximum depth of approximately 24' BSG within the interior of the mine; the actual depth of mining will vary depending on the depth of the resource encountered. All headwalls will be sloped to 3H:1 V upon reclamation as specified in this reclamation plan. Per the February 1, 2021 adequacy review response: 1. The replaced overburden and topsoil depths at the end of the mining would be equal to average overburden and topsoil depths measured during the boring of the exploration pits by the Civil Resources, LLC. We estimate these depths to be approximately 5 feet both for overburden and topsoil. During mining operations, the stockpiles of overburden and topsoil will be stabilized from erosion by shallow slopes and seeding. At end of the mining operation, the placed soil and overburden will be stabilized by seeding with the native grass mixed that is proposed pursuant to the reclamation plan. 2. C&H Solutions intends to reclaim the land to rangeland, which was chosen because it is the current land use and is compatible with the surrounding land uses. The entire area will be reclaimed to rangeland. Excavators, dozers, and haul trucks will be used to place the overburden and topsoil and to perform the sloping along the mine edges. 3. The parcels surrounding the mining site are being used for mining and rangeland. The reclaimed land use of the mining site as the rangeland is compatible with these uses. 4. C&H Solutions recognizes the security and financial warranty release conditions outlined in item number 14 of the adequacy review. C&H Solutions DRMS 112 Permit Application Page E-1 Per the March 9, 2021 adequacy review response: C&H Aggregates will utilize and/or sell the overburden material, so therefore now reclamation proposes to replace only the topsoil during reclamation. The April 11, 2008 geotechnical engineer report attached to the original DRMS amendment application makes no distinction between the topsoil and overburden layer. According to the USDA web soil survey, at this mining site the first horizon of loamy soil is 6 to 12 inches deep, which is assumed to be the topsoil at this location. C&H Aggregates will stockpile and replace this topsoil layer during. C&H Solutions DRMS 112 Permit Application Page E-2 M1�T— , RDPCRIY ,y _L__ / ALTERNATE SITE ENTRANCE l �' „ '—! y/ /,' H r -- IU/. U cm a THgPolTDR PROPERTY !.J � ELECTRIC k /__ sroac TANK rods r 1 cN PRaPETm %f II / '- 1.�. -LTOCESSITA EAT ESTAT OGTGN • •' �. CE0.TE- - I'. XNEL RcuTl RaaEftry , � J - MAIN I SITE _ ENTRANCE % / . .. 1:. 1 -' . — / - ____________ .. / o- I ..$ ' Y;x P :`" n >AD NOTE ALL REQAI UM YCPES GRAOEO TO A 4AXUAUM STEEPNESS OE 11 SIOMI 4. • / , inn � PROPOSED RECWMAifON CC.ti'^,�:-,. Ycxma evaw.c w \�gF�KK5LLE . CLo PARK 13U0.Cp� _ ' EXHIBIT F ' Pa _ftTr l +' OS//USA EMERGENCY CONTACT INFORMATION PLEASE TYPE OR PRINT C&H Aggregate, LLC Business Name: Phone: Address: 46355 NCR 39, Nunn, CC 80648 Business Owner: Cliff Simpson Phone: Home Address: 4364 6 CR 45 City:_ List three persons in the order to be called in the event of an emergency: NAME TITLE ADDRESS Derek Daniels GM 43646 CR 45, Ault, CO 970-834-22_47 970-834-2247 Ault PHONE 970-590-1688 Cliff Simpson Owner 43646 CR 45, Ault, CO 970-324-5870 Heather Simpson Owner 43646 CR 45, Ault, CC 970-214-1164 Business Hours: 24 Hours Days: 7 Days Type of Alarm: None Burglar Holdup Fire Silent Audible Name and address of alarm company: N/A MISCELLANEOUS INFORMATION: Number of entry/exit doors in this building: 2 Location(s): North & South side of scale house. Is alcohol stored in building? NO Location(s): Are drugs stored in building? NO Location(s): Are weapons stored in building? NO Location(s): The following programs are offered as a public service of the Weld County Sheriff's Office. Please indicate the programs of interest. Physical Security Check Crime Prevention Presentation UTILITY SHUT OFF LOCATIONS: Main electrical: Xcel Energy East Side of Scale House Gas shut off: N/A Exterior water shutoff: N/A Interior water shutoff: N/A An example Structure Agreement which meets the requirements of the Statutes is shown below. Structure Agreement This letter has been provided to you as the owner of a structure on or within two hundred (200) feet of a proposed mine site, The State of Colorado, Division of Reclamation, Mining and Safety ("Division") requires that where a mining operation will adversely affect the stability of any significant, valuable and permanent man-made structure located within two hundred (200) feet of the affected land, the Applicant shall either: a) Provide a notarized agreement between the Applicant and the Person(s) having an interest in the structure, that the Applicant is to provide compensation for any damage to the structure; or b) Where such an agreement cannot be reached, the Applicant shall provide an appropriate engineering evaluation that demonstrates that such structure shall not be damaged by activities occurring at the mining operation; or c) Where such structure is a utility, the Applicant may supply a notarized letter, on utility letterhead, from the owner(s) of the utility that the mining and reclamation activities, as proposed, will have "no negative effect" on their utility. ( Construction Materials Rule 6.3.12 and Rule 6.4.19 & Hard RockJMetal Mining Rule 6.3.12 and Rule 6.4.20) The Colorado Mined Land Reclamation Board ("Board" has determined that this form, if properly executed, represents an agreement that complies with Construction Materials Rule 6.3.12(a), Rule 6.4.19(a), and CR,S § 34-32.5-115(4)(e) and with Hard Rock/Metal Mining Rule 6,3,12(a), Rule 6.4.20(a), and C.R.S. § 34-32-115(4)(d). This form is for the sole purpose of ensuring compliance with the Rules and Regulations and shall not make the Board or Division a necessary party to any private civil lawsuit to enforce the terms of the agreement or create any enforcement obligations in the Board or the Division. The following structures are located on or within 200 feet of the proposed affected area: Pump house and water well near north edge of property l . F=ence along northern edge of property 2. Old farm building near north edge of property 3, 4. 5. (Please list additional structures on a separate page) CERTIFICATION The Applicant, by Derek Daniels C&H Solutions (print applicant/company name), (print representative's name), as General Manager (print representative's title), does hereby certify that Cl1RTi5 MARTINEZ (structure owner) shall be compensated for any damage from the proposed mining operation to the above listed structure(s) located on or within 200 feet of the proposed affected area described within Exhibit A, of the Reclamation Permit Application for North Weld Gravel Pit File Number M-1!78- 018 . (operation name), This,forrui has been approved by the Colorado Mined Land Reclamation Board pursuant to its authority under the Colorado Land Reclamation Act for the Extraction of Construction Materials and the Colorado Mined Land Reclamation Act for Hard Rock, Metal, and Designated Mining Operations. Any alteration or inodification to this fornt shall result in voiding this form. NOTARY FOR PERMIT APPLICANT ACKNOWLEGED BY: Applicant L4 5oL 4- lo✓► 5 Representative Name Date 1Q-tc-2 Title (7 j \e f V'14 STATE OF C 0lo ) ss. COUNTY OF__ The foregoing was acknowledged before nee this day of C5� nb t > 20.o, by as G,.•... ,re,% tn� of C„* 1r1 .a 1w xa y_ +�� My Commission Expires: / I - / o#ai Public TROY D ANDERSON NOTARY PUBLIC STATE OF COLORADO NOTARY ID 19984002198 MY COMMISSION EXPIRES NCNER 82021 NOTARY FOR STRUCTURE OWNER ACKNOWLEGEi BY: Structure Own r -. Name Date Jr Title STATE OF ( ) Ss. COUNTY OF X) i l ) The foregoing was acknowledged before me this,,day of , 20, by U ' ,as ti of 5 My Commission Expires: l� - I~ �2� Notary Public LINDA D DEISLEY NOTARY PUBLIC STATE OF COLORADO NOTARY ID 19944015070 MY COMMISSION EXPIRES 11I0112022 An example Structure Agreement which meets the requirements of the Statutes is shown below. Structure Agree t This letter has been provided to you as the owner of a structure an or within two hundred (200) feet of a proposed mine site. The State of Colorado, Division of Reclamation, Mining and Safety ("Division") requires that where a mining operation will adversely affect the stability of any significant, valuable and permanent man-made structure located within two hundred (200) feet of the affected land, the Applicant shall either: a) Provide a notarized agreement between the Applicant and the Person(s) having an interest in the structure, that the Applicant is to provide compensation for any damage to the structure; or b) Where such an agreement cannot be reached, the Applicant shall provide an appropriate engineering evaluation that demonstrates that such structure shall not be damaged by activities occurring at the mining operation; or c) Where such structure is a utility, the Applicant may supply a notarized letter, on utility letterhead, from the owner(s) of the utility that the mining and reclamation activities, as proposed, will have "no negative effect" on their utility. ( Construction Materials Rule 6.3.12 and Rule 6.4.19 & Hard Rock/Metal Mining Rule 6.3.12 and Rule 6.4.20) The Colorado Mined Land Reclamation Board ("Board') has determined that this form, if properly executed, represents an agreement that complies ivith Construction Materials Rule 6.3.12(a), Rule 6.4.19('a., and C.R.S. § 34-32.5-I15(4)(e) and with Hard .Roth/Metal Mining Rule 6.3.12(a), Rule 6.4.20(a), and CR.S. § 34-32-115(4)(d). This forma is far the sole purpose of ensuring compliance with the Rules and Regulations and shall not make the Board or Division a necessary party to any private civil lawsuit to enforce the terns of the agreement or create any enforcement obligations in the Board or the Division. The following structures are located on or within 200 feet of the proposed affected area: Overhead electrical line along the East and South boundary of the C&H Solutions property. 5. (please list additional structures on a separate page) CERTLFLCATIQN The Applicant, C&H Solutions byDerek Daniels (Print representative's name), asGeneral Manager (Print representative's title), does hereby certify that Pubic Service Company of Colorado( structure owner) shall be compensated for any damage from the proposed mining operation to the above listed structure(s) located on or within 200 feet of the proposed affected area described within Exhibit A, of the Reclamation Permit Application for North Weld Gravel Pit Expansion (operation name), applicant/company name), File Number M-1976-018. This form has been approved by the Colorado Mined Land Reclamation Board pursuant to its authority under the Colorado Land Reclamation Act for the Extraction of Construction Materials and the Colorado Mined Land Reclamation Act for Hard Rock, Metal, and Designated Mining Operations. Any alteration or modification to this form shall result in voiding this form. NOTARY FOR PERMIT APPLICANT ACKNOWLEGED BY: Applicant CA Pr SO (w ♦ ' 0" S Representative Name I — I l Ate' Li r Date (0 ZO Title ,. r, — STATE OF C.te ) ss_ COUNTY OF WL ) The foregoing was acknowledged before me this 9 day of 6r, -t -a ia- f 202111, by 17a� • n_l. as root f+�n "r of i14A_,, . _. My Commission Expires: /1- D ' Z I otary n is TROYD�ANDERSON NOTAUBLIC STATE OF COLORADO NOTARY ID 18684002181 MY COMMSSIoN El PlRES ti 202t NOTARY FOR STRUCTURE OWNER ACKNOWLEGED BY: StrtrciureOwner itc (a. �•Name's(/`s' '(4 Richard J. Grd� L / Date r Ci Title Aa Land Rig to Right of Way & Permits Department STATE OF Co Ior ) Public Service Company of Colorado ) ss. COUNTY OF ONh Nef ) The foregoing was acknowledged before me this day of r 2O R a, by e� �r`t�aYct 7", ra r to{yas 1417 r. o 12 ow i7 r,r pf Fu tzl � s'e r t/ce Co jn p cfL ? y o . My Commission Expires: 7/'79 /.O& O& I N ry ublic JACOB P BRAGG NOTARY.PUBL[C • STATE OF COLORADO Notary ID #20174008258 Gornmlhsign Expires 2/2312021 Hello