HomeMy WebLinkAbout740660.tiff r
RESOLUTION
WHEREAS, a public hearing was held on April 22, 1974, in the chambers
of the Board of County Commissioners of Weld County, Colorado, for the
purpose of hearing the petition of David E. Howard, Route 1, Box 328B,
Brighton, Colorado, requesting approval of site for the construction of a
crude oil pump station by the Continental Pipe Line Co. .on the following
described property corrected to read as follows, to-wit:
A tract of land situate in the Southeast n of Section 28, Township
1 North, Range 67 West of the 6th P. M. , Weld County, Colorado
which considering the East line of the said Southeast + as bearing
South and with all bearings contained herein relative thereto is
contained within the boundary lines which begin at the Southeast
corner of said Section 28 and run. thence along the South line of
the said Southeast '-1; North 89°34' West 361. 50 feet; thence North
361. 50 feet; thence South 89°34' East 361. 50 feet to the East line
of the said Southeast -**; thence along said East line, South 361. 50
feet to the point of beginning containing 3. 000 acres more or less
and being subject to a road right-of-way over the Easterly 30. 0
feet thereof for County Road No. 19 and being further subject to
a road right-of-way over the Southerly 30. 0 feet thereof for County
Road No. 4 and being further subject to all rights-of-way and
easements that are now in place or are now of record,
and
WHEREAS, the petitioner was present and represented by Mr. Doug
Chapman of Continental Pipe Line Co. and Thomas Richardson, counsel,
• and
WHEREAS, there was no opposition to the request of petitioner for
the location of said crude oil pump station, and
WHEREAS, the said requested location for said crude oil pump station
facility is located in an agricultural zone as set forth by the Weld County
Zoning Resolution, and
WHEREAS, according to Section 3. 3 (2) of the Zoning Resolution of
Weld County, said location for. said crude oil pump station facility may be
authorized upon the approval of the Board of County Commissioners of
Weld County, and
WHEREAS, the Board of County Commissioners heard all the testimony
and statements of those present; has studied the request of the petitioner
and studied the recommendations of the Weld County Planning Commission,
and having been fully informed;
NOW, THEREFORE, BE IT RESOLVED, by the Board of County
Commissioners, that the application of David E. Howard, Brighton, Colorado,
for the Continental Pipe Line Co. to locate a crude oil pump station facility
on the premises indicated above be, and it hereby is granted under the
conditions following:
1. That any water and sanitation facilities to-be installed shall be
approved by the State Health Department.
2. That petitioner shall proceed with due diligence to effect said
construction of the crude oil pump station facility and that it shall have up
to one year from date hereof to begin the construction of same; otherwise,
•
•
�a�ti-OGGO
•
the Board may, for good cause shown, on its own motion revoke the permit
- herein granted.
3. That such crude oil pump station facility shall be limited to the items
as shown on plan as submitted. "
4. That all applicable subdivision regulations and zoning regulations
shall be followed and complied with in accordance with the Zoning Resolutions
of Weld County, Colorado.
The above and foregoing Resolution was, on motion duly made and
seconded, adopted by the following vote on the 27 , day of November
1974, nunc pro tunc as of April 24, A.D. , 1974.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
•
� / ;
ri 1�i 1'
�7./1l� js•
ATTEST:�/ `°�� "ED
Weld County Clerk &Recorder
. and clerk to the Board -
By ., —r i . `Ff /•P J CF •
Deputy County Clerk V
APPROVED-AS TO FORM:__
j
County Attorney •
•
•
•
•
- -2-
Hello