HomeMy WebLinkAbout20223063.tiffittco
COLORADO
Department of Public
Health & Environment
Weld County - Clerk to the Board
11500 St
PO Box 758
Greeley, CO 80632
October 24, 2022
To Whom it May Concern:
RECEIVED
OCT 2 4 2022
WELD COUNTY
COMMISSIONERS
On October 24, 2022, the Air Pollution Control Division will begin a 30 -day public notice period for
Utah Gas Op Ltd. DBA Utah Gas Corp (UGC) - Badger Wash Gas Plant. A copy of this public notice is
enclosed.
Thank you for assisting the Division by posting a copy of this notice in your office. A public copy of
this notice is required by Colorado Air Quality Control Commission regulations. The notice must be
available for public inspection for a period of thirty (30) days from the beginning of the public notice
period. Please reference the public notice for instructions on submitting comments.
Pub!; G Rev: (#)
l/oq/.2
4300 Cherry Creek Drive S., Denver, CO 80246-1530 P 303-692-2000 www.colorado.gov/cdphe
Jared Potis, Governor I Jilt Hunsaker Ryan, MPH, Executive Director
GG , PL (TP/mw), HI- CDS),OG(0M),
pW (sM/cN/ ER/oK)
It1o3/22
2022-3063
4, Air Pollution Control Division
• Notice of a Proposed Project or Activity Warranting Public
-
Comment
Website Title: Utah Gas Op Ltd. DBA Utah Gas Corp (UGC) - Badger Wash Gas Plant - Weld County
Notice Period Begins: October 24, 2022
Notice is hereby given that an application for a proposed project or activity has been submitted to the
Colorado Air Pollution Control Division for the following source of air pollution:
Applicant: Utah Gas Op Ltd. DBA Utah Gas Corp (UGC)
Facility: Badger Wash Gas Plant
Natural Gas Plant
NESW quadrant of Section 29, Township 8S, Range 103W
Weld County
The proposed project or activity is as follows: New Natural Gas Processing Plant, including amine unit
controlled by thermal oxidizer, two engines, two hydrocarbon liquid storage tanks, a process heater,
associated fugitive emissions and associated ROPE emissions
The Division has determined that this permitting action is subject to public comment per Colorado
Regulation No. 3, Part B, Section III.C due to the following reason(s):
• the source is requesting a federally enforceable limit on the potential to emit in order to avoid other
requirements
The Division has made a preliminary determination of approval of the application.
A copy of the application, the Division's analysis, and a draft of Construction Permit 21ME0753 are available
on the Division's website at https://www.colorado.gov/cdphe/air-permit-public-notices
The Division hereby solicits submission of public comment from any interested person concerning the ability
of the proposed project or activity to comply with the applicable standards and regulations of the
Commission. The Division will receive and consider written public comments for thirty calendar days after
the date of this Notice. Comments may be submitted using the following options:
Use the web form at https://www.colorado.gov/cdphe/air-permit-public-notices. This page also
includes guidance for public participation
Send an email to cdphe apcd airpermitcomments@state.co.us
Send comments to our mailing address:
Christian Lesniak
Colorado Department of Public Health and Environment
4300 Cherry Creek Drive South, APCD-SS-B1
Denver, Colorado 80246-1530
NOTE: Comments submitted to the division will be uploaded to an online document repository and will be
accessible to the public. Your comments and the division's responses are not considered confidential and will
2.02 1 I a
COLORADO
Department of Public
Health b Environment
be publicly accessible, including your name and any other personal information you provide in your
comments.
2.02 2 In
COLORADO
Department of Public
Health & Environment
Hello