Loading...
HomeMy WebLinkAbout20220760.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROADS 35 AND 74 INTERSECTION FOR APPROXIMATELY FIVE (5) MONTHS, FOR NEW ROUNDABOUT CONSTRUCTION FOR TOWN OF EATON WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the intersection of County Roads 35 and 74, be temporarily closed, with said closure being effective March 9, 2022, for approximately five (5) months for the construction of a new roundabout for the Town of Eaton, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc . So(RS), o;S po.+ch,CSP 3118/22 2022-0760 EG0024 TEMPORARY CLOSURE - COUNTY ROADS 35 AND 74 INTERSECTION PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 9th day of March, A.D., 2022. BOARD OF COUNTY COMMISSIONERS WE COUNTY, COLORADO ATTEST: diddiv ;e1 Weld County Clerk to the Board BY: S 'tt K. James, Chair Mike Freeman, Pro -Tern EXCUSED Perry L. Buck APP _� FOR � I4YLd--¢""-:� teve Moreno County Attorney Date of signature: O3/te Lori Saine 2022-0760 EG0024 MEMORANDUM TO: Clerk to the Board DATE: February 9, 2022 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Duran Excavating is requesting permission to close the intersection of CR 35 and Collins St. (CR 74) from 3/9/22 through 7/29/22 for construction of a new roundabout for the Town of Eaton. See attached closure diagram. 2022-0760 03/6q EC 6024 LIGHTFIELD ENTERPRISES, INC LEGEND I INDICATES PLACEMENT OF SIGN INDICATES FACE OF SIGN CHANNELIZING DRUM 3M -A BARRICADE WORK AREA A!1 PEW !Ma #'EfT #arCD :MIAOW •1!20.1 33 a COLLINS-35 ROUNDABOUT COLLINS AVE. (WCR 74) & COUNTY ROAD 35, EATON MHT # 1 - ROAD CLOSURE & DETOUR 02/10/2022 CLOSED AHEAD DETOUR AHEAD ROAD CLOSED To MILS !RAMC fe--500' • ROAD WORK AHE BARRICADES TO BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC ( OIL: ' ROAD _ CLOSED X2) E R11.) BARRICADES TO BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC 72 NOTES 1) SIGNS SHALL BE SPACED 500' EAST, NORTH 8. SOUTHBOUND, 100' WESTBOUND AND ON SIDE STREETS, OR AS SPACE ALLOWS 2) PLAN IS FOR 24/7 ROAD CLOSURE 3) ROAD CLOSURE IS FOR CONSTRUCTION OF ROUNDABOUT IN INTERSECTION OF WCR 35 & WCR 74 4) WORK IS ESTIMATED TO TAKE 175 CALANDER DAYS 5) MHT # 1 SHALL WORK IN CONJUNCTION WITH MHT # 2 6) SEE MHT ti 2 FOR ON SITE TRAFFIC CONTROL 7) OPERATIONS SHALL BE COORDINATED WITH ONGOING CONSTRUCTION TO ACCOMMODATE ADDITIONAL CONSTRUCTION TRAFFIC ACCESS POINTS 8) CONTRACTOR SHALL MAKE CONTACT WITH RESIDENTS IN INTERSECTION TO INFORM THEM OF ACCESS POINTS 9) PLAN DRAWN BASED ON MUTCD TA 20 & 2019 M&S STANDARDS, S-630-1. CASE NO 20 10) DETOUR SHALL REMAIN IN PLACE FOR DURATION OF ROAD CLOSURE 11) EXACT PLACEMENT OF DEVICES SHALL BE BASED ON SITE CONDITIONS 12) BARRICADES AT SOUTH. NORTH AND EAST SIDE OF CONSTRUCTION SHALL BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC 13) EMERGENCY SERVICES SHALL BE NOTIFIED PRIOR TO SET UP OF CLOSURE 14) ALL DEVICES SHALL MEET OR EXCEED MUTCD STANDARDS 500' 500' • •f �' .i 1 -•-•••-•1ran 4r.e.e. r ►� ..44 -€Ca ROAD l CLOSED ROAD 0.054C TO DOW TRW n.. ROAD CLOSED To new TRUCK 500 500' I e4 500' I— ' •UR AHEAD (X2)✓• fienjanfn Dr NM.: DETOUR AHEAD WORK AHE DE AHEAD ROAD a OSLO T7 •w'VOTE 2145's' 'Uu. I (X2) ROC Clan In Tie, 1*Alil' - Collins St R c., ROAD CLOSED N w S E NOT DRAWN TO SCALE SUMMARY OF DEVICES 11 - 36" ROAD WORK AHEAD 4 - 36" ROAD CLOSED AHEAD 14 - 36" DETOUR AHEAD 7 - 60" ROAD CLOSED TO THRU TRAFFIC 1 - 48" ROAD CLOSED 2 - 48" DETOUR ARROW (DOUBLE) 1 - 48" DETOUR ARROW (RIGHT) 1 - 48" DETOUR ARROW (LEFT) 8 - 30" DETOUR MARKER 4 RIGHT ARROW 4 LEFT ARROW 17 - 3M -A BARRICADE 16 - CHANNELIZING DRUM A!! Pen ' a? wi gar A''07172 ZTi SDW • • wad, e DETOUR AHEAD • ROAD CLOSED HEAD bIN,.... t____,. TLIGHTFIELD,, ENTERPRISES ? Concrete S Construction Services 1 CMOOSO@LIGHTFIELDENTERPRISES.COM NOT AN ENGINEER OWNER TOWN OF EATON DATE 02/10/2022 PRIME CONTRACTOR: DURAN EXCAVATING INC CONTACT. DUSTIN DURAN PHONE NUMBER: 970-406-7758 JOB NAME: COLLINS-35 ROUNDABOUT JOB COLLINS AVE (COUNTY ROAD 74) LOCATION: 8 COUNTYROAD // EE ATOM MHT # PREPARED BY: £3sXtl WitiOde ATTSA CERT # 106285 ATTSA EXP- 06/25/2023 Reviewed by Duran Excavating, Inc for conformity and coordination with the contract documents. Comments: By /r Date 02/11/2022 Hello