Loading...
HomeMy WebLinkAbout20223475.tiffCHANGE OF ZONE (COZ) APPLICATION FOR PLANNING DEPARTMENT USE: AMOUNT $ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: PROPERTY INFORMATION (Attach additional sheets if necessary.) Is the property currently in violation?ENo / ['Yes Violation Case Number: Site Address: 2497 & 2507 W 125 Frontage Rd Parcel Numbers: 1 4 6 7 _ 2 2 _ 4 _ 0 0 _ 0 3 4 1 4 6 7 _ 2 2 _ 4 _ 0 0 _ 0 1 1 Legal Description: See attached Section: 22 , Township 01 N, Range 68 W # of Lots: 2 Total Acreage: Floodplain: [ZNo / Q Yes Geological Hazard: ❑ No /.QYes Airport Overlay: [R No / ❑Yes REZONING Existing Zone District(s): AG Proposed Zone District: 1-2 PROPERTY OWNER(S) (Attach additional sheets if necessary.) Name: Nate Hewson Company: R&N Properties, LLC Phone #: 303-993-0162 Email: nate@empireroofing.com Street Address: 14101 E 33rd Place, Ste F City/State/Zip Aurora/CO/80011 Code: APPLICANT/AUTHORIZED AGENT (Authorization must be included if there is an Authorized Agent.) Name: Mike Beach Company: Ridgetop Engineering Phone #: 970-663-4552 Email: mbeach@ridgetopeng.com Street Address: 541 E. Garden Drive, Unit N' City/State/Zip Windsor/CO/80550 Code: I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our) knowledge. All fee owners of the property must sign this application. If an Authorized Agent signs, an Authorization Form signed by all fee owners must be included w the application. If the fee owner is a corporation, evidence must be included indicating the signatory ha jth egal authority to sign for the corporation. nature A/ /e / fU,-) 69c4,4 //4,,J-4 Date Signature Print Print -2q-n- Date 9/10/21 7 I, (We), R&N Properties, LLC (Owner — please print) DEPARTMENTS OF PLANNING BUILDING, DEVELOPMENT REVIEW AND ENVIRONMENTAL HEALTH 1555 NORTH 17TH AVENUE GREELEY, CO 80631 AUTHORIZATION FORM give permission to Ridgetop Engineering •(Authorized Agent/Applicant—please print) to apply for any Planning, Building, Access, Grading or OWTS permits on our behalf, for the property located at (address or parcel number) below: 146722400011 & 146722400034 Legal Description: See Attached of Section 22 , Township 01 N, Range 68 Subdivision Name: Lot Block Property Owners Information: Address: 14101 E 33rd Place, Ste F Phone: 303-993-0162 E-mail: nate@empireroofing.com Authorized Agent/Applicant Contact Information: Address: 541 E. Garden Drive, Unit N Phone: 970-663-4552 E -Mail: mbeach@ridgetopeng.com Correspondence to be sent to: Owner El Authorized Agent/Applicant by: Mail ❑ Email Additional Info: I (We) hereby certify, under penalty of perjury and after carefully reading the entire contents of this document, that the information stated above is true and correct to the best of my (our) knowledge. Date D?l/ y/Z2 Owner Signature Owner Signature etc 0-c Cv loc.acia ) �� vi- a Subscribed and sworn to before me this ,4-1- day of ---37.4-Li My commission expires d2- 1 - 2 2(n Kathleen A Martin NOTARY PUBLIC STATE OF COLORADO NOTARY ID# 20184007405 MY COMMISSION EXPIRES 02/14/2026 Date ,202.. by Notary Public CHANGE OF ZONE (COZ) PLANNING QUESTIONNAIRE Answer the following questions per Section 23-2-50 of the Weld County Code. Please type on a separate sheet. If a question does not pertain to your proposal, please respond with an explanation — do not leave questions blank. 1. Describe the purpose of the proposed Change of Zone. R&N properties proposes to develop 2497 (LOT B) and 2507 (LOT A) W 125 frontage road into an industrial business park. Both Lots are currently zoned A (Agricultural). Our current plan is to develop between 20 and 25 metal frame and metal skinned building. Buildings will range in size with three different spec buildings. Each lot will be fully fenced and yards will be built with gravel surfaces and some areas of concrete. We plan to make this a jewel that Weld County and northern Colorado can be proud of. We plan to make the landscaping appealing and tasteful throughout the park. Since this proposed development will no longer fit with the Agricultural Zone, we would like to propose the Lots be rezoned to 1-2. 1-2 will allow us the flexibility needed for the proposed development and our lot currently sits within the Weld County Opportunity Zone within the Comprehensive Plan Map. 2. Describe the current and previous use of the land. The current parcel of land is used for agricultural purposes (wheat). Currently the parcel of land is divided into 2 Lots, Lot A and Lot B. Lot A is a single family home approximately 1.5 acres and Lot B is approximately 48.079 acres used for growing and farming wheat and a single family home. Surrounding the Single Family Homes, there are multiple sheds and storage structures along the north central side of the parcel within both Lots A and B. 3. Describe the proximity of the proposed use to residences. No residences are located north of the property, between Erie Pkwy and our north property line. Erie Pkwy is approximately 2,600 feet North. No residences are located to the East, between Interstate 25 and our East property line. Interstate 25 is approximately 250 feet East, at its narrowest and 1425 feet at its widest. To the South, there are 10 single family residences along the North Side of WCR 6. The closest livable structure is approximately 1,140 feet from our south property line. To the West there is one single family residence approximately 2,425 feet from our West property line. 4. Explain how the proposed rezoning will correct what the applicant perceives as faulty zoning, or how the proposed rezoning will fit with what the applicant perceives as the changing conditions in the area. With the proposed development of an industrial business park, 1-2 zoning will provide the necessary flexibility needed that the current agricultural zoning does not. 5. Explain how the uses allowed by the proposed rezoning will be compatible with the surrounding land uses. Include a description of existing land uses for all properties adjacent to the subject property. Currently the parcel of land is surrounded by Agricultural Zoning (Weld County) to the West, North, and East. The Zoning to the South is RP -3 (Town of Erie). The current property to the North is occupied by Secure Interstate Storage and the current property to the East is occupied by Asphalt Specialties/Maintenance Shop. The property to the West is Agricultural with a Single Family home and the property to the South is currently vacant and used for Agricultural purposes. With Commercial Businesses already established to the North and South, and with the rapid development of the Town of Erie to the West, the Rezoning to 1-2 would not affect and will make it more compatible with the surrounding area. 6. Does the soil report indicate the existence of moderate or severe soil limitations? If so, detail the methods to be employed to mitigate the limitations for the uses proposed. A Limited Soils Report was completed by Earth Engineering Consultants to Evaluate the potential of the Collapsible Subsoils on the property. Although the report is limited and a full report will be completed at a later date for each of the planned buildings, the potential for construction on the site is likely along with an over excavation component. 7. Explain how this proposal is consistent with the Weld County Comprehensive Plan per Chapter 22 of the Weld County Code. Per the most recent Comprehensive Plan Map, this parcel of land falls within Weld County Opportunity Zone with the potential of Annexation. 1-2 zoning is one of the zones preferred within the Weld County Opportunity Zone, as defined in Sec. 22-4-10. 8. Explain how this proposal will be compatible with future development of the surrounding area or adopted master plans of affected municipalities. With this parcel of land being located along the SW corner of Erie Parkway and Interstate 25, and with commercial businesses already established along the North and East sides of our property. The development of a Industrial Business Park would encourage the growth of more businesses to develop at one of the more traveled entrances into the Town of Erie. 9. Explain how this proposal impacts the protection of the health, safety and welfare of the inhabitants of the neighborhood and the County. The primary access for this parcel of land is to the East connecting to the existing 1-25 Frontage Rd, which currently dead ends 625 feet to the south of our existing entrance. Since all the traffic will be funneled along this drive into our site, we will see an increase in traffic along this road, but cause minimal to no effect to the health, safety, and welfare of the neighboring inhabitants. 10. Explain how this proposal complies with Article V and Article XI of Chapter 23 if the proposal is located within any Overlay Zoning District (Airport, Geologic Hazard, or Historic Townsites Overlay Districts) or a Special Flood Hazard Area identified by maps officially adopted by the County. Currently 80% of the parcel of land sits within a geological hazard area, that can be found at Rec. No. 2234699, at the Weld County Clerk and Recorder, State of Colorado. FEMA Firm Map 08013C0461J, Dated 12/18/2012, is shown as "Not Printed" and no documentation for this area is provided within the FEMA Flood Map Service Center. Maxwell Nader From: Sent: To: Subject: Follow Up Flag: Flag Status: Mike Beach <mbeach@ridgetopeng.com> Tuesday, August 23, 2022 9:59 AM Maxwell Nader RE: PRE22-0072 Completeness Review Follow up Flagged Caution: This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hello Max, see below in red: Mike Beach RidgeTop Engineering & Surveying 970-663-4552 From: Maxwell Nader <mnader@weldgov.com> Sent: Sunday, August 21, 2022 9:33 AM To: Mike Beach <mbeach@ridgetopeng.com> Subject: PRE22-0072 Completeness Review Mike, Development Review and Environmental Health had no comments and deemed the application complete. Planning has the following comments/questions: 1. Unsure if this was discussed during conversations with Angela but was there determined to be any viable hard rock below the surface? We did not discuss any hard rock, but we have already engaged a geotechnical engineer to provide a more in depth report. 2. Also just to note I highly suggest contacting CDOT now in regards to the access. I am slightly concerned about the proposed use of the COZ and the access itself. It is also hard to determine if this property actually has ROW frontage or not? We are in the process of preparing an Access Permit with CDOT to get that ball rolling. Thank you! Let me know your thoughts on these two questions/comments. Best, Maxwell Nader Planning Manager 1555 N 17th Ave Greeley, CO 80631 mnader@weldgov.com Phone: (970)-400-3527 1 CHANGE OF ZONE (COZ) DEVELOPMENT REVIEW QUESTIONNAIRE 1. Describe the access location and applicable use types (i.e., agriculture, residential, commercial/industrial, and or oil and gas) of all existing and proposed accesses to the parcel. Include the approximate distance each access is (or will be if proposed)) from and intersecting county road. State that no existing access is present or that no new access is proposed, if applicable. The current access to the property is from the W 1-25 Frontage Road in the northeastern corner of the property. The W 1-25 Frontage Road dead ends approximately 550 LF south of the existing access. The existing access is used for agricultural access for the subject property as well as two residential homes. The residential homes will be removed as part of this project. There are no longer any oil/gas facilities on this site. W 1-25 Frontage Road comes off Erie Parkway which is approximately % mile to the north of the site access. No new access points are proposed as part of this development. 2. Describe any anticipated change(s) to an existing access, if applicable. The existing access is planned to be upgraded to pavement and realigned to be perpendicular to the W 1-25 Frontage Road. General location will remain the same. 3. Describe in detail any existing or proposed access gate including its location. No gates are being proposed at the main access location onto the Frontage Road. 4. Describe the location of all existing accesses on adjacent parcels and on parcels located on the opposite side of the road. Include the approximate distance each access is from an intersecting county road. There is one access approximately 250 LF to the north of the subject property existing access, which is into an existing outdoor storage facility. There is another access approximately 300 LF south of the subject property access, which is for an existing construction company storage yard. All three access locations are on the west side of the Frontage Road as the interstate 25 is on the east side of the Frontage Road. 5. Describe any difficulties seeing oncoming traffic from an existing access and any anticipated difficulties seeing oncoming traffic from a proposed access. Currently there is no issues being able to see in both directions from the access road onto the W 1-25 Frontage Road. 6. Describe any horizontal curve (using terms like mild curve, sharp curve, reverse curve, etc.) in the vicinity of an existing or proposed access. There is a mild horizontal curve on the W 1-25 Frontage Road heading north from the access location. 7. Describe the topography (using terms like flat, slight hills, steep hills, etc.) of the road in the vicinity of an existing or proposed access. The existing access location is relatively flat with the W 1-25 Frontage Road. CHANGE OF ZONE (COZ) ENVIRONMENTAL HEALTH QUESTIONNAIRE Answer the following questions per the Weld County Code, Chapters 14, 23, and 30. Please type on a separate sheet. If a question does not pertain to your proposal, please respond with an explanation — do not leave questions blank. 1. Discuss the existing and proposed potable water source. If utilizing a drinking water well, include either the well permit or well permit application that was submitted to the State Division of Water Resources. If utilizing a public water tap, include a will serve letter from the Water District, a tap or meter number, or a copy of the water bill. Water Service for this parcel will be provided from Left Hand Water District. We have been in contact with Left Hand and they have provide a solution on how they would like the water line designed and routed to our parcel. Left Hand would like a Water Main loop installed from the NW corner of the WCR 6 and Interstate 25 intersection, where there is currently a water vault for connection. From that water Vault connection, the water main will be installed to the north parallel to 1-25, and turn west just south of our north property line, and continue west connecting to the water main within WCR 7. Coordination with surrounding property owners and entities will further be discussed during the design and execution of the water main. This will provide the necessary loop for our parcel to develop. All water connection to this main will go hand in hand with each individual development package with future development. 2. Discuss the existing and proposed sewage disposal system is on the property. If utilizing an existing on -site wastewater treatment system (OWTS), provide the OWTS permit number. If there is no permit due to the age of the existing system, apply for a permit through the Department of Public Health and Environment prior to submitting this application. If a new OWTS system will be installed, please state "a new on -site wastewater treatment system is proposed." Only propose portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy. Each individual lot will need to provide their own septic design system. This process would more than likely go hand in hand with each individual lot geotechnical report. March 28, 2022 RidgeTop Engineering & Surveying 541 E. Garden Drive, Unit N Windsor, Colorado 80550 Attn: Mr. Mike Beach (mbeachgridgetopeng.com) Re: EARTH ENGINEERING CONSULTANTS, LLC Limited Geotechnical Engineering Study Approximate 75 -Acres Parcel — Evaluation of Potential Collapsible Subsoils West of Interstate 25, Approximately 1/2 -mile south of Erie Parkway Part of the N 1/2 of the SE 1/4 of Section 22, Township 1 North, Range 68W of the 6th P.M. Erie, Weld County, Colorado EEC Project No. 1222025 Mr. Beach: The limited subsurface exploration and geotechnical engineering study of the approximately 75 - acre site located west of Interstate 25, approximately 1/4 mile north of 10th Street, approximately 1/2 mile east of Weld County Road (WCR) 7, and approximately 1/2 -mile south of Erie Parkway, in Erie, Weld County, Colorado, has been completed. For this limited subsurface exploration, three (3) backhoe test pits were excavated at random locations within the proposed development area to obtain information on existing subsurface conditions. The primary focus of this limited subsurface exploration/backhoe test pit exercise was to evaluate if the potential of collapsible soils are present on the subject site. The three (3) backhoe test pits were extended on March 15, 2022, to depths of approximately 10 feet below present site grades. Individual test pit logs and a site diagram indicating the approximate test pit locations are provided with this report. For reference purposes, collapsible soils are defined as "any unsaturated soil that goes through a radical rearrangement of particles and great decrease in volume upon wetting, additional loading, or both. Collapsible soils are generally dry, low density, silty soils with high void space or air gaps between the soil grains where the soil particle binding agents are highly sensitive to water. These micro pores can sometimes be seen by the naked eye. When exposed to and weakened by water, the binding agents break, soften, or dissolve such that the soil grains shear against each other and re -orient in tighter, denser, configurations. This reconfiguration causes a net volume decrease in the soil mass that, in turn, results in settlement of the ground surface. This condition can occur just by the weight of the soil itself called the overburden, or the weight of a structure, such as a home foundation or dam abutment, etc. " Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 2 To determine the presence collapsible soils on the subject site, it was decided to explore the site at three (3) random locations with a backhoe excavating into the overburden subsoils to approximate depths of approximately 10 feet below existing site grades, and obtaining hand driven California barrel/thin sleeve in -tact samples at various depths through each backhoe test pit for further laboratory analyses. The primary laboratory test implemented to evaluate for collapsible potential is the one-dimensional swell -consolidation (ASTM Specification D4546) test. Results of the laboratory testing are further discussed herein; variations may occur across the site and at locations not evaluated as part of this limited subsurface exploration. This limited backhoe test pit subsurface exploration was performed in lieu of a more extensive subsurface exploration consisting of drilling a series of soil borings across the site to greater depths and conducting a more thorough subsurface exploration. Prior to designing the planned site development concepts and performing any site improvements, a more thorough subsurface exploration should be performed to provide site -specific geotechnical engineering design criteria. EXPLORATION AND TESTING PROCEDURES The backhoe test pit locations were selected and established in the field by others using a hand- held GSP unit and Google Earth latitude and longitude coordinates. The approximate test pit locations are shown on the attached test pit location diagram. The locations of those pits should be considered accurate only to the degree implied by the methods used to make the field measurements. The test pit excavations were completed using a backhoe excavator, which extended the limited test pits to depths of approximately 10 feet below existing site grades. Hand driven California barrel/thin walled brass liner sleeves were obtained at 2 -foot intervals of relatively intact soils samples within each test pit for further laboratory analyses. All samples obtained in the field were sealed and returned to our laboratory for further examination, classification and testing. On each of the recovered intact liner samples, visual classifications, in -situ moisture contents and in -place dry densities were determined. On select samples, Atterberg limits and washed sieve analysis tests were completed to evaluate the quantity and plasticity of fines in the subgrades. Swell/consolidation tests were completed on intact liner samples to evaluate the potential for the overburden materials to change volume with variation in moisture content and load, in particular, Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 3 to determine the collapse and compressibility characteristics of the soil. Results of the completed laboratory tests are indicated on the attached test pit logs and summary sheets. As part of the testing program, all samples were examined in the laboratory and classified in general accordance with the attached General Notes and the Unified Soil Classification System, based on the soil's texture, plasticity and grain size distribution. The estimated group symbol for the Unified Soil Classification System is indicated on the test pit logs and a brief description of that classification system is included with this report. SITE AND SUBSURFACE CONDITIONS Site Description The development parcel is generally located west of Interstate 25, north of 10th Street, east of WCR 7 and south of Erie Parkway, in Erie, Weld County, Colorado. At the time of our excavation operations, the site was covered with sparse vegetation. At the northeast portion of the site, few buildings, a storage building, and a small pond were observed, aside from which the proposed development site was undeveloped. The site was relatively flat with an approximate relief across the site in the order of 21 feet from northwest to southeast. Photographs of the site taken during our limited backhoe test pit subsurface exploration are included with this report. Subsurface Description EEC field personnel were on site during backhoe test pit excavation to evaluate the subsurface conditions encountered and obtain subsurface soil samples for further laboratory testing. Field logs prepared by EEC site personnel were based on visual and tactual observation of disturbed samples within each backhoe test pit. The final backhoe test pit logs included with this report may contain modifications to the field logs based on results of laboratory testing and evaluation. Based on results of the field excavation and laboratory testing, subsurface conditions can be generalized as follows. In summary, from the ground surface, the topsoil and vegetation were underlain by lean clay soils with occasional sand seams extending to depths explored, approximately 10 feet below the ground surface. The cohesive lean clay subgrades were moderately plastic, calcareous and exhibited Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 4 relatively low density and low to high potential for volume changes with variations in moisture content and load. Those volume changes were associated with low swell potential with initial increases in moisture content, and/or a tendency to hydro -compact (collapse) with an increase in water and consolidate with increases in moisture content and load. The stratification boundaries indicated on the boring logs represent the approximate locations of changes in soil types. In -situ, the transition of materials may be gradual and indistinct. Groundwater Observations Observations were made while drilling and after completion of the backhoe test pit excavations to detect the presence and depth to hydrostatic groundwater. At the time of exploration, no free water was encountered in the test pits extending to depths of approximately 10 feet below the ground surface. Fluctuations in groundwater levels can occur over time depending on variations in hydrologic conditions and other conditions not apparent at the time of this report. Long-term monitoring of water levels in cased wells, sealed from the influence of surface water, would be required to evaluate the depth and fluctuations in groundwater levels at the site. ANALYSIS AND RECOMMENDATIONS Swell — Consolidation Test Results The swell -consolidation test is performed to evaluate the swell or collapse potential of soils to assist in determining foundation, floor slab and pavement design criteria. In this test, relatively undisturbed samples obtained directly from the California sampler, or in the case from the hand driven thin walled brass sleeves, are placed in a laboratory apparatus and inundated with water under a predetermined load. The swell -index is the resulting amount of swell or collapse after the inundation period expressed as a percent of the sample's preload/initial thickness. After the inundation period, additional incremental loads are applied to evaluate the swell pressure and/or consolidation. For this assessment, we conducted fifteen (15) swell -consolidation tests on relatively undisturbed/intact soil samples obtained at various intervals/depths on the site. The swell index Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 5 values for the in -situ soil samples analyzed revealed low swell characteristics and low to moderate collapse potential as indicated on the attached swell test summaries. The (+) test results indicate the soil materials swell potential characteristics while the (-) test results indicate the soils materials collapse/(tendency to hydro -compact) characteristics when inundated with water. The following table summarizes the swell -consolidation laboratory test results for samples obtained during our limited field explorations for the subject site. Table I — Laboratory Swell -Consolidation Test Results No of Samples Tested Pre -Load / Inundation Pressure, PSF Description of Material In -Situ Characteristics Range of Swell — Index Test Results Range of Moisture Contents, % Range of Dry Densities, PCF Low End, I . High End, % Low End, PCF High End, PCF Low End (+1-) % I . (+/-) % High End, 3 V 150 Lean Clay (CL) 10.5 17 92.3 V 98.4 (-) 0.3 (+) 0.8 6 500 Lean Clay (CL) 14.3 27.1 83.9 106.3 (-) 1.3 (+) 0.1 6 1000 Lean Clay (CL) 12.9 35.9 73.4 115.9 (-) 2.1 (-) 0.3 Colorado Association of Geotechnical Engineers (CAGE) uses the following information to provide uniformity in terminology between geotechnical engineers to provide a relative correlation of slab performance risk to measured swell. "The representative percent swell/consolidation values are not necessarily measured values; rather, they are a judgment of the swell/consolidation of the soil and/or bedrock profile likely to influence slab performance." Geotechnical engineers use this information to also evaluate the swell potential risks for foundation performance based on the risk categories. Table II - Recommended Representative Swell Potential Descriptions and Corresponding Slab Performance Risk Categories Slab Performance Risk Category Representative (500 Percent Swell psf Surcharge) Representative (1000 Percent Swell psf Surcharge) Low 0to<3 0<2 Moderate 3to<5 < 5 < 4 2to<4 High 5to<8 4to<6 Very High > 8 > 6 Based on a research publication from Jennings and Knight (1975) "A Guide to Construction on or With Material Exhibiting Additional Settlement Due to Collapse of Grain Structure" the following table provides information regarding collapse potential (CP) values. Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 6 Table III — Jennings and Knight (1975) — Collapse Potential (CP) Values Percent Volume Change Severity of Problem 0 —1 No Problem 1 - 5 Moderate Problem 5 — 10 Trouble 10 - 20 Severe Trouble > 20 Very Severe Trouble Based on the laboratory test results, the majority of the in -situ samples analyzed for this project were within the nil to low range of swell, however, according to Table III within the "moderate problem risk" regarding collapse potential with the increases in moisture content and load. One of the means and methods approach for resolving collapse potential soils is similar to that of expansive subsoils in which an over excavation and replacement concept is implemented to further densify the soils/ground modification. A more thorough subsurface exploration should be conducted to better characterize the extent of the collapsible soil and the depth requirement for an over excavation and replacement concept. Moisture and Density Characteristics EEC performed a standard Proctor density ASTM Specification D698 test on a composite sample of the overburden materials, obtained from Test Pit No. 2 at approximately 1 to 5 feet below site grades, with results as indicated below. Table IV - Summary of Laboratory Compaction Characteristics and Classification of Soils Sample ID Optimum Maximum Atterberg Limits and Soil Classification Moisture Content, % Dry Density, PCF Liquid Limit Plasticity Index % (-) No. 200 Sieve Soil Description 18.0 106.0 37 18 85.7 Lean Clay (CL) TP-2 @ 1— 5' The in -situ moisture contents of the various hand driven liner sleeve samples ranged from approximately 10.5% to as high as 35.9%; while the in -place dry density test results ranged from as low as 73.4 pcf to as high as 115.9 pcf. Typical project specification would require an over excavation and replacement of the collapsible prone to within (+/-) 2% of the materials Optimum moisture content and compacted to at least 95% of the material's maximum dry density. Overall, the overburden subsoils appeared relatively consistent with regards to soil classification, yet the in -situ moisture contents and dry density values varied significantly. The collapse potential Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 7 characteristics of the overburden subsoils can also be attributed to the relatively low dry density values. Conclusions The subsurface overburden soils to a depth of 10 feet below site grades encountered in the backhoe test pits generally consisted of moist, calcareous clay with relatively low dry densities. Those soils generally are characteristic of "Loess" a windblown deposited sediment of fine grain soil, loosely cemented by calcium carbonate. Loess is characteristically loosely deposited and highly porous; thus, the rationale of the tendency to collapse/hydro-compact. According to the Colorado Geologic Society (CGS) this site is identified as exhibiting potential for collapsible soils due to the presence of Eolian (wind-blown) deposits. Please refer to the enclosed CGS map "ON -006-04 Collapsible Soils of Colorado" of identified collapsible soils in Colorado. We obtained the Google Earth coordinates of the site and have plotted the coordinates on the CGS map included herein which identifies the site as having windblown deposit which are susceptible to exhibiting collapse potential characteristics. Recommendations for an over excavation and replacement concept to address the collapsible subsoils would be provided after completion of more thorough subsurface exploration across the site. GENERAL COMMENTS The analysis and conclusions presented in this preliminary/limited report are based upon the data obtained from three (3) backhoe test pits and random samples collected at the indicated locations and from any other information discussed in this report. This limited report does not reflect any variations, which may occur between backhoe test pits and/or supplemental borings or across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to re-evaluate the conclusions of this report. It is recommended that a more thorough subsurface exploration be performed on the site and that geotechnical engineer should be retained to review the plans and specifications, so comments can be made regarding the interpretation and implementation of the supplemental geotechnical recommendations in the design and specifications. It is further recommended that a geotechnical Earth Engineering Consultants, LLC EEC Project No. 1222025 March 28, 2022 Page 8 engineer be retained for testing and observations during earthwork phases to help determine that the design requirements are fulfilled. This limited report has been prepared for the exclusive use of Ridgetop Engineering, and/or assignee, for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is made. In the event that any changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions contained in this report shall not be considered valid unless the changes are reviewed, and the conclusions of this report are modified or verified in writing by the geotechnical engineer. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the enclosed report, or if we can be of further service to you in any other way, please do not hesitate to contact us. Very truly yours, Earth Engineering Consultants, LLC Reviewed b alL irithezacvnw Ali Khorasani Project Engineer David A. Richer, P.E. Senior Geotechnical Engineer DRIL G AN Fl XP ,ORA \, lI ON DRILLING & SAMPLING SYMBOLS: SS: Split Spoon - 13/8" I.D., 2" O.D., unless otherwise noted ST: Thin -Walled Tube - 2" O.D., unless otherwise noted R: Ring Barrel Sampler - 2.42" I.D., 3" O.D. unless otherwise noted PA: Power Auger HA: Hand Auger DB: Diamond Bit = 4", N, B AS: Auger Sample HS: Hollow Stem Auger PS: Piston Sample WS: Wash Sample FT: Fish Tail Bit RB: Rock Bit BS: Bulk Sample PM: Pressure Meter WB: Wash Bore Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2 -inch O.D. split spoon, except where noted. WATER LEVEL MEASUREMENT SYMBOLS: WL : Water Level WCI: Wet Cave in DCI: Dry Cave in AB : After Boring WS : While Sampling WD : While Drilling BCR: Before Casing Removal ACR: After Casting Removal Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the indicated levels may reflect the location of ground water. In low permeability soils, the accurate determination of ground water levels is not possible with only short term observations. DESCRIPTIVE SOIL CLASSIFICATION Soil Classification is based on the Unified Soil Classification system and the ASTM Designations D-2488. Coarse Grained Soils have move than 50% of their dry weight retained on a #200 sieve; they are described as: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are described as : clays, if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse grained soils are defined on the basis of their relative in - place density and fine grained soils on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff (CL); silty sand, trace gravel, medium dense (SM). CONSISTENCY OF FINE-GRAINED SOILS Unconfined Compressive Strength, Qu, psf Consistency < 500 500 - 1,000 1,001 - 2,000 2,001 - 4,000 4,001 - 8,000 8,001 - 16,000 Very Soft Soft Medium Stiff Very Stiff Very Hard RELATIVE DENSITY OF COARSE -GRAINED SOILS: N-Blows/ft 0-3 4-9 10-29 30-49 50-80 80 + Relative Density Very Loose Loose Medium Dense Dense Very Dense Extremely Dense PHYSICAL PROPERTIES OF BEDROCK DEGREE OF WEATHERING: Slight Slight decomposition of parent material on joints. May be color change. Moderate Some decomposition and color change throughout. High Rock highly decomposed, may be extremely broken. HARDNESS AND DEGREE OF CEMENTATION: Limestone and Dolomite: Hard Difficult to scratch with knife. Moderately Can be scratched easily with knife. Hard Cannot be scratched with fingernail. Soft Can be scratched with fingernail. Shale, Siltstone and Claystone: Hard Can be scratched easily with knife, cannot be scratched with fingernail. Moderately Can be scratched with fingernail. Hard Soft Can be easily dented but not molded with fingers. Sandstone and Conglomerate: Well Cemented Capable of scratching a knife blade. Cemented Can be scratched with knife. Poorly Cemented Can be broken apart easily with fingers. Earth Engineering Consultants, LLC UNTIE C JASSE CA HON Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests Soil Classification Group Symbol Group Name Coarse - Grained Soils more than 50% retained on No. 200 sieve Gravels more than 50% of coarse fraction retained on No. 4 sieve Clean Gravels Less Cu≥4 and 1<Cc≤3E than 5% fines GW Well -graded gravel F Cu<4 and/or 1>Cc>3E GP Poorly -graded gravel F Gravels with Fines more than 12% fines Fines classify as ML or MH GM Silty gravel o" Fines Classify as CL or CH GC Clayey Gravel F'G'" Sands 50% or more coarse fraction passes No. 4 sieve Clean Sands Less than 5% fines Cu≥6 and 1<Cc≤3E SW Well -graded sand Cu<6 and/or 1>Cc>3E SP Poorly -graded sand Sands with Fines more than 12% fines Fines classify as ML or MH SM Silty sand G'"'i Fines classify as CL or CH SC Clayey sand Fine -Grained Soils 50% or more passes the No. 200 sieve Silts and Clays Liquid Limit less than 50 inorganic PI>7 and plots on or above "A" Line CL Lean clay K'L'M PI<4 or plots below "A" Line ML Silt K,L,M organic Liquid Limit - oven dried Liquid Limit - not dried <0.75 OL Organic clay K'L'M'" Organic silt K'L'M'° Silts and Clays Liquid Limit 50 or more inorganic PI plots on or above "A" Line CH Fat clay K'L'M PI plots below "A" Line MH Elastic Silt K'L'M organic Liquid Limit - oven dried Liquid Limit - not dried <0.75 OH Organic clay K'L'M'F Organic silt K'L'M'° Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat ABased on the material passing the 3 -in. (75 -mm) sieve Blf field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. cGravels with 5 to 12% fines required dual symbols: GW-GM well graded gravel with silt GW-GC well -graded gravel with clay GP -GM poorly -graded gravel with silt GP -GC poorly -graded gravel with clay °Sands with 5 to 12% fines require dual symbols: SW-SM well -graded sand with silt SW -SC well -graded sand with day SP-SM poorly graded sand with silt SP -SC poorly graded sand with clay 60 50 E 40 30 u H 20 10 0 ECu=D60/D�o Cc= (D30)2 D10 X D60 Flf soil contains ≥15% sand, add "with sand" to GIf fines classify as CL -ML, use dual symbol GC - CM, or SC-SM. "If fines are organic, add "with organic fines" to group name 'If soil contains >15% gravel, add "with gravel" to group name If Atterberg limits plots shaded area, soil is a CL - ML, Silty clay Kif soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel", whichever is predominant. LIf soil contains ≥ 30% plus No. 200 predominantly sand, add "sandy" to group name. "'If soil contains ≥30% plus No. 200 predominantly gravel add "gravelly" to group name. NPI≥4 and plots on or above "A" line. °PI≤4 or plots below "A" line. PPI plots on or above "A" line. °Pl plots below "A" line. For Classification of fine-grained soils and fine-grained fraction of coarse -grained - soils. Equation of "A" -line Horizontal P1=4 to LL=25.5 e ,.J ,' , ,.\>(\ at then PI -0.73 (LL -20) Equation of U" -line Vertical at LL=16 to PI -7, �, ' ' , then P1=0.9 (LL -8) /� / 1 ' & O2 MH OR OH ' ML OR OL CL -ML I 0 10 20 30 40 50 60 70 LIQUID LIMIT (LL) 80 90 100 110 Earth Engineering Consultants, LLC 75 -ACRES IN ERIE - COLLAPSIBLE SOIL EVALUATION ERIE, COLORADO EEC PROJECT No. 1222025 MARCH 2022 rql PJ N S Id1 � 11A 2in l O z N di Q0 N 0 O rr -4-i 1522.16 ;322 06 r#w0O in`•IMO I rem 46 2M wt.�, • 1! It3— - • ar a no E I .04 r • O 1400"03' 15"4�' lir r nrm trr S 0O.12'46"1N A 4 2444. 22 1322,18 I S00°El'03"E 2644.12 N °Pan r c2 -m A A O AOad rtgv :., 11' r - 4Xb ▪ to I no rs 10 ;1 t ✓ r s 2440.20 4 , • • et: la atOt f,. 1 • e Zr! agi 12 1.-.8:rVr M 2r 1 El a',y a: g.4 la; "I!' !flJj.ypy� D� yc mei G # - 1yq ; 41.:111* 1l �r{ !Ar m fl N x 143i I fr + � 1 11411 • l I I w I. x • paw moon Dr -9422 Wax a— e- to a. N a kes esee �h. 1 i I PI i a 2 Sr rbr S M II 0 SoCv On a a N 132410 r r�yy N a645 20 srnz mrio�r�71.dr]C taZO Cfri zn a •+L I Phi 0 N 0 I — U a 0 iV I Tp a _j Air wl ,-� '..y' fi. j s, I\n O lu1 (r T 'y '9 I ' j • F I ; I. 11 b r iailINSA _ , L * 5 -ii • __--`1,` t' i ., - Lam...•. S Zst � .. , i .. , 1 2 XMM3WaO! Yin' Until Xil'Y91 , - r atitTI Z 1 a 4 2) c yr 1C' rw } f4 Y C T1 Ua 0308003Y 'ON NOliciff3X3 4 { a MI Z r� 0 O a) O -I O C 3p Jz Z m aCID pc) —4 in • �. .� MC.* .1. y. — T� ce - �} _ ice. :��,��_ ' ' Lam.' r _ . r.c�f'L'. _ — b ..: - .._...itrs.s...:„.T.w,...= - '. Boring Location Diagram 75 Acres in Erie - Collapsible Soil Evaluation Erie, Colorado EEC Project #: 1222025 Date: March 2022 TI r'1:l rd grit c'i.1 Raw_ II erlarici pcy9lYcier liter; Scw4�' .l.1Ift b_.. rl II is Ytan d 'Li ettik •t cr-v =ale l•_anr:41 :.E;LI ItsF'a I l' frrUI' "Itlt Hall Ranch FI -r 1' Frr Fan, t, all Pan,_ h Byl IN GII I •_'t- it I. ul1_ il; I ul • stile 'P.'I:its F':-.1. tr alum LL 2 , t� Rqm Stem•a I I Presenra •yat Rabb,; C•_•,, %t unt F I l* Ir:._i;- Ceps of Energy taoc ky Fla �_' Rct ky F1,3#! r~ Wildlife Ril ,, ri ;Liu : • • 11 t' : 11 �9V `•F, • slay l l Pa• • Search result CI 40'02'07.897"N 1,04'59'08.642'W Zoom to on 40.035527, -104.985734 x O Show search results for 40.035527, -1.. CoItap sabie_Soils withMeeker EG-14 Collapsble soil case histories • Colorado highways CGS Douglas County collapsible soils OFR-09-01 Collapsible Soil Hazard Montrose Geohazards Rangely area collapsible soil suscept bility Core: area collaps bie soil susceptibility MS -34 Roaring Fork River Corridor collapsible soil MS -47 Collapsible so;Ns Rifle area EG-14 Eolian (wind-blown) deposits EG-14 Dune and sheet sand deposits EG-14 Cretaceous and Tertiary Formations EG-14 Evaporate Formations ON -006-04 Collapsible Soils of Colorado — The CGS published both a regional susceptibility map and state-wide report on susceptibility of collapsible soils in Colorado in 2002. ERIE COLLAPSIBLE ERIE, SOIL EVALUATION COLORADO PROJECT NO: 1222025 LOG OF BORING TP-1 DATE: MARCH 2022 RIG TYPE: Backhoe Machine SHEET 1 OF 1 WATER DEPTH FOREMAN: DG START DATE 3/15/2022 WHILE DRILLING None AUGER TYPE: None FINISH DATE 3/15/2022 AFTER DRILLING N/A SPT HAMMER: None SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N QU MC DD A -LIMITS -200 SWELL TYPE (FEET)BLOWS/FT (PSF) (%) (PCF) LL PI r/o) PRESSURE % @ LOAD TOPSOIL AND VEGETATION 1 2 LEAN CLAY (CL) _ _ °A.@ 150 PSF brown CS 3 1500 17.0 98.4 300 PSF 0.4% 4 @ 500 PSF CS 5 500 23.5 97.9 37 20 91.3 None -0.4% 6 @ 500 PSF CS 7 500 27.1 95.5 None -0.4% 8 %@ 1000 PSF CS 9 23.9 99.6 None -2.1% 10 %@ 1000 PSF CS 11 29.4 84.1 35 20 74.4 None -2.0% BOTTOM OF BORING DEPTH 11' 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Engineering Consultants, LLC ERIE COLLAPSIBLE ERIE, COLORADO SOIL EVALUATION PROJECT NO: 1222025 LOG OF BORING TP-2 DATE: MARCH 2022 RIG TYPE: Backhoe Machine SHEET I OF I WATER DEPTH FOREMAN: DG START DATE 3/15/2022 WHILE DRILLING None AUGER TYPE: None FINISH DATE 3/15/2022 AFTER DRILLING N/A SPT HAMMER: None SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N QU MC DD A -LIMITS -200 SWELL TYPE (FEET)BLOWS/FT (PSF) (%) (PCF) LL PI r/o) PRESSURE % @ LOAD TOPSOIL AND VEGETATION 1 2 LEAN CLAY (CL) _ _ °A.@ 150 PSF brown CS 3 2000 10.5 92.3 35 18 91.9 400 PSF 0.8% 4 @ 500 PSF CS 5 1000 16.2 91.9 None -1.3% 6 @ 500 PSF sand lense CS 7 1000 26.3 83.9 40 26 74.1 None -0.5% 8 % @ 1000 PSF CS 9 6000 12.9 115.9 None -0.3% 10 %@1000PSF CS 11 2500 14.3 106.2 None -0.9% BOTTOM OF BORING DEPTH 11' 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Earth Engineering Consultants, LLC ERIE COLLAPSIBLE ERIE, SOIL EVALUATION COLORADO PROJECT NO: 1222025 LOG OF BORING TP-3 DATE: MARCH 2022 RIG TYPE: Backhoe Machine SHEET 1 OF 1 WATER DEPTH FOREMAN: DG START DATE 3/15/2022 WHILE DRILLING None FINISH DATE 3/15/2022 AFTER DRILLING N/A AUGER TYPE: None SPT HAMMER: None SURFACE ELEV N/A 24 HOUR N/A SOIL DESCRIPTION D N QU MC DD A -LIMITS -200 SWELL TYPE (FEET) :BLOWS/FT (PSF) (%) (PCF) LL PI (%) PRESSURE % @ LOAD TOPSOIL AND VEGETATION 1 2 LEAN CLAY (CL) _ _ °A.@ 150 PSF brown CS 3 2500 12.4 98.2 None -0.3% 4 % @ 500 PSF CS 5 2000 19.0 101.6 37 21 86.1 600 PSF 0.1% 6 % @ 500 PSF CS 7 1500 18.8 106.3 500 PSF 0.0% 8 %@ 1000 PSF CS 9 1500 29.9 89.7 37 15 90.2 None -0.3% 10 %@ 1000 PSF CS 11 2000 35.9 73.4 None -1.1% BOTTOM OF BORING DEPTH 11' 12 13 14 15 16 17 18 19 20 21 22 23 24 25 art h Engineering Consultants, EARTH ENGINEERING CONSULTANTS, LLC SUMMARY OF LABORATORY CLASSIFICATION/MOISTURE-DENSITY RELATIONSHIP Dry Density (Pounds per Cubic Foot) 145 140 135 130 125 120 115 110 105 100 95 90 25 30 Material Designation: A Sample Location: TP #2, Upper 5' Description: Brown Lean (CL) Atterberq Limits (ASTM D-4318) Liquid Limit: 37 Plastic Limit: 19 Plasticity Index: 18 Passing No. 200 Sieve (AASHTO T 11/ASTM C 117): 85.7% Standard Proctor (ASTM D-698) Maximum Dry Density: 106.0 pcf Optimum Moisture Content: 18.0% 0 5 10 15 20 Percent Moisture Curves for 100% Saturation For Specific Gravity Equal to: 2.80 2.70 2.60 35 Project: 75 -Acres in Erie - Collapsible Soil Evaluation Erie, Colorado Project No: 1222025 Date March 2022 EARTH ENGINEERING CONSULTANTS, LLC SUMMARY OF LABORATORY CLASSIFICATION / MOISTURE -DENSITY RELATIONSHIP Percent Finer by Weight 100% 90% 80% 70% 60%- 50% 40% 30% 20% 10% 0% 100 10 1 0.1 0.01 0.001 Grain Size in Millimeters Sieve Size Percent Passing No. 4 100% No. 10 100% No. 40 98% No. 200 85.7% Material Designation: A Sample Location: TP #2, Upper 5' Material Description: Brown Lean (CL) Project: 75 -Acres in Erie - Collapsible Soil Evaluation Erie, Colorado Project No: 1222025 Date March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 1, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 17.0% Dry Density: 98.4 pcf Ending Moisture: 26.1% Swell Pressure: 300 psf % Swell @ 150: 0.4% 10.0 8.0 6.0 4.0 CO 2.0 0.0 t ? o 2 -2.0 - Water Added 4 a) v L a 0 T ca -4.0 ID O O C U -10.0 -6.0 -8.0 0.01 1 0.1 Load (TSF) i 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 1, Sample 2, Depth 4' Liquid Limit: 37 Plasticity Index: 20 % Passing #200: 91.3% Beginning Moisture: 23.5% Dry Density: 97.9 pcf Ending Moisture: 25.0% Swell Pressure: None psf % Collapse @ 500 psf -0.4% 10.0 8.0 -- 6.0 4.0 co 2.0 C 0 E 0 O -2.0 - 4 v L 0 0. 0 T ca WaterAdded -4M ID O 0 g U -10.0 -6.0 -8.0 - 0.01 1 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 1, Sample 3, Depth 6' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 27.1% Dry Density: 95.5 pcf Ending Moisture: 26.9% Swell Pressure: None psf % Collapse @ 500 psf -0.4% 10.0 8.0 6.0 4.0 CO 2.0 0.0 C 0 E 0 O 2 -2.0 - Water Added v L a) 0. 0 T ca -4.0 ID O co OC U -10.0 -6.0 -8.0 0.01 1 0.1 Load (TSF) i 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 1, Sample 4, Depth 8' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 23.9% Dry Density: 99.6 pcf Ending Moisture: 24.0% Swell Pressure: None psf % Collapse @ 1000 psf -2.1% 10.0 8.0 -- 6.0 4.0 CO 2.0 0.0 - t a) o O 2 -2.0 - 4 a) v L a) 0. c 0 T ca Water ' Added -4.0 -- ID O co 00' U -10.0 -6.0 -8.0 - 0.01 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 1, Sample 5, Depth 10' Liquid Limit: 35 Plasticity Index: 20 % Passing #200: 74.4% Beginning Moisture: 29.4% Dry Density: 84.1 pcf Ending Moisture: 21.3% Swell Pressure: None psf % Collapse @ 1000 psf -2.0% 4.0 2.0 0.0 - CO -2.0 - sg -4.0 I > Water Added O 2 a) 2 - -6.0 a) Et -8.0 -, C 0 T ca 2 ° -10.0 -. C 0 U -12.0 -14.0 0.01 0.1 1 10 Load (TSF) Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 2, Sample 1, Depth 2' Liquid Limit: 35 Plasticity Index: 18 % Passing #200: 91.9% Beginning Moisture: 10.5% Dry Density: 92.3 pcf Ending Moisture: 25.0% Swell Pressure: 400 psf % Swell @ 150: 0.8% 10.0 8.0 -- 6.0 4.0 CO 2.0 0.0 - t ? o O 2 -2.0 - Water Added C/1 a) v CD a 0 T ca -4.0 -- ID O co OO' U -10.0 -6.0 -8.0 - 0.01 1 0.1 Load (TSF) i 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 2, Sample 2, Depth 4' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 16.2% Dry Density: 91.9 pcf Ending Moisture: 25.5% Swell Pressure: None psf % Collapse @ 500 psf -1.3% 10.0 8.0 -- 6.0 4.0 CO 2.0 0.0 C E 0 O 2 -2.0 - Water Added 4 a) v L as a c 0 T ca -4.0 ID O g 0 U -10.0 -6.0 -8.0 - 0.01 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring 2, Sample 3, Depth 6' Liquid Limit: 40 Plasticity Index: 16 % Passing #200: 74.1% Beginning Moisture: 26.3% Dry Density: 83.9 pcf Ending Moisture: 34.2% Swell Pressure: None psf % Collapse @ 500 psf -0.5% 10.0 8.0 6.0 4.0 Co 2.0 0.0 t ? o O 2 -2.0 - Water Added 4 a) v L as 0. 0 T ca -4.0 ID O O C U -10.0 -6.0 -8.0 0.01 1 0.1 Load (TSF) i 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 2, Sample 4, Depth 8' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 12.9% Dry Density: 115.9 pcf Ending Moisture: 16.2% Swell Pressure: None psf % Collapse @ 1000 psf -0.3% 10.0 8.0 6.0 4.0 m CO 2.0 0.0 c E � �0 -4.0 Water Added u d c 0 co -6.0 o U -10.0 -8.0 0.01 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 2, Sample 5, Depth 10' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 14.3% Dry Density: 106.2 pcf Ending Moisture: 18.2% Swell Pressure: None psf % Collapse @ 1000 psf -0.9% 10.0 8.0 6.0 4.0 c5 Co 2.0 0.0 t ? o O 2 -2.0 - Water Added 4 a) v L 0 0. c 0 T ca -4.0 -- ID O co 00' U -10.0 -6.0 -8.0 0.01 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 3, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 12.4% Dry Density: 98.2 pcf Ending Moisture: 22.9% Swell Pressure: None psf % Collapse @ 150 psf -0.3% 10.0 8.0 -- 6.0 4.0 CO 2.0 0.0 - t ? o O 2 -2.0 - Water Added a) L a 0 T ca -4.0 -- ID O co OO' U -10.0 -6.0 -8.0 - 0.01 0.1 Load (TSF) i 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 3, Sample 2, Depth 4' Liquid Limit: 37 Plasticity Index: 21 % Passing #200: 86.1% Beginning Moisture: 19.0% Dry Density: 101.6 pcf Ending Moisture: 23.9% Swell Pressure: 600 psf % Swell @ 500: 0.1% 10.0 8.0 6.0 4.0 CO 2.0 0.0 C E O 2 -2.0 - Water Added a) v L as a c 0 T ca -4.0 ID O co o 0 U -10.0 -6.0 -8.0 0.01 1 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 3, Sample 3, Depth 6' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 18.8% Dry Density: 106.3 pcf Ending Moisture: 23.5% Swell Pressure: None psf % Swell @ 500: None 10.0 8.0 6.0 4.0 CO 2.0 0.0 C E O 2 -2.0 - Water Added a) L as a c 0 T ca -4.0 ID O co OC U -10.0 -6.0 -8.0 0.01 1 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 3, Sample 4, Depth 8' Liquid Limit: 37 Plasticity Index: 15 % Passing #200: 90.2% Beginning Moisture: 29.9% Dry Density: 89.7 pcf Ending Moisture: 30.3% Swell Pressure: None psf % Collapse @ 1000 psf -0.3% 10.0 8.0 6.0 4.0 CO 2.0 0.0 - - C 0 E O 2 -2.0 - Water Added L a) a 0 T ca -4.0 ID O co OC U -10.0 -6.0 -8.0 0.01 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay (CL) Sample Location: Boring 3, Sample 5, Depth 10' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 35.9% Dry Density: 73.4 pcf Ending Moisture: 41.6% Swell Pressure: None psf % Collapse @ 1000 psf -1.1% 10.0 8.0 -- 6.0 4.0 CO 2.0 0.0 t ? o O 2 -2.0 - Water Added a) v L as 0 c 0 T ca -4.0 -- ID O co OO' U -10.0 -6.0 -8.0 0.01 0.1 Load (TSF) 1 10 Project: Location: Project #: Date: Erie Collapsible Soil Evaluation Erie, Colorado 1222025 March 2022 TRANSPORTATION CONSULTANTS, INC. November 8, 2022 Mr. Nate Hewson R&N Properties, LLC 14101 E. 33rd Place, Suite F Aurora, CO 80011 Dear Mr. Hewson: LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303) 333-1105 FAX (303) 333-1107 E-mail: lsc@lscdenver.com Re: Erie Industrial Traffic Impact Analysis Weld County, CO LSC #220930 In response to your request, LSC Transportation Consultants, Inc. has prepared this traffic im- pact analysis for the proposed Erie Industrial development. As shown on Figure 1, the site is located south of Erie Parkway, north of County Road 6, and west of the W. 1-25 Frontage Road in Weld County, Colorado. REPORT CONTENTS The report contains the following: the existing roadway and traffic conditions in the vicinity of the site including the lane geometries, traffic controls, posted speed limits, etc.; the existing weekday peak -hour traffic volumes; the existing daily traffic volumes in the area; the typical weekday site -generated traffic volume projections for the site; the assignment of the projected traffic volumes to the area roadways; the projected short-term and long-term background and resulting total traffic volumes on the area roadways; the site's projected traffic impacts; and any recommended roadway improvements to mitigate the site's traffic impacts. LAND USE AND ACCESS The site is proposed to include about 189,000 square feet of light industrial use and about 21,000 square feet of office space. Full movement access is proposed from the W.1-25 Frontage Road as shown in the conceptual site plan in Figure 2. ROADWAY AND TRAFFIC CONDITIONS Area Roadways The major roadways in the site's vicinity are shown on Figure 1 and are described below. Mr. Nate Hewson Page 2 November 8, 2022 Erie Industrial • Erie Parkway is an east -west, four -lane principal arterial roadway north of the site. The intersection with W. I-25 Frontage Road is stop -sign controlled with auxiliary turn lanes and the intersections with the I-25 On- and Off -Ramps are signalized with auxiliary turn lanes. The posted speed limit in the vicinity of the site is 45 mph but transitions to 35 mph just to the east through the interchange. The Roadway Plan in the 2018 Town of Erie Master Transportation Plan shows Erie Parkway as a four -lane principal arterial. Erie Park- way is maintained by the Town of Erie. • W. I-25 Frontage Road is a north -south, two-lane frontage road east of the site. The inter- section with Erie Parkway is stop -sign controlled. No speed limit is posted in the vicinity of the site. The frontage road is maintained by CDOT. Existing Traffic Conditions Figure 3 shows the existing traffic volumes, lane geometries, and traffic controls in the site's vicinity on a typical weekday. The weekday peak -hour traffic volumes and daily traffic counts are from the attached traffic counts conducted by Counter Measures in October, 2022. The vo- lumes were balanced to be consistent with the highest intersection volume count. 2027 and 2042 Background Traffic Figure 4 shows the estimated 2027 background traffic, lane geometries and traffic controls which assumes an annual growth rate of three percent. Figure 5 shows the estimated 2042 background traffic, lane geometries and traffic controls which assumes an annual growth rate of three percent. Existing, 2027, and 2042 Background Levels of Service Level of service (LOS) is a quantitative measure of the level of congestion or delay at an inter- section. Level of service is indicated on a scale from "A" to "F." LOS A is indicative of little congestion or delay and LOS F is indicative of a high level of congestion or delay. Attached are specific level of service definitions for signalized and unsignalized intersections. The intersections in Figures 3 through 5 were analyzed as appropriate to determine the exis- ting, 2 02 7, and 2042 background levels of service using Synchro. Table 1 shows the level of service analysis results. The level of service reports are attached. 1. Erie Parkway/W. I_25 Frontage Road: All movements at this unsignalized intersection currently operate at LOS "B" or better during both morning and afternoon peak -hours and are expected to do so through 2027. By 2042, all movements are expected to operate at LOS "C" or better. 2. Erie Parkway/I-25 SB Off -Ramp: This signalized intersection currently operates at an overall LOS "B" during the morning peak -hour and LOS "A" during the afternoon peak - hours and is expected to do so through 2027. By 2042 both peak -hours are expected to operate at LOS "B". Mr. Nate Hewson Page 3 November 8, 2022 Erie Industrial 3. Erie Parkway/I-25 NB Off -Ramp: This signalized intersection currently operates at an overall LOS "B" during both morning and afternoon peak -hours and is expected to do so through 2027. By 2042 both peak -hours are expected to operate at LOS "C". 4. W.1-25 Frontage Road/Storage Access: All movements at this stop -sign controlled inter- section currently operate at LOS "A" during both morning and afternoon peak -hours and are expected to do so through 2042. 5. W. I-25 Frontage Road/Site Access: This intersection was analyzed only in the total traffic scenarios. TRIP GENERATION Table 2 shows the estimated average weekday, morning peak -hour, and afternoon peak -hour trip generation for the proposed site based on the rates from Trip Generation, 11th Edition, 2021 by the Institute of Transportation Engineers (ITE) for the proposed land use. The proposed land use is projected to generate about 1,148 vehicle -trips on the average week- day, with about half entering and half exiting during a 24 -hour period. During the morning peak -hour, which generally occurs for one hour between 6:30 and 8:30 a.m., about 151 vehic- les would enter and about 21 vehicles would exit the site. During the afternoon peak -hour, which generally occurs for one hour between 4:00 and 6:00 p.m., about 22 vehicles would enter and about 131 vehicles would exit. TRIP DISTRIBUTION Figure 6 shows the estimated directional distribution of the site -generated traffic volumes on the area roadways. The estimates were based on the location of the site with respect to the regional population, employment, and activity centers; and the site's proposed land use. TRIP ASSIGNMENT Figure 7 shows the estimated assignment of site -generated traffic volumes based on the direc- tional distribution (from Figure 6) and the trip generation estimate in Table 2. 2027 AND 2042 TOTAL TRAFFIC Figure 8 shows the estimated 2027 total traffic which is the sum of the 2027 background traffic volumes (from Figure 4) and the site -generated traffic volumes (from Figure 7). Figure 8 also shows the recommended 2027 lane geometry and traffic control. Turn lanes are not recommen- ded at the Frontage Road/Site Access intersection due to very low through volumes but a few existing turn lanes on Erie Parkway should be lengthened. Figure 9 shows the estimated 2042 total traffic which is the sum of 2042 background traffic volumes (from Figure 5) and the site -generated traffic volumes (from Figure 7). Figure 9 also shows the recommended 2042 lane geometry and traffic control. Mr. Nate Hewson PROJECTED LEVELS OF SERVICE Page 4 November 8, 2022 Erie Industrial The intersections in Figures 8 and 9 were analyzed to determine the 2027 and 2042 total levels of service. Table 1 shows the level of service analysis results. The level of service reports are attached. 1. Erie Parkway/W. I-25 Frontage Road: All movements at this unsignalized intersection are expected to operate at LOS "D" or better during both morning and afternoon peak - hours through 2 042 . 2. Erie Parkway/I-25 SB Off -Ramp: This signalized intersection is expected to operate at an overall LOS "B" during both morning and afternoon peak -hours through 2 042 . 3. Erie Parkway/I-25 NB Off -Ramp: This signalized intersection is expected to operate at an overall LOS "C" or better during both morning and afternoon peak -hours through 2042. 4. W.1-25 Frontage Road/ Storage Access: All movements at this unsignalized intersection are expected to operate at LOS "A" during both morning and afternoon peak -hours through 2042. 5. W. I-25 Frontage Road/ Site Access: All movements at this unsignalized intersection are expected to operate at LOS "A" during both morning and afternoon peak -hours through 2042. CONCLUSIONS AND RECOMMENDATIONS Trip Generation 1. The site is projected to generate about 1,148 vehicle -trips on the average weekday, with about half entering and half exiting during a 24 -hour period. During the morning peak - hour, about 151 vehicles would enter and about 21 vehicles would exit the site. During the afternoon peak -hour, about 22 vehicles would enter and about 131 vehicles would exit. Projected Levels of Service 2. The signalized intersections analyzed are expected to operate at an overall LOS "C" or better during both morning and afternoon peak -hours through 2042. 3. All movements at the unsignalized intersections analyzed are expected to operate at LOS "D" or better during both morning and afternoon peak -hours through 2042. Conclusions 4. The impact of the Erie Industrial development site can be accommodated by the existing and proposed roadway network with the recommended improvements. Turn lanes are not recommended at the Frontage Road/Site Access intersection due to very low through volumes but a few existing turn lanes on Erie Parkway should be lengthened. CSM/wc Mr. Nate Hewson Recommended Improvements Page 5 November 8, 2022 Erie Industrial 5. The recommended improvements are shown in Figures 8 and 9. The existing eastbound right -turn lane and westbound left -turn lane on Erie Parkway approaching the W. 1-25 Frontage Road should be lengthened per the details in Figures 8 and 9. * * * * * We trust our findings will assist you in gaining approval of the proposed Erie Industrial deve- lopment. Please contact me if you have any questions or need further assistance. Sincerely, LSC TRANSPORT,,. ® N. CONSULTANTS INC. I ; r I By ,�`� / ; ^ ''' 10 uC_ - .{♦;�� 7 ' Y i I Cf opher S. McGranahan, PE, PTOE Pr cipal '`' ,v, - k,`: l r 2 Enclosures: Tables 1 and 2 Figures 1 - 9 Traffic Count Reports Level of Service Definitions Level of Service Reports W: \ LSC \Projects \2022 \ 220930-ErieIndustrial\ Report\ ErieIndustrial-1 10822 .wpd Table 1 Intersection Levels of Service Analysis Erie Industrial Weld County, CO LSC #220930; November, 2022 Intersection No. & Location Traffic Control Existing Traffic Level of Level of Service Service AM PM 2027 Background Traffic Level of Level of Service Service AM PM 2027 Total Traffic Level of Level of Service Service AM PM 2042 Background Traffic Level of Level of Service Service AM PM 2042 Total Traffic Level of Level of Service Service AM PM 1) Erie Parkway/Frontage Road N B Approach EB Left WB Left Critical Movement Delay 2) Erie Parkway/SB Off -Ramp EB Through EB Right WB Left WB Through SB Left/Through SB Right Entire Intersection Delay (sec /veh) Entire Intersection LOS 3) Erie Parkway/NB Off -Ramp EB Left EB Through WB Through WB Right N B Left N B Through N B Right Entire Intersection Delay (sec /veh) Entire Intersection LOS 4) Frontage Road/Storage Access N B Approach EB Approach Critical Movement Delay 5) Frontage Road/Site Access N B Approach WB Left/Through Critical Movement Delay TWSC Signalized Signalized TWSC TWSC B A A 12.1 B A D A D A 13.2 B A A B A D D A 17.4 B A A 0.0 MI IS B A A 11.4 A A C A D A 8.5 A A A B A D D A 16.1 B A A 8.6 IMI MIN alle Wad WIN WIN B A A 12.4 B A D A D A 13.7 B A A B A D D A 18.0 B A A 8.5 WM INN O M Wad W IN NM B A A 12.1 A A C A D A 8.8 A A A B A D D A 16.7 B A A 8.6 IM IS MO B A A 13.5 B A D A D A 12.2 B A A B A D D A 21.1 C A A 9.5 A A 9.0 B A A 14.5 A A C A D A 8.5 A A A B A D D A 16.9 B A A 9.4 A A 9.2 C A B 18.2 B B D A D A 16.0 B B A B A E E A 24.7 C A A 8.6 IMI Soli WEN IM Mil C A B 21.5 B A C A D A 11.1 B A A B A E E A 22.3 C A A 8.6 IMI Soli WIN IM SIP C A B 22.6 B B C A D A 15.1 B B A B A E E A 30.4 C A A 9.5 A A 9.0 D A B 31.8 B B C A D A 11.7 B A A B A E E A 22.8 C A A 9.5 A A 9.2 Table 2 ESTIMATED TRAFFIC GENERATION Erie Industrial Weld County, CO LSC #220930; November, 2022 Trip Generation Rates (1) Total Trips Generated Trip Generating Category Average AM Peak -Hour PM Peak -Hour Average AM Peak -Hour PM Peak -Hour Quantity Weekday In Out In Out Weekday In Out In Out CURRENTLY PROPOSED LAND USE Light Industrial (2) 189.0 KSF (3) 4.87 0.651 0.089 0.091 0.559 920 123 17 17 106 Office (4) 21.0 KSF (3) 10.84 1.338 0.182 0.245 1.195 228 28 4 5 25 Total = 1,148 151 21 22 131 Notes: (1) Source: Trip Generation, Institute of Transportation Engineers, 11th Edition, 2021 (2) ITE Land Use No. 110 - General Light Industrial (3) KSF = 1,000 square feet (4) ITE Land Use No. 710 - General Office Building Zito ' cn 1;-• Z,1,. ‘, I : \ _ , :1 - \la) 4 it 4_ J. l'Su it -Sumrnit s kvvy mit Blv - - - - it le 74ErietPk. , 'S -04A b4 ••3 a 'r % tSit a • Mb ii i el t Approximate /I el 87 * _ A S I E , , I ..,, . ) 1 1-4 o I a - E • 5 I.: cir vile ar t •• t I.mill,Road •, ity l t t la S. . it, 11 4,1 4 t t t,i t. s • • a - It' -• — a a a Vicinity it s _. sad . ..._ 1 ,_ Erie Industrial (LSC #220930) i i 1 I I- r r r` I I I I I I 1 I I I a ►RRa.I I w a PARCI'L S 115 *COLS POOL 4 11'9 MOSES '-f - MP- a '- 1f wr fEF FMactL ' 1,4 I RE> I I I I fait 3 LAI a 1 aP:r t Hot WI PUTS 3 SAO WKS (OTT, i1 3 CO kx ILILIIc MAAKO I I Porn 1I SAO WIGS a 1 An:1, NATSI PO* PRO OSM :saw +t TO SCALE) i 1 1 _ L 4/I YAM 'SAO g 1r9p FARM OC xis•: I 1 I 1 I 40 mars ISSCO 4 PC 10 1x Jots I Full Movement Site Access to Frontage Road - alleip_— ?LW R S Approximate Scale Scale: NTS Figure 2 Site Plan Erie Industrial (LSC #220930) LEGEND: I. = Stop Sign 26 = AM Peak Hour Traffic 35 PM Peak Hour Traffic 1,000 = Average Daily Traffic Figure 4 Year 2027 Background Traffic, Lane Geometry and Traffic Control LEGEND: I. = Stop Sign 26 = AM Peak Hour Traffic 35 PM Peak Hour Traffic 1,000 = Average Daily Traffic Figure 5 Year 2042 Background Traffic, Lane Geometry and Traffic Control Directional Distribution of Site -Generated Traffic LEGEND: I. = Stop Sign 26 = AM Peak Hour Traffic 35 PM Peak Hour Traffic 1,000 = Average Daily Traffic +- Lengthen to 150 feet + 12:1 transition taper Lengthen to 200 feet + 121 transition taper Figure 8 Year 2027 Total Traffic, Lane Geometry and Traffic Control LEGEND: I. = Stop Sign 26 = AM Peak Hour Traffic 35 PM Peak Hour Traffic 1,000 = Average Daily Traffic +- Lengthen to 150 feet + 12:1 transition taper Lengthen to 200 feet + 121 transition taper Figure 9 Year 2042 Total Traffic, Lane Geometry and Traffic Control N/S STREET: WI -25 FRONTAGE RD E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 Groups Printed- VEHICLES File Name : WI25FERIEPKWY Site Code : 00000025 Start Date : 10/19/2022 Page No : 1 NO ACCESS Southbound ERIE Westbound PKWY WI -25 Northbound FRONTAGE RD ERIE Eastbound PKWY Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Total Int. Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 06:30 AM 06:45 AM 0 0 0 0 0 0 0 0 0 1 118 147 0 0 0 0 0 0 1 0 0 0 0 0 0 70 0 97 0 0 2 0 189 247 Total 0 0 0 0 1 265 0 0 0 0 1 0 0 167 2 0 436 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 123 1 172 0 134 1 100 3 529 0 0 0 0 0 0 0 0 0 0 2 107 0 0 1 104 0 0 0 0 1 0 1 0 0 0 2 0 o o o o 0 1 0 0 1 0 0 0 0 0 o o o o 0 0 0 0 0 114 123 127 121 485 0 0 0 0 0 0 0 0 0 0 0 120 0 0 0 119 1 0 238 298 262 222 1020 229 225 Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 211 0 0 1 99 3 105 3 113 0 115 7 432 2 126 1 121 2 116 2 104 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 2 0 1 0 1 0 2 0 6 0 0 0 1 0 1 0 2 0 1 0 5 0 0 0 3 0 0 0 1 0 0 0 2 0 1 0 2 0 0 239 1 0 0 0 0 0 142 151 155 153 2 0 1 0 0 0 1 0 0 601 4 0 0 0 0 0 160 160 150 117 0 0 1 0 0 0 0 0 454 248 262 274 272 1056 291 283 271 226 Total Grand Total Apprch % Total % 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0.0 0.0 7 467 0 0 21 1904 1 0 1.1 98.9 0.1 0.0 0.5 47.2 0.0 0.0 1 0 9 37.5 0.2 8 0 0 15 0.0 62.5 0.0 0.4 0 0.0 0.0 0 587 1 0 0 2079 0.0 99.6 0.0 51.5 8 0.4 0.2 0 0.0 0.0 1071 4037 N/S STREET: WI -25 FRONTAGE RD E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : WI25FERIEPKWY Site Code : 00000025 Start Date : 10/19/2022 Page No : 2 NO ACCESS Southbound ERIE Westbound PKWY WI -25 Northbound FRONTAGE RD ERIE Eastbound PKWY Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 07:00 AM to 07:45 AM - Peak 1 of 1 Intersecti on Volume 0 0 0 0 0 07:00 AM Percent 0.0 0.0 0.0 0.0 07:15 Volume Peak Factor High Int. Volume 0 0 0 0 Peak Factor 0 0 0 0 0 0 3 529 0 0 532 0.6 99" 0.0 0.0 4 1 172 0 0 173 07:15 AM 1 172 0 0 173 0.76 9 2 0 1 0 66. 0.0 33. 0.0 7 3 1 0 1 0 07:15 AM 1 0 3 2 1 0 2 0.37 5 0 485 0 0 485 0.0 100 0.0 0.0 .0 0 123 0 0 123 07:30 AM 0 127 0 0 127 0.95 5 CD O H w Lu 0 CJ r O CO r LU O� O H 0 E CD D a) 0 NO ACCESS Out In Total 0 0 0 0 0 0 Right Thru 1-� 1 a Left Peds �-1 North 10/19/2022 7:00:00 AM 10/19/2022 7:45:00 AM VEHICLES 4 — Left 7 Thru Right Peds 2 0 1 0 3 3 6 Out In Total W1-25 FRONTAGE RD I D- 1 C n 0 v 0 Q O N CO rn U) w O 0 CO O c m m D v 1020 298 0.856 N/S STREET: WI -25 FRONTAGE RD E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : WI25FERIEPKWY Site Code : 00000025 Start Date : 10/19/2022 Page No : 3 NO ACCESS Southbound ERIE Westbound PKWY WI -25 Northbound FRONTAGE RD ERIE Eastbound PKWY Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 04:45 PM to 05:30 PM - Peak 1 of 1 Intersecti on Volume 04:45 PM 0 0 0 0 Percent 0.0 0.0 0.0 0.0 05:00 Volume Peak Factor High Int. Volume 0 0 0 0 Peak Factor 0 0 0 0 0 0 0 5 478 0 0 483 1.0 99. 0.0 0.0 0 2 126 0 0 128 05:00 PM 2 126 0 0 128 0.94 3 2 0 7 0 2Z 0.0 77. 0.0 0 0 3 0 04:45 PM 2 0 9 3 1 0 3 0.75 0 0 623 2 0 625 0.0 99. 0.3 0.0 7 0 160 0 0 160 05:00 PM 0 160 0 0 160 0.97 7 LC) O O CO O c') CN CO N CD -o a) 0 NO ACCESS Out In Total 0 0 0 0 0 0 0 Right Thru Left Peds t North 10/19/2022 4:45:00 PM 10/19/2022 5:30:00 PM VEHICLES I Left Thru Right Peds 2 0 7 0 7 9 16 Out In Total W1-25 FRONTAGE RD 1 T D- C v CD Q O CO O1 O W O 0 r m m 0 r v 1117 291 0.960 N/S STREET: W 1-25 FRONTAGE RD E/W STREET: SECURE STORAGE ENTRANCE CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 Groups Printed- VEHICLES File Name : W125FSTORAGE Site Code : 00000151 Start Date : 10/19/2022 Page No : 1 W 1-25 Southbound FRONTAGE RD NO ACCESS Westbound WI -25 Northbound FRONTAGE RD STORAGE Eastbound ENTRANCE Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Total Int. Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 06:30 AM 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 Total 0 0 0 0 07:00 AM 07:15 AM 0 1 0 0 0 1 0 0 0 0 0 0 o o 0 0 o o 0 0 0 1 0 0 0 2 0 0 o o o o 0 0 0 0 o o 0 0 o o 0 0 1 1 3 Total 0 2 0 08:15 AM 0 0 1 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1 Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 1 2 0 0 0 0 3 2 2 0 7 1 2 0 3 0 4 11 0.0 26.7 73.3 0.0 11.8 32.4 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 3 0 3 0 1 0 0 0 0 0 1 0 7 0.0 100.0 0.0 20.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0.0 0.0 0 0 0 3 3 1 1 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 3 0 0 0 4 0 0 0 12 100.0 35.3 0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 1 6 6 3 5 20 2 3 3 8 34 07:00 AM 0 N/S STREET: W 1-25 FRONTAGE RD E/W STREET: SECURE STORAGE ENTRANCE CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : W125FSTORAGE Site Code : 00000151 Start Date : 10/19/2022 Page No : 2 WI -25 Southbound FRONTAGE RD NO ACCESS Westbound W 1-25 Northbound FRONTAGE RD STORAGE Eastbound ENTRANCE Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 07:00 AM to 07:45 AM - Peak 1 of 1 Intersecti on Volume 2 100 0 0 Percent 0.0 0.0 0.0 07:15 Volume Peak Factor High Int. 07:00 AM Volume 0 1 Peak Factor .0 0 1 2 0 0 1 0 0 1 0.50 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0.0 100 0.0 0.0 .0 0 2 07:15 AM 0 2 2 0 0 2 0 0 2 0.25 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 CD w} UI- z Q F- zc w — w Q O-5 I -O -o 0 0� 0 0 0. D F- CD D 0 W -25 FRONTAGE RD Out In Total 2 2 4 0 2 0 0 Right Thru 1-� 1 a Left Peds �-1 North 10/19/2022 7:00:00 AM 10/19/2022 7:45:00 AM VEHICLES 4 — Left 7 Thru Right Peds 0 2 0 0 2 2 4 Out In Total W1-25 FRONTAGE RD I 0 D - a'0 n CD CD Q 0 0 O z 0 D O cn FAT 4 3 0.333 N/S STREET: W 1-25 FRONTAGE RD E/W STREET: SECURE STORAGE ENTRANCE CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : W125FSTORAGE Site Code : 00000151 Start Date : 10/19/2022 Page No : 3 WI -25 Southbound FRONTAGE RD NO ACCESS Westbound W 1-25 Northbound FRONTAGE RD STORAGE Eastbound ENTRANCE Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 04:45 PM to 05:30 PM - Peak 1 of 1 Intersecti on Volume Percent 0.0 04:45 Volume Peak Factor 04:45 PM 0 1 25. 0 0 1 3 75. 0 0 0 1 0 4 0.0 High Int. 05:30 PM Volume 0 0 2 0 2 Peak 0.50 Factor 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0.0 100 .0 0.0 0.0 . 0 3 04:45 PM 0 3 4 0 0 3 0 0 3 0.33 3 2 0 0 0 2 100 0 0.0 0.0 0.0 1 0 0 0 1 04:45 PM 1 0 0 0 1 0.50 CD UF- z Q F- zLLI w CC Q OD � O Co O 4- D F- 0) DC CD -o a) 0 W -25 FRONTAGE RD Out In Total 6 4 10 3 1 0 0 Right Thru Left Peds t North 10/19/2022 4:45:00 PM 10/19/2022 5:30:00 PM VEHICLES I Left Thru Right Peds 0 4 0 0 1 4 5 Out In Total W1-25 FRONTAGE RD 1 T D - CD Q O O O O O O O z O n cn U) 0 r 0 10 5 0.500 N/S STREET: I-25 ON/OFF RAMP NB E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 Groups Printed- VEHICLES File Name : I-25ERIEPKWYNB Site Code : 00000013 Start Date : 10/18/2022 Page No : 1 1-25 NORTHBOUND Southbound ON RAMP ERIE Westbound PKWY 1-25 NORTHBOUND Northbound OFF RAMP ERIE Eastbound PKWY Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Total Int. Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 06:30 AM 06:45 AM 0 0 0 0 0 0 0 0 0 77 14 0 69 0 8 0 68 1 82 0 23 31 0 0 14 16 15 19 0 0 0 0 212 225 Total 0 0 0 0 0 146 22 0 150 1 54 0 30 34 0 0 437 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 91 0 136 0 120 0 90 0 437 13 0 22 0 22 0 13 0 70 0 0 77 20 0 0 68 27 0 62 92 77 74 0 1 1 1 305 3 44 0 70 0 25 31 29 36 0 0 0 0 121 0 34 0 33 0 34 15 20 17 86 19 0 0 36 0 0 31 0 0 33 0 0 119 0 0 17 31 0 0 24 38 0 0 244 333 300 264 1141 223 260 Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total Grand Total Apprch % Total % 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 145 47 0 0 0 0 0 0 0 0 0 0 60 48 60 54 222 67 50 56 45 23 24 29 22 98 26 18 21 10 0 0 0 0 0 0 0 0 0 0 218 75 0 0 1168 312 0 0.0 78.9 21.1 0.0 0.0 27.7 7.4 0.0 114 0 52 64 56 67 239 1 0 2 0 3 78 1 81 0 84 2 68 0 311 3 1119 63.6 26.6 67 0 41 42 49 47 179 62 48 57 42 0 0 0 0 0 0 0 0 0 209 0 10 630 0.6 35.8 0.2 15.0 0 0.0 0.0 41 69 0 0 26 46 28 45 43 61 21 50 118 202 26 26 29 25 48 43 40 38 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106 169 0 0 381 593 0 39.1 60.9 0.0 9.0 14.1 0.0 0 0.0 0.0 483 249 251 300 261 1061 308 266 289 228 1091 4213 N/S STREET: I-25 ON/OFF RAMP NB E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : I-25ERIEPKWYNB Site Code : 00000013 Start Date : 10/18/2022 Page No : 2 1-25 NORTHBOUND Southbound ON RAMP ERIE Westbound PKWY 1-25 NORTHBOUND Northbound OFF RAMP ERIE Eastbound PKWY Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 07:00 AM to 07:45 AM - Peak 1 of 1 Intersecti on Volume 0 0 0 0 0 07:00 AM Percent 0.0 0.0 0.0 0.0 07:15 Volume Peak Factor High Int. Volume 0 0 0 0 Peak Factor 0 0 0 0 0 0 0 437 70 0 507 0.0 86. 13. 0.0 2 8 0 136 22 0 158 07:15 AM 0 136 22 0 158 0.80 2 305 3 121 0 429 71. 0.7 28. 0.0 1 • 2 92 1 31 0 124 07:15 AM 92 1 31 0 124 0.86 5 86 119 0 0 205 42. 58. 0.0 0.0 0 0 15 36 0 0 51 07:00 AM 34 19 0 0 53 0.96 7 45 O O N O CO rn O O 4- ai J D a) 0 a -25 ON RAMP NORTHBOUND Out in Total 159 0 159 0 0 0 0 Right Thru 1J S Left Peds �-1 North 10/18/2022 7:00:00 AM 10/18/2022 7:45:00 AM VEHICLES a 1 — Left Thru Right Peds 305 3 121 0 429 429 Out In Total 1-25 OFF RAMP NORTHBOUND 1 D- a' C n CD v 0 Q O N O O O O 0 C r AMyid EILIF 1141 333 0.857 0 N/S STREET: I-25 ON/OFF RAMP NB E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : I-25ERIEPKWYNB Site Code : 00000013 Start Date : 10/18/2022 Page No : 3 1-25 NORTHBOUND Southbound ON RAMP ERIE Westbound PKWY 1-25 NORTHBOUND Northbound OFF RAMP ERIE Eastbound PKWY Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 04:45 PM to 05:30 PM - Peak 1 of 1 Intersecti on Volume 0 0 0 0 0 04:45 PM Percent 0.0 0.0 0.0 0.0 05:00 Volume Peak Factor High Int. Volume 0 0 0 0 Peak Factor 0 0 0 0 0 0 227 87 0 314 0.0 72. 27. 0.0 3 7 0 67 26 0 93 05:00 PM 0 67 26 0 93 0.84 4 310 3 214 0 527 58. 0.6 40. 0.0 8 • 6 78 1 62 0 141 05:30 PM 84 2 57 0 143 0.92 1 102 181 0 0 283 36. 64. 0.0 0.0 0 0 26 48 0 0 74 05:00 PM 26 48 0 0 74 0.95 6 (D O H 0 - w Lu 0 O N CO CO tico N' r r c O. H O E CD D a) 0 -25 ON RAMP NORTHBOUND Out In Total 192 0 192 0 0 0 0 Right Thru 1-� 1 a Left Peds �-1 North 10/18/2022 4:45:00 PM 10/18/2022 5:30:00 PM VEHICLES 4 — Left Thru Right Peds 310 3 214 0 0 527 527 Out In Total 1-25 OFF RAMP NORTHBOUND I D- 1 C n CD v CD Q N N W O O1 O O O Co O C m m D v 7c 1124 308 0.912 N/S STREET: I-25 SOUTHBOUND RAMP E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 Groups Printed- VEHICLES File Name : I-25ERIEPKWYSB Site Code : 00000005 Start Date : 10/18/2022 Page No : 1 1-25 SOUTHBOUND Southbound RAMP OFF ERIE Westbound PKWY 1-25 SOUTHBOUND Northbound RAMP ON ERIE Eastbound PKWY Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Total Int. Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 06:30 AM 06:45 AM 15 11 1 0 23 0 24 0 49 40 103 96 0 0 0 0 0 0 0 0 0 0 0 0 0 16 0 24 64 65 0 0 263 268 Total 26 1 47 0 89 199 0 0 0 0 0 0 0 40 129 0 531 07:00 AM 07:15 AM 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 14 16 15 18 63 15 14 0 1 0 0 1 1 0 20 25 21 14 80 23 17 0 0 0 0 0 0 0 61 90 0 0 92 136 0 0 91 103 0 0 69 97 0 0 313 426 0 0 57 70 0 0 51 85 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 31 82 0 26 97 0 29 94 0 28 100 0 0 0 0 0 114 373 0 0 34 75 0 0 46 96 0 298 393 353 326 1370 275 309 Total 04:00 PM 04:15 PM 04:30 PM 04:45 PM Total 05:00 PM 05:15 PM 05:30 PM 05:45 PM Total 29 1 40 16 20 14 13 63 20 11 19 18 68 Grand Total 249 Apprch % 41.8 Total % 5.1 0 0 0 1 1 2 0 1 0 3 16 24 25 17 82 26 15 22 27 90 7 339 1.2 57.0 0.1 6.9 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 108 155 0 0 46 24 36 38 144 41 35 36 34 146 75 84 75 85 319 104 95 98 82 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 379 0 0 800 1478 1 0 35.1 64.9 0.0 0.0 16.3 30.1 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0 0.0 0.0 0 80 171 0 0 50 87 0 46 94 1 71 81 0 45 102 1 212 364 0 0 0 0 53 53 46 38 76 113 95 77 0 0 0 1 1 0 0 0 0 0 190 361 0 1 636 1398 0.0 31.2 68.7 0.0 13.0 28.5 1 0.0 0.0 584 290 292 303 303 1188 322 322 317 276 1237 4910 N/S STREET: I-25 SOUTHBOUND RAMP E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : I-25ERIEPKWYSB Site Code : 00000005 Start Date : 10/18/2022 Page No : 2 1-25 SOUTHBOUND Southbound RAMP OFF ERIE Westbound PKWY 1-25 SOUTHBOUND Northbound RAMP ON ERIE Eastbound PKWY Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 06:30 AM to 08:15 AM - Peak 1 of 1 Intersect' 07:00 AM on Volume 63 1 80 0 144 Percent 43. 0.7 55. 0.0 8 6 07:15 Volume Peak Factor High Int. 07:15 AM Volume 16 1 Peak Factor O 16 1 25 0 42 25 0 42 0.85 7 313 426 0 0 739 42. 57. 0.0 0.0 4 6 92 136 0 0 228 07:15 AM 92 136 0 0 228 0.81 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 6:15:00 AM 0 0 0 0 0 0 114 373 0 487 0.0 23. 76. 0.0 4 6 0 26 97 0 123 07:45 AM 0 28 100 0 128 0.95 1 CO C) C) ti CO C.O O O m r -- m O 4- ai D a) 0 a -25 SOUTHBOUND OFF RAMP Out In Total 0 144 144 80 1 63 0 Right Thru 1J S Left Peds �-1 North 10/18/2022 7:00:00 AM 10/18/2022 7:45:00 AM VEHICLES a 1 — Left Thru Right Peds 0 0 0 0 687 687 Out In Total 1-25 SOUTHBOUND ON RAMP 1 D- 1 C n CC v 0 Q O N O) CA) w w O Co rn 0 C r A/V\>Icl EILIF 1370 393 0.872 N/S STREET: I-25 SOUTHBOUND RAMP E/W STREET: ERIE PKWY CITY: ERIE COUNTY: WELD COUNTER MEASURES INC. 1889 YORK STREET DENVER.COLORADO 303-333-7409 File Name : I-25ERIEPKWYSB Site Code : 00000005 Start Date : 10/18/2022 Page No : 3 1-25 SOUTHBOUND Southbound RAMP OFF ERIE Westbound PKWY 1-25 SOUTHBOUND Northbound RAMP ON ERIE Eastbound PKWY Time Start Left Thr u Rig ht Ped s Total App. Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s App. Total Left Thr u Rig ht Ped s Total App. Total Int. Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1 Intersect' 04:45 PM on Volume 63 4 80 0 147 Percent 42. 2.7 54. 0.0 9 4 05:15 Volume Peak Factor High Int. Volume Peak Factor 11 0 15 0 26 05:00 PM 20 2 26 0 48 0.76 6 150 382 1 0 533 28. 71" 0.2 0.0 1 7 35 95 0 0 130 05:00 PM 41 104 0 0 145 0.91 9 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 197 386 1 584 0.0 33. 66. 0.2 7 1 0 53 113 0 166 05:15 PM 0 53 113 0 166 0.88 0 CD O H 0 - w Lu 0 co O� ti O) CO CO H E CD D a) 0 -25 SOUTHBOUND OFF RAMP Out In Total 1 147 148 80 4 63 0 Right Thru N 1 a Left Peds �-1 North 10/18/2022 4:45:00 PM 10/18/2022 5:30:00 PM VEHICLES 4 — Left 540 540 7 Thru Right Peds Out In Total 1-25 SOUTHBOUND ON RAMP I D- 1 C n 0 v 0 Q 1 CO N N O O CA) O1 O CD W O C r -r m m D v 1264 322 0.981 Page 1 Location: W/S 1-25 FRONTAGE RD S -O ERIE PKWY City: ERIE County: WELD Direction: NORTH/SOUTH COUNTER MEASURES INC. 1889 YORK STREET DENVER,COLORADO 80206 303-333-7409 Site Code: 222608 Station ID: 222608 Start Time 12:00 AM 27 -Oct -22 Thu NORTH SOUTH 0 0 01:00 0 0 02:00 0 0 03:00 0 0 04:00 0 0 Total 0 0 0 0 0 05:00 0 0 0 06:00 1 1 2 07:00 1 3 4 08:00 3 4 7 09:00 2 2 4 10:00 11:00 12:00 PM 01:00 02:00 3 6 3 3 2 4 3 5 4 3 7 9 8 7 5 03:00 5 2 7 04:00 0 0 0 05:00 0 0 0 06:00 1 1 2 07:00 0 1 1 08:00 0 0 0 09:00 1 1 2 10:00 11:00 0 0 0 0 Total Percent 31 47.7% 34 52.3% 0 0 65 AM Peak Vol. PM Peak Vol. 11:00 6 15:00 5 08:00 4 12:00 5 11:00 9 12:00 8 Grand Total Percent ADT 31 47.7% ADT 64 34 52.3% AADT 64 65 Page 1 Location: W/S 1-25 FRONTAGE RD S -O STORAGE ENTRANCE City: ERIE County: WELD Direction: NORTH/SOUTH COUNTER MEASURES INC. 1889 YORK STREET DENVER,COLORADO 80206 303-333-7409 Site Code: 222603 Station ID: 222603 Start 27 -Oct -22 Time Thu NORTH SOUTH Total 12:00 AM 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 PM 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 3 1 3 4 2 1 7 2 4 4 2 4 3 2 4 1 0 0 0 0 1 1 0 0 0 0 1 1 0 0 0 0 4 0 0 0 0 0 0 2 4 4 6 5 9 8 6 5 5 0 0 2 0 0 2 0 0 Total Percent 30 28 51.7% 48.3% 58 AM Peak Vol. PM Peak Vol. 11:00 7 12:00 4 10:00 4 12:00 4 ii ii 11:00 9 12:00 8 Grand Total Percent ADT 30 28 51.7% 48.3% ADT 59 AADT 59 58 ERIE INDUSTRIAL Location: ERIE PKWY W -O 1-25 City: ERIE County: WELD Direction: EAST/WEST COUNTER S M AMEN MEASURES, INC. TRAFFIC AND TRANSPORTATION FIELD DATA Site Code: 2226304 Station ID: 2226304 Start Date: 10/27/2022 End Date: 10/28/2022 Latitude: 0.000000 Longitude: 0.000000 10/27/2022 Time EAST WEST Total 12:00 AM 1:00 2:00 3:00 4:00 5:00 6:00 TOO 8:00 9:00 10:00 11:00 12:00 PM 1:00 2:00 3:00 4:00 5:00 6:00 TOO 8:00 9:00 10:00 11:00 7 11 15 33 49 185 348 554 619 428 370 375 351 365 383 598 646 622 463 221 160 84 41 8 3 7 7 18 49 194 439 551 378 292 340 338 275 240 184 534 614 610 486 293 232 100 51 10 10 18 22 51 98 379 787 1105 997 720 710 713 626 605 567 1132 1260 1232 949 514 392 184 92 18 Total Percent 6936 52.6% 6245 47.4% 13181 AM Peak Volume PM Peak Volume 8:00 619 4:00 646 7:00 551 4:00 614 7:00 1105 4:00 1260 Grand Total 6936 6245 13181 Percent ADT 52.6% 47.4% ADT: 13,224 AADT: 13,224 1 LEVEL OF SERVICE DEFINITIONS From Highway Capacity Manual, Transportation Research Board, 2016, 6th Edition SIGNALIZED INTERSECTION LEVEL OF SERVICE (LOS) LOS Vehicle Average Operational Characteristics Delay sec/vehicle A <10 seconds Describes This not delay most stop LOS vehicles values. at occurs operations all. arrive Short when during with cycle progression low lengths the control green is may delay, phase. extremely tend up to Many to 10 favorable contribute vehicles sec/veh. and to do low B 10 seconds to 20 Describes and progression, with up LOS to 20 A, operations sec/veh. short causing cycle higher with This control lengths, level levels delay generally or of both. delay. greater More occurs than vehicles with 10 seconds good stop than C 20 seconds to 35 Describes 35 progression, given occur. though sec/veh. may begin green The many operations to longer phase number These appear still does pass higher cycle of with at vehicles through this not control delays length, level. serve stopping the delay may or Cycle queued intersection both. greater result failure is Individual vehicles, significant from than occurs without only 20 cycle and at fair when stopping. and this overflows failures level, up a to D 35 to seconds 55 Describes 55 noticeable. unfavorable declines. Many sec/veh. vehicles operations Individual At Longer progression, stop, LOS delays and cycle D, with the the control long failures influence may proportion cycle result delay are lengths, of from noticeable. greater congestion of some vehicles and than combination high not becomes 35 v/c stopping and ratios. up more of to E 55 seconds to 80 Describes 80 progression, cycle sec/veh. failures operations long These are cycle frequent. high with lengths, delay control values and delay generally high greater v/c ratios. indicate than 55 Individual and poor up to F >80 seconds lengths Describes This with capacity many level, over individual may -saturation, of operations considered lane also groups. cycle contribute that failures. with unacceptable It control is, when may significantly also Poor delay arrival to occur progression in most flow to excess at high drivers, high rates and delay of v/c exceed 80 often long sec/veh. ratios levels. occurs cycle the with LEVEL OF SERVICE DEFINITIONS From Highway Capacity Manual, Transportation Research Board, 2016, 6th Edition UNSIGNALIZED INTERSECTION LEVEL OF SERVICE (LOS) Applicable to Two -Way Stop Control, All -Way Stop Control, and Roundabouts LOS Vehicle Average Delay Control Operational Characteristics A <10 seconds Normally, vehicles on the stop -controlled approach only have to wait up to 10 seconds before being able to clear the intersection. Left to -turning make their vehicles turn. on the uncontrolled street do not have to wait B 10 seconds to 15 Vehicles before to 15 seconds. on the being able Left stop to to -turning -controlled clear make the their vehicles intersection. turn. approach on the will The experience delay could delays be up uncontrolled street may have to wait C 15 seconds to 25 Vehicles range Motorists thereby on the of uncontrolled on 15 posing to may the 25 begin a stop seconds safety -controlled street to take risk before will chances to now through approach clearing be due required traffic. to can the the expect intersection. Left long -turning delays delays, vehicles in the to wait to make their turn causing a queue to be created in the turn lane. D . 25 seconds to 35 This is the point at which a traffic signal may be warranted for this intersection. be delays excessive. and private for the The stop access length -controlled points. of the queue intersection may are not begin to The considered block other to public E 35 seconds to 50 The unacceptable. approaches There delays is a high for as all critical length as the traffic of left that the -turn this movements queues movements intersection for are the considered stop are will -controlled extremely meet traffic to be long. be The well probability signal warrants. the the ability existing accesses stop -controlled to traffic install by a signals. eliminating traffic approach. Consideration signal the is left affected -turn may move- by The to the given ments location to from restricting of and other F >50 seconds The of Motorists The 100 delay only seconds. are remedy for the selecting The for critical length these alternative traffic long of movements the delays queues routes is due installing are are to extremely probably the long a traffic in long. delays. excess signal or restricting the accesses. The potential to motorists motorist for begin taking accidents making more at risky two this inter- -stage left section chances. -turns. are If extremely the median high permits, due HCM 6th TWSC 1: Frontage Road & Erie Parkway Existing AM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations II tt r vi +1, Traffic Vol, veh/h 0 510 0 3 500 0 2 0 1 0 0 0 Future Vol, veh/h 0 510 0 3 500 0 2 0 1 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 MN M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 554 0 3 543 0 2 0 1 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 543 0 0 554 0 0 832 1103 277 826 1103 272 Stage 1 IS S. - 554 554 - 549 549 M. Stage 2 - 278 549 - 277 554 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1291 - 1012 - *445 292 720 450 292 *903 Stage 1 - *484 512 - 786 703 Stage 2 M. S. - *852 703 - 706 512 Platoon blocked, % 1 IS S. 1 1 1 1 1 Mov Cap -1 Maneuver 1291 - 1012 - *445 291 720 449 291 *903 Mov Cap -2 Maneuver - *445 291 - 449 291 Stage 1 S. - *484 512 - 786 701 Stage 2 IS IS - *849 701 - 705 512 Approach EB WB NB SB HCM Control Delay, s 0 0.1 12.1 0 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 510 1291 SI - 1012 S. HCM Lane V/C Ratio 0.006 - 0.003 HCM Control Delay (s) 12.1 0 - 8.6 0 HCM Lane LOS B A IS A A HCM 95th %tile Q(veh) 0 0 M. 0 SO Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp Existing AM Peak is _. %), i ' t 4 \ t t \D ir I Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r 'n tt 4 Traffic Volume (vph) 0 140 373 313 426 0 0 0 0 65 1 80 Future Volume (vph) 0 140 373 313 426 0 0 0 0 65 1 80 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Flt Permitted 0.950 0.953 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 405 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 152 405 340 463 0 0 0 0 71 1 87 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 152 405 340 463 0 0 0 0 0 72 87 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp Existing AM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 51.7 51.7 13.6 72.5 9.0 90.0 Actuated g/C Ratio 0.57 0.57 0.15 0.81 0.10 1.00 v/c Ratio 0.07 0.37 0.66 0.16 0.41 0.05 Control Delay 10.5 2.5 39.0 2.1 44.0 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 10.5 2.5 39.0 2.1 44.0 0.1 LOS B A D A D A Approach Delay 4.7 17.7 20.0 Approach LOS Intersection Summary A B B Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.66 Intersection Signal Delay: 13.2 Intersection LOS: B Intersection Capacity Utilization 51.2% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp r� 103 20s I SOs 0 3 F ' �i. n7 �G. l� u Oa s Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway Existing AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations TT TT r '9 4 r Traffic Volume (vph) 86 119 0 0 437 70 305 3 121 0 0 0 Future Volume (vph) 86 119 0 0 437 70 305 3 121 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.429 0.950 0.953 Satd. Flow (perm) 799 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 182 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 93 129 0 0 475 76 332 3 132 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 93 129 0 0 475 76 166 169 132 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway Existing AM Peak Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 63.9 63.9 53.2 90.0 14.1 14.1 90.0 Actuated g/C Ratio 0.71 0.71 0.59 1.00 0.16 0.16 1.00 v/c Ratio 0.14 0.05 0.23 0.05 0.63 0.64 0.08 Control Delay 5.8 4.6 10.5 0.1 45.8 46.3 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 5.8 4.6 10.5 0.1 45.8 46.3 0.1 LOS A A B A D D A Approach Delay 5.1 9.1 33.0 Approach LOS Intersection Summary A A C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.64 Intersection Signal Delay: 17.4 Intersection LOS: B Intersection Capacity Utilization 51.2% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway I ; I . .,I It ,1 r�� � ' 25s 65s .L .. e r .�• — : . c 15 s 50 Synchro 11 Report CSM HCM 6th TWSC 4: Frontage Road & Storage Access Existing AM Peak Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Firil Traffic Vol, veh/h 0 0 0 2 2 0 Future Vol, veh/h 0 0 0 2 2 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 0 2 2 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 4 2 2 0 0 Stage 1 2 Si Stage 2 2 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 1018 1082 1620 M. Stage 1 1021 Stage 2 1021 S. Platoon blocked, % IS Mov Cap -1 Maneuver 1018 1082 1620 M. Mov Cap -2 Maneuver 1018 Stage 1 1021 S. Stage 2 1021 M IS IS S. IS Approach EB NB SB HCM Control Delay, s 0 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1620 SI HCM Lane V/C Ratio S. HCM Control Delay (s) 0 S. 0 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 SI Synchro 11 Report CSM HCM 6th TWSC 1: Frontage Road & Erie Parkway Existing PM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '1 tt r vi +1, Traffic Vol, veh/h 0 595 2 5 460 0 2 0 7 0 0 0 Future Vol, veh/h 0 595 2 5 460 0 2 0 7 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 BM M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 647 2 5 500 0 2 0 8 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 500 0 0 649 0 0 907 1157 324 834 1159 250 Stage 1 IS - 647 647 - 510 510 Stage 2 IS M. S. - 260 510 - 324 649 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1349 - 933 - *384 268 672 444 267 *903 Stage 1 - *426 465 - 836 736 Stage 2 M. S. - *852 736 - 662 464 Platoon blocked, % 1 IS S. 1 1 1 1 1 Mov Cap -1 Maneuver 1349 - 933 - *382 266 672 437 266 *903 Mov Cap -2 Maneuver - *382 266 - 437 266 Stage 1 M. S. - *426 465 - 836 732 M. Stage 2 IS IS - *847 732 - 655 464 Approach EB WB NB SB HCM Control Delay, s 0 0.1 11.4 0 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 575 1349 SI - 933 HCM Lane V/C Ratio 0.017 - 0.006 HCM Control Delay (s) 11.4 0 - 8.9 0 HCM Lane LOS B A IS A A HCM 95th %tile Q(veh) 0.1 0 M. 0 s SO Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp Existing PM Peak 4 t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r '�� tt 4 Traffic Volume (vph) 0 218 386 150 382 0 0 0 0 65 4 80 Future Volume (vph) 0 218 386 150 382 0 0 0 0 65 4 80 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.955 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1779 1583 Flt Permitted 0.950 0.955 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1779 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 420 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 237 420 163 415 0 0 0 0 71 4 87 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 237 420 163 415 0 0 0 0 0 75 87 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp Existing PM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 55.6 55.6 9.6 72.4 9.1 90.0 Actuated g/C Ratio 0.62 0.62 0.11 0.80 0.10 1.00 v/c Ratio 0.11 0.37 0.45 0.15 0.42 0.05 Control Delay 8.7 2.2 28.1 2.3 44.1 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.7 2.2 28.1 2.3 44.1 0.1 LOS A A C A D A Approach Delay 4.5 9.6 20.5 Approach LOS Intersection Summary A A C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 8.5 Intersection LOS: A Intersection Capacity Utilization 47.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp 0 5 -1 —Iltri 20s I SOs 1— ! yb F ' P. n7 �G. l� I O a s 1 J Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway Existing PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations TT TT r 'I 4 r Traffic Volume (vph) 102 181 0 0 227 87 310 3 214 0 0 0 Future Volume (vph) 102 181 0 0 227 87 310 3 214 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.536 0.950 0.953 Satd. Flow (perm) 998 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 233 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 111 197 0 0 247 95 337 3 233 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 111 197 0 0 247 95 168 172 233 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway Existing PM Peak Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 63.8 63.8 52.9 90.0 14.2 14.2 90.0 Actuated g/C Ratio 0.71 0.71 0.59 1.00 0.16 0.16 1.00 v/c Ratio 0.14 0.08 0.12 0.06 0.63 0.65 0.15 Control Delay 5.0 4.2 10.1 0.1 45.8 46.5 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 5.0 4.2 10.1 0.1 45.8 46.5 0.2 LOS A A B A D D A Approach Delay 4.5 7.3 27.5 Approach LOS Intersection Summary A A C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 16.1 Intersection LOS: B Intersection Capacity Utilization 47.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway I ; I . .,I It ,1 r�� � ' 25s 65s .L .. e r .�• — : . c 15 s 50 Synchro 11 Report CSM HCM 6th TWSC 4: Frontage Road & Storage Access Existing PM Peak Intersection Int Delay, s/veh 1.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 #1, Traffic Vol, veh/h 2 0 0 4 1 3 Future Vol, veh/h 2 0 0 4 1 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 0 0 4 1 3 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 7 3 4 0 0 Stage 1 3 Si Stage 2 4 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 1014 1081 1618 M. Stage 1 1020 Stage 2 1019 S. Platoon blocked, % IS Mov Cap -1 Maneuver 1014 1081 1618 M. Mov Cap -2 Maneuver 1014 Stage 1 1020 Si Stage 2 1019 M IS IS IS Approach EB NB SB HCM Control Delay, s 8.6 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1618 - 1014 HCM Lane V/C Ratio - 0.002 S. HCM Control Delay (s) 0 - 8.6 S. HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 2027 Background 1: Frontage Road & Erie Parkway AM Peak Intersection Int Delay, s/veh 0 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 's tt r '1 fl 4. 4+ Traffic Vol, veh/h 0 590 1 3 585 0 2 0 2 0 0 0 Future Vol, veh/h 0 590 1 3 585 0 2 0 2 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 BM M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 641 1 3 636 0 2 0 2 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 636 0 0 642 0 0 965 1283 321 963 1284 318 Stage 1 IS - 641 641 - 642 642 Stage 2 IS M. S. - 324 642 - 321 642 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1243 - 939 - *386 234 675 388 234 *869 Stage 1 - *430 468 - 755 676 Stage 2 M. S. - *820 676 - 665 467 M. Platoon blocked, % 1 IS 1 1 1 1 1 Mov Cap -1 Maneuver 1243 - 939 - *385 234 675 385 233 *869 Mov Cap -2 Maneuver - *385 234 - 385 233 Stage 1 M. S. - *430 468 - 755 674 Stage 2 IS IS - *817 674 - 663 467 Approach EB WB NB SB HCM Control Delay, s 0 0 12.4 0 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 490 1243 SI - 939 HCM Lane V/C Ratio 0.009 - 0.003 HCM Control Delay (s) 12.4 0 - 8.8 0 HCM Lane LOS B A IS A A HCM 95th %tile Q(veh) 0 0 M. 0 Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 2: Erie Parkway & SB Off Ramp AM Peak is _. %), i ' t 4 \ t t \ • ir I Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r 'n tt 4 fir Traffic Volume (vph) 0 160 430 360 495 0 0 0 0 75 2 95 Future Volume (vph) 0 160 430 360 495 0 0 0 0 75 2 95 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Flt Permitted 0.950 0.953 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 467 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 174 467 391 538 0 0 0 0 82 2 103 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 174 467 391 538 0 0 0 0 0 84 103 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 2: Erie Parkway & SB Off Ramp AM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 50.3 50.3 14.5 72.0 9.6 90.0 Actuated g/C Ratio 0.56 0.56 0.16 0.80 0.11 1.00 v/c Ratio 0.09 0.43 0.71 0.19 0.45 0.07 Control Delay 11.1 2.7 40.6 2.3 44.4 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 11.1 2.7 40.6 2.3 44.4 0.1 LOS B A D A D A Approach Delay 5.0 18.5 20.0 Approach LOS Intersection Summary A B C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 13.7 Intersection LOS: B Intersection Capacity Utilization 56.2% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp r� 103 ti; —n 4 :R) 20 s 50 s F ' P. n7 u 3 �G. l� 20 s I 70 s Mil Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 3: Erie Parkway AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations TT TT r 4 r Traffic Volume (vph) 100 135 0 0 505 80 350 4 140 0 0 0 Future Volume (vph) 100 135 0 0 505 80 350 4 140 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.387 0.950 0.953 Satd. Flow (perm) 721 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 182 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 109 147 0 0 549 87 380 4 152 0 0 0 Shared Lane Traffic (°/o) 49% Lane Group Flow (vph) 109 147 0 0 549 87 194 190 152 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 3: Erie Parkway AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 62.8 62.8 51.8 90.0 15.2 15.2 90.0 Actuated g/C Ratio 0.70 0.70 0.58 1.00 0.17 0.17 1.00 v/c Ratio 0.19 0.06 0.27 0.05 0.68 0.67 0.10 Control Delay 6.7 5.0 11.6 0.1 47.1 46.1 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 6.7 5.0 11.6 0.1 47.1 46.1 0.1 LOS A A B A D D A Approach Delay 5.7 10.0 33.4 Approach LOS Intersection Summary A A C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 18.0 Intersection LOS: B Intersection Capacity Utilization 56.2% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway I ; I . .,I It ,1 r�� � ' 25s 65s .L .. e r .�• — : . c 15 s 50 Synchro 11 Report CSM HCM 6th TWSC 2027 Background 4: Frontage Road & Storage Access AM Peak Intersection Int Delay, s/veh 1.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 1 0 0 2 2 1 Future Vol, veh/h 1 0 0 2 2 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 0 0 2 2 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 5 3 3 0 0 Stage 1 3 Si Stage 2 2 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 S IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 1017 1081 1619 M. Stage 1 1020 Stage 2 1021 S. Platoon blocked, % IS Mov Cap -1 Maneuver 1017 1081 1619 M. Mov Cap -2 Maneuver 1017 Stage 1 1020 S. Stage 2 1021 M IS IS IS Approach EB NB SB HCM Control Delay, s 8.5 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1619 - 1017 HCM Lane V/C Ratio - 0.001 S. HCM Control Delay (s) 0 - 8.5 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 2027 Background 1: Frontage Road & Erie Parkway PM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations vi tt r vi +1, Traffic Vol, veh/h 0 690 2 5 530 0 2 0 7 0 0 0 Future Vol, veh/h 0 690 2 5 530 0 2 0 7 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 MN M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 750 2 5 576 0 2 0 8 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 576 0 0 752 0 0 1048 1336 375 961 1338 288 Stage 1 - 750 750 - 586 586 Stage 2 M. - 298 586 - 375 752 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver *1300 - 853 - *326 *214 623 *389 *214 *869 Stage 1 - *369 *417 - *820 *718 Stage 2 S. - *820 *718 - *618 *416 M. Platoon blocked, % 1 IS 1 1 1 1 1 Mov Cap -1 Maneuver *1300 - 853 - *325 *213 623 *383 *212 *869 Mov Cap -2 Maneuver - *325 *213 - *383 *212 Stage 1 M. S. - *369 *417 - *820 *714 Stage 2 IS - *815 *714 - *610 *416 Approach EB WB NB SB HCM Control Delay, s 0 0.1 12.1 0 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 518 * 1300 SI - 853 HCM Lane V/C Ratio 0.019 - 0.006 HCM Control Delay (s) 12.1 0 - 9.2 0 HCM Lane LOS B A IS A A HCM 95th %tile Q(veh) 0.1 0 M. 0 s SO Notes "-: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 2: Erie Parkway & SB Off Ramp PM Peak is _. %), i ' t 4 \ t t \ • ir I Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r Vi tt 4 fir Traffic Volume (vph) 0 250 445 175 440 0 0 0 0 75 5 95 Future Volume (vph) 0 250 445 175 440 0 0 0 0 75 5 95 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.955 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1779 1583 Flt Permitted 0.950 0.955 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1779 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 484 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 272 484 190 478 0 0 0 0 82 5 103 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 272 484 190 478 0 0 0 0 0 87 103 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 2: Erie Parkway & SB Off Ramp PM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 54.4 54.4 10.3 71.9 9.7 90.0 Actuated g/C Ratio 0.60 0.60 0.11 0.80 0.11 1.00 v/c Ratio 0.13 0.42 0.48 0.17 0.46 0.07 Control Delay 9.4 2.4 28.5 2.6 44.5 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.4 2.4 28.5 2.6 44.5 0.1 LOS A A C A D A Approach Delay 4.9 9.9 20.4 Approach LOS Intersection Summary A A C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.48 Intersection Signal Delay: 8.8 Intersection LOS: A Intersection Capacity Utilization 52.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp 0 5 t, ,`'.w A IMF•. � 20s I SOs 1— ! 3 F ' �i. n7 LG. 11 u O a s 1 Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 3: Erie Parkway PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 120 205 0 0 255 100 360 4 250 0 0 0 Future Volume (vph) 120 205 0 0 255 100 360 4 250 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.518 0.950 0.953 Satd. Flow (perm) 965 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 272 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 130 223 0 0 277 109 391 4 272 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 130 223 0 0 277 109 195 200 272 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2027 Background 3: Erie Parkway PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 62.6 62.6 49.0 90.0 15.4 15.4 90.0 Actuated g/C Ratio 0.70 0.70 0.54 1.00 0.17 0.17 1.00 v/c Ratio 0.18 0.09 0.14 0.07 0.68 0.69 0.17 Control Delay 5.6 4.6 11.3 0.1 46.6 47.5 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 5.6 4.6 11.3 0.1 46.6 47.5 0.2 LOS A A B A D D A Approach Delay 4.9 8.1 28.0 Approach LOS Intersection Summary A A C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.69 Intersection Signal Delay: 16.7 Intersection LOS: B Intersection Capacity Utilization 52.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway I ; I . .,I It ,1 r�� � ' 25s 65s .L .. e r .�• — : . c 15 s 50 Synchro 11 Report CSM HCM 6th TWSC 2027 Background 4: Frontage Road & Storage Access PM Peak Intersection Int Delay, s/veh 1.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 2 0 0 4 1 3 Future Vol, veh/h 2 0 0 4 1 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 0 0 4 1 3 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 7 3 4 0 0 Stage 1 3 Si Stage 2 4 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 S IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 1014 1081 1618 M. Stage 1 1020 Stage 2 1019 S. Platoon blocked, % IS Mov Cap -1 Maneuver 1014 1081 1618 M. Mov Cap -2 Maneuver 1014 Stage 1 1020 Si Stage 2 1019 M IS IS IS Approach EB NB SB HCM Control Delay, s 8.6 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1618 - 1014 HCM Lane V/C Ratio - 0.002 S. HCM Control Delay (s) 0 - 8.6 S. HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 1: Frontage Road & Erie Parkway 2027 Total AM Peak Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations II tt r iii +1, Traffic Vol, veh/h 0 590 24 131 585 0 5 0 20 0 0 0 Future Vol, veh/h 0 590 24 131 585 0 5 0 20 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 BM a Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 641 26 142 636 0 5 0 22 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 636 0 0 667 0 0 1243 1561 321 1241 1587 318 Stage 1 la a. - 641 641 - 920 920 Stage 2 a. - 602 920 - 321 667 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 la a. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1243 - 919 - 218 146 675 218 140 *869 Stage 1 - 430 468 - 474 478 Stage 2 M. a. - 807 478 - 665 455 M. Platoon blocked, % 1 la 1 1 1 1 1 Mov Cap -1 Maneuver 1243 - 919 - 192 123 675 186 118 *869 Mov Cap -2 Maneuver - 192 123 - 186 118 Stage 1 M. a. - 430 468 - 474 404 Stage 2 - 683 404 - 644 455 Approach EB WB NB SB HCM Control Delay, s 0 1.8 13.5 0 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 449 1243 lal - 919 HCM Lane V/C Ratio 0.061 - 0.155 HCM Control Delay (s) 13.5 0 - 9.6 0 HCM Lane LOS B A a. A A HCM 95th %tile Q(veh) 0.2 0 M. - 0.5 Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2027 Total AM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r tt 4 r Traffic Volume (vph) 0 167 441 360 578 0 0 0 0 75 2 140 Future Volume (vph) 0 167 441 360 578 0 0 0 0 75 2 140 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Flt Permitted 0.950 0.953 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 479 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 182 479 391 628 0 0 0 0 82 2 152 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 182 479 391 628 0 0 0 0 0 84 152 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2027 Total AM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 50.3 50.3 14.5 72.0 9.6 90.0 Actuated g/C Ratio 0.56 0.56 0.16 0.80 0.11 1.00 v/c Ratio 0.09 0.44 0.71 0.22 0.45 0.10 Control Delay 11.1 2.7 38.0 2.3 44.4 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 11.1 2.7 38.0 2.3 44.4 0.1 LOS B A D A D A Approach Delay 5.0 16.0 15.9 Approach LOS Intersection Summary A B B Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 12.2 Intersection LOS: B Intersection Capacity Utilization 56.8% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp r� 103 20s I SOs 0 3 F ' �i. n7 �G. l� u Oa s Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2027 Total AM Peak is 7 i t `t T P \► 1 r Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Iii TT TT r 'Pi 4 r Traffic Volume (vph) 106 136 0 0 513 80 425 4 140 0 0 0 Future Volume (vph) 106 136 0 0 513 80 425 4 140 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.379 0.950 0.953 Satd. Flow (perm) 706 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 182 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 115 148 0 0 558 87 462 4 152 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 115 148 0 0 558 87 231 235 152 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2027 Total AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 61.6 61.6 50.5 90.0 16.4 16.4 90.0 Actuated g/C Ratio 0.68 0.68 0.56 1.00 0.18 0.18 1.00 v/c Ratio 0.20 0.06 0.28 0.05 0.75 0.77 0.10 Control Delay 7.1 5.3 12.2 0.1 50.5 51.4 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 7.1 5.3 12.2 0.1 50.5 51.4 0.1 LOS A A B A D D A Approach Delay 6.1 10.5 38.4 Approach LOS Intersection Summary A B D Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 21.1 Intersection LOS: C Intersection Capacity Utilization 56.8% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway I ; I . .,I It ,1 r�� � ' 25s 65s .L .. e r .�• — : . c 15 s 50 Synchro 11 Report CSM HCM 6th TWSC 4: Frontage Road & Storage Access 2027 Total AM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 #1, Traffic Vol, veh/h 1 0 0 23 153 1 Future Vol, veh/h 1 0 0 23 153 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 0 0 25 166 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 192 167 167 0 0 Stage 1 167 Si Stage 2 25 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 797 877 1411 M. Stage 1 863 Stage 2 998 S. Platoon blocked, % IS SI Mov Cap -1 Maneuver 797 877 1411 Mov Cap -2 Maneuver 797 Stage 1 863 Si Stage 2 998 M IS IS IS Approach EB NB SB HCM Control Delay, s 9.5 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1411 - 797 HCM Lane V/C Ratio IS - 0.001 S. HCM Control Delay (s) 0 - 9.5 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 5: Frontage Road & Site Access 2027 Total AM Peak Intersection Int Delay, s/veh 1.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 #1, Traffic Vol, veh/h 21 0 0 2 2 151 Future Vol, veh/h 21 0 0 2 2 151 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 23 0 0 2 2 164 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 86 84 166 0 0 Stage 1 84 S IS Si Stage 2 2 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 S IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 915 975 1412 M. Stage 1 939 Stage 2 1021 S. Platoon blocked, % IS Mov Cap -1 Maneuver 915 975 1412 M. Mov Cap -2 Maneuver 915 Stage 1 939 S. Stage 2 1021 M IS IS IS Approach EB NB SB HCM Control Delay, s 9 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1412 - 915 HCM Lane V/C Ratio - 0.025 HCM Control Delay (s) 0 IS 9 HCM Lane LOS A IS A S. IS HCM 95th %tile Q(veh) 0 - 0.1 Synchro 11 Report CSM HCM 6th TWSC 1: Frontage Road & Erie Parkway 2027 Total PM Peak Intersection Int Delay, s/veh 1.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations vi tt r vi +1, Traffic Vol, veh/h 0 690 5 24 530 0 22 0 118 0 0 0 Future Vol, veh/h 0 690 5 24 530 0 22 0 118 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 MN a Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 750 5 26 576 0 24 0 128 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 576 0 0 755 0 0 1090 1378 375 1003 1383 288 Stage 1 - 750 750 - 628 628 Stage 2 M. - 340 628 - 375 755 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 la a. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver *1300 - 851 - *299 200 623 357 198 *869 Stage 1 - *369 417 - 774 688 Stage 2 a. - *820 688 - 618 415 M. Platoon blocked, % 1 la 1 1 1 1 1 Mov Cap -1 Maneuver *1300 - 851 - *292 194 623 277 192 *869 Mov Cap -2 Maneuver - *292 194 - 277 192 Stage 1 M. a. - *369 417 - 774 667 M. Stage 2 la - *794 667 - 491 415 Approach EB WB NB SB HCM Control Delay, s 0 0.4 14.5 0 HCM LOS B A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 529 * 1300 lal - 851 HCM Lane V/C Ratio 0.288 ME - 0.031 HCM Control Delay (s) 14.5 0 - 9A 0 HCM Lane LOS B A A A HCM 95th %tile Q(veh) 1.2 0 M. - 0.1 Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2027 Total PM Peak is _. %), i ' k- 4\ t t \D ir I Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r Vi tt 4 r Traffic Volume (vph) 0 296 510 175 452 0 0 0 0 75 5 102 Future Volume (vph) 0 296 510 175 452 0 0 0 0 75 5 102 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.955 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1779 1583 Flt Permitted 0.950 0.955 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1779 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 554 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 322 554 190 491 0 0 0 0 82 5 111 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 322 554 190 491 0 0 0 0 0 87 111 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2027 Total PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 26.0 20.0 20.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Act Effct Green (s) 54.4 54.4 10.3 71.9 9.7 90.0 Actuated g/C Ratio 0.60 0.60 0.11 0.80 0.11 1.00 v/c Ratio 0.15 0.47 0.48 0.17 0.46 0.07 Control Delay 9.5 2.6 28.1 2.6 44.5 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 9.5 2.6 28.1 2.6 44.5 0.1 LOS A A C A D A Approach Delay 5.1 9.7 19.6 Approach LOS A A B Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 55 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.48 Intersection Signal Delay: 8.5 Intersection LOS: A Intersection Capacity Utilization 56.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp I 103 �E ,ll �� i�.�9 • ^il 4 :r 20s j 'SOs 08 b R) � _ ,1 20 s 70 s I Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2027 Total PM Peak is 7 i t `t T P \► 1 r Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 159 212 0 0 256 100 371 4 250 0 0 0 Future Volume (vph) 159 212 0 0 256 100 371 4 250 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.517 0.950 0.953 Satd. Flow (perm) 963 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 272 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 173 230 0 0 278 109 403 4 272 0 0 0 Shared Lane Traffic (°/o) 50% 1 Lane Group Flow (vph) 173 230 0 0 278 109 201 206 272 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2027 Total PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Act Effct Green (s) 62.4 62.4 48.4 90.0 15.6 15.6 90.0 Actuated g/C Ratio 0.69 0.69 0.54 1.00 0.17 0.17 1.00 v/c Ratio 0.23 0.09 0.15 0.07 0.69 0.71 0.17 Control Delay 6.0 4.4 11.6 0.1 47.3 48.1 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 6.0 4.4 11.6 0.1 47.3 48.1 0.2 LOS A A B A D D A Approach Delay 5.1 8.3 28.7 Approach LOS A A C Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 16.9 Intersection LOS: B Intersection Capacity Utilization 56.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway t-01.71 i TV' 25 s 1 X116 S , . - s• , 1- - r' �• - ,r..4 . fl 15S Cris I Synchro 11 Report CSM HCM 6th TWSC 4: Frontage Road & Storage Access 2027 Total PM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 #1, Traffic Vol, veh/h 2 0 0 135 23 3 Future Vol, veh/h 2 0 0 135 23 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 0 0 147 25 3 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 174 27 28 0 0 Stage 1 27 M IS Si Stage 2 147 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 816 1048 1585 M. Stage 1 996 Stage 2 880 S. Platoon blocked, % IS Mov Cap -1 Maneuver 816 1048 1585 M. Mov Cap -2 Maneuver 816 Stage 1 996 S. Stage 2 880 M IS IS IS Approach EB NB SB HCM Control Delay, s 9.4 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1585 - 816 HCM Lane V/C Ratio - 0.003 S. HCM Control Delay (s) 0 - 9.4 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 5: Frontage Road & Site Access 2027 Total PM Peak Intersection Int Delay, s/veh 7.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 131 0 0 4 1 22 Future Vol, veh/h 131 0 0 4 1 22 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 IS IS Veh in Median Storage, # 0 - - 0 0 Grade, % 0 - - 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 142 0 0 4 1 24 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 17 13 25 0 - 0 Stage 1 13 Si M Stage 2 4 IS IS .SI IS Critical Hdwy 6.42 6.22 4.12 SI Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS S Follow-up Hdwy 3.518 3.318 2.218 M. Pot Cap -1 Maneuver 1001 1067 1589 M. Stage 1 1010 Stage 2 1019 Platoon blocked, % IS Mov Cap -1 Maneuver 1001 1067 1589 M. Mov Cap -2 Maneuver 1001 Stage 1 1010 Stage 2 1019 IS IS Approach EB NB SB HCM Control Delay, s 9.2 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1589 - 1001 HCM Lane V/C Ratio - - 0.142 HCM Control Delay (s) 0 - 9.2 HCM Lane LOS A - A HCM 95th %tile Q(veh) 0 - 0.5 Synchro 11 Report CSM HCM 6th TWSC 2042 Background 1: Frontage Road & Erie Parkway AM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 'ti tt r vi +1, Traffic Vol, veh/h 0 915 3 5 910 0 3 0 3 0 0 0 Future Vol, veh/h 0 915 3 5 910 0 3 0 3 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 MN M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 995 3 5 989 0 3 0 3 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 989 0 0 998 0 0 1500 1994 498 1497 1997 495 Stage 1 IS a - 995 995 - 999 999 Stage 2 - 505 999 - 498 998 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1072 - 689 - *192 80 518 193 80 *733 Stage 1 - *262 321 - 655 582 Stage 2 M. S. - *691 582 - 523 320 M. Platoon blocked, % 1 IS 1 1 1 1 1 Mov Cap -1 Maneuver 1072 - 689 - *191 80 518 191 79 *733 Mov Cap -2 Maneuver - *191 80 - 191 79 Stage 1 M. S. - *262 321 - 655 578 Stage 2 a IS - *686 578 - 520 320 Approach EB WB NB SB HCM Control Delay, s 0 0.1 18.2 0 HCM LOS C A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 279 1072 SI - 689 HCM Lane V/C Ratio 0.023 - 0.008 HCM Control Delay (s) 18.2 0 - 10.3 0 HCM Lane LOS C A IS B A HCM 95th %tile Q(veh) 0.1 0 M. 0 Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 2: Erie Parkway & SB Off Ramp AM Peak is _. %), i ' t 4\ t t \D ir I Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r 'iii tt 4 r Traffic Volume (vph) 0 250 670 565 770 0 0 0 0 115 2 145 Future Volume (vph) 0 250 670 565 770 0 0 0 0 115 2 145 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Flt Permitted 0.950 0.953 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 467 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 272 728 614 837 0 0 0 0 125 2 158 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 272 728 614 837 0 0 0 0 0 127 158 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 2: Erie Parkway & SB Off Ramp AM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 45.0 45.0 25.0 70.0 20.0 20.0 Total Split (°/o) 50.0% 50.0% 27.8% 77.8% 22.2% 22.2% Maximum Green (s) 39.0 39.0 19.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 41.6 41.6 19.2 66.7 11.3 90.0 Actuated g/C Ratio 0.46 0.46 0.21 0.74 0.13 1.00 v/c Ratio 0.17 0.74 0.84 0.32 0.57 0.10 Control Delay 15.2 12.6 36.5 2.5 47.0 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.2 12.6 36.5 2.5 47.0 0.1 LOS B B D A D A Approach Delay 13.3 16.9 21.0 Approach LOS Intersection Summary B B C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 70 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 16.0 Intersection LOS: B Intersection Capacity Utilization 79.1% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp ir al co -; , fir. • a , - )d 25s 145s w LI ,-,- 20 s I 70 s SW Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 3: Erie Parkway AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations TT TT r 4 r Traffic Volume (vph) 155 210 0 0 785 125 550 4 220 0 0 0 Future Volume (vph) 155 210 0 0 785 125 550 4 220 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.236 0.950 0.953 Satd. Flow (perm) 440 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 239 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 168 228 0 0 853 136 598 4 239 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 168 228 0 0 853 136 299 303 239 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 3: Erie Parkway AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 59.7 59.7 45.5 90.0 18.3 18.3 90.0 Actuated g/C Ratio 0.66 0.66 0.51 1.00 0.20 0.20 1.00 v/c Ratio 0.41 0.10 0.48 0.09 0.88 0.89 0.15 Control Delay 13.7 6.3 15.9 0.1 61.7 63.0 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 13.7 6.3 15.9 0.1 61.7 63.0 0.2 LOS B A B A E E A Approach Delay 9.5 13.8 44.7 Approach LOS Intersection Summary A B D Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 24.7 Intersection LOS: C Intersection Capacity Utilization 79.1% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway t .„F„ —111174 r � p .,I ' 25s 65s d_ .. e r .�' — : . c. 15s 50 Synchro 11 Report CSM HCM 6th TWSC 2042 Background 4: Frontage Road & Storage Access AM Peak Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Firil 4 its. Traffic Vol, veh/h 1 0 0 3 3 2 Future Vol, veh/h 1 0 0 3 3 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 0 0 3 3 2 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 7 4 5 0 0 Stage 1 4 Si Stage 2 3 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 1014 1080 1616 M. Stage 1 1019 Stage 2 1020 S. Platoon blocked, % IS Mov Cap -1 Maneuver 1014 1080 1616 M. Mov Cap -2 Maneuver 1014 Stage 1 1019 S. Stage 2 1020 M IS IS IS Approach EB NB SB HCM Control Delay, s 8.6 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1616 - 1014 HCM Lane V/C Ratio - - 0.001 S. HCM Control Delay (s) 0 - 8.6 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 2042 Background 1: Frontage Road & Erie Parkway PM Peak Intersection Int Delay, s/veh 0.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations II tt r vi +1, Traffic Vol, veh/h 0 1080 5 10 825 0 5 0 10 0 0 0 Future Vol, veh/h 0 1080 5 10 825 0 5 0 10 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 MN M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 1174 5 11 897 0 5 0 11 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 897 0 0 1179 0 0 1645 2093 587 1506 2098 449 Stage 1 IS - 1174 1174 - 919 919 Stage 2 IS - 471 919 - 587 1179 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1120 - 588 - *121 63 453 168 62 *767 Stage 1 - *204 264 - 668 598 M. Stage 2 M. - *723 598 - 463 262 M. Platoon blocked, % 1 IS 1 1 1 1 1 Mov Cap -1 Maneuver 1120 - 588 - *119 62 453 162 61 *767 Mov Cap -2 Maneuver - *119 62 - 162 61 Stage 1 M. - *204 264 - 668 586 Stage 2 IS IS .SI - *709 586 - 452 262 Approach EB WB NB SB HCM Control Delay, s 0 0.1 21.5 0 HCM LOS C A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 234 1120 SI - 588 HCM Lane V/C Ratio 0.07 - 0.018 HCM Control Delay (s) 21.5 0 - 11.2 0 HCM Lane LOS C A B A HCM 95th %tile Q(veh) 0.2 0 M. - 0.1 s SO Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 2: Erie Parkway & SB Off Ramp PM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r '�� tt 4 r Traffic Volume (vph) 0 395 695 270 690 0 0 0 0 115 5 145 Future Volume (vph) 0 395 695 270 690 0 0 0 0 115 5 145 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.954 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1777 1583 Flt Permitted 0.950 0.954 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1777 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 568 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 429 755 293 750 0 0 0 0 125 5 158 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 429 755 293 750 0 0 0 0 0 130 158 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 2: Erie Parkway & SB Off Ramp PM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 48.2 48.2 12.4 66.6 11.4 90.0 Actuated g/C Ratio 0.54 0.54 0.14 0.74 0.13 1.00 v/c Ratio 0.23 0.68 0.62 0.29 0.58 0.10 Control Delay 12.2 7.5 26.7 3.9 47.2 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.2 7.5 26.7 3.9 47.2 0.1 LOS B A C A D A Approach Delay 9.2 10.3 21.4 Approach LOS Intersection Summary A B C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 11.1 Intersection LOS: B Intersection Capacity Utilization 72.4% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp r� 103 20s I SOs 0 3 F ' �i. n7 �G. l� u Oa s J Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 3: Erie Parkway PM Peak is 7 i t `t T P \► 1 r Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r � 4 r Traffic Volume (vph) 185 325 0 0 400 155 560 4 385 0 0 0 Future Volume (vph) 185 325 0 0 400 155 560 4 385 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.435 0.950 0.953 Satd. Flow (perm) 810 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 418 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 201 353 0 0 435 168 609 4 418 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 201 353 0 0 435 168 304 309 418 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2042 Background 3: Erie Parkway PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 59.6 59.6 45.1 90.0 18.4 18.4 90.0 Actuated g/C Ratio 0.66 0.66 0.50 1.00 0.20 0.20 1.00 v/c Ratio 0.32 0.15 0.25 0.11 0.89 0.90 0.26 Control Delay 7.7 5.2 13.5 0.1 63.1 64.9 0.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 7.7 5.2 13.5 0.1 63.1 64.9 0.4 LOS A A B A E E A Approach Delay 6.1 9.8 38.2 Approach LOS Intersection Summary A A D Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 22.3 Intersection LOS: C Intersection Capacity Utilization 72.4% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway t .„F„ —111174 r � p .,I ' 25s 65s d_ .. e r .�' — : . c. 15s 50 Synchro 11 Report CSM HCM 6th TWSC 2042 Background 4: Frontage Road & Storage Access PM Peak Intersection Int Delay, s/veh 1.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 3 0 0 6 3 5 Future Vol, veh/h 3 0 0 6 3 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 IS IS Veh in Median Storage, # 0 - - 0 0 Grade, % 0 - - 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 3 0 0 7 3 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 13 6 8 0 - 0 Stage 1 6 Si M Stage 2 7 IS IS .SI IS Critical Hdwy 6.42 6.22 4.12 SI Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS S Follow-up Hdwy 3.518 3.318 2.218 M. Pot Cap -1 Maneuver 1006 1077 1612 M. Stage 1 1017 Stage 2 1016 Platoon blocked, % IS Mov Cap -1 Maneuver 1006 1077 1612 M. Mov Cap -2 Maneuver 1006 Stage 1 1017 Stage 2 1016 IS IS Approach EB NB SB HCM Control Delay, s 8.6 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1612 - 1006 HCM Lane V/C Ratio - - 0.003 HCM Control Delay (s) 0 - 8.6 HCM Lane LOS A - A HCM 95th %tile Q(veh) 0 - 0 Synchro 11 Report CSM HCM 6th TWSC 1: Frontage Road & Erie Parkway 2042 Total AM Peak Intersection Int Delay, s/veh 1.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ) tt r iii +1, Traffic Vol, veh/h 0 915 26 133 910 0 6 0 21 0 0 0 Future Vol, veh/h 0 915 26 133 910 0 6 0 21 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 MN M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 995 28 145 989 0 7 0 23 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 989 0 0 1023 0 0 1780 2274 498 1777 2302 495 Stage 1 IS S. - 995 995 - 1279 1279 Stage 2 IS M. - 785 1279 - 498 1023 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 IS S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1072 - 674 - *96 45 518 97 42 *733 Stage 1 - *262 321 - 375 384 Stage 2 M. S. - *691 384 - 523 311 M. Platoon blocked, % 1 IS 1 1 1 1 1 Mov Cap -1 Maneuver 1072 - 674 - *80 35 518 77 33 *733 Mov Cap -2 Maneuver - *80 35 - 77 33 Stage 1 M. S. - *262 321 - 375 301 Stage 2 IS IS - *542 301 - 500 311 Approach EB WB NB SB HCM Control Delay, s 0 1.5 22.6 0 HCM LOS C A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 234 1072 SI - 674 HCM Lane V/C Ratio 0.125 - 0.214 HCM Control Delay (s) 22.6 0 - 11.8 0 HCM Lane LOS C A IS S. B A HCM 95th %tile Q(veh) 0.4 0 M. - 0.8 s SO Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2042 Total AM Peak is _. %), i ' t 4\ t t \D ir I Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt ic 'iii tt 4 r Traffic Volume (vph) 0 257 681 565 853 0 0 0 0 115 2 190 Future Volume (vph) 0 257 681 565 853 0 0 0 0 115 2 190 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.953 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Flt Permitted 0.950 0.953 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1775 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 467 207 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 279 740 614 927 0 0 0 0 125 2 207 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 279 740 614 927 0 0 0 0 0 127 207 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2042 Total AM Peak t \D Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 45.0 45.0 25.0 70.0 20.0 20.0 Total Split (°/o) 50.0% 50.0% 27.8% 77.8% 22.2% 22.2% Maximum Green (s) 39.0 39.0 19.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 41.6 41.6 19.2 66.7 11.3 90.0 Actuated g/C Ratio 0.46 0.46 0.21 0.74 0.13 1.00 v/c Ratio 0.17 0.75 0.84 0.35 0.57 0.13 Control Delay 15.2 13.2 34.4 2.6 47.0 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.2 13.2 34.4 2.6 47.0 0.2 LOS B B C A D A Approach Delay 13.8 15.3 18.0 Approach LOS Intersection Summary B B B Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 70 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 15.1 Intersection LOS: B Intersection Capacity Utilization 79.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp un II 3 25s 45s 1— F. Oa S Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2042 Total AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations TT TT r 'Pi 4 r Traffic Volume (vph) 161 211 0 0 793 125 625 4 220 0 0 0 Future Volume (vph) 161 211 0 0 793 125 625 4 220 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.230 0.950 0.953 Satd. Flow (perm) 428 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 239 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 175 229 0 0 862 136 679 4 239 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 175 229 0 0 862 136 339 344 239 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2042 Total AM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 59.0 59.0 44.7 90.0 19.0 19.0 90.0 Actuated g/C Ratio 0.66 0.66 0.50 1.00 0.21 0.21 1.00 v/c Ratio 0.43 0.10 0.49 0.09 0.96 0.97 0.15 Control Delay 15.1 6.3 16.4 0.1 75.5 77.9 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.1 6.3 16.4 0.1 75.5 77.9 0.2 LOS B A B A E E A Approach Delay 10.1 14.2 56.9 Approach LOS Intersection Summary B B E Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 30.4 Intersection LOS: C Intersection Capacity Utilization 79.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway t .„F„ —111174 r � p .,I ' 25s 65s d_ .. e r .�' — : . c. 15s 50 Synchro 11 Report CSM HCM 6th TWSC 4: Frontage Road & Storage Access 2042 Total AM Peak Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 1 0 0 24 154 2 Future Vol, veh/h 1 0 0 24 154 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 1 0 0 26 167 2 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 194 168 169 0 0 Stage 1 168 S IS Si Stage 2 26 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 795 876 1409 M. Stage 1 862 Stage 2 997 S. Platoon blocked, % IS Mov Cap -1 Maneuver 795 876 1409 M. Mov Cap -2 Maneuver 795 Stage 1 862 S. Stage 2 997 M IS IS IS Approach EB NB SB HCM Control Delay, s 9.5 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1409 - 795 HCM Lane V/C Ratio - 0.001 S. HCM Control Delay (s) 0 - 9.5 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 5: Frontage Road & Site Access 2042 Total AM Peak Intersection Int Delay, s/veh 1.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 21 0 0 3 3 151 Future Vol, veh/h 21 0 0 3 3 151 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 23 0 0 3 3 164 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 88 85 167 0 0 Stage 1 85 Si Stage 2 3 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 S IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 913 974 1411 M. Stage 1 938 Stage 2 1020 S. Platoon blocked, % IS SI Mov Cap -1 Maneuver 913 974 1411 Mov Cap -2 Maneuver 913 Stage 1 938 Si Stage 2 1020 IS IS IS Approach EB NB SB HCM Control Delay, s 9 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1411 - 913 HCM Lane V/C Ratio IS - 0.025 HCM Control Delay (s) 0 - 9 HCM Lane LOS A - A S. IS HCM 95th %tile Q(veh) 0 - 0.1 Synchro 11 Report CSM HCM 6th TWSC 1: Frontage Road & Erie Parkway 2042 Total PM Peak Intersection Int Delay, s/veh 2.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations II tt r iii +1, Traffic Vol, veh/h 0 1080 25 29 825 0 25 0 121 0 0 0 Future Vol, veh/h 0 1080 25 29 825 0 25 0 121 0 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - None - None - None - None Storage Length 0 0 0 BM M Veh in Median Storage, # - 0 0 0 - - 0 M. Grade, % 0 0 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 1174 27 32 897 0 27 0 132 0 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 897 0 0 1201 0 0 1687 2135 587 1548 2162 449 Stage 1 IS MP - 1174 1174 - 961 961 Stage 2 S. - 513 961 - 587 1201 Critical Hdwy 4.14 - 4.14 - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - 6.54 5.54 - 6.54 5.54 Critical Hdwy Stg 2 S. - 6.54 5.54 - 6.54 5.54 Follow-up Hdwy 2.22 - 2.22 - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap -1 Maneuver 1120 - 577 - *109 58 453 152 55 *767 Stage 1 - *204 264 - 617 564 M. Stage 2 M. S. - *723 564 - 463 256 M. Platoon blocked, % 1 IS 1 1 1 1 1 Mov Cap -1 Maneuver 1120 - 577 - *104 55 453 104 52 *767 Mov Cap -2 Maneuver - *104 55 - 104 52 Stage 1 M. S. - *204 264 - 617 533 Stage 2 IS IS - *683 533 - 329 256 Approach EB WB NB SB HCM Control Delay, s 0 0.4 31.8 0 HCM LOS D A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 288 1120 SI - 577 HCM Lane V/C Ratio 0.551 - 0.055 HCM Control Delay (s) 31.8 0 - 11.6 0 HCM Lane LOS D A IS S. B A HCM 95th %tile Q(veh) 3.1 0 M. - 0.2 Notes �: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2042 Total PM Peak k- 4 t \ • Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r '�� tt 4 r Traffic Volume (vph) 0 441 760 270 702 0 0 0 0 115 5 152 Future Volume (vph) 0 441 760 270 702 0 0 0 0 115 5 152 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 0.97 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.954 Satd. Flow (prot) 0 3539 1583 3433 3539 0 0 0 0 0 1777 1583 Flt Permitted 0.950 0.954 Satd. Flow (perm) 0 3539 1583 3433 3539 0 0 0 0 0 1777 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 568 182 Link Speed (mph) 35 35 35 35 Link Distance (ft) 580 630 617 486 Travel Time (s) 11.3 12.3 12.0 9.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 0 479 826 293 763 0 0 0 0 125 5 165 Shared Lane Traffic (°/o) Lane Group Flow (vph) 0 479 826 293 763 0 0 0 0 0 130 165 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 24 24 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 2 1 1 2 1 2 1 Detector Template Thru Right Left Thru Left Thru Right Leading Detector (ft) 100 20 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 6 20 20 6 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type NA Perm Prot NA Perm NA Free Protected Phases 4 3 8 6 Permitted Phases 4 6 Free Detector Phase 4 4 3 8 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 2: Erie Parkway & SB Off Ramp 2042 Total PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 24.0 24.0 11.0 24.0 26.0 26.0 Total Split (s) 50.0 50.0 20.0 70.0 20.0 20.0 Total Split (°/o) 55.6% 55.6% 22.2% 77.8% 22.2% 22.2% Maximum Green (s) 44.0 44.0 14.0 64.0 14.0 14.0 Yellow Time (s) 4.0 4.0 4.0 2.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 4.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lag Lag Lead Lead -Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C -Max C -Max None C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 48.2 48.2 12.4 66.6 11.4 90.0 Actuated g/C Ratio 0.54 0.54 0.14 0.74 0.13 1.00 v/c Ratio 0.25 0.74 0.62 0.29 0.58 0.10 Control Delay 12.4 10.1 26.4 3.9 47.2 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 12.4 10.1 26.4 3.9 47.2 0.1 LOS B B C A D A Approach Delay 10.9 10.2 20.9 Approach LOS Intersection Summary B B C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBT and 8:WBT, Start of Green Natural Cycle: 65 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.74 Intersection Signal Delay: 11.7 Intersection LOS: B Intersection Capacity Utilization 76.4% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: Erie Parkway & SB Off Ramp 0 5 20s I SOs 1— ! yb F ' P. n7 �G. l� I O a s 1 J Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2042 Total PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tt r 4 r Traffic Volume (vph) 224 332 0 0 401 155 571 4 385 0 0 0 Future Volume (vph) 224 332 0 0 401 155 571 4 385 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 0.95 0.95 1.00 1.00 1.00 1.00 Frt 0.850 0.850 Flt Protected 0.950 0.950 0.953 Satd. Flow (prot) 1770 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Flt Permitted 0.434 0.950 0.953 Satd. Flow (perm) 808 3539 0 0 3539 1583 1681 1686 1583 0 0 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 182 418 Link Speed (mph) 35 35 30 30 Link Distance (ft) 630 752 551 731 Travel Time (s) 12.3 14.6 12.5 16.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 243 361 0 0 436 168 621 4 418 0 0 0 Shared Lane Traffic (°/o) 50% Lane Group Flow (vph) 243 361 0 0 436 168 310 315 418 0 0 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 1 2 1 Detector Template Left Thru Thru Right Left Thru Right Leading Detector (ft) 20 100 100 20 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 20 6 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type pm+pt NA NA Free Perm NA Free Protected Phases 7 4 8 2 Permitted Phases 4 Free 2 Free Detector Phase 7 4 8 2 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 Synchro 11 Report CSM Lanes, Volumes, Timings 3: Erie Parkway 2042 Total PM Peak 7 t `t T P \► 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 11.0 24.0 24.0 24.0 24.0 Total Split (s) 15.0 65.0 50.0 25.0 25.0 Total Split (°/o) 16.7% 72.2% 55.6% 27.8% 27.8% Maximum Green (s) 9.0 59.0 44.0 19.0 19.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 Lead/Lag Lead Lag Lead -Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None None Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 59.5 59.5 44.8 90.0 18.5 18.5 90.0 Actuated g/C Ratio 0.66 0.66 0.50 1.00 0.21 0.21 1.00 v/c Ratio 0.39 0.15 0.25 0.11 0.90 0.91 0.26 Control Delay 8.7 5.1 13.6 0.1 64.9 66.9 0.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 8.7 5.1 13.6 0.1 64.9 66.9 0.4 LOS A A B A E E A Approach Delay 6.6 9.9 39.7 Approach LOS Intersection Summary A A D Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:EBTL and 8:WBT, Start of Green Natural Cycle: 60 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 22.8 Intersection LOS: C Intersection Capacity Utilization 76.4% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Erie Parkway t .„F„ —111174 r � p .,I ' 25s 65s d_ .. e r .�' — : . c. 15s 50 Synchro 11 Report CSM HCM 6th TWSC 4: Frontage Road & Storage Access 2042 Total PM Peak Intersection Int Delay, s/veh 0.2 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 3 0 0 137 25 5 Future Vol, veh/h 3 0 0 137 25 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 M IS IS Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 3 0 0 149 27 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 179 30 32 0 0 Stage 1 30 Si Stage 2 149 M IS IS IS Critical Hdwy 6.42 6.22 4.12 SI S. Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS Follow-up Hdwy 3.518 3.318 2.218 M. S. Pot Cap -1 Maneuver 811 1044 1580 M. Stage 1 993 Stage 2 879 S. Platoon blocked, % IS Mov Cap -1 Maneuver 811 1044 1580 M. Mov Cap -2 Maneuver 811 Stage 1 993 S. Stage 2 879 M IS IS IS Approach EB NB SB HCM Control Delay, s 9.5 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1580 - 811 HCM Lane V/C Ratio - 0.004 S. HCM Control Delay (s) 0 - 9.5 Si HCM Lane LOS A IS A IS HCM 95th %tile Q(veh) 0 0 Synchro 11 Report CSM HCM 6th TWSC 5: Frontage Road & Site Access 2042 Total PM Peak Intersection Int Delay, s/veh 7.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations y 4 1+ Traffic Vol, veh/h 131 0 0 6 3 22 Future Vol, veh/h 131 0 0 6 3 22 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 IS IS Veh in Median Storage, # 0 - - 0 0 Grade, % 0 - - 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 142 0 0 7 3 24 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 22 15 27 0 - 0 Stage 1 15 Si M Stage 2 7 IS IS .SI IS Critical Hdwy 6.42 6.22 4.12 SI Critical Hdwy Stg 1 5.42 Critical Hdwy Stg 2 5.42 IS S Follow-up Hdwy 3.518 3.318 2.218 M. Pot Cap -1 Maneuver 995 1065 1587 M. Stage 1 1008 Stage 2 1016 Platoon blocked, % IS Mov Cap -1 Maneuver 995 1065 1587 M. Mov Cap -2 Maneuver 995 Stage 1 1008 Si M Stage 2 1016 IS IS .SI IS Approach EB NB SB HCM Control Delay, s 9.2 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1587 - 995 HCM Lane V/C Ratio - - 0.143 HCM Control Delay (s) 0 - 9.2 HCM Lane LOS A - A HCM 95th %tile Q(veh) 0 - 0.5 Synchro 11 Report CSM COLORADO DEPARTMENT OF TRANSPORTATION STATE HIGHWAY ACCESS PERMIT APPLICATION Issuing authority application acceptance date: Instructions: - Contact the Colorado Department of Transportation (CDOT) - Contact the issuing authority to determine what plans and - Complete this form (some questions may not apply to you) Please print - Submit an application for each access affected. Or type - If you have any questions contact the issuing authority. - For additional information see CDOT's Access Management or your local government to determine your issuing authority. other documents are required to be submitted with your application. and attach all necessary documents and Submit it to the issuing authority. website at https://www.codot.gov/business/permits/accesspermits 1) Property owner (Permittee) R&N Properties, LLC 2) Applicant or Agent for permittee (if different from property owner) LSC Transportation Consultants, Inc. C%1a'eGr- Street address 14101 E 33rd Place, Ste F Mailing address 1889 York Street City, state & zip Aurora, CO 80011 Phone# 303-993-0162 City, state & zip Denver, CO 80206 Phone#(required) 303-333-1105 E-mail address nate@empireroofiing.com E-mail address if available chris@lsctrans.com 3) Address of property to be served by permit (required) 2497 & 2507 W I25 Frontage Rd 4) Legal description of property: If within jurisdictional limits of Municipality, city and/or County, which one? county subdivision block lot section township range Weld I I I 122 I 01N I 68W 5) What State Highway are you requesting access from? I-25 Frontage Road (west) 6) What side of the highway? N S W E ■ 7) How many feet is the proposed access from the nearest mile post? How many feet is the proposed access from the nearest cross street? 2,600 +/— feet ON n S ME W) from: Erie Parkway N/A feet ON M S • E W) from: 8) What is the approximate date you intend to begin construction? 5/1/2023 9) Check here if you are requesting a: anticipated: ) improvement to existing access removal of access Oelocation of an existing access (provide detail) ■ new access temporary access (duration change in access use 10) Provide existing property use Agriculture 11) Do you have knowledge of any State Highway access permits serving this property, or adjacent properties in which you have a property interest? permit number(s) and provide copies: and/or, permit date: no yes, if yes - what are the 12) Does the property owner own or have any interests in any adjacent property? no yes, if yes - please describe: 13) Are there other existing or dedicated public streets, roads, highways or access easements bordering or within the property? your plans and indicate the proposed and existing access points. no yes, if yes - list them on 14) If you are requesting agricultural field access - how many acres will the access serve? N/A 15) If you are requesting commercial or industrial access please indicate the types and number of businesses and provide the floor area square footage of each. business/land use square footage business square footage Office 21,000 Light Industrial 189,000 16) If you are requesting residential developement access, what is the type (single family, apartment, townhouse) and number of units? type number of units type number of units N/A 17) Provide the following vehicle count estimates for vehicles that will use the access. Leaving the property then returning is two counts. Indicate if your counts are # of passenger cars and light trucks at peak hour volumes 130 # of multi unit trucks at peak hour volumes 20 • peak hour volumes or average daily volumes. # of single unit vehicles in excess of 30 ft. 22 # of farm vehicles (field equipment) Total count of all vehicles 172 Previous editions are obsolete and may not be used Page 1 of 2 CDOT Form #137 12/18 18) Check with the issuing authority to determine which of the following documents are required to complete the review of your application. a) Property map indicating other access, bordering roads and streets. e) Subdivision, zoning, or development plan. b) Highway and driveway plan profile. f) Proposed access design. c) Drainage plan showing impact to the highway right-of-way. g) Parcel and ownership maps including easements. d) Map and letters detailing utility locations before and after h) Traffic studies. development in and along the right-of-way. i) Proof of ownership. 1- It is the applicant's responsibility to contact appropriate their activities. Such clearances may include Corps of Engineers permits, or ecological, archeological, historical or cultural Information Summary presents contact information for agencies prohibited discharges, and may be obtained from Regional CDOT Planning/Construction-Environmental-Guidance webpage: resources/guidance-standards/environmental-clearances-info-summary-august-2017/view agencies and obtain all environmental clearances that apply to 404 Permits or Colorado Discharge Permit System resource clearances. The CDOT Environmental Clearances administering certain clearances, information about CDOT Utility/Special Use Permit offices or accessed via the https://www.codot.gov/programs/environmental/ health policies/ - including, but not and 29 CFR Part 1926 hearing protection, in regulation. At a the following personal 2); head protection is danger of injury to 1926.95, and the standard shall by the Access Board and prescribe the use Plans and can be 2- All workers within the State Highway right of way shall comply with their employer's safety and procedures, and all applicable U.S. Occupational Safety and Health Administration (OSHA) regulations limited to the applicable sections of 29 CFR Part 1910 - Occupational Safety and Health Standards - Safety and Health Regulations for Construction. Personal protective equipment (e.g. head protection, footwear, high visibility apparel, safety glasses, respirators, gloves, etc.) shall be worn as appropriate for the work being performed, and as specified minimum, all workers in the State Highway right of way, except when in their vehicles, shall wear protective equipment: High visibility apparel as specified in the Traffic Control provisions of the documentation accompanying the Notice to Proceed related to this permit (at a minimum, ANSI/ISEA 107-1999, class that complies with the ANSI Z89.1-1997 standard; and at all construction sites or whenever there feet, workers shall comply with OSHA's PPE requirements for foot protection per 29 CFR 1910.136, 1926.96. If required, such footwear shall meet the requirements of ANSI Z41-1999. Where any of the above -referenced ANSI standards have been revised, the most recent version of apply. 3- The Permittee is responsible for complying with the Revised Guidelines that have been adopted under the American Disabilities Act (ADA). These guidelines define traversable slope requirements of a defined pattern of truncated domes as detectable warnings at street crossings. The new Standards found on the Design and Construction Project Support web page at: https://www.codot.gov/business/civilrights/ada/resources-engineers If an access permit is issued to you, it will state the terms and conditions for its use. Any changes in the use of the permitted access not consistent with the terms and conditions listed on the permit may be considered a violation of the permit. The applicant declares under penalty of perjury in the second degree, and any other applicable state or federal laws, that all information provided on this form and submitted attachments are to the best of their knowledge true and complete. I understand receipt of an access permit does not constitute permission to start access construction work. Applicant or Agent f Permittee signature ,' !' i Print name Christopher S. McGranahan Date 11/09/22 If the appficant i---not the owner of the property, we require this application also to be signed by the property owner or their tegally authorized representative (or other acceptable written evidence). This signature shall constitute agreement with this application by all owners -of -interest unless stated in writing. If a permit is issued, the property owner, in most cases, will be listed the permittee. Property o sign re Print name Nate Hewson Date 11/09/22 Previous editions are obsolete and may not be used Page 2 of 2 CDOT Form #137 12/18 INSTRUCTIONS FOR COMPLETING APPLICATION FOR ACCESS PERMIT (CDOT FORM NO. 137) December 2018 To construct, relocate, close, or modify access(es) to a State Highway or when there are changes in use of such access point(s), an application for access permit must be submitted to the Colorado Department of Transportation (CDOT) or the local jurisdiction serving as the issuing authority for State Highway Access Permits. Contact the CDOT Regional Access Unit in which the subject property is located to determine where the application must be submitted. The following link will help you determine which CDOT Region office to contact: https://www.codot.gov/business/permits/accesspermits/regional-offices.html All applications are processed and access permits are issued in accordance to the requirements and procedures found in the most current version of the State Highway Access Code (Access Code). Code and the application form are also available from CDOT' s web site at: https://www.codot.gov/business/permits/accesspermits Please complete all information requested accurately. Access permits granted based on applications found to contain false information may be revoked. An incomplete application will not be accepted. If additional information, plans and documents are required, attach them to the application. Keep a copy of your submittal for your records. Please note that only the original signed copy of the application will be accepted. Do not send or enclose any permit fee at this time. A permit fee will be collected if an access permit is issued. The following is a brief description of the information to be provided on each enumerated space on the application form (CDOT Form 137, 2010). 1. Property Owner (Permittee): Please provide the full name, mailing address and telephone number and the E-mail address (if available) of the legal property owner (owner of the surface rights). Please provide a telephone number where the Permittee can be reached during business hours (8:00 a.m. to 5:00 p.m.). Having a contract on the property is not a sufficient legal right to that property for purposes of this application. If the access is to be on or across an access easement, then a copy of the easement MUST accompany this application. If federal land is involved, provide the name of the relevant federal agency AND attach copy of federal authorization for property use. 2. Agent for permittee: If the applicant (person completing this application) is different than the property owner (Permittee), provide entity name (if applicable), the full name of the person serving as the Agent, mailing address, telephone number, and the E-mail address (if available). Please provide a telephone number where the Agent can be reached during business hours (8:00 a.m. to 5:00 p.m.). Joint applications such as owner/lessee may be submitted. Corporations must be licensed to do business in Colorado: All corporations serving as, or providing, an Agent as the applicant must be licensed to do business in Colorado. Instructions for completing Application for Access Permit (CDOT Form #137), 12/18 Page 1 3. Address of Property to be Served: Provide if property to be served has an official street address. If the access is a public road, note the name (or future name) of the road. 4. Legal Description of Property: Fill in this item to the extent it applies. This information is available at your local County Courthouse, or on your ownership deed(s). A copy of the deed may be required as part of this application in some situations. To determine applicability, check with the CDOT's Regional Access Manager or issuing authority staff. 5. State Highway: Provide the State Highway number from which the access is requested. 6. Highway Side: Mark the appropriate box to indicate what side of the highway the requested access is located. 7. Access Mile Point: Without complete information, we may not be able to locate the proposed access. To obtain the distance in feet, drive the length between the mile point and the proposed access, rounding the distance on the odometer to the nearest tenth of a mile; multiply the distance by 5,280 feet to obtain the number of feet from the mile point. Then enter the direction (i.e. north, south, east, west) from the mile point to the proposed access. Finally, enter the mile point number. It is helpful in rural or undeveloped areas if some flagging is tied to the right-of-way fence at the desired location of the access. Also, if there is a cross street or road close to the proposed access, note the distance in feet (using the same procedures noted above) from that cross street or road. 8. Access Construction Date: Fill in the date on which construction of the access is planned to begin. 9. Access Request: Mark items that apply. More than one item may be checked. 10. Existing property use: Describe how the property is currently being used. For example, common uses are Single Family Residential, Commercial or Agricultural. 11. Existing Access: Does the property have any other legal alternatives to reach a public road other than the access requested in this application? Note the access permit number(s) for any existing state highway access point(s) along with their issue date(s). If there are no existing access point(s), mark the "no" box. 12. Adjacent Property: Please mark the appropriate box. If the "yes" box is marked, provide a brief description of the property (location of the property in relation to the property for which this access application is being made). 13. Abutting Streets: If there are any other existing or proposed public roads or easements abutting the property, they should be shown on a map or plan attached to this application. 14. Agricultural Acres: Provide number of acres to be served. Instructions for completing Application for Access Permit (CDOT Form #137), 12/18 Page 2 15. Access Use: List the land uses and square footage of the site as it will be when it is fully developed. The planned land uses as they will be when the site is fully developed are used to project the amount of traffic that the site will generate, peak hour traffic levels and the type of vehicles that can be expected as a result of the planned land uses. There may be exceptional circumstances that would allow phased installation of access requirements. This is at the discretion of the CDOT Regional Access Unit or issuing authority staff. 16. Estimated Traffic Count: Provide a reasonable estimate of the traffic volume expected to use the access. Note the type of vehicles that will use the access along with the volume (number of vehicles in and out at either the peak hour or average daily rates) for each type of vehicle. A vehicle leaving the property and then returning counts as two trips. If 40 customers are expected to visit the business daily, there would be 80 trips in addition to the trips made by all employees and other visitors (such as delivery and trash removal vehicles). If the PDF on-line version of this application is being used, the fields for each type of vehicle will automatically be added together to populate the last field on the page. 17. Documents and Plans: The CDOT Regional Access Manager or issuing authority staff will determine which of these items must be provided to make the application complete. Incomplete applications will not be accepted. If an incomplete application is received via U.S. mail or through means other than in the hand of the Access Manager or issuing authority staff, it will not be processed. It is the responsibility of the applicant to verify with the CDOT Regional Access Manager or issuing authority staff whether the application is complete at the time of submission. Signature: Generally, if the applicant is not the property owner, then the property owner or a legally authorized representative must sign the application. With narrow exceptions, proof of the property owner's consent is required to be submitted with the application (proof may be a power of attorney or a similar consent instrument). The CDOT Regional Access Manager or issuing authority staff will determine if the exception provided in the Access Code (2.3 (3) (b)) is applicable. If CDOT is the issuing authority for this application, direct your questions to the CDOT Regional Access Manager or the issuing authority staff serving the subject property. https://www.codot.gov/business/permits/accesspermits/regional-offices.html If the application is accepted, it will be reviewed by the CDOT Regional Access Manager or the issuing authority staff. If an Access Permit is issued, be sure to read all of the attached Terms and Conditions before signing and returning the Access Permit. The Terms and Conditions may require that additional information be provided prior to issuance of the Notice to Proceed. The CDOT Regional Access Manager (or issuing authority staff) MUST be contacted prior to commencing work on any Access Permit project. A Notice to Proceed that authorizes the Permittee to begin access related construction MUST be issued prior to working on the access in the State Highway right-of-way. The Notice to Proceed may also have Terms and Conditions that must be fulfilled before work may begin on the permitted access. Instructions for completing Application for Access Permit (CDOT Form #137), 12/18 Page 3 Weld County Treasurer Statement of Taxes Due Account Number R0068391 Assessed To Parcel 146722400011 RICKERS CLAY M 2507 W 125 FRONTAGE RD ERIE. CO 80516-8302 Legal Description PT SE4 22-1-68 LOT A REC EXEMPT RE -1300 EXC OG&M Situs Address 2507 W INTERSTATE 25 FRONTAGE RD WELD Year Tax Tax Charge 2021 Interest Fees Payments Balance $3,634.56 $0.00 $0.00 ($3,634.56) $0.00 Total Tax Charge Grand Total Due as of 08/02/2022 Tax Billed at 2021 Rates for Tax Area 5124 - 5124 Authority WELD COUNTY SCHOOL DIST REIJ NORTHERN COLORADO WATER (NC CENTRAL COLORADO WATER (CCW CENTRAL COLORADO WATER SUBD MOUNTAIN VIEW FIRE HIGH PLAINS LIBRARY Taxes Billed 2021 * Credit Levy Mill Levy 15.0380000* 57.3580000* 1.0000000 1.4040000 Amount Values $566.79 $2,161.82 $37 69 $52.92 Total 2.1890000 $82.50 16.2470000 3.1970000 $612.35 $120.49 96.4330000 $3,634.56 SINGLE FAM.RES - LAND SINGLE FAM.RES- IMPROVEMTS $0.00 $0.00 Actual Assessed $188,951 $13,510 $338,173 $24,180 $527,124 $37,690 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES - AUGUST 1 TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK. POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS. PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH. Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer are evidence that as of this date, all current and prior year taxes related to this parcel have been paid in full. Signed: /6 21)01,), Date: 0V' i A1acq 1400 N. 17th Avenue, Greeley, CO 80631. PO Box 458, Greeley, CO 80632. (970) 400-3290 Page 1 of 1 Weld County Treasurer Statement of Taxes Due Account Number R2581603 Assessed To Parcel I46722400034 RICKERS HENRY JAMES FAMILY TRUST 2497 W 125 FRONTAGE RD FRIF. CO 80516-8302 Legal Description Situs Address PT N2SE4 22-1-68 EXC BEG E4 COR OF SEC N89D58'W 1101 44' TO POB N89D58'W 250 5' S0D0I'W 260 85' S89D58'E 250 5' 2497 W INTERSTATE 25 FRONTAGE RD WELD N0D01'E 260 85' TO BEG EXC E 100' ALSO EXC BEG E4 COR SEC S89D35'W 470 42' TO POB N89O35'E 64 89' TO NLY R/W BULL CANAL TH ALG SD R/W S41O29'W 69 12' S44D01'W 101 62' S48O42'W 235 22' S45D1 Additional Legal on File Year Tax Charge 2021 $3299.94 Tax Interest Total Tax Charge Grand Total Due as of 08/02/2022 Tax Billed at 2021 Rates for Tax Area 5124 - 5124 Authority WELD COUNTY SCHOOL DIST REIJ NORTHERN COLORADO WATER (NC CENTRAL COLORADO WATER (CCW CENTRAL COLORADO WATER SUBD MOUNTAIN VIEW FIRE HIGH PLAINS LIBRARY Taxes Billed 2021 * Credit Levy Mill Levy 15.0380000* 57.3580000* 1 0000000 1.4040000 2.1890000 16.2470000 3.1970000 Fees Payments Balance $0.00 $0.00 ($3.299.941 Amount $514.60 $1,962.79 $34.22 $48.05 $74.91 $555.97 $109.40 96 4330000 $3,299.94 $0.00 $0.00 $0.00 Values Actual Assessed AG -FLOOD $36,297 $10,530 IRRRIGATED LAND AG -GRAZING LAND $130 $40 FARM/RANCH $291,778 $20,860 RESIDENCE -IMPS OTHER BLDGS.- $9,620 $2,790 AGRICULTURAL Total $337,825 $34,220 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR TO REMITTANCE AFTER THE FOLLOWING DATES: PERSONAL PROPERTY, REAL PROPERTY, AND MOBILE HOMES - AUGUST 1. TAX LIEN SALE REDEMPTION AMOUNTS MUST BE PAID BY CASH OR CASHIER'S CHECK. POSTMARKS ARE NOT ACCEPTED ON TAX LIEN SALE REDEMPTION PAYMENTS. PAYMENTS MUST BE IN OUR OFFICE AND PROCESSED BY THE LAST BUSINESS DAY OF THE MONTH. Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer are evidence that as of this date, all current and prior year taxes related to this parcel have been paid in full. Signed: Date: D ?ia 1400 N. 17th Avenue, Greeley, CO 80631. PO Box 458, Greeley, CO 80632. (970) 400-3290 Page 1 of 1 Hello