HomeMy WebLinkAbout20222052.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF
TEMPORARY CLOSURE OF COUNTY ROADS 35 AND 74 INTERSECTION FOR
APPROXIMATELY THREE (3) WEEKS, FOR UNANTICIPATED DELAYS DUE TO
CONCRETE SUPPLY SHORTAGES
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of
Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on
County roads and any intersections thereof, and it hereby authorizes and orders the posting of
such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic
thereon for the safety of the general public and that said traffic control devices shall conform to
the Federal Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that the temporary closure of the intersection of
County Roads 35 and 74, be extended, with said extended closure being effective July 29, 2022,
for approximately three (3) weeks through August 19, 2022, for unanticipated delays due to
concrete supply shortages, and further, that standard official traffic control devices shall be
erected at said closure giving notice of the restrictions.
cc:So(RS), D:Spaicl.CSP
7/2.6/22.
2022-2052
EG0024
EXTEND TEMPORARY CLOSURE - COUNTY ROADS 35 AND 74 INTERSECTION
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 20th day of July, A.D., 2022, nunc pro tunc March 9, 2022.
BOARD OF COUNTY COMMISSIONERS
WELCOUNTY, COLORADO
ATTEST: dairy%) jC,ltO•,1
Weld County Clerk to the Board
County Attorney
Date of signature: 7725/22.
Sci!Stt K. James, Chair
Mik�.FFee an, Pro -Ten`
2022-2052
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: July 15, 2022
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Duran Excavating is requesting to extend the closure of the intersection of CR 35 and Collins St. (CR 74)
from 7/29/22 through 8/19/22 to complete construction the new roundabout for the Town of Eaton.
Shortages in the supply of concrete has delayed the project.
See attached closure diagram.
2022-2052
LIGHTFIELD ENTERPRISES, INC.
LEGEND
I.
INDICATES PLACEMENT
OF SIGN
INDICATES FACE OF SIGN
CHANNELIZING DRUM
3M -A BARRICADE
WORK AREA
NI Page Ole fifir NM S#DtIRDS
sort •v s:
W26.1
ROAD aos®
To
IHRUTRAFFIC
H500'-•4*- 500'
(X2)
DETOUR
AH
500'
500
WY', •
ROAD
WORK
AHEAF
8
BARRICADES TO BE
OFFSET TO ALLOW FOR
RESIDENTIAL AND
CONSTRUCTION TRAFFIC
72
NOTES:
1) SIGNS SHALL BE SPACED 500' EAST.NORTH &
SOUTHBOUND. 100' WESTBOUND AND ON SIDE
STREETS, OR AS SPACE ALLOWS
2) PLAN IS FOR 24/7 ROAD CLOSURE
3) ROAD CLOSURE IS FOR CONSTRUCTION OF
ROUNDABOUT IN INTERSECTION OF WCR 35 &
WCR 74
4) WORK IS ESTIMATED TO TAKE 175 CALANDER DAYS
5) MHT # 1 SHALL WORK IN CONJUNCTION WITH MHT # 2
6) SEE MHT # 2 FOR ON SITE TRAFFIC CONTROL
7) OPERATIONS SHALL BE COORDINATED WITH ONGOING
CONSTRUCTION TO ACCOMMODATE ADDITIONAL
CONSTRUCTION TRAFFIC ACCESS POINTS
8) CONTRACTOR SHALL MAKE CONTACT WITH RESIDENTS
IN INTERSECTION TO INFORM THEM OF ACCESS POINTS
9) PLAN DRAWN BASED ON MUTCD TA 20 8 2019 M&S STANDARDS,
S-630-1, CASE NO 20
10) DETOUR SHALL REMAIN IN PLACE FOR DURATION OF ROAD CLOSURE
11) EXACT PLACEMENT OF DEVICES SHALL BE BASED ON SITE CONDITIONS
12) BARRICADES AT SOUTH. NORTH AND EAST SIDE OF CONSTRUCTION SHALL
BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC
13) EMERGENCY SERVICES SHALL BE NOTIFIED PRIOR TO SET UP OF CLOSURE
14) ALL DEVICES SHALL MEET OR EXCEED MUTCD STANDARDS
COLLINS-35 ROUNDABOUT
COLLINS AVE. (WCR 74) & COUNTY ROAD 35, EATON
MHT # 1 - ROAD CLOSURE & DETOUR
02/10/2022
ROAD
CLOSED_
AHE
,
BARRICADES TO BE
OFFSET TO ALLOW FOR
RESIDENTIAL AND
CONSTRUCTION TRAFFIC
Rltd
ROAD
IdsCLOSED
Pr AIIIIIAII
///II
500'
W20-
ROAD
CLOSED
RCAO LLDSEC
-0
THRU TRAGfL
RCAO CLOSED
TO
711211 TRAFGIC
500'
500'
500'
500'
500'
DETO )
500' 500'
76 _
Benjamin Dr
500'
W20-2
w20-2
W7b3
ROAD CLOSED
M
TI*U TRAFFIC
2145
500'
W20-1
(X2)
C
in
RH-2
ROAD
CLOSED
72
N
W
S
E
NOT DRAWN TO SCALE
SUMMARY OF DEVICES
11 - 36" ROAD WORK AHEAD
4 - 36" ROAD CLOSED AHEAD
14 - 36" DETOUR AHEAD
7 - 60" ROAD CLOSED TO
THRU TRAFFIC
1 - 48" ROAD CLOSED
2 - 48" DETOUR ARROW (DOUBLE)
1 - 48" DETOUR ARROW (RIGHT)
1 - 48" DETOUR ARROW (LEFT)
8 - 30" DETOUR MARKER
4 RIGHT ARROW
4 LEFT ARROW
17 - 3M -A BARRICADE
16 - CHANNELIZING DRUM
*1 verear.ona A'ar
Arai rfiftfatfte
DETOUR
AHEAD
•
37
WI 0-3
CLOSED
AHEAD
lin
�,Naribt--
*...,
LIGHTFIELD ENTERPRISES 1.
`Concrete & Construction Services,'
CMOOSO@LIGHTFIELDENTERPRISES.COM
NOT AN ENGINEER
OWNER DATE
TOWN OF EATON 02/10/2022
PRIME CONTRACTOR: DURAN EXCAVATING. INC
CONTACT: DUSTIN DURAN
PHONE NUMBER: 970105-7758
JOB NAME: COLLINS-35 ROUNDABOUT MHT
JOB COLLINS AVE (COUNTY ROAD 741
LOCATION: & COUNTY ROAD 35 / EATON
0 _ _ _
PREPARED BY: ea toG
ATTSA CERT # 106285 ATTSA EXP-
Reviewed by Duran Excavating, Inc.
for conformity and coordination with
the contract documents.
Comments:
By _en- Date 02/11/2022