HomeMy WebLinkAbout20222052.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROADS 35 AND 74 INTERSECTION FOR APPROXIMATELY THREE (3) WEEKS, FOR UNANTICIPATED DELAYS DUE TO CONCRETE SUPPLY SHORTAGES WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the temporary closure of the intersection of County Roads 35 and 74, be extended, with said extended closure being effective July 29, 2022, for approximately three (3) weeks through August 19, 2022, for unanticipated delays due to concrete supply shortages, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc:So(RS), D:Spaicl.CSP 7/2.6/22. 2022-2052 EG0024 EXTEND TEMPORARY CLOSURE - COUNTY ROADS 35 AND 74 INTERSECTION PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 20th day of July, A.D., 2022, nunc pro tunc March 9, 2022. BOARD OF COUNTY COMMISSIONERS WELCOUNTY, COLORADO ATTEST: dairy%) jC,ltO•,1 Weld County Clerk to the Board County Attorney Date of signature: 7725/22. Sci!Stt K. James, Chair Mik�.FFee an, Pro -Ten` 2022-2052 EG0024 MEMORANDUM TO: Clerk to the Board DATE: July 15, 2022 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Duran Excavating is requesting to extend the closure of the intersection of CR 35 and Collins St. (CR 74) from 7/29/22 through 8/19/22 to complete construction the new roundabout for the Town of Eaton. Shortages in the supply of concrete has delayed the project. See attached closure diagram. 2022-2052 LIGHTFIELD ENTERPRISES, INC. LEGEND I. INDICATES PLACEMENT OF SIGN INDICATES FACE OF SIGN CHANNELIZING DRUM 3M -A BARRICADE WORK AREA NI Page Ole fifir NM S#DtIRDS sort •v s: W26.1 ROAD aos® To IHRUTRAFFIC H500'-•4*- 500' (X2) DETOUR AH 500' 500 WY', • ROAD WORK AHEAF 8 BARRICADES TO BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC 72 NOTES: 1) SIGNS SHALL BE SPACED 500' EAST.NORTH & SOUTHBOUND. 100' WESTBOUND AND ON SIDE STREETS, OR AS SPACE ALLOWS 2) PLAN IS FOR 24/7 ROAD CLOSURE 3) ROAD CLOSURE IS FOR CONSTRUCTION OF ROUNDABOUT IN INTERSECTION OF WCR 35 & WCR 74 4) WORK IS ESTIMATED TO TAKE 175 CALANDER DAYS 5) MHT # 1 SHALL WORK IN CONJUNCTION WITH MHT # 2 6) SEE MHT # 2 FOR ON SITE TRAFFIC CONTROL 7) OPERATIONS SHALL BE COORDINATED WITH ONGOING CONSTRUCTION TO ACCOMMODATE ADDITIONAL CONSTRUCTION TRAFFIC ACCESS POINTS 8) CONTRACTOR SHALL MAKE CONTACT WITH RESIDENTS IN INTERSECTION TO INFORM THEM OF ACCESS POINTS 9) PLAN DRAWN BASED ON MUTCD TA 20 8 2019 M&S STANDARDS, S-630-1, CASE NO 20 10) DETOUR SHALL REMAIN IN PLACE FOR DURATION OF ROAD CLOSURE 11) EXACT PLACEMENT OF DEVICES SHALL BE BASED ON SITE CONDITIONS 12) BARRICADES AT SOUTH. NORTH AND EAST SIDE OF CONSTRUCTION SHALL BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC 13) EMERGENCY SERVICES SHALL BE NOTIFIED PRIOR TO SET UP OF CLOSURE 14) ALL DEVICES SHALL MEET OR EXCEED MUTCD STANDARDS COLLINS-35 ROUNDABOUT COLLINS AVE. (WCR 74) & COUNTY ROAD 35, EATON MHT # 1 - ROAD CLOSURE & DETOUR 02/10/2022 ROAD CLOSED_ AHE , BARRICADES TO BE OFFSET TO ALLOW FOR RESIDENTIAL AND CONSTRUCTION TRAFFIC Rltd ROAD IdsCLOSED Pr AIIIIIAII ///II 500' W20- ROAD CLOSED RCAO LLDSEC -0 THRU TRAGfL RCAO CLOSED TO 711211 TRAFGIC 500' 500' 500' 500' 500' DETO ) 500' 500' 76 _ Benjamin Dr 500' W20-2 w20-2 W7b3 ROAD CLOSED M TI*U TRAFFIC 2145 500' W20-1 (X2) C in RH-2 ROAD CLOSED 72 N W S E NOT DRAWN TO SCALE SUMMARY OF DEVICES 11 - 36" ROAD WORK AHEAD 4 - 36" ROAD CLOSED AHEAD 14 - 36" DETOUR AHEAD 7 - 60" ROAD CLOSED TO THRU TRAFFIC 1 - 48" ROAD CLOSED 2 - 48" DETOUR ARROW (DOUBLE) 1 - 48" DETOUR ARROW (RIGHT) 1 - 48" DETOUR ARROW (LEFT) 8 - 30" DETOUR MARKER 4 RIGHT ARROW 4 LEFT ARROW 17 - 3M -A BARRICADE 16 - CHANNELIZING DRUM *1 verear.ona A'ar Arai rfiftfatfte DETOUR AHEAD • 37 WI 0-3 CLOSED AHEAD lin �,Naribt-- *..., LIGHTFIELD ENTERPRISES 1. `Concrete & Construction Services,' CMOOSO@LIGHTFIELDENTERPRISES.COM NOT AN ENGINEER OWNER DATE TOWN OF EATON 02/10/2022 PRIME CONTRACTOR: DURAN EXCAVATING. INC CONTACT: DUSTIN DURAN PHONE NUMBER: 970105-7758 JOB NAME: COLLINS-35 ROUNDABOUT MHT JOB COLLINS AVE (COUNTY ROAD 741 LOCATION: & COUNTY ROAD 35 / EATON 0 _ _ _ PREPARED BY: ea toG ATTSA CERT # 106285 ATTSA EXP- Reviewed by Duran Excavating, Inc. for conformity and coordination with the contract documents. Comments: By _en- Date 02/11/2022 Hello