Loading...
HomeMy WebLinkAbout20223100.tiffPlanner: Maxwell Nader Case Number: COZ22-0008 Owner: Representative: Request: Legal Description: Location: Acres: LAND USE APPLICATION SUMMARY SHEET Jamm Power Service, LLC c/o Josh Pralle 32495 CR 14, Keenesburg, CO 80643 Emily Tarantini 2912 Ariel Drive, Loveland, CO 80537 Hearing Date: November 1, 2022 Change of Zone from the A (Agricultural) Zone District to the C-3 (Business Commercial) Zone District. Lot B, RECX16-0018; being part of the W2SE4 of Section 19, Township 2 North, Range 64 West of the 6th P.M., County of Weld, State of Colorado North of and adjacent to County Road 18; approximately 0.50 miles east of County Road 49 +/- 55.24 acres Parcel #: 1305-19-4-00-012 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received referral responses with comments from the following agencies: ➢ Town of Hudson, referral dated August 10, 2022 ➢ Weld County Department of Public Health and Environment, referral dated July 21, 2022 ➢ Weld County Department of Planning Services — Development Review, referral dated July 28, 2022 The Department of Planning Services' staff has received referral responses without comments from the following agencies: ➢ Weld County School District RE -3J, referral July 20, 2022 ➢ Colorado Division of Water Resources, referral date July 29, 2022 ➢ Weld County Department of Planning Services — Code Compliance, referral dated July 22, 2022 The Department of Planning Services' staff has not received responses from the following agencies: ➢ Town of Keenesburg ➢ Hudson Fire Protection District ➢ Southeast Weld Conservation District COZ22-0008 Page 1 of 6 CASE SUMMARY: The owner, Jamm Power Service, LLC, is requesting to rezone a parcel of land from the A (Agricultural) Zone District to the C-3 (Business Commercial) Zone District. This parcel is adjacent to the Town of Keenesburg. The Town of Keenesburg stated in the Notice of Inquiry form, dated March 15, 2022, that the Town is not interested in annexing the property even though the plan for development is in alignment with the Town's Comprehensive Plan. Jamm Power Service, LLC purchased the property from Meadow Ridge Holdings, LLC on September 2, 2022. The site is also located primarily within the Weld County Opportunity Zone due to the fact that it is within one mile of 1-76. As defined in the 2020 Weld County Comprehensive Plan, Opportunity Zones are areas of potential opportunity for commercial and industrial development. These are potentially logical areas for rezoning land to C (Commercial) or I (Industrial), based on transportation infrastructure of roads and railroads. The site is currently vacant land. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. - That the proposal is consistent with Chapter 22 of the Weld County. Section 22-3-30.8.4 — states: "Pursue Coordinated Planning Agreements with all municipalities within the County." The proposed change of zone is located within the Town of Keenesburg Coordinated Planning Agreement area. The applicant submitted a signed Notice of Inquiry (NOI) Form dated March 15, 2022. The details of the NOI Form stated the following "Met with applicant and although this property and the plans for development are in alignment with the town's comprehensive planning map for land use, the applicant does not wish to annexation at this time." The 2019 Keenesburg Land Use Plan identifies the area of the subject property as Highway Commercial. Section 22-2-30.C. — states: "Harmonize development with surrounding land uses." The site is located within the three (3) mile referral area of the towns of Hudson and Keenesburg. The Town of Hudson did return referral, dated August 10, 2022 stating they do not favor the request due to unknown traffic counts, fire code and fire suppression, and the proximity to Keenesburg municipal limits. The Town of Keenesburg did not return a referral but the NOI form dated March 15, 2022 as mentioned before states this request is in line with the future goals of the town. The surrounding properties located to the east, west and south contain a residence along with associated farming and/or commercial uses (like vehicle towing, repair and outdoor storage). The small parcel located northwest of the site contains a residence along with buildings for agricultural use, other lands to the north are used for a current cryogenic processing plat. There will be no negative impacts to the surrounding neighborhood's health, safety and welfare. Future commercial uses will have to be approved through a Site Plan Review or Use by Special Review process. Site Plan Review and Use by Special Review applications are sent to referral agencies and surrounding property owner for comments. The Conditions of Approval and Development Standards applied to both this Change of Zone and any future Site Plan Reviews or Use by Special Review permits will adequately address and mitigate potential impacts. Based on the existing uses in the vicinity, a Change of Zone to C-3 (Business Commercial) is compatible with the surrounding land uses. COZ22-0008 Page 2 of 6 Section 22-4-10.B. — "Comprehensive Plan Compatibility: Weld County Opportunity Zones." The proposal is located within a Weld County Opportunity Zone as defined by the Comprehensive Plan Map, adopted in 2020. A Weld County Opportunity Zone is an area designated for potential commercial and industrial opportunity. These areas have the potential to be rezoned too commercial or industrial. The property is located within a Weld County Opportunity Zone due to its proximity to Interstate 76. The property is also located in the Urban and Urban/Annexation Mix Development Classification. The reason for being located in the 0.25 mile annexation ring is due to County Road 18 having been annexed by the Town of Keenesburg. B. Section 23-2-30.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. Any use proposed on the subject site will go through a permitting process, whether this is a Zoning Permit, Site Plan Review or Use by Special Review process. All permitting processes require mitigation methods for properties adjacent to the subject property that are not like to like zoning. These methods/practices are reviewed and enforced by Planning staff to ensure the property owner is compliant. All lands around the subject property are located within the County. The uses specifically consist of ongoing oil and gas activity and a Cryogenic Processing Plant permitted through 1MUSR18-17-0065. Approximately 0.50 miles to the north of the subject property is the future Pioneer Village, which is a planned master community within the Town of Keenesburg. The zoning and uses within the community vary but there are commercial and industrial uses proposed. C. Section 23-2-30.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. Water will be provided by a commercially permitted well, Permit no. 86845-F, with the Division of Water Resources. The Division of Water Resources returned a referral dated July 29, 2022 and outlined well permit no. 86845-F was issued on April 1, 2022 pursuant to §37-90-137(4) C.R.S., and the Findings of the State Engineer to construct a well to withdraw 11.5 acre-feet per year from the Laramie -Fox Hills aquifer. The well permit allows for commercial and light industrial use. Per the Weld County Department of Public Health and Environment, referral dated July 21, 2022, the property is currently vacant and will be served by an on -site wastewater treatment system when development occurs. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. Per the Development Review referral dated July 28, 2022, this portion of County Road 18 is under the jurisdiction of the Town of Keenesburg. The municipality has jurisdiction over access to the road. The applicant shall delineate on the plat the future and existing right-of-way and the physical location of the road. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. Physical roadways may not be centered in the right-of-way. County Road 18 is found to be adequate in functional classification, width and structural capacity to meet the traffic requirements of the proposed zone. County Road 18 is a paved two-lane road. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — If the proposed Change of Zone is located within any Overlay District identified by maps officially adopted by the County, that the applicant has demonstrated compliance with the County regulations concerning Overlay Districts. Compliance may be demonstrated in a previous public hearing or in the hearing concerning the rezoning application. COZ22-0008 Page 3 of 6 The proposed Change of Zone is not located within the within any overlay district officially adopted by the County, including A -P (Airport) Overlay District, 1-25 Overlay District, Municipal Separate Storm Sewer System Area (MS4), Geological Hazard Area, Special Flood Hazard Area, Historic Townsites Overlay District, or Agricultural Heritage Overlay District 2) Section 23-2-30.A.5.b. — That the proposed rezoning will not permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. The proposed Change of Zone does not interfere with the present extraction of mineral resources. The applicant included a Geotechnical Engineering Letter from High Plains Engineering & Consulting, LLC prepared on July 14, 2022. The applicant determined there are no mineral lessees per their mineral research and the Sand and Gravel Map prepared by Colorado Geologic Survey in 1974 and accepted by Weld County does not designate any hard rock minerals on this parcel. 3) Section 23-2-30.A.5.c. — If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site, that such limitations can be overcome and that the limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to the development of the property. The NRCS Soils Survey provided by the applicant indicate the following soils on site: 15 - Colby loam, 47 - Olney fine sandy loam, and 79 - Weld loam. There are no concerns with the soils on site for development. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. THE CHANGE OF ZONE A (AGRICULTURAL) ZONE DISTRICT TO THE C-3 (BUSINESS COMMERCIAL) ZONE DISTRICT IS CONDITIONAL UPON THE FOLLOWING: 1. Prior to recording the plat: A. The plat shall be amended to delineate the following: 1. All pages of the plat shall be labeled COZ22-0008. (Department of Planning Services) 2. The plat shall adhere to Section 23-2-50.C and D. of the Weld County Code. (Department of Planning Services) 3. All recorded easements and rights -of -way shall be shown and dimensioned on the Change of Zone plat by book and page or reception number. (Department of Planning Services) 4. This portion of County Road 18 is under the jurisdiction of the Town of Keenesburg. Please contact the municipality to verify the right-of-way. Show and label the right-of-way. Show the approved access(es) on the site plan and label with the approved access permit number if applicable. (Development Review) 5. Show and label the access point and the permitting information from the Town of Keenesburg. (Development Review) 2. The following notes shall be delineated on the Change of Zone plat: 1. Change of Zone, COZ22-0008, allows for C-3 (Business Commercial) uses which shall comply with the requirements set forth in Chapter 23, Article III, Division 3 of the Weld County Code. (Department of Planning Services) COZ22-0008 Page 4 of 6 2. Any future structures or uses on site may be required to obtain approval through a Site Plan Review or Use by Special Review and the appropriate zoning and building permits. (Department of Planning Services) 3. Water service may be obtained from an appropriately permitted well. (Department of Public Health and Environment) 4. The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be by an on -site wastewater treatment system designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Public Health and Environment) 5. Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. (Department of Public Health and Environment) 6. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) 7. Access on the site shall be maintained to mitigate any impacts to the public road including damages and/or offsite tracking. (Development Review) 8. The historical flow patterns and runoff amounts will be maintained on the site. (Development Review) 9. Building permits may be required, for any new construction or set up manufactured structure, per Section 29-3-10 of the Weld County Code. A building permit application must be completed and submitted. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2018 International Building Codes; 2018 International Energy Code; 2020 National Electrical Code; and Chapter 29 of the Weld County Code. A plan review shall be approved, and a permit must be issued prior to the start of construction. (Department of Building Inspection) 10. Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County -Wide Road Fee Impact Program and the County Facility Fee and Drainage Impact Fee Programs. (Department of Planning Services) 11. Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 12. RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy; (b) the populous counties of the state face a critical shortage of such deposits; and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. Mineral resource locations are widespread throughout the County and people moving into these areas must recognize the various impacts associated with this development. Often times, mineral COZ22-0008 Page 5 of 6 resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 3. Upon completion of Conditions of Approval 1. and 2. above, the applicant shall submit one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. The plat shall be prepared in accordance with the requirements of Section 23-2-50. D. of the Weld County Code. 4. Upon approval of the plat, Condition of Approval 3. above, the applicant shall submit to the Department of Planning Services a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services Staff. The Mylar plat and additional requirements shall be submitted within one - hundred -twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 5. Any approved amendments to the Official Zoning Map shall be effective immediately upon approval by the Board of County Commissioners unless otherwise specified by the approving resolution of the Board of County Commissioners. However, no building permit shall be issued, and no use shall commence on the property until the plat is recorded. 6. If a plat has not been recorded within one hundred twenty (120) days of the date of the approval of the Change of Zone (COZ), or within a date specified by the Board of County Commissioners, the Board may require the landowner to appear before it and present evidence substantiating that the COZ has not been abandoned and that the applicant possesses the willingness and ability to record the plat. The Board of County Commissioners may extend the date for recording the plat. If the Board determines that conditions supporting the original approval of the COZ cannot be met, the Board may, after a public hearing, revoke the COZ. 7. In accordance with Appendix 5-J of the Weld County Code, should the Change of Zone plat not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance fee shall be added for each additional 3 -month period. 8. The property owner shall be allowed one hundred twenty (120) days from the date the change of zone plat is recorded to submit a Site Plan Review application. COZ22-0008 Page 6 of 6 September 14, 2022 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.weldgov.com E-MAIL: mnader@weldgov.com PHONE: (970) 400-400-3527 FAX: (970) 304-6498 TARANTINI EMILY 2912 ARIEL DRIVE LOVELAND, CO 80537 Subject: COZ22-0008 - Change of Zone from the A (Agricultural) Zone District to the C-3 (Business Commercial) Zone District. On parcel(s) of land described as: LOT B REC EXEMPT RECX16-0018; PART W2SE4 SECTION 19, T2N, R64W of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on November 1, 2022 at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on November 30, 2022 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://accela- aca.co.weld.co.us/CitizenAccess Respectfully, Maxwell Nader Planner Hello