HomeMy WebLinkAbout740569.tiff _
RESOLUTION
WHEREAS, heretofore and on May 16, 1973, by Resolution, the
Board of County Commissioners, Weld County, Colorado, did authorize
the execution of a contract and agreement with Livingston Construction
Co. , Fort Collins, Colorado, to construct the Weld County Public
Health Building and to pay therefor from Federal Sharing Revenue Funds,
all pursuant to proper advertisement for bids in accordance with
statutes for said purpose, and
WHEREAS, it has now come to the attention of the Board that said
construction of the aforementioned building is subject to AIA Document
G701 concerning Change Order Nos. 1, 3 and 4, with reference made
to Architect's Project No. 73-1-CCA-0118 concerning complete con-
struction work and reference made to contract date of September 17,
1973, copies attached hereto for ready reference, and
WHEREAS, in order to be in compliance with the Federal Law, the
Board believes it to be in the best interest of the County to incorporate
the aforementioned Change Order Nos. 1, 3 and 4 within the contract
and agreement previously entered into with Livingston Construction Co.
NOW, THEREFORE, BE IT RESOLVED, by the Board of County
Commissioners, Weld County, Colorado, that Change Order Nos. 1,
3 and 4 hereinabove mentioned and made a part hereof by reference,
be and the same hereby are ordered to be made a part of the contract
and agreement heretofore mentioned and entered into between Weld
County and Livingston Construction Co. for the erection of the Weld
County Public Health Building.
The above and foregoing Resolution was, on motion duly made and
seconded, adopted by the following vote on the 30th day of January,
A. D. , 1974.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
)I L�J7? LC k LI .
/ -,_
ATTEST: �� �� -_IL,.(.___ A:Aar-
,� �wG2�Recur
Weld Count�k and Record
Y
C,and�Clerk to the Board
���_ �j�f0�, -� `
, A eD puty Count lerkew
VVV
RO DASTOF •
' ,h
Count Attorney
740569
•
• )
•
CHANGE O�'VNER LY.�Y
ARCHil ECT [XJ
��((""��r'��II''``}}�`: CONTRACTOR L1FIELD
'VRcZ4...� _L`�
AMA DOCUMENT G701 OTHER ACCA
PROJECT: Weld Co. Public Health Building CHANGE ORDER NUMBER: One (1 )
(name, address) 16th Street & Hospital Road
Greeley, Colorado 80631
TO (Contractor)
ARCHITECT'S PROJECT NO: 73-1-CCA-0118
I— Livingston Construction, Inc.
1717 Willox l ox Court CONTRACT FOR: Complete Construction Work
Fort Collins, Colorado 80521
L ___.) CONTRACT DATE: September 17, 1973
You are directed to make the following changes in this Contract:
Provide all labor, materials and equipment necessary to accomplish changes in building
interior as indicated on ten sheets of drawings revised October 5, 1973, forwarded to
your firm on October 17, 1973.
ADD $5,335 00
•
The original Contract Sum was $ 673,700.00
Nei ULtildti . , l.reviou5 chartge Oider5 ;y -U-
The Contract :.um prior to this Change Order w1> $ 673,700.00
The Contract Sum will he (increased) Est ;\s ' ) YI?1;t;;1;-trotilitby this Change Order . . $ 5,335. 00
The new Contract Sum including this Change Order will he $ 679,035. 00
The Contract Time will be ktNe;2SY el) 2;₹)aW:W6::X (unchanged) by ( ._0_ ) Days.
The Date of Completion as of the date of this Change Order therefore is October 1 , 1974
•
CNC/NHPQ, Inc. _ Livingston Construction, Inc. Weld County Commissioners
d i Clubhouse Drive 1 / 17 wi l i ox Court Weld County Courthouse
Address Address Address
Greel e ' Colorado 80531 Fort Collins, Colorado 80521 Greeley, Colorado 80631
BY n • i3Y_ 1 i • wit z. (.r- BY��r. •
/tA I)OC11'.i1N1 (701 • CiI,\N(.1 O!:);k; • .\P1 !I 1'C U I!in R)' • AI\ • :) ]4') • 11IC
ONE PAr;t:
AMER. .AN I\',lour(. UI• AkcI1II(Cf',, 171. NM' 1YlE;l: :1�:i., N'.\, '.\'.\\ItINr;iON,
LiVBNGSm ON ' COrNNS a RUC a ON,
P. GENERAL. CONTRACTORS 1 Phone:Willox @ourl 1 . O. Box I95! - _ fort Co tins, Colorado 8052! 1 hone: 48 -:Sin
November 14, 1973
CNO/mfPQ, Inc.
2021 Clubhouse Drive •
Greeley, Colorado
Re: Weld County Public Health Building
Greeley, Colorado
Gentlemen:
Enclosed herein please find our breakdown for your change order
dated October 5, 1973 . I am very sorry for the delay, but we
have had a difficult time obtaining the necessary information.
Big Thompson Drywall (omit c-vpboard ceiling) deduct $ 1S9.00
Seneca Company (add drapery track Pc drapes) acid 135.0G
Harding Glass (add gloss w glaring) 245.00 .
Academic Specialties (add casework) 649.00
Advanced Acoustics (add acoustical ceiling &brakes) 240.00
Ho]_-0—"et (e d metal frames & sidelights) 390.00
Denver Hardware(add hardware for revised doors) 101.0.
Thermal Services (add mechanical) 1,255.00
Howard Electric (add electrical) 894.00
Livia ston Construction, Inc. (add kitchen equipment,
handrail, wood doors, labor for hollow metal and finish
hardware) 91 n,r{
4,13 9.00
General Contractors Overhead & Profit (15°) 6°.4.00
Tote]. $ 5,335.00
1'1.2'1"r d. ise as sewn as possible, mechanical and electrical
rough—in will be a'ffcrtel'..
Sincerely,
L TLtTi.^__.-, 7 nr,q'mnr7CTI0M, INC.
y1&. 2A
Eraj-it, -'7nn7nr
:
1 .
OWNER
CHANGE ARCHITECT
ORDER CONTRACTOR
FIELD ❑A
A!A DOCUMENT G701 OTHER CC
PROJECT: Weld County Public Health Building CHANGE ORDER NUMBER: Three (3)
(name, address) 16th Street & Hospital Road
Greeley, Colorado 80631
TO (Contractor)
ARCHITECT'S PROJECT NO: 73-1-CCA-0118
rLivingston Construction, Inc.
1717 Willox Court CONTRACT FOR: Complete Construction Work
Fort Collins, Colorado 80521
L _J CONTRACT DATE: September 17, 1973
You are directed to make the following changes in this Contract:
Provide all labor, material , and equipment necessary to:
a. Change the boiler from an American Standard Model G-1010 to an American
Standard Model PFA-509 with a combination gas-oil burner with two 8 GPM
instantaneous heat exchangers for domestic hot water. Include a Powers
Hydroguard for temperature control . Revise boiler room (Room No. 137)
as per attached 8-1/2" x 11" drawing.
b. Change the boiler flue from a 20" diameter, Class "B" , double wall ,
Metlevent, to a 14" diameter, Class "L", Cement asbestos, Van Packer
floor mounted chimney in the same location.
c. Delete Tub Domestic Hot Water Heater, PVI Model 14 NS 85-G.
ADD $3,892 00
•
The original Contract Sum was $ 673,700.00
Net change by previous Change Orders $ 6,835.00
The Contract Sum prior to this Change Order was $ 680,535.00
The Contract Sum will be (increased) (ct%rl(C%MC) tatixturxiat) by this Change Order . . $ 3,892.00
The new Contract Sum including this Change Order will be $ 684,427.00
The Contract Time will be oexxxxdd)XalamtactsXat) (unchanged) by ( -0- ) Days.
The Date of Completion as of the date of this Change Order therefore is October 1 , 1974
CNC/NHPQ, INC. Livingston Construction, Inc. Weld County Commissioners
° TL I ubhouse Drive ff'I"f i1i hx court crel _County Courthouse
Address Address AddressGreeley Colorado 80631 Fort Collins, lorado 80521 Greece , ColorDdo 8Q631
BY • BY BY
DATE /-/4- 7j' DATE / -/7 -7/ DATE
AIA DOCUMENT G701 • CHANGE ORDER • APRIL 1970 EDITION • MA® • rJ 1970 • THE ONE PAGE
AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., .NW,WASHINGTON, D.C. 20006
tTr .A30'if G, rn
cr_Y� n-''''. NS I Ni; UN I T
• .JT DOWN I�., UP -10-0x7-0 0�A, LOLL.
D AIR I I �
1
-- BANK FOR PnE-FIl iERS
_ -4"G +-- OUTSDAMPER l. A AND MEDIUM, EFFICLNCY
FILTERS
I / T - __ - — AccEss DOOR
I/2"�— -'� ACCESS PLE UNUN M-BEL4IL / / PREHOL�F��7ERA&EfED�REF; .
��
r- -_ — __—_—__ - - - - FILTERS
it wild - - i.--7�C___�G___]I C-=-11- _q LINING �'\� 1---j1r---Ir---,,r=--III----i _ ATC PANEL
I III m d1 it! lJI�' 2' DOOR
L_ JIL--JIL _JIL __LI L-__1 _/I I` I /
r - - ----- FLEX ,TYPI CAL
-6,24 INLE II I I Ir
WI ! H I " SPRAY HEADERS l'nJo
LINING---"r I J
C -MINMUM 10'=0" CLEARANCE BELOW
J REFR IGERANI PIPING
V COIL SECTION Ci
TXl
20x22) It
AHU_I \ [ 36
I / ACCESS DOOR IN EXTERIOR
'LOCATE SPRAY WALL FOR FAN SHAFT REMO',A'.
CO-ORDINATE EXACT LOCATIO(
2" 1UMTHS PAREA� — WITH GENERAL CONTRACTOR
FAN SECTION -
r
I n
48x22—t \ / r
� I
x 7-- I-�
--66x18 i
H4x48 \ ' _ /
it
_.:7; E ?
- I •v 84
( _�
l
FLOOR SUPPORTED 121 � 22
VAN PACKER STACK °i_ x
EMERGENCY
DISCONNECT \\\\ I ''�` �\ ,•
,I��• I FOR AHU-I -- ' �
I t7 ':_ i" i 0 WELDED STEEL BOILER
// „r /, i B E ( H I NG WITH 2" THICK
/���� �/�, i//✓/•': v, /iir /�/ �� /� /, T !n IOR SILICATE PACKER
OR 12 ' VAN PACKER
STACK CONTRACTOR'S
OPTION S
%%q /7:'!.i��///,% �j �������%e •,///� �i/i// ' — BOILER, SEE F.O. ^ I
7 /
� I
[- 138 i -TEMPERING VALVE
"7, POWERS HYDROGUARD
RATED FOR 16 GPM
MECHANICAL ROOM - BOILER ROOM PLAN
IN I '_o
LIVINGSTON CONSTRUCTION, INC.
per-GENERAL CONTRACTORS
1717 Willox @ourf P.
. O. Box 1951 - •1 orf Collins, Colorado 80521 Phone:
hone: 484-4344
December 6, 1973
CNC/NHPQ, Inc.
- 2021 Clubhouse Drive
Greeley, Colo.
Attn: Don Fetig
Re: Weld County Public Health Building
Greeley, Colo.
Dear Don:
Enclosed herein please find our breakdown for Field Order No. 1 which includes
Boiler, Boiler Flue and Hot Water Heater changes.
Thermal Services (change boiler, boiler flue and heater) add $3538.00
Livingston Construction, Inc. (Gen. Contr. 0 8 P) 10% 354.00
Total Change $3892.00
It is our understanding that there is not an Electrical change involved, however
we really have no way of checking this out until we receive a submittal or the
boiler itself.
Respectfully submitted,
Livingston Construction, Inc.
itchy gate-4-46g
Mike Ballard, Project Mgr.
a
r+.. OWNER
ARCHITECT'S ARCHITECT
CONSULTANTS ❑'
HELD ORDER CONTRACTOR
FIELD
AIA DOCUMENT G708 OTHER
R ® CCA
PROJECT: Weld County Public Health Building FIELD ORDER NO: One (1 )
(name, address) 16th Street & Hospital Road
Greeley, Colorado 80631 DATE: November 27, 1973
OWNER:
•
TO (Contractor)
I-
Livingston Construction Company ARCHITECT'S PROJECT NO: 73-1-CCA-0118
1717 Willox Court CONTRACT FOR: Complete Construction
Fort Collins, Colorado 80521 Work
L _f CONTRACT DATE: September 17, 1973
You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor
changes in the Work without change in Contract Sum or Contract Time.
If you consider that a change in Contract Sum or Contract Time is required, please submit your itemized proposal to the
Architect immediately and before proceeding with this Work. If your proposal is found to be satisfactory and in proper
order, this Field Order will in that event be superseded by a Change Order.
Description: (Here insert a written description of the interpretation or change)
1. Change the boiler from an American Standard Model G-1010 to an American Standard •
Model PFA-509 with a combination gas-oil burner with two 8 GPM instantaneous
heat exchangers for domestic hot water. Include a Powers Hydroguard for tempera-
ture control.
2. Change the boiler flue from a 20" diameter, Blass "B", double wall , Metlevent,
• to a 14" diameter Class "L" , cement asbestos, Van Packer floor mounted chimney
in the same location.
3. Delete Tub Domestic Hot Water Heater, PVI Model 14 NS 85-G.
Attachments: (Here insert listing of attached documents that support description)
None
•
ARCHITECT: CNC/NHPQ, Inc.
•
BY: #4,a1„.„ACr'7 /r • OY �LlJ��� � f�' �-
AIA DOCUMENT G7110 • ARCHITECT'S FILED ORDER • APRII 1970 EDITION • AIA St • O 1970 ONE PAGE
THE AMERICAN INSTIIU TE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, U.C. 20006
a__«
{ ( 55.
p ti. "lark cf the uoard
CHANGE OWNER NI
ARCHITECT al JA:: 1 _1) ISi4
ORDER CONTRACTOR p
FIELD ❑
AIA DOCUMENT G701 OTHER CCA .--,T,C«RR AND RE.:ORDER
By _ DOpety
PROJECT: Weld County Public Health Bldg. CHANGE ORDER NUMBER: Four (4)
(name, address) 16th Street & Hospital Road
Greeley, Colorado 80631
TO (Contractor)
1- ARCHITECT'S PROJECT NO: 73-1-CCA-0118
Livingston Construction, Inc. CONTRACT FOR: Complete construction work
P. O. Box 1951
Fort Collins, Colorado 30521
L J CONTRACT DATE: September 17, 1973
You are directed to make the following changes in this Contract:
1 . Increase brick allowance from $80.00 per thousand to $86. 52 per thousand.
Total of 122,000 brick required. ADD $502. 64
2. Due to delay in delivery of structural steel , an extension of contract time
of thirty (30) days is granted. NO CHANGE IN CONTRACT COST
•
•
The original Contract Sum ,vas . . $ 673,700.00
Net change by previous Change Orders $ 10,727.00
The Contract Sum prior to this Change Order was $ 684,427. 00 .
The Contract Sum will be (increased) P`daYe'DireiMfik)hit c WW by this Change Order . . $ 502.64 - .
The new Contract Sum including this Change Order will be $ 684,929.64 .
The Contract Time will be (increased) 10aP2riY0'dO(gU'rkly8Qgettf by ( 30 ) Days.
The Date of Completion as of the date of this Change Order therefore is October 31 , 1974 .
CNC/NHPO, INC. Livingston Construction, Inc. Weld Co. Commissioners
1951 x ARCIALIE ubhouse Dri ve 99N It ciav owNE
Weld ZUZ II d County Courthouse
Address Address Address
Greeley, Colorado 80631 Fort Collins,Colorado 80521 Greeler, Colorado 80631
BY_ -- BY ---- BY--) GLL..CLi h'�l( a4i{.F
DATE DATE DATE j _ /O.._! 7.5!
AlA DOCUMENT 6701 • CHANGE ORDER • APRII. 1970 EDITION • MA;' • !® 1970 • THE ONE PAGE
AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW, WASEIING:ON, D.C. 20005
LIVINGSTON CONSTRUCTION, INC.
GENERAL CONTRACTORS
1717 P. (). Box 1951 , - fort Collins, Colorado 80521 Phone: 484-4344
January 2, 1974
Mr. Buzz :tooth
CNC/?IHP^ Inc.
2021 Clubhouse Drive
Greeley, C010T3d0 80631
Re: Weld County Public Health Building
16th St. and Hospital Road
Greeley, Colorado
Dear Mr. Reath:
As you know, we are experiencing great difficulty in the procurement
of the structural steel h=ags for the second floor.
Tri-State Steel Co. placed their order uith the mill September 28th,
1973. Delivery was promised approximately December 15, 1973 . The
delivery time has been set hack and now it is apparent that we will
not receive them prior to January 181 19Th.
An attempt has been made to keep some work underway on the project,
however, this has not been in the best interests of the project.
At this time, we feel the construction time will be delayed 30 days.
In view of the fact that the Specifications state we will be charged
$50.00 per day for Architectural costs after October 1, 19711, we
request an extension of construction time in the amount of 30 days.
Sincerely,
LI;,rrT'GSTO,.C0*ISTRUCTIOAr
�f1 /J I ' r
President
J
n
LIVINGSTON CONSTRUCTION, INC.
.;GENERAL CONTRACTORS
1717 Willox @Durk P. O. Box 1951 • ! fort Collins', Colorado 80521 Phone: 484-4344
January 2, 1974
Mr. Buss Roeth
,.C/ ,,r,,., Inc .
2021 C 1ubhou e Drive
Greeley, Colorado 80631
Re: Weld Cou:t;, 2uh11c Health Cuildinz
Dear fflr. Roeth:
:,e sub:711A the folio iiin information ation for the purpose of 1 reparit :
a chi - order to the brick alto::1nco. Copy of statement fro..,
Ben:Lord's ord{3 ..'.sonny enclosed herewith.
th.
122,000 brick C 84.12 per .: _ 8 502.64
Respectfully subnitted,
LTTrr,TOG7 C0TTST2UCTTC" I: C.
T . Livon -c„
President
?'KL'{d J
•
LIENC:G D'5 MAMMY
3390 Terry Lake Road
Fort Collins, Colorado CCS2I
Telephone 4132-4047
Pee. 26, 1 '73
Livingston Const.
Bo:: 1951
•
• City •
• JOB: _Pl e county libllc 3:-_!'c' • 1
•
Bid brick allowance = $c0.00
plus 3% tax = 2.40
Total brick allow. = sn— 0 per 'Thousand
•
Cost, of brick = SP4.00
pl is 3% tax = 2.52
Total brick cost= £' -►�.32 per thousand
122,000 brick @ SE2.40 - - - $10,052•F50
• 122,000 3rick C - - - 10, 955.44
Difference G C. - - - $ 572.6',
{ St:.tcrn nt
•
1
• 'i
Hello