WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 35, between County Roads 42 and 44,
be temporarily closed, with said closure being effective March 7, 2022, for approximately two (2)
weeks for road construction, and further, that standard official traffic control devices shall be
erected at said closure giving notice of the restrictions.
cc:so(Rs)) D.SP0,+ch CSP 2022-0702
3115/22 EG0024
TEMPORARY ROAD CLOSURES - COUNTY ROADS 35 AND 42
PAGE 2
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that County Road 42, between County Road 35 and
U.S. Highway 85, be temporarily closed, with said closure being effective March 14, 2022, for
approximately two (2) weeks for road construction, and further, that standard official traffic control
devices shall be erected at said closure giving notice of the restrictions.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 2nd day of March, A.D., 2022.
BOARD OF COUNTY COMMISSIONERS
WE COUNTY, COLORADO
ATTEST: j� �;��,
ott K. James, Chair
Weld County Clerk to the Board
Mike Freeman, anPro-Tern
: ' .A
Deputy
BYClerk to the Board
Perry L. Buck
APRUO/ED
Moreno
County A
Lori Saine
Date of signature:
2022-0702
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: February 28, 2022
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
WCR 35 between WCR 42 and WCR 44 is closed from 3/7/2022 thru 3/18/2022 for road construction.
WCR 42 between US Highway 85 and CR 35 is closed from 3/14/2022 thru 3/25/2022 for road construction.
These closures overlap with each other one week. There are 3 maps for them because of the overlap of time.
See attached closure diagrams.
2022-0702
03/ OZ EC --7 ObZ�
www.invarion.com
I•
'a
m }
• W20- iF
-�� PROJECT # HRP-30
1 0-1F •M4-103 m OETOUR
S ROAD CLOSURE DESCRIPTION
1 wp w • L.
i,� M4-10} M4-9 M4-9
W20 -1F R 35 between WCR 42 and WCR 44
closed 3/7/2022 thru 311812022
for road construction
r NOTICE TO PUBLIC
1 r
Road signs and barricaded
i= Message boards to be used
r ETOURROUTE
• M4-9
' anoiaa WCR 42 between WCR 35 and WCR 39 2 miles pavec
AIow wow ♦
`' R•= ---------------------------WCR 39 between WCR 42 and WCR 44 1 mile paved
_ ..__..._____. o
••���"� �.M4-103
-�. ...�....—.— W 20 1 F
Lu 'I'�WCR 44 between WCR 35 and WCR 39 2 miles pavec
p
M4-103M0TES:
1 M4-9
. W20 -1F
4. _______
DT of WCR 35 is: 540/2018
• Detour is paved
W20 -1F
by: Kevin Hettinger
www.invarion.com
PROJECT# HRP-83
ROAD CLOSURE DESCRIPTION
CR 42 between HWY 85 and WCR 35
closed 3/14/2022 thru 312512022
for road construction
OTICE TO PUBLIC
Road signs and barricaded
Message boards to be used
DETOUR ROUTE
HWY 85 between WCR 42 and
CR 44 between HWY 85 and
CR 35 between WCR 44 and
WCR 44 1 mile paved
WCR 35 1 mile paved
WCR 42 1 mile paved
NOTES
DT of WCR 42 is: 454/2020
Prepared by: Kevin Hettinger
12512022
www.invarion.com
a
y
1
,m • y ,n
' C, ""SJi7Jy l 2
p.
[ 3J
U
S
S ,
a
0$14-9
M4-103 1 ® PROJECT # HRP-83 & HRP-35
W20 -1F
c# ® M4-9 M -10 ' Waeu OADCLOSURE DESCRIPTION
W20 -IF ■ ;
M4-103; M4-9 WCR 42 between HWY 85 and WCR 35 AND
W20 -1E M4-103 ; M4-9CR 35 between WCR 42 and WCR 44
M4-9 A
closed 3/14/2022 thru 3/18/2022
s� M4 -j03 for road construction
■ >. NOTICE TO PUBLIC
a
I
a '
W2 iF Road signs and barricaded
1
® �; Message boards to be used
ooh
W
g o ; Fez ..._ _—.#".... .,.... a a s-._ _s = DETOUR ROUTE
�� o --
4: _
ZTH aam Rl1- t HWY 85 between WCR 42 and WCR 44 1 mile paved
ST 1174 w 0 , M4-104 M4-9
ICTH R ■ �., ; ♦ WCR 44 between HWY 85 and WCR 39 3 miles paved
f ' j WCR 39 between WCR 44 and WCR 42 1 mile paved
!H.. /
f' jf W20 -1F IW20-1F { W20 -1F
1 CR 42 between WCR 35 and WCR 39 2 miles paved
MN j , , ,
i
a NOTES:
' 1
DT of WCR 42 is: 45412020
Prepared by: Kevin Hettinger
2/25/2022