Loading...
HomeMy WebLinkAbout20220702.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE OF COUNTY ROAD 35 BETWEEN COUNTY ROADS 42 AND 44 FOR APPROXIMATELY TWO (2) WEEKS; AND COUNTY ROAD 42 BETWEEN COUNTY ROAD 35 AND U.S. HIGHWAY 85 FOR APPROXIMATELY TWO (2) WEEKS, FOR ROAD CONSTRUCTION. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Roads to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 35, between County Roads 42 and 44, be temporarily closed, with said closure being effective March 7, 2022, for approximately two (2) weeks for road construction, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc:so(Rs)) D.SP0,+ch CSP 2022-0702 3115/22 EG0024 TEMPORARY ROAD CLOSURES - COUNTY ROADS 35 AND 42 PAGE 2 BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that County Road 42, between County Road 35 and U.S. Highway 85, be temporarily closed, with said closure being effective March 14, 2022, for approximately two (2) weeks for road construction, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 2nd day of March, A.D., 2022. BOARD OF COUNTY COMMISSIONERS WE COUNTY, COLORADO ATTEST: j� �;��, ott K. James, Chair Weld County Clerk to the Board Mike Freeman, anPro-Tern : ' .A Deputy BYClerk to the Board Perry L. Buck APRUO/ED Moreno County A Lori Saine Date of signature: 2022-0702 EG0024 MEMORANDUM TO: Clerk to the Board DATE: February 28, 2022 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item WCR 35 between WCR 42 and WCR 44 is closed from 3/7/2022 thru 3/18/2022 for road construction. WCR 42 between US Highway 85 and CR 35 is closed from 3/14/2022 thru 3/25/2022 for road construction. These closures overlap with each other one week. There are 3 maps for them because of the overlap of time. See attached closure diagrams. 2022-0702 03/ OZ EC --7 ObZ� www.invarion.com I• 'a m } • W20- iF -�� PROJECT # HRP-30 1 0-1F •M4-103 m OETOUR S ROAD CLOSURE DESCRIPTION 1 wp w • L. i,� M4-10} M4-9 M4-9 W20 -1F R 35 between WCR 42 and WCR 44 closed 3/7/2022 thru 311812022 for road construction r NOTICE TO PUBLIC 1 r Road signs and barricaded i= Message boards to be used r ETOURROUTE • M4-9 ' anoiaa WCR 42 between WCR 35 and WCR 39 2 miles pavec AIow wow ♦ `' R•= ---------------------------WCR 39 between WCR 42 and WCR 44 1 mile paved _ ..__..._____. o ••���"� �.M4-103 -�. ...�....—.— W 20 1 F Lu 'I'�WCR 44 between WCR 35 and WCR 39 2 miles pavec p M4-103M0TES: 1 M4-9 . W20 -1F 4. _______ DT of WCR 35 is: 540/2018 • Detour is paved W20 -1F by: Kevin Hettinger www.invarion.com PROJECT# HRP-83 ROAD CLOSURE DESCRIPTION CR 42 between HWY 85 and WCR 35 closed 3/14/2022 thru 312512022 for road construction OTICE TO PUBLIC Road signs and barricaded Message boards to be used DETOUR ROUTE HWY 85 between WCR 42 and CR 44 between HWY 85 and CR 35 between WCR 44 and WCR 44 1 mile paved WCR 35 1 mile paved WCR 42 1 mile paved NOTES DT of WCR 42 is: 454/2020 Prepared by: Kevin Hettinger 12512022 www.invarion.com a y 1 ,m • y ,n ' C, ""SJi7Jy l 2 p. [ 3J U S S , a 0$14-9 M4-103 1 ® PROJECT # HRP-83 & HRP-35 W20 -1F c# ® M4-9 M -10 ' Waeu OADCLOSURE DESCRIPTION W20 -IF ■ ; M4-103; M4-9 WCR 42 between HWY 85 and WCR 35 AND W20 -1E M4-103 ; M4-9CR 35 between WCR 42 and WCR 44 M4-9 A closed 3/14/2022 thru 3/18/2022 s� M4 -j03 for road construction ■ >. NOTICE TO PUBLIC a I a ' W2 iF Road signs and barricaded 1 ® �; Message boards to be used ooh W g o ; Fez ..._ _—.#".... .,.... a a s-._ _s = DETOUR ROUTE �� o -- 4: _ ZTH aam Rl1- t HWY 85 between WCR 42 and WCR 44 1 mile paved ST 1174 w 0 , M4-104 M4-9 ICTH R ■ �., ; ♦ WCR 44 between HWY 85 and WCR 39 3 miles paved f ' j WCR 39 between WCR 44 and WCR 42 1 mile paved !H.. / f' jf W20 -1F IW20-1F { W20 -1F 1 CR 42 between WCR 35 and WCR 39 2 miles paved MN j , , , i a NOTES: ' 1 DT of WCR 42 is: 45412020 Prepared by: Kevin Hettinger 2/25/2022 Hello