Loading...
HomeMy WebLinkAbout20220559.tiffRESOLUTION RE: APPROVE APPLICATION FOR CONGESTION MITIGATION AND AIR QUALITY (CMAQ) PROJECT GRANT FUNDS FOR COUNTY ROAD 41 AND STATE HIGHWAY 52 TURN LANE AND AUTHORIZE ELECTRONIC SUBMITTAL - UPPER FRONT RANGE TRANSPORTATION PLANNING REGION (UFRTPR) WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Application for Congestion Mitigation Air Quality (CMAQ) Project Grant Funds for the County Road 41 and State Highway 52 Turn Lanes from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and on behalf of Larimer County, to the Upper Front Range Transportation Planning Region (UFRTPR), with further terms and conditions being as stated in said application, and WHEREAS, after review, the Board deems it advisable to approve said application, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Application for Congestion Mitigation Air Quality (CMAQ) Project Grant Funds for the County Road 41 and State Highway 52 Turn Lanes from the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Public Works, and on behalf of Larimer County, to the Upper Front Range Transportation Planning Region (UFRTPR), be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that Evan Pinkham, Department of Public Works, be, and hereby is, authorized to electronically submit said application. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 16th day of February, A.D., 2022. BOARD OF COUNTY COMMISSIONERS WEL OUN COLORADO ATTEST: C/J ; Sco K. James, Chair ccPw(R1c11P) f CT(cPIcD) 2022-0559 EG0080 O2/2$/22. Cov*aCt 1M5511 551 I BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: 2021 UFR TPR CMAQ FY22 - WCR 41 and SH 52 Auxiliary Lanes DEPARTMENT: Public Works DATE: 11/18/2021 PERSON REQUESTING: Evan Pinkham Brief description of the problem/issue: Public Works is requesting to submit an application through the Upper Front Range Transportation Planning Region applying for Congestion Mitigation and Air Quality (CMAQ) funding for intersection improvements at WCR 41 and SH 52. The improvements would include turn lanes on WCR 41 at the intersection. The available CMAQ funding is $953,445. Weld County's local match for CMAQ funding is $198,198. The total project cost is $2,504,053. In advance of the auxiliary lane project, COOT intends to install a traffic signal at this location next year to compliment this proposed project. What options exist for the Board? (include consequences, impacts, costs, etc. of options): 1. Submit the CMAQ grant application to the UFR Regional Planning Commission (RPC) for approval. 2. Don't submit an application for CMAQ funding. Recommendation: Public Works recommends presenting this application to the UFR RPC at the December meeting. Aoorove Recommendation Perry L. Buck Mike Freeman Scott K. James, Pro -tern Steve Moreno, Chair Lori Saine Schedule Work Session Other/Comments:, 2022-0559 OZ/1(s 6C-10U�O FY22 UFR CMAQ Project Application Applicant`'information Project Sponsor Sponsor Contact Phone Email Weld County Evan Pinkham 970-400-3727 epinkham�weldgov.com Mailing Address City State Zip Code P.O. Box 758 Greeley CO 80632 Additional Project Sponsors (if applicable) Project Description Project Title County Municipality WCR 41 @ SH 52 Turn Lanes Weld n/a Project Location /Limits (mileposts, intersection roadways, etc.) On Weld County Road 41 at State Highway 52 Project Description The proposed intersection improvements include left turn lanes on the north and south sides of WCR 41 at the intersection of SH 52. This improvement will occur after CDOT installs a traffic signal at the intersection. How will the project reduce emissions? Emissions will be reduced by reducing the number of idling vehicles at the intersection. Traffic flow improvements will help to reduce emissions and improve safety at the intersection. Is there another project or phase that needs to be completed before this project can be implemented? Please explain. CDOT will be installing a traffic signal at SH 52 in 2022. The proposed turn lanes will be constructed after the signal is installed. Eligibility'- Project Examples (check all that apply) n/a n/a Diesel engine retrofit Alternative fuels - replacement vehicle Alternative fuels - refueling station Idle reduction program Freight / intermodal Transit improvement / expansion Travel demand management Carpool / vanpool / carshare Multi -modal traveler information Bicycle / pedestrian facility Traffic signal (new) Traffic signal coordination / progression Congestion reduction / bottleneck removal HOV lane Public education / outreach Transportation management association Park and Ride lot Other! innovative project X Funding $953,445.00 = Requested CMAQ funding Source of localfunds $198,198.00 = Local Match (17.21% required) Weld County $1,352,410.00 = Local Overmatch (> 17.21%) Date localfunds are available $2,504,053.00 = Total Cost 2024 Hello