Loading...
HomeMy WebLinkAbout20194487.tiffCoYrIvcxC4' I1 Olo 1S61� FACILITIES DEPARTMENT PHONE: (970) 400-2020 III FAX: (970) 304-6532 C 1---. WEBSITE: www.co.weld.co.us1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 February 28, 2022 To: Board of County Commissioners From: Toby Taylor Subject: Weld County Building -1400 Additional Design - Task Order (2019-2250) Cairn Design, LLC was awarded the bid to design the Centennial Courtroom remodel and subsequent on - call design work. Building 1400 was remodeled in two phases. After construction of the second phase, it was discovered that neither construction design/phase addressed changes for establishing proper heating, ventilation, and air conditioning in the lactation/storage room. In addition, the front doors need to be replaced to comply with egress standards. Cairn Design has provided a quote for this additional design work at $5,500.00 using the fees identified in their bid. Therefore, the Facilities Department is recommending approving this task order in amount of $5,500.00 If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director SO19—L4L 1'7 (ego o a l p3/0� 1 as �6 -- TASK ORDER 1-2022 PURSUANT TO AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC Date: February 14, 2022 Project Title: Weld County Building 1400 — Architectural, Engineering & Plumbing Additional Services Completion Date: April 30, 2022 Compensation: $5,500.00 Original Agreement: Weld County document no. 2019-2250 Pursuant to the "Original Agreement", the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as -needed basis. Any such Task Order shall be signed by the Weld County Facilities Director before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year, unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, mechanical, electrical and plumbing design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests. The additional services scope includes: • Update floor plans for as -built conditions. • Provide heating coil to existing VAV serving the Lactation / Storage Rooms. • Rebalance the flow of the hydronic system. • Specify replacement hardware for the doors at the front of the building. Contractor agrees to perform the services identified above and on the attached Exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. The amount of the contract is adjusted as follows: $ 58,160.00 Original Contract Amount $ 347,057.50 Previously Approved Task order(s) Amount Page 1of2 TASK ORDER 1-2022 PURSUANT TO AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN, LLC $ 5,500.00 Current Task Order Amount $ 352,557.50 New Contact Total CONTRACTOR: By: Name: Kenneth Caudle Title: Engineering Manager ATTEST: Web Date 2/28/2022 BOARD OF COUNTY COMMISSIONERS WELD COUNTY, COLORADO c K. James, Chair MAR 0 9 Z922 Page 2 of 2 Exhibit A: Task Order 1-2022 CAIRN DESIGN, LIC February 14, 2022 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Building 1400 - Architectural and Engineering Additional Services Our lump sum price for this work for the project is $5,500.00. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, mechanical, electrical and plumbing design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests. The additional services scope includes: • Update floor plans for as -built conditions. • Provide heating coil to existing VAV serving the Lactation / Storage Rooms. • Rebalance the flow of the hydronic system. • Specify replacement hardware for the doors at the front of the building. Compensation: Total Design Fee - $5,500.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Sincerely, Ken Caudle, PE Engineering Principal 1805 Sheely Drive Fort Collins, Colorado 80526 19101286-1968 New Contract Request Entity Information Entity Name* Entity 113* CAIRN DESIGN LLC p00039527 Contract Name* ARCHITECTURAL SERVICES (2019-2250) Contract Status CTB REVIEW Contract Description * TASK ORDER 1-2022 Contract Description 2 ❑ New Entity? Contract ID 5606 Contract Lead * SGEESAMAN Contract lead Email sg eesarraan@co.weld.co. u s Parent Contract ID Requires Board Approval YES Department Project # Contract Type* Department Requested BOCC Agenda Due Date TASK ORDER BUILDINGS AND GROUNDS Date* 02/24/2022 02128.2022 Amountt Department Email $58500.00 CM- Will a work session with ItOCC be required?* BuiIdingGrourids'weIdgov.c NO Renewable* orn NO Does Contract require Purchasing Dept. to be included? Department Head EmailAmfloma YES tic Renewal CM-BuildingGrounds- DeptHeadAweldgev.com RidJRFP#* Grant 81900100 County Attorney GENERAL COUNTY EGA ATTORNEY EMAIL County Attorney Email CM- COUNTYA1TORNEY@WELDG OV.COM If this is a renewal enter previous Contract ID If this is part of a MSA enter MSA Contract ID Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in OnEase Contract Dates Effective Date Review Date * Renewal Date 05102;2022 Termination Notice Perioxl Committed Delivery Date Expiration Date$ 05/'02?2022 Contact Information Contact Info Contact Name Contact Type Contact Entail Contact Phone I Contact Phone 2 Purchasin Purchasing Approver Purchasing Approved mate ROB TURF 0310712022 Approval Process Department Head Finance Approver TORY TAYLOR CHRIS d'OVIDIO DH Approved Date Finance Approved Date 03;02,/2022 03/0212022 Final Approval BDCC Approved Tyler Ref # AG 030922 ROCC Signed Date BOCC Agenda Date 03/09;/2022 Originator SGEESAMAN Legal Counsel KARIN MCDOUGAL Legal Counsel Approved Date 03/07/2022 DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 400-2023 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 November 12, 2020 To: Board of County Commissioners From: Toby Taylor Subject: Treasurer Remodel Design Scope Change Carin Design LLC was awarded the design services for the Treasurer Office Remodel (2019-4487). During design, it was realized the following items needed to be included but were not part of the original design quote/scope: 1. Replace the existing split system AC for the telephone room which requires additional electrical and mechanical design. 2. Renovate the lobby, entrance doors, public restrooms which require additional architectural, mechanical, electrical and plumbing design. 3. Add a floor sink in a new janitor closet and icemaker plumbing which requires additional architectural and plumbing design. The costs associated with this change order follows the rate schedule provided in the bid for additional work. Therefore, Buildings & Grounds is recommending this change order for $3,545.00 If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director �nstn+AJ ll/ICn(SO 6GoodI / i//G/y° BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: Treasurer Remodel - Change Order Design Services DEPARTMENT: Buildings & Grounds PERSON REQUESTING: Toby Taylor Brief description of the problem/issue: DATE: 11-6-2020 Carin Design LLC was awarded the design services for the Treasurer Office Remodel (20194487). During design, it was realized the following items needed to be included but were not part of the original design quote/scope: 1. Replace the existing split system AC for the telephone room which requires additional electrical and mechanical design. 2. Renovate the lobby, entrance doors, public restrooms which require additional architectural, mechanical, electrical and plumbing design. 3. Add a floor sink in a new janitor closet and icemaker plumbing which requires additional architectural and plumbing design. The costs associated with this change order follows the rate schedule provided in the bid for additional work. Therefore, the total of this change order is $3,545.00 What options exist for the Board? (include consequences, impacts, costs, etc. of options): Approve the change order. Disapprove change order. Recommendation: Place change orders on an upcoming agenda so official approval can be done at a public meeting Approve Schedule Recommendation Work Session Other/Comments: Mike Freeman, Chair Scott K. James Barbara Kirkmeyer Steve Moreno, Pro -Tern _ Kevin D. Ross G �* PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Date: November 4, 2020 Task Order Number: Cairn Design LLC — 5-2020 Project Title: Weld County Treasurer Office - Additional Architectural Design Services Completion Date: Design Compensation: S3.545.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, mechanical, electrical and plumbing design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests. The additional services scope includes: • Replacement of the existing split system A/C for the telephone room not in the original scope of work (Electrical and Mechanical). • Renovation of Lobby, Entrances, Public Toilets and Employee Toilets not in original scope of work (Arch and MEP). • Addition of floor sink and plumbing for ice maker. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. CONTRACTOR: Cairn Design LLC By: Name: Kenneth Caudle Title: Engineering Manager Date 11/4/20 PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Weld M tithe and WELD COUNTY, COLORADO eputy Cl to a Bo r Steve Moreno, B0CC Pro -Tern NOV 1 6 2020 APPROVED AS TO FUNDING: APPROVED T SUBSTANCE: Controller 4 tOfficial or Department Head APPOOVED AS TO FORM: ,,& fJ 1861 County Attorney E Exhibit: Task Order 5-2020 CAIRN DESIGN, LLC eeJtk.9k oVn ct &u W.9 &u&ch& October 26, 2020 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Building 1400 - Architectural and Engineering Additional Services In accordance with the fees identified in our bid, our lump sum price for this on call work for this project is $3,545.00. The hourly breakdown is attached. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, mechanical, electrical and plumbing design for the project. This proposal is for additional items above and beyond the original scope of work due to owner requests. The additional services scope includes: • Replacement of the existing split system A/C for the telephone room not in the original scope of work (Electrical and Mechanical). • Renovation of Lobby, Entrances, Public Toilets and Employee Toilets not in original scope of work (Arch and MEP). • Addition of floor sink and plumbing for ice maker. Compensation: Total Design Fee - $3,545.00 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Sincerely, Ken Caudle, PE Engineering Principal 1805 Shealy Drive Fort Collins, Colorado 80526 (9101286-1968 Building 1400 Add Services Total hours Principal PM Arch/Eng Drafter 2 2 Replacement of split system A/C not in original area of work (Electrical and Mechanical) 6.5 0.5 2 4 Addition of floor sink and plumbing for ice maker. 3.5 0.5 1 2 Renovation of Lobby, Entrances, Public Toilets and Employee Toilets not in original scope of work (Arch and MEP) 20 2 6 12 32 2 3 9 18 hours $175.00 $150.00 $125.00 $90.00 rates $350.00 $450.00 $1,125.00 $1,620.00 $3,545.00 total fee DEPARTMENT OF BUILDINGS AND GROUNDS PHONE: (970) 304-6531 FAX: (970) 304-6532 WEBSITE: www.co.weld.co.us 1105 H STREET P.O. BOX 758 GREELEY, COLORADO 80632 October 10, 2019 To: Board of County Commissioners From: Toby Taylor Subject: 1400 Design Services — Task Order Weld County awarded on -call design services to four different vendors. There is a need for design services for remodeling the east wing of Building 1400 to accommodate the Treasurer growth of adding the Public Trustee, Assessor Meeting rooms and break room changes. Cairn Design has used the labor rates identified in their bid and quoted a lump sum of $36,845.00 to perform this design work. An amendment to the contract to accomplish this work requires BOCC approval. Therefore, Buildings & Grounds is recommending approving this task order. If you have any questions, please contact me at extension 2023. Sincerely, Toby Taylor Director 2019-4487 C: to / I g &,0011 BOARD OF COUNTY COMMISSIONERS PASS -AROUND REVIEW PASS -AROUND TITLE: Building 1400 Design Services - Treasurer Wing DEPARTMENT: B&G PERSON REQUESTING: Toby Taylor Brief description of the problem/issue: DATE: 9-20-2019 Weld County awarded on -call design services to four different vendors. There is a need for design services for remodeling the east wing of Building 1400 to accommodate the Treasurer growth of adding the Public Trustee, Assessor Meeting rooms and break room changes. Cairn Design has used the labor rates identified in their bid and quoted a lump sum of $36,840.00 to perform this design work. An amendment to the contract to accomplish this work requires BOCC approval. What options exist for the Board? (include consequences, impacts, costs, etc. of options): 1. Approve the design work. 2. Disapprove the design work. Recommendation: Approve design work at rates quoted in original RFP that was awarded. The new scope of work will be added to the agenda for approval. Sean P. Conway Mike Freeman, Pro -Tern Scott K. James Barbara Kirkmeyer, Chair Steve Moreno Approve Schedule Recommendation Work Session Other/Comments: V _ PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC Date: October 10, 2019 Task Order Number: Cairn Design LLC — 3-2019 Project Title: Weld County BuildinK1400- Architectural and Engineering Design Commencement Date: Completion Date: Design Compensation: $36,845.00 Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional Task Order Work. In addition to that work described in section 2.1, the Parties may agree to additional work to be provided by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated between the Parties on an as needed basis. Any such Task Order shall be signed by the Weld County Director of Buildings and Grounds before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in any calendar year unless first approved by the Board of County Commissioners. Any appropriately executed Task Order shall be automatically incorporated herein and enforceable. Scope of Task Order: The project will involve full architectural and engineering design and construction administration of the Weld County Building 1400 located at 1400 N. 17th Ave. in Greeley, CO. to include: 1. Architectural, mechanical, electrical and plumbing design for the project. The building is approximately 15,000 square ft. 2. Complete architectural and engineering redesign of the existing Treasurer's and Elections office areas, redesign of the existing west breakroom and mail room area, design of a new reception area for the Assessors and conversion of the east break room into a conference room (approximately 7,100 square feet). 3. HVAC design for three new offices and one conference room being provided in the Assessors area under a separate contract. Complete HVAC as -built drawings, evaluation and building -wide balancing. Contractor agrees to perform the services identified above and on the attached exhibit in accordance with the terms and conditions contained herein and in the Original Agreement between the parties. ,to /%44F? PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CAIRN DESIGN LLC CONTRACTOR: Cairn Design LLC By: V ► Date 10/10/2019 Name: Kenneth Caudle Title: Engineering Manager APPROVED AS TO FORM: its J County ttomey 22.O/9- d7t17hY7 CAIRN DESIGN, LLC ee4t September 26, 2019 Toby Taylor Weld County Department of Buildings & Grounds Weld County Veterans Services 1105 H Street Greeley, CO 80632 RE: Weld County Building 1400 - Architectural and Engineering Services In accordance with the fees identified in our bid, our lump sum price for this on call work for this project is $36,845.00. The hourly breakdown is attached. Scope of Work: The project will involve full architectural and engineering design and construction administration of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural and engineering design under this agreement including: Architectural, mechanical, electrical and plumbing design for the project. The building is approximately 15,000 square ft. The scope of work will include complete architectural and engineering redesign of the existing Treasurer's and Elections office areas, redesign of the existing west breakroom and mail room area, design of a new reception area for the Assessors and conversion of the east break room into a conference room (approximately 7,100 square feet). HVAC design for three new offices and one conference room being provided in the Assessors area under a separate contract. Complete HVAC as -built drawings, evaluation and building -wide balancing. The remodel scope includes: • Complete demolition and redesign combining the existing Treasurer and Election areas into one large area for the Treasurer with a new vestibule/reception, conference rooms and a mix of offices and systems furniture. • Selective demolition of interior drywall partitions to combine the west break room, corridor and mail room into one large break room. • Selective demolition of the east break room to conversion to a conference room. • Selective demolition of an existing conference area to conversion to a reception area for the Assessor's office. Scope of Services: The scope of services included in this proposal are limited to the following: • Field verification of existing dimensions and systems as they relate to the project. • Coordination with the client as required to execute the scope of work. 18115 Shealy Drive Fort Collins, Colorado 80526 19101286-1968 • Coordination with the building department as required for the permit. • Submissions: Schematic Design, Design Development, Final Design,and For Construction. • Construction administration to include construction project meetings, RFls, submittal and shop drawing review and approval, and final construction walk-through and punch list. Compensation: Total Design Fee - $36,845.00 Invoicing will occur at the following submissions: Schematic Design - $11,053.50 Design Development - $11,053.50 Issued for Construction - $11,053.50 Final Construction (after acceptance of project by Weld County)- $3,684.50 Changes in scope, additional trips to the site, or added services would be billed hourly identified in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service. Reimbursable expenses, +/- $600 (mileage and printing services) invoiced at cost + 10%. Exclusions: • Design of any system not listed above, including, but not limited to telecommunications design beyond conduit and boxes. • Design changes, layout changes, or value engineering requested by client or owner after the final submission. Sincerely, Ken Caudle, PE Engineering Principal Approved and Accepted By: OCT 1 4 2019 ature Date Barbara Kirkmeyer BOCC Chair Name Title Ad/9 41Lg7 Hello