February 28, 2022
To: Board of County Commissioners
From: Toby Taylor
Subject: Weld County Building -1400 Additional Design - Task Order (2019-2250)
Cairn Design, LLC was awarded the bid to design the Centennial Courtroom remodel and subsequent on -
call design work.
Building 1400 was remodeled in two phases. After construction of the second phase, it was discovered
that neither construction design/phase addressed changes for establishing proper heating, ventilation,
and air conditioning in the lactation/storage room. In addition, the front doors need to be replaced to
comply with egress standards.
Cairn Design has provided a quote for this additional design work at $5,500.00 using the fees identified in
their bid. Therefore, the Facilities Department is recommending approving this task order in amount of
$5,500.00
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
SO19—L4L 1'7
(ego o a l
p3/0� 1 as
�6 -- TASK ORDER 1-2022 PURSUANT TO AGREEMENT BETWEEN
WELD COUNTY AND CAIRN DESIGN, LLC
Date: February 14, 2022
Project Title: Weld County Building 1400 — Architectural, Engineering & Plumbing
Additional Services
Completion Date: April 30, 2022
Compensation: $5,500.00
Original Agreement: Weld County document no. 2019-2250
Pursuant to the "Original Agreement", the Parties may agree to additional work to be provided
by Contractor pursuant to an appropriately executed Task Order, which shall be negotiated
between the Parties on an as -needed basis. Any such Task Order shall be signed by the Weld
County Facilities Director before it shall be effective. In no event shall the total of all Task Orders
exceed $25,000 in any calendar year, unless first approved by the Board of County
Commissioners. Any appropriately executed Task Order shall be automatically incorporated
herein and enforceable.
Scope of Task Order:
The project will involve full architectural and engineering design and construction
administration of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide
architectural and engineering design under this agreement including:
Architectural, mechanical, electrical and plumbing design for the project. This proposal is
for additional items above and beyond the original scope of work due to owner requests.
The additional services scope includes:
• Update floor plans for as -built conditions.
• Provide heating coil to existing VAV serving the Lactation / Storage Rooms.
• Rebalance the flow of the hydronic system.
• Specify replacement hardware for the doors at the front of the building.
Contractor agrees to perform the services identified above and on the attached Exhibit in
accordance with the terms and conditions contained herein and in the Original Agreement
between the parties.
The amount of the contract is adjusted as follows:
$ 58,160.00 Original Contract Amount
$ 347,057.50 Previously Approved Task order(s) Amount
Page 1of2
TASK ORDER 1-2022 PURSUANT TO AGREEMENT BETWEEN
WELD COUNTY AND CAIRN DESIGN, LLC
$ 5,500.00 Current Task Order Amount
$ 352,557.50 New Contact Total
CONTRACTOR:
By:
Name: Kenneth Caudle
Title: Engineering Manager
ATTEST:
Web
Date 2/28/2022
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
c K. James, Chair MAR 0 9 Z922
Page 2 of 2
Exhibit A: Task Order 1-2022
CAIRN DESIGN, LIC
February 14, 2022
Toby Taylor
Weld County Department of Buildings & Grounds
Weld County Veterans Services
1105 H Street
Greeley, CO 80632
RE: Weld County Building 1400 - Architectural and Engineering Additional Services
Our lump sum price for this work for the project is $5,500.00.
Scope of Work:
The project will involve full architectural and engineering design and construction administration
of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural
and engineering design under this agreement including:
Architectural, mechanical, electrical and plumbing design for the project. This proposal is for
additional items above and beyond the original scope of work due to owner requests. The
additional services scope includes:
• Update floor plans for as -built conditions.
• Provide heating coil to existing VAV serving the Lactation / Storage Rooms.
• Rebalance the flow of the hydronic system.
• Specify replacement hardware for the doors at the front of the building.
Compensation:
Total Design Fee - $5,500.00
Changes in scope, additional trips to the site, or added services would be billed hourly identified
in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service.
Sincerely,
Ken Caudle, PE
Engineering Principal
1805 Sheely Drive Fort Collins, Colorado 80526 19101286-1968
New Contract Request
Entity Information
Entity Name* Entity 113*
CAIRN DESIGN LLC p00039527
Contract Name*
ARCHITECTURAL SERVICES (2019-2250)
Contract Status
CTB REVIEW
Contract Description *
TASK ORDER 1-2022
Contract Description 2
❑ New Entity?
Contract ID
5606
Contract Lead *
SGEESAMAN
Contract lead Email
sg eesarraan@co.weld.co. u s
Parent Contract ID
Requires Board Approval
YES
Department Project #
Contract Type*
Department
Requested BOCC Agenda Due Date
TASK ORDER
BUILDINGS AND GROUNDS
Date* 02/24/2022
02128.2022
Amountt
Department Email
$58500.00
CM-
Will a work session with ItOCC be required?*
BuiIdingGrourids'weIdgov.c
NO
Renewable*
orn
NO
Does Contract require Purchasing Dept. to be included?
Department Head EmailAmfloma
YES
tic Renewal
CM-BuildingGrounds-
DeptHeadAweldgev.com
RidJRFP#*
Grant
81900100
County Attorney
GENERAL COUNTY
EGA
ATTORNEY EMAIL
County Attorney Email
CM-
COUNTYA1TORNEY@WELDG
OV.COM
If this is a renewal enter
previous Contract ID
If this is part of a MSA enter MSA Contract ID
Note: the Previous Contract
Number and Master Services Agreement
Number should be left blank if those contracts are not in
OnEase
Contract Dates
Effective Date
Review Date *
Renewal Date
05102;2022
Termination Notice Perioxl Committed Delivery Date Expiration Date$
05/'02?2022
Contact Information
Contact Info
Contact Name Contact Type Contact Entail Contact Phone I Contact Phone 2
Purchasin
Purchasing Approver Purchasing Approved mate
ROB TURF 0310712022
Approval Process
Department Head
Finance Approver
TORY TAYLOR
CHRIS d'OVIDIO
DH Approved Date
Finance Approved Date
03;02,/2022
03/0212022
Final Approval
BDCC Approved
Tyler Ref #
AG 030922
ROCC Signed Date
BOCC Agenda Date
03/09;/2022
Originator
SGEESAMAN
Legal Counsel
KARIN MCDOUGAL
Legal Counsel Approved Date
03/07/2022
DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 400-2023
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
November 12, 2020
To: Board of County Commissioners
From: Toby Taylor
Subject: Treasurer Remodel Design Scope Change
Carin Design LLC was awarded the design services for the Treasurer Office Remodel (2019-4487). During
design, it was realized the following items needed to be included but were not part of the original design
quote/scope:
1. Replace the existing split system AC for the telephone room which requires additional electrical
and mechanical design.
2. Renovate the lobby, entrance doors, public restrooms which require additional architectural,
mechanical, electrical and plumbing design.
3. Add a floor sink in a new janitor closet and icemaker plumbing which requires additional
architectural and plumbing design.
The costs associated with this change order follows the rate schedule provided in the bid for additional
work. Therefore, Buildings & Grounds is recommending this change order for $3,545.00
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
�nstn+AJ
ll/ICn(SO
6GoodI
/ i//G/y°
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: Treasurer Remodel - Change Order Design Services
DEPARTMENT: Buildings & Grounds
PERSON REQUESTING: Toby Taylor
Brief description of the problem/issue:
DATE: 11-6-2020
Carin Design LLC was awarded the design services for the Treasurer Office Remodel (20194487).
During design, it was realized the following items needed to be included but were not part of the original
design quote/scope:
1. Replace the existing split system AC for the telephone room which requires additional electrical and
mechanical design.
2. Renovate the lobby, entrance doors, public restrooms which require additional architectural,
mechanical, electrical and plumbing design.
3. Add a floor sink in a new janitor closet and icemaker plumbing which requires additional
architectural and plumbing design.
The costs associated with this change order follows the rate schedule provided in the bid for additional work.
Therefore, the total of this change order is $3,545.00
What options exist for the Board? (include consequences, impacts, costs, etc. of options):
Approve the change order.
Disapprove change order.
Recommendation:
Place change orders on an upcoming agenda so official approval can be done at a public meeting
Approve Schedule
Recommendation Work Session Other/Comments:
Mike Freeman, Chair
Scott K. James
Barbara Kirkmeyer
Steve Moreno, Pro -Tern _
Kevin D. Ross G �*
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CAIRN DESIGN LLC
Date: November 4, 2020
Task Order Number: Cairn Design LLC — 5-2020
Project Title: Weld County Treasurer Office - Additional Architectural Design Services
Completion Date:
Design Compensation: S3.545.00
Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional
Task Order Work. In addition to that work described in section 2.1, the Parties may agree
to additional work to be provided by Contractor pursuant to an appropriately executed
Task Order, which shall be negotiated between the Parties on an as needed basis. Any
such Task Order shall be signed by the Weld County Director of Buildings and Grounds
before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in
any calendar year unless first approved by the Board of County Commissioners. Any
appropriately executed Task Order shall be automatically incorporated herein and
enforceable.
Scope of Task Order:
The project will involve full architectural and engineering design and construction administration
of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural
and engineering design under this agreement including:
Architectural, mechanical, electrical and plumbing design for the project. This proposal is for
additional items above and beyond the original scope of work due to owner requests. The
additional services scope includes:
• Replacement of the existing split system A/C for the telephone room not in the original
scope of work (Electrical and Mechanical).
• Renovation of Lobby, Entrances, Public Toilets and Employee Toilets not in original
scope of work (Arch and MEP).
• Addition of floor sink and plumbing for ice maker.
Contractor agrees to perform the services identified above and on the attached exhibit in
accordance with the terms and conditions contained herein and in the Original Agreement
between the parties.
CONTRACTOR:
Cairn Design LLC
By:
Name: Kenneth Caudle
Title: Engineering Manager
Date 11/4/20
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CAIRN DESIGN LLC
Weld M tithe and WELD COUNTY, COLORADO
eputy Cl to a Bo r Steve Moreno, B0CC Pro -Tern NOV 1 6 2020
APPROVED AS TO FUNDING: APPROVED T SUBSTANCE:
Controller 4 tOfficial or Department Head
APPOOVED AS TO FORM:
,,& fJ 1861
County Attorney E
Exhibit: Task Order 5-2020
CAIRN DESIGN, LLC
eeJtk.9k oVn ct &u W.9 &u&ch&
October 26, 2020
Toby Taylor
Weld County Department of Buildings & Grounds
Weld County Veterans Services
1105 H Street
Greeley, CO 80632
RE: Weld County Building 1400 - Architectural and Engineering Additional Services
In accordance with the fees identified in our bid, our lump sum price for this on call work for this
project is $3,545.00. The hourly breakdown is attached.
Scope of Work:
The project will involve full architectural and engineering design and construction administration
of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural
and engineering design under this agreement including:
Architectural, mechanical, electrical and plumbing design for the project. This proposal is for
additional items above and beyond the original scope of work due to owner requests. The
additional services scope includes:
• Replacement of the existing split system A/C for the telephone room not in the original
scope of work (Electrical and Mechanical).
• Renovation of Lobby, Entrances, Public Toilets and Employee Toilets not in original
scope of work (Arch and MEP).
• Addition of floor sink and plumbing for ice maker.
Compensation:
Total Design Fee - $3,545.00
Changes in scope, additional trips to the site, or added services would be billed hourly identified
in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service.
Sincerely,
Ken Caudle, PE
Engineering Principal
1805 Shealy Drive Fort Collins, Colorado 80526 (9101286-1968
Building 1400
Add Services
Total hours
Principal
PM
Arch/Eng
Drafter
2
2
Replacement of split system
A/C not in original area of work
(Electrical and Mechanical)
6.5
0.5
2
4
Addition of floor sink and
plumbing for ice maker.
3.5
0.5
1
2
Renovation of Lobby,
Entrances, Public Toilets and
Employee Toilets not in original
scope of work (Arch and MEP)
20
2
6
12
32
2
3
9
18
hours
$175.00
$150.00
$125.00
$90.00
rates
$350.00
$450.00
$1,125.00
$1,620.00
$3,545.00
total fee
DEPARTMENT OF BUILDINGS AND GROUNDS
PHONE: (970) 304-6531
FAX: (970) 304-6532
WEBSITE: www.co.weld.co.us
1105 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
October 10, 2019
To: Board of County Commissioners
From: Toby Taylor
Subject: 1400 Design Services — Task Order
Weld County awarded on -call design services to four different vendors. There is a need for design services
for remodeling the east wing of Building 1400 to accommodate the Treasurer growth of adding the Public
Trustee, Assessor Meeting rooms and break room changes. Cairn Design has used the labor rates
identified in their bid and quoted a lump sum of $36,845.00 to perform this design work. An amendment
to the contract to accomplish this work requires BOCC approval.
Therefore, Buildings & Grounds is recommending approving this task order.
If you have any questions, please contact me at extension 2023.
Sincerely,
Toby Taylor
Director
2019-4487
C:
to
/ I g &,0011
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: Building 1400 Design Services - Treasurer Wing
DEPARTMENT: B&G
PERSON REQUESTING: Toby Taylor
Brief description of the problem/issue:
DATE: 9-20-2019
Weld County awarded on -call design services to four different vendors. There is a need for design services for
remodeling the east wing of Building 1400 to accommodate the Treasurer growth of adding the Public Trustee, Assessor
Meeting rooms and break room changes. Cairn Design has used the labor rates identified in their bid and quoted a lump
sum of $36,840.00 to perform this design work. An amendment to the contract to accomplish this work requires BOCC
approval.
What options exist for the Board? (include consequences, impacts, costs, etc. of options):
1. Approve the design work.
2. Disapprove the design work.
Recommendation:
Approve design work at rates quoted in original RFP that was awarded. The new scope of work will be added
to the agenda for approval.
Sean P. Conway
Mike Freeman, Pro -Tern
Scott K. James
Barbara Kirkmeyer, Chair
Steve Moreno
Approve Schedule
Recommendation Work Session Other/Comments:
V _
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CAIRN DESIGN LLC
Date: October 10, 2019
Task Order Number: Cairn Design LLC — 3-2019
Project Title: Weld County BuildinK1400- Architectural and Engineering Design
Commencement Date:
Completion Date:
Design Compensation: $36,845.00
Note: Pursuant to the "Original Agreement", document No. 2019-2250 section 2.2- Additional
Task Order Work. In addition to that work described in section 2.1, the Parties may agree
to additional work to be provided by Contractor pursuant to an appropriately executed
Task Order, which shall be negotiated between the Parties on an as needed basis. Any
such Task Order shall be signed by the Weld County Director of Buildings and Grounds
before it shall be effective. In no event shall the total of all Task Orders exceed $25,000 in
any calendar year unless first approved by the Board of County Commissioners. Any
appropriately executed Task Order shall be automatically incorporated herein and
enforceable.
Scope of Task Order:
The project will involve full architectural and engineering design and construction
administration of the Weld County Building 1400 located at 1400 N. 17th Ave. in Greeley,
CO. to include:
1. Architectural, mechanical, electrical and plumbing design for the project. The building is
approximately 15,000 square ft.
2. Complete architectural and engineering redesign of the existing Treasurer's and
Elections office areas, redesign of the existing west breakroom and mail room area,
design of a new reception area for the Assessors and conversion of the east break room
into a conference room (approximately 7,100 square feet).
3. HVAC design for three new offices and one conference room being provided in the
Assessors area under a separate contract. Complete HVAC as -built drawings, evaluation
and building -wide balancing.
Contractor agrees to perform the services identified above and on the attached exhibit in accordance
with the terms and conditions contained herein and in the Original Agreement between the parties.
,to /%44F?
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CAIRN DESIGN LLC
CONTRACTOR:
Cairn Design LLC
By: V ► Date 10/10/2019
Name: Kenneth Caudle
Title: Engineering Manager
APPROVED AS TO FORM:
its J
County ttomey
22.O/9- d7t17hY7
CAIRN DESIGN, LLC
ee4t
September 26, 2019
Toby Taylor
Weld County Department of Buildings & Grounds
Weld County Veterans Services
1105 H Street
Greeley, CO 80632
RE: Weld County Building 1400 - Architectural and Engineering Services
In accordance with the fees identified in our bid, our lump sum price for this on call work for this
project is $36,845.00. The hourly breakdown is attached.
Scope of Work:
The project will involve full architectural and engineering design and construction administration
of the Weld County Building 1400 in Greeley, CO. Cairn Design, LLC will provide architectural
and engineering design under this agreement including:
Architectural, mechanical, electrical and plumbing design for the project. The building is
approximately 15,000 square ft. The scope of work will include complete architectural and
engineering redesign of the existing Treasurer's and Elections office areas, redesign of the
existing west breakroom and mail room area, design of a new reception area for the
Assessors and conversion of the east break room into a conference room (approximately
7,100 square feet). HVAC design for three new offices and one conference room being
provided in the Assessors area under a separate contract. Complete HVAC as -built
drawings, evaluation and building -wide balancing.
The remodel scope includes:
• Complete demolition and redesign combining the existing Treasurer and Election areas
into one large area for the Treasurer with a new vestibule/reception, conference rooms
and a mix of offices and systems furniture.
• Selective demolition of interior drywall partitions to combine the west break room,
corridor and mail room into one large break room.
• Selective demolition of the east break room to conversion to a conference room.
• Selective demolition of an existing conference area to conversion to a reception area for
the Assessor's office.
Scope of Services:
The scope of services included in this proposal are limited to the following:
• Field verification of existing dimensions and systems as they relate to the project.
• Coordination with the client as required to execute the scope of work.
18115 Shealy Drive Fort Collins, Colorado 80526 19101286-1968
• Coordination with the building department as required for the permit.
• Submissions: Schematic Design, Design Development, Final Design,and For Construction.
• Construction administration to include construction project meetings, RFls, submittal and
shop drawing review and approval, and final construction walk-through and punch list.
Compensation:
Total Design Fee - $36,845.00
Invoicing will occur at the following submissions:
Schematic Design - $11,053.50
Design Development - $11,053.50
Issued for Construction - $11,053.50
Final Construction (after acceptance of project by Weld County)- $3,684.50
Changes in scope, additional trips to the site, or added services would be billed hourly identified
in the On -Call contract, unless a fixed fee is agreed to in advance for the specific service.
Reimbursable expenses, +/- $600 (mileage and printing services) invoiced at cost + 10%.
Exclusions:
• Design of any system not listed above, including, but not limited to telecommunications
design beyond conduit and boxes.
• Design changes, layout changes, or value engineering requested by client or owner after the
final submission.
Sincerely,
Ken Caudle, PE
Engineering Principal