Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20220563.tiff
RESOLUTION RE: APPROVE APPLICATION FOR SMALL BUSINESS INCENTIVE PROGRAM AND AUTHORIZE RELEASE OF ECONOMIC DEVELOPMENT TRUST FUNDS (TIER 1) - KS ENTERPRISES, LLC, C/O RANDY KNEEBONE WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has been presented with an Application for the Small Business Incentive Program to authorize Release of Economic Development Trust Funds (Tier I) between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Planning Services, and KS Enterprises, LLC, c/o Randy Kneebone, with further terms and conditions being as stated in said application, and WHEREAS, after review, the Board deems it advisable to approve said application, a copy of which is attached hereto and incorporated herein by reference. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the Application for the Small Business Incentive Program to authorize Release of Economic Development Trust Funds (Tier I) between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the Department of Planning Services, and KS Enterprises, LLC, c/o Randy Kneebone, be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that Tier II Economic Development Trust Funds, in the amount of $18,500.00, be, and hereby are, released and payable to KS Enterprises, LLC, c/o Randy Kneebone, to offset various impact fees incurred and previously paid by KS Enterprises, LLC, c/o Randy Kneebone The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 16th day of February, A.D., 2022. BOARD OF COUNTY COMMISSIONERS ,,` �,�,/ WELD UNTY, COLORADO ATTEST: j�%�w! •aCL�o�t� Scot . James, Chair cc*.P1-(Tp),fZCPw/sue)) AcT�cv/co) 2022-0563 3/3/2-2 PL2290 18611J To: County Commissioners Ljpc Cc: Don Warden, Finance Director T Chris D'Ovidio, Controller From: Tom Parko, Director of Planning Services Subject: KS Enterprises, c/o Randy Kneebone Date: February 10, 2022 I am pleased to submit to the Board of County Commissioners an SBIP for KS Enterprises, LLC. This small business operates a truck repair, excavation and outdoor storage. KS Enterprises is a small business operating in unincorporated Weld County with nine (9) employees. As part of the application requirements, the owner submitted their business plan and met with representatives from the Small Business Development Center (SBDC). Attached is the confirmation email from the SBDC. The Small Business Incentive Plan was created by the County Commissioners to help offset land, building permit, septic and impact fees associated with development. Below is a breakdown of the fees: Land Use Fees: $2511.00 Septic Permit Fee: $950.00 Access Permit Fee: $75.00 Building Permit Fee(s): $11,287.37 Impact Fees $21,160.00 Total $35,983.37 According to the Small Business Application requirements, the business falls under Tier 1 and is eligible to receive up to $20,000. The business is obligated to cover the first $2,500.00. The Planning Services Director recommends approval of this application and respectfully requests that the County Commissioners authorize and release $18,500.00 from the Economic Development Fund. SERVICE, TEAMWORK, INTEGRITY, QUALITY 2022-0563 OZ -/i"0 Pun1 0 WELD COUNTY SMALL BUSINESS INCENTIVE PROGRAM APPLICATION Program Purpose: Weld County has established a Small Business Incentive Program (BIP) which will provide eligible businesses financial assistance to offset land use, building permit and several impact tees. The program is designed to reduce upfront capital outlay for small businesses located in unincorporated Weld County. Application Instndions: This application must be tilled out completely and signed. Attachments and exhibits may be included. A cover letter that adequately explains the scope of the company's business model must accompany the application. Application Date: 1. COMPANY INFORMATION Applicant Name: K 5 ex !� iQ c, 1-I- G / Malling Addressll 4Qii 1 ►d'U� C'�• c(le ) co Telephone:fl v Email: ('�rdy KNys�Jlka"e C� IMF < tfkt�+ Fax: Web Site: 2. INCORPORATION INFORMATION (if snarl Federal ID#: �" ��b' 40 Type: State: CO 3 Date of incorporation JEt tq 4 5 Name & Title: �GL�kt�IJ ,(�V1_F •�"'e Mailing Addres L p r Telephone: 303 - 5 G 6 o Fax: E-mail Address: (rxV1c)9 t�V 11 4. PROPERTY INFORMATION Parcel IDS: PropertyAddress: p`Z(-{04 Li..)C p 1 9 Legal Description: $ems l 72/ P lip .1 IJ, R°v - 6 7 Ownsr(s) / Tenet(s) 6. PRODUCT ANDIOR SERVICE Business activities involving the project eke in unircorp. Weld County: /CWk r! wsil+? Identify below past incentive assistance provided to the applicant by Weld County: !VOW Identify below current requests by the a applicant for any other assistance from Weld County: t\ 7. BUSINESS PLAN Provide a brief overview of the proposed business in Weld County. 6. WORKFORCE INFORMATION For the purpose of this application a full-time employee works a minimum of 32 hours per week. The business may have a combination of part-time employees that is the equivalen of at least one full-time employee. Current Employees: Existing payroll (total number of filled and unfilled positions). A�J"d 9. JOB LOCATION VERIFICATION At least 50% of the employees workforce must reside in Wald County for a period of one-year. t�� Certified Oopy of Payroll: A business presently located in Weld County must provide a certified copy of its payroll as of the date of the application. Jjoecz £/lit�rSttzs vet h )W,9— rcw Ccu&� s c w€ s L) tL+- 10. SBDal� VEI1FtCA11�N The applicant shall consult with the Small Business Development Center prior to receiving funds. The applicant shall attach a copy of an affidavit signed by the Director of the SBDC or his/her designee. The SBDC contact Information is: Mail: 902 7th Avenue Greeley, CO 80031 Website: htto:/Iwww.neeccosbdc.org Phone: (970)362-3661 11. QUESTIONS & ASSISTANCE Weld County Department of Planning Services: The application will be processed by the Director of Planning Services. The Director may contact the applicant for clarification regarding the application or to request additional information during the review process. If the application is approved, the Director will contact the business when preparing the agreement and when scheduling the agreement for action by the Wield County Board of Commissioners. The applicant is encouraged to contact the Director of Planning Services to request assistance with the program requ6emenls and with idling out the application The Director can be reached by the following methods: Applications can be mailed, faxed or a -mailed to the Department of Planning Services: Mail: Wield County Department of Planning Services Attn: Planning Director 1555 North 17TM Avenue Greeley, CO 80631 Phone: (970) 3536100 Fax: (970) 304-6498 Email: toarko@weldeov.com RaNINDER: The application nay he delayed if a la inearpleb, unsIgned or lacks n qulred docunantsdom Al! documents provided to Weld County are subject to the Pubic Records Act, State of Colorado. 11. AUTHORIZED SIGNATURE The signature appearing below must belong to an employee of the company who is authorized to sign the application on behalf of the company. I attest to the accuracy of the information which is provided hereinabove. (tom) (fie) h (print name) (date) /:&-€_. Business Plan Owners: Randy & Amanda Kneebone 4881 Avery Ct. Erie, CO 80516 Phone: 303-210-5660 Email: randykneebone@gmail.com Table of Contents ExecutiveSummary.............................................................................................. General Company Description................................................................................ ServicesProvided................................................................................................ MarketingPlan.................................................................................................... Operational & Safety Plan...................................................................................... Management....................................................................................................... FinancialPlan..................................................................................................... Appendices........................................................................................................ Executive Summary Hello and welcome to Randy Kneebone Excavating & Trucking, Inc! We are a 21 year old excavating and trucking company. Our main focus of the excavating industry is in site development and commercial construction. We work on new construction and additions to existing buildings. Our geographical focus in along the front range of Colorado. Starting from the Wyoming border on the north to Castle Rock on the south, the foothills on the west out to Ft. Morgan on the east. No project is to big or to small. Our projects range from $1000.00 up to 2 million in size. Over our 21 years in business, we have tried to follow the construction industry and especially the excavation industry closely to keep up on new technology and new, innovative means and methods of preforming our work. As a result of this studying, we have risen to a high level of expectation both from ourselves and our clients. We try to purchase equipment that allows us to use the newest technology and keep our employees educated on the use of it. We strive to be one of the premier excavating companies in the Denver metro area and also to keep a high level of customer satisfaction. By this I mean we work hard to be one of the most accommodating excavator contractors in the Front Range of Denver. We help General Contractors with a variety of tasks including managing other subcontractors that follow scope of work and help preform other small tasks that just need completed in order for the job to keep moving forward. We also strive to do an excellent job of workmanship and keeping or beating the schedule set in the beginning of the job by the owner or general contractor. We have a competent and hard working group of employees that do an excellent job of meeting the expectation of our mission statement which you will read in the next section. These assets have helped Randy Kneebone Excavating & Trucking, Inc. maintain a profitable organization and one that is trusted by the construction industry to safely build the Colorado Front Range and the Denver Metro Area into one of the leading communities of the nation. General Company Description and Services Provided We are a 21 year old excavating and trucking company. Our main focus of the excavating industry is in site development and commercial construction. We work on new construction and additions to existing buildings. Our geographical focus in along the front range of Colorado. Starting from the Wyoming border on the north to Castle Rock on the south, the foothills on the west out to Ft. Morgan on the east. No project is to big or to small. Our projects range from $1000.00 up to 2 million in size. Our mission statement is: Continue to stay committed to providing the best possible workmanship, service, trustworthiness and companionship to our clients in the earthwork and wet utility installation in the Froni Range and Denver Metro Area. We have a complete fleet of machines and semi trucks as well as a fully educated staff *With our fleet of 33 machines, we can handle all types of earthwork, demolition and wet utility projects. *With our fleet of 4 semi trucks, we haul all of our own materials including dirt and gravel. With our 2 lowboy trailers, we move our machines to and from job sites. We focus on all types of earthwork and demolition. If you need a small building or house taken down, give us a call. On the earthwork side of my business, we handle everything from overlot grading to foundation excavation and backfill. We also prepare the soil for concrete sidewalk, curb and gutter, asphalt and landscaping. We also focus on wet utilities; water lines, sewer lines and storm sewer lines. We install main line pipe as well as laterals from the main line up to a new or existing building. We install up to 16" water line, 24" sewer line and 60" storm sewer line and all size of lateral lines from the main line up to a building. Our company goals: *To execute our mission statement. *Stay profitable using the 10%/i 0% / 80% financial budget. Tithe 10%, Save 10%, Operate on 80%. *Pay off loans as fast as possible to insure a low overhead during lean times. 'Stay humble. 'Take good care of our employees and treat them with respect. 'Take great care our our clients. Since the construction industry is a service based industry, we will continue to work hard to be one of Colorado's premier excavating contractors. Marketing Plan Our marketing strategy is very simple and one of the best known to mankind: Word of Mouth. By continuing to follow our mission statement and our goals, word of mouth is the only real advertising we do here at Randy Kneebone Excavating & Trucking, Inc. Word of mouth has enabled us to get through very lean times in the economy and has helped us to establish a well known name in the excavating industry giving us many return clients. These two assets have attributed to our overall success for 21 years and counting. See Appendix A "Projects Completed " Operation and Safety Plan See Appendix B "Operation & Safety Plan" Management Owner / President Randy Kneebone *1991 graduate of Centaurus High School Lafayette, CO *1995 graduate of the University of Colorado, Hydrogeology, Civil Engineering *2001 Emerging Contractor of the Year from °Equipment Today" magazine *2003 Businessman of the Year Secretary Amanda Kneebone *1999 graduate of Centaurus High School Lafayette, CO Project Manager James Walker *1978 graduate of Washington High School Kansas City, KS Project Superintendents Taylor Walker *2009 graduate of Centaurus High School Lafayette, CO Steven Mitchell *2006 graduate of Monarch High School Louisville, CO Senior Shop Manager and Equipment Mechanic Todd Frederich *1986 graduate of Denver Automotive & Diesel College Denver, CO *1984 ASE Master Medium and Heavy Duty Truck Certification Denver, CO Equipment Operators Randy Kneebone James Walker Steven Mitchell Mario Cano Taylor Walker Kolton Kneebone Truck Drivers Todd Frederich John Grulke Jessica Beales Accounting Team Bachman and Company, Longmont, CO Legal Team Wong and Associates, Longmont, CO Business Plan Randy Kneebone Excavating & Trucking, Inc. Owners: Randy & Amanda Kneebone Address:1384 Reliance Ct Erie, CO 80516 Phone:303-210-5660 Fax:720-274-0119 Email: randykneebone@gmaii.onm Table of Contents Executive Summary..............................................................................3 Mission Statement.............................................................................. 4 General Company Description......................................................... 4 Goals.................................................................................................. 5 MarketingPlan.....................................................................................5 Management........................................................................................6 FinancialPlan.......................................................................................7 Appendices..........................................................................................7-17 PA Executive Summary Hello and welcome to Randy Kneebone Excavating & Trucking, Inc! We are a 21 year old excavating and trucking company. Our main focus of the excavating industry is in site development and commercial construction. We work on new construction and additions to existing buildings. Our geographical focus in along the front range of Colorado. Starting from the Wyoming border on the north to Castle Rock on the south, the foothills on the west out to Ft. Morgan on the east. No project is to big or to small_ Our projects range from $1000.00 up to 2 million in size. Over our 21 years in business, we have tried to follow the construction industry and especially the excavation industry closely to keep up on new technology and new, innovative means and methods of preforming our work. As a result of this studying, we have risen to a high level of expectation both from ourselves and our clients. We try to purchase equipment that allows us to use the newest technology and keep our employees educated on the use of ft. We strive to be one of the premier excavating companies in the Denver metro area and also to keep a high level of customer satisfaction. By this I mean we work hard to be one of the most accommodating excavator contractors in the Front Range of Denver. We help General Contractors with a variety of tasks including managing other subcontractors that follow scope of work and help preform other small tasks that just need completed in order for the job to keep moving forward. We also strive to do an excellent job of workmanship and keeping or beating the schedule set in the beginning of the job by the owner or general contractor. We have a competent and hard working group of employees that do an excellent job of meeting the expectation of our mission statement which you will read in the next section. These assets have helped Randy Kneebone Excavating & Trucking, Inc. maintain a profitable organization and one that is trusted by the construction industry to safely build the Colorado Front Range and the Denver Metro Area into one of the leading communities of the nation. 3 Mission Statement Continue to stay committed to providing the best possible workmanship, service, trustworthiness and companionship to our clients in the earthwork and wet utility installation in the Front Range and Denver Metro Area. General Company Description and Services Provided We are a 21 year old excavating and trucking company. Our main focus of the excavating industry is in site development and commercial construction. We work on new construction and additions to existing buildings. Our geographical focus in along the front range of Colorado. Starting from the Wyoming border on the north to Castle Rock on the south, the foothills on the west out to Ft. Morgan on the east. No project is to big or to small. Our projects range from $1000.00 up to 2 million in size. We have a complete fleet of machines and semi trucks as well as a fully educated staff With our fleet of 33 machines, we can handle all types of earthwork, demolition and wet utilityprojects. With our fleet of 4 semi trucks, we haul all of our own materials including dirt and gravel. With our 2 lowboy trailers, we move our machines to and from job sites. We focus on all types of earthwork and demolition. If you need a small building or house taken down, give us a call. On the earthwork side of my business, we handle everything from over lot grading to foundation excavation and backfill. We also prepare the soil for concrete sidewalk, curb and gutter, asphalt and landscaping. We also focus on wet utilities; water lines, sewer lines and storm sewer lines. We install main line pipe as well as laterals from the main line up to a new or existing building. We install up to 16" water line, 24" sewer line and 60" storm sewer line and all size of lateral lines from the main line up to a building. 4 Goals Since the construction industry is a service based industry, we will continue to work hard to be one of Colorado's premier excavating contractors. To execute our mission statement with a sense of quality and great customer services on a daily basis. To stay profitable on a quarterly basis using the 10% / 10% /80% financial budget. (Tithe 10%, Save 10%, Operate on 80%. To Pay off the highest interest loans on a structured and timed plan to insure a low overhead during lean times. To stay humble with and for our customers on a daily basis. *To take care of our employees and treat them with respect on a daily basis. *To take great care our our clients on a daily basis. Marketing Plan Our marketing strategy is very simple and one of the best known to mankind: Word of Mouth. By continuing to follow our mission statement and our goals, word of mouth is the only real advertising we do here at Randy Kneebone Excavating & Trucking, Inc. Word of mouth has enabled us to get through very lean times in the economy and has helped us to establish a well known name in the excavating industry giving us many return clients. These two assets have attributed to our overall success for 21 years and counting. See Append'oc A "Projects Completed" Operation and Safety Plan See Appendix B "Operation & Safety Plan" 5 Management Owner I President -Randy Kneebone *1991 graduate of Centaurus High School Lafayette, CO *1995 graduate of the University of Colorado, Hydrogeology, Civil Engineering *2001 Emerging Contractor of the Year from "Equipment Today" magazine *2003 Businessman of the Year Secretary -Amanda Kneebone 1999 graduate of Centaurus High School Lafayette, CO Project Manager -James Walker 978 graduate of Washington High School Kansas City, KS Project Superintendent -Tay I o r Walker 2009 graduate of Centaurus High School Lafayette, CO Project Superintendent -Paulin° Vasquez *1982 graduate of Valley High School Platteville, CO Senior Shop Manager and Equipment Mechanic Tim Bowman *1974 graduate of Stillwater Senior High School Stillwater, MN *1980 graduate of Denver Automotive & Diesel College Denver, CO *1984 ASE Master Medium and Heavy Duty Truck Certification Denver, CO Equipment Operators • Randy Kneebone • James Walker • Paulino Vasquez • Mario Cano • TaylorWalker • Jonathan Skaggs • Keith Schlichting Truck Drivers • Tim Bowman • John Grulke • Anthony Maniscoioa n Oliver Accounting Team Bachman and Company, Longmont, CO Legal Team Wong and Associates, Longmont CO Financial Plan See Appendix C "Profit & Loss Statement" Appendix A, B & C Randy Kneebone Excavating and Trucking, Inc. 1384 Reliance Court Erie, CO 80516 Phone: 303-210-5660 Fax: 720-274-0119 Association of General Contractors (A.G.C.) Member Projects Completed - Work History — References Boulder Scientific Administration Building $320,000.00 Year 2016-2017 * Job consisted of all earthwork and utilities for a 14,000SF building. * Mishler Construction, Inc. Jack Quandt 303-587-6890 Boulder Fire Line/domestic line $84,000.00 Year 2016 *Job consisted if installing a fire line and domestic water line. *Palace Construction, Inc. JR 303-777-7999 The Loading Dock Boulder, CO $310,000.00 Year 2016 *Job consisted of all earthwork and utilities for a large addition on an existing building. *Quinlan Construction, Inc. John Conahan, Mark, Jimmy 303-442-0202 Village on Redwood Ft. Collins, CO $365,000.00 Year 2016 *Job consists of all earthwork, importing 2200 CY of material. 13 buildings. *Deneuve Construction, Inc. Henry Freedman 720-212-6017 Boulder Fire Line Boulder, CO $20,000.00 Year 2016 *Job consisted of installing fire line under existing utilities. *Palace Construction, Inc. Ken Feld 303-777-7999 hall Residence Erie, CO $37,000.00 Year 2016 *Job consisted of excavation, backfill , water, sewer line for a custom house. *Steve and Michelle Hall 847-840-3196 303-884-3762 Aster Towncenter Apartments Denver, CO $265,000.00 Year 2015 *Job consisted of all earthwork, 4' over -excavation of site. 7 buildings. *CFC Construction, Inc. Humberto Ruiz 720-635-3669 Flatirons Parking Lots Lafayette, CO $234,000.00 Year 2015 *Earthwork for 2 large parking lots *Fransen Pittman Construction, Inc. Justin Clark 303-903-3271 Prasanna Apartments Lafayette, CO $760,000.00 Year 2014-15 *Job consists of all earthwork and wet utilities. 11 buildings. *Engineer. Hurst Engineering, Inc. 303-449-9105 Greenways Apartments Denver, CO $285,000.00 Year 2014 *Job consists of all earthwork and wet utilities. *Horizon Construction, Inc. John Thode 608-239-8232 Odyssey Housing Denver, CO $230,000.00 Year 2014-15 *Job consists of all earthwork and wet utilities. 8 -Casson lluncan construction, Inc. Jim Mewaldt 3(13-690-1)00 Flatirons Village Apartments Boulder, CO $135,000.00 Year 2014 *Job consisted of all wet utilities. *PCL Construction, Inc. Craig Widynowski 720-947-9858 Gunbarrel Apartments Boulder, CO $1,370,000.00 Year 2014-16 *Job consists of all earthwork and wet utilities. 14 buildings. *Engineer: WA, Inc. 303-444-1951 *Shaw Construction, Inc. Bart Dickson 303-825-4740 Alexan Gunbarrel Apartments Boulder, CO $597,000.00 Year 2013 • Job consists of all earthwork, 39,000 CY of over excavation and 24,000 CY of export Louisville Fire Training Complex Louisville, CO $230,000.00 Year 2103 • Job consists of all earthwork and utilities. • Engineer: Flatirons, Inc. 303-443-7001 • Symmetry Builders Andy Wood 720-340-0663 South Lincoln Redevelopment Denver, CO $440,000.00 Year 2013 *Job consisted of all earthwork and utilities, exporting 14,000 CY of dirt. • *Engineer: Jensen Slaw 303-561-3333 *Shaw Construction Pat Higgins 303-825-4740 Hartley Flats Denver, CO $650,000.00 Year 2013 • Job consists of excavating and exporting 24,000 CY of dirt, importing 2500 CY of dirt for back£ll and all water, sewer, and storm sewer on the site. • Engineer: Matrix Design Group Patrick Chalin 303-572-0200 & KTGY Architects 303-825-6414 • Casson Duncan Construction Brian Evans 303-332-5257 Dave White 720-323-4869 Solaire Apartments Briglrton, CO $946,000.00 Year 2013 Job consists of installing all new utilities including 5566 LF of water lime, 3583 LF of sewer line and 8452 LI of storm sewer line, 18 inlets, 13 manholes. • Engineer: Rediand Engineering Littleton, CO Travis Frazier 303-875-7193 • Hinton Construction, Inc. Shreveport, LA Cory Hinton 318-470-8477 Ron Rickman 512-297-0297 Aster Apartments Denver CO $543,000.00 Year: 2013 • Job consists of all earthwork for 24 new apartment buildings, including 4' over excavation of each and all sidewalk, asphalt and curb prep. • Matrix Design Group • CFC, Inc. Dave Bearwald 303-520-9114 Jim Gorr 720-272-3329 Mariposa Re -Development Denver, CO $940,000.00 Year: 2012 Job consisted of installing new utilities including 1500 LF of 12" water line, 1000 LF of 10" sewer line and 1300 LF of storm sewer line with all manholes. *Engineer: Jansen Straw Denver, CO 303-561-3333 * Deneuve Construction, Inc. Henry Freedmen 720-212-6017 Chris Gardner 303-549-4190 Boulder Community Hospital Boulder, CO $225,000.00 Year: 2012 * Job consisted of installing 250 LF of new water line with meter pits, 150' of 8" sewer line and 250 LF of storm sewer line. 9 Engineer: J VA Engineering Boulder, LU 3U.i-444-l9 1 * Wyatt Construction, Inc. John Wyatt 303-523-2128, Bruce Andersen 303-523-2129 Novella Apartments Denver, CO $541,000.00 Year. 2012 • Job consisted of all earthwork and utilities for 4 large apartment buildings on 3 acres. Including importing 10,000 CY of dirt, over excavating the site 4', installing 1100 LF of 8" waterline, 800 LF of 8" sewer line and 850 LF of 24" RCP that was 18 feet deep. • Engineer: Matrix Design Group • Colorado First Construction (CFC, Inc.) Dave Bearwald 303-520-9114, Jim Gorr 720.272-3329 Town ofFrederick Water Mainline Frederick, CO $125,000.00 Year: 2011-12 • We were the General Contractor on the job. It consisted of installing 2600 LF of 12" water mainline for a new development in town. • Town of Frederick Richard Nickson 720-382-5602 Mohummed Said 720-382-5600 Lewis Court Apartments Golden, CO $350,000.00 Year: 2011 Job consisted of all earthwork and utilities for one large apartment building. Included site demo, over excavation of the site, all water, sewer and storm sewer line with 4 porous detention ponds. • Engineer: Martin & Martin Lakewood, CO 303-431-6100 • Palace Construction, Inc. Ken Feld 303-777-7999 Red Oak Park Boulder, CO $460,000.00 Year: 2010 * Job consisted of installing all water and sewer lines for a new subdivision with 53 new homes. 1900 LF of 8" water line, 6 hydrants, 53 taps for homes, 2745 LF of sewer line with 53 taps for homes. We also installed a storm sewer system with 1200 LF of storm pipe with 6000 SF of aquabrix filter system. * Architect: Jim Sell Design 153 W. Mountain Ave. Ft. Collins, CO 80524 970-484-1921 * Wyatt Construction, Inc. John Wyatt, Bruce Andersen 303-449-1255 945 7'" St. Home Boulder, CO $35,00.00 Year: 2010 * Job consisted of excavating foundation for new custom home. * Architect: Waugh and Associates Niwot, CO 720-494-7602 * Mary Beth Emersen Owner 720-394-1997 Northern Colorado Medical Center Greeley, CO $25,000.00 Year: 2010 * Job consisted of storm sewer and sanitary sewer lines. Sanitary line tie in was 19' deep. * Engineer. Design Mechanical Louisville, CO 303-449-2092 * Design Mechanical, Inc. Jared 303-449-2092 Alfalfa's Supermarket Boulder, CO $180,000.00 Year: 2010 * Job consisted 2 large additions, new water and sewer line off mains in Arapahoe Street in Boulder, asphalt, concrete demolition, and over excavating and importing bridge material and structural fill under the asphalt parking lot. * Deneuve Construction, Inc. Eric Serfoss 303-444-6633 Fire Stations #4 and #8 Lakewood, CO $60,000.00 Year: 2010 * Job consisted of taking over for on site excavator due to issues with general. Installing 150' of new 8" water line with two lowerings, two small additions with all associated earthwork. * Golden Triangle Construction, Inc. Andy Wood 303-772-4051 The Shoppes at Iliff Aurora, CO $59,000.00 Year 2010 10 Job consistedot adding a new sewer line which included directional boring under Itin Ave. with a 20' deep tie in the existing main line with ground water at 10'. Many dewatering techniques used. • Engineer: Engineering Services Co. 1300 S. Potomac St. Aurora, CO 80012 303-337-1393 * Legacy Construction, Inc. Larry Moore 303-792-2843 Niwot High School Water Line Niwot High School $30,000.00 Year 2010 * Job consisted of installing 550 LF of new 8" water line. * Engineer: JVA Consulting 1319 Spruce St. Boulder, CO 80302 303-444-1951 * Golden Triangle Construction, Inc. Todd Schroeder 303-772-4051 985 16th. St. Boulder, CO LEEDS Project $95,000.00 Year 2009 * Job consisted of site work grading, exporting 500 CY of material, excavation and backfill of foundations, grading for new sidewalk and asphalt, installing new fire line and domestic water services from main line in the street, new sewer service line from main line in the street also. Very, very tight job location with a underground concrete encased ditch that runs through the job site that we had to work around. * Architect: North Boulder Studios 1300-C Yellow Pine Ave. Boulder, CO 80304 303-444-1598 • Deneuve Construction, Inc. Pete Touzjian 303-444-6633 Clear Creek Middle School Idaho Springs, CO $80,000.00 Year: 2009 • Job consisted of site demolition of 4 flights of concrete stairs on a 2:1 slope. Excavating for new access roads and 4 new flights of stairs and handicap ramps. Screen all backfill material. Very tight job on dangerous slopes. * Architect: Neenan Design Group 2620 E. Prospect Rd.- Ft. Collins, CO 80525 * Neenan Construction, Inc. Roger Hammond 970-493-8747 Broadway Community Subdivision Boulder, CO LEEDS Project $232,000.00 Year: 2009 * Job consisted of site demolition of 21 trees, 12,650 SF of asphalt and concrete, excavate for under ground parking garage and export 5500 CY of material, over excavate the bottom of the foundation and replace with rock, install 145 LF water line, fire line, sewer line and all site prep. of new curb, gutter and asphalt. * Architect: Stephen Spam Architects 1731 15th. St. Boulder, CO 80302 303-442-4422 * Deneuve Construction, Inc. Henry Freedman 303-444-6633 Twin Peaks Charter Academy Longmont, CO $44,000.00 Year: 2009 * Job consisted of site demolition of 53,775 SF of asphalt and concrete, grade for 2600 LF new curb and gutter and 48,775 SF of new asphalt. * Golden Triangle Construction, Inc. Andy Fiamengo 303-772-4051 111. Bank at Quail Creek Broomfield, CO $28,000.00 Year: 2009 * Job consisted of all overlot grading, exporting 1500 CY of material, excavation & backfill of foundations, curb, gutter and asphalt grading. *Golden Triangle Construction, Inc. Andy Fiamengo 303-772-4051 282 Century Drive Louisville, CO $325,000.00 Year: 2008 * Job consisted of installing all site utilities including 2220 LF of RCP storm sewer line, 475 LF of sanitary sewer line and 2050 LF of water line with 4 fire hydrants. * Engineer: Martin / Martin 12499 W. Colfax Ave. Lakewood, CO 80215 303-431-4028 * Architect: Intergroup Architecture 200W. Littleton Blvd. Littleton, CO 80120 303-738-8877 * Golden Triangle Construction, Inc. Andy Fiamengo 303-772-4051 Mountain Aviation Airport Hanger Broomfield, CO $120,000.00 Year: 2008 " Job consisted of clearing and grubbing, 2site over excavation, excavate and backfill walls and caissons, import 4000 CY of structural fill, 235 LF of sanitary sewer line, 400 LF of water line, all curb, gutter and asphalt prep. and fine grading. * Architect: Thomas Savory Architect 1545 Hooker St. Denver, CO 80204 303-733-9933 * Weaver General Construction, Inc. Tom Baughman 303-789-4111 Harvest Junction Longmont, CO $130,000.00 Year: 2008 * Job consisted of all earthwork, cut to fill and export of 1000 CY of material, excavate and backfill walls, a 20' deep storm sewer tie in with 100 LF of RCP, fire line and relocate a fire hydrant. * Engineer: Galloway Engineering 5350 DTC Parkway Greenwood Village, CO 80111 303-770-8884 * Panattoni Construction, Inc. Stephan Ballard 303-846-5856 Middle Park High School Granby, CO LEEDS Project $108,000.00 Year: 2008 * Job consisted of site demolition of 5960 SF of asphalt, 7920 LF of sidewalk, import and place 1600 CY of structural fill, excavate and backfill foundations for 3 additions and grade for new sidewalk, curb and gutter. * Engineer: Neenan Design Group 2620 E. Prospect Rd. Ft. Collins, CO 80525 970-493-8747 * Neenan Construction, Inc. Justin Tuck 970-493-8747 Gateway Building Englewood, CO LEEDS Project $122,000.00 Year: 2008 * Job consisted of 4' site over excavation, export of 1650 CY of material all site earthwork for foundations, curb, gutter, sidewalk and asphalt, 550 LF storm sewer with a stormceptor, 100 LF sewer, fire line and domestic water line. * Architect: Dulaney Architecture 1911 S. Broadway Denver, CO 80210 303-615-9123 * Engineer: Creative Civil Solutions 1282 Banner Cir. Erie, CO 80516 303-828-4885 * Legacy Construction, Inc. Larry Moore 303-792-2843 Southern Hills Middle School Boulder, CO LEEDS Project $136,000.00 Year: 2008-2009 * Job consisted of site demolition of asbestos laiden building, shop and 2 buildings, all site earthwork for 3 additions, excavate retention pond and fine grading of the site. * Engineer: JVA Consulting 1319 Spruce St Boulder, CO 80302 303-444-1951 * Architect: MOAArchitecture 821 17t. St. Ste. 400 Denver, CO 80202 303-308-1190 * Golden Triangle Construction Andy Wood 303-772-4051 Longmont Humane Society Longmont, CO $245,000.00 Year: 2007 * Job consisted of all site demolition, clearing and grubbing, over excavation 4' deep, export of 2500 CY material, import and place new structural fill, excavate and backfill for foundation, site grading, site utilities including 19' deep sanitary sewer tie in, 150 LF of 8" sewer with manholes, 460 LF 8" water line, fire line and 170 LF 10" storm sewer with concrete structures and rip rap. * Engineer: Animal Arts Design 735 Walnut St. Boulder, CO 80302 1-800-332-4413 * Golden Triangle Construction, Inc. Andy Fiamengo 303-772-4051 Cantena Laredo Restaurant Boulder, CO $65,000.00 Year: 2007 * Job consisted of all site excavation for foundations and concrete, export 500 CY material and all site utilities. * Wilson Barnes General Contractors Rick Martinez 303-275-7155 Niwot Trail Extension Niwot, CO $95,000.00 Year: 2007 * We were the general contractor of the project. * Job consisted of overlot grading, installing 7000 LF of crusher fines trail and final seeding. * Boulder County Parks & Open Space Barry Shook 303-678-6183 Coal Creek Stabilization Lafayette, CO $130,000.00 Year: 2007 L2 we were the general contractor of the project. * Job consisted of site demolition, clearing and grubbing. Diverting Coal Creek and installing a grouted bolder drop structure, re -aligning the creek, planting and re -seeding. * Engineer: McLaughlin Rincon Ltd. 230015th. St. Ste. 220 Denver, CO 80202 303-964-3333 * City of Lafayette Brad Dallum 303-665-5588 Landmark - Main Sales Center Greenwood Village, CO $179,000.00 Year: 2007 * Job consisted of rotomilling 5000 SY of asphalt, installing 400 LF 8" sewer line, 500 LF of 11/2" water line, 7000 CY of overlot grading, foundation, curb, gutter and asphalt prep. * Integrated Builders, Inc. Tim Bradsby 303-913-1256 Green Valley Ranch - Park Development Denver, CO $360,000.00 Year: 2007 * Job consisted of developing 23 acres into a park including constructing a detention pond, soccer field, skate park, baseball field, 25,000 CY of over lot grading, 12,000 CY of stripping and replacing topsoil, 12,000 SY of concrete prep., 2300 LF of storm sewer line with concrete structures and rip rap, site utilities, foundation excavation & backfill. * Engineer: RMSE 1795 McIntyre St. Golden, CO 80401 303-942-1136 * Architect: Norris Design Group 1101 Bannock St. Denver, CO 80204 303-892-1166 * Golden Triangle Construction, Inc. Scott Hill 303-772-4051 Kalmia Road Improvements Boulder, CO $15,000.00 Year: 2007 * Job consisted of clearing and grubbing, import and compact fill material, grade and prepare for new curb, gutter, sidewalk and installation of 30 LF of 18" RCP and rip rap. * Engineer: Drexel Barrel Corp. 1800 38t. St. Boulder, CO 80301 303-442-4338 * Foothills Paving & Maintenance, Inc. Seth Strinni 303-462-5600 Roosevelt High School Addition Johnstown, CO $49,000.00 Year: 2007 * Job consisted of clearing and grubbing, 4' over excavation of the site, excavate and backfill of foundation wals and install 450 LF of 8" sewer line with 4 new manholes. * Engineer: Neenan Design Group 2620 E. Prospect Rd. Ft. Collins, CO 80525 970-493-8747 * Neenan Construction, Inc. Roger Hammond 303-710-1908 Ross Dress For Less Dept. Store Aurora, Co $312,000.00 Year: 2006 * Job consisted of demolition of 4000 SY of asphalt, 5' over excavation of the site, all earthwork for foundations, curb, gutter and asphalt. All site utilities of 1200 LF of 8" water line and 900 LF of 6" sewer line. * U. S. Builders, Inc. John Elliott 1-800-274-1987 Starbucks Englewood, CO $75,000.00 Year: 2006 * Job consisted of all site earthwork, excavation and backfill. All site utilities including a 8" water line lowering, sewer line and grease interceptor. * Legacy Construction, Inc. Larry Moore 303-792-2843 Kersey Water Treatment Plant Kersey, CO $55,000.00 Year: 2006 * Job consisted of installing 4000LF of 8" forced sewer main to the North Platte River. * Fischer Construction, Inc. Bart Fischer 303-485-8855 Walker Ranch Trailhead Re -Construction Boulder, CO $195,000.00 Year: 2006 * We were the general contractor of the job. * Job consisted of excavation for retention pond, construction 1.5 mile of new road and two parking lots, install 6 culverts under the road, 14 check dams, built a 7' x 100' retaining wall, erosion control and re- Randy Kneebone Excavating & Trucking, Inc. Profit & Loss For the Years Indicated Preliminary Jan - Dec 16 Jan - Dec 17 Projected 2018 Projected 2019 Ordinary Income/Expense Income Income -Excavating 924,518.88 1,298,537.71 1,493,318.37 1,717,316.12 Total Income 924,518.88 1,298,537.71 1,493,318.37 1,717,316.12 Cost of Goods Sold Job Materials & Supplies 193,314.94 168,428.10 193,692.32 222,746.16 Equip Repairs & Maint 130,749.75 133,562.92 153,597.36 176,636.96 Contract Labor 75,350.70 86,599.09 99,588.95 114,527.30 Job Expenses 72,692.85 130,387.69 149,945.84 172,437.72 COGS -Fuel 54,345.72 75,728.15 87,087.37 100,150.48 Management Fee 24,000.00 24,000.00 27,600.00 31,740.00 Equipment Rental -COGS 7,906.66 10,528.68 12,107.98 13,924.18 Bond Expense 600.00 600.00 690.00 793.50 Total COGS 558,960.62 629,834.63 724,309.82 832,956.30 Gross Profit 365,558.26 668,703.08 769,008.54 884,359.82 Expense Insurance 105,438.08 56,483.47 64,955.99 74,699.39 Wages 35,247.50 36,395.00 41,854.25 48,132.39 Licenses and Permits 29,690.53 30,214.81 34,747.03 39,959.09 Rent & Lease 21,212.20 778.27 895.01 1,029.26 Bad Debt 20,000.00 - - - Telephone & Internet 13,731.28 13,858.86 15,937.69 18,328.34 Travel & Ent 13,110.26 12,009.59 13,811.03 15,882.68 Professional Fees 12,175.00 950.00 1,092.50 1,256.38 Utilities 10,414.45 9,637.92 11,083.61 12,746.15 Donations 9,565.00 14,031.00 16,135.65 18,556.00 Office Expenses 4,680.41 1,877.33 2,158.93 2,482.77 Payroll Tax Expenses 3,460.68 3,861.06 4,440.22 5,106.25 Bank Service Charges 2,224.05 1,181.40 1,358.61 1,562.40 Storage - 1,972.19 2,268.02 2,608.22 Dues & Fees 1,588.00 3,371.19 3,876.87 4,458.40 Taxes 1,271.53 39.42 45.33 52.13 Pest Control 499.95 404.96 465.70 535.56 Security 368.40 371.40 427.11 491.18 Advertising & Design 131.00 781.23 898.41 1,033.18 Postage and Delivery 99.77 98.00 112.70 129.61 Books & Subscriptions 44.95 19.98 22.98 26.42 Total Expense 284,953.04 188,337.08 216,587.64 249,075.79 Net Ordinary Income 80,605.22 480,366.00 552,420.90 635,284.04 Randy Kneebone Excavating & Trucking, Inc. Profit & Loss For the Years Indicated Preliminary Jan - Dec 16 Jan - Dec 17 Projected 2018 Projected 2019 Net Ordinary Income (previous page) 80,605.22 480,366.00 552,420.90 635,284.04 Other Income (Expense) Other Income Gain on Sale ofFixed Assets Gross Proceeds 92,246.20 32,400.00 - - Cost Basis (52,545.46) (18,702.00) - - Total Gain on Sale of Fixed Assets 39,700.74 13,698.00 - - Total Other Income 39,700.74 13,698.00 - - Other Expense Depreciation Expense (127,992.41) (158,548.15) (182,330.37) (209,679.93) Interest Expense (11,661.64) (12,870.05) (14,800.56) (17,020.64) Loan Fee Expense (500.00) (700.00) (805.00) (925.75) Total Other Expense (140,154.05) (172,118.20) (197,935.93) (227,626.32) Net Other Income (Expense) (100,453.31) (158,420.20) (197,935.93) (227,626.32) Net Income (Loss) (19,848.09) 321,945.80 354,484.97 407,657.72 Randy Kneebone Excavating & Trucking, Inc. Profit & Loss For the Years Indicated Preliminary Jan - Dec 16 Jan - Dec 17 Projected 2018 Projected 2019 Ordinary Income/Expense Income Income -Excavating 924,518.88 1,298,537.71 1,493,318.37 1,717,316.12 Total Income 924,518.88 1,298,537.71 1,493,318.37 1,717,316.12 Cost of Goods Sold Job Materials& Supplies 193,314.94 168,428.10 193,692.32 222,746.16 Equip Repairs & Maint 130,749.75 133,562.92 153,597.36 176,636.96 Contract Labor 75,350.70 86,599.09 99,588.95 114,527.30 Job Expenses 72,692.85 130,387.69 149,945.84 172,437.72 COGS -Fuel 54,345.72 75,728.15 87,087.37 100,150.48 Management Fee 24,000.00 24,000.00 27,600.00 31,740.00 Equipment Rental -COGS 7,906.66 10,528.68 12,107.98 13,924.18 Bond Expense 600.00 600.00 690.00 793.50 Total COGS 558,960.62 629,834.63 724,309.82 832,956.30 Gross Profit 365,558.26 668,703.08 769,008.54 884,359.82 Expense Insurance 105,438.08 56,483.47 64,955.99 74,699.39 Wages 35,247.50 36,395.00 41,854.25 48,132.39 Licenses and Permits 29,690.53 30,214.81 34,747.03 39,959.09 Rent & Lease 21,212.20 778.27 895.01 1,029.26 Bad Debt 20,000.00 - - - Telephone & Internet 13,731.28 13,858.86 15,937.69 18,328.34 Travel & Ent 13,110.26 12,009.59 13,811.03 15,882.68 Professional Fees 12,175.00 950.00 1,092.50 1,256.38 Utilities 10,414.45 9,637.92 11,083.61 12,746.15 Donations 9,565.00 14,031.00 16,135.65 18,556.00 Office Expenses 4,680.41 1,877.33 2,158.93 2,482.77 Payroll Tax Expenses 3,460.68 3,861.06 4,440.22 5,106.25 Bank Service Charges 2,224.05 1,181.40 1,358.61 1,562.40 Storage - 1,972.19 2,268.02 2,608.22 Dues & Fees 1,588.00 3,371.19 3,876.87 4,458.40 Taxes 1,271.53 39.42 45.33 52.13 Pest Control 499.95 404.96 465.70 535.56 Security 368.40 371.40 427.11 491.18 Advertising & Design 131.00 781.23 898.41 1,033.18 Postage and Delivery 99.77 98.00 112.70 129.61 Books & Subscriptions 44.95 19.98 22.98 26.42 Total Expense 284,953.04 188,337.08 216,587.64 249,075.79 Net Ordinary Income 80,605.22 480,366.00 552,420.90 635,284.04 I P Randy Kneebone Excavating & Trucking, Inc. Profit & Loss For the Years Indicated Net Ordinary Income @revious page) Other Income (Expense) Other Income Gain on Sale of Fixed Assets Gross Proceeds Cost Basis Total Gain on Sale of Fixed Assets Total Other Income Other Expense Depreciation Expense Interest Expense Loan Fee Expense Total Other Expense Net Other Income (Expense) Net Income (Loss) Jan - Dec 16 80,605.22 92,24620 (52,545.46) 39,700.74 39,700.74 (127,992.41) (11,661.64) (500.00) (140,154.05) (100,453.31) (19,848.09) Preliminary Jan -Dec 17 480,366.00 32,400,00 (18,70200) 13,698.00 13,698,00 (158,548.15) (12,870.05) (700.00) (172,118.20) (158,420.20) 321,945.80 Projected 2018 Projected 2019 552,420.90 635,284.04 (182,330.37) (14,800.56) (805.00) (197,935.93) (197,935.93) 354,484.97 (209,679.93) (17,020.64) (925,75) (227,626,32) (227,626.32) 407,657.72 17 RECEIPT WELD COUNTY, CO WELD COUNTY, CO 1401 N. 17TH AVENUE Contact Receipt No. 80681 Payment Ref Amount Payment Received Comments Method Number Paid Date Check 1187 $2,500.00 08/01/2014 Owner Info.: BARTS VENTURE LLC (3/4 INT) 9709 ALKIRE ST ARVADA, CO 800051317 Work A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL Description: USE PERMIT FOR ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (TRUCKING AND TRUCK REPAIR SHOP FOR KNEEBONE EXCAVATING & TRUCKING COMPANY ALONG WITH OUTSIDE EQUIPMENT, VEHICLE STORAGE AND STAGING; AND RECREATIONAL VEHICLE, BOAT AND CAMPER TRAILER STORAGE), PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS IN THE A (AGRICULTURAL) ZONE DISTRICT RECEIPT WELD COUNTY, CO WELD COUNTY, CO 1401 N. 17TH AVENUE Contact Application: CMA21-0058 Application Type: Building/Commercial/Construction Alteration/NA Address:2404 CR 19, Receipt No. 123916 Payment Ref Amount Payment Received Comments Method Number Paid Date Check 1804 $4,615.21 08/23/2021 Owner Info.: K5 ENTERPRISE LLC 1384 RELIANCE CT ERIE, CO 805162438 Work TENANT FINISH TO EXSITING 1440 SF COMMERCIAL BUILDING Description: BUILT IN 2016 - INCLUDES FINAL INSPECTIONS ON EXPIRED PERMIT BCR16-01128 - 667 SF STORAGE ROOM AND 644 SF OFFICE W/ RESTROOM - UTILITIES INCLUDED - KNEEBONE EXCAVATING & TRUCKING COMPANY - USR14-0045 RECEIPT WELD COUNTY, CO WELD COUNTY, CO 1401 N. 17TH AVENUE Contact . • • • 11 ; 31I.l .. •• - A ...-_..- a. .... . . .-; - ..- ... - - . •; • -... S:1 . •. , -- _ '; • ;, - .. ,_ • •.• -. '. !1 Cash $11.00 Invoice Detail Permit ID #: SP -1600332 Invoice #: 87850 Invoice Date: 10/18/2016 13:24:16 Period Fee Item EHS EHS Commercial New Septic WELD COUNTY, CO WELD COUNTY, CO 1401 N. 17TH AVENUE Contact Qty Fee 1 $950.00 Total Fee: $950.00 Application: USR14-0045 Application Type: Planning/Use By Special Review/NA/NA Address:2404 CR 19, FORT LUPTON, CO 80621 Payment Date 12/17/2015 - - - Owner Info.: BARTS VENTURE LLC (3/4 INT) 9709 ALKIRE ST ARVADA, CO 800051317 Work A SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL Description: USE PERMIT FOR ANY USE PERMITTED AS A USE BY RIGHT, AN ACCESSORY USE, OR A USE BY SPECIAL REVIEW IN THE COMMERCIAL OR INDUSTRIAL ZONE DISTRICTS (TRUCKING AND TRUCK REPAIR SHOP FOR KNEEBONE EXCAVATING & TRUCKING COMPANY ALONG WITH OUTSIDE EQUIPMENT, VEHICLE STORAGE AND STAGING; AND RECREATIONAL VEHICLE, BOAT AND CAMPER TRAILER STORAGE), PROVIDED THAT THE PROPERTY IS NOT A LOT IN AN APPROVED OR RECORDED SUBDIVISION PLAT OR LOTS PARTS OF A MAP OR PLAN FILED PRIOR TO ADOPTION OF ANY REGULATIONS CONTROLLING SUBDIVISIONS IN THE A (AGRICULTURAL) ZONE DISTRICT RECEIPT WELD COUNTY, CO WELD COUNTY, CO 1401 N. 17TH AVENUE Contact p :. A 4 Application- _ Credit Card ***5322 $75.00 07/28/2014 Tom Parko Jr. From: Randall Kneebone <randykneebone@gmail.com> Sent: Friday, July 13, 2018 9:26 AM To: Tom Parko Jr. Subject: Randy Kneebone employees in Weld County HI Tom, Here are my my employees that live in Weld County Randy Kneebone 1384 Reliance CT Erie, CO 80516 James Walker 1940 Kinnikinick Dr Erie, CO 80516 Taylor Walker 1940 Kinnikinick Dr Erie, CO 80516 Tim Bohman 29 Hwy 52 Unit 32 Longmont, CO 80504 Paulino Vasquez 19505 WCR 33 Lasalle, CO 80645 Mario Cano 400 Elm St Milliken, CO 80543 I have 2 other employees, one lives in Longmont, the other in Thornton. Thank you, Randy Kneebone From: Sent: To: Cc: Subject: Attachments: HI Tom, East Colorado SBDC <jesse.esparza@eastcoloradosbdc.com> Friday, March 16, 2018 7:56 AM Tom Parko Jr. Randall Kneebone Re: SBIP Verification Randy Kneebone revised Bus Plan.pdf Randy Kneebone came in to see me in November and wanted me to help him work to complete the business plan. At that time, what I saw was not sufficient to be labeled as a " business plan". I provided him with a a variety of additional directions on what he needed to do to complete at least a business action plan that was basic with goals and objectives and projections to where he was going as a business. I have worked with Randy to develop the plan towards something he can use. I believe he has completed the business action plan to my satisfaction and can use it as a tool to move his business forward. I have attached the final draft and am confirming that he has put some time and effort to the process for the business plan development. I will continue to work with him as time allows to help him continue to update and add to the business plan as time goes on. Let me know if you need any additional information from me. thanks Jesse Esparza SBDC Counselor 720-837-0416 iesse. esparza@eastcoloadosbdc.com jaciil@msn.com Business Consultant I East Colorado Small Business Development Center Hosted by the Monfort College of Business at the University of Northern Colorado 807 17th Street I Greeley, CO 80631 1 PH 970.351.4274 1 1 www.EastColoradoSBDC.com The Colorado SBDC is a Nationally Accredited Program On Nov 16, 2017, at 9:20 AM, Tom Parko Jr. <tparko@weldgov.com> wrote: Thank you Jenn'. I'll follow up with Randy. Have a nice weekend. 1 Tom Parko, M.A. Director of Planning Services Weld County Dept. of Planning Services 1555 N. 17th Avenue Greeley, CO. 80631 Office: 970-400-3572 Mobile: 970-302-5333 <image004.jpg> Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Jenn Negley [mailto:Tenn.negley@eastcoloradosbdc.com] Sent: Thursday, November 16, 2017 9:09 AM To: Tom Parko Jr. <tparko@weldgov.com> Cc: Jesse Esparza<iesse.esparza@eastcoloradosbdc.com>; Lisa Hudson <Iisa.hudson@eastcoloradosbdc.com> Subject: Re: FW: SBIP Verification Hello Tom, Hope all is well for you too. It's great to hear another business is using the Small Business Incentive Plan. I spoke with Jesse and he has met with Randy, however, at that time the business plan was not complete. I let Jesse know that he will need to provide your office with verification of the business plan's competition and review. Jesse is cc'ed in this email and you can find his contact information below. You can contact Jesse directly with any questions you have regarding Randy's business plan. Jesse Esparza 720-837-0416 Jesse.Esparza@EastColoradoSBDC.com Business Consultant I East Colorado SBDC & UNC BizHub Collaborative 800 17t11 St, Kepner 0025 I Greeley, CO 80631 I PH 970.351.4274 I I Jenn.Negley(dEastColoradoSBDC.com I www.EastColo radoSBDC.coml www.UNCBizHub.org xj 1'1 4JiI IjIxi: Gl 0 a Hosted by the Monfort College of Business at the University of Northern Colorado The Colorado SBDC is a Nationally Accredited Program On Wed, Nov 15, 2017 at 3:47 PM, Tom Parko Jr. <tparko@weldgov.com> wrote: Jenn, Good afternoon. I received an out of office reply for Lisa. I was hoping you could assist me. See below. Hope all is well. Thanks! Tom Parko, M.A. Director of Planning Services Weld County Dept. of Planning Services 1555 N. 17th Avenue Greeley, CO. 80631 Office: 970-400-3572 Mobile: 970-302-5333 <i mage002.j pg> Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. From: Tom Parko Jr. Sent: Wednesday, November 15, 2017 3:44 PM To: 'Drew, Lisa' <Lisa.Drew@unco.edu> Subject: SBIP Verification Lisa, Good afternoon. I am working on a Small Business Incentive Plan for Randy Kneebone who runs Kneebone Excavating and Trucking Inc. Randy indicated that he met with Jesse Esparza to go over his business plan on 11.1 at the Erie Chamber at 9:30am. Can you confirm this for me? If Randy's business plan looks good all I need is an email from you all. Sincerely, 3 Tom Parka, M.A. Director of Planning Services Weld County Dept. of Planning Services 1555 N. 17th Avenue Greeley, CO. 80631 Office: 970-400-3572 Mobile: 970-302-5333 <i m age003.j pg> Confidentiality Notice: This electronic transmission and any attached documents or other writings are intended only for the person or entity to which it is addressed and may contain information that is privileged, confidential or otherwise protected from disclosure. If you have received this communication in error, please immediately notify sender by return e-mail and destroy the communication. Any disclosure, copying, distribution or the taking of any action concerning the contents of this communication or any attachments by anyone other than the named recipient is strictly prohibited. G! 2707 25.301 GIS'CalculatedAcres__ BROWN[ GERALD S 2621 r. Y 2MS LTLLP, 5112 INTI #21528, fY 2128 at //. I tv1AR5 LANDS J I21 !148GIS Ca 1 i 1.8:i2 }I D C bTZ LAND ATTLEILLP dated Acres r: ac r-- J o << Z m Z .. cq = Y � w� J .w }ti r. VY 1: 6,703 0 1,117.1 0 558.56 1,117.1 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, WGS_1984_Web_Mercator-Auxiliary_Sphere current, or otherwise reliable. © Weld County Colorado THIS MAP IS NOT TO BE USED FOR NAVIGATION Legend Parcels Floodplain - Labels Floodplain - 500 Year Floodplain - 100 Year Zone A Floodplain - 100 Year Floodwa Floodplain - 100 Year Zone AE Floodplain - 100 Year Zone Ab Floodplain - 100 Year Zone AC Highway [] County Boundary Notes
Hello