Loading...
HomeMy WebLinkAbout20222360.tiffRESOLUTION RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE EXTENSION OF TEMPORARY CLOSURE OF COUNTY ROAD 22 BETWEEN COUNTY ROADS 31 AND 41 FOR AN ADDITIONAL TWO (2) WEEKS, FOR UNANTICIPATED DELAYS IN ASPHALT SUPPLY WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, pursuant to C.R.S. §42-4-106(6)(a): "...local authorities, with their respective jurisdiction may, for the purpose of road construction and maintenance, temporarily close to through traffic or to all vehicular traffic any highway or portion thereof for a period not to exceed a specified number of work days for project completion and shall, in conjunction with any such road closure establish appropriate detours or provide for an alternative routing of the traffic affected...", and WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal investigations, has determined that conditions exist which make it necessary to temporarily close said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting signs thereon. NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the safety of the general public and that said traffic control devices shall conform to the Federal Manual on Uniform Traffic Control Devices. BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County, Colorado, does declare and establish that the temporary closure of County Road 22, between County Roads 31 and 41, be extended, with said extended closure being effective August 12, 2022, for approximately an additional two (2) weeks through August 26, 2022, for unanticipated delays due to asphalt supply shortage, and further, that standard official traffic control devices shall be erected at said closure giving notice of the restrictions. cc: soots), o:spo tch csp 9/2/2-2 2022-2360 EG0024 EXTEND TEMPORARY CLOSURE — COUNTY ROAD 22 PAGE 2 The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on thel5thday ofAugust, A, D. 2022 ,nunc pro tunc April 11, 2022. BOARD OF COUNTY COMMISSIONERS WELCOUNTY, COLORADO ATTEST: diet.%) ..aC114•� James, Chair Weld County Clerk to the Board BY: APP:. •teve F Lori Sai County Attorney Date of signature: 01 2022-2360 EG0024 MEMORANDUM TO: Clerk to the Board DATE: August 11, 2022 FROM: Amy Mutchie, Public Works Department SUBJECT: BOCC Agenda Item Weld County Public Works is requesting permission to extend the closure of CR 22 between CR 31 and CR 37 until 8/26/2022 due to asphalt supply delays. Additional day closures from CR 37 to CR 41 are possible until 8/26/2022 as well. The closure of CR 22 from CR 31 to CR 41 was originally approved for 4/25/22 through 6/17/22 for the bridge redeck of bridge 22/35A and road construction. An extension until 8/12/2022 was approved due to weather delays. See attached closure diagram. 2022-2360 vas/15 EC -t OOZ�I www.invarion.com W20-3 • t 1 W20 -1F W20-3 W20-3 se ►Ise..4aALL .LL aIJ aaaaJait. to N I I I ci a X14-10 M4-9 • W20 -1F M cc �StR ZZ • W20 -1F I i M4-10 4 anot3o M4-9 • W20 -1F 3 • 40 �. w L1 ≥J a w 4 a s a i a A �arL a• �.t L a a nat. s a 44464. a► a 1J�-�a a a a �.�►-µ • a 4-a-a.a a t a a.ii a a a �-fr L L i 4.4-41-64-a• a a 31L. a. a s I.1 J..,a.a- a a a .s-i 4 , O M4-9 3 W20-3 PROJECT # HRP-88 ROAD CLOSURE DESCRIPTION `NCR 22 between WCR 31 and WCR 37 closed 8/12/2022 thru 8/26/2022 for road construction NOTICE TO PUBLIC Road signs and barricaded Message boards to be used DETOUR ROUTE WCR 31 between WCR 22 and WCR 20 1 mile paved WCR 20 between WCR 31 and WCR 37 3 miles gravel WCR 37 between WCR 20 and WCR 22 1 mile paved NOTES: ADTofWCR is: 1895/2019 Road Construction Closure Extension Mag Chloride to be used for dust control Prepared by: Kevin Hettinger 8/11/2022 Hello