HomeMy WebLinkAbout20222839.tiffRESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING TEMPORARY CLOSURE
OF TWO RIVERS PARKWAY BETWEEN COUNTY ROAD 54 AND STATE
HIGHWAY 60 FOR APPROXIMATELY FIVE (5) DAYS, FOR TWO (2) CULVERT
REPLACEMENTS
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, pursuant to C.R.S. §42-4-106(6)(a):
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance, temporarily close to
through traffic or to all vehicular traffic any highway or portion
thereof for a period not to exceed a specified number of work days
for project completion and shall, in conjunction with any such road
closure establish appropriate detours or provide for an alternative
routing of the traffic affected...", and
WHEREAS, the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
said County Road to through traffic and to regulate, warn and guide vehicular traffic by posting
signs thereon.
NOW, THEREFORE, BE IT RESOLVED that the Board of County Commissioners of Weld
County, Colorado, deems it necessary to regulate, warn and guide vehicular traffic on County
roads and any intersections thereof, and it hereby authorizes and orders the posting of such traffic
control devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon
for the safety of the general public and that said traffic control devices shall conform to the Federal
Manual on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that Two Rivers Parkway, between County Road 54 and
State Highway 60, be temporarily closed, with said closure being effective October 24, 2022, for
approximately five (5) days for the replacement of two (2) culverts, and further, that standard
official traffic control devices shall be erected at said closure giving notice of the restrictions.
cc:5O(as) D:spo i-c ,,, GSP
l0%/a.2.
2022-2839
EG0024
TEMPORARY CLOSURE - TWO RIVERS PARKWAY
PAGE 2
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 12th day of October, A.D., 2022.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: WAgtifik) G..xtso;ii
cott K. James, Chair
Weld County Clerk to the Board
ounty Attorney
Date of signature: to/2-0/2.2-
teve Moreno
.1:.,,, 251,1,0‘.
2022-2839
EG0024
MEMORANDUM
TO: Clerk to the Board DATE: October 10, 2022
FROM: Amy Mutchie, Public Works Department
SUBJECT: BOCC Agenda Item
Two River Parkway between WCR 54 and HWY 60 is closed from 10/24/2022 thru 10/28/2022 for 2
culvert replacement.
See attached closure diagrams.
2022-2839
iNi2 E7OO2y
www.invarion.com
M4-9
1
f
t
ano130
14-103
i
iWCR fl Ib
' DETOUR
�.J
M
4-9
- v-•►•
et
1
M4-9
01
I+
rs...I M4-103
M4-103 I
WCR52
•aeae-0psm- 4 ssertaai-r+-as.aama`pS-Sea
U
A
N
u
3 i0.a D wt.
".=TREE 4.
Etna
i
4
,
1
,
,
r
a
4�Yy31r�
ti -3"4
W20-3 $ W20 -1F
}f
a<
12
i�
}
}
1
i
I•aa ---
1A/')f1-1 C
M4-9
W20-1F
0
Qi
L
8'
V1/20-3
W20-3
0-46•••••a'
r
t
U)
PROJECT #AN -59
ROAD CLOSURE DESCRIPTION
Two Rivers between WCR 54 and HWY 60
closed 10/24/2022 thru 10/28/2022
fort culvert replacements
NOTICE TO PUBLIC
Road signs and barricaded
Message boards to be used
DETOUR ROUTE
WCR 54 between Two rivers and HWY 257 2 miles paves
HWY 257 between WCR 54 and HWY 60 2 mile paved
HWY 60 between HWY 257 and Two rivers 2 miles paved
NOTES
ADT of WCR is. 9825 / 2021
Culverts replaced are irrigation: with new 18" RCP &
24" RCP
Detour is paved
Culverts are .3 and .4 east of HWY 60
Prepared by: Ryan Reynolds
10/5/2022
Hello