WELL PERMIT NUMBER 86845-F
RECEIPT NUMBER 10O19892
ORIGINAL PERMIT APPLICANT(S)
MEADOW RIDGE HOLDINGS, LLC (FEHR, BARRY)
PERMIT TO CONSTRUCT A NEW WELL
APPROVED WELL LOCATION
Water Division: 1 Water District: 1
Designated Resin: N.(A
Management District: N.A
County: WELD
Parcel Name: RED 1h-0018
Lot: B Block: Fil i r:
Physical Address: N.(A
SW 1/4 SE 1.4 Section 119 Township _0 N Range 84.0 W Sixth P.M.
UTM COORDINATES (Meteo Zone: 13, NAD83)
Easting: 534959.3 Northing: 4441004i
ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT
CO NDITlO NS OF APPROVAL
1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit does not
ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from seeking
relief in a civil court action..
2 The construction of this well shall be in compliance with the Water Well Construction Rules 2 C.C.R 402-2, unless approval of a
variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in
accordance with Rule 18.
3.) Approved pursuant to CRS 37-90-137(41 and the findings of the State Engineer dated April 1, 2022,
4) The use of groundwater from this well is limited to commercial and light industrial.
5 Production from this well is limited to the Laramie -Fox Hills aquifer which is located approximately.630 feet below ground
surface and extends to a depth of approximately 915 feet. In accordance with Rule 10.4.8 of the Water Well Construction Rules,
plain steel casing must be installed and grouted from the top of the permitted production zone up to at least ten feet above the
base of the surface casing, or to the depth required by Rule 10.5.2.1, if no surface casing is installed, (NOTE: If coals and/or
carbonaceous shales are encountered in the borehole) plain casing and grout should be installed through these i n ter va is to
exclude poor quality water from entering the well.)
6) The pumping rate of this well shall not exceed 45 GPM.
7) The average annual amount of groundwater to be withdrawn shall not exceed 11.5 acre-feet and the total volume of
groundwater to be withdrawn shall not exceed 11,500 acre-feet.
8) The entire length of the hole shall be geophysically logged as required by Rule 9 of the Statewide Nontributory Ground Water
Rules prior to installing casing.
9 The owner shall mark the well in a conspicuous location with well permit number(s), name of the aquifer, and court case
number(s) as appropriate. The owner shall take necessary means and precautions to preserve these markings.
10) A totalizing flow meter must be installed on this well and maintained in good working order. Permanent records of all diversions
must be maintained by the well owner (recorded at least annually) and submitted to the Division Engineer upon request.
11) This well shall be constructed more than 4500 feet from any existing well, completed in the same aquifer, that is. not owned by
the applicant.
12 This well shall be constructed not more than 200 feet from the location specified on this p-ermit.
13) Pursuant to CRS 37-90-137(9)(b) and the Denver Basin Rules, no more than 98% of the nontributart' groundwater withdrawn
annually shall be consumed and the well owner shall demonstrate to the reasonable satisfaction of the State Engineer that no
more than 98% of the water withdrawn will be consumed.
14) This well is subject to administration by the Division Engineer in accordance with applicable decrees, statutes, rules, and
regulations.
Printed 01-O1-2022 For questions about this permit call 303_$66.35$1 or go to https=ffdwr_coLorada_gov
Page 1 of 2
WELL PERMIT NUMBER 86845-F
RECEIPT NUMBER 10019892
15 ADVANCE NOTICE REQUIRED - Pursuant to Construction Rule 6.2..2..1 (2 CCR 402-2), licensed or private drillers and pump
installers must provide advance notification (by 11:99 pm the day before) to the State Engineer prior tci each of the following
for this well the start of well construction, the initial installation of the first permanent pump, and the initial installation of a
cistern connected to the water well supply system. Any change in the date of construction/installation must be re -noticed prior
to the activity (by 11:99 pm the days before). Information regar-ding the notification process and a link to the electronic
notification form can be found on the Division of Water Resources website at dwr..colorado..gov
NOTE: This well is withdrawing water from a non-renewable aquifer. While the withdrawals from this aquifer are administered
based on a 100 year aquifer life, water level declines may prevent this well from diverting the permitted amounts for that 100
years.
NOTE: To ensure a maximum productive life of this well, perforated casing should be set through the entire producing interval
of the approved zone or aquifer indicated above,
NOTE: This permit will expire on the expiration date unless the well is constructed and a pump is installed by that date. A We l l
Construction and Yield Estimate Report (GWS-31) and Pump Installation and Production Equipment Test Report (GW5-32)must
be submitted to the Division of Water Resources to verify the well has been constructed and the pump has been installed. A
one-time extension of the expiration date may be available. Contact the DWR for additional information or refer to the
extension request form (GM -64) available at: dwr..colorado..'gov
Issued By AILIS THYME
Date Issued; 4/11 2022
Expiration [ate; 41112023