Loading...
HomeMy WebLinkAbout710550.tiff • larimer-weld regional planning commission SFECIFICATIOUS FCR A CCST PRGPCSAL FCR THE CACHE LA FCUDRE RIVER FLCOD PLAIN STUDY Part I . General Description of the Proposed Study. The Larimer-'geld Regional Planning Commission reouests a cost proposal for a Flood Plain Study of the Cache La Foudre River from La Port to the confluence of the South Platte River . The study will define the 50, 75 and 100 year flood plain. The study will be conducted in two phases . Phase I will con- sist of field control , mapping and cross section tabulation con- ducted by a firm or agency. Phase II will he composed of a flood plain delineation done by the U. S. Army Corps of En.^:.nc3rs . Herinafter, the bari_ner-Weld Regional Planning Corm .ssion (which includes the counties, cities , and towns in Larmier and Leld Counties) will he referred to as the "Cornission." . Also, the firm or aeency which will be contracted to conduct Phase I will be referred to as the "Contractor . Fart II . Phase Field Investigation and '. apning by the Contractor . A. Section Con:era7. Conditins I . Scope of or.k : • The Contractor shall perform all work and POST OFFICE BOX 2137/ FORT COLLINS, COLORADO 80521 /484-13O3 710550 Flood Flain Specifications Page 2 1. Scope of Work : (Can' t) , f irnish all services, eouipment, supplies , per- sonnel, plant, transporation, and all aerial photo flights necessary to furnish the aerial photography, topographic mapping, and cross sec- tion tabulation specified herein. The work specified herein shall be completed by priority. Moreover, the work must meet with the approval of the Commission before the Corn- mission will consider that the terms of the contract have been fulfilled . 2. Priorities : a . FIRST: Canyon mouth to the confluence of Spring Creek. b . SECCMD : Sheep' s Draw to the confluence of the Platte. c . THIRD : The remainder of Lariner County and Weld County to Sheep' s Draw. 3. I.iaterials to be furnished by the Ccrtractor . to the Cc m scion : a . Tflnonraohic ".anpino : Co;ipcs4 e Film positive of the topographic information on a photo- graphic base with the following al- ternates : Flood Plain Specification Page 3 1 . ) Alternate #1: Priorities 1, 2 & C with a scale of 1" - 200' and a contour interval of 4 feet. (If this alternate is chosen by the Commission, aerial photographs will be available from the Corps at a scale of 1 : 12, 000) . 2. ) Alternate #2: Priorities 1, 2 with a scale of 1 - 100' and a con- tour interval of 2 feet . Priority 3 with a scale of 1" - 200' and a con- tour interval of it feet . (If this alternative is chosen by the Com- mission, aerial photos must be re- flown) . b. Cross-Section Information The Contractor shall submit the cross sectional information in tabular form ( approximately 200 cross-sections) . c . Cross-Section Cverla The Contractor will submit an (overlay of the topographic map showing cross-section location and alignment with location of zero station for each cross-section. 4 . Licencs and Permits : a . The Contractor will obtain all necessary • Flood Plain Specification Page 4 4 . Licences and Permits : (Cont . ) permits and approvals from all local, state and federal authorities . • b . Should it become necessary in the performance of the work for the Con- • tractor to secure right of ingress or egress to perform any of the work on properties not owned or controlled by the Commission, the Contractor shall, • if practicable, secure the consent of the owner, his representative or agent prior to effecting entry on such property. 5. Responsibility: The Contractor shall be responsible for all damages to persons and property which occur as a result of work performed by the Contractor in the prosecution of the contract . 6. Safe Operation: The Contractor shall conduct the .cork with due 'reaard to safety and shall maintain safe working conditions at the site of the work . 7 . Topooraphic Conditions . The Contractor is charged with making his own reconnaissance and estimate of the character of the terrain with regard to difficulties in- volved . • • Flood Plain Specification - Page 5 8 . Report of Progress . The Contractor will be required to forward a weekly report of progress to the Commission. The report is to contain a listing of completed work as well as a statement of work in progress and an estimate on percentage basis of over-all completion. B. Section 3: Special Conditions 1. Special Conditions by Alternates: • a . If Alernate 41 or Alternate 42 is selected : 1 . Contour Limits The limits of the contours shall be at an elevation of twenty (20) feet above the surface of the river at the time of the aerial flights regardless of the distance necessary to attain that contour. b . If Alternate ;tl is selected : 1 . Scale of F'h:otooraphv, (Scale of 1" - 200' ) The Cache La Poudre River shall have a • scale of 1 : 12, 000. • Flood Plain Specification Page 6 c. If Alternate # 2 is selected : 1 . Aerial. Photographs. a . If Alternate 2 is selected , the aerial photography shall be exposed with a calib- rated precision Aerial Camera equipped with a high resolution, distortion free lens . b. The exposures shall cover the area stere- copically and at the proper scales to provide for the contour intervals and accuracies specified herein . c . Scale of 1" - 200' The Cache La Poudre River shall have a scale of 1 : 12,000. d . All negatives and two (2) sets of contact prints , on double-weight semi-matte paper, of the River photography. e. Photo Index: Furnish all negatives and two (2) sets of contact prints of the Cache La Poudre River photo indexes . use of �.irfie_ 's : (If Alternate 2 is Selected ) . The Contractor will be responsible for making all arrangements fcr use of airports , airfields , or emergency landing fields . Such arrangements by the Contractor will be made without obligation on the part of the Com- mission. • Flood Plain Specification rage 7 2. Control. a. Horizontal and Vertical Control Surveys . 1. The Control surveys required for all mapping specified under this contract shall be performed by the Contractor. 2. The density, location, and methods used to establish control shall coincide with the photogrammetric procedures, scale, contour interval, and plotting instruments used. b. Accuracy of Surveys. 1. Horizontal. Basic horizontal instru- mental surveys shall meet the requirements for third order traverse; i . e. , the error in closure before adjustment shall not exceed one part in 5, 000. 2. Vertical. Basic vertical survey acc- uracy shall meet the recuirments for third order leveling. 3. Topographic Maps - Cache La roudre Area . a. Scale. The final publication scale of the mapping is described under Part II, Section A. 3. L.. , b. Contour Interval. The contour interval of the mapping described under Part II, Section A. 3. C. . Flood Plain Specification Fage 4 . Vertical and Horizontal Control Accuracy. a . Horizontal Accuracy. The horizontal accuracy is to be such that not more than 10 percent of the points tested Mg shall be in error by more than ."1"744Q� an inch measured on the publication scale. These limits of accuracy shall apply in all cases to the positions of well-defined points only. "Well- defined" points are those that are easily visible or recoverable on the ground , such as the following : - monuments or markers as bench marks, property boundary monuments, corners of buildings or sturctures . In general, what is "well-defined" will also be determined by what is plottable on the scale of the map within 1/100 of an inch. b . Vertical Accuracy. Vertical accuracy shall be such that not more than 10 percent of the elevations tested shall be in error more than one-:Zalf of the contour interval. In checking elevations taken from the map, the apparent vertical error may be decreased by assuming a horizontal displace- ment within the permissible horizontal error for the map scale. Flood Plain Specification Page 9 5. Monuments . a . Vertical Position. The elevations of the nonuments .shall be run with third order accuracy, and the elevation shall be with reference to :.,ean Sea Level . C. Section C : Completion Deadlines : These items shall be completed by the Contractor and submitted to the Ccmi_ssion by the following dates : 1. Priority 1 - 29 February 1972 2. Priority 2 - 31 :. arch 1972 3. Priority 3 - 30 April 1972 Tart III . F tease IT : Flood Plain Delineation. The Corps of Engineers in Crr.aha, Nebraska will delineate the Cache La Poudre flood plain from data submitted by the ontractor. Part IV. Sii'rni ttal Procedure fn Cost Pron^sals. a . Cc st estimates should be submitted to Edward S. :telly, Actin° Director of Public .arks, City of Greeley. b . Cnst proposals are issued this date and must ce submitted no later than .1 F .1:, ;.'.ST, December 17 , 1971 . • Flood Plain Specification Page 10 Issued By: The Larimer-Weld Regional Flood Plain Study Selection and Recommendation Committee. • Members: Mr. Roy A. Bingman, City Engineer, City of Fort Collins . ' Mr. Edward S. Kelly, Acting Director of Public Works, City of Greeley. Mr. Dwight Whitney, Planning Director, Larimer County. December 6 , 1971 Hello