HomeMy WebLinkAbout20220582.tiffMEMORANDUM TO: Michael Hall, Planning Services FROM: Melissa J King, PE, DRE DATE: October 28, 2021 SUBJECT: COZ21-0008 Zadel The proposal has been reviewed for the Weld County Department of Public Works requirements. Staff comments made during this phase of the application process may not be all-inclusive, as other issues may arise during the remaining application process. COMMENTS: Parcel: 105934000027 The project proposes to: Change of Zone from the A (Agricultural) Zone District to the E (Estate) Zone District ACCESS: Weld County Public Works has reviewed the application materials related to access. The parcel has existing unpermitted access onto County Road 38 approximately 208 feet east of the intersection of CR 38 and CR 19. This access location does not meet the Minimum Access Spacing Criteria (i.e. 660 feet) specified in Table 1 of Sec. 8-14-30 of the Code. Further, this access location is associated with Lot 1 of the proposed minor subdivision. Therefore, per Sec. 24-5-20.A.11 (i.e. all lots shall be accessed via a privately maintained internal road), this access point shall be closed and reclaimed. The applicant has proposed a "development access" for the proposed minor subdivision's internal road onto County Road 38 approximately 540 feet east of the intersection of CR 38 and CR 19. This location does not meet the Minimum Access Spacing Criteria from the intersection. See Table 1 below. The applicant has applied for a variance of the Minimum Access Spacing Criteria which requires 1,320 feet minimum spacing. The Department of Public Works has reviewed the variance request. Based on this review, the Department of Public Works supports this variance request. Sec. 8-14-30. Table 1 Minimum Access Spacing Criteria (Feet) Access Element Arterial Collector Local Distance between intersections Signalized Unsignalized 2,640 1,320 N/A 1,320 N/A 330 Distance between accesses and intersections 660 660 330 Distance between access points 660 330 150 Distance between access points in subdivisions 660 330 75 No other access is requested. ROADS AND RIGHT-OF-WAY: This portion of County Road 38 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a collector road, which requires 80 feet of right-of-way. The applicant shall delineate on the plat the future and existing right-of-way and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated or reserved per Weld County Code. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. This portion of County Road 19 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a collector road, which requires 80 feet of right-of-way. The applicant shall delineate on the plat the future and existing right-of-way and the physical location of the road. If the right-of-way cannot be verified it shall be dedicated or reserved per Weld County Code. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. Be aware that physical roadways may not be centered in the right-of-way. This road is maintained by Weld County. Per Chapter 8, Article 13, Section 8-13-30, a Weld County Right -of -Way Use Permit is required for any project that will be occupying, constructing or excavating facilities within, and or encroaching upon, any County rights -of -way or easement. Right -of -Way Use Permit instructions and application can be found at https://www.weldgov.com/departments/public works/permits!. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the County right-of-way. RIGHT-OF-WAY USE This project appears to use Weld County Right -of -Way associated with County Road 38. This use may require a Right -of -Way Use Permit. The Right -of -Way Use Permit is a tool to help regulate unauthorized obstructions of, excavations in, and use of the County's rights -of -way and easements by utilities and line providers by requiring permits for ALL construction activities within the Weld County rights -of -way, whether gravel or paved, and including all public drainage easements. A Right -of -Way Use Permit grants a permit holder permission to occupy, excavate, survey, perform locations, or construct facilities within the County rights -of -way or easement, and provide for the subsequent restoration upon completion. Review the following link for additional information: httos://www.weldaov.com/Govern ment/Departments/Pub! Ic-Works/Permits/Riaht-of-Wav-Permits TRAFFIC An acceptable traffic narrative was submitted. Based on this traffic narrative, the county road facilities providing access to the property are adequate in functional classification, width and structural capacity to meet the traffic requirements. CONDITIONS OF APPROVAL: The plat shall be amended to delineate the following: County Road 38 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a collector road, which requires 80 feet of right-of-way at full buildout. The applicant shall delineate and label on the plat the future and existing right-of-way (along with the documents creating the existing right-of-way) and the physical location of the road. If the existing right-of-way cannot be verified it shall be dedicated. The applicant shall also delineate the physical location of the roadway. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. This road is maintained by Weld County. (Department of Public Works) 2. County Road 19 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a collector road, which requires 80 feet of right-of-way at full buildout. The applicant shall delineate and label on the plat the future and existing right-of-way (along with the documents creating the existing right-of-way) and the physical location of the road. If the existing right-of-way cannot be verified it shall be dedicated. The applicant shall also delineate the physical location of the roadway. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. This road is maintained by Weld County. (Department of Public Works) 3. Show and label the existing access point as "close and reclaim." Show and label the proposed development access point and the usage type (Commercial). Final review of the access location is part of the plat submittal. (Department of Public Works) DEVELOPMENT STANDARDS (NOTES ON THE PLAT) 1. The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Department of Public Works) 2. Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the existing County right-of-way. (Department of Public Works) 3. Access on the site shall be maintained to mitigate any impacts to the public road including damages and/or offsite tracking. (Department of Public Works) 4. Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Department of Public Works) 5. The historical flow patterns and runoff amounts will be maintained on the site. (Department of Public Works) WELD COUNTY DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT c u 1 rY 1555 North 17th Avenue, Greeley, CO 80631 www.weldhealth.org Memorandum To: Michael Hall From: Lauren Light, Environmental Health Services Date: October 27, 2021 Re: COZ21-0008 George Zadel Environmental Health Services has reviewed this proposal for a Change of Zone from the A (Agricultural) Zone District to the E (Estate) Zone District. The site is currently served by Little Thompson Water District and an on -site wastewater treatment system permitted for two bedrooms. (G19860121) We recommend the following appear as notes on the plat: 1. Water service may be obtained from Little Thompson Water District. 2. The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be by an on -site wastewater treatment system (OWTS) designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. 3. Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. Health Administration Public Health & Vital Records Clinical Services Icic: 9/0 304 6410 Ice: 9:0 304 6420 Fax: 9/0-301-6412 Fax: 9/0-304-6416 Environmental Health Communication, Emergency Preparedness Services Education & Planning g Response Tele: 970-304-6415 Tele: 970-.304-6470 Tele: 970-304-6470 Fax: 970-304-641 1 Fax: 970-304-6452 Fax: 970-304-6462 Public Health Submit by Email Weld County Referral October 21, 2021 The Weld County Department of Planning Services has received the following item for review: Applicant Goerge G. Zadel Case Number COZ21-0008 Please Reply By: November 18, 2021 Planner. Michael Hall Project Change of Zone from the A (Agricultural) Zone District to the E (Estate) Zone District Parcel Number 105934000027-R0371694 Legal: LOT B RE -1359, PT SW4SW4 SECTION 34, T4N, R67W of the 6th P.M. Weld County, Colorado. Location: EAST OF AND ADJACENT TO COUNTY ROAD 19, NORTH OF AND ADJACENT TO COUNTY ROAD 38 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. 0 We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: 0 We have reviewed the request and find no conflicts with our interests. El See attached letter. Signature Billie Moore Date 11/08/2021 Agency WELD COUNTY BUILDING DEPT - Weld County Planning Dept. 1555 N. 17th Ave, Greeley, CO 80631 (970)-440-6100 (970)-304-6498 fax ZADEL MINOR COZ21-0008 (AG TO ESTATE) MINK20-0002 PT SW4 34-4-67 ZONED ESTATE NOT IN FLOOD PLAIN (1695C) RIF AREA #3 LITTLE THOMPSON WATER DISTRICT ENGINEERED INDIVIDUAL SEPTIC SYSTEMS UNITED POWER WELD SCHOOL DIST RE -1 PLATTEVILLE-GLICREST FIRE DEPT JOHNSTOWN PO 5 RESIDENTIAL LOTS W/STANDARD ESTATE USES Developer: GEORGE ZADEL Planner: Michael Hall PRELIMINARY ADDRESSING (BILLIE MOORE 11108/21) Lot 1 18100 CR 19 (EXISTING) Lot 2 TBD CR 38 Lot3 TBDCR38 Lot 4 TBD CR 38 Lot 5 TBD CR 38 Need approved access permit prior to addressing the subdivision. Lot 1 will need to have a new address issued as that lot will have to access from the internal subdivision road system. Submit by Email Weld County Referral October 21, 2021 The Weld County Department of Planning Services has received the following item for review: Applicant: Goerge G. Zadel Case Number: COZ21-0008 Please Reply By: November 18, 2021 Planner: Michael Hall Project: Change of Zone from the A (Agricultural) Zone District to the E (Estate) Zone District Parcel Number: 105934000027-R0371694 Legal: LOT B RE -1359, PT SW4SW4 SECTION 34, T4N, R67W of the 6th P.M., Weld County, Colorado. Location: EAST OF AND ADJACENT TO COUNTY ROAD 19, NORTH OF AND ADJACENT TO COUNTY ROAD 38 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. ❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Signature Jake Hebert, PE Agency Little Thompson Water District Date 11/11/2021 LTWD issued a commitment letter for this property. Al requirements for water service are outlined in the letter. Weld County Planning Dept. 1555 N. 17th Ave, Greeley, CO 80631 (970)-440-6100 (970)-304-6498 fax Weld County Referral October 21, 2021 The Weld County Department of Planning Services has received the following item for review: Applicant: Goerge G. Zadel Case Number: COZ21-0008 Please Reply By: November 18, 2021 Planner: Michael Hall Project: Change of Zone from the A (Agricultural) Zone District to the E (Estate) Zone District Parcel Number: 105934000027-R0371694 Legal: LOT B RE -1359, PT SW4SW4 SECTION 34, T4N, R67W of the 6th P.M., Weld County, Colorado. Location: EAST OF AND ADJACENT TO COUNTY ROAD 19, NORTH OF AND ADJACENT TO COUNTY ROAD 38 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. o We have reviewed the request and find that it does / does not comply with our Comprehensive Plan because: Q We have reviewed the request and find no conflicts with our interests. Q See attached letter. Signature Doug Moss CFO -COO Agency Weld County School District RE -1 Date 10/21/2021 Weld County Planning Dept. 1555 N. 17th Ave, Greeley, CO 80631 (970)-440-6100 (970)-304-6498 fax Weld County School District RE -1 Gilcrest • LaSalle • Platteville P.O. Box 157 14827 W.C.R. 42 Gilcrest, CO 80623 Johan van Nieuwenhuizen, Superintendent October 21, 2021 Michael Hall Weld County Planning Department 1555 North 17"' Avenue Greeley, CO 80631 RE: Case Number COZ21-0008 Dear Michael: We have reviewed the application by George Zadel for COZ21-0008 and have the following comments: Weld County School District RE -1 has developed methodology for Land Dedication and/or In Lieu Payments. The current In Lieu Payment amount per single family unit is $1,054.20. Based on the information provided, it appears that there are plans to add 4 additional lots to the parcel turning it into four additional lots. Therefore, an in -lieu payment in the amount of $4,216.80 is due to the school district prior to approval of the recorded exemption. Respectfully, Doug Moss Chief Financial/Operations Officer BOARD OF EDUCATION Kim Chacon Ben Rain bolt, Jr Naomi Nguyen Bridget Holcomb President Vice President Secretary Treasurer Pat Montoya Director Our Total Commitment is to Provide an Exemplary Education and Safe Environment for all Students COLORADO Division of Water Resources DH Department of Natural Resources October 27, 2020 Michael Hall Weld County Planning Services Transmission via email: mhall@weldgov.com RE: Zadel Minor Subdivision Case No. MINK20-0002 Part of the SW1/4 of the SW1/4 of Sec. 34, T4N, R67W, 6a' P.M. (Lot B RE -1359) Water Division 1, Water District 2 Dear Mr. Hall: We have reviewed your submittal of October 21, 2020 concerning the above referenced proposal for a minor subdivision of 5 single-family residential lots on 25.4 acres (Lot B of RE - 1359) to be known as Zadel Minor Subdivision. The lots will range in size from 3.52 acres to 6.84 acres. Water Supply Demand A Water Supply Information Summary Sheet ("Summary Sheet") was not submitted, however according to a letter dated August 20, 2020 (District Letter) from the Little Thompson Water District (District) the water supply demand is 0.70 acre-feet per tap, totaling 2.8 acre-feet for the new taps proposed for lots 2, 3, 4, and 5. Proposed Lot 1 will be served by the District through existing tap 3564. Source of Water Supply The proposed water source is listed as the District. The District letter noted that water service for new taps for Lots 2, 3, 4, and 5 can be made available provided all requirements of the District are satisfied including a 6 -inch mainline extension that ties into an existing 6 - inch diameter water line located in the WCR-38. In addition the developer will be required to provide water rights to meet the minimum project needs of the proposed development at 0.70 acre-feet per tap. We do not know if the applicant has met these other requirements. The commitment letter will expire two years from the date of the letter if the taps have not been purchased, paid for and installed by that date of expiration date. Based on current records on file in this office, the District will require the developer to purchase and transfer to the District 1.4 share of Colorado -Big Thompson (CBT) water prior to tap activation. This office most recently received information from the District regarding their water supply in a letter dated January 10, 2013. At that time, the District had a total firm yield of 4,923 acre-feet, with a total projected demand of 5,423 acre-feet at the end of 2020. By policy, new growth within the LTWD requires developers to dedicate water rights sufficient to supply the anticipated demands within their development. 13133 Sherman Street, Room 821, Denver. CO 80203 P 303.856.3581 ntiv v.coorado.8 v/water y �1 r O� _tared S. Fells. Governor I Dan Gibbs, Executive Director I Kevin G. Rein, State Engineer/Oitector f Zadel Minor Subdivision October 27, 2020 Page 2 of 2 The applicant should be aware that, unless the structure can meet the requirements of a "storm water detention and infiltration facility" as defined in section 37-92-602(8), Colorado Revised Statutes, the structure may be subject to administration by this office. The applicant should review DWR's Administrative Statement Regarding the Management of Storm Water Detention Facilities and Post-Wildland Fire Facilities in Colorado to ensure that the notification, construction and operation of the proposed structure meets statutory and administrative requirements. The applicant is encouraged to use Colorado Stormwater Detention and Infiltration Facility Notification Portal, located at hps: erture.di italdataservices.com/ vh/?viewer=cswdif, to meet the notification requirements. State Engineer's Office Opinion Based upon the above and pursuant to Section 30-28-136(1)(h)(I) and Section 30-28- 136(1)(h)(II), C.R.S., it is our opinion that the proposed water supply is adequate and can be provided without causing injury to decreed water rights as long as the District provides water to all 5 lots within this subdivision. Our office recommends that the County obtain proof, prior to subdivision approval, that the developer has met the requirements of the District for obtaining water service for the five lots, including the requirement to provide water rights to the District in an amount of 0.7 acre-feet per proposed tap. Should you or the applicant have any questions, please contact loana Comaniciu at (303) 866- 3581 x8246. Sincerely, Joann Williams, P.E. Water Resource Engineer Ec: Subdivision File 27388 District File Hello