Loading...
HomeMy WebLinkAbout20220104.tiffLAND USE APPLICATION STAFF COMMENTS Planner: Angela Snyder Hearing Date: December 7, 2021 Case Number: COZ21-0007 Owner: Gary Lee Site Address: 580 E. 161h St, Greeley, CO 80631 Request: Change of Zone from the A (Agricultural) Zone District to the 1-3 (Heavy Industrial) Zone District Legal Lot 2 of Union Colony Subdivision; being part of the NE4SW4 of Section 9, Description: Township 5 North, Range 65 West of the 6'" P.M., Weld County, Colorado Location: South of and adjacent to E 16th St, approximately 330 feet west of Balsam Ave Acres: ± 5.05 acres Parcel #: 0961-09-3-00-083 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received responses from the following agencies: With Comment: ■ City of Greeley, referral dated October 29, 2021 ■ Weld County Department of Planning Services - Development Review, referral dated October 13, 2021 ■ Weld County Department of Public Health and Environment, referral dated October 21, 2021 Without Comment: ■ Town of Garden City, referral dated October 19, 2021 ■ Greeley Fire Protection District, referral dated October 12, 2021 ■ Weld County Zoning Compliance, referral dated October 13, 2021 The Department of Planning Services' staff has not received responses from: ■ Town of Kersey ■ Greeley -Weld County Airport ■ Weld County Assessor's Office ■ Weld County Sheriff's Office ■ North Weld County Water District ■ Weld County School District RE -6 COZ21-0007 Page 1 of 6 Narrative The property owner has requested a Change of Zone on a property zoned A (Agricultural) to 1-3 (Heavy Industrial). Potential uses for 1-3 zoned properties can be found in Section 23-3-330 of the Weld County Code. The property has one single family, manufactured residence added in 1992. As the home is modular, it can be used for a caretaker or security personnel in accordance with Section 23-3-330.E.1 of the Weld County Code as part of an approved site plan. As the property is not currently being used commercially, any new business will require a Site Plan Review. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-50 of the Weld County Code. All necessary application materials were found to be complete on October 12, 2021. 2. The submitted materials are in compliance with Section 23-2-30 of the Weld County Code, as follows: A. Section 23-2-30.A.1. - That the proposal is consistent with Chapter 22 of the Weld County. Section 22-2-30.B. Locate urban development in urban areas. North Weld County Water District currently serves the subject property with public water. Should future development of the site require sanitary sewer, service could be made available from the City of Greeley and would require annexation, according to the October 13, 2021 referral. Urban use of this property is acceptable because it is located in an urban area. Section 22-2-30.C. Harmonize development with surrounding land uses The applicant owns two adjacent lots to the west which are zoned 1-3 (Heavy Industrial) and being used industrially. Further west is a commercial/industrial business park annexed into the City of Greeley. Land to the northwest is zoned industrially in both city and county. Directly north is residential property. The property directly south is zoned C-3 (Business Commercial). The property to the east remains zoned A (Agricultural) but a USR15-0009 for a trucking company is adjacent. Industrial use of this property is in harmony with the majority of surrounding land uses. Section 22-2-40.A. Support compatible economic development opportunities. The site is located within a Weld County Opportunity Zone on the Comprehensive Plan Map and is in an industrial area, thus encouraging the agglomeration of synergistic businesses. B. Section 23-2-30.A.2. - The uses which would be allowed on the subject property by granting the change of zone will be compatible with the surrounding land uses. Surrounding land is being used commercially. Notice was sent to twenty-four (24) surrounding properties and no responses were received. The City of Greeley referral dated October 29 contained only advisory comments for future development and no concerns with the present request. The Greeley Land Use Guidance Map (2017) designates the area for Mixed Use High Intensity land uses. The Town of Garden City expressed no concerns in the October 19, 2021 referral. The Greeley Fire Department also expressed no concerns in the October 12, 2021 referral. COZ21-0007 Page2of6 Future industrial uses will have to be approved through a Site Plan Review or Use by Special Review process. Site Plan Review and Use by Special Review applications are sent to referral agencies for comments. The Conditions of Approval and Development Standards applied to both this Change of Zone and any future Site Plan Reviews will adequately address and mitigate potential impacts. Due to the proximity of other industrial operations in the vicinity, a Change of Zone to 1-3 (Heavy Industrial) is compatible with the surrounding land uses. C. Section 23-2-30.A.3. - Adequate water and sewer service can be made available to the site to serve the uses permitted within the proposed zone district. The site is currently served domestic water from North Weld County Water District via account #2176002. The site uses onsite wastewater treatment for sewage disposal, permit #G19920283. No concerns regarding water or sewer service were expressed by the Department of Public Health and Environment in the October 21, 2021 referral response, the City of Greeley in the October 29, 2021 referral response, or from North Weld County Water District. D. Section 23-2-30.A.4. - Street or highway facilities providing access to the property are adequate in size to meet the requirements of the proposed zone districts. Section 23-3-330 of the Weld County Code states, "... Properties zoned 1-3 should be located near transportation infrastructure such as highways, railroads, or airports." East 16th Street is designated on the 2011 Greeley Transportation Plan as a minor arterial and a local road on the Weld County Functional Classification Map (2020). The Weld County Development Review referral dated October 13, 2021 indicated that the county road providing access to the property is adequate in functional classification, width and structural capacity for the estimated traffic. Should the traffic increase, the City of Greeley, in the October 13, 2021 referral, requests to review any traffic studies and discuss future impacts to the transportation system. The City also reviewed the future drainage report showing storm drainage to be discharged into Greeley's stormwater infrastructure system. E. Section 23-2-30.A.5. - In those instances where the following characteristics are applicable to the rezoning request, the applicant has demonstrated compliance with the applicable standards: 1) Section 23-2-30.A.5.a. — If the proposed Change of Zone is located within any Overlay District identified by maps officially adopted by the County, that the applicant has demonstrated compliance with the County regulations concerning Overlay Districts. Compliance may be demonstrated in a previous public hearing or in the hearing concerning the rezoning application. The site is located within the A -P (Airport) Overlay District. Development of the site will be required to comply with applicable requirements in Chapter 23, Article V, Division 1 of the Weld County Code. Future development applications will be sent to the airport for review. The site is not located within the following overlay districts officially adopted by the County: geologic, historic, Multiple Separate Storm Sewer System (MS4), or floodplain. 2) Section 23-2-30.A.5.b. - That the proposed rezoning will not permit the use of any area known to contain a commercial mineral deposit in a manner which would interfere with the present or future extraction of such deposit by an extractor to any greater extent than under the present zoning of the property. The Geotech Report, dated September 8, 2021, submitted with the application indicates that sand and gravel deposits may be located at least ten (10) feet under the surface, but are not economically viable, that the site is not located within an area recognized as COZ21-0007 Page 3 of 6 having economically recoverable sand and gravel or other metallic resources. No other potential geologic hazards were identified. 3) Section 23-2-30.A.5.c. - If soil conditions on the site are such that they present moderate or severe limitations to the construction of structures or facilities proposed for the site, that such limitations can be overcome and that the limitations will be addressed by the applicant and/or the applicant's successors or assigns prior to the development of the property. The Geotech Report, dated September 8, 2021, submitted with the application also considered soils, which are mostly Otero sandy loam, which has "rapid permeability, slow surface runoff and low erosion hazard." No soil limitation was identified. This recommendation for approval is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. THE CHANGE OF ZONE FROM THE A (AGRICULTURAL) ZONE DISTRICT TO THE 1-3 (HEAVY INDUSTRIAL) ZONE DISTRICT IS CONDITIONAL UPON THE FOLLOWING: 1. Prior to recording the plat: A. The plat shall be amended to delineate the following: 1. All pages of the plat shall be labeled COZ21-0007. (Department of Planning Services) 2. The plat shall adhere to Section 23-2-50. D. of the Weld County Code. (Department of Planning Services) 3. All recorded easements and rights -of -way shall be shown and dimensioned on the Change of Zone plat. (Department of Planning Services) 4. E. 16'" Street is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as a local road, which requires 60 feet of right-of-way at full buildout. The applicant shall delineate and label on the plat the future and existing right-of-way (along with the documents creating the existing right-of-way) and the physical location of the road. If the existing right-of-way cannot be verified it shall be dedicated or reserved per Weld County Code. The applicant shall also delineate the physical location of the roadway. Pursuant to the definition of setback in the Weld County Code Sec. 23-1-90, the required setback is measured from the future right-of-way line. This road is maintained by Weld County. (Development Review) 5. Show and label the existing, proposed access point and the usage type (Commercial). Final review of the access location is part of the plat submittal. (Development Review) 2. The following notes shall be delineated on the Change of Zone plat: 1) The Change of Zone, COZ21-0007, allows for 1-3 (Heavy Industrial) uses which shall comply with the 1-3 (Heavy Industrial) Zone District requirements as set forth in Chapter 23, Article III Division 4 of the Weld County Code, as amended. (Department of Planning Services) 2) Any future structures or uses on site must obtain the appropriate zoning and building permits. (Department of Planning Services) 3) The manufactured home may be used as living quarters for caretaker or security personnel responsible for maintaining or guarding the property in accordance with Section 23-3- COZ21-0007 Page4of6 330.E.1. (Department of Planning Services) 4) Buffering and screening of industrial uses from residential properties may be required through the permitting process. (Department of Planning Services) 5) Building permits may be required, for any new construction or set up manufactured structure, per Section 29-3-10 of the Weld County Code. A building permit application must be completed and submitted. Buildings and structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2018 International Building Codes, 2018 International Residential Code, 2006 International Energy Code, 2017 National Electrical Code, and Chapter 29 of the Weld County Code. A plan review shall be approved, and a permit must be issued prior to the start of construction. (Department of Building Inspection) 6) Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County -Wide Road Fee Impact Program and the County Facility Fee and Drainage Impact Fee Programs. (Department of Planning Services) 7) The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) 8) Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the existing County right-of-way. (Development Review) 9) Access on the site shall be maintained to mitigate any impacts to the public road including damages and/or offsite tracking. (Development Review) 10) Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Development Review) 11) The historical flow patterns and runoff amounts will be maintained on the site. (Development Review) 12) Water service may be obtained from North Weld County Water District. (Department of Public Health and Environment) 13) The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be an on -site wastewater treatment system (OWTS) designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Public Health and Environment) 14) Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. (Department of Public Health and Environment) 15) During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of Weld County Environmental Health Services, a fugitive dust control plan must be submitted. (Department of Public Health and Environment) 16) If land development exceeds 6 months in duration, the responsible party shall prepare a COZ21-0007 Page 5 of 6 fugitive dust control plan, submit an air pollution emissions notice application, and apply for a permit from the Colorado Department of Public Health and Environment. (Department of Public Health and Environment) 17) Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 18) RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy, (b) the populous counties of the state face a critical shortage of such deposits, and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. Mineral resource locations are widespread throughout the County and people moving into these areas must recognize the various impacts associated with this development. Often times, mineral resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 3. Upon completion of Conditions of Approval 1. and 2. above, the applicant shall submit one (1) electronic copy (.pdf) of the plat for preliminary approval to the Weld County Department of Planning Services. The plat shall be prepared in accordance with the requirements of Section 23-2-50. D. of the Weld County Code. 4. Upon approval of the plat, Condition of Approval 3. above, the applicant shall submit to the Department of Planning Services a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services Staff. The Mylar plat and additional requirements shall be submitted within one -hundred -twenty (120) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. 5. Any approved amendments to the Official Zoning Map shall be effective immediately upon approval by the Board of County Commissioners unless otherwise specified by the approving resolution of the Board of County Commissioners. However, no building permit shall be issued and no use shall commence on the property until the plat is recorded. 6. If a plat has not been recorded within one hundred twenty (120) days of the date of the approval of the Change of Zone (COZ), or within a date specified by the Board of County Commissioners, the Board may require the landowner to appear before it and present evidence substantiating that the COZ has not been abandoned and that the applicant possesses the willingness and ability to record the plat. The Board of County Commissioners may extend the date for recording the plat. If the Board determines that conditions supporting the original approval of the COZ cannot be met, the Board may, after a public hearing, revoke the COZ. 7. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required one -hundred -twenty (120) days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall be added for each additional 3 -month period. COZ21-0007 Page 6 of 6 November 2, 2021 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.weldgov.com E-MAIL: asnyder@weldgov.com PHONE: (970) 400-3525 FAX: (970) 304-6498 LEE GARY V 7201 HIDING ELK LN LOVELAND, CO 80538 Subject: COZ21-0007 - Change of Zone from the A (Agricultural) Zone District to the 1-3 (Heavy Industrial) Zone District On parcel(s) of land described as: LOT 2 OF THE UNION COLONY SUBDIVISION; BEING PART OF THE NE4SW4 SECTION 9, T5N, R65W of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on December 7, 2021 at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on January 12, 2022 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://accela- aca.co.weld.co.us/CitizenAccess Respectfully, / l 4 1 Angela Snyder Planner Hello