HomeMy WebLinkAbout20220486.tiffRESOLUTION
RE: APPROVE SUMMARY OF GRANT AWARD TERMS AND CONDITIONS FOR ENERGY
AND MINERAL IMPACT ASSISTANCE FUND (EIAF) PROGRAM FOR
COUNTY ROAD 22 IMPROVEMENTS PROJECT (SEPTEMBER CYCLE -TIER II)
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with a Summary of Grant Award Terms and
Conditions for the Energy and Mineral Impact Assistance Fund (EIAF) Program for the County
Road 22 Improvements Project (September Cycle -Tier II) between the County of Weld, State of
Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the
Department of Public Works, and the Colorado Department of Local Affairs, with further terms
and conditions being as stated in said summary of grant award terms and conditions, and
WHEREAS, after review, the Board deems it advisable to approve said summary of grant
award terms and conditions, a copy of which is attached hereto and incorporated herein by
reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that the Summary of Grant Award Terms and Conditions for the Energy
and Mineral Impact Assistance Fund (EIAF) Program for the County Road 22 Improvements
Project (September Cycle -Tier II) between the County of Weld, State of Colorado, by and through
the Board of County Commissioners of Weld County, on behalf of the Department of Public
Works, and the Colorado Department of Local Affairs, be, and hereby is, approved.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 9th day of February, A.D., 2022.
ATTEST: dJ Ej,pi�
Weld County Clerk to the Board
BY:
puty Clerk to the Boa
APP
Date of signature: o I?/ 2
BOARD OF COUNTY COMMISSIONERS
WEL COU TY, COLORADO
S tt K. James, Chair
Mike Freeman, Pro-Tem
EXCUSED
Perry L. Buck
oreno
Lori Saine—
CC . P�,J(ER/CH), ACT (cvkD)
3/3 /.22
2022-0486
EG0080
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: Executed DOLA Contract EIAF 9453 — WCR 22 Improvements
DEPARTMENT: Public Works DATE: January 27, 2022
PERSON REQUESTING: Elizabeth Relford
Brief description of the problem/issue:
Weld County has received an executed contract from DOLA for $450,000 for WCR 22 full depth reconstruction
improvements from WCR 31 to WCR 41. Public Works will use the grant funds to leverage the cost to purchase
cement treated base (CTB), aggregate, and asphalt materials, which our crews will use to make the
improvements. We anticipate the construction starting at the beginning of this summer and being completed by
November 2022.
What options exist for the Board? (include consequences, impacts, costs, etc. of options):
• BOCC approves placing this agreement on the next available agenda.
• BOCC denies the pass around and requests a work session.
Recommendation:
Staff recommends the Board consider placement of the DOLA contract on your next available agenda.
Ap�rove Schedule
Recommendation Work Session
Perry L. Buck
Mike Freeman, Pro -Tern
Scott K. James, Chair
Steve Moreno
Lori Saine
Other/Comments:
2022-0486
021 U�
DocuSign Envelope ID: 991 DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF
CTGGI NLAA 2022*2914
SUMMARY OF GRANT AWARD TERMS AND CONDITIONS
State Agency
DLG Portal Number
CMS Number
Department of Local Affairs (DOLA)
EIAF-09453
173116
Grantee
Grant Award Amount
Retainage Amount
Weld County
$450,000.00
$22,500.00
Project Number and Name
Performance Start Date
Grant Expiration Date
EIAF - 9453 Weld County Road 22 Improvements
The later of the Effective Date
January 31, 2024
or January 05, 2022
Project Description
Program Name
The Project consists of purchasing materials for roadway
Energy & Mineral Impact Assistance Program (EIAF)
improvements on Weld County Road 22.
Funding Source
STATE FUNDS
Catalog of Federal Domestic Assistance (CFDA) Number
N/A
DOLA Regional Manager
Funding Account Codes
Chris La May, (970) 679-7679,
chris.la.ma state.co.us
DOLA Regional Assistant
VCUST#
Address
Robert Thompson, (970) 290-2381,
14294
Code AD007 EFT
robert.thom son state.co.us
THE SIGNATORIES LISTED BELOW AUTHORIZE THIS GRANT
STATE OF COLORADO
Jared S. Polis, Governor
DEPARTMENT OF LOCAL AFFAIRS DEPARTMENT OF LOCAL AFFAIRS
PROGRAM REVIEWER Rick M. Garcia, Executive Director
DocuSigned by:
DocuSigned by: , f _ �A
�IIAR L9CF536BC34AC...
1DOB4F9ADCOA49C... By: Rick M. Garcia, Executive Director
By: Tim Katers, EIAF Program Manager
Date: 1/7/2022 1 3:18 PM MST Date: 1/9/2022 1 8:28 AM MST
In accordance with §24-30-202 C.R.S., this Grant is not valid until signed and dated below by the State Controller
or an authorized delegate (the "Effective Date").
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD
DocuSigned by:
SStf
090ACD88A721474.
By: Beulah Messick, Controller Delegate
Department of Local Affairs
Effective Date: 1/13/2022 1 9:55 AM MST
DocuSign Envelope ID: 991 DFDD5-CFAF-4C1 0-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
TERMS AND CONDITIONS
As of the Performance Start Date, the State Agency shown on the Summary of Grant Award Terms
and Conditions page of this Grant Award Letter (the "State") hereby obligates and awards to
Grantee shown on the Summary of Grant Award Terms and Conditions page of this Grant Award
Letter (the "Grantee") an award of Grant Funds in the amount shown on the Summary of Grant
Award Terms and Conditions page of this Grant Award Letter. By accepting the Grant Funds
provided under this Grant Award Letter, Grantee agrees to comply with the terms and conditions
of this Grant Award Letter and requirements and provisions of all Exhibits to this Grant Award
Letter.
2. TERM
A. Initial Grant Term and Extension
The Parties' respective performances under this Grant Award Letter shall commence on the
Performance Start Date and shall terminate on the Grant Expiration Date unless sooner
terminated or further extended in accordance with the terms of this Grant Award Letter. Upon
request of Grantee, the State may, in its sole discretion, extend the term of this Grant Award
Letter by providing Grantee with an updated Grant Award Letter or an executed Option Letter
showing the new Grant Expiration Date.
B. Early Termination in the Public Interest
The State is entering into this Grant Award Letter to serve the public interest of the State of
Colorado as determined by its Governor, General Assembly, or Courts. If this Grant Award
Letter ceases to further the public interest of the State or if State, Federal or other funds used
for this Grant Award Letter are not appropriated, or otherwise become unavailable to fund
this Grant Award Letter, the State, in its discretion, may terminate this Grant Award Letter
in whole or in part by providing written notice to Grantee. If the State terminates this Grant
Award Letter in the public interest, the State shall pay Grantee an amount equal to the
percentage of the total reimbursement payable under this Grant Award Letter that
corresponds to the percentage of Work satisfactorily completed, as determined by the State,
less payments previously made. Additionally, the State, in its discretion, may reimburse
Grantee for a portion of actual, out-of-pocket expenses not otherwise reimbursed under this
Grant Award Letter that are incurred by Grantee and are directly attributable to the
uncompleted portion of Grantee's obligations, provided that the sum of any and all
reimbursements shall not exceed the maximum amount payable to Grantee hereunder. This
subsection shall not apply to a termination of this Grant Award Letter by the State for breach
by Grantee.
C. Reserved.
3. AUTHORITY
Authority to enter into this Grant Award Letter exists in the law as follows:
A. State Authority
Authority to enter into this Grant exists in C.R.S. 24-32-106 and 29-3.5-101 and funds have
been budgeted, appropriated and otherwise made available pursuant to C.R.S. 39-29-110
(Local Government Severance Tax Fund) and a sufficient unencumbered balance thereof
remains available for payment. Required approvals, clearance and coordination have been
Page 2 of 10 Version 0717
DocuSign Envelope ID: 991 DFDD5-CFAF-4O10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
accomplished from and with appropriate agencies. This Grant Award Letter is funded, in
whole or in part, with State funds.
B. Reserved.
4. DEFINITIONS
The following terms shall be construed and interpreted as follows:
A. Reserved.
B. Reserved.
C. "CORA" means the Colorado Open Records Act, §§24-72-200.1 et. seq., C.R.S.
D. "Exhibits" means the following exhibits attached to this Grant Award Letter:
i. Exhibit B, Scope of Project
ii. Exhibit G, Form of Option Letter
E. "Extension Term" means the period of time by which the Grant Expiration Date is extended
by the State through delivery of an updated Grant Award Letter, an amendment, or an Option
Letter.
F. Reserved.
G. Reserved.
H. "Goods" means any movable material acquired, produced, or delivered by Grantee as set
forth in this Grant Award Letter and shall include any movable material acquired, produced,
or delivered by Grantee in connection with the Services.
I. "Grant Award Letter" or "Grant" means this letter which offers Grant Funds to Grantee,
including all attached Exhibits, all documents incorporated by reference, all referenced
statutes, rules and cited authorities, and any future updates thereto.
J. "Grant Expiration Date" means the Grant Expiration Date shown on the Summary of Grant
Award Terms and Conditions page of this Grant Award Letter. Work performed after the
Grant Expiration Date is not eligible for reimbursement from Grant Funds.
K. "Grant Funds" or "Grant Award Amount" means the funds that have been appropriated,
designated, encumbered, or otherwise made available for payment by the State under this
Grant Award Letter.
L. "Incident" means any accidental or deliberate event that results in, or constitutes an imminent
threat of, the unauthorized access or disclosure of State Confidential Information or of the
unauthorized modification, disruption, or destruction of any State Records.
M. "Initial Term" means the time period between the Performance Start Date and the initial
Grant Expiration Date.
N. Reserved.
O. "Other Funds" means all funds necessary to complete the Project, excluding Grant Funds.
Grantee is solely responsible for securing all Other Funds.
P. "Party" means the State or Grantee, and "Parties" means both the State and Grantee.
Page 3 of 10 Version 0717
DocuSign Envelope ID: 991 DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
Q. "Performance Start Date" means the later of the Performance Start Date or the Execution
Date shown on the Summary of Grant Award Terms and Conditions page of this Grant Award
Letter.
R. Reserved.
S. Reserved.
T. Reserved
U. "Project" means the overall project described in Exhibit B, which includes the Work.
V. "Project Budget" means the amounts detailed in §6.2 of Exhibit B.
W. Reserved.
X. Reserved.
Y. "Services" means the services performed by Grantee as set forth in this Grant Award Letter,
and shall include any services rendered by Grantee in connection with the Goods.
Z. "State Confidential Information" means any and all State Records not subject to disclosure
under CORA. State Confidential Information shall include, but is not limited to State
personnel records not subject to disclosure under CORA.
AA. "State Fiscal Rules" means the fiscal rules promulgated by the Colorado State Controller
pursuant to §24-30-202(13)(a) C.R.S.
BB. "State Fiscal Year" means a 12 month period beginning on July 1 of each calendar year and
ending on June 30 of the following calendar year. If a single calendar year follows the term,
then it means the State Fiscal Year ending in that calendar year.
CC. "State Records" means any and all State data, information, and records, regardless of
physical form, including, but not limited to, information subject to disclosure under CORA.
DD. Reserved.
EE. "Subcontractor" means third -parties, if any, engaged by Grantee to aid in performance of
the Work. "Subcontractor" also includes sub -grantees.
FF. Reserved.
GG. Reserved.
HH. Reserved.
II. "Work" means the delivery of the Goods and performance of the Services described in this
Grant Award Letter.
JJ. "Work Product" means the tangible and intangible results of the Work, whether finished or
unfinished, including drafts. Work Product includes, but is not limited to, documents, text,
software (including source code), research, reports, proposals, specifications, plans, notes,
studies, data, images, photographs, negatives, pictures, drawings, designs, models, surveys,
maps, materials, ideas, concepts, know-how, and any other results of the Work. "Work
Product" does not include any material that was developed prior to the Performance Start
Date that is used, without modification, in the performance of the Work.
Any other term used in this Grant Award Letter that is defined in an Exhibit shall be construed and
interpreted as defined in that Exhibit.
Page 4 of 10 Version 0717
DocuSign Envelope ID: 991 DFDD5-CFAF-4C1 0-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
5. PURPOSE
The purpose of the Energy and Mineral Impact Assistance Program is to assist political
subdivisions that are socially and/or economically impacted by the development, processing, or
energy conversion of minerals and mineral fuels. The purpose of this Grant is described in Exhibit
B.
6. SCOPE OF PROJECT
Grantee shall complete the Work as described in this Grant Award Letter and in accordance with
the provisions of Exhibit B. The State shall have no liability to compensate or reimburse Grantee
for the delivery of any goods or the performance of any services that are not specifically set forth
in this Grant Award Letter.
7. PAYMENTS TO GRANTEE
A. Maximum Amount
Payments to Grantee are limited to the unpaid, obligated balance of the Grant Funds. The
State shall not pay Grantee any amount under this Grant that exceeds the Grant Award
Amount shown on the Summary of Grant Award Terms and Conditions page of this Grant
Award Letter.
i. The State may increase or decrease the Grant Award Amount by providing Grantee
with an updated Grant Award Letter or an executed Option Letter showing the new
Grant Award Amount.
ii. The State shall not be liable to pay or reimburse Grantee for any Work performed or
expense incurred before the Performance Start Date or after the Grant Expiration Date.
iii. Financial obligations of the State payable after the current State Fiscal Year are
contingent upon funds for that purpose being appropriated, budgeted, and otherwise
made available.
B. Erroneous Payments
The State may recover, at the State's discretion, payments made to Grantee in error for any
reason, including, but not limited to, overpayments or improper payments, and unexpended
or excess funds received by Grantee. The State may recover such payments by deduction
from subsequent payments under this Grant Award Letter, deduction from any payment due
under any other contracts, grants or agreements between the State and Grantee, or by any
other appropriate method for collecting debts owed to the State.
C. Matching Funds.
Grantee shall provide the Other Funds amount shown on the Project Budget in Exhibit B (the
"Local Match Amount"). Grantee shall appropriate and allocate all Local Match Amounts to
the purpose of this Grant Award Letter each fiscal year prior to accepting any Grant Funds
for that fiscal year. Grantee does not by accepting this Grant Award Letter irrevocably pledge
present cash reserves for payments in future fiscal years, and this Grant Award Letter is not
intended to create a multiple -fiscal year debt of Grantee. Grantee shall not pay or be liable
for any claimed interest, late charges, fees, taxes or penalties of any nature, except as required
by Grantee's laws or policies.
Page 5 of 10 Version 0717
DocuSign Envelope ID: 991 DFDD5-CFAF-4C1 0-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
D. Reimbursement of Grantee Costs
The State shall reimburse Grantee's allowable costs, not exceeding the maximum total
amount described in this Grant Award Letter for all allowable costs described in this Grant
Award Letter and shown in the Project Budget in Exhibit B.
i. Upon request of the Grantee, the State may, without changing the maximum total
amount of Grant Funds, adjust or otherwise reallocate Grant Funds among or between
each line of the Project Budget by providing Grantee with an executed Option Letter or
formal amendment.
E. Close -Out and De -obligation of Grant Funds
Grantee shall close out this Grant no later than 90 days after the Grant Expiration Date. To
complete close out, Grantee shall submit to the State all deliverables (including
documentation) as defined in this Grant Award Letter and Grantee's final reimbursement
request or invoice. Any Grant Funds remaining after submission and payment of Grantee's
final reimbursement request are subject to de -obligation by the State.
8. REPORTING - NOTIFICATION
A. Performance and Final Status
Grantee shall submit all financial, performance and other reports to the State no later than the
end of the close out period described in §7.E.
B. Violations Reporting
Grantee shall disclose, in a timely manner, in writing to the State, all violations of federal or
State criminal law involving fraud, bribery, or gratuity violations potentially affecting this
Award.
9. GRANTEE RECORDS
A. Maintenance and Inspection
Grantee shall make, keep, and maintain, all records, documents, communications, notes and
other written materials, electronic media files, and communications, pertaining in any manner
to this Grant for a period of three years following the completion of the close out of this
Grant. Grantee shall permit the State to audit, inspect, examine, excerpt, copy and transcribe
all such records during normal business hours at Grantee's office or place of business, unless
the State determines that an audit or inspection is required without notice at a different time
to protect the interests of the State.
B. Monitoring
The State will monitor Grantee's performance of its obligations under this Grant Award
Letter using procedures as determined by the State. The State shall monitor Grantee's
performance in a manner that does not unduly interfere with Grantee's performance of the
Work.
C. Audits
Grantee shall comply with all State and federal audit requirements.
Page 6 of 10 Version 0717
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
10. CONFIDENTIAL INFORMATION -STATE RECORDS
A. Confidentiality
Grantee shall hold and maintain, and cause all Subcontractors to hold and maintain, any and
all State Records that the State provides or makes available to Grantee for the sole and
exclusive benefit of the State, unless those State Records are otherwise publically available
at the time of disclosure or are subject to disclosure by Grantee under CORA. Grantee shall
not, without prior written approval of the State, use for Grantee's own benefit, publish, copy,
or otherwise disclose to any third party, or permit the use by any third party for its benefit or
to the detriment of the State, any State Records, except as otherwise stated in this Grant
Award Letter. Grantee shall provide for the security of all State Confidential Information in
accordance with all policies promulgated by the Colorado Office of Information Security
(http://oit.state.co.us/ois) and all applicable laws, rules, policies, publications, and guidelines.
Grantee shall immediately forward any request or demand for State Records to the State's
principal representative.
B. Other Entity Access and Nondisclosure Agreements
Grantee may provide State Records to its agents, employees, assigns and Subcontractors as
necessary to perform the Work, but shall restrict access to State Confidential Information to
those agents, employees, assigns and Subcontractors who require access to perform their
obligations under this Grant Award Letter. Grantee shall ensure all such agents, employees,
assigns, and Subcontractors sign nondisclosure agreements with provisions at least as
protective as those in this Grant, and that the nondisclosure agreements are in force at all
times the agent, employee, assign or Subcontractor has access to any State Confidential
Information. Grantee shall provide copies of those signed nondisclosure restrictions to the
State upon request.
C. Use, Security, and Retention
Grantee shall use, hold and maintain State Confidential Information in compliance with any
and all applicable laws and regulations in facilities located within the United States, and shall
maintain a secure environment that ensures confidentiality of all State Confidential
Information wherever located. Grantee shall provide the State with access, subject to
Grantee's reasonable security requirements, for purposes of inspecting and monitoring access
and use of State Confidential Information and evaluating security control effectiveness. Upon
the expiration or termination of this Grant, Grantee shall return State Records provided to
Grantee or destroy such State Records and certify to the State that it has done so, as directed
by the State. If Grantee is prevented by law or regulation from returning or destroying State
Confidential Information, Grantee warrants it will guarantee the confidentiality of, and cease
to use, such State Confidential Information.
D. Incident Notice and Remediation
If Grantee becomes aware of any Incident, it shall notify the State immediately and cooperate
with the State regarding recovery, remediation, and the necessity to involve law enforcement,
as determined by the State. After an Incident, Grantee shall take steps to reduce the risk of
incurring a similar type of Incident in the future as directed by the State, which may include,
but is not limited to, developing and implementing a remediation plan that is approved by the
State at no additional cost to the State.
Page 7 of 10 Version 0717
DowSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
11. CONFLICTS OF INTEREST
Grantee shall not engage in any business or activities, or maintain any relationships that conflict in
any way with the full performance of the obligations of Grantee under this Grant. Grantee
acknowledges that, with respect to this Grant, even the appearance of a conflict of interest shall be
harmful to the State's interests and absent the State's prior written approval, Grantee shall refrain
from any practices, activities or relationships that reasonably appear to be in conflict with the full
performance of Grantee's obligations under this Grant. If a conflict or the appearance of a conflict
arises, or if Grantee is uncertain whether a conflict or the appearance of a conflict has arisen,
Grantee shall submit to the State a disclosure statement setting forth the relevant details for the
State's consideration.
12. INSURANCE
Grantee shall maintain at all times during the term of this Grant such liability insurance, by
commercial policy or self-insurance, as is necessary to meet its liabilities under the Colorado
Governmental Immunity Act, §24-10-101, et seq., C.R.S. (the "GIA"). Grantee shall ensure that
any Subcontractors maintain all insurance customary for the completion of the Work done by that
Subcontractor and as required by the State or the GIA.
13. REMEDIES
In addition to any remedies available under any Exhibit to this Grant Award Letter, if Grantee fails
to comply with any term or condition of this Grant, the State may terminate some or all of this
Grant and require Grantee to repay any or all Grant Funds to the State in the State's sole discretion.
The State may also terminate this Grant Award Letter at any time if the State has determined, in
its sole discretion, that Grantee has ceased performing the Work without intent to resume
performance, prior to the completion of the Work.
14. DISPUTE RESOLUTION
Except as herein specifically provided otherwise, disputes concerning the performance of this
Grant that cannot be resolved by the designated Party representatives shall be referred in writing
to a senior departmental management staff member designated by the State and a senior manager
or official designated by Grantee for resolution.
15. NOTICES AND REPRESENTATIVES
Each Party shall identify an individual to be the principal representative of the designating Party
and shall provide this information to the other Party. All notices required or permitted to be given
under this Grant Award Letter shall be in writing, and shall be delivered either in hard copy or by
email to the representative of the other Party. Either Party may change its principal representative
or principal representative contact information by notice submitted in accordance with this §15.
16. RIGHTS IN WORK PRODUCT AND OTHER INFORMATION
Grantee hereby grants to the State a perpetual, irrevocable, non-exclusive, royalty free license, with
the right to sublicense, to make, use, reproduce, distribute, perform, display, create derivatives of
and otherwise exploit all intellectual property created by Grantee or any Subcontractors or
Subgrantees and paid for with Grant Funds provided by the State pursuant to this Grant.
17. GOVERNMENTAL IMMUNITY
Liability for claims for injuries to persons or property arising from the negligence of the Parties,
their departments, boards, commissions, committees, bureaus, offices, employees and officials
shall be controlled and limited by the provisions of the GIA; the Federal Tort Claims Act, 28 U.S.C.
Page 8 of 10 Version 0717
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
Pt. VI, Ch. 171 and 28 U.S.C. 1346(b), and the State's risk management statutes, §§24-30-1501,
et seq. C.R.S. No term or condition of this Grant Award Letter shall be construed or interpreted as
a waiver, express or implied, of any of the immunities, rights, benefits, or protections of any of
these provisions.
18. GENERAL PROVISIONS
A. Assignment
Grantee's rights and obligations under this Grant are personal and may not be transferred or
assigned without the prior, written consent of the State. Any attempt at assignment or transfer
without such consent shall be void. Any assignment or transfer of Grantee's rights and
obligations approved by the State shall be subject to the provisions of this Grant Award
Letter.
B. Captions and References
The captions and headings in this Grant Award Letter are for convenience of reference only,
and shall not be used to interpret, define, or limit its provisions. All references in this Grant
Award Letter to sections (whether spelled out or using the § symbol), subsections, exhibits
or other attachments, are references to sections, subsections, exhibits or other attachments
contained herein or incorporated as a part hereof, unless otherwise noted.
C. Entire Understanding
This Grant Award Letter represents the complete integration of all understandings between
the Parties related to the Work, and all prior representations and understandings related to the
Work, oral or written, are merged into this Grant Award Letter.
D. Modification
The State may modify the terms and conditions of this Grant by issuance of an updated Grant
Award Letter, which shall be effective if Grantee accepts Grant Funds following receipt of
the updated letter. The Parties may also agree to modification of the terms and conditions of
the Grant in either an option letter or a formal amendment to this Grant, properly executed
and approved in accordance with applicable Colorado State law and State Fiscal Rules.
E. Statutes, Regulations, Fiscal Rules, and Other Authority
Any reference in this Grant Award Letter to a statute, regulation, State Fiscal Rule, fiscal
policy or other authority shall be interpreted to refer to such authority then current, as may
have been changed or amended since the Performance Start Date. Grantee shall strictly
comply with all applicable Federal and State laws, rules, and regulations in effect or hereafter
established, including, without limitation, laws applicable to discrimination and unfair
employment practices.
F. Order of Precedence
In the event of a conflict or inconsistency between this Grant Award Letter and any Exhibits
or attachment, such conflict or inconsistency shall be resolved by reference to the documents
in the following order of priority:
i. Any executed Option Letter
ii. The provisions of this Grant Award Letter.
iii. The provisions of any exhibits to this Grant Award Letter.
Page 9 of 10 Version 0717
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
G. Severability
The invalidity or unenforceability of any provision of this Grant Award Letter shall not affect
the validity or enforceability of any other provision of this Grant Award Letter, which shall
remain in full force and effect, provided that the Parties can continue to perform their
obligations under the Grant in accordance with the intent of the Grant.
H. Survival of Certain Grant Award Letter Terms
Any provision of this Grant Award Letter that imposes an obligation on a Party after
termination or expiration of the Grant shall survive the termination or expiration of the Grant
and shall be enforceable by the other Party.
I. Third Party Beneficiaries
Except for the Parties' respective successors and assigns described above, this Grant Award
Letter does not and is not intended to confer any rights or remedies upon any person or entity
other than the Parties. Any services or benefits which third parties receive as a result of this
Grant are incidental to the Grant, and do not create any rights for such third parties.
J. Waiver
A Party's failure or delay in exercising any right, power, or privilege under this Grant Award
Letter, whether explicit or by lack of enforcement, shall not operate as a waiver, nor shall any
single or partial exercise of any right, power, or privilege preclude any other or further
exercise of such right, power, or privilege.
K. Reserved.
L. Digital Signatures
If any signatory signs this Grant using a digital signature in accordance with the Colorado
State Controller Contract, Grant, and Purchase Order Policies regarding the use of digital
signatures issued under the State Fiscal Rules, then any agreement or consent to use digital
signatures within the electronic system through which that signatory signed shall be
incorporated into this Grant by reference.
THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK
Page 10 of 10 Version 0717
DocuSign Envelope ID: 991 DFDD5-CFAF-4C1 0-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
EXHIBIT B - SCOPE OF PROJECT (SOP)
1. PURPOSE
1.1. Energy Impact. The purpose of the Energy and Mineral Impact Assistance Program is to assist
political subdivisions that are socially and/or economically impacted by the development, processing,
or energy conversion of minerals and mineral fuels.
2. DESCRIPTION OF THE PROJECT(S) AND WORK
2.1. Project Description. The Project consists of purchasing materials for roadway improvements on Weld
County Road 22.
2.2. Work Description. Weld County (Grantee) will purchase materials needed to conduct the full depth
reconstruction (FDR) of approximately 5 miles of Weld County Road (WCR) 22 from WCR 31 to
WCR 41. Weld County Public Works crews will mill off the existing asphalt to a depth suitable for
mixing cement treated base (CTB) into the subgrade. The CTB will reinforce the subgrade structure to
strengthen the foundation for the asphalt to sustain the heavy-duty truck traffic. County Public Works
will pave the roadway with approximately 6 inches of polymer asphalt. The Grantee will own and
maintain all improvements.
2.3. Responsibilities. Grantee shall be responsible for the completion of the Work and to provide required
documentation to DOLA as specified herein.
2.3.1. Grantee shall notify DOLA at least 30 days in advance of Project Completion.
2.4. Recapture of Advanced Funds. To maximize the use of Grant Funds, the State shall evaluate
Grantee's expenditure of the Grant Funds for timeliness and compliance with the terms of this Grant.
DOLA reserves the right to recapture advanced Grant Funds when Grantee has not or is not complying
with the terms of this Grant.
2.5. Eligible Expenses. Eligible expenses shall include: asphalt and materials costs for roadway
reconstruction. Any cost overruns incurred in the completion of the Project, engineering, bid process,
bond, insurance, legal fees and permitting shall be the sole responsibility of the Grantee.
3. DEFINITIONS
3.1. Project Budget Lines.
3.1.1. "Equipment, Vehicles or Materials Acquisition" means vehicles, equipment and materials costs,
freight costs, RFP/Bid advertisement costs, hardware, software and training costs, installation
costs, and attorney's fees.
3.2. "Substantial Completion" means the Work is sufficiently complete in accordance with the Grant so it
can be utilized for its intended purpose without undue interference.
4. DELIVERABLES
4.1. Outcome. The final outcome of this Grant is the completed purchasing of materials for roadway
improvements that will increase safety and longevity on Weld County Road 22.
4.2. Service Area. The performance of the Work described within this Grant shall be located in Weld
County, Colorado.
4.3. Performance Measures. Grantee shall comply with the following performance measures:
Milestone/Performance Measure/Grantee will:
Put Project out to bid.
Within 30 days after the
Effective Date of this
Grant Award Letter.
Award and finalize subcontract(s).
Within 30 days after bid
opening.
Page 1 of 5
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
Provide DOLA with digital photos of the Project with the
Quarterly Status Report.
See §4.5.2 below
Submit Quarterly Pay Requests
See §4.5.2 below
Submit Quarterly Status Reports
See §4.5.2 below
Submit Project Final Report
May 01, 2024
4.4. Budget Line Adjustments.
4.4.1. Grant Funds. Grantee may request in writing that DOLA move Grant Funds between and
among budget lines, so long as the total amount of Grant Funds remains unchanged. To make
such budget line changes, DOLA will use an Option Letter (Exhibit G).
4.4.2. Other Funds. Grantee may increase or decrease the amount of Other Funds in any one or any
combination of budget lines as described in §6.2, or move Other Funds between and among
budget lines, so long as the total amount of such "Other Funds" is not less than the amount set
forth in §6.2 below. Grantee may increase the Total Project Cost with "Other Funds" and such
change does not require an amendment or option letter. DOLA will verify the Grantee's
contribution of "Other Funds" and compliance with this section at Project Closeout.
4.5. Quarterly Pay Request and Status Reports. Beginning 30 days after the end of the first quarter
following execution of this Grant and for each quarter thereafter until termination of this Grant,
Grantee shall submit Pay Requests and Status Reports using a form provided by the State. The State
shall pay the Grantee for actual expenditures made in the performance of this Grant based on the
submission of statements in the format prescribed by the State. The Grantee shall submit Pay Requests
setting forth a detailed description and provide documentation of the amounts and types of
reimbursable expenses. Pay Requests and Status Reports are due within 30 days of the end of the
quarter but may be submitted more frequently at the discretion of the Grantee.
4.5.1. For quarters in which there are no expenditures to reimburse, Grantee shall indicate zero (0)
requested in the Pay Request and describe the status of the Work in the Status Report. The
report will contain an update of expenditure of funds by budget line as per §6.2 of this Exhibit
B Scope of Project as well as a projection of all Work expected to be accomplished in the
following quarter, including an estimate of Grant Funds to be expended.
4.5.2. Specific submittal dates.
Quarter
Year
Due Date
Pay Request Due
Status Report Due
1st (Jan -Mar)
2022
April 30, 2022
Yes
Yes
2nd (Apr -Jun)
2022
July 30, 2022
Yes
Yes
3'd (Jul -Sep)
2022
October 30, 2022
Yes
Yes
4th (Oct -Dec)
2022
January 30, 2023
Yes
Yes
1St (Jan -Mar)
2023
April 30, 2023
Yes
Yes
2°d (Apr -Jun)
2023
July 30, 2023
Yes
Yes
3'd (Jul -Sep)
2023
October 30, 2023
Yes
Yes
4th (Oct -Dec)
2023
January 30, 2024
Yes
Yes
1St (Jan -Mar)
2024
April 30, 2024
Yes
Yes
4.6. DOLA Acknowledgment. The Grantee agrees to acknowledge the Colorado Department of Local
Affairs in any and all materials or events designed to promote or educate the public about the Work and
the Project, including but not limited to: press releases, newspaper articles, op-ed pieces, press
conferences, presentations and brochures/pamphlets.
Page 2 of 5
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
5. PERSONNEL
5.1. Responsible Administrator. Grantee's performance hereunder shall be under the direct supervision of
Chris D'Ovidio, Assistant Controller, (cdovidio(a)weldEov.com), who is an employee or agent of
Grantee, and is hereby designated as the responsible administrator of this Project and a key person
under this §5. Such administrator shall be updated through the process in §5.3. If this person is an agent
of the Grantee, such person must have signature authority to bind the Grantee and must provide
evidence of such authority.
5.2. Other Key Personnel. None. Such key personnel shall be updated through the process in §5.3.
5.3. Replacement. Grantee shall immediately notify the State if any key personnel specified in §5 of this
Exhibit B cease to serve. All notices sent under this subsection shall be sent in accordance with §15 of
the Grant.
5.4. DLG Regional Manager: Chris La May, (970) 679-7679, (chris.la.mav(is state.co.us)
5.5. DLG Regional Assistant: Robert Thompson, (970) 290-2381, (robert.thomason(a)state.co.us)
6. FUNDING
The State provided funds shall be limited to the amount specified under the "Grant Funds" column of §6.2,
Budget, below.
6.1. Matching/Other Funds. Grantee shall provide at least 68% of the Total Project Cost as documented
by Grantee and verified by DOLA at Project Closeout. Initial estimates of Grantee's contribution are
noted in the "Other Funds" column of §6.2 below. Increases to Grantee's contribution to Total Project
Cost do not require modification of this Grant Award Letter and/or Exhibit B.
6.2. Budget
Budget Line(s)
Total Project ,
Grant
Other
Other
Cost
Funds
Funds
Funds
Source
Line
Cost Category
I
Equipment, Vehicles or
$1,400,000
$450,000
$950,000
Grantee
Materials Acquisition
Total
$1,400,000
$450,000
$950,000
7. PAYMENT
Payments shall be made in accordance with this section and the provisions set forth in §7 of the Grant.
7.1. Payment Schedule. If Work is subcontracted or subgranted and such Subcontractors and/or
Subgrantees are not previously paid, Grantee shall disburse Grant Funds received from the State to
such Subcontractor or Subgrantee within fifteen days of receipt. Excess funds shall be returned to
DOLA.
Payment
Amount
Interim Payment(s)
$427,500
Paid upon receipt of actual expense documentation and
written Pay Requests from the Grantee for
reimbursement of eligible approved expenses.
Final Payment
$22,500
Paid upon Substantial Completion of the Project (as
determined by the State in its sole discretion), provided
that the Grantee has submitted, and DOLA has
accepted, all required reports.
Total
$450,000
7.2. Interest. Grantee or Subgrantee may keep interest earned from Grant Funds up to $100 per year for
administrative expenses.
Page 3 of 5
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
8. ADMINISTRATIVE REQUIREMENTS
8.1. Reporting. Grantee shall submit the following reports to DOLA using the State -provided forms.
DOLA may withhold payment(s) if such reports are not submitted timely.
8.1.1.Quarterly Pay Request and Status Reports. Quarterly Pay Requests shall be submitted to
DOLA in accordance with §4.5 of this Exhibit B.
8.1.2.Final Reports. Within 90 days after the completion of the Project, Grantee shall submit the final
Pay Request and Status Report to DOLA.
8.2. Monitoring. DOLA shall monitor this Work on an as -needed basis. DOLA may choose to audit the
records for activities performed under this Grant. Grantee shall maintain a complete file of all records,
documents, communications, notes and other written materials or electronic media, files or
communications, which pertain in any manner to the operation of activities undertaken pursuant to an
executed Grant. Such books and records shall contain documentation of the Grantee's pertinent activity
under this Grant in accordance with Generally Accepted Accounting Principles.
8.2.1. Subgrantee/Subcontractor. Grantee shall monitor its Subgrantees and/or Subcontractors, if
any, during the term of this Grant. Results of such monitoring shall be documented by Grantee
and maintained on file.
8.3. Bonds. If Project includes construction or facility improvements, Grantee and/or its contractor (or
subcontractors) performing such work shall secure the bonds hereunder from companies holding
certificates of authority as acceptable sureties pursuant to 31 CFR Part 223 and are authorized to do
business in Colorado.
8.3.1.Bid Bond. A bid guarantee from each bidder equivalent to 5 percent of the bid price. The "bid
guarantee" shall consist of a firm commitment such as a bid bond, certified check, or other
negotiable instrument accompanying a bid as assurance that the bidder shall, upon acceptance of
his bid, execute such contractual documents as may be required within the time specified.
8.3.2. Performance Bond. A performance bond on the part of the contractor for 100 percent of the
contract price. A "performance bond" is one executed in connection with a contract to secure
fulfillment of all the contractor's obligations under such contract.
8.3.3. Payment Bond. A payment bond on the part of the contractor for 100 percent of the contract
price. A "payment bond" is one executed in connection with a contract to assure payment as
required by statute of all persons supplying labor and material in the execution of the work
provided for in the contract.
8.3.4. Substitution. The bonding requirements in this §8.3 may be waived in lieu of an irrevocable letter
of credit if the price is less than $50,000.
9. CONSTRUCTION/RENOVATION. The following subsections shall apply to construction and/or
renovation related projects/activities:
9.1. Plans & Specifications. Construction plans and specifications shall be drawn up by a qualified
engineer or architect licensed in the State of Colorado, or pre-engineered in accordance with Colorado
law, and hired by the Grantee through a competitive selection process.
9.2. Procurement. A construction contract shall be awarded to a qualified construction firm through a
formal selection process with the Grantee being obligated to award the construction contract to the
lowest responsive, responsible bidder meeting the Grantee's specifications.
9.3. Subcontracts. Copies of any and all contracts entered into by the Grantee in order to accomplish this
Project shall be submitted to DOLA upon request, and any and all contracts entered into by the Grantee
or any of its Subcontractors shall comply with all applicable federal and state laws and shall be
governed by the laws of the State of Colorado.
9.4. Standards. Grantee, Subgrantees and Subcontractors shall comply with all applicable statutory design
and construction standards and procedures that may be required, including the standards required by
Page 4 of 5
DocuSign Envelope ID: 991 DFDD5-CFAF-4C1 0-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
Colorado Department of Public Health and Environment, and shall provide the State with
documentation of such compliance.
THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK
Page 5 of 5
DocuSign Envelope ID: 991DFDD5-CFAF-4C10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
OPTION LETTER #Insert # Here
SIGNATURE AND COVER PAGE
State Agency
DLG Portal Number
Option Letter CMS
Department of Local Affairs (DOLA)
Insert DLG Portal number
Number
for this Project•
Insert CMS number for this
Amendment
Grantee
Previous CMS #(s)
Insert Grantee's Full Legal Name
Insert CMS number for orig Agreement, and any prior chg
does
Project Number and Name
Grant Amount
Insert DOLA's project number and name
Initial Award: $Insert orig award amt
Option Letter ## and date effective/spendable: $0.00
Option Letter ## and date effective/spendable: $0.00
Total Grant Amount: $Insert total award to date
DOLA Regional Manager
Prior Grant Agreement
Current Grant Agreement
Choose an item.
Expiration Date
Expiration Date
DOLA Regional Assistant
Month Day, Year
Month Day, Year
Choose an item.
THE PARTIES HERETO HAVE EXECUTED THIS OPTION LETTER
Each person signing this Option Letter represents and warrants that he or she is duly authorized to execute this
Option Letter and to bind the Party authorizing his or her signature.
STATE OF COLORADO
Jared S. Polis GOVERNOR
Colorado Department of Local Affairs
By:
Rick M. Garcia, Executive Director
Date:
ALL CONTRACTS REQUIRE APPROVAL BY THE STATE CONTROLLER
CRS §24-30-202 requires the State Controller to approve all State contracts. This Option Letter is not valid until signed and
dated below by the State Controller or delegate.
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD
By:
Beulah Messick, DOLA Controller Delegate
Effective Date:
Page 1 of 3
DocuSign Envelope ID: 991DFDD5-CFAF-4O10-AC31-0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
1) OPTIONS: Choose all applicable options listed in §1 and in §2
❑ a. Option to extend (use this option for Extension of Time)
❑ b. Change in the Grant Award Amount within the current term (use this option for an Increase or
Decrease in Grant Funds, including Supplemental funding awards)
❑ c. Budget Line Adjustment(s) - reallocation of awarded Grant Funds to Budget Line(s) (use this
Option to redistribute existing Grant Funds between budget lines)
2) REQUIRED PROVISIONS. All Option Letters shall contain the appropriate provisions set forth below:
a. For use with Option 1(a): In accordance with Section 2(A) of the original Grant Award Letter between the
State of Colorado, acting by and through the Colorado Department of Local Affairs, and Grantee's Name, the
State hereby exercises its option for an additional term beginning Insert start date and ending on Insert ending!
date. Tables in Sections 4.3 and 4.5.2 of Exhibit B are deleted and replaced with the following:
Milestone/Performance Measure
Put Project out to bid.
Within _
Letter.
days of the Effective Date of this Grant Award
Award and finalize subcontract(s) and/or sub-
grant(s).
[give target date]
Provide DOLA with Project Timeline
Within _
days of the Effective Date of the subcontract(s).
Contractor mobilization begin Work.
Within _
days of the Effective Date of the subcontract(s).
Submit Quarterly Pay Requests
See §4.5.2
below
Submit Quarterly Status Reports
See §4.5.2
below
Submit Project Final Report
[give date
certain]
Quarter
Year
Due Date
Pay Request
Status Report
• 1St (Jan -Mar)
2023
April 30, 2023
Yes
Yes
2"d (Apr -Jun)
2023
July 30, 2023
Yes
Yes
3''d (Jul -Sep)
2023
October 30, 2023
Yes
Yes
4th (Oct -Dec)
2023
January 30, 2024
Yes
Yes
Pt (Jan -Mar)
2024
April 30, 2024
Yes
Yes
2nd (Apr -Jun)
2024
July 30, 2024
Yes
Yes
3" (Jul -Sep)
2024
October 30, 2024
Yes
Yes
4th (Oct -Dec)
2024
January 30, 2025
Yes
Yes
Pt (Jan -Mar)
2025
April 30, 2025
Yes
Yes
2"d (Apr -Jun)
2025
July 30, 2025
Yes
Yes
3'd (Jul -Sep)
2025
October 30, 2025
Yes
Yes
4th (Oct -Dec)
2025
January 30, 2026
Yes
Yes
b. For use with Option 1(b): In accordance with Section 7(A)(i) of the original Grant Award Letter between the
State of Colorado, acting by and through the Colorado Department of Local Affairs, and Grantee's Name, the
State hereby exercises its option to increase/decrease Grant Funds awarded for this Project in an amount equal to
amt of increase or (decrease), from beginning dollar amt to ending dollar amt. The Grant Award Amount
Page 2 of 3
DocuSign Envelope ID: 991 DFDD5-CFAF-4C1 0-AC31 -0C97B5094EA1
EIAF - 9453 Weld County Road 22 Improvements
shown on the Summary of Grant Award Terms and Conditions page of this Grant Award Letter is hereby changed
to ending dollar amt. The Budget table in Section 6.2 and the Payment Schedule in Section 7.1, both of Exhibit
B, are deleted and replaced with the following:
Budget Line(s)
Total Project _-
Cost
Grant
Funds
Other
Funds
Other
Funds
Source
Line
Cost Category
Architectural/Engineering Services
$ 0.00
Grantee
Construction/Improvement of
Public Roadways
Grantee
Total
$ 0.00
$ 0.00
$ 0.00
Payment
Amount
Interim Payment(s)
Paid upon receipt of actual expense documentation and
written Pay Requests from the Grantee for reimbursement
of eligible approved expenses.
Final Payment
Paid upon Substantial Completion of the Project (as
determined by the State in its' sole discretion), provided that
the Grantee has submitted, and DOLA has accepted, all
required re ports.
Total
c. For use with Option 1(c): In accordance with Section 7(D)(i) of the original Grant. Award Letter between the
State of Colorado, acting by and through the Colorado Department of Local Affairs, and Grantee's Name, the
State hereby exercises its option to re -allocate awarded Grant Funds within the Project Budget. The Budget table
in Section 6.2 of Exhibit B is deleted and replaced with the following:
Budget Line(s)
Total Project
Cost
Grant
Funds
Other
Funds
Other
Funds
Source
Line
Cost Category
Architectural/Engineering Services
$ 0.00
Grantee
Construction/Improvement of
Public. Roadways
•.: .
Grantee
Total
$ 0.00
$ 0.00
$ 0.00
3) Effective Date. The effective date of this Option Letter is upon approval of the State Controller or , whichever
is later.
THE REST OF THIS PAGE INTENTIONALLY LEFT BLANK
Page 3 of 3
SUMMARY OF GRANT TERMS AND CONDITIONS FOR ENERGY AND MINERAL IMPACT
ASSISTANCE FUND (EIAF) PROGRAM FOR COUNTY ROAD 22 IMPROVEMENTS
PROJECT (SEPTEMBER CYCLE -- TiER II)
APPROVED SUBSTANCE:
JQC7°1i47
Elec ed epartment Head
A P OVED FUNDING:
of ina cial Officer
APPROVED AS TO FORM:
Coun y Attorney
o7Do?
Hello