HomeMy WebLinkAbout20222990.tiffRESOLUTION
RE: APPROVE TWO (2) OFF -SYSTEM BRIDGE PROGRAM APPLICATIONS FOR
BRIDGE 60.5/49A AND BRIDGE 34/17A REPLACEMENT PROJECTS, AND
AUTHORIZE DEPARTMENT OF PUBLIC WORKS TO SUBMIT ELECTRONICALLY -
COLORADO COUNTIES, INC. (CCI)
WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS, the Board has been presented with two (2) Off -System Bridge Program
Applications for Bridge 60.5/49A and Bridge 34/17A Replacement Projects between the County
of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County,
on behalf of the Department of Public Works, and Colorado Counties, Inc. (CCI), with further
terms and conditions being as stated in said applications, and
WHEREAS, after review, the Board deems it advisable to approve said applications,
copies of which are attached hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Weld County, Colorado, that the two (2) Off -System Bridge Program Applications for
Bridge 60.5/49A and Bridge 34/17A Replacement Projects between the County of Weld, State of
Colorado, by and through the Board of County Commissioners of Weld County, on behalf of the
Department of Public Works, and Colorado Counties, Inc. (CCI), be, and hereby are, approved.
BE IT FURTHER RESOLVED by the Board that the Department of Public Works be, and
hereby is, authorized to submit said applications electronically.
The above and foregoing Resolution was, on motion duly made and seconded, adopted
by the following vote on the 26th day of October, A.D., 2022.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST: dj,/vo;4-
Weld County Clerk to the Board
ounty ney
Date of signature: I I x'/22 -
chit K. James, Chair
Cc:p&(cH/ER/Ks/DD) AcT(cP/cD)
111(0/22
2022-2990
EG0080
Con4r64 it # (03 O
BOARD OF COUNTY COMMISSIONERS
PASS -AROUND REVIEW
PASS -AROUND TITLE: CCI Applications for Bridge Replacement Grant Funds for 2023-2025
DEPARTMENT: Public Works DATE: 10/10/2022
PERSON REQUESTING: Michael Bedell and Don Dunker
Brief description of the problem/issue:
The annual applications for bridge replacement grant funds through Colorado Counties Inc. (CCI) are due
October 28, 2022. Public Works Department would like to submit grant applications for bridges 60.5/49A and
34/17A.
Bridge 60.5/49A crosses Lone Tree Creek about 2 miles east of the Airport on WCR60.5. This structure was
constructed in 1967, is classified as structurally deficient, and has been defined as "poor" on the CDOT Off -
System Structure Eligibility List. The total cost estimate for this bridge replacement is $8,700,000. The total
available grant funds described in the CCI memo for this round of grant funding is $13.6 million. Since there is
not a lot of available grant funds, and the goal of CCI is to spread those funds amongst as many qualified
applicants as possible, we are proposing to request a grant of $1,000,000 for this bridge replacement. The
remainder of the estimated costs, $7,700,000, would be the County's contribution to the project (89%). This
bridge would be our #1 priority for this grant funding and is included in our current 5 -year CIP.
Bridge 34/17A crosses Saint Vrain River about 2 miles west of Platteville on WCR34. This structure was
constructed in 1960, is classified as structurally deficient, and has been defined as "poor" on the CDOT Off -
System Structure Eligibility List. The total cost estimate for this bridge replacement is $13,600,000. For the
reasons described above we are proposing to request a grant of $1,000,000 for this replacement. The remainder
of the estimated costs, $12,600,000, would be the County's contribution to the project (93%). This bridge
would be our #2 priority for this grant funding since it is less time critical than Bridge 60.5/49A. This bridge is
also included in our 5 -year CIP.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options):
• Approve staff to move forward with both grant applications as shown above.
o Potentially receive $2.0M in grant funds to offset estimated expenditures of $22.3M.
• Approve staff to move forward with one highest priority of the grant applications as shown above.
o Potentially receive $1.0M in grant funds to offset estimated expenditures of $8.7M.
• Change the amount of grant funding being requested and apply for one or both bridges.
• Deny staff submitting for these grant funds for the replacement of these bridges.
2022-2990
I°/at,
ggDo86
Recommendation:
Staff recommends applying for both projects and requesting $2.0M on the applications with the County
contributing the remainder of the needed funds. Staff requests authorization to place these bridge grant
applications on the BOCC Meeting Agenda prior to October 28 ".
Perry L. Buck
Mike Freeman, Pro-Tem
Scott K. James, Chair
Steve Moreno
Lori Seine
Approve
Recommendation
(-
Schedule
Work Session
Other/Comments:
COLORADO SPECIAL HIGHWAY COMMITTEE
Off -System Bridge Program
Application Data
Structure Number
WEL60.5/49A
Application Date
10/10/2022
Structure Location
Lone Tree Creek
County/ Municipality
Weld County
CDOT Engmeenng Region
Region 4
CDOT Local Agency Coordinator
Consulted Prior to
Jake Oneal ApPhcation Date
Project type
Request type
Replacement
Original
Design level completed at time of application
No Design
Work phase to be funded by this grant application
Construction Only
Estimated total project cost (Design + Construction)
$ 8,700,000
Year the total project cost estimate was created
2022
20% minimum local match amount
$ 1,740,000
Local overmatch amount
$ 5,960,000
Proposed total local match amount
$ 7,700,000
Local match commitment documentation
Narrative Letter
SHC grant amount requested
$ 1,000,000
Colorado fiscal years when funding will be required
2024
Anticipated start date
Anticipated completion date
February -2024
June -2027
Work description
Replacement of an existing bridge constructed in 1967 and currently classified as "Poor" The
roadway would be closed during the construction which would likely take 9-10 months The new
bridge would be designed to meet current CDOT bridge design standards and current 100 -year
flood elevations Weld County would hire a qualified design consultant with extensive knowledge of
the CDOT standards Some new right-of-way acquisition would likely be required Some utilities
relocations would likely be required Weld County would bid out the construction to a qualified
general contractor
SHC Worksheet
For further definition of terms, see the Structure Management Manual Section 5, Off -System Bridge Program
8/2020
Eric Bergman
Colorado Counties, Inc.
800 Grant Street, Suite 500
Denver, CO 80203
PUBLIC WORKS DEPARTMENT
1111 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
PHONE: 970-400-3706
October 10, 2022
RE: Narrative for Bridge WEL060.5-049.0A (Fiscal Years 2023-2025 Funding)
Bridge WEL060.5-049.0A is on Weld County Road 60.5 and spans Lone Tree Creek. The
bridge is located 0.7 miles east of WCR 49. WCR 60.5 is classified as a Collector Road
and is a vital paved link for the County and the nearby communities of Greeley, Kersey,
and Gill. Traffic counts taken in 2021 show an ADT of 3,082 vehicles per day, with 27%
being trucks. This high percentage of trucks is likely accelerating the poor condition of this
bridge. Replacement of this bridge is our number one priority for this bridge funds
application period.
The existing bridge is 34 feet wide, 165 feet long (three spans), and was built in 1967. It is
structurally deficient and has been defined as "poor" on the Off -System Structure Eligibility
List. The bridge has issues with rusted steel and spoiling concrete on the substructure and
superstructure. The bridge rail and approach guardrails are constructed improperly, in poor
condition and do not meet current AASHTO/CDOT standards. Rehabilitation instead of
replacement is not a viable option, nor cost effective, because of the concrete deck
extensive degradation, rusted steel substructure elements, and age of the overall structure.
The new structure may need to be elevated above its current configuration to allow for
adequate freeboard to prevent debris collection and scour in future flood events.
Weld County is proposing to provide most of the funding for this project due to the
importance of this vital link for the area. Instead of the typical 20% funding match, Weld
County is proposing that CDOT partner with Weld County on this project by providing a
$1,000,000 grant from the available bridge replacement funds. We estimate the
replacement cost at $8,700,000 with the Weld County portion being $7,700,000 (89%).
Weld County currently has the necessary funds to cover our portion of this project. Please
contact us if you need any information in addition to the contents of this application.
fiLle4CD °LDS&
Michael Bedell, P.E. Senior Engineer
SPECIAL BRIDGE FUN r -- .I RIDGE PROJECT COST ESTIMATE
Structure Number WEL060 5-049.0A Municipality/County- Weld
Priority # Average Daily Traffic (ADT) 3,082
Engineering
Preliminary Engineering
Design Engineering
Construction Engineering
and Staking
Project Engineering
Final Inspection
TOTAL ENGINEERING COSTS
Labor - Matei la's - Equipment
Mobilization
Site Preparation
Excavation
Abutments/Piers/Piling
Structure/Deck/Guard Rail
Approaches
Pavement
$ 50,000
$ 800,000
300,000
190,000
10,000
$
$ 500,000
$ 500,000
$ 600,000
$ 2,000,000
$ 2.000,000
$ 600,000
$ 600 000
TOTAL LABOR - MATERIALS - EQUIPMENT COSTS
Contingencies
TOTAL PROJECT COSTS
Design/Engmeening Start Date (mo/yr)
Date of Bid Opening (mo/yr)
02/2024
$
$
1,350,000
6 800 000
550,000
8,700,000
10/2026
Construction Start Date (mo/yr)
11 /2026
Construction Completion Date (mo/yr) 06/2027
Mb
Estimate Prepared by Michael Bedell, P E Phone (970) 400-3706 Title Sr Engineer Date 10/03/21
Approved by Don Dunker, P E Phone (970) 400-3749 Title County Engineer Date 10/03/21
This map is a user generated static output from an Internet mapping site and is for
reference only. Data layers that appear on this map may or may not be accurate,
current, or otherwise reliable
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Highway Number (ON) 5D: 00000 V
Mile Post (ON) 11: -1 mi
Linear Ref Sys. MP. 1.958 mi
Bridge Key: WEL060.5-049.0A Inspection Date: 06/06/2022
Suff Rating:
75.6
SD
G/F/P Condition: Poor
NBI
Reporting ID:
WEL060.5-049.0A
District (Region/Sect).
Reg 4 MSec 1
Wan Region 2T.
13
County Code 3:
123
123
WELD
Place
Code 4:
00000
non -city
Rte (On/Under) 5A:
1
4
Signing Prefix 5B:
1
Level of Service 5C:
0
Direction Suffix 5E:
Feature Intersected 6:
Lone Tree Creek
Facility Carried 7:
County Road 60.5
Alias Str No 8A:
C -18
-CO
Prll
Str
No. 8P.
N/A
Location 9:
4.7 MI
E OF JCT US 85
BYP
Max Clr 10:
99.99
BaseHiway Net12:
0
IrsinvRout 13A.
123-0-2013
IrssubRout No13B:
00
Latitude 16:
40d 25' 42.00"
Longitude 17:
104d
35' 23 00"
Detour Length 19:
2 mi
Toll
Facility 20:
3
Custodian 21:
02
Owner 22:
02
Functional Class
26:
07
Year Built 27:
1967 -__r__
Lanes On 28A:
2
Lanes Under 28B:
0
ADT 29:
3,082
Year of ADT
30:
2021
Design Load 31:
5 MS 18 (HS 20)
Apr Rdwy Width 32:
25.00 ft
Median 33:
0
Skew 34:
47 °
Structure Flared 35:
0
Sfty Rail 36a/b/c/d:
0
0
0
0
Rail ht36h:
34.0 in
Hist Signif 37:
5
Posting status 41:
A
Service on/un 42A/B.
1
5
Inspection Type:
FOR
Regular NBI
Unknown
Main Mat/Desgn 43A/B:
Appr Mat/Desgn 44A/B:
Main Spans Unit 45:
Approach Spans 46:
Horiz CIr 47:
Max Span 48:
Str Length 49:
Curb Wdth L/R 50A/B:
Width Curb to Curb 51:
Width Out to Out 52:
Deck Area
Min Clr Ovr Brdg 53
Min Undrclr Ref 54A
Min Underclr 54B:
Min Lat Clrnce Ref R 55A:
Min Lat Undrclr R 55B:
Min Lat Undrclr L 56:
Deck 58:
Super 59:
Sub 60:
Channel/Protection 61:
Culvert 62:
Oprtng Rtg Method 63
Operating Rating 64:
Operating Factor 64:
Inv Rtng Method 65
Inventory Rating 66
Inventory Factor 66:
Asph/Fill Thick 66T:
Str. Evaluation 67:
Deck Geometry 68:
Undrclr Vert/Hor 69:
TPosting 70:
Waterway Adequacy 71:
Approach Alignment 72
Type Of Work 75A:
fr
Work Done By 75B:
Length of Improvment 76:
Insp Team Indicator 90B:
Inspector Name 90C:
Frequency 91:
FC Frequency 92A:
UW Frequency 92B:
SI Frequency (Pin) 92C:
FC Inspection Date 93A:
UW Inspection Date 93B:
SI Date (Pin) 93C:
4
02
0
3
0
0
30.00 ft
57.0 ft
165.5 ft
2.0 ft
2.0 ft
30.00 ft
34.0 ft
5627
99.99
N
0.0 ft
N
0.0 ft
0.0 ft
4
6
7
8
N
1 LF Load Factc
56.10
1 LF Load Factc
33.70
4.0 in
6
4
N
5 At/Above Lega
8
8
-2
I
NLD ENGINEER
DICKHAUSENN
24 months
Bridge Cost 94.
Roadway Cost 95:
Total
Cost 96:
Year of Cost Estimate 97:
Brdr Brdg Code/% 98A/B.
Border Bridge Number 99:
Defense
Highway
100:
Parallel Structure
101:
Direction of Traffic 102:
Temporary Structure 103:
Hiohwav Systems 104
Fed Lands Hiway 105:
Year Reconstructed 106:
Deck Type 107:
Wearing Surface
108A:
Membrane 108B:
Deck Protection
108C:
Truck
ADT 109:
Trk Net 110:
Pier Protection 111:
NBIS
Length 112:
Scour Critical 113:
Scour Watch 113M:
Future ADT 114:
—61
Year of Future
ADT 115:
CDOT Str Type 120A:
CDOT Constr Type 120B:
Expansion Dev/Type 124:
Brdg Rail
Type/Mod 125A/B:
Posting Trucks 129A/B/C:
Str Rating Date 130:
Special Equip 133:
Vert CIr N/E 134A/B/C:
Vert Clr S/W 135A/B/C:
Vertical Clr Date:
Weight Limit Color 139:
Userkey 1.
Insp System:
Userkey 4, Insp Sched:
Userkey 5, UW Sched:
Userkey 6, Pin Sched:
FHWA
Bridge
Risk:
FHWA
UW Risk.
FHWA Load Rating
Risk:
CBTE.
Inspection Key
Date Entered:
Entered By:
Data Responsibility: Asset Management
0,00
-,
0.00
0.00
2018
-2 0.00
0
0
N
2
r
0
0
1
6
2
0
27.00 %
0
Y
5
N
14,376
2041
CIC
00
1
G
2
-
-I
05/16/1996
0.00
X
99.99
0.00
X
99.99
0.00
01/01/1901
0, White
OFFSYS
EVN JUN N_0
LOW
NA
LOW
NA
OXIV
6/7/2022 12:00:0
SalakhadinovZ
Inspection
Rating
CDOT_SIA v10 - 4/10/2022
Structure ID: WEL060.5-049.0A
Thu 06/23/2022 8:51:38
Page 1 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Element Inspection Report
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 ml
Linear Ref Sys MP 1 958 m1
Elm/Env
Description
Unit
Total Qty
in1
Qty St 1
%in2
Qty St 2
in
Qty St 3
in 4
Qty St 4
1211
Re Concrete Deck
sgft
5627
0%
20%
1125
80%
4502
0%
4 inches of asphalt on 7 5 thick concrete deck It is not known if previously noted spalls in deck were
rehabilitated prior to new overlay Forms in place from full depth patches on underside Haunch has broken
off along several girder top flanges In Span 1 Slab supports/haunch have spalls at ends of Girders 3A 3B
and 3C at Abutment 4
510/1 I Weanng Surfaces Isq ft 14965 1 96% 14770 1 0% 10 14% 1195 10% 10
4 inches of asphalt on 7 5 inch thick concrete deck Longitudinal crack in overlay down centerline of
roadway and centerline of lanes Area of transverse cracks up to 0 25 inches wide spaced at 10 feet
affecting 15 square feet, over Span 3
3220/11 Crack (Weanng Su'sq ft 1195
1 0% 10 10% I0
1 100% 1195 I °% 10
1080/1 1 Delamination/SpaII/Pao1sq ft 16
10% 10 10% 10
1100% 16
10% 10
Spalls throughout, up to 6 inch long with exposed rebar in Span 3 Honeycomb near Pier 3 with (5)
locations of areas of delaminations and spalls (1) 1 foot x 1 foot x 1 inch deep spall with R3 rusted rebar
in north overhang at Abutment 4 (2) 1 foot x 6 inch x 1 inch deep spalls with R2 rusted mbar in north
overhang of Span 3, near Abutment 4 1 foot long x 6 inch wide x 1 inch deep spall at failed patch with
exposed rebar in Bay D at Span 2 Quantity of 80 square feet in CS2 not used to avoid double counting
1120/1 I Efflorescence/Rust Stailsq ft 14501
10% 10
125% 11125 175% 13376
10% '0
80% of map cracking has efflorescence and 60% with rust staining
1130/1 I Cracking (RC and Othelsq ft 11118
10% 1a
I.% 10 1100% 11118 1 0% lo
100% of soffit has insignificant width map cracking up to 0 01 inch wide at 4 Inch spacing
107/1 'Steel Opn Girder/Beam Ift 1662
1 66% 1439
12% 110
132% 1213 10%
lS
(4) steel girders Cover plates welded full perimeter to bottom flanges over piers All girders have 2 bolted
splice locations in Span 2
515/1 I Steel Protective Coatwlsq ft 1662
10% 10 10% 10
166% 1439 I34% 1223
Painted Chalking and faded throughout Faded at rust locations
1000/1 1 Corrosion
Ift 1223
5 feet of isolated R2 rust of bottom flange of Girder 3D at Abutment 4 Spotty R1 rust at random locations
throughout R2 rust at top flanges of all girders where haunch has broken away in Span 1 Small spotty
areas of pitting rust of bottom flange of Girder D full length in Span 1 and 30 feet in Span 2
I. 1100
Minor honeycombing on pier walls Cofferdam/footing exposed up to 3 Inches at upstream nose of Pier 2
1 0% 10 14% Ito
196% 1213 I3% 10
210/1 IRe Conc Pier Wall
1100% 1100 10% 10 10% 10
I.% I.
215/1 IRe Conc Abutment Ift 1100 193% 193 l 0% 10 17% 17
10% 10
Few insignificant width vertical cracks Both waterstained Debris built up on Abutment 4 seat Water
stains on backwalls
1080/1 I Delamination/SpallPatclft 11
10% 10
10% 10 1100% I1
10% 1a
Map cracks, delaminations, and exposed rusted (R2) reinforcement at south corner of Abutment 1
1130/1 1 Cracking (RC and Othelft 16
10% 10 10% 10
1100% 16 10% 10
6 foot long horizontal crack in south end of Abutment 1 open up to 0 25 inch wide
260/1 'Slope Prot/Benns
I(EA) 12
Dirt berms Rock and concrete rubble nprap at each
100% 12 10% 10
10% 10 10% 10
304/3 'Open Expansion Joint Ift 16
0% I0 150% I.
150% 13
10% I.
Sliding plates in north curb of Abutment 4 only Missing plate at southeast
2360/3 I Adjacent Deck or Headlft 13
0% lo ' 100% 13
10% 10 10% I0
Minor spalls adjacent to plates
311/1 'Moveable Bearing
leach 112
Rockers at Pier 2 Pier 3 and Abutment 4 Debris at bearings Rockers at Abutment 4 all rotated 9 degrees
in the expansion direction at time of 2022 inspection
1 0% 10 150% IS
150% 16 I.% 10
CDOT SIA v10 - 4/10/2022
Structure ID WEL060 5-049 OA
Thu 06/23/2022 8 51 38
Page 2 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 ml
Linear Ref Sys MP 1 958 ml
515/1 1 Steel Protective Coatinisq ft 112
1 o% 10 1 o% 10
10% 10 1100% 112
Painted Faded at rust locations
1000/1 I Corrosion
leash Ito
R1 to R2 rust of plates and rockers R1 rust of interior rockers R2 rust of Bearing 4D Full quantity of 6 in
CS3 not used to avoid double counting
10% 10
160% 16
140% 14 10% 10
I 2210/1 I Movement leach '2
10% 10
10% I.
1100% 12 10% 10
Debris impaction restricts movement of exterior bearings
Full quantity of 4 in CS3 not used to avoid double counting
bush 14
Fixed at Abutment 1 Debris on bearings
313/1 'Fixed Bearing
10% I.
1100% 14
10% 10 1 0% 10
515/1 I Steel Protective CoatisJoq ft 14
10% lo 10% 10
10% 10 1100% 14
Painted Faded at rust locations
I 1000/1 I Corrosion leach 14
10% 10
1100% 14
Io% I0 10% lo
R1 rust on all bearings
(322/1 'Approach Roadway 1(EA) I1
1100% I1
10% 10
10% 10 10% 10
Well aligned, no speed reduction required
326/1 'Bridge Wmgwalls
I(EA) 14
Extensions of abutment backwalls 1 5 foot long x full width x 4 inch deep spell at cover plate location in
curb with exposed and corroded reinforcement in southeast wingwall No significant defects at
southwest, northwest and northeast wingwalls
1 100% 14
10% Jo
10% I.
1329/1 ISrdewalk/Median/Curb I(LF) 1331 1100% 1331
10% I. 10% I.
I o% '0
A few insignificant width transverse and shrinkage cracks Minor spells m curb edges
330/1 'Motel Bridge Railing Ift 1331
195% 1316 14% 113 11% 12
Galvanized W -beam on wide flange posts bolted to exterior faces of curbs
I 515/1 I Steel Protective Coatiro'sq ft '331
I99% 1329 10% ICI 10% 10
It% 12
Galvanized Galvanizing failed at rust locations
1000/1 I Corrosion
1ft 12
(2) areas of R4 rust with perforations at end section at southeast and northwest corners
10%
Jo
1 o% 'o
1100% 12 10% 10
7000/1 I Damage
1ft 113
6 foot section on south side near Abutment 4 is damaged from collision 6 foot section on north side and
near middle of Span 2 is damaged from collision 1 foot tear in northwest corner of bridge rail
10% 10
1100% 113
I0% lo '0% 10
501/1 IChannel/Bank 1(EA) I1
1100% I1 10% I.
10% 10 10% 10
Winding channel with flow along Pier 2 Steep banks with trees, grass, and brush
600/1 'General Notes
I(EA) I1
No approach rails 5 inch utility pipe on north side Non-standard ob/ect markers at southwest and
northeast corners
11.0% I1
10% I. 10% I.
-10% 10
19306/1 'Asphaltic Pig Exp Jt 1(LF) 144
189% I30 111% 15
1o% l0 10% l0
New asphaltic plug installed prior to 2010 inspection at Abutment 4 Cracks along side of deck m shoulder
areas
Inspection References and Definitions
CDOT SIA 010 - 4/10/2022 Structure ID WEL060 5-049 OA
Thu 06/23/2022 8 51 38
Page 3 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units),
Crack Width Descriptions for Reinforced Concrete
Insignificant cracking (in ) = Less than 0 012 wide
Moderate cracking (in ) = 0 012 to 0 05 wide
Wide cracking (in ) = Greater than 0 05 wide
Crack Width Descriptions for Prestressed Concrete
Insignificant cracking (in ) = Less than 0 004 wide
Moderate cracking (in ) = 0 004 to 0 009 wide
Wide cracking (in ) = Greater than 0 009 wide
Maintenance Activity Summary
MMS Activity Description
Substructure -Patch spalls
200 31
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 mi
Linear Ref Sys MP 1 958 mi
Rust Codes (R Codes)
R1 = Peeling of the paint pitting, surface rust, etc , no measurable section loss
R2 = Flaking, minor section loss (< 10% thickness loss)
R3 = Flaking swelling mod section loss (10% < thickness loss <30%)
R4 = Heavy section loss (> 30% thickness loss), may have holes through base metal
Concrete Scaling Codes (S Codes)
S1 = Light scale up to 1/4' deep
S2 = Moderate scale up to 1/2" deep with agg exposed
S3 = Heavy scale up to 1" deep with some agg loose or missing
S4 = Critical scale > 1' deep with reinforcing bars exposed and general disintegration
of the concrete
Repair cracking, delaminations, and spalls in south end of Abutment 1
302 01
Misc-Install Sign
Install Type 3 object markers at all corners
306 05
Approach Railing
Recommended Status Target Year Priority
6/13/2018
2023 Medium
6/6/2022 2023 Medium
6/23/2020 2025 Medium
Install approach rails, transitions, and end treatments to meet current AASHTO/CDOT standards
306 07
Bridge Rail -Repair
6/6/2022 2024 Medium
Repair/replace areas of damaged bridge rails if not completed per Activity 306 09
306 09
Bridge Rail -Upgrade
Upgrade bridge rails to meet current AASHTO/CDOT guidelines
5/4/2010 2025 Medium
CDOT SIA v10 - 4/10/2022 Structure ID WEL060 5-049 OA
Thu 06/23/2022 8 51 38
Page 4 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
353.03
[Deck -Replace
Highway Number (ON) 5D: 00000 V
Mile Post (ON) 11 -1 mi
Linear Ref Sys. MP 1.958 mi
6/7/2016
Monitor spalls and cracking in deck and schedule replacement if condition worsens.
353.08
Deck -Seal
6/19/2014
2023
2023
Seal cracks in asphalt overlay along centerline and in travel lanes; at east end, and along plug joint.
357.00
Substruct-Cln Abutment/Pier Seat
Remove debris from bearings.
358.06
Substructure -Patch spalls
Patch spalls in southeast wingwall.
Bridge Notes (Inspection > Inventory > Admin)
6/13/2018
6/19/2014
2023
2024
Monitor
Medium
High
Low
Inventory route is west to east
North side is upstream
Superstructure is named Girder A through D from north to south
Substructure is numbered 1 through 4 from west to east
Inspection Notes (Inspection > Condition)
Date: 06/06/2022
Time: 1:08 PM
Temp: 84 F
Weather: Partly Cloudy
Inspectors: ND/RB
Item 60 (Substructure) raised from a 6 to a 7 in 2022 due to isolated location and significance of defects.
Scour Item 113 Documentation (Inspection > CDOT Bridge)
WEL060.5-049.0A SCOUR Item 113 Screening Memo 2016 04 20.pdf
Bat Present At Bridge (Inspection > Inventory > Agency Items > userkey9)
No
Inspection Access Requirements (Inspection > CDOT Bridge)
CDOT_SIA v10 - 4/10/2022
Structure ID: WEL060.5-049 OA
Thu 06/23/2022 8:51:38
Page 5 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Scheduling Notes (Inspection > Schedule)
Scope:
[0 NBI
14 Element
Team Leader Inspection Check -off:
■
■
■
FCM's
Posting Signs
Essential Repair Verification
Inspection Team: NLD ENGINEERING
Inspection Date: 06/06/2022
■
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 mi
Linear Ref Sys. MR 1 .958 mi
Underwater ■ Fracture Critical ■ Other Type: Regular NBI
■
■
Vertical Clearance
Stream Bed Profile
Inspector: Ryan Butkovich
(limm Lea}44,44bm
Inspector (Team Leader): NINA DICKHAUSEN
CDOT_SIA v10 - 4/10/2022 Structure ID: WEL060.5-049.0A
Thu 06/23/2022 8:51:38
Page 6 of 6
tO
Engineering
Operations, LLC.
WEL060.5-049.OA
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
Ch
tool
Roadway Looking East
1,r. •
-
ti
Elevation Looking South
•ir.if 4.•
•r L
1A'-`, �, +• ' , .•_a
- M k
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 1 of 9
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
0 Engineering
Operations, LLC.
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
‘1‘
Multi Directional Cracking in Asphalt on Deck at East End
Typical Spalling and Delamination's in Deck Soffit of Bay 3C
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 4 of 9
0 Engineering
Operations, LLC.
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
a
Typical Map Cracking with Rust Staining and Efflorescence in Deck Soffit of Bay 3A
Rust of Girder 1A Top Flange Near Abutment 1
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 5 of 9
e0
Engineering
Operations, LLC.
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
Horizontal Crack with Delamination in South End of Abutment 1
Rust and Debris Impaction of Bearing 4D
COLORADO
Department of Transportation
CI)OT Off -System Bridge Inspections
Page 6 of 9
0 Engineering
Operations, LLC.
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
0 COLORADO
® doe*
Typical Rocker Bearing Rotation at Abutment 4, Bearing 4D Shown
Dirt and Debris on Abutment 4 Bearing Seat
Department of Transportation
C1)OT Off -System Bridge Inspections
Page 7 of 9
cO
Engineering
Operations, LLC.
WEL060.5-049.0A
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
ti; COLORADO
Department of Transportation
Impact Damage of North Bridge Rail Over Span 2
Rust of South Bridge Rail at East End
CDOT Off -System Bridge Inspections
Page 8 of 9
Engineering
Operations, LLC.
WEL060.5-049.OA
County Road 60.5 over Lone Tree Creek
Weld County
Inspection Date: 6/6/2022
SpaII in Top of Southeast Wingwall
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections Page 9 of 9
WEL060 5-049 OA
/
PLAN
LONE
TREE
/CREEK
NORTH
/ // 47
SKEW
// COUNTY ROAD 60 5 //
165'-6" STR LENGTH
4)// DIRECTION _
OF INVENTORY
/
/ 154 N
Al
5'-4
COFFER
DAM P2I
44'-6" CLR SPAN
P3
57'-0" MAX SPAN
49'-6" CLR SPAN
ELEVATION
LOOKING NORTH
5" PLASTIC
CONDUIT
SECTION
LOOKING EAST
-0"
34'-0' 0/0 1 (49'-10" 0/0 SKEW)
A4
5 -4'
30'-0' CURB -CURB
GALV W -BEAM RAIL ON
6(-a"x6" I -BEAM POSTS
@ 6'-3" 0 C
r1 _
4" ASPHALT ON 71," DECK
I I
A B
3 SPA @ 9'-0" O C
C
I
Metric tons
Tons
Metric tons
Tons
COLORADO DEPARTMENT OF TRANSPORTATION
LOAFACTOR RATING SUMMARY
using
Asphalt thickness .5/ mm ( 10
Colorado legal loads
113 Interstate legal loads
Structural member
5I q jo
--717` 74Z e.• oar'
Metric tons (Tons)
)
Paraflel structure #
Inventory
zef (.57.r)
00,&(e3.-7)
`Operating
40, /(.6-s.a)
X0.9 (56./
)
Type 3 truck
(
)
(
)
(
)
(
Type 382 truck
(
)
(
)
(
)t
f
(
)
Type 3-2 truck
(
)
(
)
(
)
(
) ,
Permit truck
(
)
y
(
)
(
)
lnlarslato
354 =Morons (331ons)
Colorado
36 6 menc lore 025 fon)
Metric tons
Tons
Comments
_ )DC -E REINSPECTED BUT r .'
Dad
:RATED BY L _WCO il�C
Previous edtttons are obsolete and may not be used CDOT Form C1187 1/95
YES
YES
YES
4 _
Bridge over waterway?
YES
Item 113 = 7, 6, 4, 3, 2, 1?
NO
Foundations well above
lood water elevations?
NO
Reported scour issues?
NO
CBC, CMP, RCP or
floored structure?
Open -bottom culvert?
NO
NCHRP Doc 107
P/MPL ratio <1?
NO
Engineering Review:
Is available information
sufficient for
coding?
NO,
NC
YES
YES
YES
O
Item 113 = N
Stop / Document
Item 113 = 9
Stop / Document
Item 113 = 8
Stop / Document
No Change
Item 113 = 5 or 8
Stop / Document
Stop / Document
COLORADO
Department of
Transportation
CDOT OFF -SYSTEM BRIDGE SCOUR SCREENING CHART
STRUCTURE ID: WEL060.5-049.0A
FACILITY CARRIED: County Road 60.5
FEATURE INTERSECTED: Lone Tree Creek
Structure Probability of Failure (P):
Minimum Performance Level (MPL):
Ratio (P/MPL):
N
ITEM 113 =
POA REQUIRED (V/N):
POA COMPLETION DATE:
0.00025
0.0005
0.5
5
N
N/A
EVALUATED BY: Auto -Generated
ORGANIZATION: Stantec Consulting
DATE:
4/20/2016
REVIEWER COMMENTS:
WEL060.5-049.0A was previously rated Item 113=5 or 8, has no
reported scour problems, and passes the P/MPL test. Item 113
code will not change.
Item 113 = 3
POA = Monitor
until replaced
Bridge or open -bottom
culvert?
NO
YES
HEC-18 scour
analysis and POA
Culvert analysis
and POA
Save file as: [structure number) Scour Screening Memo YYYY-MM-DD.pdf
STREAMBED HISTORY
u.
0
2
o �
�W
W
O u
m --
O �
cO
u.
WU
US
z0
Q -�
I
O
2012
2014
2016
2018
2020
aa�m 2022
Al
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0 41,
0.0
25.0
WTP
P2
_VL
LOW CHORD
50.0 75.0 100.0
CLEAR DISTANCE FROM Al (FEET)
P3
125.0
150.0
A4
0.0
30.2
50.8
62.8
80.3
109.8
141.5
165.5
2012
2.8
11.3
13.6
13.6
13.1
13.1
10.0
3.3
2014
2.8 I
11.1
13.6
13.8
12.9
12.7
10.3
3.3
2016
2.6
11.5
13.6
14.2
12.9
13.0
11.1
3.3
2018
3.0
10.9
13.8
13.7
12.4
12.8
10.5
3.2
2020
3.1
10.3
13.6
13.0
11.8
12.8
9.3
3.7
2022
2.9
10.6
13.5
12.7
12.3
12.8
9.2
3.3
STRUCTURE NUMBER: WEL060.5.049.0A
INSPECTION DATE: 6/6/2022
PERFORMED BY: ND/RB
W.
L
13.0
12.4
13.3
Mike Bedell
From:
Sent:
To:
Cc:
Subject:
Attachments:
Mike Bedell
Wednesday, October 5, 2022 1:17 PM
O'Neal - CDOT, John
Don Dunker; Reeves - CDOT, Bryce
RE: CCI Bridge Grant Applications
2022-off-bridge-system-program-docs.pdf
My estimates are generated using the formulas provided to us in the attached document (see pages 8 and 9). I am
under the impression that all applicants are strongly encouraged to use these same formulas.
From: O'Neal - CDOT, John <jake.oneal@state.co.us>
Sent: Wednesday, October 5, 2022 11:31 AM
To: Mike Bedell <mbedell@weldgov.com>
Cc: Don Dunker <ddunker@weldgov.com>; Reeves CDOT, Bryce <bryce.reeves@state.co.us>
Subject: Re: CCI Bridge Grant Applications
Caution! This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hi Mike,
The first page of your application looks a little different than the application form found on the CCI website's application
documents. I have attached the application form to this email. Your local match amount also appears incorrect, as it is
supposed to be 20% of the grant amount requested, not the total project cost. That being said, it looks like the new
application form calculates that for you.
Did you use your own historical price data to develop these cost estimates? Are you also accounting for inflation and
ROW costs? I ask because your estimates appear to be higher than other estimates I have received, particularly the
WEL34/17A bridge.
Thanks,
John "Jake" Oneal, EIT
Engineer In Training II
Region 4 Traffic and Local Agency Coordinator
COLORADO
Department of Transportation
C 970.515.2731
10601 W. 10th St., Greeley, CO 80634
1
lake oneal@state co usr I www cdot gov I www cotrip.org
On Wed, Sep 28, 2022 at 1 20 PM Mike Bedell <mbedell@weldgov corn> wrote
These bridge grant applications require us to first consult with our CDOT Local Agency Coordinator prior to submitting
the final applications Please review the attached draft applications and let me know if you have any questions or
concerns I will need either a short memo or an e-mail from you after reviewing, which will end up being attached to
the final applications These are the same ones we tried for last year
2
COLORADO SPECIAL HIGHWAY COMMITTEE
Off -System Bridge Program
Application Data
Structure Number
WEL34/17A -
Application Date
10/10/2022
Structure Location
Saint Vraln River
County/Municipality
Weld County
CDOT Engineering Region
Region 4
CDOT Local Agency Coordinator
Consulted Prior to S
Jake Oneal Applicator Date d/
Project type
Request type
Replacement
Original
Design level completed at time of application
No Design
Work phase to be funded by this grant application
Construction Only
Estimated total project cost (Design + Construction)
$ 1 3,600,000
Year the total project cost estimate was created
2022
20% minimum local match amount
$ 2,720,000
Local overmatch amount
$ 9,880,000 -
Proposed total local match amount
$ 1 2,600,000
Local match commitment documentation
Narrative Letter
SHC grant amount requested
$ 1,000,000
Colorado fiscal years when funding will be required
2025
Anticipated start date
Anticipated completion date
February -2025
June -2028
Work descnpton
Replacement of an existing bridge constructed in 1960 and classified as "Poor" The roadway
would be closed during the construction which would likely take 9-10 months The new bridge
would be designed to meet current CDOT bridge design standards and current 100 -year flood
elevations Weld County would hire a qualified design consultant with extensive knowledge of the
CDOT standards Some new right-of-way acquisition would likely be required Some utilities
relocations would likely be required Weld County would bid out the construction to a qualified
general contractor
r
SHC Worksheet
For further definition of terms, see the Structure Management Manual Section 5, Off -System Bridge Program
8/2020
Eric Bergman
Colorado Counties, Inc.
800 Grant Street, Suite 500
Denver, CO 80203
PUBLIC WORKS DEPARTMENT
1111 H STREET
P.O. BOX 758
GREELEY, COLORADO 80632
PHONE: (970) 400-3706
October 10, 2022
RE: Narrative for Bridge WEL034.0-017.0A (Fiscal Years 2023-2025 Funding)
Bridge WEL034.0-017.0A is on Weld County Road 34 and spans the Saint Vrain River.
The bridge is located 2 miles west of Platteville. WCR 34 is classified as a Collector Road
and is a vital paved road serving Weld County, Platteville, and the agricultural and oil/gas
industries. Traffic counts taken in 2021 show an ADT of 1,759 vehicles per day, with 39%
being trucks. This high percentage of trucks is likely accelerating the poor condition of this
bridge. Replacement of this bridge is our number two priority for this bridge funds
application period.
The existing bridge is 30 feet wide, 294 feet long (six spans), and was built in 1960. It is
structurally deficient and has been defined as "poor" on the Off -System Structure Eligibility
List. The bridge has issues with rusted steel and spalling concrete on the substructure and
superstructure. The bridge rail and approach guardrails are constructed improperly, in poor
condition and do not meet current AASHTO/CDOT standards. Rehabilitation instead of
replacement is not a viable option, nor cost effective, because of the rusted steel
substructure elements, and age of the overall structure. The new structure may need to be
elevated above its current configuration to allow for adequate freeboard to prevent debris
collection and scour in future flood events. This bridge was badly impacted during the 2013
flood event and required extensive emergency repairs to put it back into service.
Weld County is proposing to provide most of the funding for this project due to the
importance of this bridge for the area. Instead of the typical 20% funding match, Weld
County is proposing that CDOT partner with Weld County on this project by providing a
$1,000,000 grant from the available bridge replacement grant funds. Using the CDOT
guidelines we estimate the replacement cost at $13,600,000 with the Weld County portion
being $12,600,000 (93%). Weld County currently has the necessary funds to cover our
portion of this project. Please contact us if you need any information in addition to the
contents of this application.
orLSLO
Michael Bedell, P.E. Senior Engineer
SPECIAL : RIDGE FUND -- BRIDGE PROJECT COST ESTIMATE
Structure Number WEL034 0-017 OA Municipality/County Weld
Priority # 2 Average Daily Traffic (ADT) 1,759
Engineering
Preliminary Engineering
Design Engineering
Construction Engineering
and Staking
Project Engineering
Final Inspection
TOTAL ENGINEERING COSTS
Labor - Materials - Equipment
Mobilization
Site Preparation
Excavation
Abutments/Piers/Piling
Structure/Deck/Guard Rail
Approaches
Pavement
$ 100,000
$ 1,000.000
$ _
500,000
190 000
10.000
800 000
800,000
800,000 _ __
3,500,000
3.500,000
800,000
800,000
TOTAL LABOR - MATERIALS - EQUIPMENT COSTS
Contingencies
TOTAL PROJECT COSTS
Design/Engineering Start Date (mo/yr)
Date of Bid Opening (mo/yr)
Construction Start Date (mo/yr)
Construction Completion Date (mo/yr)
02/2025
1,800,000
$ 11.000,000
800.000
$ 13.600 000
10/2026
11/2027
06/2028
Estimate Prepared by Michael Bedell. P E Phone (970) 400-3706 Title Sr Engineer Date 10/03/22
Approved by Don Dunker, P E Phone (970) 400-3749 Title County Engineer Date 10/03/22
ti
400
800
1 inch = 800 feet
1,600
Feet
Weld County Bridge
WCR 34 - WCR 17A
VICINITY MAP
Legend
Paved
Township / Range
Section
Weld County GIS
901 10th Avenue
Greeley, CO 80631
970-400-4357
maps@co.weld.co.us
This product has been developed solely for internal use only by
Weld County. The GIS database, applications and data in the product is
subject to constant change and the accuracy and completeness cannot
be and is not guaranteed. The designation of lots or parcels or land uses
in the database does not imply that the lots or parcels were legally
created or that the land uses comply with applicable State or Local law,
UNDER NO CIRCUMSTANCE SHALL ANY PART THE PRODUCT BE
USED FOR FINAL DESIGN PURPOSES. WELD COUNTY MAKES NO
WARRANTIES OR GUARANTEES EITHER EXPRESSED OR IMPLIED
AS TO THE COMPLETENESS, ACCURACY, OR CORRECTNESS OF
SUCH PRODUCT NOR ACCEPTS ANY LIABILITY, ARISING FROM
ANY INCORRECT, INCOMPLETE OR MISLEADING INFORMATION
CONTAINED THEREIN.
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Highway Number (ON) 5O: 00000 V
Mile Post (ON) 11: -1 mi
Linear Ref. Sys. MP: 3.746 mi
Bridge Key: WEL034.0-017.0A Inspection Date:
06/07/2022
Suff Rating:
63.1
SD
G/F/P Condition: Poor
NBI Reporting ID:
District (Region/Sect):
Tran Region 2T:
County Code 3:
123 WELD
Place Code 4:
non -city
Rte.(On/Under) 5A:
WEL034.0-017.0A
Reg 4 MSec 1
13
123
Signing Prefix 5B:
Level of Service 5C:
Direction Suffix 5E:
Feature Intersected 6:
St. Vrain Creek
00000
1
4
1
0
Facility Carried 7:
County Road 34
Alias Str No.8A:
Prll Str No. 8P:
N/A
Location 9:
0.3 Mi E of Co Rd 17
Max CIr 10:
BaseHiway Net12:
IrsinvRout 13A:
IrssubRout No13B:
Latitude 16:
Longitude 17:
Detour Length 19:
Toll Facility 20:
Custodian 21:
Owner 22:
Functional Class 26:
Year Built 27:
Lanes On 28A:
Lanes Under 28B:
ADT 29:
Year of ADT 30:
Design Load 31:
Apr Rdwy Width 32:
Median 33:
Skew 34:
Structure Flared 35:
Sfty Rail 36a/b/c/d:
Rail ht36h:
Hist Signif 37:
Posting status 41:
Service on/un 42A/B:
99.99
0
123-0-2013
00
40d 13' 59.00"
104d 53' 57.00"
4 mi
3
02
02
08
1960
2
0
1,759
2021
5 MS 18 (HS 20)
24.00 ft
0
0
0
0 0 0 0
24.0 in
5
A
1
[Inspection Type: Regular NBI
LEOR: Unknown
5
Main Mat/Desgn 43A/B:
Appr Mat/Desgn 44A/B:
Main Spans Unit 45:
Approach Spans 46:
Horiz CIr 47:
Max Span 48:
Str Length 49:
Curb Width L/R 50A/B:
Width Curb to Curb 51:
Width Out to Out 52:
Deck Area:
Min CIr Ovr Brdg 53:
Min Undrclr Ref 54A:
Min Underclr 54B:
Min Lat Clrnce Ref R 55A
Min Lat Undrclr R 55B:
Min Lat Undrclr L 56:
Deck 58:
Super 59:
Sub 60:
Channel/Protection 61:
Culvert 62:
Oprtng Rtg Method 63:
Operating Rating 64:
Operating Factor 64:
Inv Rtng Method 65:
Inventory Rating 66:
Inventory Factor 66:
Asph/Fill Thick 66T:
Str. Evaluation 67
Deck Geometry 68:
Undrclr Vert/Hor 69:
Posting 70:
Waterway Adequacy 71:
Approach Alignment 72:
Type Of Work 75A:
Work Done By 75B:
Length of Improvment 76:
Insp Team Indicator 90B:
Inspector Name 90C:
Frequency 91
FC Frequency 92A:
UW Frequency 92B:
SI Frequency (Pin) 92C:
FC Inspection Date 93A:
UW Inspection Date 93B:
SI Date (Pin) 93C:
5
04
0
0
6
0
29.60 ft
48.1
ft
294.1
ft
0.0 ft
0.0 ft
29.60 ft
30.1
ft
8852
99 99
N
0.0 ft
N
0.0 ft
0.0 ft
6
6
4
6
N
0 Field eval and
36.00
0 Field eval and
36.00
4.5 in
4
5
N
5 At/Above Lega
8
8
-2
ENGINEERING
i
RICHARDSONA
24 months
Bridge Cost 94:
Roadway Cost 95:
Total Cost 96:
Year of Cost Estimate 97:
Brdr Brdg Code/% 98A/B:
Border
Bridge Number
99:
Defense
Highway
100:
Parallel Structure 101:
Direction of Traffic 102:
Temporary Structure 103:
Hiohwav Systems 104.
Fed Lands Hiway 105:
Year Reconstructed 106:
Deck Type 107:
Wearing Surface 108A:
Membrane 108B:
Deck Protection 108C:
Truck ADT 109:
Trk Net 110:
Pier Protection 111:
NBIS Length 112:
Scour Critical
113:
Scour Watch 113M:
Future ADT 114:
Year of Future ADT 115:
CDOT Str Type 120A:
CDOT Constr Type
120B:
Expansion Dev/Type 124:
Brdg Rail Type/Mod 125A/B:
Posting Trucks 129A/B/C:
Str Rating Date 130:
Special Equip 133:
Vert CIr N/E 134A/B/C:
Vert CIr S/W 135A/B/C:
Vertical CIr Date.
Weight Limit Color 139:
Userkey 1, Insp System
Userkey 4, Insp Sched:
Userkey 5, UW Sched:
Userkey 6. Pin Sched:
FHWA Bridge Risk:
FHWA UW Risk:
FHWA Load Rating Risk:
CBTE:
Inspection Key:
Date Entered:
Entered By:
Data Responsibility: Asset Management
0.00
0.00
0.00
2018
J
-2
0.00
0
0
N
2
0
0
1
6
0
0
39.00
0
i
Y
8
N
2,498
2041
CDTPG
21
O
W
2
12/18/1995
0.00
X
99.90
0.00
X
99.90
0.00
01/01/1901
0, White
OFFSYS
EVN JUN N_0
HIGH
NA
HIGH
NA
SUMS
6/8/2022 12:00:0
MAMIROVM
Inspection
Rating
CDOT SIA v10 - 4/10/2022
Structure ID: WE L034.0 -017.0A
Wed 06/22/2022 11:27:33
Page 1 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Element Inspection Report
Highway Number (ON) 5D 00000 V
Mlle Post (ON) 11 -1 ml
Linear Ref Sys MP 3 746 ml
Elm/Env
Description
12/1
Re Concrete Deck
Unit I Total Qty
sq ft 8852
6 inch thick concrete topping slab Not visible except at the deck edges
in1
Qty St 1
Qty St 2
m3
Qty St 3
% in 4
Qty St 4
100%
8852
0%
0%
0%
I 510/1 I Wearing Surfaces Isq ft 18852 1 100% 18827
10% 10
10% 125 10% 10
3220/11 Crack (Wearing Sulsq ft 125 10% 1a
4 5 inches of asphalt Chip seal added prior to 2018 inspection A few isolated longitudinal and transverse
cracks up to 1/8 inch wide for 25 square feet total
Ias la
1100% 125 I0% lc,
109/1 'Pre Opn Conc Girder/Beanlft 12372
I46% (1086 133% 1780 121% 1506 10% 10
1080/1 I Delamination/Spall/Pat Ift 120
2 5 inch precast concrete double T top flange (2) 30 inch x 84 inch exterior and (2) 30 inch x 96 inch
intenor double T girder sections (8 girders total) Spalls 6 inch x 6 inch x 1/4 inch deep, with exposed
reinforcement in all end diaphragms at piers and abutments Water stains on diaphragms and on several
girder ends
(as 1a
1100% 120 10% 10
1as I.
Several minor small spalls, less than 2 inches diameter, and patches, predominantly in exterior girders
I 1110/1 I Cracking (PSC)
1ft 11266 10% 1a
Insignificant width to 0 025 inch wide fillet cracks in most girders, some with efflorescence Insignificant
width transverse cracks in Bays F and G in Span 3
160% 1760
140% (506 1 0% la
210/1 1Re Corm Pier Wall 1ft (120
I 0% 10 10% 10 1100% 1120 10% 10
Precast concrete panels between H -piles
I 4000/1 I Settlement Ift 1120
10% 1a
los la 1 100% 1120 '0% 10
All panels have settled between a couple inches and several feet, due to past scour Upper panel
between Piles C and D at Pier 3 is slightly rotated restricting movement of the panel, lower panel has
settled below channel bottom with only top of panel visible
1215/1 'Re Conc Abutment 1ft 160
198% 159
Precast concrete panels between H -piles
1 2% 11 los lo
los 10
1130/1 I Cracking (RC and Othelft 11
I 0% Is 1100% (1
los I.
10% 1a
(1) vertical crack up to 0 012 inch wide at center of Abutment 7
225/1 'Steel Pde
1(EA) 135
(5) 8 inch x 8 inch H -piles per pier and abutment with precast concrete panels between piles Original
flange and web thickness =0 445 inches Previous underwater inspection notes (2016 08 12) were
removed from SIA report as underwater inspections are not required for complete inspection and defects
overlap with routine inspection comments
10% 10 134% 112
149% 117 117% IC
515/1 I Steel Protective Coatinisq ft (35
The Condition State 4 Defect is not able to be reviewed by Engineenng Operations Program Engineer due
to the defects silted in/covered by timber debns and not visible for inspection The quantity was left in
Condition State 4 as a a flag to the next inspector to determine if the defects have become exposed and
will require another review
10% la
Painted Faded at rust locations
1as I.
1a% 10 1100% 135
1000/1 I Corrosion I(EA) (34
I as lo 1 35% 112
(475 116 1 18% 16
19002 I Distortion
R1 rust of all piles below the high waterline R2 to R3 rust with up to 0 5 inch laminar corrosion of vanous
piles near the waterline 5./0 to 30% section loss to pile flanges was measured where exposed in 2022
Minimum remaining thickness of approximately 0 3 inches measured at Piles 3D and 6B
Defects not verified due to channel silting in (most defects not observed since before 2014 inspection)
Heavy rust with perforations in Pile 2E Piles at Pier 3 have R3 to R4 rust with 40% to 100% +/- section
loss to flanges and webs at flowline with deep pitting on faces
Quantity of 6 each left in CS4 Actual quantity of 35 each not used to avoid double counting
I(EA) 11
los I0 los 10
1100% It
los I.
Pile 2D has distortion from impact, possibly from debris The pile deflects 1 5 inches over 1 5 feet around
high water level Pile 3D is buckled slightly above flowline Pile 3E is distorted near groundline where
CDOT_SIA v10 - 4/10/2022
Structure ID WEL034 0-017 OA
Wed 06/22/2022 11 27 33
Page 2 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 ml
Linear Ref Sys MP 3 746 MI
corrosion is worst A steel plate has been welded to the east face of the pile to mitigate section loss and
distortion The steel plate does not look distressed Minor distortion of flanges in Piles 4E and 5D
Actual quantity of 5 each not used to avoid double counting
234/1 IRe Cone Pier Cap Ift 1211 1 76% 1160
10% 10
124% 151 10% 10
16 inch x 20 inch precast cap at abutments and piers Water stains on all caps
1080/1 I Delamination/Spell/Patclft 147
15% '0
10% 10 1100% 147
10% to
Horizontal delaminations with associated cracking up to 0 125 inch wide, rust staining and spoiling with
exposed reinforcement throughout pier caps, worst near middle and ends of caps
Pier 2 = 16` Feet
Pier 3= 6 Feet
Pier 4 = 6 Feet
Pier 5 = 6 Feet
Pier 6 = 8 Feet
Spell, 1 foot diameter x 3 inch deep, in top of Pier 6 cap adjacent Girder 5D
1090/1 -I Exposed Reber Ift 14
_I0% lo 10% lo
1100% 14 10% lo
Minor spoils, up to 6 inch diameter x 1 inch deep, with exposed and corroded reinforcement in underside
of Pier 2 cap between Piles 2B and 2C 3 similar spoils in Pier 6 cap
26011 'Slope Prot/Berms 1(EA) 12
1 100% 12 1 0% 10
10% 10
10% lo
Bank in front of Abutment 1 is eroded at toe of slope
322/1 'Approach Roadway '(EA) 11
1 100% 11
10% l0 10% lo
10% to
Well aligned no speed reduction required Erosion of embankment at northwest and southwest corners of
bodge is undermining pavement up to 16 inch high x 20 inch long x up to 15 inch penetration, with
associated settlement of asphalt at southwest Chipseal added to approach overlay Minor settlement at
west approach
330/1 'Metal Bridge Railing Ift 1588 188% 1516
I9% 152
13% 120 1 0% Is
Galvanized W -beam rails on steel wide flange posts -
515/1 I Steel Protective Coatislsq ft 1588 1 91% 1536
10% Is
10% 10 19% 152
Galvanized rails on painted posts Paint faded at rust locations
1000/1 I Corrosion
Kt 152
Rust of all posts near deck connection and at connections Various posts have minor pack rust with
section loss at deck connection
Ift 120
Minor impact damage for 20 feet of north rail in Span 4
10% I.
162% 132
138% 120 15% 10
7000/1 I Damage
l o°% 10
1 100% 120
10% '0 15%
I0
501/1 (Channel/Bank I(EA) 11
1100% 11 10% 10
15% '0 15% to
Natural, meandering, sandy streambed with partially regulated flows through a wide, flat, prairie valley
floor General channel scour occurred under bridge during September 2013 flood During the 2014
inspection it was noted that up to 10 feet of scour was present at several piers and channel between
piers During the 2016 inspection the streambed had returned to more typical levels See channel profile
The upstream streambed has aggraded across the channel Sand bar has developed on downstream side
of structure Concrete rubble at northwest bank Streambed meanders eroding protection in bends West
bank upstream and downstream from bodge is vertical and sloughing Bank cut to west during September
2013 flood Moderate timber debris built up around channel side of Pier 3
600/1 'General Notes '(EA) 11
1100% 11 10% ' 0
15% 10 10% 10
(1) 9 inch diameter utility pipe attached to the fascia of south girder Delineator decals on end terminations
Underwater inspection performed on 8/12/2016 Debris resting on southeast corner of the structure
against exterior girder
9306/1 'Asphaltic Plg Exp Jt '(LF) 1151
1155% 1151 10°i° lo
I. I.
10°i° lo
Plug joints installed over piers between 2010 and 2012 inspections No significant defects noted
9530/1 'Approach Guardrail A 1(EA) 14
1 100% 14 10% 10
10% 10 10% I.
No transitions, approach rails low and not long enough and ends are inadequate at northwest and
southeast corners
CDOT_SIA v10 - 4/10/2022
Structure ID WEL034 0-017 OA
%Ned 06/22/2022 11 27 33 '
Page 3 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Inspection References and Definitions
Crack Width Descriptions for Reinforced Concrete
Insignificant cracking (in ) = Less than 0 012 wide
Moderate cracking (in ) = 0 012 to 0 05 wide
Wide cracking (in ) = Greater than 0 05 wide
Crack Width Descriptions for Prestressed Concrete
Insignificant cracking (in ) = Less than 0 004 wide
Moderate cracking (in ) = 0 004 to 0 009 wide
Wide cracking (in ) = Greater than 0 009 wide
Maintenance Activity Summary
MMS Activity Description
154 01
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 ml
Linear Ref Sys MP 3 746 ml
Rust Codes (R CodesL
R1 = Peeling of the paint, pitting, surface rust etc , no measurable section loss
R2 = Flaking, minor section loss (< 10% thickness loss)
R3 = Flaking, swelling, mod section loss (10% < thickness loss <30%)
R4 = He, section loss (> 30% thickness loss), may have holes through base metal
Concrete Scaling Codes (S Codes)
S1 = Light scale up to 1/4" deep
S2 = Moderate scale up to 1/2" deep with agg exposed
S3 = Heavy scale up to 1" deep with some agg loose or missing
S4 = Critical scale > 1" deep with reinforcing bars exposed and general disintegration
of the concrete
Apprh Rdway-Mill Apprch/Shlder
Recommended
6/8/2016
Status Target Year
ri
Mitigate erosion and undermining of approaches at northwest and southwest corners of bridge
200 31 l
Substructure -Patch spalls
Clean and patch spalls in concrete caps
206 01
Channel -Remove Debris
6/8/2016
6/18/2014
2024
2026
Priority
High
Medium
2023 Monitor
2016-08-12 UWI Notes
During and post high water events, an underwater inspection, soundings, and channel profile should be performed to
monitor any additional scour or substructure displacement
306 09
'Bridge Rail -Upgrade
Upgrade bridge rails to meet current AASHTO/CDOT standards
1306 10 1
Upgrade approach rails to meet current AASHTO/CDOT standards
'Approach Railing
3/29/2006 _ 2032
6/2/2020
E
2032
Low
1
Low
CDOT SIA v10 - 4/10/2022 Structure ID WEL034 0-017 OA
Wed 06/22/2022 11 27 33
Page 4 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
358.05
Superstructure -Rehab
Encase steel H -piles at all piers in concrete.
Bridge Notes (Inspection > Inventory > Admin)
Highway Number (ON) 50: 00000 V
Mile Post (ON) 11: -1 mi
Linear Ref. Sys. MP: 3.746 mi
5/14/2008
2026
Medium
Inventory route is west to east
South side is upstream
Superstructure is named Girder A through H from north to south
Substructure is numbered 1 through 7 from west to east
Underwater inspection performed on 8/12/2016. 2019-06; Removed from underwater inspection schedule per request
of 2016 underwater inspection report due to shallow water.
Inspection Notes (Inspection > Condition)
Date: 06/07/2022
Time: 8:30 AM
Temp: 58 F
Weather: Partly Cloudy
Inspectors: AR/NA
Scour Item 113 Documentation (Inspection > CDOT Bridge)
WEL034.0-017.0A SCOUR Item 113 Screening Memo 2016 04 19.pdf
Bat Present At Bridge (Inspection > Inventory > Agency Items > userkey9)
No
Inspection Access Requirements (Inspection > CDOT Bridge)
Scheduling Notes (Inspection > Schedule)
CDOT_SIA v10 - 4/10/2022 Structure ID: WEL034.0-017.0A
Wed 06/22/2022 11:27:33
Page 5 of 6
Routine Inspection
Colorado Department of Transportation
Structure Inspection and Inventory Report (English Units)
Highway Number (ON) 5D 00000 V
Mile Post (ON) 11 -1 mi
Linear Ref Sys MP 3 746 mi
s—
Scope
O NBI 10 Element ❑ Underwater ❑ Fracture Critical ❑ Other Type Regular NBI
Team Leader Inspection Check off
❑ FCM's
❑ Posting Signs
❑ Essential Repair Verification
Inspection Team ENGINEERING OPERATIONS
Inspection Date 06/07/2022
❑ Vertical Clearance
❑ Stream Bed Profile
Inspector Anderson
r
nspector(Team Leader) Aaron Richardson
CDOT_SIA v10 - 4/10/2022 Structure ID WEL034 0-017 OA
Wed 06/22/2022 11 27 33
Page 6 of 6
0 Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
Roadway Looking East
Elevation Looking North
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 1 of 9
0 Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
Superstructure Looking East
Elevation Looking South
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 2 of 9
e0
Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
Channel Looking South Upstream
Channel Looking North Downstream
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 3 of 9
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
CO
Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
69
Minimum Remaining Thickness of Pile 3D, Similar at Pile 6B
Typical Settlement of Concrete Panels at Piers, Pier 2 Shown
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 5 of 9
0 Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
cc),
Minor Spall in Top of Pier 6 Cap
Horizontal Cracking with Associated Delaminations and Rust Stains in Pier 2 Cap
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 6 of 9
e0
Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
SpaII with Exposed Rebar in Pier 2 Cap
Damaged North Bridge Rail in Span 4
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections
Page 7 of 9
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
0 Engineering
Operations, LLC.
WEL034.0-017.0A
County Road 34 over St. Vrain Creek
Weld County
Inspection Date: 06/07/2022
Erosion and Undermining of Southwest Corner of Approach Roadway
COLORADO
Department of Transportation
CDOT Off -System Bridge Inspections Page 9 of 9
WEL034 0-017 OA
iT
ST VRAIN
CREEK
PLAN
NI MI
wI w I
a4 a4
1' 1' 1'
"XI E CR 34 oI .I
El wI wI
A4 a4 %
294'-1' STR LENGTH
DIRECTION
NORTH
OF INVENTORY
i
ELEVATION
LOOKING NORTH
SECTION
LOOKING EAST
PillP2
u
47'-6" 47'-6"
P3
47'-6"
ABUTMENTS
16"x20" CONC CAP ON (5)
8"x8" H -PILES W/ CONC
BACKWALLS, PILES HAVE 44"
CABLE TIEBACKS
P5T P6
47 -9" 47.-6" 48.-1"
30.-1" 0/0
MAX SPAN
PIERS
16"x20" CONC CAP ON (5) 8"x8"
H -PILES W/ PRECAST CONC PANELS
29'-7" R/R
GALV W -BEAM RAIL ON
5"x5" STL WF POSTS
4 5" ASPHALT ON 6" CONC TOPPING
7. SLAB ON 23" THK DOUBLE TEE TOP
FLANGE
9"0 PIPE ON BRACKETS,
WELDED TO INSERTS ON
S EXT GIRDER
J
C
J
J
A B D) E F G
CONC DIAPHRAGMS AT MIDSPANS (TYP )
(4) 30" DEEP PRECAST CONCRETE DOUBLE TEE GIRDERS (7'-0"W A EXT, 8'-0"W A INT)
,�,
COLORADO DEPARTMENT C' . TRANSPORTATION assanstr"c. 7 _
LOAD FACTOR RATING SUMMARY
noteu using
Asphalt thickness:
X
Colorado legal loads
Interstate legal loads
51-76 mm
(2-3 in.)
state hignway #
Batch I.D.
WEL034.0-017.OA
COUNTY ROAD 31
123010
Structure type
CDTPG
Parallel structure #
N/A
Structural
Member
CONCRETE
GIRDER
CONCRETE
DECK
Metric tons
(Tons)
Metric tons
(Tons)
Metric ton
Inventory
(HS
20)
MS
18
32.7
(36.0)
32.7
(36.0)
Operating
(HS
20)
MS
18
32.7
(36.0)
32.7
(36.0)
Type
3 truck
1
Type
3S2 truck
Type
3-2 truck
A
Permit
truck
Type 3 Truck
•nICr$lUSC 21 8 'nett IC tCr5 (24 rLn5)
• CO►erotic 24 5 metal: tons (2? ten 4
0 _ O -O
Metric tons
Tons
n
•1
L
I
g.
I,I
.:.4OC1 O OO
Type 3S2 Truck
:nIcrstcte 34! " eusr tors ;3c Jr.s,
COtOrO:C 35 6 r^ertst trens ;42 5 ._'^..)
Metric tons Tons
Comments BRIDGE REIN REC TED UT NOT RE.R_ATED_B.Y._
NO POSTING REQUIRED -
t
I
in!cfstele
25 4 rnClrK
Type 3-2 Truck'
1t
tcns in
Item:
.38.5 •ne:ra: tuns '4:5 Ions1
t
.
r
r"
Metric tons Tons
RERA A t p_BY LAU a.14-4-1-
E1RK
Rating updated from original visual rating
dated 10/3/84. No distress observed.
0
2" - 3" ACP over 6" C.I.P. concrete deck over 2.5" precast concrete double tee top flange.
2 - 30"x 7'-O" ext. and 2 - 30"x 8'-0" int . precast, prestressed concrete double tee girder sections.
No plans available.
BRIDGE REINSP'ECrED BUT NOT RERATED BY
�� r�zstr�ururc,T�r. e 1997 -
Rated by
.0441
Date
12/18/95
_ :CTI�D UI
�A1 L.LS L3 ON+CO INC. 2010
Wert _:
-1
BUT N0TIUMATED
ILIA leashes • 1999
Previous editions are obsolete and may not be u
Dat
3
J
87 li9r
CDOT Form # 1
YE'
Bridge over waterway?
Y c:
Item 113=7,6,4,3,2. 1?
NO
Foundations well above
lood water elevations?
NO
Reported scour issues?
NO
CBC, CMP. RCP or
floored structure?
N
Open -bottom culvert?
NO
N c-)
Engineering Review:
Is available information
sufficient for
coding?
N
NC
YES
YES
Item 113 = N
Stop / Document
Item 113 = 9
Stop / Document
Item 113 = 8
Stop / Document
No Change
Item 113=5or8
Stop / Document
YES �� Stop / Document
NO
00)
In NHS?
YES
COLORADO
Department of
Transportation
CDOT OFF -SYSTEM BRIDGE SCOUR SCREENING CHART
STRUCTURE ID: WEL034.0-017.0A
FACILITY CARRIED: County Road 34
FEATURE INTERSECTED: St. Vrain Creek
Structure Probability of Failure (P): 0.0005
Minimum Performance Level (MPL): 0.001
N
Ratio (P/MPL): 0.5
ITEM 113 = 8
POA REQUIRED (YIN): N
POA COMPLETION DATE: N/A
EVALUATED BY: KJR
ORGANIZATION: SEH
DATE: 4/19/2016
REVIEWER COMMENTS:
Scour smart flag: channel bottom is up to 10 ft deeper at P4
than any other previous measurement. No maintenance
related to scour. Leave Item 113 = 8.
Item 113 = 3
POA = Monitor
until replaced
Bridge or open -bottom
culvert?
NU
HEC-18 scour
analysis and POA
Culvert analysis
and POA
Save file as: [structure number] Scour Screening Memo YYYY MM-DD.pdf
WEL034.0-017.0A Scour Screening Memo 2016-04-19.xlsx Last Revised: 2/26/2016
STREAMBED HISTORY
U-
O
2
O "
E- w
w
OLs.
m
2O
O�
wO
u..=
O
O
z0
aJ
I
0
Al
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
-.--2012
2014
2016
2018
--dr- 2020
2022
P2
0.0
._ I...._._ 4- _ { - - 1- -f-
25.0 50.0
P3
WTR LVL
P4
LOW
tl
TI F I itivha► +
100.0 125.0 150.0 175.0
CLEAR DISTANCE FROM Al (FEET)
75.0
P5
_.. + . -•••r + + "
200.0
225.0
P6
A7
250.0
0.0
14.0
29.8
54.0
78.1
102.3
126.4
150.6
174.7
198.9
223.0
247.15
271.65
279.1
294.1
2012
1.8
5.0
5.7
13.8
11.5
13.8
8.0
7.8
8.0
9.8
6.6
8.6
6.3
5.3
0.0
2014
1.8
8.5
12.3
14.3
15.0
17.0
I
17.3
17.4
14.3
15.3
11.3
12.8
6.8
5.3
0.0
2016
1.7
7.6
10.6
14.3
15.0
9.3
9.2
10.1
8.4
12.3
9.7
9.6
7.4
4.1
0.3
2018
1.7
I 7.6
10.3
12.7
15.7
9.8
9.0
11.0
9.2
11.5
9.8
9.8
8.3
5.0
0.3
2020
1.4
6.2
9.2
10.6
I
13.7
9.7
8.8
10.6
8.9
10.7
9.3
9.2
7.5
5.1
0.0
2022
1.2
6.7
8.8
11.1
16.5
9.9
8.8
10.7
8.7
10.8
I
9.3
9.1
7.8
5.6
0.0
STRUCTURE NUMBER: WEL034.0-017.0A
INSPECTION DATE:
6/7/2022
PERFORMED BY: AR/NA
275.0
W.L.
10.3
8.4
9.1
Mike Bedell
From:
Sent:
To:
Cc:
Subject:
Attachments:
Mike Bedell
Wednesday, October 5, 2022 1:17 PM
O'Neal - CDOT, John
Don Dunker; Reeves - CDOT, Bryce
RE: CCI Bridge Grant Applications
2022-off-bridge-system-program-docs.pdf
My estimates are generated using the formulas provided to us in the attached document (see pages 8 and 9). I am
under the impression that all applicants are strongly encouraged to use these same formulas.
From: O'Neal - CDOT, John <jake.oneal@state.co.us>
Sent: Wednesday, October 5, 2022 11:31 AM
To: Mike Bedell <mbedell@weldgov.com>
Cc: Don Dunker <ddunker@weldgov.com>; Reeves - CDOT, Bryce <bryce.reeves@state.co.us>
Subject: Re: CCI Bridge Grant Applications
Caution This email originated from outside of Weld County Government. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hi Mike,
The first page of your application looks a little different than the application form found on the CCI website's application
documents. I have attached the application form to this email. Your local match amount also appears incorrect, as it is
supposed to be 20% of the grant amount requested, not the total project cost. That being said, it looks like the new
application form calculates that for you.
Did you use your own historical price data to develop these cost estimates? Are you also accounting for inflation and
ROW costs? I ask because your estimates appear to be higher than other estimates I have received, particularly the
WEL34/17A bridge.
Thanks,
John "Jake" Oneal, EIT
Engineer In Training II
Region 4 Traffic and Local Agency Coordinator
COLORADO
Department of Transportation
C 970.515.2731
10601 W. 10th St., Greeley, CO 80634
1
Jake onealjPistate co.us I www.cdot gov I www cotrip org
On Wed, Sep 28, 2022 at 1 20 PM Mike Bedell <mbedell(atweldgov corn> wrote
These bridge grant applications require us to first consult with our CDOT Local Agency Coordinator prior to submitting
the final applications Please review the attached draft applications and let me know if you have any questions or
concerns I will need either a short memo or an e-mail from you after reviewing, which will end up being attached to
the final applications These are the same ones we tried for last year
2
Contract Form
Entity Information
Entity Name*
CCI
New Contract Request
Contract Narne
2022 CCI BRIDGE GRANT APPLICATIONS
Contract Status
CTB REVIEW
Entity ID.
O00026371
❑ New Entity?
Contract ID
6390
Contract Lead.
MBEDELL
Contract Lead Email
MBedell@co.weld.co.us
Parent Contract ID
Requires Board Approval
YES
Department Project #
N:A
Contract Description •
CCI BRIDGE GRANT APPLICATIONS IN REPONSE TO A REQUEST FOR APPLICATIONS DATED 8;'26, 22. THE APPLICATIONS DUE
DATE IS 10;28: 22.
Contract Description 2
Contract Type
GRANT
Amount
52,000,000.00
Renewable.
NO
Automatic Renewal
Grant
YES
IGA
Department
PUBLIC WORKS
Department Email
CM-
PublicWorkscr'weldgov.corn
Department Head Email
CM-PublicWorks-
DeptHead0weldgov.com
County Attorney
GENERAL COUNTY
ATTORNEY EMAIL
County Attorney Email
CM-
COU NTYATTOR.N EY SYVELDG
OV.COM
Grant Deadline Date
10 28,2022
Requested BOCC Agenda
Date.
10:19%2022
Due Date
10x'15'2022
Will a work session with ROCC be required?*
NO
Does Contract require Purchasing Dept. to be included?
NO
tf this is a renewal enter previous Contract ID
If this is part of a NSA enter MSA Contract ID
Note: the Previous Contract Number and Master Services Agreement Number should be left blank if those contracts are not in
OnBase
Contract Dates
Effective Date
Review Date.
10, 28;'2022
Renewal Date
Termination Notice Period
Contact Information
Contact Info
Contact Name
Purchasing
Committed Delivery Date
Expiration Date
10; 28/2022
Contact Type Contact Email Contact Phone I Contact Phone 2
Purchasing Approver Purchasing Approved Date
Approval Process
Department Head
.CURTIS HALL
DH Approved Date
10/21;2022
Final Approval
BOCC Approved
MCC Signed Date
BOCC Agenda Date
10/26/2022
Originator
MBEDELL
Finance Approver
CHERYL PATTELLI
Legal Counsel
BRUCE BARKER
Finance Approved Date Legal Counsel Approved Date
10/24/2022 10/24/2022