Loading...
HomeMy WebLinkAbout20221387.tiffPlanner: Case Number Owners: Request: Legal: Location: Total Acres: PLANNED UNIT DEVELOPMENT CHANGE OF ZONE STAFF COMMENTS Maxwell Nader : PUDZ22-0002 Wesley J. and Shaun A. Basiliere 13813 County Road 74, Eaton, CO, 80615 Hearing Date: May 3, 2022 A Change of Zone from A (Agricultural) to PUD for two (2) residential lots with Estate Zone Uses and certain A (Agricultural) Zone District uses, specifically allowing for one (1) second single-family home per lot and the allowed animal units per lot. Amended Subdivision Exemption AMDSE-1030, being part of the E2SE4 of Section 32, T7N, R66W of the 6th P.M., Weld County, Colorado North of and adjacent to County Road 74; approximately 650 feet west of County Road 29 +/- 15.23 acres Parcel #: 0707-32-4-00-008 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The Department of Planning Services' staff has received referral responses with comments from the following agencies: v Weld County School District RE -2, referral dated February 16, 2022 Y Weld County Department of Public Health and Environment, referral dated March 3, 2022 Y Weld County Department of Planning Services — Development Review referral dated February 16, 2022 The Department of Planning Services' staff has received referral responses without comments from the following agencies: Town of Severance, referral dated February 22, 2022 West Greeley Conservation District, referral dated March 14, 2022 Weld County Zoning Compliance, referral dated February 16, 2022 The Department of Planning Services' staff has not received responses from the following agencies: ▪ Eaton Fire Protection District ▪ Weld County Attorney's Office ▪ North Weld County Water District PUDZ22-0002 — Basiliere Page 1 of 8 Case Summary: The applicant has requested a two (2) lot Planned Unit Development (PUD) with E (Estate) Zone District uses and certain A (Agricultural) Zone District uses, specifically allowing for one (1) second single-family home per lot and four (4) animal units per acre, per the Agricultural bulk requirements. A Planned Unit Development Final Plat will be required after PUDZ22-0002 is approved and recorded. Water Service is provided by North Weld County Water District (NWCWD) and an On -Site Waste System (OWTS) will handle the effluent flows. A second home is currently permitted through, ZPSD13-0001 on proposed Lot 2, if approved this will be an allowed use in the PUD. THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 27-5-30 of the Weld County Code. 2. The submitted materials are in compliance with Section 27-6-120 of the Weld County Code as follows: A. Section 27-6-120.B.2.a - The proposal is consistent with any intergovernmental agreement in effect influencing the PUD and Chapters 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter 23 (Zoning), and Chapter 24 (Subdivision) of the Weld County Code. Section 22-2-30.C.2. of the Weld County Code states: "Establish residential development options based on compatibility, proximity to municipalities, and availability of services that reflect the desired density and character of that location." The proposed PUD is located near nine (9) lots that are all in similar size and use of the proposed PUD. These lots were created through the Recorded Exemption process. These lots are zoned Agricultural. The expected use of the lots created through the PUD will be similar to what is allowed on these adjacent lots. Therefore, the character of the area will not significantly change, nor will it be a negative impact. The site is located in a rural area and is not located within % mile of the nearest subdivision/PUD. The nearest subdivision is Golden Eagle Acres subdivision 4000 feet to the west (approximately 0.9 mile). As a result, this is not considered an urban scale development and is not proposing an open space allocation. B. Section 27-6-120.B.2.b - The uses which would be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Article 11, Chapter 27 of the Weld County Code. The proposed PUD conforms with most of the performance standards as outlined in Chapter 27, Article II, Section 27-2-20 through Section 27-2-220 of the Weld County Code. The applicant seeks approval to not include the following specific performance standards: common open space per Section 27-2-60, landscaping standards per Section 27-2-100, and monuments per Section 27-2-130 of the Weld County Code. Given the intensity of development, the Department of Planning Services supports this request. C. Section 27-6-120.B.2. c - The uses which would be permitted shall be compatible with the existing or future development of the surrounding area as permitted by the existing Zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The proposed PUD is located within three (3) miles the Town of Severance and within the Severance Coordinated Planning Agreement boundary. The Town of Severances referral dated February 22, 2022, stated that they have no concerns or conflicts with the request. Additionally, the Town of Severance Future Land Use Map shows the area as Rural Residential PUDZ22-0002 — Basiliere Page 2 of 8 Conservation/Agricultural which is aligned with the proposed PUD uses. D. Section 27-6-120.B.2.d - The PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Article 11 the Weld County Code. Water is and will be provided by the North Weld County Water District (the District). Sewer is and will be provided by individual on -site wastewater treatment systems (OWTS). The application has satisfied Chapter 27, Article II, Section 27-2-176 and Section 27-2-210 of the Weld County Code in regard to water and sewer provisions. Proposed Lot 2 is served by the District by existing meter 363. The application materials indicate that North Weld County Water District will provide water to proposed Lot 1. A letter from the District, dated April 5, 2021, was included in the application and states, in part: "1. The District is able to provide water service to the Property, contingent upon all requirements of the District being satisfied. If all District requirements, including all contracts, have not been satisfied and completed with the district within 1 year of the date of this Letter, the District may refuse to supply water to the Property. After 1 year, it should be understood that the district reserves the right to refuse water service, if raw water is unavailable, and/or pipeline or water treatment capacity is not capable of providing water service to the above -described property." The applicant has had further discussion with North Weld County Water District There are two (2) existing residences located on proposed Lot 2. On -site wastewater treatment systems (OWTS) provide separate sewer service to each residence. SP -9700122 is permitted for two (2) bedrooms and SP -1300048 is permitted for three (3) bedrooms. A new OWTS will provide sewer when the residences are constructed on proposed Lot 1. E. Section 27-6-120.B.2.e - The street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. County Road 74 is a paved road and is designated on the Weld County Functional Classification Map (Code Ordinance 2017-01) as an arterial road, which requires 140 feet of right-of-way. County Road 74 is considered adequate in functional classification, width, and structural capacity to meet the potential traffic requirements. The applicant submitted a variance request to the Minimum Access Spacing Criteria so that the existing residential access point could be used for the development access location. After review of the variance request, it was determined that the existing access location (AP13-00064), even though it does not meet the Minimum Access Spacing Criteria as specified in Table 1 of Sec 8- 14-30 (i.e. 1,320 feet), will be accepted. A new access permit shall be obtained as the use will be upgraded to a "development access" for an internal road, per Development Reviews referral dated February 16, 2022. F. Section 27-6-120.B.2.f - An off -site road improvements agreement and an on -site improvements agreement proposal is in compliance with Chapter 24 of the Weld County Code as amended and a road improvements agreement is complete and has been submitted, if applicable. An improvements agreement is not required for the PUD Change of Zone. G. Section 27-6-120.B.2.g - There has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. The PUD is not located within a Special Flood Hazard Area, Airport Overlay, Geological Hazard Area, or Municipal Separate Storm Sewer System (MS4) Area. PUDZ22-0002 — Basiliere Page 3 of 8 Per the geotechnical subsurface exploration performed by Soilogic clayey to silty sand with trace amounts of gravel were detected. Additionally, per the 1974 Weld County Sand, Gravel Resources map of hard rock minerals, there are no viable aggregates located subsurface to this proposed development. The six (6) wells that were owned and maintained by PDC Energy have been plugged and abandoned since September 22, 2021, per an email by Kristy Weyerman of PDC Energy, Inc dated September 27, 2021, submitted with the application material. H. Section 27-6-120.6.2.h - Consistency exists between the proposed zone district(s), uses, the specific or conceptual development guide. The submitted Specific Development Guide does reflect the performance standards and allowed uses described in the Estate Zone District. The E (Estate) zoned lots shall comply with all (Estate) requirements as described previously along with the certain A (Agricultural) Zone District uses, specifically allowing for one (1) second single-family home per lot and the allowed animal units per lot. The Department of Planning Services is recommending that this Change of Zone be approved as a specific development guide and that it be reviewed administratively at the final plat stage. THIS APPROVAL RECOMMENDATION IS BASED UPON COMPLIANCE WITH CHAPTER 27 REQUIREMENT AND IS CONDITIONAL UPON THE FOLLOWING: 1. Prior to recording the PUD Change of Zone plat: A. The applicant shall acknowledge the requirements of Weld County School District RE -2 as stated in the referral response dated February 16, 2022. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) 2. The PUD Change of Zone plat shall delineate the following: A. The plat shall be labeled PUDZ22-0002. (Department of Planning Services) B. The attached Plat Notes. (Department of Planning Services) C. The applicant shall adhere to the plat requirements in preparation of the plat per Section 27- 9-20 of the Weld County Code. (Department of Planning Services) D. Show and label all recorded easements, ditches and rights -of -way on the map by book and page number or reception number. (Department of Planning Services) E. County Road 74 is a paved road and is designated on the Weld County Functional Classification Map as an arterial road which requires 140 feet of right-of-way at full buildout. The applicant shall delineate on the site plan the existing right-of-way. All setbacks shall be measured from the edge of right-of-way. This road is maintained by Weld County. (Development Review) F. The proposed internal road system, that delineates right-of-way width, road surface width and depth, and access to public right -of- way, that meets the requirements of Chapter 8 of the Weld County Code. (Development Review) G. Show and label the approved access location, width, and the appropriate turning radii on the plat. (Development Review) The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording. 1) A Change of Zone from A (Agricultural) to PUD for two (2) residential lots with Estate Zone PUDZ22-0002 — Basiliere Page 4 of 8 Uses and certain A (Agricultural) Zone District uses, specifically allowing for one (1) second single-family home per lot and the allowed animal units per lot. The PUD will be subject to, and governed by, the Conditions of Approval stated heron and all applicable Weld County Regulations. (Department of Planning Services) 2) The two (2) residential lots will adhere to the Bulk Standard Requirements as delineated in Section 23-3-440, for the E (Estate) Zone District except for the allowance of one (1) second single-family dwelling per lot and four (4) animal units per acre. (Department of Planning Services) 3) Water service may be obtained North Weld County Water District. (Department of Public Health and Environment) 4) The parcel is currently not served by a municipal sanitary sewer system. Sewage disposal may be by On -site wastewater treatment systems (OWTS) designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. (Department of Public Health and Environment) 5) Activity or use on the surface of the ground over any part of the OWTS must be restricted to that which shall allow the system to function as designed and which shall not contribute to compaction of the soil or to structural loading detrimental to the structural integrity or capability of the component to function as designed. (Department of Public Health and Environment) 6) Installation of utilities shall comply with the Subdivision Design Standards as listed in Chapter 24, Article III of the Weld County Code. (Department of Planning Services) 7) Approval of this plan may create a Vested Property Right pursuant to Article 68 of Title 24, C.R.S., as amended and Chapter 23, Article VIII of the Weld County Code. (Department of Planning Services) 8) The property owner or operator shall be responsible for controlling noxious weeds on the site, pursuant to Chapter 15, Article I and II, of the Weld County Code. (Development Review) 9) Weld County will not replace overlapping easements located within existing right-of-way or pay to relocate existing utilities within the existing County right-of-way. (Development Review) 10) The access on the site shall be maintained to mitigate any impacts to the public road including damages and/or off -site tracking. (Development Review) 11) Any work that may occupy and or encroach upon any County rights -of -way or easement shall acquire an approved Right -of -Way Use Permit prior to commencement. (Development Review) 12) The historical flow patterns and runoff amounts on the site will be maintained. (Development Review) 13) No Uses by Special Review land use permit shall be permitted within this Planned Unit Development. (Department of Planning Services) 14) All proposed or existing structures will or do meet the minimum setback and offset requirements for the zone district in which the property is located. Pursuant to the definition of setback in the Weld County Code, the required setback is measured from the future right- of-way line. No occupied building or structure shall be constructed within two hundred (200) feet of any tank battery, within one hundred -fifty (150) feet of any oil and gas wellhead or within twenty-five (25) feet of any plugged or abandoned oil and gas well. (Department of Planning Services) PUDZ22-0002 — Basiliere Page 5 of 8 15) Building permits shall be obtained prior to the construction of any building. Buildings that meet the definition of an Ag Exempt Building per the requirements of Section 29-1-20 and Section 29-3-20.B.13 of the Weld County Code do not need building permits, however, a Certificate of Compliance must be filed with the Planning Department and an electrical and/or plumbing permit is required for any electrical service to the building or water for watering or washing of livestock or poultry. (Department of Planning Services) 16) Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County -Wide Road Impact, County Facility Fee and Drainage Impact Fee Programs. (Department of Planning Services) 17) Any future subdivision of land shall be in accordance with Chapter 27 of the Weld County Code, as amended. (Department of Planning Services) 18) No development activity shall commence on the property, nor shall any building permits be issued on the property until the PUD Final Plan has been approved and recorded and all conditions satisfied. (Department of Planning Services) 19) The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Article II and Article VIII of the Weld County Code. (Department of Planning Services) 20) The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. (Department of Planning Services) 21) The site shall maintain compliance at all times with the requirements of the Weld County Department of Public Works, Public Health and Environment, Planning Services and all applicable Weld County regulations. (Department of Planning Services) 22) Necessary personnel from the Weld County Departments of Planning Services, Public Works, and Public Health and Environment shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval and all applicable Weld County regulations. (Department of Planning Services) 23) The applicant shall comply with Section 27-8-50 Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan - If a PUD Final Plan application is not submitted within three (3) years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed or that the landowner cannot implement the PUD Final Plan, the Board of County Commissioners may, at a public hearing revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. (Department of Planning Services) 24) RIGHT TO EXTRACT MINERAL RESOURCES STATEMENT: Weld County has some of the most abundant mineral resources, including, but not limited to, sand and gravel, oil, natural gas, and coal. Under title 34 of the Colorado Revised Statutes, minerals are vital resources because (a) the state's commercial mineral deposits are essential to the state's economy; (b) the populous counties of the state face a critical shortage of such deposits; and (c) such deposits should be extracted according to a rational plan, calculated to avoid waste of such deposits and cause the least practicable disruption of the ecology and quality of life of the citizens of the populous counties of the state. PUDZ22-0002 — Basiliere Page 6 of 8 Mineral resource locations are widespread throughout the County and person moving into these areas must recognize the various impacts associated with this development. Often times, mineral resource sites are fixed to their geographical and geophysical locations. Moreover, these resources are protected property rights and mineral owners should be afforded the opportunity to extract the mineral resource. 25) WELD COUNTY'S RIGHT TO FARM STATEMENT: Weld County is one of the most productive agricultural counties in the United States, typically ranking in the top ten counties in the country in total market value of agricultural products sold. The rural areas of Weld County may be open and spacious, but they are intensively used for agriculture. Persons moving into a rural area must recognize and accept there are drawbacks, including conflicts with long-standing agricultural practices and a lower level of services than in town. Along with the drawbacks come the incentives which attract urban dwellers to relocate to rural areas: open views, spaciousness, wildlife, lack of city noise and congestion, and the rural atmosphere and way of life. Without neighboring farms, those features which attract urban dwellers to rural Weld County would quickly be gone forever. Agricultural users of the land should not be expected to change their long-established agricultural practices to accommodate the intrusions of urban users into a rural area. Well - run agricultural activities will generate off -site impacts, including noise from tractors and equipment; slow -moving farm vehicles on rural roads; dust from animal pens, field work, harvest and gravel roads; odor from animal confinement, silage and manure; smoke from ditch burning; flies and mosquitoes; hunting and trapping activities; shooting sports, legal hazing of nuisance wildlife; and the use of pesticides and fertilizers in the fields, including the use of aerial spraying. It is common practice for agricultural producers to utilize an accumulation of agricultural machinery and supplies to assist in their agricultural operations. A concentration of miscellaneous agricultural materials often produces a visual disparity between rural and urban areas of the County. Section 35-3.5-102, C.R.S., provides that an agricultural operation shall not be found to be a public or private nuisance if the agricultural operation alleged to be a nuisance employs methods or practices that are commonly or reasonably associated with agricultural production. Water has been, and continues to be, the lifeline for the agricultural community. It is unrealistic to assume that ditches and reservoirs may simply be moved "out of the way" of residential development. When moving to the County, property owners and residents must realize they cannot take water from irrigation ditches, lakes, or other structures, unless they have an adjudicated right to the water. Weld County covers a land area of approximately four thousand (4,000) square miles in size (twice the size of the State of Delaware) with more than three thousand seven hundred (3,700) miles of state and county roads outside of municipalities. The sheer magnitude of the area to be served stretches available resources. Law enforcement is based on responses to complaints more than on patrols of the County, and the distances which must be traveled may delay all emergency responses, including law enforcement, ambulance, and fire. Fire protection is usually provided by volunteers who must leave their jobs and families to respond to emergencies. County gravel roads, no matter how often they are bladed, will not provide the same kind of surface expected from a paved road. Snow removal priorities mean that roads from subdivisions to arterials may not be cleared for several days after a major snowstorm. Services in rural areas, in many cases, will not be equivalent to municipal services. Rural dwellers must, by necessity, be more self-sufficient than urban dwellers. People are exposed to different hazards in the County than in an urban or suburban setting. Farm equipment and oil field equipment, ponds and irrigation ditches, electrical power for pumps and center pivot operations, high speed traffic, sandburs, puncture vines, territorial farm dogs and livestock, and open burning present real threats. Controlling children's activities is important, not only for their safety, but also for the protection of the farmer's livelihood. PUDZ22-0002 — Basiliere Page 7 of 8 3. Upon completion of Conditions of Approval 1. and 2. above, the applicant shall submit one (1) electronic copy (.pdf) of the Amended Planned Unit Development Change of Zone plat for preliminary approval to the Weld County Department of Planning Services. Upon County approval of the plat, the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' staff. (Department of Planning Services) 4. The Amended Planned Unit Development Change of Zone plat shall be submitted to the Department of Planning Services for recording within one hundred and twenty (120) days of approval by the Board of County Commissioners. (Department of Planning Services) 5. In accordance with Appendix 5-J of the Weld County Code, should the Planned Unit Development Change of Zone plat not be recorded within the specified timeline from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance fee shall be added for each additional three (3) month period. (Department of Planning Services) 6. The PUDZ plat shall be submitted to the Department of Planning Services' for recording within sixty (60) days of approval by the Board of County Commissioners. (Department of Planning Services) PUDZ22-0002 — Basiliere Page 8 of 8 April 6, 2022 DEPARTMENT OF PLANNING SERVICES 1555 N 17th AVE GREELEY, CO 80631 WEBSITE: www.weldgov.com E-MAIL: mnader@weldgov.com PHONE: (970) 400-400-3527 FAX: (970) 304-6498 Basiliere Shaun 13813 County Road 74 Eaton, CO 80615 Subject: PUDZ22-0002 - A Change of Zone from A (Agricultural) to PUD for two (2) residential lots with Estate Zone Uses and certain A (Agricultural) Zone District uses, specifically allowing for one (1) second single-family home per lot and the allowed animal units per lot. On parcel(s) of land described as: AMEND SUB EXEMPT AMSE-1030; PART E2SE4 SECTION 32, T7N, R66W of the 6th P.M., Weld County, Colorado. Dear Applicants: I have scheduled a meeting with the Weld County Planning Commission on May 3, 2022 at 12:30 p.m. A subsequent hearing with the Board of County Commissioners will be held on May 25, 2022 at 10:00 a.m. Both hearings will be held in the Hearing Room, Weld County Administration Building, 1150 O Street, Greeley, Colorado. The property owner and/or authorized agent must be in attendance to answer any questions the Planning Commission members or Board of County Commissioners may have. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant needs to provide the Weld County Planning Department with written certification indicating the above requirement has been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign, adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission and will be included in the staff report one week prior to the scheduled Planning Commission hearing. You may view the staff report at https://accela- aca.co.weld.co.us/CitizenAccess Respectfully, ,, ; v '/ Maxwell Nader Planner Hello