Loading...
HomeMy WebLinkAbout20223150.tiffUSE BY SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE: AMOUNT $ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: P ROPERTY INFORMATION Is the property currently in violation? No/ Yes Violation Case Number: Parcel Number: 0 7 0 9 _ 1 9 _ 0 _ 0 0 _ 0 1 8 S ite Address: 38387 County Road 39, Ault, CO 80610 Legal Description: SENE Section 19, Township 7 North, Range 65 West Section: 19 , Township 7 N, Range 65 Within subdivision or townsite? IT No/ Yes Name: W Zoning District: Ag Acreage: 10.08 Water (well permit # or water district tap #): N/A Sewer (On -site wastewater treatment system permit # or sewer account #): NiA Floodplain No/ Yes Geological Hazard I No/ P ROJECT U SR Use being applied for: the operation of saltwater disposal wells Name of proposed business: Calvary Farms Disposal Wells Yes Airport Overlay I No / Yes PROPERTY OWNER(S) (Attach additional sheets if necessary.) Name: Calvary Farms LLC Company: Phone #: 970-590-2227 Email: roper227@gmail.com Street Address: 134 Oak Ave City/State/Zip Code: Eaton, Colorado 80615-3491 APPLICANT/AUTHORIZED AGENT (Authorization Form must be included if there is an Authorized Agent) Name: Ryan Kaminky Company: Bayswater Exploration & Production LLC do Ascent Geomatics Solutions Phone #: 303.928.7128 Email: regulatory@ascentgeomatics.com Street Address: 8620 Wolff Court City/State/Zip Code: Westminster, Colorado 80031 I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our) knowledge. All fee owners of the property must sign this application. If an Authorized Agent signs, an Authorization Form signed by all fee owners must be included with the application. If the fee owner is a corporation, evidence must be included indicating the signatory has the legal authority to sign for thpi corporation . 1 S ignature Ryan Kaminky 8/15/2022 Date Signature Date P rint Print DEPARTMENT OF PLANNING AND BUILDING DEPARTMENT OF PUBLIC HEALTH AND ENVIRONNMENT 1555 NORTH 17TH AVENUE GREELEY, CO 80631 AUTHORIZATION FORM FOR BUILDING, PLANNING AND HEALTH DEPARTMENT PERMITS AND SERVICES I, (We) Calvary Farms LLC (Owner — please print) give permission to Bayswater Exploration & Production, LLC do Asce (Applicant/Agent — please print) to apply for any Planning, Building or Health Department permits or services on our behalf, for the property located at: 38387 County Road 39, Ault, CO 80610 Legal Description: SENE of Section 19 , Township 7 N, Range 65 w Subdivision Name: Lot Block Property Owners Information: Phone: 970-590-2227 Applicant/Agent Contact Information: 303.928.7128 Phone: E-mail: roper227@gmail.com E -Mail: regulatory@ascentgeomatics.com Email correspondence to be sent to: Owner � Applicant/Agent EBothE±.. Postal service correspondence to be sent to: (choose only one) Owner _a_ Applicant/Agent __E_ Additional Info: Owner Signature:,,. Date: Owner Signature: Date: Mail to: Secretary of State Corporations Section 1560 Broadway, Suite 20O Denver, CO 80202 (303) 8942251 MUST BE TYPED Fax (303) 8942242 FIUNG FEE: $50.00 MUST SUBMIT TWO COPIES Please include a typed ARTICLES OF ORGANIZATION self-addressed envelope For office use only • VIC,ORJA , �. YZ, w; rvi Sc�[ 1^',� !l' Orsr,vjp ,f rIr t f f P-+ : Pt" jet :1L SECRETARY OF in- ' 7.;--1 qr+ n .# STATE i/We the undersigned natural persons] of the age of eighteen years or more, acting as organizer[s] of a limited liability company under the Colorado Limited Liability Company Act, adopt the following Articles of Organization for such limited liability company: FIRST: The name of the limited liability company is: Calvary Farms, LLC SECOND: Principal place of business (if known): 1552 WCR 51 , La Salle , CO 80645 THIRD: The street address of the initial registered office of the limited liability company is: 8 2 2 Seventh Street, Suite 530, Greeley, Colorado SOAR1 The mailing address (if different from above ] of the initial registered office of the limited liability company is: The name of its proposed registered agent in Colorado at that address is: Dave Evans 822 7th Street, Suite 530, Greeley, CO 80631 FOURTH: The management is vested in managers [check if appropriate) FIFTH: The names and business addresses of the initial manager or managers or if the management is vested in the members, rather than managers, the names and addresses of the member or members are: NAME ADDRESS (include zip codes) Richard A. Montera 50 Cherry Ave., #14, Eaton, CO 80615 SIXTH: The name and address of each organizer is: NAME Ronald J. Lambden ADDRESS (include zip code) 801 8th Street, Suite 210 Greeley, CO 80631-3900 Signed Organizer Revised 7195 gds WELD COUNTY / USE BY SPECIAL REVIEW WELD COUNTY USE BY SPECIAL REVIEW APPLICANT: di.� BAYSWATER lalp EXPLORATION &PR0DUCTION, LLC 73017t'' Street Suite 500 Denver, Colorado 80202 CALVARY FARMS 19-L PAD SWD WELLS Pre -Application Meeting Number PRE22-0116 SENE SECTION 19, TOWNSHIP 7 NORTH, RANGE 65 WEST, 6th P.M. WELD COUNTY, COLORADO SUBMITTAL AUGUST 17, 2022 PREPARED BY: 46) ASCENT GEOMATHCS SOLUTIONS COLLECT • ANALYZE* DELIVER GEOSPATIAL DATA 8620 Wolff Court Westminster, Colorado 80031 BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 1 WELD COUNTY / USE BY SPECIAL REVIEW BAYSWATER EXPLORATION AND PRODUCTION, LLC CALVARY FARMS 19-L PAD SWD WELLS Table of Contents USE BY SPECIAL REVIEW PLANNING REQUIREMENTS • Planning Questionnaire • Application Form • Authorization Form • Surface Estate Ownership/Deed/Lease • Articles of Organization • Certificate of Conveyances / Chain of Title Guarantee • Statement of Taxes • USR Map — Site Plan • Lighting Plan • Sign Plan • Soil Report • Communication or Decommissioning Plan — N/A • Emergency Contact Form • Notice of Inquiry (NOI) Form • Buffer Report • Community Meeting Sign -in Sheet, Minutes, Summary — N/A • List of Owners, Operators of any oil and gas facilities, irrigation ditches/laterals, pipelines, overhead lines, railroads, etc., on the property • Surface Use Agreement, Mineral Owner List PUBLIC WORKS REQUIREMENTS • Development Review Questionnaire • Drainage Report • Traffic Impact Study ENVIRONMENTAL HEALTH REQUIREMENTS • Environmental Health Questionnaire • Water Supply Documentation — N/A • Sewage Disposal Documentation — N/A • Noise Study — to be determined upon review by Environmental Health • Waste Handling Plan — to be determined upon review by Environmental Health • Dust Abatement Plan — to be determined upon review by Environmental Health • Engineering, Design, Operations Plan— to be determined upon review by Environmental Health • Nuisance Abatement Plan — to be determined by Environmental Health BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 2 WELD COUNTY / USE BY SPECIAL REVIEW Use by Special Review Planning Questionnaire 1. Explain the proposed use and business name. The facility will consist of tanks for oil and water storage, piping, pumps, for the operation of a saltwater disposal wells, related to the disposal of produced water from oil and gas production nearby. Business Name: Bayswater Exploration & Production, LLC 2. Explain the need for the proposed use. Existing SWD facilities are over 5 miles away from Bayswater's 38 -well development. Bayswater is planning to pipe production water from new facilities to the Calvary SWD Facility to eliminate truck traffic. 3. Describe the current and previous use of the land. Currently the site is used as an oil and gas production facility. 4. Describe the proximity of the proposed use to residences. There are two residences northeast of the Calvary Farms 19-L Pad and within 1,000 feet of the disturbance area. Both residences are owned by the Surface Owner, Calvary Farms LLC. 5. Describe the surrounding land uses of the site and how the proposed use is compatible with them. Surrounding land use is rural farmland and existing oil and gas production. The proposed facility is compatible with the surrounding land use. 6. Describe the hours and days of operation (e.g., Monday through Friday 8:00 a.m. to 5:00 p .m. ) Twenty-four (24) hour pump and facility operations with intermittent trucking. 7. Describe the number of employees including full-time, part-time, and contractors. If shift work is proposed, detail number of employees, schedule, and duration of shifts. No full-time employees will be on site. Employees will make daily checks of the equipment and operation and be on site for up to one hour. Trucks will be delivering produced water and be on site for up to 45 minutes to unload water. 8. Describe the maximum number of users, patrons, members, buyers, or other visitors that the site will accommodate at any one time. Two is the maximum number of operators/workers Bayswater plans to be onsite at any one time. 9. List the types and maximum numbers of animals to be on the site at any one time (for dairies, livestock confinement operations, kennels, etc.). No animals will be onsite at any time. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 3 WELD COUNTY / USE BY SPECIAL REVIEW 10. List the types and number of operating and processing equipment. 1 injection building 4 injection pumps 1 surface valve set 2 oil tanks (proposed) 2 gun barrel tanks (proposed) 6 water tanks (proposed) 4 offload pumps 11. List the types, number, and uses of the existing and proposed structures. 10 wellheads 9 separators 3 compressors 2 ECDs 8 existing 500 -bbl tanks 12. Describe the size of any stockpile, storage, or waste areas. Wastewater will be stored in steel 500 -bbl tanks and 750 -bbl tanks. 13. Describe the method and time schedule of removal or disposal of debris, junk and other wastes associated with the proposed use. Bayswater will remove trash weekly from location via trash dumpsters. 14. Include a timetable showing the periods of time required for the construction of the operation. Construction will take up to 3 months. Drilling the wells will take up to 18 days per well. 15. Describe the proposed and existing lot surface type and the square footage of each type (e.g., asphalt, gravel, landscaping, dirt, grass, buildings). The existing surface of the oil and gas location is approximately 3.6 acres of road base/gravel with an access road that is approximately 0.25 acres of road base/gravel. 16. How many parking spaces are proposed? How many handicap -accessible parking spaces are proposed? No public parking will be onsite. No public access will be allowed. 17. Describe the existing and proposed fencing and screening for the site including all parking and outdoor storage areas. No existing or proposed fencing/screening is onsite. 18. Describe the existing and proposed landscaping for the site. No existing or proposed landscaping is onsite. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 4 WELD COUNTY / USE BY SPECIAL REVIEW 19. Describe reclamation procedures to be employed as stages of the operation are phased out or upon cessation of the Use by Special Review activity. All equipment is removed from the site, all underground lines removed, and soil is reclaimed back to original grade. 20. Describe the proposed fire protection measures. Fire extinguishers will be on site as well as alarms and warnings of operational issues, and remote shut-in capabilities via SCADA. 21. Explain how this proposal is consistent with the Weld County Comprehensive Plan per Chapter 22 of the Weld County Code. The Calvary Farms 19-L Pad is an existing oil and gas location within urban development classification as outlined in the Weld County Comprehensive Plan. The proposed disposal wells are consistent with the Weld County Comprehensive Plan in that all planned equipment will be inside the existing disturbance area of the oil and gas location and no additional development is required. 22. Explain how this proposal is consistent with the intent of the zone district in which it is located. (Intent statements can be found at the beginning of each zone district section in Article III of Chapter 23 of the Weld County Code.) The Calvary Farms 19-L Pad is an existing oil and gas location within the Agricultural Zone District. The proposed disposal wells are consistent with the intent of this zone district in that all planned equipment will be inside the existing disturbance area of the oil and gas location with no effect on current zoning. 23. Explain how this proposal will be compatible with future development of the surrounding area or adopted master plans of affected municipalities. All planned equipment will be inside our existing disturbance area and no additional ground will be disturbed with the new SWD wells and facilities. 24. Explain how this proposal impacts the protection of the health, safety, and welfare of the inhabitants of the neighborhood and the County. By drilling 2 SWD wells and building the injection facility, Bayswater will eliminate large quantities of trucks from the public roads. 25. Describe any irrigation features. If the proposed use is to be located in the A (Agricultural) Zone District, explain your efforts to conserve prime agricultural land in the locational decision for the proposed use. No irrigation features are proposed. The SWD wells will be on an existing oil and gas facility. 26. Explain how this proposal complies with Article V and Article XI of Chapter 23 if the proposal is located within any Overlay Zoning District (Airport, Geologic Hazard, or Historic Townsites Overlay Districts) or a Special Flood Hazard Area identified by maps officially adopted by the County. The proposed SWD wells are not within an Overlay District Area or within a Special Flood Hazard Area. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 5 WELD COUNTY / USE BY SPECIAL REVIEW 27. Detail known State or Federal permits required for your proposed use(s) and the status of each permit. Provide a copy of any application or permit. COGCC Drilling permits have been approved. COGCC Form 31 and 33 Intents have been submitted. COGCC Form 4 Location Sundry to include additional equipment has been approved. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 6 WELD COUNTY / USE BY SPECIAL REVIEW Use by Special Review Development Review Questionnaire 1. Describe the access location and applicable use types (e.g., agricultural, residential, commercial/industrial, and/or oil and gas) of all existing and proposed accesses to the parcel. Include the approximate distance each access is (or will be if proposed) from an intersecting county road. State that no existing access is present or that no new access is proposed, if applicable. The only access will be the existing access from CR 39 to the Calvary Farms 19-L production facility. 2. Describe any anticipated change(s) to an existing access, if applicable. No changes to an existing access are required. 3. Describe in detail any existing or proposed access gate including its location. No existing or proposed access gate will be on this location. 4. Describe the location of all existing accesses on adjacent parcels and on parcels located on the opposite side of the road. Include the approximate distance each access is from an intersecting county road. Access on adjacent parcel 070919000019 on WCR 39 is approximately 200 feet south of the intersection of WCR 39 and WCR 80. Access on adjacent parcel 07092020009 on WCR 80 is approximately 900 feet east of the intersection of WCR 39 and WCR 80. Access on adjacent parcel 070919400010 on WCR 78 is approximately 100 feet east of the intersection of WCR 39 and WCR 78. 5. Describe any difficulties seeing oncoming traffic from an existing access and any anticipated difficulties seeing oncoming traffic from a proposed access. There are no line -of -sight concerns with access from CR 39, as this county road is flat with no visual blocking. 6. Describe any horizontal curve (using terms like mild curve, sharp curve, reverse curve, tec.) in the vicinity of an existing or proposed access. There are no horizontal curves in the vicinity of this existing oil and gas location. 7. Describe the topography (using terms like flat, slight hills, steep hills, etc.) of the road in the vicinity of an existing or proposed access. The topography is flat terrain with no blocking line -of -sight to the county road. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 7 WELD COUNTY / USE BY SPECIAL REVIEW Use by Special Review Environmental Health Questionnaire 1. Discuss the existing and proposed potable water source. If utilizing a drinking water well, include either the well permit or well permit application that was submitted to the State Division of Water Resources. If utilizing a public water tap, include a letter from the Water District, a tap or meter number, or a copy of the water bill. The existing and proposed potable water source will be bottled water. 2. Discuss the existing and proposed sewage disposal system. What type of sewage disposal system is on the property? If utilizing an existing on -site wastewater treatment system, provide the on -site wastewater treatment permit number. (If there is no on -site wastewater treatment permit due to the age of the existing on -site wastewater treatment system, apply for a on -site wastewater treatment permit through the Department of Public Health and Environment prior to submitting this application.) If a new on -site wastewater treatment system will be installed, please state "a new on -site wastewater treatment system is proposed." (Only propose portable toilets if the use is consistent with the Department of Public Health and Environment's portable toilet policy.) Onsite sewage disposal will not be necessary. Portable toilets will be available and cleaned regularly. 3. If storage or warehousing is proposed, what type of items will be stored? No storage or warehousing is proposed. 4. Describe where and how storage and/or stockpile of wastes, chemicals, and/or petroleum will occur on this site. The storage and use of paraffin solvents, corrosion inhibitors, and methanol may be possible. If necessary, the listed chemicals will be stored in properly labeled chemical totes with built in secondary containment and SDS paperwork onsite. 5. If there will be fuel storage on site, indicate the gallons and the secondary containment. State the number of tanks and gallons per tank. No fuel storage is proposed on site. 6. If there will be washing of vehicles or equipment on site, indicate how the wash water will be contained. There will not be any washing of vehicles or equipment on site. 7. If there will be floor drains, indicate how the fluids will be contained. No floor drains are proposed. 8. Indicate if there will be any air emissions (e.g., painting, oil storage, etc.). Emissions from all equipment will be captured in accordance with our Air Permit (APEN). 9. Provide a design and operations plan if applicable (e.g., composting, landfills, etc.). Not applicable. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 8 WELD COUNTY / USE BY SPECIAL REVIEW 10. Provide a nuisance management plan if applicable (e.g., dairies, feedlots, etc.). Not applicable. 11. Additional information may be requested depending on type of land use requested. BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 9 WELD COUNTY / USE BY SPECIAL REVIEW List of Owners, Operators of any oil and gas facilities, irrigation ditches/laterals, pipelines, overhead lines, railroads, etc., on the property Eaton Ditch (Larimer-Weld Canal) c/o Windsor Reservoir and Canal Co. Eaton, Colorado 80631 Division: South Platte River Basin Phone: 970 454 3377 North Weld County Water District 32825 CR 39 P.O. Box 56 Lucerne, CO 80646 970-356-3020 www.nwcwd.org email: water@nwcwd.org Mapelli Lake Mapelli Farms c/o Roland L. Mapelli Route 2, Box 206A Eaton, Colorado 80615 Oil & Gas Location: Bayswater Exploration & Production LLC 730 17th St Suite 500 Denver, CO 80202 Oil & Gas Location: DCP Operating Company LP 6900 E Layton Ave Suite 900 Denver, CO 80237 Pipeline: NWC Development, LLC 5956 Sherry Lane, Suite 825 Dallas, Texas 75225 Overhead Utility: Xcel Energy 1500 6th Ave Greeley, CO 80631 coloradorightofway@xcelenergy.com 303.571.7240 BAYSWATER EXPLORATION AND PRODUCTION, LLC Page 13 FOR COMMERCIAL OR INDUSTRIAL BUILDINGS, PLEASE COMPLETE THE FOLLOWING INFORMATION: Business Name: Address: Business Owner: Home Address: Bayswater Exploration & Production, LLC 730 17th Street, Suite 500 Phone: City, state, zip: Phone: City, state, zip: List up to three persons in the order to be called in the event of an emergency: NAME Tyler Greenly TITLE Field Superintendent PHONE 970-324-0934 303-893-2503 (office) Denver, Colorado 80202 720-515-2297 (emergency line) ADDRESS 228 7th st, Eaton, CO 80615 Brandon Springer Facilities Engineer 432-853-6286 228 7th st, Eaton, CO 80615 Walt Galloway EH&S Coordinator 720-425-5386 228 7th st, Eaton, CO 80615 Business Hours: 8 am - 4 pm (Eaton Office) UTILITY SHUT OFF LOCATIONS: Main Electrical: Gas Shut Off: Exterior Water Shutoff: Interior Water Shutoff: Days: Monday - Friday (Eaton Office) Please use RED ESD buttons on location panels Please use RED ESD buttons on location panels Please use RED ESD buttons on location panels Please use RED ESD buttons on location panels 7/29/2019 21 AMENDMENT TO U .F .C _ DAMAGE ► ND RELEASE AGREEMENT This Amendment to SurfaceiDamage and Release Agreement ("_Amendment") is made and entered into this day ofhpdt. 2022, by and between Calvary Farms LLC, ("Owner") with an address of 134 Oak Ave., Eaton, CO 80615, and Bayswater Exploration & Production, LLC, ("Operator") with an address of 730 17th Street, Suite 500, Denver, 80202; sometimes referred to each as a "Party," or collectively as the "Parties." WINES ETH: A. Operator and Owner entered into that certain Surface Damage and Release Agreement dated April 14, 2017 (the "Agreement"). Be The Parties desire to, amend the Agreement to provide Operator with the right to permit, drill, complete, equip and operate up to two salt water disposal wells; and the right to bring produced water from the Wells covered by the Agreement as well as from wells other than the Wells; and the right to have produced water delivered to the disposal wells by pipeline and by truck. Now therefor, for and in consideration of the covenants and agreements contained herein, and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. All terms us s in this Amendment that are defined in the Agreement shall have the meanings given in the Agreement. 2. The Agreement is hereby amended by adding the following new Section 2A, immediately following Section 2 of the Agreement: "2A. (a) Owner hereby grants to operator, its successors and assigns, the exclusive rights, with respect to the Lands, to: 1. Obtain permits to drill and operate up to two (2) salt water disposal wells (individuallya "Disposal Fell", or collectively "Disposal Wells"within the South Oil and Gas Operations Area, as depicted in the Agreement; and to thereafter drill, complete, equip and operate up to two Disposal Wells; i . Dispose of produced water in the Disposal "ells from the Wells covered by the Agreement, ent, as well as from wells other than the Wells ("Outside Wells"); ill. To construct and install pipelines, at locations approved by Owner, which. approval shall not be unreasonably withheld, delayed or conditioned, for transportation of produced water from Outside Wells to the Disposal Wells; iv. To construct or use existing access roads for truck transportation of produced water from Outside Wells to the Disposal Wells. Page 1 of 3 (b) Operator shall compensate Owner for the rights granted under this Section 2A, as follows: iFor each Disposal Well drilled, operator shall pay Owner such to be paid prior to the spud date of such Disposal Well, Additionally, if operator drills an H Dis. osal well, then operator shall pay additional damages compensation of ; such payment covering damages compensation for up to two (2) Disposal Wells. The foregoing compensation shall be considered "Amount" for the purpose of Section 8 of the Agreement. iii. Additionally, operator shall pay Owner the following disposal fees for produced water disposed of in the Disposal Wells: Barrels of month in the of Disposal produced disposed barrel Fee per water during the Wells Such payments to be made within sixty (60) days following the end of each calendar month. iv. Once any Disposal Well is capable of injection, in no event shall the a ment made for any calendar month for the Disposal Wells be less than V. 3. Section 15 of the Agreement, TERVIINATION is hereby amended by deleting it in its entirety and replacing it with the following revised Section 15: "15. TE23'UNATION. This Agreement will 't nate on the later of (a) the termination of the applicable oil and gas lease(s) as they relate to Operator's and/or its affiliate's rights to explore, drill, and produce hydrocarbon from the Lands or lands pooled therewith, or ) upon Operator's cessation of use of the Wells and Disposal Wells and the plugging, abandonment of the Wells and Disposal Wells and restoration of the site.,' 44 Section 8 of the Agreement, INDEMNITMELEASE is hereby amended by Page 2 of deleting it in its entirety and replacing it with the following revised Section rib. INDEMNITY/RELEASE. Owner hereby releases and agrees to bold harmless operator from any and all liability and further payment, other than what has been provided herein, for damages on the Lands which arise from, out of or in connection with the operator's operations on the Lands, including operations related to the Disposal Wells, but only as to those operations which are described in and permitted by this Agreement, and for those operations which the Amount has been paid and received by Owner pursuant t to this Agreement. Operator agrees to indemnify and. hold Owner harmless from any and all claims, damages and causes of action arising out of and caused by Operator's operations on the Lands that may be asserted by any of Operator's agents. employees subcontractors, contractors or persons entering upon the premises at the request of Operator." 5. Except for theforegoing, all other terms and provisions of the Agreement shall remain in full force and effect. 6. This Agreement may be executed by facsimile or by email, in counterparts, each of which will be considered an original and enforceable against the Party executing. IN WITNESS ►+HEREOF, the Parties have set their hands, the day and year first written above. Owner: Calvary Farms LLC B Name: Richard onter' a Title: Manager Operator: Bayswater Exploration & Production, LLC 'a/1r/ , By: Name: er Hammond Title: District Landman Page 3 of 3 Final Drainage Report Calvary Farms 19-L Pad Created for Bayswater Exploration & Production 4111k BAYSWATER mopEXPLORATION & PRODUCTION, LLC Weld Co Case Number: 1041 WOGLA22-00XX Project Number: B17.BEP.0006 Report Number: FDR 01 Rev A Issue Date August 2022 ASCENTTA GEOMATICS SOIATIMS 8620 Wolff Court Westminster, CO 80031 303-928-7128 Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page i August 2022 REFERENCE CONTRACT This work has been conducted by Ascent Geomatic Solutions (Ascent) for Bayswater Exploration & Production (BEP) under contract number B17.BEP.0006 — CO1. This work has been performed under Ascent project number B17.BEP.0006. The BEP project manager for Calvary Farms 19-L Pad is Ms. Lauren Walsh; Mr. Jay Knutson is the project manager for Ascent. DOCUMENT REVISION HISTORY Rev Date Issued Prepared Reviewed Approved A 08/5/2022 Issued for Review RMC MAS MAS This report, and all associated materials, has been prepared by Ascent Geomatic Solutions for the exclusive use of Bayswater Exploration & Production for Calvary Farms 19-L Pad. No other party is an intended beneficiary of this report or any of the information, opinions, and conclusions contained herein. The use of this report shall be at the sole risk of the user regardless of any fault or negligence of Bayswater Exploration & Production or Ascent Geomatic Solutions. Ascent Geomatic Solutions accepts no responsibility for damages, if any, suffered by any third party as a result of decisions or actions based on this report. Note that this report is a controlled document, and any reproductions are uncontrolled and may not be the most recent version. ASCENT GinWis SJIWiIntl`_, Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page ii August 2022 EXECUTIVE SUMMARY A drainage analysis was performed for the project site in accordance with the Weld County requirements for a final drainage report. It was determined that a detention pond is required to maintain historic release rates off site. A grading and stormwater management system has been designed based on the hydrological analysis. The drainage system was designed to be phased. The design implements a detention pond during the construction phase. During interim -reclamation, a portion of the site will be returned to pre -construction conditions and elevations, the detention pond will remain to service the site through the life of the facility. ASCENT GinWis SJIWiIntl`_, Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page iii August 2022 TABLE OF CONTENTS REFERENCE CONTRACT DOCUMENT REVISION HISTORY EXECUTIVE SUMMARY TABLE OF CONTENTS WELD COUNTY FINAL DRAINAGE REPORT CHECKLIST CERTIFICATE OF COMPLIANCE 1. INTRODUCTION AND PURPOSE 2. PROJECT DESCRIPTION AND BACKGROUND 3. DESIGN CRITERIA 4. DESIGN CONDITIONS 4.1 Existing Conditions 4.2 Proposed Conditions 4.2.1 Stormwater System Design 5. MAINTENANCE PLAN 6. SUMMARY AND CONCLUSIONS Appendix A — REFERENCE DOCUMENTS, SOFTWARE AND WEBSITES Appendix B — ABBREVIATIONS AND ACRONYMS Appendix C — DRAINAGE REPORT CHECKLIST Appendix D — VICINITY MAP Appendix E — FEMA MAP Appendix F — NOAA ATLAS 14 PRECIPITATION FREQUENCY TABLE Appendix G — GROUND SURFACE IMPERVIOUS CALCULATIONS Appendix H — HYDROLOGIC CALCULATIONS Appendix I — DETENTION/WQCV CALCULATIONS Appendix J — HYDRAULIC CALCULATIONS ASCENT OEOMATICS i i ii iii 5 6 7 7 8 8 9 10 10 12 14 A.1 B.1 C.1 D.1 E.1 F.1 G.1 H.1 1.1 J.1 Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page iv August 2022 Appendix K —DRAINAGE DRAWINGS Appendix L — GEOTECHNICAL REPORT ASCENT O1OMATICS K.1 LA Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 5 August 2022 WELD COUNTY FINAL DRAINAGE REPORT CHECKLIST Yes No ' Is the project in the MS4? Report Content Section Weld County Case Number Cover Page Certificate of Compliance Certificate of Compliance Signed and Stamped by a Colorado Licensed PE 1 & 2 vs Description/Scope of Work 2 V Location (County Roads, S -T -R) 2 vs Nearby Water Features and Ownership Total Acres vs. Developed Acres 2 4 & Appendix G Hydrological Soil Types/Maps V FEMA Flood Zones 4 & Appendix E 2 l Urbanizing or Non -urbanizing 3 vs Methodologies Used For Report & Analysis (Full Spectrum is not accepted) 4.2 vs Discussion of Offsite Drainage Routing 6 4, Conclusion Statement indicating that the design will adequately protect public health, safety, and general welfare and have no adverse impacts on public rights -of -way or offsite properties Hydrology and Hydraulic Analysis vs Design Storm / Rainfall Information (NOAA Atlas or Local Data) 4, Appendix F vs Release Rate Calculations 4.2 & Appendix H & vii Post Construction Site Imperviousness Appendix G 's Hydrologic calculations (historic & developed basins) 4.1 & 4.2, Appendix H, I &J 's Hydraulic Calculations for Proposed Drainage Improvements (Swales, Culverts, Riprap, Pond, Appendix J Outlet, Spillway, WQCV Outlet, etc.) Appendix I v' Detention WQCV calculations Construction Drawings 's Stamped by PE Appendix I< 's Engineering scale and north arrow Appendix K vs Property lines, rights -of -way and easements Appendix K vs 1' contours & elevations (existing and proposed) Appendix K vs Pre- and post -development drainage basins Appendix K 's Arrows depicting flow direction Appendix K 's Time of Concentration Critical Path Appendix K `s Drainage Design Points Appendix K `s Improvements Labeled Appendix K 's Permanent Control Measure and Associated Drainage Features Labeled 'No Build/No Storage', Appendix K Include Design Volume `s Cross Sections for Open Channel, Profiles for Pipes Appendix K vs Elevations for Inverts, Flow Lines, Top of Grates, Orifice(s), etc. Appendix K vii Pipe Specs (Size, Material, Length, Slope) Appendix K 's Outlet and Spillway Details Appendix K Maintenance Plan n Frequency of Onsite Inspections 5 's Repairs, If Needed 5 vs Cleaning of Sediment and Debris 5 vii Vegetation Maintenance 5 's Manufacturer Maintenance Specifications, If Applicable 5 Other Required Documents Of applicable) n Variance Request and Documentation - Explain hardship, applicable code section, and proposed Certificate of Compliance mitigation. A copy of the Weld County issued drainage report checklist can be found in Appendix C. ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 6 August 2022 CERTIFICATE OF COMPLIANCE Weld County Drainage Code Certificate of Compliance Weld Co u m'ti Case Number: 1041WOL- Parcel Number. 07919000018 & 070919400011 Legal Description, ection/Townshipi'Range: 14020 PT N.E419 7 65 BEG AT SE COR NE4 N&9D W 800' N43114 3'F 540' N12D431E 303' N30D3S W 300' SaeD21'E 514" S925' TO BEG AND PT SE4 Date: August 5, 2022 19-7-65 LOT 8 REC EXEMPT RECX16-0112 12 I Mark A. Skelske, , Consultant Engineer for _ Bayswater Exploration & Production (Applicant), undertand and acknowledge that the applicant is seeking land use approval of the case and parcel in the description above. I have designed or reviewed the design for he proposed land use set for in the application. ►I (hereby certify, on behalf of the applicant, that the design will meet all a pp l ica o le drainage requirements of the Weld County Code with the exception of the variance(s) described on the attached exhibits. This certification is not a parartee or warranty either expressed or implied, Engineer's Stamp: Engineer of Record Signature Variance Reouest (If Applicable& 1. 2. 3. that Describe List Describe Demonstrate result the there of design the be tie are hardship proposed project, criteria That no granting adverse for of alternative the which of impacts, Weld the the variance variance County with from engineering storrwater Code will is still being of which rationale adequately runoff requested, a to variance the which protect public supports is public rights being the health, -of requested. -Nay intent safety, andfor of the Weld and offsite general County properties welfare Code, and as a Public Works DirectorlDesionee Review (If Applicable.) Public Works Director/Designee Name Date of Signature Comments: .1,abTe Department of Public Works I Development Review 1111 H Street, Greeley, CO 80631 I Ph: 970-304-6496 I www.we dgov.corn!dep€rt7ments/public_workWWdevelaprnent_review ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 7 August 2022 1. INTRODUCTION AND PURPOSE Bayswater Exploration & Production (BEP) is constructing two saltwater injection wells on an existing oil and gas well site in Weld County, Colorado. The project is referred to as the Calvary Farms 19-L Pad. As part of the project, a drilling and production pad will need to be constructed. Ascent Geomatic Solutions (Ascent) has been contracted to perform the grading, drainage analysis and drainage report for the Calvary Farms 19-L Pad. This report presents the findings and recommendations for the grading and stormwater management for the project. 2. PROJECT DESCRIPTION AND BACKGROUND The Calvary Farms 19-L Pad is located in the Northeast quarter of the Southeast quarter of Section 19, Township 7 North, Range 65 West of the 6th Principal Meridian in Weld County, Colorado'. Figure 1 shows an aerial photo of the project site location. A vicinity map showing the project location relative to the surrounding area can be found in Appendix D. Figure 1: Aerial of Project Location Aerial photo from Google Earth® The proposed oil and gas facility is located on a 7.3-acre2 site which is a portion of a 10.1 acre parcel owned by Calvary Farms LLC and resides at a mean elevation 4,886 ft. amsl. The site is located 62' west of County Road 39 and 2,096' north of County Road 78. The site is in a non - urbanizing area and is bounded by farmland. At the closest point there is a National Hydrography Dataset (NHD) waterbody located 50' west of the proposed on -site detention pond. The waterbody 1 The project site is located at latitude: 40.560508° N, longitude: 104.697875° W. 2 Acreage per surface use agreement (SUA). ASCENT Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 8 August 2022 is classified as a perennial pond with a NHD designation of Waterbody 3651662. An irrigation ditch classified as a NHD flowline/irrigation ditch is located along the southern boundary of the previously construction well pad. This ditch has a designation or identification number of 8518897. A geotechnical investigation was conducted at the proposed site3. The grading and design are in accordance with the results of the geotechnical investigation. The hydrologic soil group was determined to be Type C within the proposed site 3. DESIGN CRITERIA The proposed drainage plan follows Weld County Code requirements' and Weld County Engineering and Construction Criteria (WC-ECC)3. Weld County Charter and County Code (WC- CCC)5 incorporates many of the requirements from Urban Drainage and Flood Control district (UDFCD) by reference into its code and as such UDFCD requirements have been included in the design and analysis for the Calvary Farms 19-L Pad project. UDFCD Rational Method (UD-Rational)5, culvert sizing (UD-Culvert)5 , channel sizing (UD- Channel)3 and pond sizing software (UD-Detention6)3 spread sheets were used to perform most of the calculations for the drainage analysis. The runoff coefficients used in the UD-Rational calculations are taken from USDCM-1-2008 in accordance with WC-PW requirements. The overall design directives include mitigation of stormwater so as not to negatively impact adjacent properties. 4. DESIGN CONDITIONS The existing conditions ground cover of the project site and much of the ground cover of the land adjacent to the pad can be described as tillage and field'. Figure 2 provides a photograph of the existing surface conditions and the basin delineation map is presented in Appendix L. The hydrologic soil classifications for the project were obtained from the NRCS Web Soil Survey (NRCS3). Appendix G presents the NRCS soils map used to perform the analysis. Basin 1 Design Point 1 was assumed to be 100% Type C soils. 3 Reference Appendix A, Table 2: Reference Documents for more information. 4 Particular attention to Weld County Code Chapter 8 (Public Works), Article XI (Storm Drainage Criteria) has been given for this project designs. 5 Reference Appendix A Table 3: Reference Software and Websites for more information. 6 The current version of UD Detention (a.k.a. MHFD Detention 4.00) utilizes a "full spectrum" design approach which is not accepted by WC, hence UD-Detention 2.35 which utilizes the modified FAA Method was used to perform the pond sizing analysis, as this method is accepted by WC. The "tillage and field" condition has a corresponding Conveyance Factor (K) of 5 within UD-Rational. f.. ASCENT '1 i, Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 9 August 2022 Selection of imperviousness values for the project site are based on whether the conditions are existing or proposed; the specific imperviousness values selected for the hydrologic analysis are discussed in Sections 4.1 and 4.2. The design storm data used to analyze both existing and proposed conditions were taken from NOAA Atlas 14 (NOAA-14)8. The NOAA-14 precipitation frequency data used for the hydrologic analysis is provided in Appendix F. The proposed site is not located within the FEMA 100-yr floodplain. The mean groundwater depth at this location is ed6.50 ft below grade.' 4.1 Existing Conditions The existing conditions design values are provided in Table 1. Tillage/field conditions cover the project area (reference Figure 2). Stormwater from the project site travels down gradient towards the northwest where it reports to an existing irrigation pond approximately 50 ft from the northwestern edge of the limits of disturbance (reference Sheet K.1 in Appendix K for the limits of disturbance). Figure 2: Project Site Existing Conditions Table 1: Existing Conditions Design Values Parameter Value Average Slope 3-5% Existing Condition Flow Direction Southeast to Northwest Coverage Type Tillage/Field Conveyance Factor 5 8 Reference Appendix A, Table 3: Reference Software and Websites for more information. 9 Groundwater elevation taken from GER in Appendix M) ASCENT I 1i Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 10 August 2022 4.2 Proposed Conditions The proposed drainage drawings located in Appendix L show the proposed project site with construction disturbance area and grading. The stormwater management system for the drilling phase was designed based on the drilling phase conditions with equipment, which provides a hydrologic "worst case" design. The proposed well pad will be capped with 6" of base course. The well pad was assigned an assumed imperviousness of 40%. Piers, concrete pads and/or footers are expected and were assigned an assumed imperviousness of 100%. The detention pond was assigned an assumed imperviousness of 2%. Reference Appendix H for composite value for total imperviousness calculations' o See Drainage Drawings in Appendix K for basin delineations. 4.2.1 Stormwater System Design The stormwater system for the Calvary Farms 19-L Pad is designed to be phased. Drilling Phase (Phase 1) The drilling phase stormwater system includes two onsite channels, one detention pond with a concrete outlet structure, and one topsoil stockpile acting as a diversion berm. Sheet K.2 in Appendix K identifies the stormwater design elements for the drilling phase. Production Phase (Phase 2) The production phase includes two onsite channels, one detention pond with a concrete outlet structure, and one diversion berm. Sheet K.5 identifies the stormwater design elements for the production phase. 4.2.1.1 Well Pad Drainage Features Drilling Phase During the drilling phase rainfall that lands on the pad will flow north to the detention pond located along the entire north side of the site; from there water will flow through the outlet structure and out onto existing ground where it will resume historical flow patterns. Channel 1 is located along the west edge of the well pad and will convey runoff to the detention pond. Channel 2 is located along the east edge of the well pad and will convey runoff to the detention pond. The topsoil 10 Imperviousness calculations were performed by referencing USDCM-1 Table 6-3 "Recommended Percentage Imperviousness Values" (see Appendix A for more information on USDCM-1) ASCENT Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 11 August 2022 stockpile serves as a diversion berm along the east side of the pad, preventing offsite runoff from flowing onto the site. Production Phase Similarly, rainfall that lands on the pad during production phase will flow north directly towards the detention pond or will flow north directly to the detention pond; from there water will flow through the outlet structure and out onto existing ground where it will resume historical flow patterns. The remaining topsoil stockpile serves as a diversion berm along the east side of the pad preventing stormwater from flowing onto the site. Channel 1 and 2 from the drilling phase will remain in place for the life of the site. 4.2.1.2Detention Pond — Drill. Phase Stormwater for Basin 1 will flow north across the well pad surface and report to the detention pond in the northwest corner of the site. The UD-Detention spreadsheets 1 was used to size the detention pond (Design Point 1) . The required detention pond volume is 0.633 ac -ft (27,587 cu-ft)12 . The total detention pond design volume is 0.648 ac -ft (28,242 cu -ft). The depth of the proposed pond at the outlet structure is 4.0' deep plus 1.0' (minimum) of freeboard above the 1 -hr, 100-yr water surface elevation. The pond is graded at 4:1 interior side slopes. The detention pond utilizes a concrete outlet structure with a maximum design release rate (3.45 cfs) equals the 10 -year historical peak flow rate of 3.45 cfs12. The detention pond design also includes a 14' wide emergency spillway. 4.2.1.3Detention Pond — Production Phase Stormwater for Basin 2 will flow north across the well pad surface and report to the detention pond in the northwest corner of the site. The UD-Detention spreadsheets 1 was used to size the detention pond (Design Point 1) . The required detention pond volume is 0.501 ac -ft (21,830 cu-ft)12 . The total detention pond design volume is 0.564 ac -ft (24,597 cu -ft). The depth of the proposed pond at the outlet structure is 4.0' deep plus 1.0' (minimum) of freeboard above the 1 -hr, 100-yr water surface elevation. The pond is graded at 4:1 interior side slopes. The detention pond utilizes a concrete outlet structure with a maximum design release rate (2.90 cfs) equals the 10 -year historical peak flow rate of 2.90 cfs12. The detention pond design also includes a 11' wide emergency spillway. 11 Reference Appendix A, Table 3: Reference Software and Websites for more information. The current version of UD Detention (a.k.a. MHFD Detention 4.00) utilizes a "full spectrum" design approach which is not accepted by WC, hens UD-Detention 2.35 which utilizes the modified FAA method was used to perform the pond sizing analysis, as this method is accepted by WC. 12 Reference Appendix I- DETENTION/WQCV CALCULATIONS ASCENT I 11 Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 12 August 2022 5. MAINTENANCE PLAN Drainage Basin Detention ponds have low to moderate maintenance requirements on a routine basis but may require significant maintenance once every 15 to 25 years. Maintenance frequency depends on the amount of construction activity within the tributary watershed, the erosion control measures implemented, the size of the watershed, and the design of the facility. Inspection of the surface system will include functional and aesthetic needs. Functional maintenance is important for performance and safety reasons and aesthetic is important primarily for public acceptance of stormwater facilities. The removal of debris, sediment, overgrown or weedy vegetation will be prioritized based upon the inspection results. Inspection Inspect the drainage structures at least once annually, generally in the Spring, observing the amount of sediment where channels discharge into the pond and checking for debris at the outlet structure Maintenance Debris and Litter Removal -Remove debris and litter from the detention area as required to minimize clogging of the outlet. Mowing and Plant Care- When starting from seed, mow native/drought tolerant grasses only when required to deter weeds during the first three years. Following this period, mowing of native/drought tolerant grass may stop or be reduced to maintain a height of no less than 6 inches (higher mowing heights are associated with deeper roots and greater drought tolerance) . In general, mowing should be done as needed to maintain appropriate height and control weeds. Mowing of manicured grasses may vary from as frequently as weekly during the summer, to no mowing during the winter. Sediment Removal from the Forebay, Trickle Channel, and Micropool (if applicable)- Remove sediment from the forebay and trickle channel annually. If portions of the watershed are not developed or if roadway or landscaping projects are taking place in the watershed, the required frequency of sediment removal in the forebay may be as often as after each storm event. The forebay should be maintained in such a way that it does not provide a significant source of resuspended sediment in the stormwater runoff. Sediment removal from the micropool is required about once every one to four years and should occur when the depth of the pool has been reduced to approximately 18 inches. Small micropools may be vacuumed and larger pools may need to be pumped in order to remove all sediment from ASCENT Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 13 August 2022 the micropool bottom. Removing sediment from the micropool will benefit mosquito control. Ensure that the sediment is disposed of properly and not placed elsewhere in the basin. Sediment Removal from the Basin Bottom- Remove sediment from the bottom of the basin when accumulated sediment occupies about 20% of the water quality design volume or when sediment accumulation results in poor drainage within the basin. The required frequency may be every 15 to 25 years or more frequently in basins where construction activities are occurring. Erosion and Structural Repairs- Repair basin inlets, outlets, trickle channels, and all other structural components required for the basin to operate as intended. Repair and vegetate eroded areas as needed following inspection. The following is a more detailed guideline for detention pond maintenance considerations: Lawn mowing and lawn care Occasional mowing Maintain irrigated non -irrigated to limit unwanted vegetation. turf grass as 2 to 4 inches natives grasses at 4 to 6 inches. tall and Routine - Depending on aesthetic requirements. Debris and litter removal Remove debris minimize outlet and clogging litter from and the entire pond improve aesthetics. to Routine and - Including May) and following annual, pre -storm season significant rainfall (April events. Erosion and sediment control Repair and revegetate eroded areas in the basins and channels. Non -routine - Periodic and repair as necessary based on inspection. Structural Repair pond channel liners, inlets, outlets, and energy dissipaters forebays, low flow as needed. Non -routine - Repair as needed based on regular inspections. Inspections Inspect function for sedimentation and element. basins to insure as initially clogging, erosion, levels, spillway integrity, intended. slumping, overgrowth, that and the basin continues Examine the excessive embankment damage to any to outlet structural _ Routine - structural during routine plugging Annual facilities. of outlets. inspection Also maintenance check of visits, hydraulic and for obvious problems especially for Nuisance control Address associated bottom odor, insects, and with stagnant or zone. overgrowth standing issues water in the Non -routine - Handle as necessary per inspection or complaints. Sediment Removal Remove and the accumulated bottom of the sediment from the forebay basin. Non -routine - Performed accumulation occupies may vary considerably, necessary per inspection. more frequent cleanout pond. when 20 percent but The than sediment of the expect to do forebay other areas this will WQCV. This as require of the ASCENT Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page 14 August 2022 6. SUMMARY AND CONCLUSIONS The proposed drainage plan follows Weld County's Charter and County Code (WC-CCC) and the Weld County Engineering and Construction Criteria (WC-ECC). UDFCD Rational (UD-Rational) and pond sizing software (UD-Detention) spread sheet were used to perform many of the calculations for drainage analysis. The drainage system was designed to be phased. The design implements a detention pond during the construction phase. Once drilling and completions operations are complete, a portion of the site will be taken back to as close to existing ground as possible; the detention pond will remain to service the site through its life. This report and the calculations have been produced after proper due diligence for the site and surrounding adjacent offsite areas. The drainage design is adequate to protect public health, safety, and general welfare and has no adverse impacts on public rights -of -way or offsite properties. The stormwater management designs provided in this report have been performed in accordance with Weld County requirements. Raejanna Church Project Engineer August 5, 2022 airet ASCENT Mark Skelskey, P.E. Engineer of Record LILilMS silluirMS Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page Al August 2022 APPENDIX A - REFERENCE DOCUMENTS, SOFTWARE AND WEBSITES Table 2: Reference Documents Document Abbreviation "Urban Storm Drainage Criteria Manual: Hydrology, and Hydraulics ", by Urban Revised August 2018; Originally Published Drainage Volume September 1 & —Management, Control District; USDCM-1 Flood 1969 "Urban Storm Drainage Criteria Manual: Volume 1 ", by Flood Control District; Revised April 2008; Originally Published Urban Drainage & June 2001 USDCM-1-2008 "Urban and September Recreation Storm Drainage ", by Urban 2017; Originally Criteria Manual: Volume 2 Drainage & Flood Control Published September 1969 — Structures, Storage, Updated USDCM-2 District; "Urban Practices 2019; Storm Drainage ", by Urban Drainage Originally Published Criteria Manual: Volume 3 & Flood Control District; September 1992 — Best Management Updated October USDCM-3 "Weld County Engineering and Construction Originally Published March 2021. Criteria", by Weld County, CO; WC-ECC "Geotechnical Originally Engineering Report", by Inberg-Miller 2, 2022. Engineering, GER-1 Published August airet ASCENT f:iLILilMS silluirMS Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page A.2 August 2022 Table 3: Reference Software and Websites Document Abbreviation UD-Channel "Channel Design — UD Channel 1.05 ", XLS. file by Urban Drainage & Flood Control District; released October 2013. UD-Culvert "Culvert Design — UD Culvert 3.05 ", XLS. file by Urban Drainage & Flood Control District; released November 2017. https://udfcd.org/software UD-Detention "Detention Design - UD Detention 2.35 ", XLS. file by Urban Drainage & Flood Control District; released January 2015. https://udfcd.org/software UD-Rational "Peak Runoff Prediction by Rational Method - UD Rational 2.00", XLS. file by Urban https://udfcd.org/software Drainage & Flood Control District; released May 2017. "AutoCAD Civil 3D - 2018", by Autodesk; released 2018. CAD-C3D "NOAA Updated https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html Atlas April 14", by 21, 2017 the National Oceanic and Atmospheric Administration, NOAA-14 "Weld County Charter County Code - Supplement 63", by Weld County, WC-CCC CO; Codified Updated December and through Ordinance No. 2019-14, adopted 19, 2019. September 23, 2019; "USDA/NRCS Web Soil Survey ", Society. https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx by National Resource Conservation NRCS trat ASCENT f:iLIL1 i(LS LIiillh; Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page B.1 August 2022 APPENDIX B - ABBREVIATIONS AND ACRONYMS ABC ac AMSL Avg. BMP C CDOT cfs COGCC cm CM ECD EURV FAA FEMA FIRM ft. fps HEC-HMS hr. K LACT MHFD MLVT min. RG RI T0C UD UDFCD Aggregate Base Course acres Above Mean Sea Level Average Best Management Practice Runoff Coefficient Colorado Department of Transportation Cubic feet per second Colorado Oil and Gas Commission Centimeters Criteria Manual Emissions Control Device Excess Urban Runoff Volume Federal Aviation Administration Federal Emergency Management Agency Flood Insurance Rate Map feet Feet Per Second Hydrologic Engineering Center - Hydrologic Modeling System hour Conveyance Factor (UD-Rational)' Lease Automatic Custody Transfer Mile High Flood District Modular Large Volume Tanks minutes Rough Grade Recurrence interval (rainstorm) Top of Concrete Urban Drainage Urban Drainage and Flood Control District 13 Reference Table 3: Reference Software and Websites for additional information on this engineering reference document. men ASCENT f:iLILilMS silluirMS Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page B.2 August 2022 USDCM-1 USDCM-1-2008 USDCM-2 USDCM-3 WC WC-ECC WC -ED WC-SDC WC-SDC WOGLA WQCV Urban Storm Drainage Criteria Manual — Volume 1 14 Urban Storm Drainage Criteria Manual — Volume 1(2008) 14 Urban Storm Drainage Criteria Manual — Volume 2 14 Urban Storm Drainage Criteria Manual — Volume 3 14 Weld County Weld County Engineering and Construction Criteria 14 Weld County Energy Department Weld County Storm Drainage Criteria Weld County Storm Drainage Criteria Addendum 14 Weld County Oil & Gas Location Assessment (permit) Water Quality Capture Volume 14 Reference Table 2: Reference Documents for additional information on this engineering reference document. rs Abio fl ASCENT f:iilt.ib1([IS U1UiiDh; Calvary Farms 19-L Pad: Final Drainage Report Document: FDR 01 Rev A Page C.1 August 2022 APPENDIX C - DRAINAGE REPORT CHECKLIST Drainage Report Checklist Project Name: The purpose of this checklist is to assist the applicant's Engineer with developing a drainage report that supports the intent of the Weld County Code using commonly accepted engineering practices and methodologies. Is the project in the MS4? DYes D No If yes, the following requirements in blue apply„ See Chapter 8, Article IX of the Weld County Code. Report Content Weld County Case Number Certificate of Compliance signed and stamped by a Colorado Licensed PE ❑ Description/Scope of Work El Location (County Roads, S -T -R) ❑ Nearby water features and ownership CI Total acres vs. developed acres ❑ Hydrological soil types/maps • FEMA Flood Zones Urbanizing or non -urbanizing ❑ Methodologies used for report & analysis (full spectrum is not accepted) ❑ Base Design Standard used for permanent control measure design in the MS4 ❑ Discussion of offsite drainage routing Conclusion statement indicating that the design will adequately protect public health, safety, and general welfare and have no adverse impacts on public rights -of -way or offsite properties Hydrology and Hydraulic Analysis ❑ Design Storm / Rainfall Information (NOM Atlas or Local Data) ❑ Release Rate calculations • Post construction site imperviousness ❑ Hydrologic calculations (historic & developed basins) ❑ Hydraulic calculations for proposed drainage improvements (swales, culverts, riprap, pond, outlet, spillway, WQCV outlet, etc.) ❑ DetentionNVQCV calculations Construction Drawings ❑ Stamped ped by PE ❑ Engineering scale & north arrow El Property lines, rights -of -way, and easements ❑ 1' Contours & elevations (existing & proposed) ❑ Pre- and post -development drainage basins ❑ Arrows depicting flow direction 1 Time of concentration critical path Drainage design points ❑ Improvements labeled El Permanent control measure and associated drainage features labeled "No Build/No Storage', include design volume ❑ Cross sections for open channels, profiles for pipes ❑ Elevations for inverts, flow lines, top of grates, orifice(s), etc. ❑ Pipe specs (size, material, length, slope) • Outlet and spillway details Maintenance Plan ❑ Frequency of onsite inspections Li Repairs, if needed Cleaning of sediment and debris • Vegetation maintenance ❑ Manufacturer maintenance specifications, if applicable l9 Other Required Documents (If Applicable) l _ a Variance Request and documentation— explain hardship, applicable code section, and proposed mitigation. Variances will not be granted for the Base Design Standard requirement in the MS4. Highlighted Items _ Minimum Requirements for Preliminary Drainage Report *Note: Additional information may be necessary on a case by case basis* Department of Public Works I Development Review 1111 H Street, Greeley, CO 80631 I Ph: 970-304-6496 I wwwv.weldgov.comidepartmentsipublic_worksidevelopment_rerriew ASCENT f:iilt ilMS ;UIUiiDh; Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page D.1 August 2022 _ .4 LE: 1 ` 2000? APPENDIX D - VICINITY MAP CALVARY FARMS 19-L PAD VICINITY MAP 1000 213400 DISCLAIMER - THIS PLOT DOES NOT REPRE.SEI4T A MONUMENTED LAND SURVEY AND SIIOL .0 NOT SE RELIED UPON TOOETER1/ IIE BOUNDARY LINES, PROPERTY CYa *JERSFII P OR OTHER PROPERTY INTEPflTS PARCEL LINES, IF DEPICTED RAVE NOT BEEN FIELD VERIFIED AND MAY BE BASED UPON PUBLICLY AVAILABLE L1 ATA THAT ALSO HAS NOT BEEN INDEPENDENTLY VERIFIED. DATA SOURCE: a IMAGERY: GNP 201110 PUBUCI Y AVAILABLE DATA SOURCES IEIAVF NOT BEEN INDEPEPACENTILY VERIFIED BY ASCENT. IGa aakt -4tdll k.nIsk. {K' IHpI (1711.!2E ?U4 ma.rsa!*zf.Q.i "to cry! ;ICE MA`"E CALVARY FARMS 19-L PAD L:LA- I9% NE 1/4 SE 1/4 SEC 19, TIN, R651111, 6TH P Si. WELD COUNTY, COLORADO a FIE.: 06-27-22 DATE DgAli Ihi r3Ar( 07-20-22 I U I MOM kit e RMC EL:.t.y; MASj PPUFAIIEII' I:pp lifirsweaun vie Erw?tnau inn isnan.WE ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page E.1 August 2022 APPENDIX E - FEMA MAP National Flood Hazard Layer FIRMette PJ4"42'111 Au 41.1"3 `±.] r'. (I 0812301237E elf. I/20/2016 siosar- Feet 1:6,000 500 1.000 1.500 2.000 Basemtip: &SGS National Map: Orthoimgery: Data refreshed October. 2020 1WI13'34^W 40'331'24"N FEMA ASCENT Legend SEE FE REPORT FOR OE USDLEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPEC AL rtLOon HAZARD AREAS Without Base Flood Elevation (BFt ) c0nne A-1.3 With 8FE or Depth 1c: ILE AO, Ati. YE, AR Fri}gutatary Fioodway OTHER AREAS OF FLOOD HALAFUJ OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 9 V4 0.2% Annual Chance Flood Hamra, Ares of 1% annual chance flood with average dearth less than one foot or with drainage areas of less than one square mile zo4e x Future Conditions 1% Annual Chance Flood Hazard zcce A Area with Reduced Flood Risk due to Levee. See Notes. i0"" Area with Flood Risk due to Leveezvro o NOSrrEEN Area of Minimal Flood Hazard zoo x Effective LAMRs Area of Undetermined Flood Hazard tnrr n J - — a. Channel. Culvert, or Storm Sewer I r 1 1 1 1 1 Levee, Dike, or Floods -all Cross Sections with 1% Annual Chance Water Surface Elevation Coastal Transect Base Flood Elevation Line (Sill Limit of Study Jurisdiction Boundary Coastal Transact Baseline Prattleelinc Hydrographic Feature Digital Data Available Na Digital Data Available Unmapped The pin displayed en the map Is an approximate point selected by the uscr and does not rcprescrt an autnoftilative property location. This map ctomnplieswiUt FEMk's standards for the use of digital flood maps if it is not 'void as described below.. The basemap shown complies with FEMA's basenlap accuracy standards The flood hazard intormatlon is derived directly from the authe ritativc MEHL web services provided by FEMA.This map was exported on 7/28/2022 at 5.45 PM and does not reflect changes ix ar nendnicnts subsequent to this date and time The NFHL and erlecth+e information may change or become superseded try new data over Dine. This map image Is void if the one or more of the following map aliments do not appear: basemap Imagery, flood tone labels, legend, scale bar, map creation date, community Identifiers, FIRM panel number, and FIRM effective date. Man Images k r unsnapped and ummodenitzed areas cannot be used for regulatory purposes. GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page F.1 August 2022 APPENDIX F - NOAA ATLAS 14 PRECIPITATION FREQUENCY TABLE NOAA Atlas 14, Volume 8, Version 2 Location name: Ault, Colorado, USAt Latitude: 40.5604, Longitude: -1104.6979n Elevation: 4884.93 f t4 . Kturoc E-3RI Maw ,t source: Mt PONT PRECIPITATION FREQUENCY ESTIMATES Santa Ponca, Deborah Marlins Sandra Pavleme, Mani , Michael St Laurent, Carl Trypeluk., Dale Unruh. Michael Yakut., Geo Eery Hinnla i4DAA,, Walklher SeMott. Slim. Spring, Maryland PF_tabtiilar I P graph I Maps & aerials PF tabular PD -based point precipitation frequency estimates with 90% confidence intervals (in inchesil Average recurrence interval (years) Duration 1 2 5 10 25 50 Jim 200 500 1000 Amin 0.241 (0.196.0.296) 0.291 (1 8) 4.3 111..386 (0.314-0.478) !l 80 (0.3 .0,595j 0,026 (0.491=4. 51, 0154 (0.571.0.` 9), 'Q 01894 (0.6 •1.21) I 1 (0.724,1.4►6) 1.28 (0.539.182) 1.46 (0.9 ,2_09)V 10 $'17tt7 I,o.287-0A33 i 0,426 (0.347-0.525) 0.567 (0.459-0.700) 0303 (0.555-0.871) 091 rF (0.719-121) 1„10 (0..63'6-1.44) 1.31 (0.950-1. 78) 1,54 (1.06-2.14) 1.07 (1.23-2,67) 2,14 (1.36-3.06) , 1-Inliiltii 0.430 (0.3$0,0,628) 0.520 (0.423-0,640) 0.692 (0.660-0.050 0157 (0:8 1-O6) 1,12 , (( Ofla1-4') 1.35 (1,Q2 , i) 1480 0.16-2'.17) a 1488 (1. 9-2,61) 2..28 O.5O-325I (1.65-3.14) 2.61 r1-rn1n 0. (0.476&.7t8) 0.705 (0.573.0.867) 0.936 ('0.758.1.15) 1.16 (01132-1.44) 1.51 (1.1.9.2.00) 1.83 (128.2.42) 117 (1.57-2,94) 2.55 (1.76.3.55) 3.10 (2.04-4.43) 3.56 (2.26.5.10) a 60=min 0.723 (0.586-D.889) 0.868 10 705-1 07,M 1,15 (0.934-1_42) 1.43 (1.15-1 78) 1,89 11.49-2.5 0) 2.29 (1.74-3.04) 11.99-3 173 72) 3,23 42 2� y-4 51) 3.97 (2.61-5,57) 4,57 142.89-5,54) II.2-hr 0_861 (0-705:1._05) ■ .0Y1_37 -844a1.28) (1.12-1.68) 1 01.38.2.10) 471 (1.80.2.98) ,.. 26 2_75 (2-113-64) 3_30 (2.42-446) 192 (2.734,42) aV3 (3,21.6.6+4) 5658 (3, ..7,91 -hr 0.936 (0_770-1.14) 1.12 (0.917-1.35) 1448 (1.21-1.61) N (1.50-226) 1.85 2.45 (1.95-322) 2.99 (2313.94) 3.60 (2.65-4.84) 4,28 43.00-5.90) , 5.29 {3.54-7.46) 6.13 (3. -&66) -hr 1.06 (0.876-1.26) 1.29 (1.06-1 :55) f 1.72 1,41-2, ) . (114-2.69) 13 239 (2,23-3.61) 3.37 (2.61-4,3'x) 4,01 (197-5,33) 4472 (x/33-6,43) 535 (3.88-6,03) 6861 (4,30-9,24) 12 -hr 1.25 (1.04 1.49) 1.50 (1.25 1.80) ► 1.97 1.63 2.3eti_ I l 240 l sOuz..90) 3'.08 4 .4713•.9 ) 3.66 ( 2.854.10 .(3, 110 1c5.64 199 3.55w6,72 5.99 4.08 0.27) 1911 {4.48.9..44) 24 -hr 1.50 (1.25-1.78) 11.46-2.1O 1,75 ((1.8;5-2.61) 2,22 2,66 2.21-:3.18) 3,35 .71-4.23) 3',95 (3.09-5.02) I3.-15-5:97Lf3.81-7':07'" 4,59 5.30 6,33 Ri4.35-0,.66) 7.17 {4.76-9.851, 1.72 (1,45-x.03) 102 (1,704,38) 2.54 (2.13-3,00) 3.02 (242-356) I 3.73 (3.03-1,64) 4.33 (3.41-5,44) 4..'98 (3,77-6,39)1 5.67 (4 I1-i &7) 6.65 x,4,62-9,00) I 7.45 it5.OIJ-1,2) 3 -day 1.89 (1.60-x22) 0.854 219 , ) i.2.29-3.19) 2.71 (2.67--337) .19� 3'.91 (3.191.4.83) x4.52 (3-59.5.4) £1 (3-!9 -6.60) 5�n (4.28-7.70) (4.79-9.23) 7.68 (5.19-11.4 ) -+J4 2.02 (1:71-2.35) 2.32 41.97-2.71) in3.35 (2.42-3.36) v;2.82 -3.9r5) 4.19 (3.34-5.02) 430 i3.73-5)34) 1 5.36 14.09-0.81 1 6.,16 � _ 3-x.94 7,06 - 41 P 7.86 da.5.33-1+0.6 g 7 -day 2.27 (1.9 402.64) 2.66 (2.27-3.09) (2.81-x.66) 131 (3.274.63) 187 .63) 4.67 (.81♦5�.65) 5.30 (4.22-6.50) 5.96 (4.57=.747) 6.641 (4..87,8.55) 7.578.30 (5..340.0) I5-6641.110 il 10 -clay 2 51 (2.15• .90) 95 , i s7� � 69 • IF ) _ (3. 4.30 S!'ILil t� 'Llrt r.SR. 11 �5.79 (420.6.16) (4.62.7.04) 6.45 (4.984.02) 7.12 (5.24.9.09) 8.00 (.65-10.5) 8.67 15-7-1t..61)1 3.23 '2,19-3,70) 315 (3,23-4,30 440 3,94-5. ) 5,27 4,50-6,09) 1,19 5,08-7,33) 619 15.53-8121) 7.5₹ 15287-9,31. 0.25 46.12-10,4 9.13 (6 51-11,8) 9.7$ (6,80-12,9 -d' 3.82 (3 14.35) 4.39 3,179401) 5.30 (4.5? -6,07) (5.17-6.94) 6.04 7..03 (5.81.6.27) 7.77 (6,27.9.28) 84+49 (6,62,10A) 9'x21 (6.9741.6) 10.1 (7.26-13.0) 10.8 (7.56-142) 45 -day 4.51 (3.92-5.12) 5,17 (4.49-5.88) 622 (5.38-7'.1 ) (6.07-8.07) 7.06 8.16 (6.75-9.54) 8.98 (7.27-10.6) 9/6 (7_64-11.9) 10.5 (7.90-13.1) 11.5 (9.29-14.7) 12.2 (8..56-15.9) a 5:0$ (4.41-5.7:x) 5.82 (5,0 7-6,60) 7_02 a,(.'9 .97) $5.3L-9.0) 7.97 9,20 7.62-1h0.7) 10_1 I 6.19-1l.9p 10«9 (8.58-13.2) 11.7 (8.84-14,6) 12.7 022-162)0.51-17.5) I 134 1 Precipitation frequency. (RP) estimates in this . table are lb: sad on frequency enelYele of partial duration series (PDS). .Numbers in parenthe (for a given duration and are not checked against Please refer to NOAA. Atlas are PE estimates at lower gage recurrence probable maximum pre 14 document Mir and upper bounds cif the 90% confidence interval. interval) will be greater than tree upper bound (or less ipitalion (PRIP) estimates and may be higher than more Ittaiabon The than the currently probability lower valid that precipitant®n frequency bound) Is 5%. Estimates MP values, estimates at upper bounds ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page F.2 August 2022 Maps & aerials Small scale terrain Galt Large scale terrain re c:X win 0 -r F e fll FrirtCc'Ilins L gni_I , Peak. !: I m • • CISeyeniie a�a,••,.. •Freelet * (Longmont Denver U t + f l i Large scale map Fort Collins Che enne i 11%'"Y Longmont Boulder 1 OOk],..._r !mi er ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page GA August 2022 APPENDIX G - GROUND SURFACE IMPERVIOUS CALCULATIONS COMPOSITE BASIN -WEIGHTED "% IMPERVIOUS" CALCULATIONS -REFERENCE : UDFCD USDCM VI Table 6-3 Recommended Percentage Imperviousness Values Undeveloped areas Historic flow analysis Greenbelts, Agricultural Off -site flow analysis (when land use not defined) Street Paved Gravel Recycled asphalts Drives and walks Roofs CONSTRUCTION % Imperv. 2.00% 2.00% 45.00% 100.00% 40.00% 75.00% 90.00% 90.00% Area Area Area Area Area Area Area Area Total Area Percent Imperv. 4.66 4.66 40.00% BASIN 1 DESIGN POINT 1 0.54 0.54 100.00% 1.23 1.23 2.00% 0.00 1.23 0.00 0.54 4.66 0.00 0.00 0.00 P 6.43 ' 37.78% 2.70 2.70 40.00% (DRILLING) PHASE BASIN 1 DESIGN POINT 2 0.28 0.28 100.00% 0.33 0.33 2.00% 0.00 0.33 0.00 0.28 2.70 0.00 0.00 0.00 P 3.31 P 41.40% 1.75 1.75 40.00% BASIN 1 DESIGN POINT 3 0.30 0.30 100.00% 0.55 0.55 2.00% 0.00 0.55 0.00 0.30 1.75 0.00 0.00 0.00 V 2.60 P 38.88% 3.51 3.51 40.00% INTERIM- BASIN 2 DESIGN POINT 4 0.54 0.54 100.00% RECLAMATION 0.99 0.99 2.00% (PRODUCTION) PHASE 0.00 0.99 0.00 0.54 3.51 0.00 0.00 0.00 r 5.04 r 38.96% 7r-1 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page H.1 August 2022 Project: Calvary Farms 19-L Location: Weld County Owner: BEP Designer: RMC Date: 8/4/2022 APPENDIX H - HYDROLOGIC CALCULATIONS 5-yr 10-yr 100-yr 1 -hr rainfall depth P1 1.15 in 1.43 in 2.73 in Basin ID Design Point Area (ac) Imperviousness (%) NRCS Hydrologic Soil (%) Group Flow Overland (ft) length Overland Slope (ft/ft) Channelized Flow (ft) length Channelized Slope (ft/ft) Type of Land Surface Conveyance NRCS Factor i A B C/D L; So Lt Sc Existing Conditions Basin 1 1 6.4 2% 0.0% 0.0% 100.0% 100 0.008 532 0.012 Tillage/Field Basin 2 4 5.1 2% 0.0% 0.0% 100.0% 100 0.008 442 0.012 Tillage/Field Proposed Condtions Basin 1 1 6.4 38% 0.0% 0.0% 100.0% 100 0.005 750 0.009 Nearly bare ground 10 Basin 1 2 3.3 41% 0.0% 0.0% 100.0% 100 0.005 631 0.008 Nearly bare ground 10 Basin 1 3 2.6 39% 0.0% 0.0% 100.0% 100 0.005 501 0.009 Nearly bare ground 10 10 Basin 2 4 5.1 39% 0.0% 0.0% 100.0% 100 0.005 659 0.011 Nearly bare ground ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page H.2 August 2022 Project: Calvary Farms 19-L Location: Weld County Owner: BEP Designer: RMC Date: 8/4/2022 Basin ID Design Point Area (ac) Runoff Coefficient Time of Concentration (min) Rainfall (in/hr) Intensity Peak (cis) Flow C5 C10 C100 Initial ti Channelized tt Total tc Is 110 1100 05 010 0100 v) C O Basin 1 1 6.4 0.16 0.26 0.51 18.28 16.26 34.54 1.66 2.06 3.94 1.73 3.45 12.78 Basin 2 4 5.1 0.16 0.26 0.51 18.28 13.38 31.66 1.75 2.17 4.15 1.45 2.90 10.74 75 C O U nn C X W Condtions Basin 1 1 6.4 0.34 0.4]. 0.58 17.28 13.34 30.6i 1.78 2.22 4.23 3.86 _:).t_ 15.69 Basin 1 7 32 0.36 0.42 0.59 16.58 11.64. 28.22 1.87 2 33 1.44 2.19 3.2 a 8.57 Basin 1 3 2.598 0.34 0.41 0.58 17.17 8.63 25.80 1.97 2.45 4.67 1.76 2.62 7.05 Basin 2 4 5.12 0.34 0.41 0.58 17.16 10.55 27.71 1.89 2.35 4.49 3.33 4.97 13.35 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.1 August 2022 APPENDIX I - DETENTION/WQCV CALCULATIONS Clear Worksheet DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Calvary Farms 19-L Pad Basin ID: Basin 1 Design Point 1 (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Catchment Drainage Imperviousness Catchment Drainage Area Predevelopment NRCS Soil Group Return Period for Detention Control Time of Concentration of Watershed Allowable Unit Release Rate One -hour Precipitation Design Rainfall IDF Formula i = Cf* Pl/(C2+Tc)^C3 Coefficient One Coefficient Two Coefficient Three Use Denver Area Default Values la = A= Type = T= Calculate Tc Tc = Use Default q q = P1= C1 = 02= C3 = 37.78 6.400 C 10 31 0.54 1 1.43 28.50 10 0.786 percent acres A, B, C, or D years (2, 5, 10, 25, 50, or 100) minutes cfs/acre inches Use this side of the worksheet for the MINOR (e.g. 2 -year, 5 -year, or 10 - year) storage volume. Design Information (Input): Catchment Drainage Imperviousness Catchment Drainage Area Predevelopment NRCS Soil Group Return Period for Detention Control Time of Concentration of Watershed Allowable Unit Release Rate One -hour Precipitation Design Rainfall IDF Formula Coefficient One Coefficient Two Coefficient Three Use Default q la = A= Type = T= Tc = q= P1 = = C1* Pi/(C2+Tc)^C3 37.78 percent 6.400 acres C 100 31 A, B, C, or D years (2, 5, 10, 25, 50, or 100) minutes 0.54 cfs/acre 2.73 inches C1 = 28.50 C2 = 10 C3 = 0.786 Use this side of the worksheet for the MAJOR (e.g. 25 -year, 50 -year, or 100 -year) storage volume Determination of Average Outflow from the Basin (Calculated): 1 Runoff Coefficient C = 0.41 Inflow Peak Runoff Qp-in = 5.82 cfs Allowable Peak Outflow Rate Qp-out = 3.45 cfs Mod. FAA Minor Storage Volume = 4,718 cubic feet Mod. FAA Minor Storage Volume = 0.108 acre ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5 -Minutes) Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 1 6.19 0.022 1.00 3.45 0.005 0.018 2 5.78 0.042 1.00 3.45 0.010 0.032 3 5.43 0.059 1.00 3.45 0.014 0.045 4 5.12 0.074 1.00 3.45 0.019 0.055 5 4.85 0.088 1.00 3.45 0.024 0.064 6 4.61 0.100 1.00 3.45 0.029 0.071 7 4.40 0.111 1.00 3.45 0.033 0.078 8 4.20 0.122 1.00 3.45 0.038 0.084 9 4.03 0.131 1.00 3.45 0.043 0.088 10 3.87 0140 1.00 3A5 0:048 0.092 11 3.72 0.148 1.00 3.45 0.052 0.096 12 3.59 0.156 1.00 3.45 0.057 0.099 13 3.47 0.163 1.00 3.45 0.062 0.101 14 3.35 0.170 1.00 3.45 0.067 0.103 15 3.25 0.176 1.00 3.45 0.071 0.105 16 3.15 0.182 1.00 3.45 0.076 0.106 17 3.06 0.188 1.00 3A5 0:081 0107 18 2.97 0.193 1.00 3.45 0.086 0.108 19 2.89 0.198 1.00 3.45 0.090 0.108 20 2.81 0.203 1.00 3.45 0.095 0.108 21 2.74 0.208 1.00 3.45 0.100 0.108 22 2.67 0.213 1.00 3.45 0.105 0.108 23 2.61 0.217 1.00 3.45 0.109 0.108 24 2.55 0.221 1.00 3A5 0114 0107 25 2.49 0.225 1.00 3.45 0.119 0.106 26 2.44 0.229 1.00 3.45 0.124 0.106 27 2.39 0.233 1.00 3.45 0.128 0.104 28 2.34 0.236 1.00 3.45 0.133 0.103 29 2.29 0.240 1.00 3.45 0.138 0.102 30 2.24 0.243 1.00 3.45 0.143 0.101 31 2.20 0.247 0.99 3.43 0.146 0.100 32 2.16 0.250 0.98 3.38 0.149 0.101 33 2.12 0.253 0.96 3.33 0.151 0.102 34 2.08 0.256 0.95 3.28 0.154 0.102 35 2.05 0.259 0.94 3.23 0.156 0.103 36 2.01 0.262 0.93 3.19 0.158 0.103 37 1.98 0.264 0.91 3.15 0.161 0.104 38 1.94 0.267 0.90 3.11 0.163 0.104 39 1.91 0.270 0.89 3.08 0.165 0.104 40 1.88 0.272 0.88 3.05 0.168 0.104 41 1.85 0.275 0.87 3.01 0.170 0.105 42 1.83 0.277 0.86 2.98 0.173 0.105 43 1.80 0.280 0.86 2.95 0175 0105 44 1.77 0.282 0.85 2.93 0.177 0.105 45 1.75 0.284 0.84 2.90 0.180 0.104 46 1.72 0.286 0.83 2.87 0.182 0.104 47 1.70 0.289 0.83 2.85 0.184 0.104 48 1.68 0.291 0.82 2.83 0.187 0.104 49 1.65 0.293 0.81 2.80 0.189 0.104 50 1.63 0.295 0.81 2.78 0192 0:103 51 1.61 0.297 0.80 2.76 0.194 0.103 52 1.59 0.299 0.79 2.74 0.196 0.103 53 1.57 0.301 0.79 2.72 0.199 0.102 54 1.55 0.303 0.78 2.70 0.201 0.102 55 1.53 0.305 0.78 2.69 0.203 0.101 56 1.51 0.306 0.77 2.67 0.206 0.101 57 1.50 0.308 0.77 2.65 0.208 0100 58 1.48 0.310 0.76 2.64 0.211 0.099 59 1.46 0.312 0.76 2.62 0.213 0.099 60 1.45 0.313 0.76 2.61 0.215 0.098 61 1.43 0.315 0.75 2.59 0.218 0.097 Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.58 Inflow Peak Runoff Qp-in = 15.71 cfs Allowable Peak Outflow Rate Qp-out = 3.45 cfs Mod. FAA Major Storage Volume = 27,587 cubic feet Mod. FAA Major Storage Volume = 0.633 acre -ft Recalculate Results Rainfall Duration minutes (input) Rainfall Inflow Adjustment Average Intensity Volume Factor Outflow inches / hr acre-feet "m" cfs (output) (output) (output) (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 1 11.82 0.060 1.00 3.45 0.005 0.056 2 11.03 0.113 1.00 3.45 0.010 0.103 3 10.36 0.159 1.00 3.45 0.014 0.145 4 9.78 0.200 1.00 3.45 0.019 0.181 5 9.26 0.237 1.00 3:45 0.024 0.213 6 8.80 0.270 1.00 3.45 0.029 0.242 7 8.39 0.300 1.00 3.45 0.033 0.267 8 8.02 0.328 1.00 3.45 0.038 0.290 9 7.69 0.354 1.00 3.45 0.043 0.311 10 7.39 0.378 1.00 3.45 0.048 0.330 11 7.11 0.400 1.00 3.45 0.052 0.348 12 6.85 0.420 1.00 3:45 0.057 0.363 13 6.62 0.440 1.00 3.45 0.062 0.378 14 6.40 0.458 1.00 3.45 0.067 0.392 15 6.20 0.475 1.00 3.45 0.071 0.404 16 17 6.01 0.492 5.83 0.507 1.00 3.45 1.00 3.45 0.076 0.416 0.081 0.426 18 5.67 0.522 1.00 3.45 0.086 0.436 19 5.52 0.536 1.00 3.45 0.090 0.446 20 5.37 0.549 1.00 3.45 0.095 0.454 21 5.23 0.562 1.00 3.45 0.100 0.462 22 5.10 0.574 1.00 3.45 0.105 0.470 23 4.98 0.586 1.00 3.45 0.109 0.477 24 4.87 0.597 1.00 3.45 0.114 0.483 25 4.76 0.608 1.00 3.45 0.119 0.489 26 4.65 0.619 1.00 3.45 0.124 0.495 27 4.55 0.629 1.00 3.45 0.128 0.500 28 4.46 0.638 1.00 3.45 0.133 0.505 29 4.37 0.648 1.00 3.45 0.138 0.510 30 4.28 0.657 1.00 3.45 0.143 0.514 31 4.20 0.666 0.99 3.43 0.146 0.519 32 4.12 0.674 0.98 3.38 0.149 0.526 33 4.05 0.683 0.96 3.33 0.151 0.532 34 3.97 0.691 0.95 3.28 0.154 0.537 35 3.90 0.699 0.94 3.23 0.156 0.543 36 3.84 0.706 0.93 3.19 0.158 0.548 37 3.77 0.714 0.91 3.15 0.161 0.553 38. 3.71 0.721 0.90 3.11 0.163 0.558 39 3.65 0.728 0.89 3.08 0.165 0.563 40 3.59 0.735 0.88 3.05 0.168 0.567 41 3.54 0.742 0.87 3.01 0.170 0.572 42 3.49 0.748 0.86 2.98 0.173 0.576 43 3.43 0.755 0.86 2.95 0.175 0.580 44 3.38 0.761 0.85 2.93 0.177 0.584 45 3.33 0.767 0.84 2.90 0.180 0.588 46 3.29 0.773 0.83 2.87 0.182 0.591 47 3.24 0.779 0.83 2.85 0.184 0.595 48 3.20 0.785 0.82 2.83 0.187 0.598 49 3.16 0.791 0.81 2.80 0.189 0.601 50 3.11 0.796 0.81 2.78 0.192 0.605 51 3.07 0.802 0.80 2.76 0.194 0.608 52 3.04 0.807 0.79 2.74 0.196 0.611 53 3.00 0.812 0.79 2.72 0.199 0.614 54 2.96 0.817 0.78 2.70 0.201 0.616 55 2.92 0.822 0.78 2.69 0.203 0.619 56 2.89 0.827 0.77 2.67 0.206 0.622 57 2.86 0.832 0.77 2.65 0.208 0.624 58 2.82 0.837 0.76 2.64 0.211 0.627 59 2.79 0.842 0.76 2.62 0.213 0.629 60 2.76 0.846 0.76 2.61 0.215 0.631 61 2.73 0.851 0.75 2.59 0.218 0.633 Mod. FAA Minor Storage Volume (cubic ft.) = Mod. FAA Minor Storage Volume (acre -ft.) = 4,718 Mod. FAA Major Storage Volume (cubic ft.) = 0.1083 Mod. FAA Major Storage Volume (acre -ft.) = 27,587 0.6333 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.2 August 2022 Clear Worksheet STAGE -STORAGE SIZING FOR DETENTION BASINS Dar Project Calvary Farms 19-L Pad Basin ID: Basin 1 Design Point 1 Side Slope Z . Side Slope Z 4 Flow Design Information (Input): Width of Basin Bottom, W = Length of Basin Bottom, L = Dam Side -slope (H:V), Zd = Auto -Fill Water Surface Elev. Column Stage -Storage Relationship: Dam Side Slope Z r ft ft ft/ft L Side Slope Z L Side Shope z Side Slope z nioma Check Basin Shape Right Triangle OR... Isosceles Triangle OR... Rectangle OR... Circle / Ellipse OR... Irregular (Use Overide values in cells G32:G52) Storage Requirement from Sheet 'Modified FAA': Storage Requirement from Sheet 'Hydrograph': Storage Requirement from Sheet 'Full -Spectrum': MINOR MAJOR 0.11 0.63 acre -ft. acre -ft. acre -ft. for WQCV, & Major Labels Stages (input) Storage Minor, Water Surface Elevation (input) ft Side Slope (H:V) Below (input) ft/ft El. Basin Width Stage (output) ft at Basin Length Stage (output) ft at Surface Area Stage (output) ft2 at Surface Area Stage ft2 Overide at User Volume (output) Below Stage ft3 Surface Area Stage acres (output) at Volume Below Stage acre (output) -ft Target for & (for WQCV, Major Volumes goal Volumes Storage seek) Minor, 4880.60 32 0.001 0.000 4880.70 4.00 0.00 0.00 111 7 0.003 0.000 4880.80 4.00 0.00 0.00 259 26 0.006 0.001 4880.90 4.00 0.00 0.00 497 63 0.011 0.001 4881.00 4.00 0.00 0.00 840 130 0.019 0.003 4881.10 4.00 0.00 0.00 1,285 237 0.029 0.005 4881.20 4.00 0.00 0.00 1,819 392 0.042 0.009 4881.30 4.00 0.00 0.00 2,433 604 0.056 0.014 4881.40 4.00 0.00 0.00 3,116 882 0.072 0.020 4881.50 4.00 0.00 0.00 3,843 1,230 0.088 0.028 4881.60 4.00 0.00 0.00 4,589 1,651 0.105 0.038 4881.70 4.00 0.00 0.00 5,356 2,149 0.123 0.049 4881.80 4.00 0.00 0.00 6,142 Z724 0.141 0.063 4881.90 4.00 0.00 0.00 6,949 3,378 0.160 0.078 4882.00 4.00 0.00 0.00 7,776 4,114 0.179 0.094 WQCV 4882.09 4.00 0.00 0.00 8,624 4,865 0.198 0.112 4882.20 4.00 0.00 0.00 9,492 5,848 0.218 0.134 4882.30 4.00 0.00 0.00 10,381 6,841 0.238 0.157 4882.40 4.00 0.00 0.00 11,291 7,925 0.259 0.182 10-YR 4882.48 4.00 0.00 0.00 12,221 8,855 0.281 0.203 4882.60 4.00 0.00 0.00 13,173 10,390 0.302 0.239 4882.70 4.00 0.00 0.00 14,145 11,756 0.325 0.270 4882.80 4.00 0.00 0.00 15,139 13,220 0.348 0.303 4882.90 4.00 0.00 0.00 16,154 14,784 0.371 0.339 4883.00 4.00 0.00 0.00 17,190 16,452 0.395 0.378 4883.10 4.00 0.00 0.00 18,248 18,224 0.419 0.418 4883.20 4.00 0.00 0.00 19,327 20,102 0.444 0.461 4883.30 4.00 0.00 0.00 20,428 22,090 0.469 0.507 100-YR 4883.41 4.00 0.00 0.00 21,551 24,370 0.495 0.559 4883.50 4.00 0.00 0.00 22,695 26,391 0.521 0.606 4883.60 4.00 0.00 0.00 23,862 28,719 0.548 0.659 4883.70 4.00 0.00 0.00 25,050 31,165 0.575 0.715 4883.80 4.00 0.00 0.00 26,261 33,730 0.603 0.774 4883.90 4.00 0.00 0.00 27,494 36,418 0.631 0.836 4884.00 4.00 0.00 0.00 28,749 39,230 0.660 0.901 4884.10 4.00 0.00 0.00 30,027 42,169 0.689 0.968 4884.20 4.00 0.00 0.00 31,328 45,237 0.719 1.038 4884.30 4.00 0.00 0.00 32,651 48,436 0.750 1.112 4884.40 4.00 0.00 0.00 33,997 51,768 0.780 1.188 4884.50 4.00 0.00 0.00 35,365 55,236 0.812 1.268 4884.60 4.00 0.00 0.00 36,757 58,843 0.844 1.351 4884.70 4.00 0.00 0.00 38,172 62,589 0.876 1.437 4884.80 4.00 0.00 0.00 39,610 66,478 0.909 1.526 4884.90 4.00 0.00 0.00 40,000 70,458 0.918 1.618 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.3 August 2022 Water Quality Capture Volume (WQCV) Imperviousness I 38.00% BMP a 1.0 coefficient Watershed area A 6.40 ac Water Quality Capture Volume WQCV 0.1745 watershed -in Required storage volume VR 0.0931 4,054 ft"3 ac -ft Design Volume VD 0.1117 ac -ft 4,865 ft^3 Spillway Weir Calculation Discharge 0 15.7 cfs Weir Coefficient CBCW 3.0 Depth of flow through weir H 6.0 in Sideslopeofweir(H:V) Z 4.0 Minimum Length of Weir L 13.2 ft -Arms ASCENT GEOMATICS S�ULLIVIOWS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.4 August 2022 Clear Worksheet STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project: Calvary Farms 19-L Basin ID: Basin 1 Design Point 1 WQCV Design Volume (Input): Click Here to size WQCV Perforations Catchment Imperviousness. I= 37.8 percent Catchment Area, A = 6:40 acres Diameter of holes, D = 0.750 inches Depth at WQCV outlet above lowest perforation, H = 4 feet Number of holes per row, N = 1 Vertical distance between rows, h = 6.00 inches OR Number of rows, NL = 4.00 il Orifice discharge coefficient, C°= 0.60 Height of slot, H = inches Slope of Basin Trickle Channel, S = 0.010 it /ft Width of slot, W = inches Time to Drain the Pond = 40 hours 0 0 0 0 0 0 Perforated O O O Watershed Design Information (Input): Plate Percent Soil Type A = 0 % O O O O O O Examples P o o 0 0 0 o Percent Soil Type B= 0 % O O O Percent Soil Type C/D = 100 % �- u O O [- Outlet Design Information (Output): 0 0 O 0 0 O O 0 0 0 4 Water Quality Capture Volume, WQCV = 0.224 watershed inches O O 0 Water Quality Capture Volume (WQCV) = 0.120 acre-feet O O 0 Design Volume (WQCV / 12 * Area * 1.2) Vol = 104444 acre-feet o 0 0 0 0 0 Outlet A0 0.34 inches area per row, = square You for Total opening area at each row based on user -input above, A0 = 0.44 s ches can override water row at the bottom quality orifice areas each of the table below. Note that Total opening area at each row based on user -input above, A0 = 0.003 square feet your override areas will be in square feet. Auto -Fill Stages To entirely block that row, enter an area of zero. Central Elevations of Rows of Holes in feet I Flow Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 4880.75 4881.25 4881.75 4882.25 Collection Capacity for Each Row of Holes in cfs 4881.15 0.0093 0.0000 0.0000 0:0000 0.01 4881.65 0.0140 0.0093 0.0000 0.0000 0.02 4882.15 0.0175 0.0140 0.0093 0.0000 0.04 4882.65 0.0204 0.0175 0.0140 0.0093 0.06 4883.15 0.0229 0.0204 0.0175 0.0140 0.07 4883.65 0.0252 0.0229 0.0204 0.0175 0.09 4884.15 0.0272 0.0252 0.0229 0.0204 0.10 4884.65 0.0292 0.0272 0.0252 0.0229 0.10 4885.15 0.0310 0.0292 0.0272 0.0252 0.11 4885.65 0.0327 0.0310 0.0292 0.0272 0.12 4886.15 0.0343 0.0327 0.0310 0.0292 0.13 4886.65 0.0359 0.0343 0.0327 0.0310 0.13 4887.15 0.0374 0.0359 0.0343 0.0327 0.14 4887.65 0.0388 0.0374 0.0359 0.0343 0.15 4888.15 0.0402 0.0388 0.0374 0.0359 0.15 4888.65 0.0415 0.0402 0.0388 0.0374 0.16 4889.15 0.0428 0.0415 0.0402 0.0388 0.16 4889.65 0.0441 0.0428 0.0415 0.0402 0.17 4890.15 0.0453 0.0441 0.0428 0.0415 0.17 4890:65 0.0465 0.0453 0.0441 0.0428 0.18 4891.15 0.0476 0.0465 0.0453 0.0441 0.18 4891.65 0.0488 0.0476 0.0465 0.0453 0.19 4892.15 0.0499 0.0488 0.0476 0.0465 0.19 4892.65 0.0510 0.0499 0.0488 0.0476 0.20 4893.15 0.0520 0.0510 0.0499 0.0488 0.20 4893.65 0.0531 0.0520 0.0510 0.0499 0.21 4894.15 0.0541 0.0531 0.0520 0.0510 0.21 4894.65 0.0551 0.0541 0.0531 0.0520 0.21 4895.15 0.0561 0.0551 0.0541 0.0531 0.22 4895.65 0.0570 0.0561 0.0551 0.0541 0.22 4896.15 0.0580 0.0570 0.0561 0.0551 0.23 4896.65 0.0589 0.0580 0.0570 0.0561 0.23 4897.15 0.0598 0.0589 0.0580 0.0570 0.23 4897.65 0.0607 0.0598 0.0589 0.0580 0.24 4898.15 0.0616 0.0607 0.0598 0.0589 0.24 4898.65 0.0625 0.0616 0.0607 0.0598 0.24 4899.15 0.0634 0.0625 0.0616 0.0607 0.25 4899.65 0.0642 0.0634 0.0625 0.0616 0.25 4900.15 0.0651 0.0642 0.0634 0.0625 0.26 4900.65 0.0659 0.0651 0.0642 0.0634 0.26 4901.15 0.0667 0.0659 0.0651 0.0642 0.26 4901.65 0.0675 0.0667 0.0659 0.0651 0.27 4902.15 0.0683 0.0675 0.0667 0.0659 0.27 4902.65 0.0691 0.0683 0.0675 0.0667 0.27 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.5 August 2022 Clear Worksheet REST RICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: Calvary Farms 19-L Pad Basin ID: Basin 1 Design Point 1 UDFCD: A restrictor plate is placed over the upper portion of an outlet pipe or circular vertical orifice to limit the flow at a prescribed headwater depth. The remaining open area is then evaluated as an equivalent rectangular vertical orifice. Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Water Surface Elevation at Design Depth PipeNertical Orifice Entrance Invert Elevation Required Peak Flow through Orifice at Design Depth PipeNertical Orifice Diameter (inches) Orifice Coefficient Full -flow Capacity (Calculated) Full -flow area Half Central Angle in Radians Full -flow capacity Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Flow area Top width of Orifice (inches) Height from Invert of Orifice to Bottom of Plate (feet) Elevation of Bottom of Plate Resultant Peak Flow Through Orifice at Design Depth El ev: WS = Elev: Invert = Q= Dia = Co = Af = Theta = Qf = Percent of Design Flow = Theta = To = Yo = Elev Plate Bottom Edge = Q0= #1 Ve Orifice rti ca l #2 Vertical Orifice 4,884.00 4,880.50 3.45 12.0 0.61 0.79 I 3.14 i 6.7 193% 1.57 0.39 12.00 0.50 4,881.00 3.5 feet feet cfs inches sgft rad cfs rad sgft inches feet feet cfs ASCENT 6EOMAlICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.6 August 2022 Outlet Pipe M r.i mu Capacity n 0.013 Ma ng Roughness Coe fi ci ent 'refer D , 12th Isi & s long Area A -e L:'5 ≥ R 0050 ft Hydraulic adi us (full flow} Q ' 4.21.th Maximum Outlet Pipe Maximorrr Protection a Drilling Phase IQ Design V schar a 3.5 ftA3/ Al owab. ells Deity a iii ' attiltittis u r b er Barrels 1 Li 12 in Pipe inside L: iar peter (ir i) .,fit. ID ' frtH Pipe Inside Diameter Fronde Parameter 1D1'" 149 i FL airrui 3049 tI Tam %eater Depth lit known) Calculated Tail ester Depth ( f unknown) a Yt L 0a40 ft ' ,' " • I`® Tail ester Depth 1 treprth of rfater : 14.2ta n e i : as I Expansion Flo' Ares of flow At ' ' ._ �.2 - r7 FriprapDesign I L Type ' Ds.o 9M Hp 18 is Depth al Protection LEI Tit Length of Protection Width kith .c@" Protection 3ft I OK OK ASCENT 6EOMAlICS SOL1IUOWS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.7 August 2022 Clear Worksheet DETENTION VOLUME BY THE MODIFIED FAA METHOD Project: Calvary Farms 19-L Pad Basin ID: Basin 2 Design Point 4 (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method Design Information (Input): Design Information (Input):, Catchment Drainage Imperviousness la = 39.00 percent Catchment Drainage Imperviousness la = 39.00 percent Catchment Drainage Area A = 5.100 acres Catchment Drainage Area A = 5.100 acres Predevelopment NRCS Soil Group Type = C Al B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 10 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Calculate Tc Tc = 28 minutes Time of Concentration of Watershed Tc = 28 minutes Allowable Unit Release Rate Use Default q I q = , 0.57 cfs/acre Allowable Unit Release Rate Use Default q I q = 0.57 cfs/acre One -hour Precipitation Pi = 2.73 inches One -hour Precipitation Pi = 1.43 inches Design Rainfall IDF Formula i = Ci* Pi/(C2+Tc)^C3 Use this side of the Design Rainfall IDF Formula i = Ci* Pi/(C2+Tc)^C3 Coefficient One Ci = 28.50 Use this side of the worksheet for the MAJOR Coefficient One Use Denver Ci = 28.50 worksheet for the MINOR Coefficient Two C2 = 10 (e.g. 25 -year, 50 -year, or Coefficient Two Area Default C2 = 10 (e.g. 2 -year, 5 -year, or 10- Coefficient Three Values C3 = 0.786 year) storage volume. Coefficient Three C3 = 0.786 100 -year) storage volume Determination of Average Outflow from the Basin (Calculated): 1 Runoff Coefficient C = 0.41 Inflow Peak Runoff Qp-in = 4.91 cfs Allowable Peak Outflow Rate Qp-out = 2.90 cfs Mod. FAA Minor Storage Volume = 3,584 cubic feet Mod. FAA Minor Storage Volume = 0.082 acre -ft 1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5 -Minutes) Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 1 6.19 0.018 1.00 2.90 0.004 0.014 2 5.78 0.033 1.00 2.90 0:008 0.025 3 5.43 0.047 1.00 2.90 0.012 0.035 4 5.12 0.059 1.00 2.90 0.016 0.043 5 4.85 0.070 1.00 2.90 0.020 0.050 6 4.61 0.080 1.00 2.90 0.024 0.056 7 4.40 0.089 1.00 2.90 0.028 0.061 8 4.20 0.097 1.00 2.90 0.032 0.065 9 4.03 0.104 1.00 2.90 0:036 0.068 10 3.87 0.111 1.00 2.90 0.040 0.072 11 3.72 0.118 1.00 2.90 0.044 0.074 12 3.59 0.124 1.00 2.90 0.048 0.076 13 3.47 0.130 1.00 2.90 0.052 0.078 14 3.35 0.135 1.00 2.90 0.056 0.079 15 3.25 0.140 1.00 2.90 0.060 0.080 16 3.15 0145 1.00 2.90 0:064 0.081 17 3.06 0.150 1.00 2.90 0.068 0.082 18 2.97 0.154 1.00 2.90 0.072 0.082 19 2.89 0.158 1.00 2.90 0.076 0.082 20 2.81 0.162 1.00 2.90 0.080 0.082 21 2.74 0.166 1.00 2.90 0.084 0.082 22 2.67 0.169 1.00 2.90 0.088 0.082 23 2.61 0173 1.00 2.90 0:092 0.081 24 2.55 0.176 1.00 2.90 0.096 0.080 25 2.49 0.179 1.00 2.90 0.100 0.080 26 2.44 0.183 1.00 2.90 0.104 0.079 27 2.39 0.186 1.00 2.90 0.108 0.078 28 2.34 0.188 0.99 2.88 0.111 0.077 29 2.29 0.191 0.98 2.83 0.113 0.078 30 2.24 0.194 0.96 2.79 0.115 0.079 31 2.20 0.196 0.95 2.74 0.117 0.079 32 2.16 0.199 0.93 2/0 0.119 0.080 33 2.12 0.201 0.92 2.66 0.121 0.080 34 2.08 0.204 0.91 2.63 0.123 0.081 35 2.05 0.206 0.90. 2.60 0125 0.081 36 2.01 0.208 0.88 2.56 0.127 0.081 37 1.98 0.211 0.87 2.53 0.129 0.082 38 1.94 0.213 0.86 2.50 0.131 0.082 39 1.91 0.215 0.86 2.48 0.133 0.082 40 1.88 41 1.85 0.217 0.85 2.45 0.135 0.082 0.219 0.84 2.43 0.137 0.082 42 1.83 0:221 0.83 2.40 0139 0.082 43 1.80 0.223 0.82 2.38 0.141 0.082 44 1.77 0.225 0.81 2.3.6 0.143 0.082 45 1.75 0.226 0.81 Z34 0.145 0.081 46 1.72 0.228 0.80 2.32 0.147 0.081 47 1.70 0.230 0.79 2.30 0.149 0.081 48 1.68 0.232 0.79 2.28 0.151 0.081 49 1.65 0.233 0.78 2.27 0.153 0.080 50 1.63 0.235 018 2.25 0.155 0.080 51 1.61 0.237 0.77 2.24 0.157 0.080 52 1.59 0.238 0.77 2.22 0.159 0.079 53 1.57 0.240 0.76 2.21 0.161 0.079 54 1.55 0.241 0.76 2.19 0.163 0.078 55 1.53 0.243 0.75 2.18 0.165 0.078 56 1.51 0:244 0.75 2.17 0167 0.077 57 1.50 0.246 014 2.15 0.169 0.077 58 1.48 0.247 0.74 2.14 0.171 0.076 59 1.46 0.248 0.73 2.13 0.173 0.075 60 1.45 0.250 0.73 2.12 0.175 0.075 61 1.43 0.251 0.73 2.11 0.177 0.074 Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = Inflow Peak Runoff Qp-in = Allowable Peak Outflow Rate Qp-out = Mod. FAA Major Storage Volume = Mod. FAA Major Storage Volume = I 0.58 cfs cfs cubic feet acre -ft Recalculate Results 13.27 2.90 21,830 0.501 Rainfall Duration minutes (input) Rainfall Intensity inches / hr (output) Inflow Volume acre-feet (output) Adjustment Factor "m" (output) Average Outflow cfs (output) Outflow Volume acre-feet (output) Storage Volume acre-feet (output) 1 11.82 0.048 1.00 2.90 0.004 0.044 2 11:03 0.090 1.00 2.90 0.008 0.082 3 10.36 0.127 1.00 2.90 0.012 0.115 4 9.78 0.159 1.00 2.90 0.016 0.143 5 9.26 0.189 1.00 2.90 0.020 0.169 6 8.80 0.215 1.00 2.90 0.024 0.191 7 8.39 0.239 1.00 2.90 0.028 0.211 8 8.02 0.262 1.00 2.90 0.032 0.230 9 7.69 0.282 1.00 2.90 0.036 0.246 10 7.39 0.301 1.00 2.90 0.040 0.261 11 7.11 0.319 1.00 2.90 0.044 0.275 12 6.85 0.335 1.00 2.90 0.048 0.287 13 6.62 0.351 1.00 2.90 0.052 0.299 14 6.40 0.365 1.00 2.90 0.056 0.309 15 6.20 0.379 1.00 2.90 0.060 0.319 16 6.01 0.392 1.00 2.90 0.064 0.328 17 5.83. 0.404 1.00 2.90 0.068 0.336 18 5.67 0.416 1.00 2.90 0.072 0.344 19 5.52 0.427 1.00 2.90 0.076 0.351 20 5.37 0.438 1.00 2.90 0.080 0.358 21 5.23 0.448 1.00 2.90 0.084 0.364 22 5.10 0.458 1.00 2.90 0.088 0.370 23 4.98 0.467 1.00 2.90 0.092 0.375 24 4.87 0.476 1.00 2.90 0.096 0.380 25 4.76 0.485 1.00 2.90 0.100 0.385 26 4.65 0.493 1.00 2.90 0.104 0.389 27 4.55 0.501 1.00 2.90 0.108 0.393 28 4.46 0.509 0.99 2.88 0.111 0.398 29 4.37 0.516 0.98 2.83 0.113 0.403 30 4.28 0.524 0.96 2.79 0.115 0.408 31 4.20 0.531 0.95 2.74 0.117 0.413 32 4.12 0.537 0.93 2.70 0.119 0.418 33 4.05 0.544 0.92 2.66 0.121 0.423 34 3.97 0.551 0.91 2.63 0.123 0.427 35 3.90 0.557 0.90 2.60 0.125 0.432 36 3.84 0.563 0.88 2.56 0.127 0.436 37 3.77 0.569 0.87 2.53 0.129 0.440 38 3.71 0.575 0.86 2.50 0.131 0.444 39 3.65 0.580 0.86 2.48 0.133 0.447 40 3.59 0.586 0.85 2.45 0.135 0.451 41 3.54 0.591 0.84 2.43 0.137 0.454 42 3.49 0.596 0.83 2.40 0.139 0.457 43 3.43 0.602 0.82 2.38 0.141 0.460 44 3.38 0.607 0.81 2.36 0.143 0.463 45 3.33 0.611 0.81 2.34 0.145 0.466 46 3.29 0.616 0.80 2.32 0.147 0.469 47 3.24 0.621 0.79 2.30 0.149 0.472 48 3.20 0.626 0.79 2.28 0.151 0.474 49 3.16 0.630 0.78 2.27 0.153 0.477 50 3.11 0.634 0.78 2.25 0.155 0.479 51 3.07 0.639 0.77 2.24 0.157 0.482 52 3.04 0.643 0.77 2.22 0.159 0.484 53 3.00 0.647 0.76 2.21 0.161 0.486 54 2.96 0.651 0.76 2.19 0.163 0.488 55 2.92 0.655 0.75 2.18 0.165 0.490 56 2.89 0.659 0.75 2.17 0.167 0.492 57 2.86 0.663 0.74 2.15 0.169 0.494 58 2.82 0.667 0.74 2.14 0.171 0.496 59 2.79 0.671 0.73 2.13 0.173 0.498 60 2.76 0.674 0.73 2.12 0.175 0.500 61 2.73 0.678 0.73 2.11 0.177 0.501 Mod. FAA Minor Storage Volume (cubic ft.) = Mod. FAA Minor Storage Volume (acre -ft.) = 3,584 Mod. FAA Major Storage Volume (cubic ft.) = 0.0823 Mod. FAA Major Storage Volume (acre -ft.) = 21,830 0.5011 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.8 August 2022 Clear Worksheet STAGE -STORAGE SIZING FOR DETENTION BASINS Dam A. V Project: Calvary Farm 19-L Pad Basin ID: Basin 2 Design Point 4 --_-_- side Slope Z -• II - _ - ` Side Slope Design Information (Input): Width of Basin Bottom, W = Length of Basin Bottom, L = Dam Side -slope (H:V), Zd = Auto -Fill Water Surface Elev. Column Stage -Storage Relationship: Dam A. V Side Slope Z I ft ft ft/ft L Side Slope Side Slope z Check Basin Shape Right Triangle Isosceles Triangle Rectangle Circle / Ellipse Irregular Storage Requirement from Sheet 'Modified FAA': Storage Requirement from Sheet 'Hydrograph': Storage Requirement from Sheet 'Full -Spectrum': MINOR 0.08 4 _ L Side Slope z r£ it OR... OR... OR... OR... (Use Overide values in cells G32:G52) MAJOR 0.50 acre -ft. acre -ft. acre -ft. Labels for WQCV, & Major Stages (input) Storage Minor, Water Surface Elevation (input) ft Side Slope (H:V) Below (input) ft/ft El. Basin Width Stage (output) ft at Basin Length Stage (output) ft at Surface Area Stage (output) ft2 at Surface Area Stage ft2 Overide User at Volume Below Stage (output) ft3 Surface Area Stage acres (output) at Volume Below Stage acre (output) -ft Target for & (for WQCV, Major Volumes goal Volumes Storage seek) Minor, 4881.80 13 0 1 0.000 0.000 4881.90 4.00 0.00 0.00 48 3 0.001 0.000 115 11 0.003 0.000 4882.00 4.00 0.00 0.00 4882.10 4.00 0.00 0.00 228 28 0.005 0.001 396 60 0.009 0.001 4882.20 4.00 0.00 0.00 4882.30 4.00 0.00 0.00 624 111 I 0.014 0.003 4882.40 4.00 0.00 0.00 913 188 0.021 0.004 4882.50 4.00 0.00 0.00 1,266 296 0.029 0.007 4882.60 4.00 0.00 0.00 1,684 444 0.039 0.010 4882.70 4.00 0.00 0.00 2,168 637 0.050 0.015 4882.80 4.00 0.00 0.00 2,722 881 0.062 0.020 4882.90 4.00 0.00 0.00 3,347 1,185 0.077 0.027 4883.00 4.00 0.00 0.00 4,043 1,554 0.093 0.036 4883.10 4.00 0.00 0.00 4,814 1,997 0.111 0.046 4883.20 4.00 0.00 0.00 5,639 2,520 0.129 0.058 4883.30 4.00 0.00 0.00 6,496 3,126 0.149 0.072 WQCV 4883.42 4.00 0.00 0.00 7,384 3,936 0.170 0.090 4883.50 4.00 0.00 0.00 8,305 4,590 0.191 0.105 10-Y R 4883.55 4.00 0.00 0.00 9,258 5,038 0.213 0.116 10,243 6,490 0.235 0.149 4883.70 4.00 0.00 0.00 11,261 7,565 0.259 0.174 4883.80 4.00 0.00 0.00 4883.90 4.00 0.00 0.00 12,311 8,744 0.283 0.201 4884.00 4.00 0.00 0.00 13,394 10,029 0.307 0.230 4884.10 4.00 0.00 0.00 14,509 11,424 0.333 0.262 4884.20 4.00 0.00 0.00 15,657 12,933 0.359 0.297 4884.30 4.00 0.00 0.00 16,839 14,558 0.387 0.334 4884.40 4.00 0.00 0.00 18,053 16,302 0.414 0.374 100-YR 4884.50 4.00 0.00 0.00 19,300 18,083 0.443 0.415 4884.60 4.00 0.00 0.00 20,581 20,170 0.472 0.463 4884.70 4.00 0.00 0.00 21,894 22,293 0.503 0.512 4884.80 4.00 0.00 0...00 23,242 24,550 0.534 0.564 24,622 26,943 0.565 0.619 4884.90 4.00 0.00 0.00 4885.00 4.00 0.00 0.00 26,037 29,476 0.598 0.677 27,485 32,152 0.631 0.738 4885.10 4.00 0.00 0.00 28,967 34,975 0.665 0.803 4885.20 4.00 0.00 0.00 4885.30 4.00 0.00 0.00 30,482 32,032 37,947 0.700 0.871 41,073 0.735 0.943 4885.40 4.00 0.00 0.00 4885.50 4.00 0.00 0.00 33,616 44,355 0.772 1.018 4885.60 4.00 0.00 0.00 35,234 47,798 0.809 1.097 36,887 51,404 0.847 1.180 4885.70 4.00 0.00 0.00 4885.80 4.00 0.00 0.00 38,574 55,177 0.886 1.267 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 1.9 August 2022 Clear Worksheet STAGE -DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project: Calvary Farms 19-L Pad Basin ID: Basin 2 Design Point 4 WQCV Design Volume (Input): Click Here to size WQCV Perforations Catchment Imperviousness. I= 39.0 percent Catchment Area, A = 5.10 acres Diameter of holes, D = 0.500 inches Depth at WQCV outlet above lowest perforation, H = 4 feet Number of holes per row, N = 1 Vertical distance between rows, h = 6.00 inches OR Number of rows, NL = 4.00 il Orifice discharge coefficient, C°= 0.60 Height of slot, H = inches Slope of Basin Trickle Channel, S = 0.010 it /ft Width of slot, W = inches Time to Drain the Pond = 40 hours 0 0 0 0 0 0 Perforated 0 0 0 Watershed Design Information (Input): Plate Percent Soil Type A = 0 % O O O 0 0 0 Examples P o o 0 0 0 o Percent Soil Type B= 0 % O O O Percent Soil Type C/D = 100 % �- u 0 0 [- Outlet Design Information (Output): 0 0 O 0 0 0 0 0 0 0 4 Water Quality Capture Volume, WQCV = 0.229 watershed inches o 0 0 Water Quality Capture Volume (WQCV) = 0.097 acre-feet 0 O 0 Design Volume (WQCV / 12 * Area * 1.2) Vol = acre-feet 0 0 0 0 0 0 Outlet A0 0.28 inches area per row, = square You for Total opening area at each row based on user -input above, A0 = 0.20 s ' ches can override water row at the bottom quality orifice areas each of the table below. Note that Total opening area at each row based on user -input above, A0 = 0.001 square feet your override areas will be in square feet. Auto -Fill Stages To entirely block that row, enter an area of zero. Central Elevations of Rows of Holes in feet I Flow Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 4881.90 4882.40 4882.90 4883.40 Collection Capacity for Each Row of Holes in cfs 4881.80 0.0000 0.0000 0.0000 0:0000 0.00 4882.30 0.0042 0.0000 0.0000 0.0000 0.00 4882.80 0.0062 0.0042 0.0000 0.0000 0.01 4883.30 0.0078 0.0062 0.0042 0.0000 0.02 4883.80 0.0090 0.0078 0.0062 0.0042 0.03 4884.30 0.0102 0.0090 0.0078 0.0062 0.03 4884.80 0.0112 0.0102 0.0090 0.0078 0.04 4885.30 0.0121 0.0112 0.0102 0.0090 0.04 4885.80 0.0130 0.0121 0.0112 0.0102 0.05 4886.30 0.0138 0.0130 0.0121 0.0112 0.05 4886.80 0.0145 0.0138 0.0130 0.0121 0.05 4887.30 0.0153 0.0145 0.0138 0.0130 0.06 4887.80 0.0159 0:0153 0.0145 0.0138 0.06 4888.30 0.0166 0.0159 0.0153 0.0145 0.06 4888.80 0.0172 0.0166 0.0159 0.0153 0.07 4889.30 0.0179 0.0172 0.0166 0.0159 0.07 4889.80 0.0185 0.0179 0.0172 0.0166 0.07 4890.30 0.0190 0.0185 0.0179 0.0172 0.07 4890.80 0.0196 0.0190 0.0185 0.0179 0.07 4891:30 0.0201 0:0196 0.0190 0.0185 0.08 4891.80 0.0207 0.0201 0.0196 0.0190 0.08 4892.30 0.0212 0.0207 0.0201 0.0196 0.08 4892.80 0.0217 0.0212 0.0207 0.0201 0.08 4893.30 0.0222 0.0217 0.0212 0.0207 0.09 4893.80 0.0226 0.0222 0.0217 0.0212 0.09 4894.30 0.0231 0.0226 0.0222 0.0217 0.09 4894.80 0.0236 0.0231 0.0226 0.0222 0.09 4895.30 0.0240 0.0236 0.0231 0.0226 0.09 4895.80 0.0245 0.0240 0.0236 0.0231 0.10 4896.30 0.0249 0.0245 0.0240 0.0236 0.10 4896.80 0.0253 0.0249 0.0245 0.0240 0.10 4897.30 0.0258 0.0253 0.0249 0.0245 0.10 4897.80 0.0262 0.0258 0.0253 0.0249 0.10 4898.30 0.0266 0.0262 0.0258 0.0253 0.10 4898.80 0.0270 0.0266 0.0262 0.0258 0.11 4899.30 0.0274 0.0270 0.0266 0.0262 0.11 4899.80 0.0278 0.0274 0.0270 0.0266 0.11 4900.30 0.0282 0.0278 0.0274 0.0270 0.11 4900.80 0.0285 0.0282 0.0278 0.0274 0.11 4901.30 0.0289 0.0285 0.0282 0.0278 0.11 4901.80 0.0293 0.0289 0.0285 0.0282 0.11 4902.30 0.0297 0.0293 0.0289 0.0285 0.12 4902.80 0.0300 0.0297 0.0293 0.0289 0.12 4903.30 0.0304 0.0300 0.0297 0.0293 0.12 ASCENT GEOMATICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 110 August 2022 Clear Worksheet REST RICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: Calvary Farms 19-L Pad Basin ID: Basin 2 Design Point 4 UDFCD: A restrictor plate is placed over the upper portion of an outlet pipe or circular vertical orifice to limit the flow at a prescribed headwater depth. The remaining open area is then evaluated as an equivalent rectangular vertical orifice. Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Water Surface Elevation at Design Depth PipeNertical Orifice Entrance Invert Elevation Required Peak Flow through Orifice at Design Depth PipeNertical Orifice Diameter (inches) Orifice Coefficient Full -flow Capacity (Calculated) Full -flow area Half Central Angle in Radians Full -flow capacity Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Flow area Top width of Orifice (inches) Height from Invert of Orifice to Bottom of Plate (feet) Elevation of Bottom of Plate Resultant Peak Flow Through Orifice at Design Depth Elev: WS = Elev: Invert= Q= Dia = Co = Af= Theta = Qf = Percent of Design Flow = Theta = A0 = To = Y0= Elev Plate Bottom Edge = Q0 _ #1 Vertical Orifice #2 Vertical Orifice 4,885.00 4,881.70 2.90 12.0 0.61 0.79 3.14 6.4 222% t46 0.34 11.93 0.45 4,882.15 2.9 feet feet cfs inches sgft rad cfs rad sgft inches feet feet cfs ASCENT 6EOMAlICS SOLUTIONS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 111 August 2022 PRODUCTION PHASE Water Quality Capture Volume (WQCV) Imperviousness I 39.00% BMP coefficient a 1.0 Watershed area A 5.10 ac Water Quality Capture Volume WQCV 0.1772 -in watershed Required storage volume VR 0.0753 ac -ft 3,280 ft^3 Design Volume VD 0.0904 ac -ft 3,936 ft^2 Spillway Weir Calculation Discharge Weir Coefficient Depth of flow through weir Side slope of weir (H:V) Minimum Length of Weir Q CBCW H Z 13.4 cfs 3.0 6.0 in 4.0 L I 11.0 ft ASCENT GEOMATICS S�GLLIVIOWS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page 112 August 2022 Outlet Pipe Maximum Capacity Manning Roughness Coefficient n 0.013 12 in Diameter D Slope S 0.0081 Area A 0.785 ft^2 flow) R 0.250 ft Hydraulic Radius (full Maximum Flow Rate Q 3.22 cfs Outlet Pipe Maximum Protection - Production Phase Design Discharge Q 2.9 ft^3/s Allowable Velocity V 3.0 ft/s 11 Number of Barrels 1 Pipe Inside Diameter (in) D 12 in Pipe Inside Diameter(ft) D 1.n ft Froude Parameter Q;/D2.5 2.90 Qi/D1.s 2.90 Tailwater Depth (If known) Yt ill Calculated Tailwater Depth (If unknown) Yt 0.40 ft Depth / of Water YJD 0.4 Tailwater Depth Expansion Factor 1/(2tan A) 4.5 11 Area of flow At 1.0 ft^2 Riprap Design Type iu L D50 9 in Depth of Protection HP 18 in Length of Protection LP 6ft Width of Protection T aft OK OK 7r --r ASCENT GEOMATICS S�GLLIVIOWS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page J.1 August 2022 APPENDIX J - HYDRAULIC CALCULATIONS Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: Calvary Farms 19-L Pad Basin 1 - Design Point 2 - Channel 1 (Q1oo = 6.42cfs) F T Z1 T III B 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So = n- B= Z1 - Z2 F= Y= 0.0050 0.030 2.00 4.00 4.00 1.00 0.68 ft/ft ft ft/ft ft/ft ft ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q- Fr V= A= R- D= Es Yo Fs 6.42 0.53 1.98 3.24 7.47 7.64 0/12 0.43 0.74 0.27 0.08 cfs fps sgft ft ft ft ft ft ft kip Clear ASCENT GEOMATICS aflur!OMS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page J.2 August 2022 Channel 1 Outlet Protection Design Discharge Q 6.4 ft^3/s Allowable Velocity V ii 3.0 ft/s Width of Channel (at H/2) W 6.0 ft Design Water Depth 1.7 ft H Froude Parameter Q/WH1.5 Q/WH° 5 0.82 Depth (If known) Yt iii Tailwater Calculated Depth (If unknown) Yt 0.68 ft Tailwater Depth / Depth of Water Yt/H 0.4 Tailwater Expansion Factor 1/(2tan e) 6.6 Area of flow At 2.1 ft^2 Riprap Design ii L Type D50 gin Depth of Protection HP 18 in Length of Protection LP -19 ft Width of Protection 8ft T Use Lp=6H 10ft Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page J.3 August 2022 Normal Flow Analysis - Trapezoidal Channel Project: Channel ID: Calvary Farms 19-L Pad Basin 1 - Design Point 3 - Channel 2 (Qioo 4.87cfs) F It' 1I X 1 1 1 1 5.' T Z1 } B Zi 1 Design Information (Input) Channel Invert Slope Manning's n Bottom Width Left Side Slope Right Side Slope Freeboard Height Design Water Depth So n B Z1 Z2 F Y 0.0050 0.030 2.00 4.00 4.00 1.00 0.60 ft/ft ft ft/ft ft/ft ft ft Normal Flow Condtion (Calculated) Discharge Froude Number Flow Velocity Flow Area Top Width Wetted Perimeter Hydraulic Radius Hydraulic Depth Specific Energy Centroid of Flow Area Specific Force Q= Fr = V= A= T= D= Es Yo Fs 4.87 0.52 1.84 2.64 6.80 6.95 0.38 0.39 0.65 0.24 0.06 cfs fps sgft ft ft ft ft ft ft kip Clear C. ASCENT GEOMATICS aflur!OMS Calvary Farms 19-L Pad: Final Drainage Report Document FDR 01 Rev A Page J.4 August 2022 Channel 2 Outlet Protection Design Discharge 0 4.9 ft"3/s Allowable Velocity V 3.0 ft/s 1 Width of Channel (at H/2) W 6.0 ft Design Water Depth H 1.6 ft Froude Parameter WWH1.5 0.40 OJWH°'5 0.64 Tailwater Depth (If known) Yt 1 Calculated Depth (If unknown) Yt 0.64ft Tailwater Tailwater Depth / Depth of Water Yt/H 0.4 Expansion Factor 1/(2tan 0) 1 6.6 Area of flow At 1.6 ft"2 Riprap Design Type L D50 9in Depth of Protection Hp 18 in Length of Protection LP -23 ft Width of Protection T 8ft OK Use Lp = GH 10 ft OEOMATICS SOLUTIONS RAEJANNA CHURCH Ascent Geomatics Solutions 8620 Wolff Court Westminster, Colorado 80031 SUBSURFACE EXPLORATION AND GEOTECHNICAL DATA REPORT CALVARY FARMS PAD WELD COUNTY, COLORADO AUGUST 2, 2022 INBERG-MILLER ENGINEERS 300 East 16th Street Suite 305 Greeley, CO 80631 (970) 373-0009 www.inberg-miller.com INBERG-MILLER ENGINEERS Greeley Casper Cheyenne I Douglas I Gillette Green River Riverton August 2, 2022 22876-FX PDF REPORT EMAILED: RCHURCH@ASCENTGEOMATICS.COM THIS CONSTITUTES THE ORIGINAL Raejanna Church Ascent Geomatics Solutions 8620 Wolff Court Westminster, Colorado 80031 RE: SUBSURFACE EXPLORATION AND GEOTECHNICAL DATA REPORT CALVARY FARMS PAD WELD COUNTY, COLORADO Dear Ms. Church: This letter transmits our Subsurface Exploration and Geotechnical Data report for the above - referenced project. The work described in this report has been completed in accordance with our Statement of Work dated June 20, 2022. It has been a pleasure participating in this project. Additional services we could provide include: • environmental assessment • civil engineering • plan and specification review • surveying • construction materials testing • observation of excavations and earthwork If you have any questions or comments, please contact us at (970) 373-0009. \ Sincerely, INBERG-MILLER ENGINEERS L Rami Ksaibati, P.E., M.S. Office Manager/Geotechnical Engineer REVIEWED BY Derek Baker, P.E.,P.G. Vice President/Geotechnical Engineer RAK:DJB:bjs\\EgnyteDrive\Projects\22876-FX ASCENT GEOMATICS SOLUTIONS Calvary Farms Pad\Geotech\22876-FX Calvary Farms Pad Subsurface Data Report.docx Enclosures as stated O Civil I Geotechnical 0 Environmental I Materials Testing I Surveying I Drilling Scan the QR Code using your mobile device to learn more about our services. r�' . 3 exit . O O Calvary Farms Pad/ Ascent Geomatics Solutions 22876-FX TABLE OF CONTENTS 1.0 INTRODUCTION......OOOOOOOOOOOO.......................................................®.a.®...®.......................... 1 1.1 PURPOSE AND SCOPE OF SERVICE 1 2.0 CONDITIONS 000060000....006.6.....00000.....00060000....006.6.....00000....000060000....006.6.....00000.....6006006.....006. 1 2.1 SITE DESCRIPTION 2.2 FIELD EXPLORATION 1 2.3 LABORATORY TESTING PROGRAM 2 2.4 SOIL/ROCK CONDITIONS 2 2.5 GROUNDWATER CONDITIONS 2 2.6 SITE DRAINAGE 3 2.7 CONSTRUCTION CONSIDERATIONS 3 3.0 4.0 5.0 TECHNICALDATA.......................................................................................................... STANDARD REPORT INFORMATION ...........6006000.6006006.6006006.6006006.6006000.6006006.6006006......... 4 CL O S U R E 6 0 0 6 .... 6 0 0 6 0 0 6 .... 6 0 0 6. 6 0 ... 0 0 0 6 0 0 6 .... 6 0 0 6 0 0 6. 6 0 0 6 0 0 6. 6 0 0 0 0 0 0 0 6 0 0 6 0 0 6. 6 0 0 6 0 0 6. 6 0 0 6 0 0 6. 6 0 0 0 0 0 0 0 6 0 0 6 0 0 6. 6 0 0 6 0 0 6. 6 0 0 6 0 0 6. 4 APPENDICES Appendix A - FIELD EXPLORATION Sample and Data Collection Information Site and Exploration Location Map Test Boring Logs Appendix B - LABORATORY TESTING Laboratory Testing Program Laboratory Test Reports Appendix C - TERMINOLOGY, CONVENTIONS AND REPORT INFORMATION Glossary General Notes Classification of Soils for Engineering Purposes Important Information about your Geotechnical Data Report 4 INBERG-MILLER ENGINEERS ii August 2, 2022 Calvary Farms Pad/ Ascent Geomatics Solutions 22876-FX 1.0 INTRODUCTION 1.1 PURPOSE AND SCOPE OF SERVICE Inberg-Miller Engineers was requested by Ascent Geomatic Solutions to perform a subsurface exploration and prepare this geotechnical data report for the purpose obtaining subsurface soil and groundwater information for construction of the proposed new Calvary Farms Pad. Details regarding permanent or temporary structures and utility of the pad were not provided to Inberg-Miller Engineers. Geotechnical engineering analyses and recommendations were not requested and are not part of our scope of services. Our specific scope of service is described by our Statement of Work dated June 20, 2022. 2.0 CONDITIONS 2.1 SITE DESCRIPTION The proposed new pad is located approximately 1/2 mile south of the intersection of County Road 39 and County Road 80 in Weld County, Colorado. The overall ground surface of the site slopes down gently towards the west. The site is bordered by an existing pad on the south side and undeveloped plowed agricultural fields on the other sides. A reservoir is located within 150 feet northwest of the proposed pad. The ground surface is covered by light growth of native grasses and plowed soil. 2.2 FIELD EXPLORATION The fieldwork was performed using a CME B-55 truck -mounted drilling rig at the site on June 25, 2022. A total of 2 test borings were advanced to depths approximately 15 feet below ground surface (bgs). Drilling was performed using Solid -Stem Auger Drilling and field sampling were performed according to the following standard specifications: a) "Standard Practice for Soil Investigation and Sampling by Auger Borings,"ASTM D1452. b) Sampling with a 2 -inch O.D., split -barrel (split -spoon) sampler per ASTM D1586, "Penetration Test and Split -Barrel Sampling of Soils." Standard penetration test blow counts were obtained by driving a 2.0 -inch -diameter split -spoon sampler into the soil using an automatic hammer that drops a 140 -pound hammer a distance of 30 inches. The SPT N -value is the blow count for 12 inches of sampler penetration. N -values are correlated to soil relative density, hardness, strength and a variety of other parameters. c) Sampling with a 2.41 -inch I.D., split -barrel Dames and Moore sampler per ASTM D3550 "Standard Practice for Thick Wall, Ring -Lined, Split Barrel, Drive Sampling of Soils". Sampling was performed using an automatic hammer as described above. N -value shown on the test boring logs is the blow count for 12 inches of sampler penetration. SPT N -value is generally correlated to equal roughly 60% of the Ring -Lined Sampler N - value. INBERG-MILLER ENGINEERS 1 August 2, 2022 Calvary Farms Pad/ Ascent Geomatics Solutions 22876-FX The soil samples were field classified by a geotechnical engineer visually in accordance with ASTM D2487, sealed in containers to prevent loss of moisture, and returned to our laboratory. They were then reviewed by the geotechnical engineer to assign appropriate laboratory testing prior to the preparation of this report. A field log was prepared for each boring during drilling. LABORATORY TESTING PROGRAM As requested, the following laboratory soil tests were performed: 1. Moisture Content (ASTM D2216) 2. In -Situ Density (ASTM D2937) 3. Sieve Analysis (ASTM D422) 4. Atterberg Limits (ASTM D4318) 5. Moisture -Density Relationship (ASTM D698) TESTS 12 2 3 3 1 The sieve analyses and moisture -density relationship test results are presented graphically in Appendix B. A final log for each boring was prepared containing the work method, samples recovered, and a description of soils encountered. All other test results are arrayed on the final logs in Appendix A. 2.4 SOIL/ROCK CONDITIONS A summary of soil conditions that were encountered and recorded on the logs is provided below. For a more detailed description of conditions refer to the test boring logs and drilling plan presented in Appendix A. Soil classification laboratory test results indicate a USDA hydrological soil classification of Soil Group C was encountered at our test boring locations. Permeability testing would be required to confirm this soil group is correct. USCS Classification Density/Consistency Boring Occurrence Vertical Limits Below Ground Surface TOPSOIL: Clayey SAND Silty Sand and Clayey SAND CLAY Interbedded Shale and Sandstone SC SC, SM CL N/A Loose to Medium Dense Loose to Medium Dense Firm to Very Stiff Weathered to Hard All All All B-1 12" to 14" from ground surface See Logs 1'to 10' Varies, See Logs 71/z' to 16W Varies, See Logs 15' to 161/2' 2.5 GROUNDWATER CONDITIONS A summary of groundwater observations and measurements that were made during the subsurface exploration are provided below. Additional details are documented on the test boring logs presented in Appendix A. INBERG-MILLER ENGINEERS 2 August 2, 2022 Calvary Farms Pad/ Ascent Geomatics Solutions 22876-FX Boring Groundwater Depth bgs No. Measured During Drilling B-1 B-2 Groundwater Depth bgs Measured After Drilling Date 71/2 feet 6 feet 6/25/2022 71/2 feet 7 feet 6/25/2022 Groundwater conditions could change with seasonal or long-term changes in climatic conditions and post -construction changes in irrigation and surface water runoff. Generally, developed sites have a significantly greater volume of water available to percolate into the ground due to irrigation and storm water runoff from hard surfaces. Localized, perched groundwater tables may develop above clay layers or bedrock, or within the foundation backfill zone. SITE DRAINAGE Consistent with the International Building Code (IBC), the ground surface adjacent to structures should be sloped a minimum of 5% away from foundations within 10 feet of the structure. If the slope adjacent to the structure is paved with asphalt or concrete, the slope can be reduced by 2%. Slope the ground surface beyond 10 feet of the structure at least 2% away to pavement, ditch, or other positive drainage system. Negative drainage and improper management of near -surface water by not providing an effective grading and drainage design, can result in moisture entering structure subgrade soils. Sources of near surface water may include pressurized irrigation and water supply lines, rainwater, snowmelt, and roof drains. Downspouts and roof drains should discharge at least 5 feet away from the structure when the ground surface beneath such drains is not protected by exterior slabs or paving. Landscape irrigation within 10 feet of the structure perimeter should be minimized or eliminated where positive drainage away from the structure cannot be assured. Backfill against the footings and exterior walls and in utility trenches should be well compacted to reduce the potential for moisture infiltration. 2.7 CONSTRUCTION CONSIDERATIONS Excavations should be sloped, benched, shored, or made safe for entry by use of trench boxes as required by the standards of 29 CFR Part 1926. The contractor is solely responsible for designing and constructing stable excavations. Furthermore, the contractor's "responsible person" should continuously evaluate the soil exposed in the excavations, the geometry of the excavation slopes, and the protective equipment and procedures employed by his forces. For the sole purpose of project planning, we recommend that silty and clayey sand be considered an OSHA Type C soil with a corresponding Maximum Allowable Slope of 1 1H:1V. Excavations, including utility trenches, extending to depths of greater than 20 feet are required to have side slopes, trench boxes, or shoring designed by a professional engineer. Exterior slabs and foundations are subject to frost heave due to formation of ice lenses in underlying frost susceptible soils. The frost line depth according to the Weld County Design Criteria is 30 inches. INBERG-MILLER ENGINEERS 3 August 2, 2022 Calvary Farms Pad/ Ascent Geomatics Solutions 22876-FX Laboratory test results of average in -situ density when compared with the maximum dry density test result indicate a shrinkage of approximately 5% to 10% will occur from in -situ to post -compaction conditions. The actual shrinkage could vary significantly depending on actual post -compaction density achieved. For estimating purposes, the Federal Highway Administration recommends assuming dry sand, similar to soils encountered at the site, will expand approximately 11% from in -situ density to loose density for transport or stockpiles. 3.0 TECHNICAL DATA Our Sample and Data Collection Information, Drilling Plan, and Test Boring Logs are included in Appendix A. 4.0 STANDARD REPORT INFORMATION Our Field and Laboratory Testing Program and Testing Data (laboratory reports) are included in Appendix B. Our Standard Report Information, including Terms and Definitions, Limitations, and Comments Form are included in Appendix C. 5.0 CLOSURE This report has been prepared for the exclusive use of our client, Ascent Geomatics Solutions, for evaluation of the site, design, and construction planning purposes of the described project. All information referenced in the Table of Contents, as well as any future written documents that address comments or questions regarding this report, constitute the "entire report." Inberg-Miller Engineers' conclusions, opinions, and recommendations are based on the entire report. This report may contain insufficient information for applications other than those herein described. Our scope of services was specifically designed for and limited to the specific purpose of providing geotechnical recommendations for the design of the proposed Calvary Farms Pad project. Consequently, this report may contain insufficient information for applications other than those herein described. The readers of this geotechnical data report should realize that subsurface variations and anomalies can and will exist across the site and between the test borings. The readers should also realize that site conditions will change due to the modifying effects of seasonal, climatic and construction conditions. We appreciate participating in your project. We can offer services under a separate contract to provide environmental engineering services, review final plans and specifications, field and laboratory construction materials testing, and observe excavations, as may be required. Please call us at (970) 373-0009 if you have any questions regarding this report. INBERG-MILLER ENGINEERS 4 August 2, 2022 Appendix A SAMPLE AND DATA COLLECTION INFORMATION Field -sampling techniques were employed in this exploration to obtain the data presented in the Final Logs and Report generally in accordance with ASTM D420, D1452, D1586 (where applicable), and D1587 (where applicable). The drilling method utilized in most test borings is a dry -process, machine rotary auger type that advances hollow steel pipe surrounded by attached steel auger flights in 5 -foot lengths. This method creates a continuously cased test hole that prevents the boring from caving in above each level of substrata to be tested. Sampling tools were lowered inside the hollow shaft for testing in the undisturbed soils below the lead auger. In some test borings, as appropriate to advance to the desired depth, air or wash rotary drilling methods were utilized. Air or wash rotary drilling methods allow for the extraction of rock core samples. Samples were brought to the surface, examined by an IME field representative, and sealed in containers (or sealed in the tubes) to prevent a significant loss of moisture. They were returned to our laboratory for final classification per ASTM D2487 methods. Some samples were subjected to field or laboratory tests as described in the text of this report. Groundwater observations were made in the open drill holes by IME field personnel at the times and dates stated on the Final Logs. Recorded groundwater levels may not reflect equilibrium groundwater conditions due to relatively low permeability of some soils. It must also be noted that fluctuations may occur in the groundwater level due to variations in precipitation, temperature, nearby site improvements, nearby drainage features, underdrainage, wells, severity of winter frosts, overburden weights, and the permeability of the subsoil. Because variations may be expected, final designs and construction planning should allow for the need to temporarily or permanently dewater excavations or subsoil. A Final Log of each test pit or boring was prepared by IME. Each Final Log contains IME's interpretation of field conditions or changes in substrata between recovered samples based on the field data received, along with the laboratory test data obtained following the field work or on subsequent site observations. The final logs were prepared by assembling and analyzing field and laboratory data. Therefore, the Final Logs contain both factual and interpretive information. IME's opinions are based on the Final Logs. The Final Logs list boring methods, sampling methods, approximate depths sampled, amounts of recovery in sampling tools (where applicable), indications of the presence of subsoil types, and groundwater observations and measurements. Results of some laboratory tests are arrayed on the Final Logs at the appropriate depths below grade. The horizontal lines on the Final Logs designate the interface between successive layers (strata) and represent approximate boundaries. The transition between strata may be gradual. We caution that the Final Logs alone do not constitute the report, and as such they should not be excerpted from the other appendix exhibits or from any of the written text. Without the written report, it is possible to misinterpret the meaning of the information reported on the Final Logs. If the report is INBERG-MILLER ENGINEERS reproduced for reference purposes, the entire numbered report and appendix exhibits should be bound together as a separate document, or as a section of a specification booklet, including all drawings, maps, etc. Pocket penetration tests taken in the field, or on samples examined in the laboratory are listed on the Final Logs in a column marked "qp." These tests were performed only to approximate unconfined strength and consistency when making comparisons between successive layers of cohesive soil. It is not recommended that the listed values be used to determine allowable bearing capacities. Bearing capacities of soil is determined by IME using test methods as described in the text of the report. INBERG-MILLER ENGINEERS Ascent Geomatics Solutions - Calvary Farms Pad 22876-FX 40.561111° Site Location Map -104.698889° +IfF •:�. - l.i �,/r �'. f: it yY� .f1. •i-J . r v♦!.♦ 'r f7 ��ihpyy 1 J l 1�'T t- ! iii. JohnsN n Milliken >l 1. ., �. •4 d Or' -104.697778° r- ♦ - r. • r • r ( I 4 , :.Tr • Nom. tidf- r11 r . 1 1 _ - i .+ al Syr ? tul ; r ,./' -.- -•_-' ..�'. . .1,� •0 —- - • l .r.1 - — • 1*_;rj{,r'- • •,. .. `fir . •#-_�• - f►t-t iwt - • ♦ f i s• , r r ..I a T ♦ •• J • � x.r� +7`• w_' fr2.i t 1t' •t'• ♦ rf . 1 4_ •..l• 1• . s • "re. ��s � C•1� .r .L• :.fir • , 7 r,• . , _ _•►._ +. - .. :� : ,r . `.• 4n1� 1 till e .�1 . �' -� .~ y_ •� .t .'L,71. .7.r v+vr #7 •_.f�•• .. '..• -1 �w.-. Ai1•�I ' �M" s.• r I • ..17 ft: • f �r ` s e .• . a , atF • r • . I' 7 �ji - 1 -, -_-` ires�♦,�= ......! _tom p, ,r ■ ` y• Lags t• rj _ ��" •... . j 'I .t'"'' ' , • >1" :z -104.696667° r , 7, .YJI • -tom af. ��, �' sue, N -++ Cg t 556° Service Layer Credits: Sources: Esri. HERE. Garmin. USGS. Intermap. INCREMENT P. NRCan. Esri Japan. METI, Esri China (Hong Kong). Esri Korea. Esri (Thailand). NGCC. (c) OpenStreetMap contributors. and the GIS User Community Source: Esri, DigitalGlobe. GeoEye. Earthstar Geographies, CNES/Airbus DS. USDA. USGS. AeroGRID. IGN, and the GIS User Community INBERG-MILLER ENGINEERS Date: 8/1/2022 N N CO cR O N J J CO z 0 C7 I- z C3 x U- N- co N cr H 0 H w O m H w O 0 J -�on.LER ENGI ►e, TEST BORING B-1 Page 1 of 1 ,c.s I Project: Calvary Farms Pad Job No.: 22876-FX 0,,,„/r \ i Location: Weld County, Colorado Client: Ascent Geomatics Solutions /raUr. R��o��'° 40.56085°, -104.69837° C1 /O I '' / , ' j' ///..)///, f� ,' Q N / e / lt✓Q 1 / WATER CONTENT/ � %' � ,rW��v BLOWS � /� \ % , ,/� 4/ �,- SOIL ' DESCRIPTION / T ,,Q:O /' C�J'g4w � PER ��Z' j - ;1� � o PL LL C3 O° �� OTHER TESTS (v" r ' ��/t - -, /' Surface Elevation (Ft): ;' ''� Ft / % j ,�' ;` ,' ,' AND NOTES r 0 TOPSOIL: Brown, Clayey 12 INCHES SAND, Moist, with roots,' 0 0 50 100 0 53 47 0 20 40 60 Dry LL=NP PL P1=NP = Density NP = 104.9 pct 11 8 8 15 N- Medium SAND Dense, Moist, Gray, Silty T5 .,; :~ /\ 21 32 IC A 21 22 / \ Firm CLAY, - to Very with becomes ferrous dark Stiff, gray Moist, stains Gray, 15.0 r / 10 V r M \ 13 o 25 15 Weathered Sandstone Gray, Interbedded to Hard, Moist, Shale Brown\1(and and 16.5 50/3" 20 Remarks: Date Date Termination Crew: Rig: Method: Benchmark/Datum Begun: Completed: Depth 6/25/22 6/25/22 (ft): 16.5 TJM, Solid (Ft): CME-55 JP -Stem Auger SAMPLE TYPES WATER LEVEL OBSERVATIONS X Standard Y While Penetration Test Drilling (ft) 7.5 e End of Drilling(ft) 6 Drive Sampler, 2.41-I.D. Depth to Cave In (Ft): 7 0 c9 I- z C3 x U- N- co cr N H 0 H w 0 m H w 0 0 J ENCI ►S, TEST BORING B-2 Page 1 of 1 ,G.GGemiLLER I Project: Calvary Farms Pad Job No.: 22876-FX \ i Location: Weld County, Colorado Client: Ascent Geomatics Solutions „/raUr. R��o��'° 40.56075°, -104.69756° C1 I ' , j / ' //..)71. C � ,' Q 4 ' N / Q //JWATER CONTENT/ � fr / %',�% BLOWS /� \ , ,/� 4O �,- SOIL DESCRIPTION / T ,,Q/O /' C�J'g4w PER ��Z' ,j �- ;1� Jcz o PL LL C3 0° �� OTHER TESTS (v" r` ' ��/t - -, /' Surface Elevation (Ft): ;' �''� Ft / % j ,�' ;` ,' ,' AND NOTES r 0 TOPSOIL: Brown, Clayey 14 INCHES SAND, Moist, with roots 1.2 0 50 100 1 1 52 5 46 94 0 20 40 60 SC LL= PL=13 P1= Dry CL LL= PL= P1= 23 10 Density 41 13 28 = 101.6 pcf 7 8 11 A .N - ,.; . Loose to Brown, Clayey Medium SAND Dense, Moist, 10.0 . °+ / 14 )(\/ 26 22 27 V 10 l 1 Firm Gray, - to CLAY, becomes Very Stiff, with sandy ferrous and Moist, gray Dark stains 16.5 % 12 `' x A 21 15 /I 23 20 II Remarks: Date Date Termination Crew: Rig: Method: Benchmark/Datum Begun: Completed: Depth 6/25/22 6/25/22 (ft): 16.5 TJM, Solid (Ft): CME-55 JP -Stem Auger SAMPLE TYPES WATER LEVEL OBSERVATIONS X Standard Y While Penetration Test Drilling (ft) 7.5 e End of Drilling(ft) 7 Drive Sampler, 2.41-I.D. Depth to Cave In (Ft): 8 Appendix B LABORATORY TESTING PROGRAM Soil samples were transported to our laboratory where they were subject to further evaluation, which may include visual classification according to ASTM D2488 or other analysis to determine certain engineering properties. Tests were performed in accordance with the test methods listed below. Laboratory Test Moisture Content Liquid Limit, Plastic Limit and Plasticity Index Sieve Analysis Sieve Analysis with Hydrometer Sieve Analysis (200 Sieve only) Water Soluble Sulfate Unconfined Compressive Strength Moisture -Density Relationship (Standard Proctor) Moisture -Density Relationship (Modified Proctor) California Bearing Ratio (CBR) Hydraulic Conductivity Minimum Resistivity pH Tube Density Direct Shear Consolidation -Swell Test Method ASTM D2216 ASTM D4318 ASTM C117 ASTM D422 ASTM D1140 Comparative ASTM D2166 ASTM D698 ASTM D1557 ASTM D1883 ASTM D5084 AASHTO T288 AASHTO T288 ASTM D2937 ASTM D3080 ASTM D2435 Test results that are not displayed on the test boring logs are presented in Appendix B of this report. INBERG-MILLER ENGINEERS Moisture -Density Analysis lnberg-Miller Engineers 350 Parsley Boulevard Cheyenne, WY 82007 Ph: (307) 635-6827 Fax: (307) 856-3851 cheyenne@inberg-miller.com CeeeMfity sa Yeer44_ 1971 - 2021 Client: Ascent Geomatics Solutions Address: 8620 Wolff Court Westminster, CO 80031 Attention: Raejanna Church IME Project No: 22876-FX Project Name: Calvary Farms Project Location: Weld County, Colorado Sample Location/ID: IME Sample No: 22876-01 Sampled By: TJM & JP Sample Date: 6/25/2022 Date Received in Lab: 6/25/2022 Type of Material: Native Source: Test Boring B-1 and 2 auger cuttings Sample Description: Brown, f/m, clayey -sand ASTM Method: D698 - A Tested By: EBR Test Date: 7/6/2022 140 130 - - Lines of 100% Saturation Gs=2.6 Gs=2.7 Gs=2.8 Ak,Ji20 ® 110 100 90 0% 5% 10% 15% Moisture Content 20% 25% OPTIMUM MOISTURE CONTENT (%) MAXIMUM DRY DENSITY (PCF) 14.8 110.8 US_GRAIN_SIZE 22876-FX GINT.GPJ US_LAB GDT 811122 U.S. SIEVE OPENING IN INCHES I 6 4 3 2 1.5 1 4 1 /2 3 8 .... U.S. 3 6 $10 1416 - SIEVE NUMBERS 20 30 40 50 60 100 140 I 200 HYDROMETER __ 100 . ro: 95 : �, 90 85 PERCENT FINE ., 100 10 GRAIN SIZE 1 IN MILLIMETERS 0.1 0.01 0.001 GRAVEL SAND COBBLES coarse fine coarse medium fine SILT OR CLAY Specimen Identification Classification LL PL PI Cc Cu e B-1 5.0 B-2 2.5 CLAYEY SAND(SC) 23 13 10 o ® B-2 10.0 LEAN CLAY(CL) 41 13 28 Specimen Identification D100 D60 D30 D10 %Gravel %Sand %Silt %Clay e B-1 5.0 4.75 0.102 0.0 53.0 47.0 B-2 2.5 19 0.099 1.4 52.4 46.3 o ® B-2 10.0 9.5 0.7 5.4 94.0 PROJECT: JOB CLIENT:. TEST NO.: METHOD: Ascent 22876-FX Calvary Geomatics ASTM Farms D422 Pad Solutions PARTICLE SIZEANALYSES INBERG-MILLER ENGINEERS Appendix C GLOSSARY Definition of certain words, terms or phrases that are used in this report are provided below, to help the reader to interpret the intent of lnberg Miller Engineers. These definitions: 1. May differ from other published versions 2. Have not been vetted by any organization outside of Inberg-Miller Engineers 3. May not present a complete understanding of the term The reader is encouraged to seek additional interpretation of important terms and consult with lnberg- Miller Engineers as necessary where discrepancies may be discovered, or a definition has not been provided. Active Lateral Soil Pressure - Horizontal pressure applied by soil to a wall that sufficiently yields or rotates about its base to allow the full soil shear strength to be mobilized Allowable End Bearing Pressure - Recommended maximum pressure on soil or rock expressed as load per unit area that can be applied across the full bottom bearing surface of a pier or pile deep foundation within a given settlement tolerance Allowable Skin Friction - Recommended maximum frictional resistance of soil or rock as load per unit area that can be applied over the vertical side surface of a pier or pile deep foundation within a given settlement tolerance. Alluvium - Soil that has been transported and deposited in a moving water environment At -Rest Lateral Soil Pressure - Horizontal pressure applied by soil to a wall or the vertical face of a structure that is restrained from movement and soil is not allowed to deform Backfill - Soil that is used to replace some or all of soil that was excavated, and is usually subject to material specifications and density requirements Base - Either 1: the bottom surface of a structure or excavation, or 2: soil or aggregate that is placed immediately below a structure or pavement Bearing Elevation - A subsurface level where the base of foundations rest and transmit applied load to the soil or rock Bearing Stratum - A specific soil layer defined by soil description and depth below ground surface, or elevation, to which foundations transmit applied load Claystone - Consolidated sedimentary bedrock comprised chiefly of clay sized particles Collapse - Loss of inter -particle soil friction, usually as a result of the effects of excessive moisture or water, and often leading to large subsidence or settlement of supported structures Colluvium - Soil that has accumulated as a result of gravitional transport, commonly found near the base of slopes Compaction/Compacted - Process or the result of a process where soil density is increased, soil voids are decreased, and usually resulting in an increased strength and reduced settlement potential INBERG-MILLER ENGINEERS 1 Compressibility - Relative term applied to soil or soil layer to describe how much it may yield to expected applied load or pressure Conglomerate - A mixture of clay through gravel -size particles, commonly cemented with calcium carbonate Consistency - Term applied to cohesive soils to describe relative stiffness, often defined by either ASTM D1586 Standard Test Method for Standard Penetration Test (SPT) and Split -Barrel Sampling of Soils or as indicated by unconfined compressive strength Continuous Footing - A long narrow footing usually supporting a linear structure such as a wall. Length to width ratio may vary but is commonly taken as 10. Contraction Joints - Formed or sawn joints in concrete slabs or pavements used to control crack patterns that result from thermal contraction or shrinkage Crushed Aggregate Base - Processed gravel at a specified grading and quantity of fractured faces, and sometimes certain durability requirements, that is used below slabs or pavements Cut - Term applied to the volume or depth of soil that has been excavated to a certain design grade Cut Slope - Soil or rock slope that results from cut or excavation Density - The weight of soil for a unit volume, which may be stated in a dry condition, or a moist to saturated condition with weight of water included Dewatering - Process of removing water from an excavation or lowering the groundwater elevation usually via drains or pumps Differential Settlement - The difference in subsidence of a soil surface, or structure resting on soil, between two points spaced a certain distance apart Disturbed Soil - Soil that has been loosened usually as a result of excavation activity, traffic, vibration Embedment - The portion of a structure buried within a specific stratum, usually measured as a vertical distance Engineered Fill - Soil that meets a specific gradation criteria and/or other quality requirements and that is placed at a specified thickness and moisture content and compacted to meet certain minimum density requirements, for the purpose of consistently obtaining certain minimum engineering properties for design Envelope A - Specified gradation criteria that describes reasonably well graded sand and gravel mixtures, with less than 20 percent silt and clay. ESAL - Criteria that describes traffic loading equivalent to a certain number of passes from an 18 kip single axle Excavation Subgrade - The bottom of an excavation Expansion Joints - joints that are formed in a concrete pavement or slab that allow for thermal expansion of the concrete. Joints are usually filled with an elastic material to prevent entry of foreign particles Factor of Safety - A multiplier for recommended allowable values that provides a margin for safety against failure, considering uncertainty and risk Fill - Soil or rock that has been placed to raise the ground surface elevation INBERG-MILLER ENGINEERS 2 Footing/Foundation Subgrade - The surface of soil or rock to receive a structure which is usually a reinforced cast - in -place concrete Friction Angle - A measure of physical resistance against sliding between soil or rock particles, usually ranging between 0 and 45 degrees Frost Heave - A phenomenon that occurs in certain soil types where soil -moisture may concentrate and freeze as ice layers, causing upward swelling of the soil Frost Protection - Any measure used to prevent frost -heave from affecting a structure Frost Susceptibility - Soil types that are prone to frost heave Geotechnical Engineer - An engineer trained through education and experience in soil mechanics and earth - structure systems Grade Beam - A horizontal structural element that spans between foundations which may carry a portion of load from a structure above, but usually doesn't rely upon support from the soil below Heave - The upward swelling of soil or rock, usually as a result of freezing or moisture adsorption Helical Screw Pile/Pier - A foundation type that consists of a steel shaft with steel helices welded to the shaft, so that the system will pull itself into the ground when torque is applied Hydraulic Conductivity - The rate at which water passes through soil under a certain pressure, usually expressed in the units of centimeters per second Hydrostatic Pressure - The hydraulic pressure at a certain depth below the surface of a water body or water in saturated soil equivalent to the weight of water multiplied by the depth Isolated Pad Footing - A single footing for the support of a leg, column, stanchion or other vertical structural element Lifts - Layers of material that are placed as fill, backfill or pavement Mat Foundation - A large, shallow spread footing that may support any combination of multiple point or area loads Maximum Allowable Bearing Pressure - The recommended maximum pressure that may be applied to soil or rock, including a factor of safety, within estimated settlement tolerances Maximum Dry Density - The peak soil density that is determined in a laboratory using a drop -hammer and mold over a range of varying moisture contents, expressed in terms of dry weight per unit volume Moisture Sensitivity - A characteristic of soil that describes how the strength or compressibility is affected by increasing moisture content Moisture Vapor Control - A design measure to limit the upward movement of soil moisture, usually through a concrete floor slab resting on the soil Native Soil - Soil that is present naturally at a subject site On -Site Fill - Soil used as fill or backfill that originates from a source located at the subject site Optimum Moisture Content - The moisture content at which the maximum dry density is achieved in laboratory testing INBERG-MILLER ENGINEERS 3 Organic Materials - Matter contained in soil that is subject to decomposition Overburden - Soil or rock that is present above an ore body, sedimentary bedrock or certain deposit such as gravel Overexcavation - A process by which usually unsuitable or unwanted soil or rock is removed or excavated below the bottom of a structure or minimum required excavation limits Passive Lateral Soil Pressure - Available resisting soil pressure when a structure is forced against the soil Pavement Subbase - A specified soil type, often described by gradation that is placed below base, which in turn supports flexible or rigid pavement Perched Groundwater - A subsurface condition where water collects above a relatively low permeability stratum Permeability - The rate at which a liquid or gas may pass through soil, rock or other material Pile/Pier Cap - A reinforced concrete block designed to distribute load from a structure to multiple deep foundation elements Proof -Rolling - A process by which a subgrade is subjected to wheel loading to locate relative soft or yielding areas that might be repaired before covering with structures, soil, pavement etc. Raft Foundation - See Mat Foundation Residual Soil - Soil that has resulted from the in -place weathering of rock Rigid Pavement - Usually reinforced or unreinforced Portland cement concrete, which when cured exhibits high compressive strength but is relatively inflexible Sandstone - Sedimentary bedrock comprised chiefly of sand sized particles Saturation - A condition where the pores of soil or rock are completely filled with water Sedimentary Bedrock - Consolidated sediments of clay, silt or sand Shrink -Swell Potential - Likelihood that soil or rock may increase or decrease in volume, usually as result of water adsorption and indicated by high plasticity index and/or measured response to inundation Siltstone - Sedimentary bedrock comprised chiefly of silt sized particles Site Fill - Soil used to raise the grade of all or a portion of a site to a design elevation, exclusive of structures or buildings Slab Fill - Soil used to fill above the foundation bearing elevation to the bottom of any special subbase or base soil/aggregate that supports a concrete slab -on -grade Slab Subbase - Soil that meets a specified gradation requirement or other criteria for placement below a base aggregate Spread Footing/Foundations - A foundation type that usually consists of a reinforced, cast -in -place concrete that is formed in a round, square, rectangle or continuous strip shape for transferring structural loads to the soil and is placed at certain minimum depths for frost protection or confinement Stripping Depth - The depth below ground surface that unsatisfactory soil or other materials should be removed before placement of engineered fill or structures INBERG-MILLER ENGINEERS 4 Structural Fill - Soil that meets a specified gradation or other quality or strength criteria for the purpose of raising the ground surface elevation or improving bearing conditions to receive a structure Subgrade - Soil surface or substrate that will receive pavement, structure, engineered fill, backfill etc. Synthetic Reinforcement - Specially manufactured fabric, usually as a woven or extruded plastic, used for the purpose of forming a composite with soil or aggregate and adding strength Synthetic Separation - Specially manufactured fabric, usually as a woven plastic or non -woven fibrous plastic, used for the purpose creating a barrier for the migration of fine-grained soil Topsoil - Soil that contains organic matter, usually as decayed vegetation and roots, in sufficient quantity that it is compressible, moisture sensitive, or subject to settlement with continued decay Total Settlement - An estimate of the amount of settlement that may occur over the life of a structure as a result of compression of underlying soil due to the pressure imposed by the structure Transient Loading - Short term loads applied to a structure, such as from seismic force or wind pressure. Ultimate Bearing Capacity - An estimate of the bearing pressure applied to a soil stratum that would induce shear failure, without consideration of a factor of safety or limiting settlement Undisturbed Soil - Soil that is allowed to remain in its natural state without changing moisture content or density Void Form - A concrete form material for casting a structure which provides support long enough for the concrete to complete curing and gain sufficient strength for the structure to support itself, leaving a void when the form disintegrates with weathering and moisture. Water Table - The surface of groundwater within saturated soil or rock layers Weathered Bedrock - Native rock formation that has become delaminated or shows evidence of disintegration as determined and defined by the geotechnical engineer to distinguish a certain stratum for the purposes of the report INBERG-MILLER ENGINEERS 5 GENERAL NOTES - LOG OF TEST BORING/TEST PIT Soil Fraction Boulders Cobbles Gravel: Coarse Fine Sand: Coarse Medium Fine Silt Clay DESCRIPTIVE SOIL CLASSIFICATION Grain Size Terminology Particle Size U.S. Standard Sieve Size Larger than 12" Larger than 12" 3" to 12" 3" to 12" 3/4" to 3" 3/4" to 3" 4.76mm to 3/4" 2.00mm to 4.76mm 0.42mm to 2.00mm 0.074mm to 0.42mm 0.005mm to 0.074mm Smaller than 0.005mm #4 to 3/4„ #10 to #4 #40 to #10 #200 to #40 Smaller than #200 Smaller than #200 Plasticity characteristics differentiate between silt and clay Term Relative Density "N" Value* Very Loose Loose Medium Dense Dense Very Dense 0-4 4-10 10-30 30-50 Over 50 Term Consistency qu-tons/sq. ft. Very Soft Soft Firm Stiff Very Stiff Hard 0.0 to 0.25 0.25 to 0.5 0.5 to 1.0 1.0 to 2.0 2.0 to 4.0 Over 4.0 *Note: The penetration number, N, is the summation of blows required to effect two successive 6" penetrations of the 2" split -barrel sampler. The sampler is driven with a 140 -pound weight falling 30", and is seated to a depth of 6" before commencing the standard penetration test. Very Soft Soft Medium Soft DESCRIPTIVE ROCK CLASSIFICATION Engineering Hardness Description of Rock (not to be confused with MOH's scale for minerals) Can be carved with a knife. Can be excavated readily with point of pick. Pieces one inch or more in thickness can be broken with finger pressure. Can be scratched readily by fingernail. Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure. Can be grooved or gouged 1/16 -inch deep by firm pressure on knife or pick point. Can be excavated in small chips to pieces about 1 -inch -maximum size by hard blows of the point of a geologist's pick. Medium Hard Can be scratched with knife or pick. Gouges or grooves to 1/4 -inch deep. Can be excavated by hard blow of a geologist's pick. Hand specimens can be detached by moderate blow. Hard Very Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen. Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of geologist's pick. NOMENCLATURE Drilling and Sampling SS -- Split Barrel (spoon) Sampler N ST DC C DP -- CS -- Standard Penetration Test Number, blows/foot* Thin -walled Tube (Shelby Tube) Sampler Thick -wall, ring lined, drive sampler Coring Direct Push Sampler Continuous Sampler (used in conjunction with hollow stem auger drilling) D Disturbed Sample (auger cuttings, air/wash rotary cuttings, backhoe, shovel, etc.) Laboratory Tests USCS -- Unified Soil Classification System (soil type) W LL PL PI qu qp Ym Yd WSS ca c SG S e n k t Water Content (%) Liquid Limit (%) Plastic Limit (%) Plasticity Index (LL -PL) (%) Unconfined Strength, TSF Penetrometer Reading (estimate of unconfined strength), TSF Moist Unit Weight, PCF Dry Unit Weight, PCF Water Soluble Sulfate (%) Angle of Internal Friction (degrees) Soil Cohesion, TSF Specific gravity of soil solids Degree of Saturation (%) Void Ratio Porosity Permeability (cm/sec) Water Level Measurement Water Level at Time Shown Note: Water level measurements shown on the boring logs represent conditions at the time indicated, and may not reflect static levels, especially in cohesive soils. The available water level information is given at the bottom of each log. INBERG-MILLER ENGINEERS CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES ASTM Designation: D2487-69 and D2488-69 (Unified Soil Classification System) Major Divisions Group Symbols Y Typical Names Laboratory Classification Criteria Coarse -Grained Soils (More than half of material is larger than No, 200 sieve size) Gravels (More than half of coarse fraction is larger than No, 4 sieve size) Clean Gravels (Little or no fines) GW Well graded gravels, gravel- sand mixtures, little or no fines Determine percentages of sand and gravel from grain -size curve. Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse -grained soils are classified as follows: Less than 5% GW, GP, SW, SP More than 12% GM, GC, SM, SC Cm= 60 than 4; Cc= (C302 between 1 & 3 greater fl 10 D70xD60 GP Poorly Graded gravels, gravel -sand mixtures, little or no fines Not meeting all gradation requirements for GW Gravels w/ Fines (Appreciable amount of fines) d Silty gravels, gravel -sand -silt mixtures Atterberg limits below "A" line or P.I. less than 4 Above "A" line with P.I. between 4 and 7 borderline GMa u GC Clayey gravels, clay mixtures gravel -sand- Atterberg limits below "A" line or P.I. greater than 7 are cases requiring use of dual symbols Sands (More than half of coarse fraction is smaller than No, 4 sieve size) Clean Sands (Little or no fines) SW Well -graded sands, gravelly sands, little or no fines 2 D60 (D3ojbetween 1 & 3 Cc= C,_,= greater than 6; D10 D ioxD6o SP Poorly graded sands, gravelly sands, little or no fines Not meeting all gradation requirements for SW Sands w/ Fines (Appreciable amount of fines) d Silty sands, sand -silt mixtures Atterberg limits above "A" line or P.I. less than 4 Limits plotting in hatched zone with P.I. between 4 and 7 SMa u SC Clayey sands, sand -clay mixtures Atterberg limits above "A" line or P.I. greater than 7 are borderline cases requiring q g use of dual symbols Fine -Grained Soils (More than half material is smaller than No. 200 sieve size) Silts and Clays (Liquid limit less than 50) ML Inorganic silts and very fine sands, rock flour, silty or clayey fine sands, or clayey silts with slight plasticity Plasticity Chart CL Inorganic clays of low to medium plasticity, gravelly, clays, sandy clays, silty clays, lean clays' - r , (as\ OL Organic silts and organic silty clays of low plasticity �r - Wit. '" .,c. �is.:`-' %s° ° �9\' Inorganic clays of 40 ,- _ nigh plasticity Silts and Clays (Liquid limit greater than 50) MH Inorganic silts, micaceous diatomaceous fine silty soils, elastic silts or sandy or CH Micaceous or diatomaceous 3O fine sandy end silty soil;: iderfium f� elastic silts:cPits, wanic Low plastic onorganic plastic clays, and silty clays clays, sandy and rr inortpani 20 silty clays , cJlay OH . C H Inorganic clays of high plasticity, fat clays silty days: ! or - c►ayovsilts CL --MH oL— 10 and sands j�� a Inorganic and organtc silts 7 —CLJVii �9 and silty clays of low _r_ f' =- PAL plasticity. rock flour. 4 MIL I. e. fine silty a+ clayey sands, 0 0 10 20 30 40 50 60 70 80 90 100 L'auldiimit OH Organic clays of medium to high plasticity, organic silts u s .2 vi �i) s ° to O Pt Peat and other highly organic soils a Division of GM and SM groups into subdivision of d and u are for roads and airfields only. Subdivision is based on Atterberg limits; suffix d used when L.L. is 28 or less and the P.I. is 6 or less; the suffix u used when L.L. is greater than 28. b Borderline classifications, used for soils possessing characteristics of two groups, are designated by combinations of group symbols. For example: GW-GC, well -graded gravel -sand mixture with clay binder. INBERG-MILLER ENGINEERS Im 'ortant Information about Your Geotechnical-Engineering Report Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot el/nirnafe all such risks, you can manage them. The following information is provided to help. Beotechnical Services Are Performed for SpeciNc Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a civil engi- neer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical-engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one not even you should apply the report for any purpose or project except the one originally contemplated. Read the Full Report Serious problems have occurred because those relying on a geotechnical- engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only. A Geotechnical-Engineering Report is Based on a Unique Set of Project -Specific Factors Geotechnical engineers consider many unique, project -specific factors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk -management preferences; the general nature of the structure involved, its size, and configuration; the location of the struc- ture on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotech- nical engineer who conducted the study specifically indicates otherwise, do not rely on a geotechnical engineering report that was: • not prepared for you, • not prepared for your project, not prepared for the specific site explored, or completed before important project changes were made, Typical changes that can erode the reliability of an existing geotechnical- engineering report include those that affect:. • the function of the proposed structure, as when it's changed from a parking garage to an office building, or from a light -industrial plant to a refrigerated warehouse, • elevation, configuration, location, orientation, or weight of the proposed structure, • composition of the design team, or • project ownership. As a general rule, always inform your geotechnical engineer of project changes --even minor ones and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed. Subsurface Conditions Can Change geotechnical-engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical-engineer- ing report whose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site; or by natural events, such as floods, droughts, earthquakes, or groundwa- ter fluctuations. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems. Most Ceotechnical FiNdINgS Are .ProtessloNal Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engi- neers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ sometimes significantly from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions. A Report's Recommendations Are Not Final Do not overrely on the construction recommendations included in your report. Those recommendations are not final, because geotechnical engi- neers develop them principally from judgment and opinion, Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or flab/lily for the reports recommendations if that engineer does not perform construction ion observation. o. f. A. Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical-engineering reports has resulted in costly problems. Lower that risk by having your geo- technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review perti- nent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical-engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation. Do Not Redraw the Engineer's Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings, only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation, To help prevent costly problems, give con- tractors the complete geotechnical-engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contrac- tors have sufficient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Reed Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disci- plines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations," many of these provisions indicate where geotechnical engineers' responsi- bilities begin and end, to help others recognize their own responsibilities and risks. Head these provisions closely Ask questions. Your geotechnical engineer should respond fully and frankly, GeoenvlroNmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform a geoelaviron- mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical-engineering report does not usually relate any geoenvironmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoenvi- ronmental information, ask your geotechnical consultant for risk manage- ment guidance. Do not rely on an environmental report prepared for some- one else, obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a com- prehensive plan, and executed with diligent oversight by a professional mold -prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, many mold -prevention strategies focus on keeping building surfaces dry. While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical-engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold -prevention consultant; none of the services perm formed in connection with the geotechnical engineer's study were designed or conducted for the purpose of mold preven- tion. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold from growing in or on the structure involved. Rely on Your CDA-Member Geoteclincial Engineer for Additional Assistance Membership in the GEOPROEESSIDNAL BUSINESS ASSOCIATION exposes geotech- nical engineers to a wide array of risk confrontaton techniques that can be of genuine benefit for everyone involved with a construction project. Confer with your GBA-member geotechnical engineer for more information. GEOPROFESSIONAL SI NAL BUSINESS ASSOCIATION 8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@geoprofessional.org vsurvvw.geoprofessionalsorg Copyright 2014 by Geaprotessional Business Association, lnc.(GBA), Duplication, reproduction, or copying of this document, in whole or in part. by any means whatsoeverr, is strictly prohibited, except with Gaks specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GM, and only for purposes of scholarly research or book review. Only members of GSA may use this document as a complement to or as an element of a geotechnical-engineering report. Any other firm, individual, or other entity that so uses this document without being a GSA member could be commitirrg negligent or intentional (fraudulent) misrepresentation. TIGER 0914/5,OMRP TRANSPORTATION CONSULTANTS, INC. August 5, 2022 Mr. Jay Knutson Ascent Geomatic Solutions 8620 Wolff Court Westminster, CO 80031 Dear Mr. Knutson: LSC TRANSPORTATION CONSULTANTS, INC. 1889 York Street Denver, CO 80206 (303) 333-1105 FAX (303) 333-1107 E-mail: lsc@lscdenver.com Re: BEP Calvary Farms SWD Injection Well Site Traffic Narrative Weld County, CO LSC #220690 In response to your request, LSC Transportation Consultants, Inc. has prepared this Traffic Narrative for the proposed BEP Calvary Farms SWD well site in Weld County, Colorado. The site is located north of County Road 78 and west of County Road 39. REPORT CONTENTS The report contains the following: the typical peak and average site -generated traffic volume projections for the site; an estimate of the directional distribution of site -generated traffic; and any recommended roadway improvements to mitigate the traffic impacts from the site. The estimated start and finish dates are the best information available today but are subject to change over time. LAND USE AND ACCESS Injection wells are proposed to be added to the existing site. Full movement access exists to County Road 39 via an existing private access road. ROADWAY AND TRAFFIC CONDITIONS Area Roadways The major roadways in the site's vicinity are shown on Figure 1 and are described below. • County Road 39 is a north -south, two-lane paved roadway east of the site. The inter- sections with County Road 80 and County Road 78 are stop -sign controlled. The posted speed limit in the vicinity of the site is 55 mph. Mr. Jay Knutson Page 2 August 5, 2022 BEP Calvary Farms SWD Injection Well Site • Existing Private Access Roads are gravel roadways that will provide access to the site from the public roadway network. They will be maintained to accommodate construction traffic. TRIP GENERATION Table 1 shows the estimated average weekday daily and peak -hour trip generation by vehicle type based on information provided by the applicant (see Appendix Table 1). The highest trip generating month is expected to be July, 2024 with about 300 average vehicle - trips per day. During the morning peak -hour, about 24 vehicles are expected to enter and about 24 vehicles are expected to exit the site. During the afternoon peak -hour, about 24 vehic- les are expected to enter and about 24 vehicles are expected to exit the site. During an average month about, the site is expected to generate about 198 vehicle -trips on an average weekday. During the morning peak -hour, about 20 vehicles are expected to enter and about 20 vehicles are expected to exit the site. During the afternoon peak -hour, about 20 vehicles are expected to enter and about 20 vehicles are expected to exit the site. DIRECTIONAL DISTRIBUTION The site -generated traffic volumes on the area roadways are expected to be distributed 50% to the north and 50% to the south on County Road 39. CONCLUSIONS Trip Generation 1. The impact will be highest at about 300 vehicle -trips per average weekday in July 2024. The majority of vehicles will be large trucks. 2. On an average weekday during an average month, the site is expected to generate about 198 vehicle -trips. The majority of vehicles will be large trucks. Conclusions 3. The impact of the proposed BEP Calvary Farms SWD injection well site can be accommo- dated by the existing roadway network. Recommendations 4. It would be appropriate for the applicant to develop a traffic control plan advising the traveling public of heavy truck turning traffic. Mr. Jay Knutson Page 3 August 5, 2022 BEP Calvary Farms SWD Injection Well Site We trust our findings will assist you in gaining approval of the proposed BEP Calvary Farms SWD injection well site development. Please contact me if you have any questions or need further assistance. Sincerely, . - LSC TRANSPO ' TAf _ Ic w• ONSSLTANTS, INC. 1 C r'sttopher S. I cGranahar , RE., PTOE Prrcipal t - e -\\N ;b 4= `/^ „t4 may, rte ,I f Q NAL ,; , ,.: es.,fie. t ,_--.--e CSM/wc Enclosures: Table 1 Appendix Table 1 W: \ LSC \Projects \2022 \220790-BEP-CalvaiyFarms\Report\BEP-CalvaryFannsInjectionWellSite-080522.wpd Table 1 ESTIMATED TRAFFIC GENERATION (1) BEP Calvary Farms SWD Injection Well Site Weld County, CO LSC #220790; August, 2022 Vehicle -Trips Generated by Scenario (1) Trip Generating Phase Average AM Peak -Hour (2) PM Peak -Hour (2) Weekday In Out In Out Busiest Month (2) (3) July 2024 (Peak Month) Large Trucks Pickup Trucks Average Month Large Trucks Pickup Trucks Total 296 22 22 22 22 4 2 2 2 2 300 24 24 24 24 194 18 18 18 18 4 2 2 2 2 Total = 198 20 20 20 20 Notes: (1) This information is based on data provided by the Applicant (2) Conservatively assumes daily large trucks trips are evenly distributed over a 10 -hour day with a 1.5 peaking factor for the two peak -hours. The small number of pickup trucks is conservatively assumed to occur in the peak -hours. (3) Based on Appendix Table 1 Appendix Table 1: Bayswater's DJ Basin Produced Water Volumes, South Calvary SWD Volumes, and South Calvary SWD Trucking Date Bayswater's DJ Basin Total Produced Water Forecast Available Pipeline Volume from Topaz, Ruby, East Ault, North Calvary, and South Calvary to South Calvary SWD BWPD Available Pipeline Volume from Topaz, Ruby, East Ault, North Calvary, and South Calvary to South Calvary SWD BWPD Truck Volume to South Calvary SWD (BWPD) South Calvary SWD Trucks (# of Trucks Per Day) *Assume 150 bbl truck average South Calvary SWD Trucks (# of Trucks Per Month) *Assume 150 bbl truck average South Calvary SWD Maximum Disposal Volume (BWPD) Jan -23 Feb -23 Mar -23 Apr -23 May -23 Jun -23 Jul -23 Aug -23 Sep -23 Oct -23 Nov -23 Dec -23 Jan -24 Feb -24 Mar -24 Apr -24 May -24 Jun -24 Jul -24 Aug -24 Sep -24 Oct -24 Nov -24 Dec -24 Jan -25 35,546 46,824 41,067 34,646 28,812 24,971 31,853 27,520 33,965 29,082 31,690 27,397 23,341 20,247 17,276 35,485 31,141 27,123 22,683 19,349 17,570 15,115 13,454 12,061 17,068 31,078 27,213 22,758 18,422 15,865 13,751 11,504 9,860 8,433 7,237 6,232 5,390 4,683 4,090 3,593 3,175 2,825 2,531 2,285 2,078 1,904 1,793 1,760 17,068 25,000 25,000 22,758 18,422 15,865 13,751 11,504 9,860 8,433 7,237 6,232 5,390 4,683 4,090 3,593 3,175 2,825 2,531 2,285 2,078 1,904 1,793 1,760 7,932 2,242 6,578 9,106 11,249 13,496 15,140 16,567 17,763 18,768 17,951 15,564 13,186 21,407 21,825 22,175 20,152 17,065 15,492 13,211 11,661 10,301 53 15 44 61 75 90 101 110 118 125 120 104 88 143 145 148 134 114 103 88 78 69 1,608 455 1,334 1,847 2,281 2,737 3,070 3,359 3,602 3,806 3,640 3,156 2,674 4,341 4,426 4,497 4,086 3,460 3,141 2,679 2,365 2,089 Number of Pickup Truck Visits (Trucks/month) 25,000 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 Total = Average = 2/126 97 64/653 2,939 1,464 61 INBOUND NOTIFICATION ; FAX RECEIVED SUCCESSFULLY TIME RECEIVED REMOTE CSID DURATION PAGES STATUS August 23, 2022 at 12; ;38 PM MDT 9708342199 Received 08/23/2022 TUE 12:58 FAX S37083421?9 Town of Ault, CO 1]001/001 Notice of Inquiry Weld County Pre -application Case It PRE22-0116 Date of Inquiry 5/11/22 Municipality nicipality Ault CPA Name of Person Inquiring Bayswater Exploration & Production, LLC c/a Lauren Walsh Property Owner Calvary Farms LLC Planner Maxwell Nader Planner Phone Number 970-400-3527 Planner Email Address mnader@welclgovcon, Legal Description Being a County, part CO of the SE4NE4 of Section 19 TIN! RGSW of the 6th P.M. Weld Parcel Number 070919000018 & 070919400011 Nearest Intersection CR 29 and CR 78 Type of .. Inquiry Ii' . .. ..... . I..... Two wastewater . . . . disposal . wells . and additional . . . I" p equipment •.. .. 1 . . • .. . P .d • The above person met with County Planning staff about developing a parcel of land inside your designated Intergovernmental Agreement/Coordinated Planning Agreement Boundary. fr�: +rf •-� County Planner's signature Would you like to pursue nnexation of this property? NO a3 /22, Date of Contact Comments: YES /attart CCvc�- na ure of Municipality Representative Title Date Please sign and date to acknowledge that the applicant has contacted you and return this signed form to Weld County Department of Planning Services, Weld County Planning Department 1566 N 17th Aye, Greeley, CO 80631 as (970) 400-6100 (970) 304-6498 Fax 20181107 Weld County Treasurer Statement of Taxes Due Account Number R0912886 Parcel 070919000018 Legal Description Situs Address 14020 PT NE4 19 7 65 BEG AT SE COR NE4 N89D W 800' N43D43'E 540' N12D43'E 303' N30D38'W 300' S86D21'E 514' S925' TO BEG Account: R0912886 CALVARY FARMS LLC 134 OAK AVE EATON, CO 80615-3491 Year Tax Charge 2021 Total Tax Charge R s • ■ • • ♦ • • • s a •0414. Grand Total Due as of 07/28/2022 Tax Interest $110.70 $0.00 Fees _ Payments Balance $0.00 ($110.70) $0.00 $0.00 $0.00 Tax Billed at 2021 Rates for Tax Area 0919 - 0919 Authority WELD COUNTY SCHOOL DIST RE9 NORTHERN COLORADO WATER (NC AULT FIRE AIMS JUNIOR COLLEGE HIGH PLAINS LIBRARY WEST GREELEY CONSERVATION Taxes Billed 2021 * Credit Levy Mill Levy 15.0380000* 23.8890000* 1.0000000 7.7730000 6.3420000 3.1970000 0.4140000 _ Amount $28.88 $45,87 $1.92 $14,93 $12.17 $6.14 $0.79 57.6530000 $110.70 Values AG -FLOOD IRRRIGATED LAND Total Actual $6,625 Assessed $1,920 $6,625 $1,920 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer are evidence that as of this date, all current and prior year taxes related to this parcel have been paid in full. Date: %. 222022 Weld County Treasurer Statement of Taxes Due Account Number R0912986 Parcel 070919000019 Legal Description ] 4021 NE4/PT NE4NW4 19 7 65 BEG AT NE COR NW4 S89D32'W 522' S51D42'E 60' S37D0'E 70' S25D32'E 390' S33D49'E 357' S37D34'E 146' TOE LN NW4 N l D30'W 852' TO BEG (SA) EXC BEG AT SE COR NE4 N89D W 800' N43D43'E 540' N 12D43'E 303' N30D38'W 300' S86D21'E 514' S925' TO BEG (10 08A MIL) EXC 1 A BK 1 543 PG 407 Situs Address Account: R0912986 CALVARY FARMS LLC 134 OAK AVE EATON, CO 80615-3491 Year Tax Charge 2021 r Y Tax Interest $1,807.42 Fees Pa ments Balance $0.00 $0.00 ($1.807.42) $0.00 Total Tax Charge Grand Total Due as of 07/28/2022 $0.00 Tax Billed at 2021 Rates for Tax Area 0917 - 0917 Authority WELD COUNTY SCHOOL DIST RE9 NORTHERN COLORADO WATER (NC AULT FIRE AIMS JUNIOR COLLEGE HIGH PLAINS LIBRARY WEST GREELEY CONSERVATION Taxes Billed 2021 * Credit Levy Mill Levy 15,0380000* 23.8890000* 1.0000000 7.7730000 6.3420000 3.1970000 0.4140000 57.6530000 Amount $471.43 $748.93 $31.35 $243.68 $198.82 $100.23 $12.98 $1,807.42 Values AG -FLOOD IRRRIGATED LAND AG -WASTE LAND Total Actual $107,852 $242 $0.00 Assessed $31,280 $70 $108,094 $31,350 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. Weld County Treasurer's Office 1400 N 17th Avenue PO Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer are evidence that as of this date, all current and prior year taxes related to this parcel have been paid in full. Date: el. 2g• 2O2 2 Weld County Treasurer Statement of Taxes Due Account Number R8947565 Parcel 070919400011 Legal Description PT SE4 19-7-65 LOT B REC EXEMPT RECX 16-0112 Account: R8947565 CALVARY FARMS LLC 134 OAK AVE EATON, CO 80615-3491 M • • e • � P • • • s • • Year Tax Charge i�••w4*■• Tax. _ Interest Fees Situs Address 18823 COUNTY ROAD 78 WELD Payments Balance 2021 $4,882.34 Total Tax Charge $0.00 $0.00 ($4,882.34) $0.00 $0.00 Grand Total Due as of 07/28/2022 $0.00 Tax Billed at 2021 Rates for Tax Area 3883 - 3883 Authority Mill Levy WELD COUNTY 15.0380000* SCHOOL DIST RE2 43.3540000* NORTHERN COLORADO WATER 1.0000000 (NC AULT FIRE 7.7730000 AIMS JUNIOR COLLEGE 6.3420000 HIGH PLAINS LIBRARY 3.1970000 WEST GREELEY CONSERVATION 0.4140000 Taxes Billed 2021 * Credit Levy 77.1180000 Amount $952.05 $2,744.74 $63.3] $492.11 $401.51 $202,41 $26.21 $4,882.34 Values AG -SPRINKLER IRRIGATED LAND AG -FLOOD IRRRIGATED LAND AG -WASTE LAND FARM/RANCH RESIDENCE -IMPS OTHER BLDOS.- AGRICULTURAL Total Actual Assessed $66,460 $19,270 $26,660 $7,730 $57 $20 $475,421 $33,990 $7,945 $2,300 $576,543 $63,310 ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO ADVERTISING AND DISTRAINT WARRANT FEES. Weld County Treasurer's Office 1400 N 17th Avenue Po Box 458 Greeley, CO 80632 Phone: 970-400-3290 Pursuant to the Weld County Subdivision Ordinance, the attached Statement of Taxes Due issued by the Weld County Treasurer are evidence that as of this date, all current and prior year taxes related to this parcel have been paid in full. Signed: i Date: %. 29.. 2022 Hello